Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower Project (Lao People's Democratic Republic) Prepared by Nam Ngiep 1 Power company Limited for the Asian Development Bank This master plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Master Plan for Livelihood Development

Transcript of Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number:...

Page 1: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019

Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower Project (Lao People's Democratic Republic)

Prepared by Nam Ngiep 1 Power company Limited for the Asian Development Bank

This master plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Master Plan for Livelihood Development

Page 2: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower
Page 3: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 1 of 196 

TABLE OF CONTENTS 

EXECUTIVE SUMMARY .................................................................................................................. 9 

1  PROJECT BACKGROUND ....................................................................................................... 12 

1.1  BACKGROUND ................................................................................................................... 12 

1.1.1  Project Impact Zones ................................................................................................. 12 

1.2  RESETTLEMENT ................................................................................................................. 14 

2  METHODOLOGY OF PREPARATION OF THE PLAN ................................................................ 16 

2.1  RATIONALE ....................................................................................................................... 16 

2.2  PREPARATIONS .................................................................................................................. 16 

2.3  TRAINING ......................................................................................................................... 16 

2.3.1  Training on Market Chain Assessment ...................................................................... 17 

2.4  TRAINING ON ECONOMIC CALCULATION OF A PROFESSION .......................................................... 17 

2.4.1  Concept of a Profession ............................................................................................. 18 

3  CA OBLIGATIONS AND REDP REQUIREMENTS ..................................................................... 18 

3.1  CA OBLIGATIONS ............................................................................................................... 18 

3.2  REDP ............................................................................................................................. 19 

3.3  POVERTY LINES ................................................................................................................. 19 

3.4  INCOME TARGETS ............................................................................................................... 19 

4  LIVELIHOOD POTENTIAL, OPPORTUNITIES AND MARKETS .................................................. 20 

4.1  CONDITION FOR SUCCESS ..................................................................................................... 20 

4.2  POTENTIAL, OPPORTUNITIES AND MARKETS IN ZONE 2UR ......................................................... 20 

4.3  POTENTIAL, OPPORTUNITIES AND MARKETS IN PHOUHOMXAY AND ZONE 5 ................................... 21 

4.4  POTENTIAL, OPPORTUNITIES AND MARKETS FOR SELF‐RESETTLERS ............................................... 21 

4.5  HOUSEHOLD OCCUPATION ................................................................................................... 22 

4.5.1  Consultations ............................................................................................................ 23 

4.5.2  Selection of profession .............................................................................................. 24 

4.6  CURRENT MARKET CHAIN OF KEY PRODUCTS ........................................................................... 27 

4.6.1  Cattle ......................................................................................................................... 29 

4.6.2  Pigs ............................................................................................................................ 33 

4.6.3  Chickens .................................................................................................................... 35 

4.6.4  Fish ............................................................................................................................ 38 

4.6.5  Water melon ............................................................................................................. 40 

4.6.6  Sweet corn ................................................................................................................ 41 

Page 4: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 2 of 196 

4.6.7  Vegetables ................................................................................................................ 42 

4.6.8  Pineapple .................................................................................................................. 43 

4.6.9  Mushrooms ............................................................................................................... 44 

4.6.10  Banana processing ................................................................................................ 45 

4.6.11  Woven Lao skirt ..................................................................................................... 46 

5  PROFESSIONAL PILLARS ....................................................................................................... 48 

5.1  LIVESTOCK RAISING ............................................................................................................ 48 

5.1.1  Cattle farmer ............................................................................................................. 50 

5.1.2  Pig farmer ................................................................................................................. 51 

5.1.3  Fish farmer ................................................................................................................ 51 

5.1.4  Poultry farmer ........................................................................................................... 52 

5.1.5  Goat farmer .............................................................................................................. 52 

5.2  CROP CULTIVATION ............................................................................................................ 53 

5.2.1  Flat land crop farmer ................................................................................................ 54 

5.2.2  Upland crop farmer ................................................................................................... 55 

5.3  OFF‐FARM ....................................................................................................................... 56 

5.3.1  Shop owner ............................................................................................................... 56 

5.3.2  Restaurant owner...................................................................................................... 56 

5.3.3  Service provider ......................................................................................................... 56 

5.3.4  Banana chips ............................................................................................................. 56 

5.3.5  Weaving .................................................................................................................... 57 

5.4  RISKS .............................................................................................................................. 58 

6  DETAILS OF PROFESSIONS AND ECONOMIC CALCULATIONS ............................................... 58 

6.1  LIVESTOCK ........................................................................................................................ 59 

6.1.1  Large Livestock Raising ............................................................................................. 59 

6.1.2  Pig Raising ................................................................................................................. 60 

6.1.3  Chicken Raising ......................................................................................................... 61 

6.1.4  Aquaculture ............................................................................................................... 61 

6.2  CROP CULTIVATION ............................................................................................................ 62 

6.2.1  Paddy Rice Cultivation ............................................................................................... 62 

6.2.2  Wet season rice and dry season melon ..................................................................... 63 

6.2.3  Wet season rice and dry season sweet corn .............................................................. 63 

6.2.4  Mushroom Cultivation ............................................................................................... 64 

6.2.5  Mixed vegetables in greenhouse ............................................................................... 64 

Page 5: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 3 of 196 

6.2.6  Pineapple .................................................................................................................. 65 

6.3  RESERVOIR FISHERIES ......................................................................................................... 65 

6.3.1  Fish catch .................................................................................................................. 65 

6.4  OFF‐FARM & BUSINESS ...................................................................................................... 66 

6.4.1  Banana Chips ............................................................................................................ 66 

6.4.2  Weaving .................................................................................................................... 66 

6.4.3  Electrician .................................................................................................................. 67 

6.4.4  Tailor ......................................................................................................................... 68 

7  SUPPORT POLICY FOR PROFESSIONAL DEVELOPMENT ........................................................ 68 

7.1  PRINCIPLES OF CONTRIBUTION .............................................................................................. 68 

7.2  ACCESS TO FUNDS .............................................................................................................. 70 

7.3  KEY PROJECT INTERVENTION ................................................................................................. 70 

7.3.1  Business plan ............................................................................................................. 70 

7.3.2  Technical Trainings .................................................................................................... 71 

7.3.3  Market training ......................................................................................................... 71 

7.3.4  Economic Training ..................................................................................................... 71 

7.3.5  Training on laws and regulations .............................................................................. 71 

7.3.6  Production group ...................................................................................................... 72 

7.4  SCHOLARSHIP PROGRAM ..................................................................................................... 72 

7.5  VOCATIONAL TRAINING ....................................................................................................... 73 

7.6  CONTINUED LEARNING ........................................................................................................ 73 

7.7  APPROVAL BY GOL ............................................................................................................. 74 

8  END OF RESETTLEMENT IMPLEMENTATION PERIOD ‐ HAND OVER ..................................... 74 

8.1  THE END OF THE RESETTLEMENT IMPLEMENTATION PERIOD ........................................................ 74 

8.2  RECIPIENTS – PAP AND GOL ............................................................................................... 76 

