LONG LOTS parcels e rec ra er · BUILDING CONSTRUCTION ORGANIC PARCELS BUILDING CONSTRUCTION O T T...
Transcript of LONG LOTS parcels e rec ra er · BUILDING CONSTRUCTION ORGANIC PARCELS BUILDING CONSTRUCTION O T T...
existing longitudinal section
100 year base �ood elevation stepps stone warehousegennet lumber co.
inner klang letter press asheville waste paper co.days warehouse
asheville metal recyclecurve studiosriver link
BIOREMEDIATION RIVERWALKOnce the tributaries have been exposed the planting of bioremediating native vegetation will occuraround each tributary to create water filtration swales. These plants will remain during production and after the completion of the site to provide a buffer of plants that will filter the water that runs through the site from East to West into the river.
PHASE 3: COMPLETIONBUILDING CONSTRUCTION ORGANIC PARCELS
BUILDING CONSTRUCTIONOnce the tributary construction, new roads and building slabs are completed, construction of the new buildings can occur. The buildings will contain studios, galleries, residences, shops, restaurants, and markets throughout the site.
The new mixed-use buildings will provide spaces for a diverse set of occupants. The ground level will provide parking and open-air markets for local farmers and artists to sell their products. The first level will have many large balconies to provide access to galleries, shops, and restaurants, while also providing space to walk around and view the site from above. The upper levels will befor the more private spaces such as apartments and studios.
The final phase is the development of the organic parcels, or long lots. Dispersed throughout the site, there will be playgrounds, parks, community gardens, woodlands, water filtration swales, created wetlands, and the riverwalk. These outdoor spaces will help rejuvenate the site, bringing people to the river and making the area a much more pleasant place to be.
(5-10 years)
BIOREMEDIATION RIVERWALKOnce the tributaries have been exposed the planting of bioremediating native vegetation will occuraround each tributary to create water filtration swales. These plants will remain during production and after the completion of the site to provide a buffer of plants that will filter the water that runs through the site from East to West into the river.
PHASE 3: COMPLETIONBUILDING CONSTRUCTION ORGANIC PARCELS
BUILDING CONSTRUCTIONOnce the tributary construction, new roads and building slabs are completed, construction of the new buildings can occur. The buildings will contain studios, galleries, residences, shops, restaurants, and markets throughout the site.
The new mixed-use buildings will provide spaces for a diverse set of occupants. The ground level will provide parking and open-air markets for local farmers and artists to sell their products. The first level will have many large balconies to provide access to galleries, shops, and restaurants, while also providing space to walk around and view the site from above. The upper levels will befor the more private spaces such as apartments and studios.
The final phase is the development of the organic parcels, or long lots. Dispersed throughout the site, there will be playgrounds, parks, community gardens, woodlands, water filtration swales, created wetlands, and the riverwalk. These outdoor spaces will help rejuvenate the site, bringing people to the river and making the area a much more pleasant place to be.
(5-10 years)
LONG_LOTS on the French Broad Riverparcels
lawnpark parkbioswale
created wetland created
community gardens
created wetlandcreated wetland
arboretum parkplay ground
bioswale arboretum park community gardens
created wetland
tributary
created
park park community gardens
tributary
created wetland
park park recreation lawn bioswale community gardens community gardens
tributary
created wetlandcreated wetland
bio swalebioswale
rain gardenrain gardenrain garden
rain gardencreated wetland
rain gardenrain garden
rain garden
tributary
rain gardenrain garden
tributary
rain gardenrainrecreation lawnrecreation lawnrecreation lawnrecreation lawnrecreation lawn
wetland
recreation lawn
wetland
recreation lawngarden
createdwetland
createdwetland
raingarden
recreation
raingarden
tributarytributary
createdwetland
createdwetland
raingarden
bioswale
controlled �ood zonecontrolled �ood zonecontrolled �ood zonecontrolled �ood zonecontrolled �ood zonecontrolled �ood zonecontrolled �ood zone
proposed longitudinal site section
12 bones
artist loft
marketgallery
resturantartist studio
family residence
gallerygrocery
family residence
artist loft
design o�ce
galleryresturant
market
artist loft
family residenceartist studio
galleryfamily residence
family residenceartist loftgallery
artist studio
resturant grocerygallery
artist studio artist loft
family residencedesign o�ce
artist studiocurve studios river link
adaptedwarehouse
existing longitudinal section
100 year base �ood elevation stepps stone warehousegennet lumber co.
inner klang letter press asheville waste paper co.days warehouse
asheville metal recyclecurve studiosriver link
12 bones
north
south