LSSIP Year 2013 Cyprus Released Issue
DOCUMENT IDENTIFICATION SHEET
LSSIP for CYPRUS
Infocentre Reference: 14/01/07-09
Document Identifier Edition: Year 2013
LSSIP Year 2013 CYPRUS Edition Date: 03/04/2014
LSSIP Focal Point - Haris Antoniades E-mail: [email protected]
Head of Nicosia ACC
LSSIP Contact Person - Bernd Hill E-mail: [email protected] Unit DSS/EIPR
Status Intended for
Working Draft General Public
Draft Agency Stakeholders
Proposed Issue Restricted Audience
Released Issue
Accessible via: Internet (http://www.eurocontrol.int/articles/cyprus)
Path: I:\Single Sky\8-EIPR\03 LSSIP\1. LSSIP States\Cyprus (CY)\CY_Year 2013\CY_LSSIP2012_Released Issue\LSSIP_CY_Year 2013_Released.docx
LINKS TO REFERENCE DOCUMENTS
1. LSSIP Guidance Material: http://www.eurocontrol.int/articles/guidance-material 2. ESSIP Plan Edition 2013: http://www.eurocontrol.int/articles/endorsed-essip-plan 3. ESSIP Report 2012: http://www.eurocontrol.int/articles/essip-report 4. STATFOR Forecasts: http://www.eurocontrol.int/statfor 5. Acronyms and abbreviations: http://www.eurocontrol.int/articles/glossaries 6. European ATM Master Plan: https://www.atmmasterplan.eu/ 7. LSSIP Documents: http://www.eurocontrol.int/articles/cyprus 8. Aeronautical Information Publication (AIP) Republic of Cyprus:
http://www.mcw.gov.cy/mcw/dca/dca.nsf/DMLairtraffic_en/DMLairtraffic_en?OpenDocument 9. National Performance Plan Republic of Cyprus: https://www.eurocontrol.int/articles/ses-performance-
scheme-reference-period-1-2012-2014
LSSIP Yea
The followconfirms tactions lai
ar 2013 Cyprus
wing authoritthe correctnid down in th
s
ties have apness of the rhe European
APPR
pproved all preported infoSingle Sky I
ROVAL SH
parts of LSSormation anImPlementat
HEET
SIP Year 20d reflects thtion (ESSIP)
013 documeheir commitmPlan – Editio
Relea
ent and theirment to implon 2013.
ased Issue
r signature lement the
LSSIP Yea
Executive
Introductio
Chapter 11.1
1.1.1 1.1.2 1.1.3
1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5
Chapter 22.1
2.1.1
Chapter 3
Chapter 4
Chapter 55.1 5.2 5.3
Chapter 6
ANNEXE
ar 2013 Cyprus
Summary ...
on ................
National A -GeographInternationGeographAirspace National SCivil ReguDCAC - AAirports ...Military AuAccident/i
En-route T -EvolutionNICOSIA
ESSIP Re -
National P -
Regional C -FAB Co-oFAB ProjeOther reg
ESSIP Ob -
ES
s
....................
....................
ATM Environmhical Scope .nal Members
hical descriptClassificationStakeholdersulator(s) .......Air Navigation....................uthorities ...../incident Inve
Traffic and C of traffic in CACC ...........
port recomm
Projects ........
Co-ordinationordination ....ects .............
gional coordin
bjective Imple
TABLE
....................
....................
ment ................................ship ..............tion of the FIn and Organs ......................................n Services P........................................
estigation Bod
apacity ........Cyprus .............................
mendations ...
....................
n ..........................................................nation projec
ementation ...
E OF CON
....................
....................
....................
....................
....................IR(s) ............nisation ................................................
Provider ................................................dy ...............
....................
....................
....................
....................
....................
....................
....................
....................cts ...............
....................
TENTS
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
Relea
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
ased Issue
............... 1
............... 4
............... 5
............... 5
............... 5
............... 5
............... 6
............... 7
............... 8
............... 9
............. 11
............. 12
............. 15
............. 16
............. 16
............. 17
............. 20
............. 22
............. 25
............. 25
............. 25
............. 27
............. 28
LSSIP Year 2013 Cyprus 1 Released Issue
Executive Summary
State Context
2013 was a critical year for the Ministry of Communication and Works and subsequently for the Department of Civil Aviation as it was the year of serious challenges affecting. The State economic situation along with the heavy austerity measures affected both budgeting and the staffing levels of the ANSP. 2013 also saw the phased implementation of the new ATM system (“TopSky-C”) in the ACC as a quick mitigation measure for the termination of the LEFCO project. Based on the operation of the new system a relatively good level of compliance with EU requirements is achieved.
The level of delays for 2013 has remained relatively high due to various reasons these being budgeting constrains and system implementation. The overall situation of the ANSP on delays and generally on its ability to meet demand and ATM challenges has led the Ministry to move forward to the reorganization of the ANS provider into a private law company. This will enhance the ANSP with flexibility and empowerment to manage ATM into a competitive environment.
The regulatory context of the State remains as the previous year with the National Supervisory Authority and the Ministry of Communications and Works being the main stakeholders in this perspective. The reorganization of the ANSP will be followed by a reorganization of the regulatory context with the transformation of the DCAC into a well balance regulator.
ESSIP Objective Implementation
The limited resources of the ANSP introduce a challenge for the fulfilment of the LSSIP obectives as most of them have to be executed a “series process” and not in “parallel”. Besides these type of constraints the ANSP stands at a relatively satisfactory level of completion of the LSSIP, given also the limited applicability of several objectives for Cyprus.
Out of the 29 overall applicable objectives, 8 are completed, 1 partially completed, 18 planned, and 2 are late.
A good percentage of objectives are completed because of the implementation of the new ATM system in the ACC. The system shall also drive the completion of other objectives such as the MTCD and the Datalink. The same applies with the COM objectives and the FMTP protocol.
Larnaca is not included in the list of airports that have a significant impact on the network so it is not in the applicability area for the ENV objectives and CDM. Besides this, a large proportion of the objectives are fulfilled based on the current operations.
The initiation of the IDP project of SESAR, along with the work under the Blue Med FAB and the possible funding under the TEN-T, has enhanced the implementation of the projects of Free Route Airspace, MTCD further development, and PBN (also APV).
The most significant problem encountered in the completion of the work was the availability of resources combined with the austerity measures imposed on the State. The State shall strive to fulfil the applicable objectives with priority based on the implementation deadline but also based on the operational significance.
LSSIP Year 2013 Cyprus 2 Released Issue
LSSIP 2013 - Cyprus * FOC Date █ Planned implementation date (see legend at the bottom of the table)
State-related ESSIP Objectives
<=
2007
20
08
2009
20
10
2011
20
12
2013
20
14
2015
20
16
2017
20
18
2019
20
20
AOM13.1 Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling
[IDP] [E] *
AOM19 Implement Advanced Airspace Management [IDP] [E] *
AOM20 Implement ATS Route Network (ARN) - Version 7 [E] * AOM21 Implementation of Free Route Airspace [IDP]
[E] *AOP03 Improve runway safety by preventing runway incursions * ATC02.2 Implement ground based safety nets - Short Term Conflict
Alert (STCA) - level 2 [E] *
ATC02.5 Implement ground based safety nets - Area Proximity Warning - level 2
[E] *
ATC02.6 Implement ground based safety nets - Minimum Safe Altitude Warning - level 2 [E] *
ATC02.7 Implement ground based safety nets - Approach Path Monitor - level 2 [E] *
ATC07.1 Implement arrival management tools [E] * ATC12 Implement automated support for conflict detection and
conformance monitoring [E] *
ATC15 Implement, in En-Route operations, information exchange mechanisms, tools and procedures in support of Basic AMAN operations
[IDP] [E] *
ATC16 Implement ACAS II compliant with TCAS II change 7.1 * ATC17 Electronic Dialogue as Automated Assistance to Controller
during Coordination and Transfer [IDP]
[E] *
COM09 Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP)
[IDP] * COM10 Migrate from AFTN to AMHS * COM11 Implementation of Voice over Internet Protocol (VoIP) in
ATM *FCM01 Implement enhanced tactical flow management services [E] * FCM03 Implement collaborative flight planning [IDP]
[E] *
FCM04 Implementation of Short Term ATFCM Measures - phase 1 [IDP] [E] *
FCM05 Implementation of interactive rolling NOP [IDP] [E] *
INF04 Implement integrated briefing * ITY-ADQ Ensure quality of aeronautical data and aeronautical
information [E] *
ITY-AGDL Initial ATC air-ground data link services above FL-285 [IDP] [E] *
ITY-AGVCS2 Implement air-ground voice channel spacing requirements below FL195 *
ITY-COTR Implementation of ground-ground automated co-ordination processes [E] *
ITY-FMTP Apply a common flight message transfer protocol (FMTP) [IDP] * ITY-SPI Surveillance performance and interoperability *NAV03 Implementation of P-RNAV [E] * NAV10 Implement APV procedures [IDP]
[E] *
SAF10 Implement measures to reduce the risk to aircraft operations caused by airspace infringements *
SAF11 Improve runway safety by preventing runway excursions *SRC-CHNG Implementation of Safety Oversight of Changes to ATM by
National Supervisory Authorities (NSA) *
SRC-RLMK Implement the EUROCONTROL Safety Regulatory Requirements (ESARRs) *
SRC-SLRD Safety Levels and Resolution of Deficiencies *
LSSIP Year 2013 Cyprus 3 Released Issue
LSSIP 2013 - Cyprus * FOC Date █ Planned implementation date (see legend at the bottom of the table)
Airport-related ESSIP Objectives
<=
2007
20
08
2009
20
10
2011
20
12
2013
20
14
2015
20
16
2017
20
18
2019
20
20
LCLK-Larnaca
AOP01.2 Implement airside capacity enhancement method and best practices based on Eurocontrol capacity and efficiency implementation manual
*
AOP04.1 Implement Advanced Surface Movement Guidance and Control System (A-SMGCS) Level1 [E] *
AOP04.2 Implement Advanced Surface Movement Guidance and Control System (A-SMGCS) Level 2 *
AOP05 Implement Airport Collaborative Decision Making (CDM) [IDP] [E] *
ENV01 Implement Continuous Descent Operations (CDO) techniques for environmental improvements
[IDP] * ENV02 Implement Collaborative Environmental Management
(CEM) at Airports *
Understanding the Table
Objective Completed No Plan
Objective Partly Completed Missing Data
Objective Planned Not Applicable (Larnaca airport does not participate in this obj.)
Late
NOTE: The year where the coloured box is placed indicates the ‘Implementation Completion Date’ as stated in the ESSIP for each objective. The colour-code indicates the Local progress with respect to this date.
LSSIP Year 2013 Cyprus 4 Released Issue
Introduction
The Local Single Sky ImPlementation documents (LSSIPs), as an integral part of the ESSIP/LSSIP mechanism, constitute a five-year plan containing ECAC States’ actions to achieve the Implementation Objectives as set out by the ESSIP and to improve the performance of their national ATM System. The LSSIP document – Year 2013 describes the situation in the State at the end of December 2013.
The LSSIP documents are structured into 6 chapters to better differentiate the Stakeholder(s) accountable for the information contained in each of them:
Chapters 1 to 5 present the key players in the State, and sets the institutional and geographical scenes to help the reader understand the specifics of the State and interpret the rest of the document correctly. It also presents a short description of the main national and regional projects in which the national Stakeholders are involved.
Chapter 6 contains high-level information on progress and plans of each ESSIP Objective. The information for each ESSIP Objective is presented in boxes giving a summary of the progress and plans of implementation for each Stakeholder. The conventions used are presented at the beginning of the section.