8.3  BUILDING CAPACITY TO SUPPORT GOVERNMENT OPERATIONS AFTER HAND OVER ............................. 76 

8.4  BUILDING CAPACITY TO SUPPORT PAP OPERATIONS AFTER HAND OVER .......................................... 76 

8.5  COMMUNITY DEVELOPMENT PROGRAM FUND ......................................................................... 76 

9  INTEGRATION OF SPECIAL CONSIDERATIONS GIVEN TO VULNERABLE HOUSEHOLDS INTO THE PROGRAM ............................................................................................................................ 77 

10  INTEGRATION OF GENDER POLICIES INTO THE PROFESSION DEVELOPMENT PROGRAM .... 78 

11  MONITORING OF INDICATORS ............................................................................................. 78 

11.1  SELF‐MONITORING OF THE ECONOMICS OF A PROFESSION BY PAPS .............................................. 78 

11.2  PARTICIPATION IN PROFESSION DEVELOPMENT ACTIVITIES .......................................................... 79 

Page 6: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 4 of 196 

11.3  MONITORING OF INCOME THROUGH THE BIENNIAL SOCIO‐ECONOMIC SURVEY ............................... 79 

11.4  EXTERNAL MONITORING ..................................................................................................... 79 

12  PROJECT MANAGEMENT SYSTEMS ...................................................................................... 79 

12.1  COOPERATION WITH GOL ................................................................................................... 79 

12.2  THE INSTITUTIONS .............................................................................................................. 79 

12.3  OVERALL PROJECT INSTITUTIONAL ARRANGEMENTS .................................................................. 80 

12.3.1  Environment and Social Division ............................................................................ 80 

12.3.2  Information Management Section ......................................................................... 81 

12.3.3  Database Team ..................................................................................................... 81 

12.3.4  Knowledge Management Team ............................................................................. 82 

12.3.5  GIS Team ............................................................................................................... 82 

12.3.6  Environmental Management Office....................................................................... 82 

12.3.7  Social Management Office .................................................................................... 82 

12.3.8  Infrastructure Section ............................................................................................ 83 

12.3.9  Livelihood Teams ................................................................................................... 83 

12.3.10  Social Development Team ..................................................................................... 84 

12.3.11  Grievance Team ..................................................................................................... 84 

12.3.12  Government Relation and Community Relations Team ......................................... 84 

12.3.13  Socio Economic Monitoring Team ......................................................................... 84 

13  SCHEDULES .......................................................................................................................... 85 

14  OVERALL SMO BUDGET ....................................................................................................... 86 

15  CONCLUSION ....................................................................................................................... 87 

16  ANNEX.................................................................................................................................. 89 

16.1  ANNEX 1 LIST OF PROFESSIONS ............................................................................................. 90 

16.2  ANNEX 2 PROFESSION QUESTIONNAIRE .................................................................................. 92 

16.3  ANNEX 3 PM DECREE 309 ON POVERTY AND DEVELOPMENT STANDARD (ENGLISH TRANSLATION) ... 104 

16.4  ANNEX 4 DETAILS OF ECONOMIC CALCULATIONS .................................................................... 109 

16.4.1  Detailed Economic Calculations of Livestock ....................................................... 109 

16.4.2  Detailed Economic Calculations of Fish ................................................................ 132 

16.4.3  Detailed Economic Calculations of Crop farming ................................................. 142 

16.4.4  Detailed Economic Calculations of Off‐Farm Professions ..................................... 162 

16.5  ANNEX 5 UNOFFICIAL TRANSLATION OF THE SUPPORT POLICY ................................................... 174 

16.6  ANNEX 6 POTENTIAL INDICATORS FOR PAP TO DETERMINE LEVEL OF PROFESSIONAL ..................... 195 

 

Page 7: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 5 of 196 

TABLE OF TABLES 

Table 1‐1: Summary of Resettlers to Phouhomxay (31 December 2018) ............................... 15 

Table 1‐2: Number of Self‐Resettler Households in Bolikhan District. ................................... 15 

Table 1‐3: Number of Self‐Resettler Households in Hom District. ......................................... 15 

Table 1‐4: Number of Self‐Resettler Households in Thathom District. ................................... 16 

Table 4‐1: Number of PAP Selecting a Professions per Project Zone ..................................... 24 

Table 4‐2: Percentage of PAP by Age Selecting one of the Top 5 Professions in Zone 2UR, Thathom District. ....................................................................................... 24 

Table 4‐3: Number of People who Selected One of the Top 5 Professions by Gender in Zone 2UR, Thathom District. ............................................................................... 25 

Table 4‐4: Percentage of PAP by Age Selecting one of the Top 5 Professions by Self‐Resettlers in Thathom District. ....................................................................................... 25 

Table 4‐5: Number of People who Selected One of the Top 5 Professions by Gender by Self‐Resettlers in Thathom District. ................................................................... 25 

Table 4‐6: Percentage of PAP by Age Selecting one of the Top 5 Professions in Bolikhan District. ................................................................................................................... 26 

Table 4‐7: Number of People who Selected One of the Top 5 Professions by Gender in Bolikhan District. ....................................................................................................... 26 

Table 4‐8: Percentage of PAP by Age Selecting one of the Top 5 Professions in Hom District.26 

Table 4‐9: Number of People who Selected One of the Top 5 Professions by Gender in Hom District. ....................................................................................................... 26 

Table 4‐10: Number of People by Age Group Selecting One of the Top 5 Professions in Phouhomxay .............................................................................................. 27 

Table 4‐11: Number of People Selection One of the Top 5 Professions by Gender and Age Group in Phouhomxay........................................................................................... 27 

Table 4‐12: Price Ranges of different Types of Woven Lao Skirts........................................... 46 

Table 5‐1: Number and Gender of PAP selecting a profession in Livestock raising in Bolikhan District. ....................................................................................................... 48 

Table 5‐2: Number and Gender of PAP selecting a profession in Livestock raising in Hom District. ................................................................................................................... 49 

Table 5‐3: Number and Gender of PAP selecting a profession in Livestock raising in Zone 2UR, Thathom District. ....................................................................................... 49 

Table 5‐4: Number and Gender of PAP selecting a profession in Livestock raising by Self Resettlers in Thathom District. ................................................................... 50 

Table 5‐5: Number and Gender of PAP selecting a profession in Crop Cultivation in Bolikhan District. ....................................................................................................... 53 

Table 5‐6: Number and Gender of PAP selecting a profession in Crop Cultivation in Hom District. ................................................................................................................... 53 

Page 8: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 6 of 196 

Table 5‐7: Number and Gender of PAP selecting a profession in Crop Cultivation in Zone 2UR, Thathom District. ....................................................................................... 53 

Table 5‐8: Number and Gender of PAP selecting a profession in Crop Cultivation by Self Resettlers in Thathom District. ................................................................... 54 

Table 6‐1:Summary of Economic Calculation of Raising Cattle on an Annual Basis ............... 59 

Table 6‐2: Summary of Economic Calculation of Cattle Fattening on an Annual Basis ........... 60 

