Page 1: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

//

Presentation Title: View > Header & Footer

2-Jan-19 1

London Bridge Station

Redevelopment ProgrammeRHT Supported Works

Page 2: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 2

The Train Shed Roof

Page 3: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Train Shed Roof

• The redevelopment involved the demolition of the Grade II listed train shed

under listed building consent.

• One of the conditions of the demolition was to retain various elements of

the train shed roof for potential reuse, namely 10 of the upright columns

and 10 of the foliate spandrels (decorative angle pieces).

• The project exceeded the consents requirements by retaining 16 columns

and 14 beams, but the process was very complex and challenging. This

was partly due to complications of working round operational requirements;

in part due to the logistical difficulties of the demolition process as a whole

and also due to the nature of the retained objects – made of brittle cast iron

and in the case of the columns weighing approximately 10 tons each.

2-Jan-19

Presentation Title: View > Header & Footer

3

Page 4: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Train Shed Roof

• The removal of the columns was further complicated by the fact that their

base plates were buried within concrete below platform level; the platform

area had to be excavated down to the base plate level and then the four bolts

connecting the column to the base plate removed.

• The base plate and columns were then split apart prior to lifting out of the

columns to which the spandrels (in most cases) were still attached.

• Whilst the column and spandrel removal process was underway, the project

successfully negotiated with the Vale of Rheidol Railway to take all the agreed

savage items together with various additional materials to form the

cornerstone of their planned new locomotive museum in Aberystwyth.

• The listed train shed roof, was replaced with a fine piece of contemporary

architecture designed by Grimshaw and was praised by Southwark Council for

its design quality.

• .2-Jan-19

Presentation Title: View > Header & Footer

4

Page 5: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

5

Page 6: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

6

Page 7: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 7

Page 8: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 8

Page 9: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 9

Page 10: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Architectural Model

2-Jan-19

Presentation Title: View > Header & Footer

10

Page 11: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 11

St Thomas St Facade

Page 12: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

St Thomas Street Facade

• The railway arches in St Thomas Street were listed on 7th July 2011

after the original planning submission earlier in that year.

• The demolition of the trainshed also included the demolition of a

small area of these separately listed arches, but the majority were

retained, cleaned, repaired and restored.

2-Jan-19

Presentation Title: View > Header & Footer

12

Page 13: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

13

Page 14: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

14

Page 15: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

15

Page 16: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

16

Page 17: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

17

Page 18: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

18

Page 19: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

19

Page 20: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

20

Page 21: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

21

Page 22: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

22

Page 23: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 23

The Warren Trusses

Page 24: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Description of the Listed Feature Prior to

Restoration

The Warren Truss Bridge Abutments have been subject to a great number of

repair interventions, and periods of minimal maintenance.

Generally, sections of the stone columns and arches have been replaced with

cementitious render repairs at high and low level. The elevations have also

been repointed incementitious mortar of varying depth.

There were signs of issues with water infiltration to both elevations. Also

notable was the amount of salt crystallisation on the surfaces of stone and

brickwork, which demonstrates the level of moisture trapped within the fabric

of these elevations.

Brickwork to both elevations shows signs of aggressive cleaning which has

removed the more durable exterior surface and exposed the softer, interior

fabric

2-Jan-19

Presentation Title: View > Header & Footer

24

Page 25: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Description of the Works

• Removal of the ticket barriers

• Waterproofing and removal of the temporary drainage equipment

• Removing power cables form the walls and roof areas so far as is

reasonably practical

• Cleaning of brickwork and stonework

• Painting of warren trusses

2-Jan-19

Presentation Title: View > Header & Footer

25

Page 26: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

26

Page 27: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 27

Page 28: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 28

Page 29: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 29

Page 30: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 30

Page 31: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 31

Page 32: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 32

The Western Arcade -

Quadripartite Arches

Page 33: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Victorian Heritage

• Throughout the station original Victorian features have been

sympathetically incorporated within the final design where possible.

• While the different eras of development created something of a

labyrinth underneath the platforms, the new design pays homage to

its Victorian roots, with quadripartite arches lining increased retail

and leisure space, keeping the aesthetics while enhancing London

Bridge as a destination in itself.

2-Jan-19

Presentation Title: View > Header & Footer

33

Page 34: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

1836 Quadripartite arches

Description of Works

• Cleaned all surfaces

• Removed all redundant fixings, cable cleats, surface mounted fittings and

brackets.

• Fillled holes with lime mortar, or with brick cores

• Raked out loose/failed mortar and repointed in lime mortar, colour and finish

Carefully removed all decayed and damaged brickwork, allowing for

replacement

2-Jan-19

Presentation Title: View > Header & Footer

34

Page 35: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

35

Page 36: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

36

Page 37: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

37

Page 38: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

38

Page 39: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 39

Page 40: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

40

Page 41: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 41

Tooley st

Page 42: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

42

Page 43: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 43

Page 44: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 44

Page 45: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 45

Page 46: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

46

Page 47: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/2-Jan-19

Presentation Title: View > Header & Footer

47

Page 48: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 48

Page 49: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 49

Page 50: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 50

Page 51: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 51

Bermondsey st

Page 52: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 52

Page 53: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 53

Page 54: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 54

Page 55: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 55

Page 56: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 56

Page 57: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 57

South Eastern Railway Office

(SERO)

64/84 Tooley Street

Page 58: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

SERO

• Although within the Tooley st Conservation area, the building itself was not

listed

• An attempt to have the building listed was made by the Victorian society in

2010 - the request was turned down by English Heritage, as was the later

appeal

• The retention of 64-84 Tooley Street was entirely incompatible with the safe

and effective operation of the station, for example

Safety – congestion on Tooley St

Construction of platforms would be prohibited

Design Quality - retention would have compromised legibility of

entrances

2-Jan-19

Presentation Title: View > Header & Footer

58

Page 59: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

SERO

Liaised with the Vale of Rheidol Heritage Railway to identify

features for salvage to complement the train shed roof elements

already donated

• Stone portal – the entrance to the building

• SER Cartouche

• Iron Staircase

• Stonework Parapets

2-Jan-19

Presentation Title: View > Header & Footer

59

Page 60: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Doorway Portal and SER Cartouche

Presentation Title: View > Header & Footer

2-Jan-19 60

Page 61: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Stairwell handrail and Parapet

Presentation Title: View > Header & Footer

2-Jan-19 61

• 16 panels of stairwell handrail • 70m of Parapet stonework

Page 62: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Other notable features

Presentation Title: View > Header & Footer

2-Jan-19 62

Page 63: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

War Memorial

Presentation Title: View > Header & Footer

2-Jan-19 63

Page 64: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 64

Plaques

Former Stainer Street (South)

Page 65: London Bridge Station Redevelopment Programme...St Thomas Street Facade • The railway arches in St Thomas Street were listed on 7th July 2011 after the original planning submission

/

Presentation Title: View > Header & Footer

2-Jan-19 65

Heritage InstallationFour Plaques;

• 1836 – The first station

• 1845 – The joint station

• 1871 – Further expansion

• 2018 – The Present

Former Stainer Street (North)