Note: Chapter 6 is completed with a separate document called LSSIP Level 2. This document consists of a set of tables organised in line with the list of ESSIP Objectives. Each table contains all the actions planned by the four national stakeholders to achieve their respective Stakeholder Lines of Action (SLoAs) as established in the ESSIP.
LSSIP Yea
1.1 G
1.1.1 I
Cyprus is
1.1.2 G
The geogrby ICAO.
Nicosia FIFIR / DamECAC Sta
ar 2013 Cyprus
Geograph
Internation
a Member o
Organisati
ECAC
EUROCON
European U
EASA
ICAO
Geographi
raphical sco.
IR is surrounmascus FIR /ates.
s
hical Scop
nal Member
of the followin
ion
NTROL
Union
ical descrip
pe of this do
nded by FIRs/ Ankara FIR
e
rship
ng internation
ption of the
ocument add
s of 6 StatesR/UIR. Four o
5
Chapter
nal organisat
e FIR(s)
dresses the C
s, namely Athof these Sta
Natr 1 -
tions in the fi
Sin
196
199
200
200
196
Cyprus FIR,
hinai FIR / Ctes, Egypt, I
ional AT
eld of ATM:
nce
69
91
04
04
61
namely Nico
airo FIR / Tesrael, Syria
Relea
TM Enviro
osia FIR as
el Aviv FIR/Uand Lebano
ased Issue
onment
delineated
UIR / Beirut on are non-
LSSIP Year 2013 Cyprus 6 Released Issue
1.1.3 Airspace Classification and Organisation
The republic of Cyprus applies Commission Regulation (EC) No 730/2006 of 11 May 2006 “on airspace classification and access of flights operated under visual flight rules above flight level 195” Consequently, the Airspace above FL 195 has been categorised as Class “C”.
Flight Level /Altitude Band
Republic of Cyprus (Nicosia FIR/UIR)
Upper Limit of Controlled Airspace (CAS) - FL 660
Class C FL460-FL660
FL245-FL460
FL195-FL245
9000FT-FL195
Class G 3000 Ft- 9000Ft (transition
altitude)
SFC- 3000 Ft
Major TMA No TMAs Implemented yet. Minor TMA
AWYs Class C from
GND/MSL – FL195)
CTR Class B in ATZ
Class C
The Cyprus Airspace classification chart
LSSIP Year 2013 Cyprus 7 Released Issue
1.2 National Stakeholders
The main National Stakeholders involved in ATM in Cyprus are the following:
- The Department of Civil Aviation comprising the
o ANSP (supporting ATS, AIS and CNS service provision, and using MET Services provided by the Ministry of Agriculture, Environment and Natural Resources);
o Functionally separated NSA;
- The Ministry of Communications and Works; with responsibility for the Regulation of ATM;
- The Ministry of Defence, comprising
o The ANS department which incorporates the Airspace Management Cell (AMC) staffed by both civil and military personnel (FUA arrangements).
The AMC reports to the High Level Airspace Management Committee composed of:
o Department of Civil Aviation (DCA);
o Ministry of Communications and Works( MCW);
o Ministry of Defence (MoD);
o Ministry of Foreign Affairs (MFA).
- The Cyprus Meteorological Service under the responsibility of the Ministry of Agriculture, Environment and Natural Resources.
- The Cyprus Telecommunications Agency (CYTA) under the responsibility of the Ministry of Finance.
Their activities are detailed in the following subchapters and their relationships are shown in the diagram below.
LSSIP Year 2013 Cyprus 8 Released Issue
1.2.1 Civil Regulator(s)
1.2.1.1 General information
Civil Aviation in Cyprus is the responsibility of the Ministry of Communications and Works (MCW). The different national entities having regulatory responsibilities in ATM are summarised in the table below. The regulatory organisation is further detailed in the following sections.
Activity in ATM: Organisation responsible Legal Basis
Rule-making Ministry of Communications and
Works Civil Aviation Law Art8
Safety Oversight National Supervisory Authority of Air
Navigation Services (*) Civil Aviation Law Art 8
Establishment of Tolerable Safety Levels
Ministry of Communications and Works
Government authority
Safety Performance Monitoring National Supervisory Authority of Air
Navigation Services, Civil Aviation Law Art 8
Enforcement actions in case of non-compliance with safety
regulatory requirements
Ministry of Communications and Works
In accordance with Chapter 27 (protection of civil aviation) on the civil
aviation act
Airspace Ministerial committee composed of
MINISTRY OF COMMUNICATIONS AND WORKS, MoD and MFA
Council of Ministers decision 67.662 (24.09.2008)
Economic Ministry of Communications and
Works Civil Aviation Law Art8
Environment Ministry of Communications and
Works Civil Aviation Law Art8
Security Ministry of Communications and
Works Civil Aviation Law Art8
(*) The National Supervisory Authority for Air Navigation Services (NSA) has been established in Cyprus following Reg. (EC) 550/2004 and under Art. 8B of the Civil Aviation Act 213 (I) 2008. There is functional separation from the ANSP as the NSA reports only to the Director and the Ministry. The NSAs’ areas of responsibility include ATS, CNS, AIS, MET, ATCO Licensing, Engineering & Technical Staff, ANSPs accounts, Interoperability and Performance.
1.2.1.2 DCAC
The Department of Civil Aviation Cyprus (DCAC) is a Governmental department of the Ministry of Communications and Works. It is an organisation encompassing both Service Provision and Safety Oversight. The responsibility for safety oversight rests within the National Supervisory Authority, which is an entity of the DCAC functionally separated from the ANSP, and linked only to the Director of the DCAC and the Ministry of Communications and Works. The NSAs’ areas of responsibility include ATS, CNS, AIS, MET, ATCO Licensing, Engineering & Technical Staff, ANSPs accounts, Interoperability and Performance.
DCAC is responsible for the following services:
- Air Traffic Service (ATS);
- Aeronautical Information Service (AIS);
- Communication Navigation and Surveillance service (supported by CYTA for maintenance).
Annual Report published: Y http://www.mcw.gov.cy/dca
Further description of the DCAC organisation is provided on the following web site: http://www.mcw.gov.cy/dca
The Organisation Chart of DCAC is available in Annex B
.
LSSIP Year 2013 Cyprus 9 Released Issue
1.2.2 DCAC - Air Navigation Services Provider
Name of the ANSP: Department of Civil Aviation (DCAC)
Governance:
Department of a Government Ministry (MINISTRY OF COMMUNICATIONS AND WORKS)
Ownership: State Entity
Services provided Y/N Comment
ATC en-route Y
ATC approach Y
ATC Airport(s) Y
AIS Y
CNS Y The CNS maintenance is delegated to the Cyprus Telecommunications Agency (CYTA) through a Service Level agreement.
MET N The Meteorological Services are under the responsibility of the Ministry of Agriculture, Environment and Natural Resources.
ATCO training Y
Others Y Instrument Procedures Design
Additional information: -
Provision of services in other State(s):
N -
Annual Report published: Y http://www.mcw.gov.cy/dca
The website address of DCAC-ANSP is: http://www.mcw.gov.cy/dca
The Organisation Chart of DCAC-ANSP is available in Annex B.
LSSIP Year 2013 Cyprus 10 Released Issue
1.2.2.1 ATC system in use
Manufacturer of the ATC system currently in use: THALES- TopSky C ATC system
Major upgrade1 of the ATC system is performed /planned System operational in 2013
A diagram of the basic technical infrastructure
1. Airspace management (ASM): ASM in Cyprus comprises of two major pillars, the FUA and the
ATFCM function. The FUA application is regulated via a Ministerial committee composed of MINISTRY OF COMMUNICATIONS AND WORKS, MoD and MFA, and applied via the Airspace Management Cell (AMC). All three FUA levels are applied. The ATFCM function is performed by the Flow Management Unit at Nicosia ACC. Both FUA and ATFCM functions are inputs to the operations in the ACC via sector configuration and capacity management. The AMC produces the Airspace Usage Plan (AUP) utilizing the Eurocontrol tool, CIAM.
2. Air Traffic Flow and Capacity Management (ATFCM): performed at Nicosia ACC via a dedicated function. System used is the NMOC CHMI for the FMP.
3. Air Traffic Control System: System used is the THALES TopSky-C system which has become operational in October 2013. The system comprises of a THALES Multi Radar Tracker (MRT), a THALES Flight Data Processor (FDP) and a THALES HMI.
4. Communications: G/A communications via VHF/UHF Tx/Rx at various sites in Cyprus. G/G communications via normal telephone lines. No datalink employed yet.
1 Upgrade is defined as any modification that changes the operational characteristics of the system (SES Framework Regulation 549/2004, Article 2 (40))
LSSIP Year 2013 Cyprus 11 Released Issue
5. Navigation: Aircraft navigation via the AWYs network (RNP5). No free route airspace provided yet. The two local aerodromes rely on conventional SID/STARs based on VOR/DMW. The design of new PBN procedures has been initiated in cooperation with ICAO and Israel.
6. Surveillance systems: The surveillance function of the DCAC is served by a network of both PSR and SSR radars that are combined (through the MRT) to provide a radar picture at Nicosia ACC. The application of ADSB is being evaluated under the CRISTAL Med project currently ongoing.
7. Aeronautical Information Services: AIS is primarily using the European AIS Database (EAD) for the origination and the dissemination of information.
8. Meteorological Information: Meteorological info is disseminated via the AFTN to the ATC units. The information is fed into a digital VOLMET serving Nicosia FIR and a D-ATIS serving the two local aerodromes.
1.2.2.2 ATC units
The ATC units in the Cyprus airspace, which are of concern to this LSSIP are the following:
ATC Unit Number of sectors
Associated FIR(s) Remarks En-route TMA
Nicosia ACC 4 - Nicosia FIR
Larnaca - 1 LCA CTZ
Pafos - 1 PHA CTZ
1.2.3 Airports
1.2.3.1 General information
The two international airports of the Republic of CYPRUS are Larnaca (LCLK) and Paphos (LCPH). Both are state owned, but operated on a limited time lease contract (BOT) by an international consortium HERMES. ATC is provided by the DCAC.
Up to the time after which the management of the airports was granted to the company Hermes (12/05/2006), the Department of Civil Aviation was responsible for their operation. In light of the new state of play, the Department’ s role has been modified, and it now has a supervisory role in matters concerning Civil Aviation (Security) and licensing/certification of airports in accordance with Annex 14 (Aerodromes) of the Chicago Treaty.
The size of the two terminal buildings is such that with respect to passenger convenience, and according to the specifications of the International Air Transport Association (IATA), the level of service provided is B and C, for Larnaca and Paphos respectively.
1.2.3.2 Airport(s) covered by the LSSIP
The airport covered by this LSSIP document is Larnaca International Airport.
LSSIP Year 2013 Cyprus 12 Released Issue
1.2.4 Military Authorities
Military Entities
The operation of the Armed Forces in the Republic of Cyprus is governed by the “National Guard Law” (1964-2003) and the executive power is exercised by the Minister of Defence.
The Chief of the National Guard is accountable to the Minister of Defence for the general command and supervision of the National Guard, its organization, training, readiness, discipline and order within, and he is also accountable to the Minister of Defence for all equipment provided to the National Guard and for carrying out the orders of the Minister of Defence or the Council of Ministers.
The Commander of the Air Force Command is accountable directly to the Chief of the National Guard. Under the authority of the Air Force Command are the, Military Air Control Centre (MACC), the Early Warning Radar squadrons, the Air-Defence Units and the Aircraft Squadrons. In addition to the above, a Joint Rescue Coordination Centre (JRCC) is manned and operated by personnel of the Ministry of Defence.