Table 6‐3: Summary of Economic Calculation of Raising Pigs on an Annual Basis .................. 60 

Table 6‐4: Summary of Economic Calculation of Raising Native Breed Chickens for sale as meet on an Annual Basis ..................................................................................... 61 

Table 6‐5: Summary of Economic Calculation of Raising Fish in Pond on an Annual Basis ..... 61 

Table 6‐6: Summary of Economic Calculation of Raising Fish in Cages on an Annual Basis .... 62 

Table 6‐7: Summary of Economic Calculation of Paddy Rice Cultivating in Two Seasons on an Annual Basis ............................................................................................... 62 

Table 6‐8: Summary of Economic Calculation of Cultivating Wet Season Rice and Dry Season Melon on an Annual Basis .......................................................................... 63 

Table 6‐9: Summary of Economic Calculation of Cultivating Wet Season Rice and Dry Season Sweet corn on an Annual Basis .................................................................. 63 

Table 6‐10: Summary of Economic Calculation of Mushroom Cultivation on an Annual Basis64 

Table 6‐11: Summary of Economic Calculation of Vegetable Production on an Annual Basis 64 

Table 6‐12: Summary of Economic Calculation of Pineapple Cultivation in average by an Annual Basis ........................................................................................................... 65 

Table 6‐13: Summary of Economic Calculation of Reservoir Fisheries on an Annual Basis .... 66 

Table 6‐14: Summary of Economic Calculation of Banana Chips on an Annual Basis ............. 66 

Table 6‐15: Summary of Economic Calculation of Weaving Lao Traditional Skirts on an Annual Basis ........................................................................................................... 67 

Table 6‐16: Summary of Economic Calculation of Electrician on an Annual Basis .................. 67 

Table 6‐17: Summary of Economic Calculation Tailor on an Annual Basis ............................. 68 

Table 7‐1: Summary of Scholarship Programme to date. ....................................................... 72 

Table 14‐1: Overall NNP1 SMO Budget (REDP) with SMO update in November 2019 ........... 87  

 

TABLE OF FIGURES 

Figure 1‐1: Overview Map of the Project Impact Zones ......................................................... 14 

Figure 4‐1: Interview for Selection of a Profession, Bo Village, Bolikhan District ................... 23 

Figure 4‐2: Market Chain Flowchart for Cattle in Zone 2UR ................................................... 30 

Figure 4‐3: Market Chain Flowchart for Cattle in Phouhomxay ............................................. 30 

Page 9: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 7 of 196 

Figure 4‐4: Market Chain Flowchart for Cattle in Phamuang ................................................. 31 

Figure 4‐5: Market Chain Flowchart for Cattle in Hom District .............................................. 31 

Figure 4‐6: Market Chain Flowchart for Cattle Trading in Zone 2UR. ..................................... 32 

Figure 4‐7: Market Chain Flowchart for Cattle  for Fattening in Phouhomxay. ...................... 32 

Figure 4‐8: Market Chain Flowchart for Pigs in Zone 2UR. ..................................................... 33 

Figure 4‐9: Market Chain Flowchart for Pig in Phouhomxay. ................................................. 34 

Figure 4‐10: Market Chain Flowchart for Pig Trading in Zone 2UR. ........................................ 34 

Figure 4‐11: Market Chain Flowchart for Piglets in Phouhomxay .......................................... 35 

Figure 4‐12: Market Chain Flowchart for Chickens in Zone 2UR ............................................ 36 

Figure 4‐13: Market Chain Flowchart for Chickens in Phouhomxay ....................................... 36 

Figure 4‐14: Market Chain Flowchart for Chickens in Phamuang ........................................... 37 

Figure 4‐15: Market Chain Flowchart for Chickens in Hom District ........................................ 37 

Figure 4‐16: Market Chain Flowchart for Fish from the Nam Ngiep Reservoir in Zone 2UR ... 38 

Figure 4‐17: Market Chain Flowchart for Fish from the Nam Ngiep Reservoir in Bolikhan .... 39 

Figure 4‐18: Market Chain Flowchart for Fish from the Nam Ngiep Reservoir in Hom .......... 39 

Figure 4‐19: Market Chain Flowchart for Raising Fish in Cages in Tahuea Village .................. 40 

Figure 4‐20: Market Chain Flowchart for Water Melons in Phouhomxay village ................... 41 

Figure 4‐21: Market Chain Flowchart for Sweet Corn in Zone 2UR ........................................ 42 

Figure 4‐22: Market Chain Flowchart for Vegetables from Phouhomxay .............................. 43 

Figure 4‐23: Market Chain Flowchart for Pineapples from Phouhomxay ............................... 44 

Figure 4‐24: Market Chain Flowchart for Mushrooms from Zone 2UR .................................. 45 

Figure 4‐25: Market Chain Flowchart for Processed Banana from Phouhomxay ................... 45 

Figure 4‐26: Market Chain Flowchart for Woven Lao Skirts from Zone 2UR .......................... 47 

Figure 4‐27: Market Chain Flowchart for Woven Lao Skirts from Phouhomxay ..................... 47 

Figure 5‐1: Women Weaving a Lao Skirt, Zone 2UR ............................................................... 57 

Figure 8‐1: Flowchart on hand over of Livelihood Program to GOL ....................................... 75 

Figure 12‐1: Organisational chart of the ESD, April 2019 ....................................................... 81 

Figure 12‐2: SMO Organizational Chart, April 2019 ............................................................... 83 

Figure 13‐1: Roadmap to Development of Professions .......................................................... 85 

Figure 13‐2: Time Schedule for development of Professions ................................................. 86  

   

Page 10: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 8 of 196 

Abbreviation  Full Name 

2LR  Zone 2 Lower Reservoir 

2UR  Zone 2 Upper Reservoir 

ADB  Asian Development Bank 

AMSL  Above Mean Sea Level 

AP  Affected People 

BCS  Broad Community Support 

CA  Concession Agreement 

COD  Commercial Operation Date 

FSL   Full Supply Level 

GOL  Government of Lao PDR 

Ha  Hectare 

HH  Household or Households 

IAP  Independent Advisory Panel 

IEE  Initial Environmental Examination 

IMA  Independent Monitoring Agency 

KANSAI  The Kansai Electric Power Company, Incorporated. 

LAK  Lao Kip 

NGO  Non‐Government Organization 

NNP1  Nam Ngiep 1 Hydropower Project 

NNP1PC  Nam Ngiep 1 Power Company 

PAP  Project Affected People 

OSEM  Ongoing Socio‐Economic Monitoring 

PAH  Project Affected Household or Households 

PIZ  Project Implementation Zone 

PRLRC  Provincial Resettlement and Livelihood Restoration Committee 

REDP  Resettlement and Ethnic Development Plan 

RMU   Resettlement Management Unit  

SDP  Social Development Plan 

SMO  Social Management Office 

SPS 2009  Social Policy Statement 2009 (ADB) 

 

Page 11: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 9 of 196 

EXECUTIVE SUMMARY 

This Master Plan for Livelihood Development is an update of the Livelihood Income Restoration Plan (LIRP), contained in the REDP and Zone Specific REDP Updates (available on the company and ADB websites).   The Zone Specific REDP Updates were prepared as an  integral part of the Resettlement Program. Resettlement of all PAPs was concluded in May 2018, when the last Self‐Resettlers from Zone 2LR resettled. With the resettlement completed, NNP1PC  is now able to update it’s program of support for Livelihood Development to PAPs based on the actual number of households who have  resettled  to  the Phouhomxay Resettlement  area or  to  self‐selected locations (self‐resettlement). The Project will continue to provide livelihood support program for all  PAP  including  those  who  did  not  physically  relocate  but  have  experienced  economic displacement and who are living in the 3 target districts of Thathom, Bolikhan and Hom. 

