Longitudinal Joints in Asphalt Pavements
37th Annual Utah Asphalt ConferenceMarch 27, 2012
Howard Anderson, PE.
UDOT Central Materials
![Page 2: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/2.jpg)
Acknowledgements
• FHWA and Asphalt Institute Partner to Identity Best Practices for Longitudinal Joints. Training Class, February 23, 2012. Mark Buncher, Ph.D., P.E.
• NCAT Report No. 97-4 Longitudinal Joint Construction Techniques for Asphalt Pavements.
![Page 3: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/3.jpg)
Best Practices forSpecifying and Constructing
HMA Longitudinal Joints
A Cooperative Effort betweenAsphalt Institute & FHWA
![Page 4: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/4.jpg)
Definitions
• Longitudinal Joint – HMA placed adjacent to existing lane, Interface between two existing HMA mats.
• Hot Joint – Adjacent lanes paved in echelon.
• Cold Joint – first pass cooled to ambient temperature with next HMA pass.
![Page 5: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/5.jpg)
Longitudinal Joint
Performance equals
Mat Performance
Goal LJP = MP
![Page 6: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/6.jpg)
Is It a Problem?
![Page 7: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/7.jpg)
LCC Alternate Bid Competitiveness DOT Program Costs HMA Industry’s Livelihood the Travelling Public
An Agency and Industry Concern
Longevity matters, it impacts:
![Page 8: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/8.jpg)
Project Team– Asphalt Institute
• Mark Buncher• Carlos Rosenberger• AI Regional Engineers
– FHWA• Thomas Harman• Michael Arasteh• Stephen Cooper
– PA State Asphalt Paving Association• Gary Hoffman
National Asphalt Pavement Association• David Newcomb
![Page 9: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/9.jpg)
How many State Agencies have a longitudinal joint specification?
•About thirdA
•About halfB
•About two-thirdsC
![Page 10: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/10.jpg)
Takeaways from FHWA Survey to 52 Division Offices
• ½ States are not satisfied with overall performance of L-Joints
• 2/3rds of States have a “L-Joint spec”– Half of those (17) require a minimum density
• Range from 89% - 92% min Gmm (Rice)
– Other half are method specs• From Joint Adhesive to very prescriptive
![Page 11: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/11.jpg)
312
Trucking Compaction
Paving Plant
Dump Person MTV
GETTING STARTED OFF RIGHT
![Page 12: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/12.jpg)
Managing Material in the Hopper
Conveyor area is exposed and augers are starved!
![Page 13: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/13.jpg)
Tack Coat
Full width of mat to minimize movement of unsupported edge
![Page 14: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/14.jpg)
Dump Person
![Page 15: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/15.jpg)
First Pass Must Be Straight!Unanimous that a string-line should be used to assure first
pass is straight
String-line Skip Paint Reference
![Page 16: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/16.jpg)
Great Results
![Page 17: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/17.jpg)
Paver operator using the curb as his reference
![Page 18: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/18.jpg)
Tough to get proper overlap (1”) with next pass
![Page 19: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/19.jpg)
Contact Grade Sensor
Ultrasonic Grade Sensor
Use Automatic Control
Systems
![Page 20: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/20.jpg)
Vibratory Screed Should Always Be On
![Page 21: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/21.jpg)
Department, Name, Security Class 23Date
Forward Motion
Screed Weight
Screed HeatingVibration
Angle of Attack
Achieving Pre-Compaction
![Page 22: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/22.jpg)
END GATE
Seated on the Existing Surface
![Page 23: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/23.jpg)
Uniform Head of MaterialAcross the Entire Screed
Auger
Carry Material Within12 – 18-inches of
the End Gate
![Page 24: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/24.jpg)
Another example of uniform head of material
![Page 25: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/25.jpg)
Controlling material flow at outer edges of screed and
delivering homogenous HMA
Hydraulic Extending Tunnels
Tunnels
![Page 26: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/26.jpg)
Result of uniform head of HMA and auger/tunnel within 12 to 18-inches of end gate: non-segregated HMA at the joint
![Page 27: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/27.jpg)
Auger Overload…these are unacceptable
![Page 28: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/28.jpg)
Auger not extended towithin 12 to 18-inches of the end gate.
The result -SEGREGATION at joint
![Page 29: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/29.jpg)
Rollers Need to Be Kept Close to the PaverCritical in cool and cold weather!
![Page 30: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/30.jpg)
Our Recommendation:1st Roller Pass Hangs Over 4-6 inches
![Page 31: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/31.jpg)
Alternative: Stay Back 4-6 inches on 1st pass, then roll 2nd pass w/
slight overhang
• Concern:–developing
stress crack?
• Merit:–minimize
lateral movement?