Airspace and Control
The Republic of Cyprus is included among those countries where the MACC does not have an ATM function hence it does not provide ATS to either civil or military aircraft flying as GAT. Air Traffic Management is provided by the DCAC.
Military flights are generally conducted below FL 195. In some cases military flights are conducted over FL 195, in Temporary Reserved Areas, within the Nicosia FIR. These areas are reserved in accordance with ICAO regulations and in cooperation with the DCAC.
Military authorities control or provide information, with simultaneous notification and coordination with the civil ATS providers (Larnaca - Paphos Towers and Nicosia ACC), to their own aircraft in the following cases:
When the aircraft fly operationally (OAT);
Within predefined and limited time reserved areas of airspace. These areas are reserved for specific purposes and operational reasons and after cooperation with the DCAC for the release of the relevant NOTAMs;
When the JRCC is conducting SAR operations within the Nicosia FIR.
The surveillance of airspace for Security and Defence purposes is conducted by the Air Force Command.
For the time being there is no military commitment for implementing ESARRs. However additional theoretical training relevant to air traffic control services is provided to military personnel by the DCAC.
LSSIP Year 2013 Cyprus 13 Released Issue
1.2.4.1 Regulatory role
Regulatory framework and rule-making
Oversight
OAT GAT
OAT and provision of service for OAT governed by national legal provisions?
Y Provision of service for GAT by the Military governed by national legal provisions?
N/A
Level of such legal provision: Ministerial Decree Level of such legal provision: N/A
Authority signing such legal provision: Ministry of Defence
Authority signing such legal provision: N/A
These provisions cover: These provisions cover:
Rules of the Air for OAT Y
Organisation of military ATS for OAT Y Organisation of military ATS for GAT N/A
OAT/GAT Coordination Y OAT/GAT Coordination N/A
ATCO Training Y ATCO Training N/A
ATCO Licensing Y ATCO Licensing N/A
ANSP Certification N ANSP Certification N/A
ANSP Supervision N ANSP Supervision N/A
Aircrew Training Y ESARR applicability N/A
Aircrew Licensing Y
Additional Information: OAT is conducted within Nicosia FIR, in respect of the rules of the air for GAT. Military ATCO licensing and Aircrew licensing are certified by the Ministry of Defence.
Additional Information: MIL does not provide ANS to GAT but to OAT in segregated areas.
Means used to inform airspace users (other than military) about these provisions:
Means used to inform airspace users (other than military) about these provisions:
National AIP Y National AIP N/A
National Military AIP N National Military AIP N/A
EUROCONTROL eAIP N EUROCONTROL eAIP N/A
Other: (Circulars) Y Other N/A
OAT GAT
National oversight body for OAT Air Force Command/ Military Air Control Centre
NSA (as per SES reg. 550/2004) for GAT services provided by the military: N/A
Additional information: - Additional information: -
LSSIP Year 2013 Cyprus 14 Released Issue
1.2.4.2 Service Provision role
Military ANSP providing GAT services SES certified?
N/A If YES, since: N/A> Duration of the Certificate:
N/A
Certificate issued by: N/A If NO, is this fact reported to the EC in accordance with SES regulations?
Y
Additional Information: The Cypriot National Guard does not have any ATM service provision role. Their aircraft fleet is intended only for coastal patrol and SAR activities. Any services to OAT are provided by DCAC-ANSP or, in the case of MET the by the Cyprus Meteorological Service. The European Commission was notified accordingly on 21/12/2011.
1.2.4.3 User role
1.2.4.4 Flexible Use of Airspace (FUA)
OAT GAT
Services Provided: Services Provided:
En-Route N DCAC-ANSP En-Route N
Approach/TMA N DCAC-ANSP Approach/TMA N
Airfield/TWR/GND N DCAC-ANSP Airfield/TWR/GND N
AIS N DCAC-ANSP AIS
MET N Cyprus Meteorological Service MET N
SAR Y SAR Y
TSA/TRA monitoring Y Military in coordination with DCAC-ANSP
FIS N
Other: N/A Other: N/A
Additional Information: Additional Information:
IFR inside controlled airspace, Military aircraft can fly?
OAT only N GAT only N Both OAT and GAT Y
If Military fly OAT-IFR inside controlled airspace, specify the available options:
Free Routing Y Within specific corridors only N
Within the regular (GAT) national route network Y Under radar control Y
Within a special OAT route system Y Under radar advisory service N
If Military fly GAT-IFR inside controlled airspace, specify existing special arrangements:
No special arrangements √ Exemption from Route Charges √
Exemption from flow and capacity (ATFCM) measures √ Provision of ATC in UHF √
CNS exemptions: RVSM √ 8.33 √ Mode S √ ACAS √
Others:
Military in Cyprus applies FUA requirements as specified in the Regulation No 2150/2005: Y
FUA Level 1 implemented: Y
FUA Level 2 implemented: Y
FUA Level 3 implemented: Y
LSSIP Year 2013 Cyprus 15 Released Issue
1.2.5 Accident/incident Investigation Body
1.2.5.1 Technical investigations
Investigations following accidents and/or incidents are carried out by Air Accident and Incident Investigation Board (AAIIB) of Cyprus. This body is a permanent body, reporting only to the Minister of Communications and Works and is functionally independent in compliance with Regulation (EU) No 996/2010 of the European Parliament and of the Council of 20 October 2010 on the investigation and prevention of accidents and incidents in civil aviation and repealing Directive 94/56/EC. A safety review is published annually at national level and is available on the following website:
The AAIIB conducts investigations for Civil Aviation aircraft accidents and all incidents and occurrences including those voluntary reported.
AAIIB website: coming soon
1.2.5.2 Collection, Evaluation & Processing of Data
Cyprus is EU member and Directive 2003/42/EC has been transposed into national legislation:
The DCA Safety Regulation Unit (SRU) performs the collection, evaluation, process and storing of all information related to accidents, incidents and occurrences, as well as making this information available to the other EU States according to Directive 2003/42/EC.
In order to carry out this function, the DCA Safety Regulation Unit (SRU) uses the tools developed in the frame of the programme for the “European Co-ordination Centre for Aviation Incidents Reporting System” (ECCAIRS).
1.2.5.3 Civil-Military Accidents/Incidents
The Civil occurrences are investigated by the AAIIB whereas the Military authorities are responsible, with their own internal committee for the investigation of Military occurrences. In the case of incidents/accidents including both military and civil aircraft, close cooperation between the two authorities shall apply. A new provision in the law is law is being drafted that will encompass the cooperation of both the Civil and Military AAIIB in the case of civil-military occurrences.
LSSIP Yea
2.1 E
2013
Traffic in CSummer 2
2014-2018
The STAT5.5% throu
0
50000
100000
150000
200000
250000
300000
350000
400000
450000
IFR
flig
hts
A = ActualF = Forecast
ESRA
IFR flights y
Cyprus
ar 2013 Cyprus
Evolution
Cyprus incre2012.
8/19
TFOR mediuughout the p
2009 A 2010 A
2HBLB
yearly growth
s
of traffic
eased by 3.0
m-term forecplanning cycle
Cyprus - An
2011 A 2012 A 2
2010 A 2011 A
6,4% -1,2%
0,8% 3,1%
STA
Ch
in Cyprus
% during Su
cast (MTF) pe, with an av
nnual IFR Moveme
2013 F 2014 F 20
A 2012 A
% -4,1%
% -2,4%
ATFOR Medium
16
hapter 2
s
ummer 2013
predicts an avverage basel
nts
015 F 2016 F 20
IFR movements - Act
IFR movements - Ba
IFR movements - Hig
IFR movements - Low
2013 F 2014,6% 7,53,9% 5,33,2% 3,2-0,9% 1,4
m-Term Forecast
En-rou-
(May to Oct
verage annuine growth o
17 F 2018 F 201
tuals
seline forecast
gh forecast
w forecast
4 F 2015 F5% 4,9%3% 3,1%2% 1,3%4% 2,6%
t (September 20
ute Traffi
tober inclusiv
al traffic growof 3.8%.
9 F
Cypru
Domestic flights 0%
Overflight76%
2016 F 205,2% 43,7% 32,2% 12,7% 2
013)
Relea
ic and C
ve), when co
wth between
us - Distribution (Ref. year
InternatDep/A
23%
ts
017 F 2018 F4,9% 5,3%3,3% 3,7%,9% 2,2%
2,2% 2,5%
ased Issue
apacity
ompared to
n 2.2% and
2012)
tional Arr
%
2019 F5,2%3,8%2,2%2,5%
LSSIP Yea
2.1.1 N
2.1.1.1 T
2.1.1.2 S
Traffic
+3
The averag2013.
46% of the
Capacity P
ATS route
June 2013:
New Cypru
Operation oHRM)
4 sectors fo
Improve CiFIR
CAPAN stu
Mature ATF
New configmore flexib
6 Additiona
Maximum c
Summer 2
The capaciSummer sewas 49.
ar 2013 Cyprus
NICOSIA A
Traffic and
Summer 20
Evolution
3.1%
ge en-route dela
delays were fo
Plan +18%
network and se
: Transition to th
us TMA impleme
of a 5th en-rout
or extended hou
vil-Military coop
udy – revised ca
FCM function
gurations and bility
al ATCOs
configuration: 4/
013 performan
ity baseline waseason. During t
s
ACC
d en-route A
013 perform
2013 Cap
48
ay per flight incr
r the reason AT
ctorization optim
he new ATM sys
entation
te sector (Subje
urs
peration in the S
apacity figures
minor sector
/5 sectors
nce assessmen
s evaluated to bthe measured p
ATFM delay
mance
pacity Baseline
8 (-4%)
reased from 1.6
TC Capacity, 28%
misation
stem EUROCAT
ect to improveme
South-East part
adaptations al
nt
be 48 with ACCEeriod, the avera
17
ys 2009-20
e Optimum
0.3 - 0.4
minutes per flig
% for Special e
Ach
Y
T – C N
N
ents in N
Y
t of the Y
N
Pa
llowing Y
Y
N
ESS/Reverse Cage peak 1 hour
018/19
En-route Dela
m All reason
4 2.7
ght in Summer 2
vent, 12% for A
ieved Comm
Yes
No Sept
No New
No
Yes
Yes
No Traffsout
artly
Yes New c
Yes
No Maxim
CASA, based onr demand was 5
ay (min/flight)
s Without w
2.7
2012 to 2.7 min
ATC staffing and
ments
tember 2013: Tmain
w STARs imple
fic flows and coth sectors follow
cl
configurations dimplemente
mum configurati
the traffic and 55 and the avera
Relea
C
weather
7
utes per flight in
d 11% for Equip
Transition to TOPn system
emented on a tri
omplexity changwing the Syrian losure
designed with Ned in June 2013
ion: 4 sectors
delay situation rage peak 3 hou
ased Issue
Capacity gap
Yes
n Summer
ment.
PSKY as
al basis
ed in the airspace
NMOC and 3
for the full ur demand
LSSIP Year 2013 Cyprus 18 Released Issue
2.1.1.3 Planning Period 2014-2018/19 - Summer
The planning focuses on the Summer season to reflect the most demanding period of the year from a capacity perspective. This approach ensures consistency with the previous planning cycles.