The purposes of the Master Plan for Livelihood Development is to express NNP1PC’s coherent strategy for the development of the livelihoods of affected people as well as provide guidance to the Livelihood Teams for its implementation. It establishes key principles such as best practice and standards, alignment with national livelihood approaches or strategies, access to the market and  investment support for those who do not have enough capital such as vulnerable, elderly and disabled people.   

The basis of the  livelihood program  is the concept of self‐determination of Affected People to decide in what way they will provide for their family. The Concession Agreement signed between the Company and the Government of Laos requires NNP1PC to implement a livelihood program aimed at increasing of the average net income by 200% within ten years from COD (September 2019) from what was measured in the baseline socioeconomic survey.  

This master plan builds on the experience of implementing the NNP1PC Livelihood Program since its full start in 2014 and the trials conducted at the resource centre since 2012. Fundamental to the concept of the  livelihood master plan  is the realization that  in order to meet the required increase of  income,  land,  capital  and  labour productivity needs  to be  increased. To  increase productivity,  strategies  and  activities  to  increase  the  productivity  of  land  and  capital  and specialization of tasks is considered. This specialization is captured in this plan by using the term “Profession”.   

In  this  document,  a  profession  is  classified  as  the  main  activity  undertaken  by  a  person  to contribute to the income of the family. A person is expected to spend approximately 6 hours per day working on such activity. Beside this activity, the person can also carry out other  income generating activities to increase the family or personal income. This means that apart from the main activity of  identified profession, one person  can undertake many activities  in a year  to create enough income for the family. 

A set of consecutive internal meetings were conducted for the staff of the 3 Livelihood Teams to prepare: (i) an agreed concept of a profession, (ii) a  list of professions, (iii) a questionnaire to collect information from PAPs on their preferred profession (iv) a database and data entry system and (v) a livelihood support policy. Following the establishment of the questionnaire in Q4 2018, staff conducted household by household interviews in order to obtain the personal preference of PAPs on their profession   

An external international consultant was contracted to train the staff on (i) conducting a Rapid Market Chain Assessment and (ii) Economic Analysis of a Profession. Following each training, staff 

Page 12: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 10 of 196 

collected  information on the Market Chain and Economics of selected professions, which was presented to and reviewed by the consultant.   

Lessons learned and evaluations of the livelihood programs implemented since 2018 identified the areas for project interventions for various professions. Access to knowledge and best practice experiences  are  the  main  factors  limiting  current  production.  A  support  policy  to  build  the profession is established based on this available information. On 26 April 2019 this support policy was discussed with relevant GOL counterparts and modified to incorporate their suggestions. 

Through  the  professional  development  program,  each  person  is  asked  what  their  choice  of profession is. This choice will then be supported. By working at an individual level, there is close attention to the choice made by women  for their selected profession. Support and necessary trainings will be provided to the person who selected a specific profession, ensuring that women have equal access to training and support for development of their selected profession. 

Special attention will continue to be provided to vulnerable households. This includes a focus on producing food at the home plot with more intense training and follow‐up. This food production can include both vegetables, fruit and meat through raising chicken or fish. The program will also seek to establish community or kinship support for cultivation of agricultural land during periods of  high  labour  input,  such  as  ploughing,  planting  and  harvesting.  Key  to  the  support  is  an individual approach, taking into consideration the abilities of each person, their family, clan and kinship support  for  long term sustainability. Through timely addressing small  issues,  including health  issues  and  other  concerns  not  directly  related  to  income  generation,  a  gradual improvement will be achieved for the vulnerable household over time.  

It is expected that most PAPs will require several years to build their profession after relocation. It was noted that all resettlers are already connected to the market and many respond well to market  signals.  These  signals  will  dictate  their  “profession”  and  they  may  change  their “profession”  based  on  these  signals.  In  this  case,  the market  reward  (profitability)  for  each profession  will  be  considered  as  an  input  in  to  the  PAP’s  decision  to  choose  or  change “profession.”   The number of PAP involved in activities building their profession is expected to increase over the next 3 years. Not all people are ready to select their profession and not all PAPs can be meaningfully engaged during this year. A key contributing factor for PAP to not yet select their profession is that they have not yet purchased their desired agricultural land. They still plan to purchase land and, in the meantime, engage with the project in "home sweet home1" activities to contribute to daily food requirements.   The Resettlement Implementation period  is 5 years after COD, during which this Livelihood Master Plan will be implemented  

An  important  part  of  the  program  is  building  the  capacity  of  PAPs,  producer  groups, model farmers and district  staff  to  continue  to build professions after  the end of  the Resettlement Implementation Period.  

The goal is to ensure food security for resettled households, to generate cash surplus for savings and purchase of consumables, and  to ensure  that  the PAPs are  secure enough  in  their post‐

 

 1 home sweet home is a program targeting improvements of the productivity of the home plot for producing food items for family consumption, through a range of activities including cultivating various fruit trees along the home plot fences, raising a limited number of small animals for consumption (including chickens, ducks, catfish) as well as establishing household vegetable plots. Some households build a mall shop on their land to sell a select number of goods to their neighbours.

Page 13: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 11 of 196 

resettlement livelihoods that any unforeseen future events (natural and family) do not present long term threats.  

Project support to activities for development of professions are described in the support policy (Annex 5 Unofficial Translation of the Support Policy), related staffing and operational expenses are part of and covered by the SMO Budget. The support policy attached in Annex 5 covers the years 2019 and 2020. During 2020, it will be reviewed and updated as required for the next period of the Resettlement Implementation Period.       

NNP1PC  realizes  that  this plan  sets  the  framework of  the activities and  that detailed annual planning is required to adjust its programs to the local situations as they develop over time, taking into  consideration  the  actual progress of professional development,  land production,  capital expansion and  the  resulting  income growth   as well as overall changes  in  local, national and international  markets  which  all  influence  the  economy.  Annual  activity  plans  will  therefore continue to be made and strategies adjusted to reflect the actual situation on the ground, using the method of adaptive management. 

Page 14: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 12 of 196 

1 PROJECT BACKGROUND 1.1 BACKGROUND 

The Nam Ngiep 1 Hydropower Project is located along the Nam Ngiep River in Xaysomboun and Bolikhamxay Provinces of Lao PDR, downstream of the Nam Ngiep 2 Hydropower Project. The Project is situated some 41 km north of Paksan, the provincial capital of Bolikhamxay Province, itself located 145 km north‐east of the national capital, Vientiane. 