![Page 32: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/32.jpg)
What We Don’t Want
Edge of drum inside unsupported edge
can cause cracking near the edge
Rolling Unsupported Edge
(First Paver Pass)
![Page 33: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/33.jpg)
Compacting Notched Wedge
add-on vibratory compactorplate compactor
![Page 34: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/34.jpg)
Quality Control, Monitor Joint Density
![Page 35: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/35.jpg)
Tack the Joint! (Butt or Wedge)
Emulsion, or
PG asphalt or Proprietary Joint Adhesive (JA)
Good, Better, Best
![Page 36: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/36.jpg)
Paver Automation Using Joint Matcher (versus Ski) to Always Achieve Exact
Thickness of Mat Needed
If the joint (hot-side) is starved of material, the roller drum will “bridge” onto the cold mat and no further density will occur at joint. To ensure this never occurs, target height difference after compaction is 0.1”
![Page 37: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/37.jpg)
Destined for Failure Hot side of joint
starved of material.Bridging?
![Page 38: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/38.jpg)
Types of Joint Matchers
G. Bridenbaugh photo
Frank Colella photo
Non-contact sensor
Contact sensor
![Page 39: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/39.jpg)
Ski best for smoothness
Arm
Averages optimum HMA thickness over entire length of ski.
![Page 40: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/40.jpg)
Proper Overlap: 1.0 + 0.5 inches.
Exception: Milled or sawed joint should be 0.5 inches
![Page 41: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/41.jpg)
Bridenbaugh & Colella
Top Photos Show Voids at Bottom of Lift (no overlap)
![Page 42: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/42.jpg)
Bumping the joint?
![Page 43: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/43.jpg)
Don’t broadcast material across the mat
![Page 44: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/44.jpg)
Lute the Longitudinal Joint
This lute person isdoing a great job
![Page 45: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/45.jpg)
No lute person
![Page 46: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/46.jpg)
1st pass off the jointapprox 6-8 inches
2nd pass overlap onto the cold mat
Rolling the Supported Edge
Our Recommendation:
![Page 47: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/47.jpg)
Roller
Make a roller pass in the vibratory mode overhanging 2 to 4-inches on the cold side.
versus an Alternate Method of1st Pass over the Supported Edge
Concern is bridging (roller being supported by cold mat)
![Page 48: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/48.jpg)
• Plant tons/hour• # of trucks• Plant to project (time)• Type of project
(rural/urban)• Ambient / Surface temps• Paver speed• # of rollers
On this day goal was 35 ft/min
Contractor Prior Planning
Consideration given to mix selection
Plan joint offsets when multiple lifts
![Page 49: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/49.jpg)
Tack Full Width to Minimize Lateral Movement
![Page 50: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/50.jpg)
Paver on Automatic
![Page 51: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/51.jpg)
Vibratory Screed “ON”
![Page 52: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/52.jpg)
End Gate Tight to the Existing Surface
![Page 53: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/53.jpg)
First Pass Must be Straight
![Page 54: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/54.jpg)
Uniform head of materialacross entire screed to joint…Do Not Overload Auger
Extend auger and tunnel within 12 to 18-inches of the end gate
![Page 55: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/55.jpg)
Rolling Unsupported Edge: Overlap 6-inches on the First Pass
![Page 56: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/56.jpg)
Tack / Paint the Vertical Face
1. Joint Adhesive2. PG Binder3. Double Tack
with Emulsion
![Page 57: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/57.jpg)
Overlap the cold lane by 1-inch +/-(unless milled or cutback joint, then 0.5-inch) Use a Joint Matcher
![Page 58: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/58.jpg)
Do Not Push Overlap Back
![Page 59: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/59.jpg)
Rolling Supported Edge: Stay off the Joint 6 to 12 inches on the first pass
![Page 60: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/60.jpg)
Making sure everythingis just right
Attention to Detail
Monitor density with gauge, on both sides of the joint, as part of QC program
![Page 61: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/61.jpg)
Less permeable mixes• Smallest NMAS that will do the job• Consider using a “fine” gradation• Lower gyration levels
Min lift thickness is NMAS x 4, exception: for “fine” gradation NMAS x 3 Warm Mix Asphalt may serve as compaction aid Pay for tack as a separate bid item to facilitate proper
application rate
Consider use of the notch wedge joint (versus butt) for lift thicknesses > 1.5 inches and < 3 inches
Mix Selection and Design Considerations
![Page 62: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/62.jpg)
Offset longitudinal joints between layers by at least 6-inches
![Page 63: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/63.jpg)
Innovative Techniques / Materials
• Infrared Joint Heaters– In cold weather
• Evaluate Project and Traffic Control Requirements for:– Echelon Paving– Mill / Fill One Lane at a Time– Cutting Back the Joint
• Consider Joint Enrichment – Overbanding with PG Binder – Use of Surface Sealers
![Page 64: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/64.jpg)
I-68 project 5+ years old
GOAL
![Page 65: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/65.jpg)
I-68 project 5+ years old
( same project, same location as previous slide )
![Page 66: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/66.jpg)
Industry Help Needed HMA
• Concrete getting more competitive due to HMA cost increase.
• Concrete has worked out many of its problems with smoothness.
• HMA problems with Longitudinal Joints, durability, dry mixes.
• UAPA can bring one voice to UDOT to represent best interest of the industry, not just one contractor.
![Page 67: Long Joint Presentation -- Short Version](https://reader033.fdocuments.in/reader033/viewer/2022061119/546430a7af795967228b71b6/html5/thumbnails/67.jpg)
We Know Unsupported Edge Will Have Lower Density
Proper Overlap Sufficient Materialfor Roll-Down
Low Density Area