The 2014-2018/19 summer capacity profile and delay breakdown has been derived according to the following parameters:
• 2014: capacity requirement profiles based on the delay breakdown per ACC as provided in January 2011
• 2015-2018/19: Reference value based on the breakdown of a yearly European delay target of 0.5 min/flight
Capacity Plan
Year 2014 2015 2016 2017 2018 2019
Measures
planned
Continuous improvement of ATS route network
Implementation of TOPSKY (Sept 2013)
Implementation of Approach
Radar
New ATC tools and new safety
nets New Cyprus TMA implementation
6 additional
ATCOs
5 additional ATCOs
Improved ATFCM, including more flexibility in sector configuration openings
Reduction of 4 sector opening
hours*
Operation of a 5th en-route
sector**
Operation of a 6th en-route
sector**
Reduce lateral separation from
10 to 5 NM
Improve Civil-Military cooperation in the South-East part of the FIR
OLDI with Athens and
Egypt MTCD Datalink
Benefits from CPR exchange
with NM
Revision of sector capacities
Significant Events
Max sectors 4 4 4/5 4/5 5/6 5/6
Capacity increase p.a.
6% 0% 5% 0% 5% 0%
Reference profile 19% 4% 5% 3% 6% 3%
Additional information
* Due to reduction of overtime budget
** Subject to improvements in HRM
2014 2015 2016 2017 2018 20190.30 0.26 0.26 0.25 0.25 0.250.29 0.32 0.32 0.32 0.31 0.31
Annual
En-route ATFM delay breakdown - Reference ValuesLCCCCTA
Summer
H 60 25% 62 3% 66 6% 70 6% 73 4% 77 5%Ref. 57 19% 59 4% 62 5% 64 3% 68 6% 70 3%
L 53 10% 54 2% 56 4% 58 4% 60 3% 62 3%C/R 55 15% 57 4% 62 9% 65 5% 68 5% 70 3%
2013 baseline 2014 2015 2016
LCCC 48
2019
Capacity ProfilesProfiles (hourly movements and % increase over previous year)
2017 2018ACC
LSSIP Year 2013 Cyprus 19 Released Issue
LCCCCTA - Reference capacity profile and alternative scenarios
0
10
20
30
40
50
60
70
80
90
Cap
acit
y p
rofi
le (
mo
vem
ents
per
ho
ur)
2014-2019 Reference Capacity Profile 57 59 62 64 68 70
Capacity Profile - Current Routes 55 57 62 65 68 70
Capacity Profile - High 60 62 66 70 73 77
Capacity Profile - Low 53 54 56 58 60 62
Capacity Baseline 50 48
2014 - 2019 Plan 51 51 54 54 57 57
2012 2013 2014 2015 2016 2017 2018 2019
2014-2018/19 Planning Period Outlook
The capacity gap in Nicosia ACC will remain over the full planning period.
LSSIP Yea
Recommecorrective
Numbe
REC-2012
REC-2012
REC-2012
REC-2012
REC-2012
ar 2013 Cyprus
endations issactions and
er
2-03
To ensreport thas definplans.
2-05
To ensLSSIP implemeLSSIP i
2-10
To enspresent of basicobjectiv
2-11
States actions present of prioriESSIP o
2-15
To enspresent of rimplemeobjectiv
s
sued from theimprovemen
Recommen
sure that ahe expected cned in their N
sure correct guidance m
ent the resultn-cycle check
sure actions delays in the
c ATSMHS cae COM10).
to ensure tare taken delays in the
ty capabilitiesobjective FCM
sure actions delays in the
remaining entation of Pe NAV03).
Chap
e ESSIP Rents ahead of
ndation
ll Stakeholdecompletion datational busine
application material and ts of mandato.
for overcome implementatapability (ESS
hat appropriafor overcom
e implementats specified in tM03.
for overcome implementat
SLoAs P-RNAV (ESS
20
Epter 3 -
port for 2012f the 2013 re
Owner
ers tes ess
All Sta
of to
ory All Sta
ing ion
SIP
AL, AM, ACZ, DK,
FR, GR, HIT, LU,
MD, MT, NSI, U
ate ing ion the
BE, UK, SFI, LV, P
UA, AM, TFR, PT, MHR, BA,
IT, CZ, MA
ing ion for
SIP
AL, AZ, BBG, CY, DES, GE, GHU, IT, L
MT, NO, PSI, UA
ESSIP Re
2 applicable porting exerc
rship
ates
Theregaundbecwhelong
ates
Dueinvothe
AZ, CY, EE, FI, HR, HU, MAS, NO, SE, UA
For impof rethe
SE, NO, PL, HU, TR, MK, MT, RO, AL, SI, AS, CY.
TheATMalsowill benminperiimpis sidepsystfor psoftw
BA, BE, DE, EE, GR, HR, LV, ME, PT, RS,
A, UK
Theveryfundalmthe initia
eport rec
to Cyprus focise.
Comment
e two documenarding compleerstood thougomes a bit of a
en it comes to g horizon i.e. 2
e to the small solved there is oexplanation of
Cyprus there lementation ofesources (othenon-necessity
e objective reqM systems’ FDo part of the IDtry to meet theefit for Cyprusimal due to thephery, but thelications) of mgnificant. Theended on the tem company,providers that ware developm
e P-RNAV projy active in Cypded by Ten-T aost ensured. Asame area of ated currently.
Relea
commend
or all items t
ts from Cyp
nts are mostlyetion dates. It sgh that plannina theoretical iobjectives tha
2018
scale of stakeone-to-one guf various obje
will be a delaf AMHS due ter projects) any of the AMHS
quires an updaDP. The objectDP program. Te deadline thos is expected te geographica
e cost (and promodification of e deadline also
availability of , which is not have their owment departm
ject is on-goinprus. The projeand the deadlAn additional pPBN is also b.
ased Issue
dations
hat require
prus
y aligned should be ng ssue at have a
holders uidance on ctives.
y in the o the lack nd due to S.
ate of the tive is
The State ough the to be al obable the FDP
o is the the case
wn ments.
ng and ect is lines are project in being
LSSIP Year 2013 Cyprus 21 Released Issue
Interim Deployment Programme View
Number Recommendation Ownership Comments from Cyprus
REC-2012-22
States are encouraged to speed up the AFP implementation and to schedule AFP testing with Network Manager
All States
The objective requires an update of the ATM systems’ FDP. The objective is also part of the IDP program. The State will try to meet the deadline though the benefit for Cyprus is expected to be minimal due to the geographical periphery, but the cost (and probable implications) of modification of the FDP is significant. The deadline also is depended on the availability of the system company, which is not the case for providers that have their own software development departments.
REC-2012-27
Airports are encouraged to establish performance committees and implement information sharing and performance reporting processes in line with A-CDM guidelines (AOP05 objective).
Airports in applicability area
reported other than “completed”
Even though the Cyprus airports are outside the applicability zone of CDM, the operating company practices the elements of CDM to a “useful” extend.
REC-2012-28
To revise deployment plans and as much as possible speed up the implementation of CPDLC requirements
ANSPs of core area States
CY has started planning for the implementation of CPDLC but the imminent operational benefit of the functionality is unclear in this geographical area.
REC-2012-31 ANSPs to increase activities towards the migration to IP.
NO, FI, IE, FR, ES, IT, HR, HU,
UA, RS, ME, MK, GR, MT, CY, AZ,
SE
No significant delays are expected in this area.
Stakeholders View
Number Recommendation Ownership Comments from Cyprus
REC-2012-40 ANSPs are encouraged to publish more APV routes.
All ECAC ANSPsUnder the scope of NAV03 (REC-2012-15).
FAB View
Number Recommendation Ownership Comments from Cyprus
REC-2012-41
To update the FABs plans and establish a more appropriate roadmap to improve the current lack of coordination and ensure a common response to deployment needs.
FAB States
A BLUE MED deployment program aligned with IDP and the LSSIP has been established.
REC-2012-42
The ANSPs should coordinate system deployment (including system upgrades) and capabilities implementation plans with FAB partner first, and then follow on with coordination to adjacent FABs and ANSPs.
FAB States
This recommendation, even though it is reasonable, it is difficult to be followed due to the different level of each State in the FAB, the ATM system and the different ATM systems providers. An alignment will be pursued on upgrades that fall under the IDP/LSSIP cycles.
REC-2012-43
Ongoing work to harmonise reporting culture between States in the FAB should be continued to ensure alignment of reporting principles.
FAB States
A BLUE MED deployment program that includes the common on-going development of SMS has been established
LSSIP Y
The ma
TopSk
TopSksy
IntroduAPP
fr
Redete
A
B
G
2 Capaci
Year 2013 Cyprus
ain ATM projects c
Name
ky C – ATM main system
ky C – ATM main ystem - OLDI
uction of Terminal RADAR control om Larnaca.
esign of the new erminal area
DS-B project
BLUE MED
Ground to Air Tx/Rx
ty, safety, cost-efficien
currently ongoing
Schedule
October 2013
January 2014
Targeted for operation by 2014
3 years project started in Januar2010. Expected t
end 2013
2012-2015
August 2013
ncy and environment –
22
in Cyprus or com
Descriptio
Upgraded tEurocat-C for
main systeaddition of e
and functi
Introduction OLDI functiAthens and
4.
DevelopmentControl Area aATS routes aand departure
Training of Acontrollers. I
equipm
ry to
ImplementatiWAM sur
infrastructureIFR
Functional Aiwith Italy, GMalta. Imple
phase starte12/10/201
signature of thAgree
Changetransmitters/
8.33 capa
– as defined in Recita
mpleted in 2013 ar
on – Scope
the existing rm standby to em with the extra sectors ionalities.
of the basic onality with
d Cairo FIR
t of Terminal and review of
and approach e procedures. APP Radar nstallation of ment.
co
on of ADS-B rveillance e for Nicosia R.
rspace Block Greece and ementation
ed as per the 2 with the
he State Level ement
e of all /receivers to able ones
l 2 of Regulation (EU)
Rele
re depicted in the
Status
Completed
Ongoing
Airspace design process partly
ompleted- On going
Ongoing
Ongoing
Completed
) No 691/2010.
eased Issue
table below.
Link w
ATC02.2, ATC02
ATC02.6, ATC02
AOP08, ATC07.
ITY-SPI
N/A
N/A
Ch
with ESSIP Obj.
2.5
2.7, ATC12
1, ENV01
Nahapter 4 -
ExpectedKey Pe
Safety / ca
Safety / ca
Safety andterminal a
Cost effici
Safety/ Ca
Safety /Re
ational Proje
d Contribution to terformance Areas2
apacity
apacity
d capacity of the areas.
ency
apacity/ Cost Efficie
egulatory requireme
ects
the 2
ency
ent
LSSIP Year 2013 Cyprus 23 Released Issue
Name Schedule Description – Scope Status Link with ESSIP Obj. Expected Contribution to the
Key Performance Areas3
ATS Message Handling System (AMHS)
Expected to be fully completed by end
2014 Ongoing COM10 Regulatory requirement
ATC Simulator December 2013 Installation of a new Radar
simulator Completed N/A Regulatory requirement
VCCS Acropolis upgrade and Backup 2013-2014
Upgrade of the VCCS system for enhancing the
backup functionality. Ongoing N/A Safety /Regulatory requirement
Pafos and Lara SSR Radars 2014
Upgrade of the Lara Radar and installation of new
MSSR at Pafos. Ongoing ITY-SPI Safety and capacity of the
terminal areas.
DME Larnaca and Pafos
2014 Replacement of two DME
stations Started ITY-SPI Safety and capacity of the
terminal areas.