The main construction works of NNP1 started in October 2014.  Impounding of the main reservoir started in May 2018 and electricity will be generated from the planned Commercial Operation Date (COD) in August 2019, over a concession period of 27 years.    

The  Social  Measures  are  described  in  the  approved  Project  Resettlement  and  Ethnic Development Plan (REDP) and the Social Development Plan (SDP) which were made public and uploaded onto the Project and Asian Development Bank (ADB) websites in June 2014.  

The REDP provides a comprehensive background on the Project and the legal framework in which the Project functions as well as a description of the applicable social safeguards policies.  It further presents all project social and  livelihood restoration plans  including the Compensation Policy, Zonal Resettlement Action Plans, Livelihood and Income Restoration Plan, Ethnic Development Plan,  Public  Consultation  Plans  leading  to  Broad  Community  Support,  and  describes  the implementation  and monitoring  structures  for  these  programmes  as well  as  a  schedule  and budget for their execution. 

The Social Development Plan (Updated October 2016) covers those social, economic, labour and cultural mitigation issues that are not covered in the Resettlement and Ethnic Development Plans (REDPs). The SDP elaborates on the issues of public health, labour and social management linked to  construction  and  community  development.  This  update  has  taken  into  consideration  the findings of the latest socio‐economic survey of the project affected communities (Q4‐2014), the needs and priorities of these communities which was obtained through consultations held since 2014 and the lessons learned from the initial activities implemented since NNP1 started partly implementing some components of the SDP. 

1.1.1 Project Impact Zones 

As indicated in Figure 1‐1, the implementation of the Social Measures is divided into geographical zones based on the assessment of the level and nature of the potential impacts from the Project construction and operations.  

Zone 2UR (Upper Reservoir Area) covers the upper section of the immediate catchment area of the  main  reservoir  below  elevation  320  m  AMSL.  The  three  villages  of  Pou,  Hatsamkhone, Piengtha,  located alongside the Nam Ngiep River, will be directly affected. All of these villages belong to Thathom District, Xaysomboun Province. 

Zone 2LR (Lower Reservoir Area) covers the lower section of the reservoir, where the four villages of Houaypamom,  Sopphuane,  Sopyouak, and Namyouak will be  completely  inundated. All of these villages are located in Hom District, Xaysomboun Province. All households in these villages will be resettled and compensated for the loss of housing, residential land, productive lands, and other assets, and will have their livelihoods restored.  

Zone 3 (Construction Area) covers the area where the main project components are being built and includes one community, Hatsaykham, which administratively belongs to the village of Hat Gniun, one of the two host villages. 

Page 15: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 13 of 196 

Zone 4 (Downstream) covers the villages downstream from the regulating dam, excluding Hat Gniun Village, which is considered a host village. Zone 4 includes the villages of Nampa, Somseun, Houaykhoun, Thong Noi, Thong Yai, Sanaxay, Phonsy, Pak Niep and Sene Oudom. 

Zone 5 (Host Villages) covers the villages nearest to the resettlement site being Ban Hat Gniun and Ban Thahuea 

230  kV  Transmission  Line  corridor  covers  24  villages  located  in  one  province  and  Vientiane municipality affected by the permanent acquisition of land for transmission tower bases and the temporary impact from construction and line stringing 

Page 16: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 14 of 196 

Figure 1‐1: Overview Map of the Project Impact Zones 

 1.2 RESETTLEMENT 

Resettlement of all PAP  from Zone 2LR was completed  in May 2018, prior  to  the start of  the inundation of the main Reservoir. Table 1‐1 to  Table 1‐4 provide  the number of  resettlers who opted  to  resettle within  the Project Zone of Influence. Due  to households  splitting,  the  total number of households after  resettlement  is larger than the number of households required to resettle from the original villages.   

Page 17: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 15 of 196 

Significantly  impacted people who  are  living  in  the Project  Zone of  Influence  are entitled  to participate  in  the  Livelihood  Programs  initiated  by  NNP1PC.  This  includes  Resettlers,  Self‐Resettlers, the host community as well as the significantly impacted people in the 3 communities in Zone 2UR.   

Table 1‐1: Summary of Resettlers to Phouhomxay (31 December 2018)  

Zone  Origin Village Name 

Number of Resettling Households 

Number of Splitting Households 

Total Number of Households 

Total Number of People 

Number of Female Re‐settlers 

Age of Resettlers in years

0‐5  5‐10 

10‐15 

15 and more 

Zone 3 

Hatsaykham  20  4 24 167 84 31  30  16 90

Zone 2LR 

Houaypamom  11  1 12 93 43 22  13  15 43

Namyouak  5  0 5 27 15 5  7  1 14

Sopphuane  12  4 16 94 46 19  7  11 58

Sopyouak  23  2 25 152 80 22  22  26 82

  Total  71  11 82 534 268 99  79  69 287

 

Table 1‐2: Number of Self‐Resettler Households in Bolikhan District. 

Number  Village Name  Number of Self‐Resettler Households in the village 1  Nonsomboun  15 2  Wa  39 3  Nakoun  5 4  Bor  18 5  Phameuang  24 6  Sisavath  4 7  Nahun  38 8  Phadai  1 9  Thongphankham  1 10  Nalong  1 

Total  146  

Table 1‐3: Number of Self‐Resettler Households in Hom District. 

No.  Village Name  Number of Self‐Resettler Households in the village 1  Houayxay  80 2  PhouNgou  10 3  Homthat  20 4  Phalavak  28 5  Phoukatha  1 6  Namkhaine  54   Total  193 

Page 18: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 16 of 196 

 

Table 1‐4: Number of Self‐Resettler Households in Thathom District. 

Village name  Number of Self‐Resettler Households in the village 

Thaviengxay and Phonhom  35 Vanghai, Paknyong cluster   99 

Total  134  

2 METHODOLOGY OF PREPARATION OF THE PLAN 2.1 RATIONALE 

This Master Plan for Livelihood Development is an update of the Livelihood Income Restoration Plan (LIRP), contained in the REDP and Zone Specific REDP Updates (available on the company and ADB websites).   The Zone Specific REDP Updates were prepared as an  integral part of the Resettlement Program. Resettlement of all PAPs was concluded in May 2018, when the last Self‐Resettlers from Zone 2LR resettled. With the resettlement completed, NNP1PC  is now able to update it’s program of support for Livelihood Development to PAPs based on the actual number of households who have  resettled  to  the Phouhomxay Resettlement  area or  to  self‐selected locations  (self‐resettlement)  in  the project  area of  influence of Bolikhan, Hom  and  Thathom Districts. The Project will continue to provide support for PAP in the form of a livelihood support program  for  all  PAP  including  those  in  Zone  2UR  who  did  not  physically  relocate  but  have experienced economic displacement and who are living in the 3 above mentioned districts. 

