Transcript of LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.
LOGO
Link It CompanyLink It Company
Supervised By:Mr.: Ahmed AbumsamehMr.: Ahmed Abumsameh
Students
Mohamed A.Al Ashy. Mohamed A.Al Ashy. 1
Bader aldeen J.alsabeh.3
5
2
4
5
Hashem S.Humeed
Shaaban Kh.alhello
Planning
Analysis
Contents
IntroductionIntroduction ,Prob,Problemlem
1
The project ,ModelThe project ,Model2
Requirements , AnalysesRequirements , Analyses3
Entity Relationship ,Class Entity Relationship ,Class DiagramDiagram
4
55
USE case models ,USE case models ,Sequence Sequence DiagramsDiagrams
5
Implementation & DesignImplementation & Design5556
IntroductionIntroduction
The name of software …Design an internet web application for Link IT System
Company Why are we selected this project:-Modern construction company and help this important cause
and to develop a large information system for the company.-Place the company is in the middle homes for students on the
project.-Users need like this system to reaction with it.-The company has a large system and it's important to
convert it to web application.-We have a good connection with some company members
and can help us to do like this project
IntroductionIntroduction
Problem definition: the organization use the paper
systematic to archive his data and information
The advertisements which the organization made are not enough, and too cost.
Hard reaching to the information, or data, and the search function is too slow.
The projectThe project
Project Definition: Project Goals:Design an internet web, connect with database. Project Scope: • The services of the project
- Saving the data and the information of the customers, and training information.
- Make the queries possible and the searching easier than before.
- Advertisement services.
• The project will be sure about some things like…..
-Decrease the errors, and loosing any information or data from the database.
- Increasing the security of the data, from any risks. Project Users: The people who will use the project
model
Work Breakdown:After we did the primary study of the
project, we put the suitable work breakdown to this project, and we choose the waterfall development model.
ProblemProblem
The phases of the waterfall model: The first phase " REQUIREMENTS ANALYSIS &
DIFINITION “ The second phase" SYSTEM & SOFTWARE
DESIGN“ The third phase "IMPLEMENTATION & UNIT
TESTING “ The fourth phase "INTEGRATION &SYSTEM
TESTING “ The fifth phase "OPERATION & MAINTENANCE "
System and software design
Implementation and unit testing
Integration and system
Requirements definition
Operation maintenance
requirementsrequirements
User requirements: System requirements:Software Requirement
-Microsoft Visio 2003
-Microsoft project 2003-DreamWaver cs4-WampServer 2.0-SmartDrow 2010-Flash 8
Requirements (cont…)Requirements (cont…)
None functional:-ReliabilityOur system as a website will be under manyrisks but we do the best to avoid all risks. -AvailabilityThe system will be available on 24 hour a day. -SecurityAuthentication from username and password to login to
related page….-MaintainabilityThe Manager can maintain any problem and modify any data. -Transferability/PortabilityOur system is a website so it is a platform independent and
user can explore it by any web browser.
Requirements (cont…)Requirements (cont…)
Functional Requirement:• Detailed in the project file.• Add ST, Delete ST, Modify ST, Add TE,
Delete TE, Modify TE, Add CO, Delete CO, Modify CO ,Report view, Login.
Project DevelopingProject Developing
Project Description: The project is design a web to use it in the
organization, to increase the efficiency, speed of the work and to decrease the wasting time in the data flaw.
The objectives:-Convert the paper system to computer system or
web system.-Electronic advertisement by the web.-The web will solve all the search , wasting time , and
the efficiency problems. Project Organization:The project divided into submissions, and for every
mission we have one man to do it.
Project DevelopingProject Developing (cont…)
no Mission name Name
1 1. Studying the last system and analyzing it to produce the new one.
2. reviewing the work done by others.3. coordinate the final version.
Mohammed Al Ashy &
Shaaban Al Hello
2 1. making reports.2. making the meeting reports.
Shaaban Al Hello
3 1. design the software Hashem humeed
4 1. design the database Hashem Humeed
5 1. programming the software2. making the power point
Bader Al Sabeh
&Hashem humeed
6 1. general coordinator Bader Al Sabeh
7 1. rational rose programmer Mohammed Al Ashy
And here you are the details with schedule time.
Risk AnalysisRisk Analysis
There are tow kind of risks: The first kind "the risks which face the project in general
from beginning to finish it".-The time wasn't enough to make a good project.-The employees were busy.
the second kindRisks may the customers, or users face in using the project.
And these few problems are: May the users or the manager want some modifying or some
accessories? And to solve this problem by make a maintenance contact.
At beginning, the users and customers may not use the web good. And the solution of this problem is by training.
Resource RequirementsResource Requirements
Hardware and software resource requirements:PART. A. Hardware Requirement -3 pc's -Scanner-PrinterPART .B. Software Requirement-Microsoft Front Page 2003-Microsoft Word 2003-Microsoft Visio 2003-Microsoft project 2003-DreamWaver cs4-WamoServer 2.0-SmartDrow 2010-Flash 8
USE Case ModelsUSE Case Models
Manager
Trainer
Trainee
Update_trainee_information
Update_trainers_information
Print_report
Categonize_trainees
Create_certificate
Manage_marks
Manage_exam
Fil l_the_application_for_registration
Login
Display_report_mark
Sequence For Viewing Sequence For Viewing MarksMarks
: Trainee : Start Page : Main Page : View Marks : View : Classification in
D.B.
1: Enter Data
2: Verify Data
3: Select View Marks
4: View mark Page
5: Select the course
6: Select its marks
7: Select Marks
8: Results
9: Display Marks
Sequence For RegistrationSequence For Registration
: Trainee Verify Data : Start Page : Login Page : Registration Page Manager : Manager
: Registration
1: Enter Data
3: Select Registration Page
4: Request for Registration
5: Enter personality Data
6: Send the application
7: Save to D.B
2:
Entity Relationship:Entity Relationship:
courseEducating
trainee
trainer
training room
registry
Class Diagram:Class Diagram:
Entitymo3athsameer
ManagerLoginUpdateTraineeInformationUpdateTrainerInformation
RegistrationChickPasswordChickUsername
Login()opname()
+n
+1<<extend>>
Trainee
EnterPasswordEnterUsernameViewReport
(from Use Case View)
Trainer
EnterUsernameEnterPasswordAddMarksAddExams
(from Use Case View)+1
+0<<subscribe>>
+1n
+0
Implementation &Design
programming language:-Chose the programming language PHP
Chosen because it is the language of art, met all the requirements of the system, where data structures, dealing with Internet sites and this was the main reason, because the system should work on the web.
-Also convenient to control the color and form through the pages CSS, JavaScript and deal with this for the convenience of the user and good interaction with the system
InterfaceInterface
Page to enter users and powers according to the type of user
Interface (Cont…)Interface (Cont…)
Registration page on the site
Interface (Cont…)Interface (Cont…)
Page of the trainee
the last
It is the last stage of the project and loads the web application for services from the company itself to be the experience of the new system, the user experience of the three rules of the Director, the coach and the trainee.
the last (cont…)(cont…)
The results are as follows: 1. A system (web application) the prerequisites set
by the Director and the coach and the trainee. 2. 2. has the same system requirements of
the project: 1- high-efficiency 2- easy to use 3- easy data archiving 4- speed the search for data 5- easy download advertisements on existing courses and raised courses 6- deal with the Director of trainees or students are faster and easier
the last (cont…)(cont…)
The project won the admiration of both the Director and the coach and the trainee 3 and the problem faced in the training of the students in the beginning, but that problem was solved by increasing the number of trainers or supervisors on the stage of Testing.
End