3 Capacity, safety, cost-efficiency and environment – as defined in Recital 2 of Regulation (EU) No 691/2010.
LSSIP Year 2013 Cyprus 24 Released Issue
The table below indicates the major investment projects of the DCAC in 2013-2014
Α/Α Project Expected Delivery
1. Introduction into service of the new primary radar at Kionia Jan. 2013
2. Upgrade of TopSky system with additional functionalities Dec 2014
2. Ground to air Tx/Rx Oct. 2013
3. Automatic Message Handling System- AMHS Dec. 2013
4. Cristal project ADS-B WAM Dec 2013-2014
5. TopSky –C upgrade October 2013 - 2014
6. VCCS Acropolis upgrade 2014
7. VCCS back-up for ACC, LCA and PHA 2014
8. ATC Simulator ACC Dec. 2013
9. Direction Finder for LCA and PHA 2014
10 Pafos and Lara SSR Radars 2014
LSSIP Year 2
5.1 FA
BLUE MEDundertaken Italy and Mthe BLUE MJordan took
5.2 FA
The followin
Nam
FAB OptimATS Ro
Netwo
Free RoOperati
FlighEfficiency
MigratioIPv6 Netw
4 Capacity, saf
2013 Cyprus
AB Co-ord
D FAB is an ethrough a soalta). The Im
MED Governik part with the
AB Projec
ng projects a
e Sch
mised oute ork
Reac
2O
oute ons
At l22
Atl22
ht y Plan
Reac
2o
on to work
22
fety, cost-efficie
dination
established olid Impleme
mplementatioing bodies. Ite status of O
cts
are listed in th
hedule FA
current ctivity
2012-Open
AM
ANSP level 2012-2015
t FAB level 2015-2017
AM
current ctivity
2014-open
AM
2012-2014
AM
ency and enviro
2
Functional Aentation Progon Programmt is to be not
Observer or A
he BLUE ME
AB Partner
All BLUE ED States
All BLUE ED States
All BLUE ED States
All BLUE ED States
nment – as defi
25
Cha
Airspace Blocgramme, invome is ongointed that AlbaAssociated P
ED Implemen
Status
On-Going
On-Going
On-Going
On-Going
ined in Recital 2
apter 5 -
ck (FAB) witolving four E
ng and is connia, Egypt, T
Partner in the
ntation Progr
ExpePerform
A cataloMED Rohas been
Project230 newin line a
CaEnviron
The Fairspacroute be
defineroute via
airspacflights r
Envi
The Fligyear actANSPs
ATM nettime, fue
Env
The unetwordata ex
costlyconseq
ground nmigrate
toward
Cost-eff
2 of Regulation
Region
h an ongoinguropean Countinuously upTunisia, Leba BLUE MED
am:
ected Contrmance Area
gue of airspaoute Networkn finalized wit Definition P
w airspace deand beyond t
of ARN
apacity, Cosnment doma
ree Route Aie in which usetween a defd exit point, intermediate
ce availabilityremain subje
ironment, CCapacity
ght Efficiencytion plan devthat, by opti
twork, allowsel consumpti
emissions
ironment, Cefficienc
use of X.25 drks to supporxchanges is by and has a luence, it is nnetworking inexisting X.25
d TCP/IPv6 d
ficiency dom
(EU) No 691/20
Release
nal Co-or
g Implementuntries (Cyppdated uponanon and the
D FAB Definit
ribution to thas4 and link
ace projectsk Catalogue ith the BLUE
Phase contaiesign proposthe scope & Version-7.
st-efficiencyains (also Re
irspace is a ssers may frefined entry pwith the pose way pointsy. Within thisect to air traff
Cost-efficieny domains
y Plan (FEP)veloped by Bmizing the s
s for a reduction and carb
s by aircrafts
Capacity andcy domains
data commurt ground-grobecoming inclimited lifetimnecessary to nfrastructure5 data commdata commun
main (also R
010.
ed Issue
rdination
tation Phaserus, Greece,
n direction ofe Kingdom oftion Phase.
he Key to ESSIP
, the BLUE (BMRNC),
E MED FAB ning over als that are timeframe
y and egulatory)
specified eely plan a point and a sibility to
s, subject to s airspace fic control.
cy and
is a multi-BLUE MED tructure of tion in flight on dioxide .
d Cost-
nication ound ATS creasingly
me. As a adapt the in order to
munications nications.
Regulatory)
n
e , f f
LSSIP Year 2013 Cyprus 26 Released Issue
Name Schedule FAB Partner Status Expected Contribution to the Key
Performance Areas5 and link to ESSIP
Aeronautical data quality
2013-2014
All BLUE MED States
On-Going
The ADQ activity aims to establish a cooperation framework at BLUE MED FAB level in order to implement in a harmonised
manner the provisions contained in the Regulation (EU) No 73/2010 on the quality
of aeronautical data and aeronautical information.
Safety and Capacity domains (also Regulatory)
Air/Ground Data-Link services
2012-2016
All BLUE MED States
On-Going
Air/Ground Data-Link (AGDL) services facilitate air/ground exchanges between
controllers and pilots. These exchanges are possible due to the adoption of appropriate standards and associated DL technologies. Implementation of AGDL services includes
the adaptation of communication infrastructure and, in particular, the
deployment of VDL Mode 2, upgrades of data processing systems and aircraft
equipage to support the required data-link services.
Capacity and Safety domains (also Regulatory)
PBN/RNP Approach
Procedures with APV
2012-2015
All BLUE MED States
On-Going
RNP APCH procedures are the simplest RNP procedures that provide instrument
approaches to runways. RNP APCH procedures are well suited for providing
instrument approaches to runways that do not currently have adequate ground-based
navigation facilities to support an instrument approach or to back up existing ground-
based navigation procedures
Safety and Cost-efficiency domains (also Regulatory)
Radar sensor data exchange
SLA and Surveillance Maintenance
Plan
Recurrent activities
2013-Open
All BLUE MED States
On-Going
The activity is aimed at performing a coordinated update of current Service Level Agreement according to the EU Regulation
1207/2011 and at establishing, at BLUE MED FAB level, of a coordinated
Surveillance maintenance plan in order to share and minimize the downstream effects
of the maintenance on operations.
Safety and Capacity domains
BLUE MED FAB
Performance framework
2013-2014
All BLUE MED States
On-Going
The activity is aimed at preparing and managing the BLUE MED FAB
Performance Plan according to EU Regulation 390/2013.
Capacity, Safety, Environment and Cost-efficiency domains
5 Capacity, safety, cost-efficiency and environment – as defined in Recital 2 of Regulation (EU) No 691/2010.
LSSIP Year 2013 Cyprus 27 Released Issue
Name Schedule FAB Partner Status Expected Contribution to the Key
Performance Areas6 and link to ESSIP
ATM System upgrade and
SESAR Programme
Recurrent activities
2014-Open
All BLUE MED States
On-Going
The activity is aimed at establishing, at FAB level, a coordinated plan for the various ATM System developments in order to
ensure full interoperability and optimization of infrastructures and resources, and at
ensuring alignment between SESAR Programme and BLUE MED activities to
ensure that SESAR objectives and priorities are properly reflected in BLUE MED
developments and vice-versa.
Capacity, Safety, Environment and Cost-efficiency domains
Safety management
2012- Open
All BLUE MED States
On-Going
The overriding safety objective of the BLUE MED FAB is to ensure that current safety
performance is maintained and, in so far as practicable, improved. For this to be
achieved it is necessary to undertake a number of activities related to both safety
management and safety oversight.
Safety domain
5.3 Other regional coordination projects
NONE
6 Capacity, safety, cost-efficiency and environment – as defined in Recital 2 of Regulation (EU) No 691/2010.
LSSIP Yea
Conventio
Two colou
o
o
Obj. ID (*
State’s hig
REG (By:mm-yy
ASP (By:mm-yy
MIL (By:mm-yy
APO (By:mm-yy
(*) Object
ar 2013 Cyprus
ons
ur codes are
one colou
another conational st
) Obj. Title
gh level progres
yyy) REG high
yyy) ASP high
yyy) MIL high
yyy) APO high
ive Scope Cod
ECAC
EU+
Multi-N
APT
s
used for eac
r code is use
olour code istakeholder.
e (By mm/yyyy o
ss statement
h level progress
h level progress
level progress
h level progress
de:
Chap
ch ESSIP Ob
ed to show th
s used to sho
of overall object
s statement
statement
statement
s statement
28
Epter 6 -
bjective ‘box’
he Objective
ow the Objec
ive, inc non-Sta
(**) Objec
ESSIP Ob
:
Scope in th
ctive Progres
ate SloAs)
ctive/Stakehold
Comple
Partly Comple
Plan
L
bjective I
e Objective I
ss in the Stat
der Progress C
eted
eted
ned
Late
Relea
Impleme
ID cell, and
te and for ea
Obj. Pro
State Im
APO. Pro
APO Imp
ASP. Pro
ASP Imp
MIL. Pro
MIL Imp
APO. Pro
APO Imp
Code:
No
Not Appl
Missing
ased Issue
entation
ach
ogress (**)
mpl. Date ogress (**)
pl. Date
ogress (**)
pl. Date
ogress (**)
l. Date
ogress (**)
pl. Date
o Plan
licable
g Data
LSSIP Year 2013 Cyprus 29 Released Issue
AOM13.1 Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling (By:12/2018)
[IDP] [Essential]
Partly Completed
The airspace issue such as the harmonization of OAT and GAT is under the authority of the combined Civil‐Military National Airspace Policy Body. Regulatory work shall be finalised and endorsed by the first quarter of 2014 and the bulk amount of work has been completed. Due to the limited scope of military operations and due to local geography where most of the State is covered by controlled airspace, ATC for military traffic is provided by the Civilian ATC units.
04/2014
REG (By:12-2018)
Regulatory work shall be finalised and endorsed by the first quarter of 2014 and the bulk amount of work has been completed.
Partly Completed
04/2014
ASP (By:12-2018)
Military traffic is handled by Civil ATC where applicable. Due to the limited scope of military operations and due to local geography where most of the State is covered by controlled airspace, ATC for military traffic is provided by the Civilian ATC units.
Partly Completed
04/2014
MIL (By:12-2018)
Military work in this area is alligned to the work of the DCAC and the combined Civil‐Military National Airspace Policy Body
Partly Completed
04/2014
AOM19 Implement Advanced Airspace Management (By:12/2016) [IDP]
[Essential] Planned
The military needs of the Cyprus National Guard regarding airspace usage is very limited and do not interfere with the ATFCM process for GAT airspace. No need for extensive airspace management. ASM is being executed based on local needs. Airspace Management Cell in producing a UUP reflecting any change in airspace use planning as described in the ASM Handbook, coordinates the UUP with CNMF and submits UUP to CNMF as described in the ASM Handbook.
12/2015
ASP (By:12-2015)
Due to the limited extend of the military operations and the existing level of cooperation of the Civil and Military authorities the objective is completed to a large extend.
Planned
12/2015
MIL (By:12-2015)
Due to the limited extend of the military operations and the existing level of cooperation of the Civil and Military authorities the objective is completed to a large extend.
Planned
12/2015
AOM20 Implement ATS Route Network (ARN) - Version 7 (By:10/2013)
[Essential] Completed
Cyprus is progressively deploying the ATS route network including the first FAB developments such as Free Route Airspace (FRA) implementation, and Terminal Airspace System (TAS) developments. Cyprus is a member of the Blue Med FAB within which a lot of work is completed with regards to ARN v7.
10/2013
ASP (By:10-2013)
DCAC is progressively deploying the ATS route network including the first FAB developments such as Free Route Airspace (FRA) implementation, and Terminal Airspace System (TAS) developments. DCAC is working in the Blue Med FAB within which a lot of work is completed with regards to ARN v7.