2.2 PREPARATIONS The process of preparing this master plan started during the External Monitoring mission by the Independent Advisory Panel (IAP) and Asian Development Bank (ADB) in November 2017. During the  mission,  NNP1PC  committed  itself  to  the  preparation  of  this  plan.  Fundamental  to  the concept of the livelihood program is the realization that in order to meet the required increase of income (see Chapter 3), land productivity, capital and labour productivity needs to increase. To  increase productivity, specialization of tasks  is considered. This specialization  is captured  in this plan by using the term “Profession”.  In this document, a profession is classified as the main activity undertaken by a person to contribute to the income of the family. A person is expected to spend approximately 6 hours per day working on such activity. Beside this activity, the person can also be involved in other income generating activities.     

2.3 TRAINING The information contained in this plan has been contributed by the Livelihood Staff of NNP1PC, following several trainings conducted by 2 external consultants: (i) Elizabeth Mann on Off Farm Livelihood Activities (March 2018) and (ii) Chris Flint on Rapid Market Chain Assessment (January 2019) and Economic Calculations of a Profession (February 2019). The overall lead was taken by NNP1PC’s  Social  Specialist,  Marcel  Frederik.  He  managed  the  Trainings  provided  by  the international consultants and guided the Livelihood Teams through a capacity building process to (i) define the concept of Professions, (ii) prepare the list of Professions (Annex 1), (iii) prepare the  Profession  Questionnaire    (iv)  data  collection  by  PAP’  interview/consultation  on  their interested profession (v)  a database and data entry system and (vi) a livelihood support policy. 

Page 19: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 17 of 196 

2.3.1 Training on Market Chain Assessment 

A Market Chain Assessment is a term broadly used to describe the exercise of finding out about and visualizing how different actors work together to perform various processing steps of input materials  into a product used by a consumer. A range of different techniques can be used for such exercises as well as different focuses on either the micro or macro‐economic level of the study. For the purpose of the development of professions of PAP, NNP1PC decided to focus on the micro‐economic level with the PAP at the centre of the market chain assessment. 

NNP1PC engaged an international consultant with over 20 years work experience in the Lao PDR to provide a 3‐day training to the livelihood staff on the technique of conducting a Rapid Market Chain Assessment. After the training (January 2019), the livelihood staff collected data in their project area and reported this back to the consultant. The consultant reviewed the available data and requested for additional  information when required. Once all data was completed,  it was presented back to all livelihood staff and ESD Management.       

NNP1PC chose to closely  integrate the  livelihood staff  into the Market Chain Assessment and have them collect the primary data because this has several advantages: 

Staff  became  interested  and  gained  better  understanding  of  the  importance  of  the market chain in the development of Professions for PAPs 

It raised the awareness of staff on factors influencing the Market Chain  It  increased the ability of staff to communicate regarding the Market Chain actors and 

steps, essential for when they will build the capacity of the PAP on marketing   Staff experienced first‐hand the difficulty of obtaining clear  information on the market 

demand,  commonly  experience  by  PAP.  Thereby,  they  can  better  understand  the difficulties experienced by PAPs 

Capacity building has a positive effect on staff morale 

Obtaining detailed data from traders proved difficult, because they consider trade volume and trade  pricing  as  confidential  information.  Their  knowledge  of  trade  volumes,  detailed  sale locations and prices is their key resource to doing their business.    

2.4 TRAINING ON ECONOMIC CALCULATION OF A PROFESSION An Economic Calculation is a term broadly used to describe the exercise of finding out about the financial benefit of undertaking an activity. It looks at required inputs, the processing step and the sales and taxes levied. Different economic calculations make different generalizations. Some take  into consideration the depreciation of assets or a nominal cost of  labour provided by the business owner, while others do not. In order to establish a uniform calculation of the economics of undertaking a profession amongst all 3  livelihood teams, NNP1PC engaged an  international consultant with over 20 years work experience in the Lao PDR to provide a 3‐day training to the livelihood staff on Economic Calculations of selected Professions. After  the  training  (February 2019), the livelihood staff collected data on their specific technical expertise in their project area and  reported  this  back  to  the  consultant.  The  consultant  reviewed  the  available  data  and requested  for  additional  information  when  required.  Once  all  data  was  completed,  it  was presented back to all livelihood staff and ESD Management. 

 

Page 20: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 18 of 196 

2.4.1 Concept of a Profession 

In this document, a livelihood activity is described as a profession, if it is undertaken as the main activity undertaken by a person to obtain income for the family. It is expected that by the time an activity is a profession, a person spends approximately 6 hours per day on it.  Besides having a profession, a person is likely to undertake other activities which contribute to the households’ income either in cash or in kind. However, such activities are not seen as the main contribution to  the household  income. For example, a small household vegetable garden plot will provide food, but it takes only up to 30 minutes a day to water the vegetables of a small plot.  This is very different in scale from cultivating vegetables for sale under a set of greenhouses on half a hectare of land.  

Furthermore,  each  profession  is  seen  as  a  production  process,  requiring  inputs  which  are undergoing  some  sort  of  processing  and  value  adding,  and  then  are  sold.  By  approaching  a profession  as  such,  an  organized  approach  to  capacity  building  through  targeted  training  is possible (see Chapter 7.3). Though this approach, vaccination of livestock, traditionally seen as a (unnecessary) cost, can be explained as an effective investment, aimed to reduce losses during the production process (death of animals) and thereby increasing overall profits.   

 

3 CA OBLIGATIONS AND REDP REQUIREMENTS 3.1 CA OBLIGATIONS 

The Concession agreement was signed between the Government of the Lao People’s Democratic Republic and  the Nam Ngiep 1 Power Company  Limited on 27 August 2013. The Concession Agreement, Annex C requires NNP1PC to undertake Livelihood and Income Restoration measures for PAP.  

CA annex C, Clause 91  lists  the  requirements  for  the Livelihood and  Income Restoration Plan (LIRP) in Detail. It requires the Company to prepare the LIRP strictly in compliance with Decree No: 112/PM, Decree No: 192/PM and other related legal documents.  

The CA Annex C, Appendix 7 Entitlement Matrix defines  the 4  categories of Project affected Persons and those who are Entitled to Livelihood Restoration measures.   

The CA Annex C, Clause 87 requires NNP1PC  to: compensate PAPs and assist  them to  regain, maintain  and  improve  their  net  incomes  and  living  standards  beyond  the  pre‐Project  levels (always taking into consideration the impact of increased number, type and amount of expenses incurred by such PAPs which would not have been incurred but for the Project), and ensure that PAPs are in no significant aspect of their lives and livelihoods worse off than they would have been without the Project. This clause also includes targets on: 

I. Poverty Elimination: raising households above the national poverty line; II. Maintaining  Economic  Parity:  a  living  standard  of  at  least  pre‐project  level  for  every 

household;  III. Net  Income  Improvement:  increase of average community net  income by 200% within 

ten years from COD from what will be measured in the baseline socioeconomic survey, to be carried out after cut‐off‐date close to the effective date  

Page 21: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 19 of 196 

3.2 REDP  The Resettlement and Ethnic Development Plan and  it’s Zone Specific Updates clarify how the company  will  achieve  the  Social  Obligations  of  the  Concession  Agreement  made  with  the Government of Lao and Financing Agreement made with the Lenders.  

