LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date:...

12
2040 LONG RANGE PLAN TRANSPORTATION MAY 2016

Transcript of LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date:...

Page 1: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

2040LONG RANGE

PLANTRANSPORTATION

MAY 2016

Page 2: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

 

* List includes members of Board of Directors located within the Metropolitan Planning Organization 

Boundary 

 

MVRPCBOARDOFDIRECTORS* 

Beavercreek Township 

Bethel Township 

City of Beavercreek 

City of Bellbrook 

City of Brookville 

City of Centerville 

City of Clayton 

City of Dayton 

City of Englewood 

City of Fairborn 

City of Franklin 

City of Huber Heights 

City of Kettering 

City of Miamisburg 

City of Moraine 

City of Oakwood 

City of Piqua 

City of Riverside 

City of Springboro 

City of Tipp City 

City of Trotwood 

City of Troy 

City of Union 

City of Vandalia 

City of West Carrollton 

City of Xenia 

Clay Township 

Concord Township 

Five Rivers MetroParks 

Greater Dayton Regional Transit Authority 

Greene County  

Greene County Engineer 

Greene County Transit Board 

Harrison Township 

Jefferson Township 

Miami Conservancy District 

Miami County 

Miami County Engineer 

Miami County Transit 

Miami Township, Greene County 

Miami Township, Montgomery County 

Monroe Township 

Montgomery County 

Montgomery County Engineer 

Municipality of Carlisle 

Municipality of Germantown 

Municipality of New Lebanon 

ODOT District 7 

ODOT District 8 

Perry Township 

Vectren Energy Delivery of Ohio 

Village of Covington 

Village of Farmersville 

Village of Phillipsburg 

Village of West Milton 

Village of Yellow Springs 

Washington Township 

Page 3: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

2040LONGRANGETRANSPORTATIONPLAN  

 Adopted: May5, 2016

               

Miami Valley Regional Planning Commission 10 North Ludlow Street 

Suite 700 Dayton, Ohio  45402 

   This document  is  the product of  a  study  financed by  the U.S. Department of Transportation (U.S.  DOT),  the Ohio  Department  of  Transportation  (ODOT),  and  the Miami  Valley  Regional Planning Commission.  The  contents  of  this  document  reflect  the  views  of  the  Miami  Valley  Regional  Planning Commission, which is responsible for the facts and accuracy of the data presented herein.  The contents do not necessarily reflect the views of the U.S. DOT or ODOT.  This document does not constitute a standard, specification, or regulation.     

Page 4: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...
Page 5: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...
Page 6: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...
Page 7: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

MVRPC – 2040 Long Range Transportation Plan (May 2016)    Page i 

 

TABLEOFCONTENTS

Chapter 1: Introduction ................................................................................................................. 1 

1.1  Transportation Program Structure .................................................................................................... 1 

1.2  Long Range Transportation Plan Overview ....................................................................................... 3 

1.3  Transportation Goals and Objectives ................................................................................................ 5 

1.4 Federal,State,andLocalRequirementsfortheLongRangeTransportationPlan.........................6

1.5  Fiscal Constraints ............................................................................................................................... 7 

1.6  Air Quality Conformity ....................................................................................................................... 7 

1.7  Project Implementation ..................................................................................................................... 8 

1.8  Process for Amending and Updating the Long Range Transportation Plan ...................................... 8 

Chapter 2: Federal, State, and Local Planning Requirements ....................................................... 11 

2.1  Overview .......................................................................................................................................... 11 

2.2  The Fixing America’s Surface Transportation Act (FAST Act) .......................................................... 11 

2.3  Development and Content of the Regional Transportation Plan .................................................... 14 

Chapter 3: State of the Region ..................................................................................................... 19 

3.1  Overview .......................................................................................................................................... 19 

3.2  The Miami Valley Region Today ...................................................................................................... 19 

3.3  The Miami Valley Region in the Year 2040 ...................................................................................... 33 

3.4  Travel Demand Forecasting Model .................................................................................................. 43 

Chapter 4: Long Range Transportation Planning & The Congestion Management Process .......... 47 

4.1  Overview .......................................................................................................................................... 47 

4.2  Roadway Congestion in the Miami Valley Region ........................................................................... 48 

4.3  Congestion and Safety ..................................................................................................................... 60 

4.4  Public Transportation ...................................................................................................................... 62 

4.5  Regional Intelligent Transportation Systems ................................................................................... 64 

4.6  Congestion Management Strategies ............................................................................................... 65 

Chapter 5: Congestion Management Strategies — Highway ....................................................... 69 

5.1  Overview .......................................................................................................................................... 69 

5.2  Process Overview ............................................................................................................................. 69 

5.3  Work Group Meetings ..................................................................................................................... 70 

5.4  Public Participation .......................................................................................................................... 71 

5.5  Project Evaluation ............................................................................................................................ 73 

5.6  Congestion Management Projects .................................................................................................. 74 

5.7  Status of Recently Completed and Under Construction Projects .................................................... 75 