Completed
10/2013
MIL (By:10-2013)
The implemenation of the MIL requirements is done in conjuction with the DCAC and the AMC.
Completed
10/2013
LSSIP Year 2013 Cyprus 30 Released Issue
AOM21 Implementation of Free Route Airspace (By:12/2017) [IDP]
[Essential] Planned
The State supports the ANSP in this effort as this project is part of the IDP of SESAR. Funding for the support of the project was granted by the Ten‐T.
09/2015
REG (By:12-2017)
The NSA shall review the safety case that will be supplied by the ANSP before the implementation phase of the project. Parallel oversight with the progress of the project shall be effected.
Planned
09/2015
ASP (By:12-2017)
The aim of this project is to implement the capability of aircraft operators to plan their flight direct from all the entry to exit points in Nicosia FIR to accommodate the main traffic flows on the South East axis of Europe enabling flights to operate close to user preferred trajectories. This implementation will be an example of efficiency to neighboring third countries at the boundaries with Europe and, in this respect, it should be considered for its potential of extending the free route concept beyond the European airspace. The general concept is that the entry and exit points of the FIR will be retained, allowing however free routing within the FIR.
Planned
09/2015
MIL (By:12-2017)
The military does not operate flights within the upper airspace of Nicosia FIR. If the need arises coordination with the DCA shall be initiated.
Not Applicable
‐
AOP01.2 Implement airside capacity enhancement method and best practices based on Eurocontrol capacity and efficiency implementation manual (By:12/2013)
Not Applicable
LCLK - Larnaca(Outside Applicability Area)
Larnaca is not in the applicability area ‐ ASP (By:12-2011) Larnaca is not in the applicability area
Not Applicable
‐
APO (By:12-2011) Larnaca is not in the applicability area
Not Applicable
‐
AOP03 Improve runway safety by preventing runway incursions (By:12/2013)
Completed
Runway Safety team is established in Larnaca and Pafos. Full implementation including all EAPPRI recommendations have been done in 2010.
12/2010
REG (By:12-2013) All actions have been completed in 2010.
Completed
12/2010
ASP (By:12-2013)
Team established in 2005. The status of the Larnaca Runway Safety Team was defined in 2008 and recommendations have been met.
Completed
12/2008
MIL (By:12-2013)
The Cypriot National Guard does not deliver any ATC services to Civil Aviation and has no Regulatory role.
Not Applicable
‐
APO (By:12-2013) All actions completed in 2010.
Completed
12/2010
AOP04.1 Implement Advanced Surface Movement Guidance and Control System (A-SMGCS) Level1 (By:12/2011)
[Essential] Not Applicable
LCLK - Larnaca
(Outside Applicability Area)Larnaca is not in the applicability area ‐ REG (By:12-2010) Larnaca is not in the applicability area
Not Applicable
‐
ASP (By:12-2011) Larnaca is not in the applicability area
Not Applicable
‐
MIL (By:12-2010) Larnaca is not in the applicability area
Not Applicable
‐
APO (By:12-2010) Larnaca is not in the applicability area
Not Applicable
‐
LSSIP Year 2013 Cyprus 31 Released Issue
AOP04.2 Implement Advanced Surface Movement Guidance and Control System (A-SMGCS) Level 2 (By:12/2017)
Not Applicable
LCLK - Larnaca(Outside Applicability Area)
Larnaca is not in the applicability area ‐ REG (By:12-2017) Larnaca is not in the applicability area
Not Applicable
‐
ASP (By:12-2017) Larnaca is not in the applicability area
Not Applicable
‐
APO (By:12-2017) Larnaca is not in the applicability area
Not Applicable
‐
AOP05 Implement Airport Collaborative Decision Making (CDM) (By:01/2016)
[IDP] [Essential]
Not Applicable
LCLK - Larnaca(Outside Applicability Area)
Larnaca is not in the applicability area ‐ ASP (By:01-2016) Larnaca is not in the applicability area
Not Applicable
‐
MIL (By:01-2016) Larnaca is not in the applicability area
Not Applicable
‐
APO (By:01-2016) Larnaca is not in the applicability area
Not Applicable
‐
ATC02.2 Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2 (By:01/2013)
[Essential] Completed
ATC2.2 implemented with new TopSky‐ATC system operation. 06/2012
REG (By:01-2013)
The safety oversight and approval of the introduction of the STCA was part of the oversight activities for the introduction of the ATC system.
Completed
06/2012
ASP (By:01-2013) ATC2.2 implemented since 2013 with new TopSky‐ATC system operation.
Completed
06/2012
MIL (By:01-2013)
The Cypriot National Guard does not deliver any ATC services to Civil Aviation, neither it has any Regulatory role.
Not Applicable
‐
ATC02.5 Implement ground based safety nets - Area Proximity Warning - level 2 (By:12/2016)
[Essential] Completed
APW is a functionality of the current ATM system. 08/2012 ASP (By:12-2016) APW is a functionality of the current ATM system.
Completed
08/2012
MIL (By:12-2016)
The Cypriot National Guard does not deliver any ATC services to Civil Aviation, neither it has any Regulatory role.
Not Applicable
‐
ATC02.6 Implement ground based safety nets - Minimum Safe Altitude Warning - level 2 (By:12/2016)
[Essential] Completed
The MSAW functionality is employed by the current ATM system. 08/2012
ASP (By:12-2016)
The MSAW was part of the set of functionalities of the new TopSKy‐C system. The functionality was also part of the ATCO training for the introduction of the system into operations. The functionality is currently employed.
Completed
08/2012
MIL (By:12-2016)
The Cypriot National Guard does not deliver any ATC services to Civil Aviation, neither it has any Regulatory role.
Not Applicable
‐
LSSIP Year 2013 Cyprus 32 Released Issue
ATC02.7 Implement ground based safety nets - Approach Path Monitor - level 2 (By:12/2016)
[Essential] Planned
APM was integrated in the current system with the first upgrade of summer 2013. ATCO training was based on the EUROCONTROL Specification for APM and related guidance material will be analyzed before operations. Further analysis of the functionality shall be made with the implementation of Approach Radar at Larnaca airport. Approximate date for the APP radar implementation is 2016.
09/2016
ASP (By:12-2016)
It was integrated with the 1st upgrade of the new ATM System in summer 2013. The functionality shall be used by the approach radar control ATCOs at Larnaca airport in 2016 (estimated)
Planned
09/2016
MIL (By:12-2016)
The Cypriot National Guard does not deliver any ATC services to Civil Aviation, neither it has any Regulatory role.
Not Applicable
‐
ATC07.1 Implement arrival management tools (By:12/2015) (Outside Applicability Area)
[Essential] Not Applicable
Cyprus is not in the applicability area of this Objective. ‐ ASP (By:12-2015) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
ATC12 Implement automated support for conflict detection and conformance monitoring (By:12/2016)
[Essential] Planned
The ATM system is equipped with an MTCD. ATCO training is completed and the safety assessment is planned .
06/2014
REG (By:12-2016)
The acceptance of the MTCD functionality is included in the ATM system upgrade and the functionality was assessed within the safety assessment of the project. The use of the functionality is under the continuous assessment of the NSA.
Planned
06/2014
ASP (By:12-2016)
The ATM system is equipped with an MTCD. ATCO training is completed and the safety assessments is planned .
Planned
06/2014
ATC15
Implement, in En-Route operations, information exchange mechanisms, tools and procedures in support of Basic AMAN operations (By:12/2017) (Outside Applicability Area)
[IDP] [Essential]
Not Applicable
Cyprus is not in the applicability area of this Objective. ‐ REG (By:12-2017) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
ASP (By:12-2017) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
ATC16 Implement ACAS II compliant with TCAS II change 7.1 (By:12/2015)
Planned
Cyprus will fulfil the objective by the set deadline. The DCAC Safety Regulatory Unit, the body responsible for the safety oversight of airline operators, has initiated its work towards informing the aircraft carriers.
01/2015
REG (By:12-2015) Objective to be handled by the Safety Regulaton Unit of the DCAC (SRU)
Planned
01/2015
ASP (By:03-2012) DCAC incorporates the training material in ATCO training.
Completed
03/2012
MIL (By:12-2015)
Not applicable for the Military authorities as military do not operate aircraft falling under this requirement.
Not Applicable
‐
LSSIP Year 2013 Cyprus 33 Released Issue
ATC17 Electronic Dialogue as Automated Assistance to Controller during Coordination and Transfer (By:12/2018)
[IDP] [Essential]
Planned
Cyprus shall strive to implement this new ESSIP objective ATC17 to the maximum possible extend. In doing so the State shall ensure that the requirements of Commission Regulation (EC) 1032/2006 and ATC17 are fulfilled. The ANSP is implementing the electronic dialogue within the scope of the new ATM system. The NSA shall ensure that all safety aspects related to the changes are reviewed.
12/2018
REG (By:12-2018)
The NSA shall review and approve the proposed changes of the ANSP under the scope of the approval of changes. Shall oversee the changes induced to the system to support Electronic Dialogue during Coordination and Transfer, via the submission and review of the relevant safety assessment document of the ANSP
Planned
12/2018
ASP (By:12-2018)
The ANSP has started implementing the requirements of ATC 17 under the scope of the upgrade of the ATM system. In doing so the relevant safety studies shall be completed and the required training shall be developed and delivered to all concerned personnel.
Planned
12/2018
COM09 Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) (By:12/2014)
[IDP]
Planned
A mandate to migrate to IPv6 has been notified to DCA ANSP. Information of DCA ANSP compliance has been provided to the European Commission and the Agency by end of 2010. The new ATM system that became operational in 2013 foresees the use of the FMTP protocol for information exchanges between flight data processing systems for the purpose of notification, coordination and transfer of flights. The FMTP application shall be effected via migration to IPv6. The ATM system did not utilize any X25 networks since OLDI was not implemented. The current OLDI implementation foreseen for 2014 will utilize the internet protocol.
12/2014
REG (By:12-2010)
A Mandate to migrate to IPv6 has been notified to DCA ANSP; Information of DCA ANSP compliance has been provided to the European Commission and the Agency by end of 2010.
Completed
12/2010
ASP (By:12-2014)
The new ATM system that became operational in 2013 foresees the use of the FMTP protocol for information exchanges between flight data processing systems for the purpose of notification, coordination and transfer of flights. The FMTP application shall be effected via migration to IPv6. The ATM system did not utilize any X25 networks since OLDI was not implemented. The current OLDI implementation foreseen for 2014 will utilize the internet protocol.
Planned
12/2014
MIL (By:12-2014) The Cypriot National Guard does not deliver any GAT service.
Not Applicable
‐
COM10 Migrate from AFTN to AMHS (By:12/2014)
Planned
Plans are ready for the introduction of AMHS. Implementation will commence after the introduction of the new ATM system is put into operation.
12/2014
ASP (By:12-2014)
The ANSP has initiated the planning of the project with the drafting of the specificaitons. Due to limited resource availability the project will essentially be accelarated when the new ATM system is put into operation
Planned
12/2014
MIL (By:12-2014) The Cypriot National Guard does not deliver any GAT service.
Not Applicable
‐
COM11 Implementation of Voice over Internet Protocol (VoIP) in ATM (By:12/2020)
Planned
The general intention of all Blue Med FAB partners is to implement COM11 Voice over IP. 12/2018 REG (By:12-2018) NSA will follow the procedure for the oversight of changes.
Planned
12/2018
ASP (By:12-2020)
The general intention of all Blue Med FAB partners was to rather concentrate on COM11 Voice over IP as this was seen as the technology of the future.
Planned
12/2018
MIL (By:12-2020) The Cypriot National Guard does not deliver any GAT service.