 

3.3 POVERTY LINES The CA requires raising households above the applicable National Poverty Line then in effect for similarly located and situated PAPs.  

Determining  the National Poverty  line  in effect  is  complicated. The CA, Annex C, Appendix 1 “Definitions” defines the “National Rural Poverty Line means the Lao PDR indicator per person as calculated by the National Statistics Center, which is current and in effect on the date on which such indicator is applied.” 

The Laos Statistics Bureau have calculated a set of poverty lines relevant to different areas of the country and analysed level and distribution of poverty (eg Poverty in the Lao PDR, 2008).  This analysis used household consumption (as opposed to income) to determine the various poverty lines and estimated a total poverty head count. This is an internationally established norm and the method used by the Laos Statistics Bureau to analyse poverty in Laos (eg Poverty in the Lao PDR, 2008).   

However, the Laos Statistics Bureau does not publish the absolute value of their poverty lines nor sets the official Government of Laos poverty lines.  These are set through Government Decree.  PM Decree 309, dated 14 November 2013 is the most recent decree on poverty (Annex 3). This sets the poverty line for rural areas at an income of LAK 192,000 per person per month and will be adjusted for inflation using the national CPI values published by the Bank of Lao as required by Article 12 of Decree 309. 

Lao  government  Decree  No.  348/G,  dated  16  November  2017  on  Poverty  Graduation  and Development  Standards  is a planning  tool designed  to assess development  status and  is not designed to evaluate poverty. This decree does NOT set an updated poverty line. 

 

3.4 INCOME TARGETS For planning of achieving net income improvement, an easy to understand income target for a Profession was established, based on the following simplifications and assumptions2 : 

An average household has 6 members, comprising of: 1 elder, a husband and wife and 3 children.  This  is  based  on  data  from  the  BSES‐2017  survey,  which  covered  1,530 households with a total of 9,145 people, or 5,97 people per household 

Average baseline net income is 500,000 Kip per person per month (baseline survey)  Target income after 10 years  is double the average baseline net  income, or 1,000,000 

Kip per person/month, NOT considering Inflation  To meet the Net Income Improvement target, a household of 6 people needs to earn 

 

 2 The simplifications made are a planning tool. The in-depth socio-economic monitoring conducted by NNP1PC will establish final achievement of the income improvement target set in the Concession Agreement.

Page 22: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 20 of 196 

6 x 1,000,000 x 12 = LAK 72,000,000 per year.  

With 2 adults working  in a profession, this means that one person needs to earn LAK 36,000,000 per year. 

It is realized that this target of LAK 36,000,000 is a simplification, but as such, it is a good tool to indicate the required scale of a profession.  

This target for a profession will bring a family above the poverty line. 

4 LIVELIHOOD POTENTIAL, OPPORTUNITIES AND MARKETS 4.1 CONDITION FOR SUCCESS 

In order  to successfully  implement a profession, a set of conditions need  to be met. Without these, long term operation will be difficult. A PAP will require to have: 

1. Knowledge 2. Resources (land, capital, other assets) 3. Experience 4. Motivation 5. Sufficient economic return 6. Ability to overcome difficult times 7. Family and community acceptance 8. Permission of the Authorities 

The Project needs to understand the differing levels of skills, needs and resources particular to each affected household.   This plan, will outline how these conditions are enhanced  for PAPs supported in their livelihood activities. 

4.2 POTENTIAL, OPPORTUNITIES AND MARKETS IN ZONE 2UR The 3 Villages of  zone 2UR  are  located  at  the northern edge of  the  reservoir  and  along  the National  Route  1D.  Road  1D  is  a  tar‐sealed  road  connecting  Vientiane  Capital,  via  Paksan (Bolikhamxay Province) to Phonsavanh, the provincial capital of Xiengkuang Province. Since the upgrade of this road in 2013, it has been observed by project staff that traffic is increasing year by year. Several busses travel along this route on a daily basis.  

Being  located  at  the  edge  of  the  reservoir  and  along  a  tar‐sealed  road  provides  good opportunities for reservoir fishing and tourism activities on the reservoir.  

The  suspension bridge and  the agricultural access  roads constructed by  the company greatly improves vehicle access to agricultural  land on the right bank of the Nam Ngiep River. During 2018,  agricultural  land mostly  left  vacant  (fallow  stage), was  taking  into  cultivation  by  their owners.  Low  sloping  lands  were  transformed  to  paddy  fields  and  higher  sloping  land  was transformed to cattle grazing areas. 

The climate during the first months of the dry season in Zone 2UR is cold at night, resulting in the formation of dew on the plants. This allows for the cultivation of a dry season crop with minimum application of irrigation water, because the night time dew partially provides for the water needs of the plants. Small‐scale gravity‐fed irrigation systems are available at different locations in the villages, were streams run from the mountains located close to the villages.  The dew also allows grass to stay green for a longer period, supporting the raising of animals into the dry season. 

Being located along road 1D provides the 2UR villages with good access to markets at different population centres. Thaviengxay is the local cluster of nearby villages. Thathom, the district city 

Page 23: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 21 of 196 

is located only a 30 minutes’ drive away.  Phonesavanh town, the centre of Xiengkuang Province, is located at a distance of approximately 1‐and‐a‐half‐hour drive. Paksan, the centre of Bolikhan Province is 2.5‐hour drive along the road towards Vientiane, which is only a 5‐hour drive away from Zone 2UR.  

In Zone 2UR there are several small streams originating from the surrounding hills which have the potential to provide gravity fed water to small scale irrigation system. This potential will be explored by SMO and the communities in 2020 for development in 2021. 

The Participatory Land Use Plan (PLUP) process will include the reservoir drawdown zone (DDZ) area as an area for agricultural use. In the first year of the DDZ (2020) its potential will be assessed by the livelihood team and its active use for agriculture (if possible) is expected to start in 2021.     

4.3 POTENTIAL, OPPORTUNITIES AND MARKETS IN PHOUHOMXAY AND ZONE 5 Phouhomxay  is  located  near  the  dam  site. A  gravel  compacted  road  provides  access  to  the community. The two host villages, Hat Gniun and Tahuea are located along the same access road. It is a 45‐minute drive from Phouhomxay to Bolikhan, the district centre. It is a 1‐hour drive from Phouhomxay  to Paksan,  the provincial capital city.  It  is a 3.5‐hour drive  from Phouhomxay  to Vientiane. This close  location  to  these 3 population centres provides good market access  for products.   

Phouhomxay  villagers  are  also  looking  at  markets  in  Thailand.  NNP1PC  supported  the development of contract farming with Thai traders and firms for producing and supplying certain crops such as big onion and gingers. Thailand is a large market with good potential and is close by for Phouhomxay villagers. They also have the potential to sell their product to NNP1 operator village, which will continue to operate the dam for 27 years after COD.      

The  availability  of  land  and  the  irrigation  system  in  Phouhomxay  provide  opportunities  to produce dry season cash crops. Soil improvement techniques, not used prior to resettlement, are now well understood, accepted and applied by the Resettlers.    