Page 8: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

MVRPC – 2040 Long Range Transportation Plan (May 2016)    Page ii 

 

5.8  Fiscal Constraint ............................................................................................................................... 77 

Chapter 6: Congestion Management Strategies — Transit ........................................................ 107 

6.1  Overview ........................................................................................................................................ 107 

6.2  Greater Dayton Regional Transit Authority ................................................................................... 109 

6.3  Greene County Transit Board ........................................................................................................ 115 

6.4  Miami County Transit System ........................................................................................................ 116 

6.5  Public Transit Human Services Transportation .............................................................................. 118 

Chapter 7: Alternative Modes and Development Choices .......................................................... 121 

7.1  Overview ........................................................................................................................................ 121 

7.2  Funding Outlook ............................................................................................................................ 122 

7.3  Ridesharing Programs .................................................................................................................... 123 

7.4  Air Quality Program ....................................................................................................................... 124 

7.5  Bikeway and Pedestrian Program and Projects ............................................................................. 125 

7.6  Development Choices – Going Places ............................................................................................ 136 

Chapter 8: Environmental Planning ........................................................................................... 141 

8.1  Air Quality Planning ....................................................................................................................... 141 

8.2  Transportation and Climate Change .............................................................................................. 144 

8.3  Environmental Mitigation in SAFETEA‐LU/FAST Act ...................................................................... 144 

Chapter 9: Community Impact Assessment ................................................................................ 155 

9.1  Overview ........................................................................................................................................ 155 

9.2  Background .................................................................................................................................... 155 

9.3  MVRPC’s Approach to Environmental Justice ............................................................................... 157 

9.4  Defining Environmental Justice Populations ................................................................................. 157 

9.5  Identifying Environmental Justice Target Areas ............................................................................ 159 

9.6  Community Impact Analysis .......................................................................................................... 161 

9.7  Environmental Justice and Public Participation ............................................................................ 172 

Chapter 10: Public Participation and Consultation ..................................................................... 175 

10.1  Overview ........................................................................................................................................ 175 

10.2  Plan2040.mvrpc.org Webpage ...................................................................................................... 175 

10.3  Public Participation Meetings ........................................................................................................ 176 

10.4  Community Outreach and Public Participation ............................................................................. 179 

10.5  Participation in Other Public Outreach Efforts .............................................................................. 180 

10.6  Consultation Requirements in the FAST Act .................................................................................. 181 

 

Page 9: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

MVRPC – 2040 Long Range Transportation Plan (May 2016)    Page iii 

 

LISTOFFIGURES

Figure 1.1 — MVRPC Transportation Planning Area ............................................................................ 2 

Figure 1.2 — MVRPC Transportation Program Structure ..................................................................... 3 

Figure 1.3 — 2040 Long Range Transportation Plan Update Process Overview.................................. 5 

Figure 2.1 — Organization of MAP‐21 Performance‐Related Provisions ........................................... 13 

Figure 3.1 — Urbanization Trends: 1950‐2010 .................................................................................. 21 

Figure 3.2 — Generalized Land Use/Land Cover in 2007 ................................................................... 22 

Figure 3.3 — Population Distribution: Population Density by Block Group ....................................... 24 

Figure 3.4 — Highway Functional Classification ................................................................................. 26 

Figure 3.5 — Multimodal Passenger Facilities .................................................................................... 29 

Figure 3.6 — Multimodal Freight Facilities ......................................................................................... 31 

Figure 3.7 — Journey‐to‐Work Characteristics ................................................................................... 35 

Figure 3.8 — Adopted Land Use Plans ................................................................................................ 37 

Figure 3.9 — Projected Areas of Concentrated Growth: 2010 – 2040 ............................................... 38 

Figure 3.10 — Population Changes: 2010 – 2040 ............................................................................... 41 

Figure 3.11 — Basic Model Structure ................................................................................................. 44 

Figure 4.1 — Level of Service: Existing (2010) .................................................................................... 51 

Figure 4.2 — Level of Service: Existing+Committed (2040) ................................................................ 53 

Figure 4.3 — Level of Service: Long Range Plan (2040) ...................................................................... 55 

Figure 4.4 — Map of Corridors ........................................................................................................... 58 

Figure 4.5 — Regional Public Transit Use ........................................................................................... 64 

Figure 5.1 — Congestion Management Projects Development Process Overview ........................... 70 

Figure 5.2 — LRTP Work Group Meetings .......................................................................................... 72 

Figure 5.3 — Project Evaluation System Design Concept .................................................................. 73 

Figure 5.4 — Congestion Management Projects: Greene County ..................................................... 99 

Figure 5.5 — Congestion Management Projects: Miami County ..................................................... 101 

Figure 5.6 — Congestion Management Projects: Montgomery County, Carlisle, Franklin and   Springboro ................................................................................................................... 103 

Figure 5.7 — Congestion Management Projects: Montgomery County Insets ................................ 105 

Figure 6.1 — Transit Agency Service Areas ...................................................................................... 108 