Not Applicable
‐
LSSIP Year 2013 Cyprus 34 Released Issue
ENV01 Implement Continuous Descent Operations (CDO) techniques for environmental improvements (By:12/2013)
[IDP]
Not Applicable
LCLK - Larnaca(Outside Applicability Area)
Larnaca is not in the applicability area ‐ ASP (By:12-2013) Larnaca is not in the applicability area
Not Applicable
‐
APO (By:12-2013) Larnaca is not in the applicability area
Not Applicable
‐
ENV02 Implement Collaborative Environmental Management (CEM) at Airports (By:12/2016)
Not Applicable
LCLK - Larnaca(Outside Applicability Area)
Larnaca is not in the applicability area ‐ ASP (By:12-2016) Larnaca is not in the applicability area
Not Applicable
‐
MIL (By:12-2015) Larnaca is not in the applicability area
Not Applicable
‐
APO (By:12-2016) Larnaca is not in the applicability area
Not Applicable
‐
FCM01 Implement enhanced tactical flow management services (By:12/2006)
[Essential] Late
Planned in combination with the new ATM system, installation and operation planned for 06/2014. 06/2014
ASP (By:12-2006)
Implementation dependent on the installation and operation of the new ATM system planned for 06/2014.
Late
06/2014
MIL (By:12-2001) The Cypriot National Guard does not deliver any GAT service.
Not Applicable
‐
FCM03 Implement collaborative flight planning (By:12/2015) [IDP]
[Essential] Planned
Partly completed. The remaining SLoAs are planned to be implemented with the update roadmap of the ATM system
12/2015
ASP (By:12-2015)
Already partially implemented in current system, but it will be fully implemented with the update roadmap of the ATM system
Planned
12/2015
MIL (By:12-2015) The Cypriot National Guard does not deliver any GAT service.
Not Applicable
‐
FCM04 Implementation of Short Term ATFCM Measures - phase 1 (By:12/2015) (Outside Applicability Area)
[IDP] [Essential]
Not Applicable
Cyprus is not in the applicability area of this Objective. ‐ REG (By:12-2015) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
ASP (By:12-2015) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
LSSIP Year 2013 Cyprus 35 Released Issue
FCM05 Implementation of interactive rolling NOP (By:12/2016) [IDP]
[Essential] Planned
The State will fulfill this requirement with the cooperation of the DCAC (ANSP) and the Military authorities under the FUA law and the operation of the AMC.
12/2016
REG (By:12-2016)
The NSA shall review the safety argument of the changes to the automated ASM support system of the ANSP. If the severity class of identified risks is 1 or 2 or 3, the following actions are foreseen, to analyze the safety case, review the safety arguments and conditions for the acceptance of the changes. The necessary notification shall be made in due time.
Planned
12/2016
ASP (By:12-2016)
The DCAC and the AMC shall cooperate for the better knowledge of the airspace availability and of the traffic demand. Operations shall be optimized to better reflect the needs of military users.
Planned
12/2016
MIL (By:12-2016)
The Military needs are well addressed by the use of FUA and the operation of the AMC. The Military will cooperate to provide more accurate and prompt data to be inputed into the system
Planned
12/2016
APO (By:12-2016) Larnaca and Pafos outside Coordinated Airports scope
Not Applicable
‐
INF04 Implement integrated briefing (By:12/2012)
Completed
AIS modernisation including integrated briefing (AIS, ARO, ATFM) has been implemented during 2008. There is no current plan to integrate MET briefing
12/2008
ASP (By:12-2012)
AIS modernisation including integrated briefing (AIS, ARO, ATFM) has been implemented during 2008.
Completed
12/2008
MIL (By:12-2012)
The Cypriot National Guard does not deliver any ATC services to Civil Aviation, neither it has any Regulatory role.
Not Applicable
‐
ITY-ADQ Ensure quality of aeronautical data and aeronautical information (By:07/2017)
[Essential] Planned
The State has initiated its work on this objective. The main part of the work shall be completed by the AIS. All suport shall be given to the AIS provider in terms of equipment and training.
07/2017
REG (By:07-2017)
The NSA is ready to oversight the changes required by the objective and that will be implemented by AIS provider. Any changes to procedures, training and equipment shall be the subject of an NSA review including the relevant safety assessment.
Planned
06/2014
ASP (By:07-2017)
Parts of the requirement are partially completed. Changes in the infrastructure and personnel training are under study.
Planned
07/2017
MIL (By:07-2017)
The objective is not applicable to the Cypriot National Guard, as all military aeronautical data is originated by the AIS provider of the DCAC.
Not Applicable
‐
APO (By:07-2017) Work in progress in coordination with AISP and Regulator
Planned
07/2017
ITY-AGDL Initial ATC air-ground data link services above FL-285 (By:02/2015)
[IDP] [Essential]
Planned
The work for this objective is now under the scope of the IDP program of SESAR. The ANSP is planning the execution of the project
02/2015
REG (By:02-2015)
This introduction of this functinality will be performed according to the approved SMS procedures and oversight practices.
Planned
02/2015
ASP (By:02-2015)
Planned with the entry into operations of the new ATM system. The DCA is in contact with Data Link services to prepare a plan within the Blue Med program.
Planned
02/2015
MIL (By:-)
The Cypriot National Guard does not possess any transport type state aircraft.
Not Applicable
‐
LSSIP Year 2013 Cyprus 36 Released Issue
ITY-AGVCS2
Implement air-ground voice channel spacing requirements below FL195 (By:12/2020)
Planned
The State will follow the deadlines and applicability requirements of regulation (EU) 1072/2012 regarding the channel spacing below FL195. The relevant guidelines and applicability exceptions will be decided shortly and notified to the ANSP and military fort their project plans.
12/2018
REG (By:12-2018)
The NSA will monitor the change via the submission of the required safety cases by the ANSP and by collecting evidences on the radios operated that comply with the 8,33 channel spacing except where derogations/exceptions apply.
Planned
12/2017
ASP (By:12-2018)
The ANSP has recently put into operations new radio equipment with 8,33 kHz channel spacing capability. The change has been safety assessed. The upgrading of the communication systems will be completed well before the deadline of the regulation. Training of operational staff will be planned accordingly.
Planned
12/2018
MIL (By:12-2020)
The Military authorities will examine the applicability of the regulation and will plan the relevant changes to both airborne and ground systems. The extend of the changes is assessed to be initially small to the limited scope of operations.
Planned
12/2018
APO (By:12-2018)
The airports shall examine the applicability of article 2(4) of (EU) 1072/2012 and will create a plan for the conversions of frequency assignments
Planned
12/2017
ITY-COTR Implementation of ground-ground automated co-ordination processes (By:02/2015)
[Essential] Planned
Current FDP currently support these operations but OLDI is not implemented. Implementation will be done with the connection to the ATC system of Greece, Egypt and Israel. The other adjacent countries (Lebanon and Syria) do not currently support the OLDI protocol, whereas Turkey refuses to cooperate with Cyprus on all issues, including Air Traffic.
02/2015
REG (By:12-2012)
The operator has a SMS which foresees that any change is assessed for Safety point of view. The NSA will review the safety case for the introduction of COTR
Late
06/2014
ASP (By:02-2015)
Current FDP currently support these operations but OLDI is not implemented. Implementation will be done with the connection to the ATC system of Greece, Egypt and Israel. The other adjacent countries (Lebanon and Syria) do not currently support the OLDI protocol, whereas Turkey refuses to cooperate with Cyprus on all issues, including Air Traffic.
Planned
02/2015
MIL (By:12-2012)
Operations of Cypriot National Guard OAT do not require any ground to ground automated co‐ordination processes.
Not Applicable
‐
ITY-FMTP Apply a common flight message transfer protocol (FMTP) (By:12/2014)
[IDP]
Completed
Technically completed with the new ATM system that uses OLDI over FMTP 12/2013
REG (By:12-2014)
The objective is fulfilled with the installation and operation of the new ATM system.
Completed
12/2013
ASP (By:12-2014)
The new ATM system became operational in 2013 uses the FMTP protocol for information exchanges between flight data processing systems for the purpose of notification, coordination and transfer of flights. The system implements OLDI with FMTP.
Completed
12/2013
MIL (By:12-2014)
The Cypriot National Guard does not provide any GAT service, these are provided by DCAC. Therefore this Objective is not aplicable.
Not Applicable
‐
LSSIP Year 2013 Cyprus 37 Released Issue
ITY-SPI Surveillance performance and interoperability (By:12/2019)
Planned
The Republic of Cyprus shall be fully compliant with Regulation (EU) No 1207/2011 on the appropriate time scale.
02/2015
REG (By:12-2013)
The NSA has established a well documented system on the oversight of CNS changes in the State and regularly reviews and approves the safety assessment of the ANSP. The review of the assessment is based on the methodology proposed by Eurocontrol. The whole process is published for all providers in Cyprus. The process is currently being practiced extensively.
Completed
12/2012
ASP (By:02-2015)
The ANSP conducts a safety assessment process for all surveillance function related changes. The safety assessment process aim is to analyses the evidences and justify the arguments. This methodology shall be applied for any upcoming change. The ANSP is in continuous communication with the ANSP in the development of the safety cases. A vital part of the management of changes is the relevant training of the affected ATM personnel.
Planned
02/2015
MIL (By:12-2019)
The Cyprus Military does not use or does not provide surveillance data for ATM purposes.
Not Applicable
‐
NAV03 Implementation of P-RNAV (By:12/2012)
[Essential] Late
The restructuring of the airspace around Larnaca airport in accordance with ICAO PANS OPS requirements is at a mature stage. A Terminal Area has been designed, new fixed transition altitude has been decided and new conventional STARS and SIDS and let down procedures are already designed. The same airspace design concept will also apply for Paphos as soon as the Larnaca procedures are published. The process is expected to be completed in the second half of 2014. Cyprus will implement RNAV 1/RNP procedures to be supported though the use of GNSS. The RNAV 1 SIDS and STARS will overlay the new conventional procedures. In an environment without adequate ground navigation infrastructure, the SID/STAR application of RNAV 1 might necessitate exclusive application of GNSS. In this phase, aircraft that do not meet the RNAV 1 Standards (non‐capable) will be requested to fly on VOR/DME/NDB routes, whereas aircraft that meet the RNAV 1 Standards (capable) are to fly in general on RNAV routes (Mixed Operations). These RNAV1 trajectories will also improve efficiency in running continuous climb and descent operations.
12/2014
REG (By:01-2005)
The NSA shall provide the nessesary oversight on the design and the implementation of the new procedures
Late
12/2014
ASP (By:12-2012)
The restructuring of the airspace around Larnaca airport in accordance with ICAO PANS OPS requirements is at a mature stage. A Terminal Area has been designed, new fixed transition altitude has been decided and new conventional STARS and SIDS and let down procedures are already designed. The same airspace design concept will also apply for Paphos as soon as the Larnaca procedures are published. The process is expected to be completed in the second half of 2014. Cyprus will implement RNAV 1/RNP procedures to be supported though the use of GNSS. The RNAV 1 SIDS and STARS will overlay the new conventional procedures. In an environment without adequate ground navigation infrastructure, the SID/STAR application of RNAV 1 might necessitate exclusive application of GNSS. In this phase, aircraft that do not meet the RNAV 1 Standards (non‐capable) will be requested to fly on VOR/DME/NDB routes, whereas aircraft that meet the RNAV 1 Standards (capable) are to fly in general on RNAV routes (Mixed Operations). These RNAV1 trajectories will also improve efficiency in running continuous climb and descent operations.