Figure 6.2 — GDRTA Trolleybus Service ........................................................................................... 110 

Page 10: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

MVRPC – 2040 Long Range Transportation Plan (May 2016)    Page iv 

 

Figure 7.1 — Bikeway Level of Stress Analysis ................................................................................. 127 

Figure 7.2 — Regional Bikeway Network ......................................................................................... 137 

Figure 7.3 — Concentrated Development Vision ............................................................................. 139 

Figure 8.1 — Air Quality Standards Designations ............................................................................. 141 

Figure 8.2 — Significant Projects ...................................................................................................... 148 

Figure 8.3 — Environmental Mitigation Analysis ............................................................................. 149 

Figure 9.1 — Environmental Justice Target Group Populations ....................................................... 163 

Figure 9.2 — Major Facilities in the Dayton Region ......................................................................... 165 

Figure 9.3 — Transit Accessibility in Montgomery County .............................................................. 168 

Figure 9.4 — Regional Bikeway Accessibility .................................................................................... 171 

Figure 9.5 — Pedestrian Activity Centers by Sidewalk Availability .................................................. 173 

Figure 9.6 — Sidewalk Gap Analysis ................................................................................................. 174 

Figure 10.1 — Features and Content: plan2040.mvrpc.org ............................................................. 176 

  

 

 

Page 11: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

MVRPC – 2040 Long Range Transportation Plan (May 2016)    Page v 

 

LISTOFTABLES

Table 1.1 — Fiscal Constraints of the 2040 LRTP Projects ................................................................... 7 

Table 2.1 — Required Transportation Plan Elements ........................................................................ 14 

Table 3.1 — 2010 Socioeconomic Data .............................................................................................. 23 

Table 3.2 — Functional Classification System .................................................................................... 27 

Table 3.3 — Population Projections: 2010 – 2040 ............................................................................. 40 

Table 3.4 — Population Density by Area Type: 2010 – 2040 (Persons per Acre) .............................. 42 

Table 3.5 — Employment Projections: 2010 – 2040 .......................................................................... 42 

Table 3.6 — Employment Density by Area Type: 2010 – 2040 (Jobs per Acre) ................................. 43 

Table 3.7 — Employment Classification by SIC Code ......................................................................... 45 

Table 3.8 — Year 2010 and 2040 Forecasted Socioeconomic Variables ............................................ 45 

Table 3.9 — Typical Weekday Trip Summary ..................................................................................... 46 

Table 4.1 — Regional Report Card ...................................................................................................... 49 

Table 4.2 — Corridor Performance Comparison ................................................................................ 59 

Table 4.3 — Transit Vehicle LOS and Load Factor  ............................................................................. 62 

Table 4.4 — Maximum Load Factor Level of Service .......................................................................... 63 

Table 4.5 — Sample Congestion Mitigation Strategies ...................................................................... 67 

Table 5.1 — Congestion Management Projects Costs and Revenues ................................................ 77 

Table 5.2 — Congestion Management Projects ................................................................................. 78 

Table 5.3 — Congestion Management Projects Vision List ................................................................ 98 

Table 6.1 — GDRTA 2040 LRTP Projects ........................................................................................... 114 

Table 6.2 — Greene CATS 2040 LRTP Operating Statistics ............................................................... 116 

Table 6.3 — Greene CATS 2040 LRTP Expenses Summary ............................................................... 116 

Table 6.4 — Miami County Transit 2040 LRTP Projects ................................................................... 117 

Table 7.1 — 2040 Forecasted Cost and Revenues for Alternative Modes ....................................... 122 

Table 7.2 — Short Range Regional Bikeway and Pedestrian Projects (Funded) .............................. 129 

Table 7.3 — Long Range Regional Bikeway and Pedestrian Projects (Unfunded) ........................... 130 

Table 8.1 — Dayton/Springfield Region PM 2.5 Regional Emissions Analysis ................................. 143 

Table 8.2 — Cincinnati Region 8‐Hour Ozone Regional Emissions Analysis ..................................... 143 

Table 8.3 — Cincinnati Region PM 2.5 Regional Emissions Analysis ................................................ 143 

Table 8.4 — Environmental Resources for Mitigation ..................................................................... 146 

Page 12: LONG RANGE TRANSPORTATION · Microsoft Word - FinalReport.docx Author: parikh Created Date: 5/5/2016 1:15:02 PM ...

MVRPC – 2040 Long Range Transportation Plan (May 2016)    Page vi 

 

Table 8.5 — Superfund Sites on Final NPL ........................................................................................ 151 

Table 8.6 — Environmental Conservation Organizations in the Region .......................................... 153 

Table 9.1 — Target Population Thresholds ...................................................................................... 160 

Table 9.2 — Average Travel Time to Major Facilities by EJ Status in Minutes ................................. 162 

Table 9.3 — Average Travel Time to Work by EJ Status in Minutes ................................................. 167 

Table 10.1 — Public Participation Meeting Summary ...................................................................... 177