Late
12/2014
MIL (By:12-2012)
The Cypriot National Guard does not provide any GAT service as these are provided by DCAC.
Not Applicable
‐
LSSIP Year 2013 Cyprus 38 Released Issue
NAV10 Implement APV procedures (By:12/2016) [IDP]
[Essential] Planned
The EASA material for APV procedures is currently under review and projectst for the Design and Publication of APV/Baro and/or APV/SBAS procedures and the development of a national safety case for APV/Baro operations and/or APV/SBAS operations are initiated.
12/2015
REG (By:04-2016) The EASA material for APV procedures is currently under review
Planned
09/2014
ASP (By:12-2016)
A project for the Design and Publication of APV/Baro and/or APV/SBAS procedures is initiated and shall follow the completion of NAV03. The Approach Procedures (RNAV GNSS) with vertical guidance (APV) shall use barometric inputs (APV Baro‐VNAV). APV Baro‐VNAV criteria is waiting for enhancements like offset criteria and Vertical Error Budget (VEB) methodology. The standard approach procedure will be GNSS based. This will significantly contribute to improving safety because it reduces pilot workload and prevents CFIT. ILS will be retained and ground based approaches are considered to be essential for contingency purposes. A project for the development of a national safety case for APV/Baro operations and/or APV/SBAS operations is initiated.
Planned
12/2015
MIL (By:12-2016)
The Cypriot National Guard does not intend to implement this objective as it does not possess any transport type aircraft.
Not Applicable
‐
SAF10 Implement measures to reduce the risk to aircraft operations caused by airspace infringements (By:12/2011)
Completed
The interfaces between the commercial civilian, VFR and Military traffic has been examined. The DCAC has reviewed the VFR airspace infringement issue through a survey on VFR/military operations at Larnaca/Paphos airports and redesigned the lower national airspace. Training and procedures and the relevant AICs were completed. Additional measures to reduce airspace infringements are made already. Specific reporting mechanism for IFR airspace infringements also exists, and results are communicated to airlines for corrective actions.
12/2011
REG (By:12-2011)
The measures employed ny the ANSP to reduce the risk to aircraft operations caused by airspace infringements are under the scope of the regulatory oversight.
Completed
12/2009
ASP (By:12-2011)
The interfaces between the commercial civilian, VFR and Military traffic has been examined. The DCAC has reviewed the VFR airspace infringement issue through a survey on VFR/military operations at Larnaca/Paphos airports and redesigned the lower national airspace. Training and procedures and the relevant AICs were completed. Additional measures to reduce airspace infringements are made already. Specific reporting mechanism for IFR airspace infringements also exists, and results are communicated to airlines for corrective actions.
Completed
12/2011
MIL (By:12-2011)
The Cypriot National Guard does not deliver any ATC services to Civil Aviation, neither it has any Regulatory role. The actions by the DCAC has been conducted in collaboration with the Military Authorities.
Not Applicable
‐
LSSIP Year 2013 Cyprus 39 Released Issue
SAF11 Improve runway safety by preventing runway excursions (By:01/2018)
Planned
The State has established the necessary oversight activities in the form of audit plans, audit reports and subsequent corrective action plans. The process of airport certification has been initiated and its expected to cover the requirements emanating thought the excursion action plan. The State will follow the process closely.
06/2015
REG (By:01-2018)
The DCAC‐Airports Oversight section and the NSA will include the program under their audit scopes for the upcoming years.
Planned
06/2015
ASP (By:12-2014)
The ANSP is actively participating in the local safety teams and will adjust the Tower staff trailing accordingly to cover the aspects of the plan.
Planned
12/2014
MIL (By:01-2018)
The Cyprus National Guard does not operate and IFR/GAT that falls under the Runway prevention excursion program.
Not Applicable
‐
APO (By:12-2014)
The airport is under certification process which covers both the physical elements required and the procedure requirements. Participates also in the local safety teams.
Planned
12/2014
SRC-CHNG
Implementation of Safety Oversight of Changes to ATM by National Supervisory Authorities (NSA) (By:12/2010) (Outside Applicability Area)
Not Applicable
Cyprus is not in the applicability area of this Objective. ‐ REG (By:12-2010) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
MIL (By:12-2010) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
SRC-RLMK
Implement the EUROCONTROL Safety Regulatory Requirements (ESARRs) (By:12/2010) (Outside Applicability Area)
Not Applicable
Cyprus is not in the applicability area of this Objective. ‐ REG (By:12-2010) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
MIL (By:12-2010) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
SRC-SLRD Safety Levels and Resolution of Deficiencies (By:12/2010) (Outside Applicability Area)
Not Applicable
Cyprus is not in the applicability area of this Objective. ‐ REG (By:12-2010) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
MIL (By:12-2010) Cyprus is not in the applicability area of this Objective.
Not Applicable
‐
LSSIP Year 2013 Cyprus 40 Released Issue
Annexes
Annex A – Specialists involved in the LSSIP Process
LSSIP Co-ordination
LSSIP Focal Point for CYPRUS
DCAC Nicos NICOLAOU / Haris ANTONIADES [email protected]
LSSIP Focal Point for ANSP DCAC Haris ANTONIADES [email protected]
LSSIP Focal Point for NSA DCAC/NSA Panayiota DEMETRIOU-GEORGIOU [email protected]
LSSIP Focal Point for Military Cypriot National Guard Marinos KYROU [email protected]
LSSIP Focal Point for Airport DCAC Nicolas MYTIDES [email protected]
LSSIP Contact Person for CYPRUS
EUROCONTROL Bernd HILL [email protected]
ESSIP Objective Implementation
ESSIP Objective
EUROCONTROL Objective Owners EUROCONTROL EIPR Objective Coordinator
National Stakeholder Specialist(s)
AOM13.1 R. BUCUROIU, O. MROWICKI, E. REUBER
O. CIOARA Nicos NICOLAOU
AOM19 G. ACAMPORA, O. MROWICKI O. CIOARA Nicos NICOLAOU
AOM20 R. BUCUROIU O. CIOARA Nicos NICOLAOU
AOM21 R. BUCUROIU O. CIOARA Nicos NICOLAOU
AOP01.2 P. ADAMSON P. VRANJKOVIC Persephone PAPADOPOULOU
AOP03 T. LICU P. VRANJKOVIC Persephone PAPADOPOULOU
AOP04.1 P. ADAMSON P. VRANJKOVIC Persephone PAPADOPOULOU
AOP04.2 P. ADAMSON P. VRANJKOVIC Persephone PAPADOPOULOU
AOP05 P. ADAMSON P. VRANJKOVIC Persephone PAPADOPOULOU
ATC02.2 B. BAKKER, S. DROZDOWSKI I. FEIJT Haris ANTONIADES
ATC02.5 B. BAKKER, S. DROZDOWSKI I. FEIJT Haris ANTONIADES
ATC02.6 B. BAKKER, S. DROZDOWSKI I. FEIJT Haris ANTONIADES
ATC02.7 B. BAKKER, S. DROZDOWSKI I. FEIJT Haris ANTONIADES
ATC07.1 N. GAUTIER L. DELL’ORTO Haris ANTONIADES
ATC12 N. GAUTIER L. DELL’ORTO Haris ANTONIADES
ATC15 N. GAUTIER L. DELL’ORTO Haris ANTONIADES
ATC16 S. DROZDOWSKI L. DELL’ORTO Haris ANTONIADES
ATC17 N. GAUTIER L. DELL’ORTO Haris ANTONIADES
COM09 L. POPESCU O. ALFARO Haris ANTONIADES
COM10 Y. EYUBOGLU A. KOKONA Haris ANTONIADES
COM11 L. POPESCU A. KOKONA Haris ANTONIADES
ENV01 P. ADAMSON B. HILL Haris ANTONIADES
ENV02 S. MAHONY, A. WATT B. HILL Haris ANTONIADES
FCM01 H. KOOLEN O. CIOARA Haris ANTONIADES
FCM03 S. SMIDT O. CIOARA Haris ANTONIADES
FCM04 M. RICHARD O. CIOARA Haris ANTONIADES
LSSIP Year 2013 Cyprus 41 Released Issue
ESSIP Objective
EUROCONTROL Objective Owners EUROCONTROL EIPR Objective Coordinator
National Stakeholder Specialist(s)
FCM05 N. AGACDIKEN O. CIOARA Haris ANTONIADES
INF04 P. MATERN A-P. FRANGOLHO Persephone PAPADOPOULOU
ITY-ADQ M. UNTERREINER A-P. FRANGOLHO Persephone PAPADOPOULOU
ITY-AGDL S. DISSING A. KOKONA Haris ANTONIADES
ITY-AGVCS2 TBD O. ALFARO Persephone PAPADOPOULOU
ITY-COTR N. GAUTIER L. DELL’ORTO Haris ANTONIADES
ITY-FMTP L. POPESCU O. ALFARO Haris ANTONIADES
ITY-SPI M. BORELY, R. STEWART A-P. FRANGOLHO Haris ANTONIADES
NAV03 F. PAVLICEVIC A. KOKONA Nicos NICOLAOU
NAV10 R. FARNWORTH A. KOKONA Nicos NICOLAOU
SAF10 T. LICU I. FEIJT Petros STRATIS
SAF11 S. LAWRENCE I. FEIJT Petros STRATIS
SRC-CHNG M. DEBOECK A. DYBOWSKA Petros STRATIS
SRC-RLMK M. DEBOECK A. DYBOWSKA Petros STRATIS
SRC-SLRD M. DEBOECK A. DYBOWSKA Petros STRATIS
LSSIP Year 2013 Cyprus 42 Released Issue
Annex B – National Stakeholders Organisation Charts
B1. Organisation chart of DCAC:
B2. Stakeholders Organisation Chart (arrows indicate interaction)
Safety Regulation Unit
SecurityAir Navigation Services Air Transport
NSA
Air Traffic Services
Aeronautical Information
Services
CNS
MET Services
Airport Operator
TWRs located in the airport periphery
LSSIP Year 2013 Cyprus 44 Released Issue
Annex C – Glossary of Abbreviations
ACAS Airborne Collision Avoidance System
ACC Area Control Center
ADEXP ATS exchange presentation
ADS Automatic Dependent Surveillance
AIS Aeronautical Information Service
AMAN Arrival Management
ANS Air navigation services
AOP Airport operations
APP Approach Control Service
ARN Area Route Network
ASM Airspace Management Service
ATC Air Traffic Control
ATCO Air Traffic Control Officer
ATFM Air Traffic Flow Management
ATM Air Traffic Management
ATS Air Traffic Services
CNS/ATM Communication Navigation Surveillance/Air Traffic Management
COM Communication
CYTA Cyprus Telecommunications Agency
DCA Department of Civil Aviation
EAD European AIS Data Base
EASA European Aviation Safety Agency
EC European Commission/Community
ECAC European Civil Aviation Conference
EGNOS European Geostationary Navigation Overlay Service
ETFMS Enhanced tactical flow management system
ENV Environment
ESA European Space Agency
EU European Union
EUROCONTROL European Organisation for the Safety of Air Navigation
FIR Flight Information Region
FPL Flight Plan
FUA Flexible Use of Airspace
GNSS Global Navigation Satellite System
GPS Global positioning system
ICAO International Civil Aviation Organisation
ILS Instrument Landing System
MCW Ministry of Communications and Works
MET Meteorology
MFA Ministry of Foreign Affairs
MoD Ministry of Defence
MSAW Minimum safe altitude warning
MTCD Medium term conflict detection
NOTAM Notice to Airmen
OLDI On Line Data Interface
RNAV Area Navigation