Agricultural production for the market,  instead of production for home consumption only has been successfully introduced by the project and is well accepted. It is also the support mechanism most  familiar  to government extension  staff. The  success of  the production of water melons during the dry season greatly supported this concept. This, combined with cooperation with an agricultural trade company first started in 2017 opened up the opportunity for the production of a range of cash crops.       

Although Phouhomxay is located close to the main reservoir, fisheries on the main reservoir are not yet developing in the area. A lack of good fishing grounds near the reservoir access point, a lack of experience with reservoir fisheries and better economic opportunities in other activities contribute  to  a  slow uptake of  reservoir  fisheries. However,  this may  change over  time  and tourism on the reservoir is a potential activity, especially if the access road improves.     

4.4 POTENTIAL, OPPORTUNITIES AND MARKETS FOR SELF‐RESETTLERS Self‐Resettlers  resettled  to a  range of different  communities. Each  location has  its own  local opportunities and benefits. Compared to their old villages, the majority of self‐resettlers now live in villages with improved road access, grid electricity and access to public infrastructure such as schools and a health centre. The cash compensation allowed self‐resettlers to change profession and invest in businesses and service provision.  

A trade‐off has been observed between living in close vicinity to population centres and access to natural  resources. This  is  a normal  situation  and expected.  For example,  self‐resettlers  in 

Page 24: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 22 of 196 

Houayxay village, Hom District have good access to reservoir fisheries. However, the access road to the market for agricultural produce is less developed. This is expected to change over time, as roads improve and local centres such as Hom District town grows in population and economic activity.  

The Self‐Resettlers in Thathom district have the similar potential and opportunities as the PAPs in Zone 2UR. Vanghai is located along the same highway, 1D, between Thathom district town and the  intersection  at  Thasi,  with  the  turn  of  to  Paksan.  Vanghai  is  becoming  a  more  densely populated area, with increasing local demand, as can be clearly seen by the increasing number of shops vending grocery, vegetables, food and other items which are establishing along road 1D.  

The Self‐Resettlers settling in Bolikhamxay use Phamuang as a trading hub. Phamuang is quickly developing  and  increasing  its  population.  Being  located  along  the  road  from  Paksan  to Xiengkuang, there are good trade routes to different towns in Laos as well as to Thailand. 

Self‐Resettlers  in Hom district use Phalaveck as the trading centre. From here, there are trade routes to Xaysomboun and Vientiane. The road from Houayxay village leading to Phalaveck is not paved and more difficult to travel  in the wet season. Self‐resettlers  in   Houayxay however has more abundant access to natural resources compared to other locations.      

    

4.5 HOUSEHOLD OCCUPATION The  concept of household occupation or  “Profession” was  introduced  to  the  livelihood  team during 2018,  in preparation of 2019  livelihood activities.  Fundamental  to  the  concept of  the livelihood program is the realization that in order to meet the required increase of income (see Chapter  3),  land/asset,  capital  and  labour  productivity  needs  to  increase.  To  increase productivity, specialization of tasks is considered. This specialization is captured in this plan by using  the  term “Profession”.    In  this document, a profession  is classified as  the main activity undertaken by a person to contribute to the income of the family. A person is expected to spend approximately 6 hours per day working on such activity. Beside this activity, the person and/or other household members can also be involved in other income generating activities. Different household members can have different professions.   

Following internal discussion on the definition of a Profession, the Livelihood Teams of the SMO prepared a list of professions.  The Profession is targeted to be the main income source of the person, or the activity on which the main  income earner  is spending his/her time. The person may have income from other sources e.g. income from government employment or pensions etc. 

The professions are divided in 3 main groups: 

Livestock raising  Crop Farming  Off farm 

A total of 7 sub‐groups are established: 

1. Livestock farmer 2. Fishermen 3. Flat land crop farmer 4. Upland crop farmer 5. Trader 6. Service Provider 

Page 25: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 23 of 196 

7. Government / Private sector staff 

 

4.5.1 Consultations 

Following internal discussion on the information required in order to assess available resources to establish a Profession, the Livelihood Teams of the SMO prepared a detailed questionnaire for the initial selection of a profession by the PAP. The questionnaire looks into labour availability, land resources, available equipment, current livestock holdings, current farm practices, current business activities, prior involvement into livelihood activities promoted by the project and finally the selected profession of each of the household members. 

This  questionnaire  (Annex  2  Profession  Questionnaire)  is  used  for  the  initial  selection  of  a profession by a PAP. Those who selected a specific profession are then grouped together and a follow‐up group consultation is conducted. During this group discussion, information is provided on  the  specific profession and  if applicable,  feedback  is provided on  the  results of  the group evaluation of the 2018 livelihood activity on which the profession will build.  

Information collected by the profession questionnaire is entered into the SMO database system by each of the Livelihood Teams. 

 

Figure 4‐1: Interview for Selection of a Profession, Bo Village, Bolikhan District 

  

Page 26: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 24 of 196 

4.5.2 Selection of profession 

The profession selection interviews were conducted between October 2018 and February 2019. Students and  the elderly are excluded  from  the  survey. A  total of 1,325 people out of 3,062 interviewed PAPs selected their profession (Table 4‐1). The remaining people could either not be interviewed or they did not yet know what profession to select. A key contributing factor for PAP to not yet select their profession is that they have not yet purchased their desired agricultural land. They still plan to purchase  land and,  in the meantime, engage with the project  in home sweet home activities to contribute to daily food requirements.  

For PAP who have not yet selected a profession, those with larger cash payments live off interest payments on capital deposited  in a bank, not their capital.   For those with  less compensation payments,  APs  engage  in  trading,  through  opening  small  shops  and/or  home  sweet  home activities.   

As expected, certain professions are more popular with women and others with men. Different age groups also prefer different professions. 

Table 4‐1: Number of PAP Selecting a Professions per Project Zone 

Zone 

Total number of people 

targeted for selection of profession 

Total number of people actually interviewed for 

profession selection 

Total number of people who selected their 

profession 

Total number of people who did NOT select their 

profession 

Number  Percentage  Number  Percentage 

2UR  1,765  927 413 45%  514  55%

Self Resettlers ‐Thathom  567  461 121 26%  340  74%

Self Resettlers ‐Bolikhan  693  610 240 39%  370  61%

Self Resettlers ‐Hom  770  657 215 33%  442  67%

Phouhomxay   270  253 195 77%  58  23%

Host communities  615  154 141 92%  13  8%

Total  4,680  3,062 1,325 43%  1,737  57%

 

Table 4‐2: Percentage of PAP by Age Selecting one of the Top 5 Professions in Zone 2UR, Thathom District. 

No  Profession 

Percentage of PAP who selected the profession in total and per age group in Years 

Total  13 – 18   19 ‐ 35   36 ‐ 60   61+  

1  Cattle rancher  25.2% 0.0% 6.8%  17.2%  1.2%

2  Weaving  13.8% 1.0% 7.0%  5.6%  0.2%

3  Fisherman  8.7% 0.2% 3.6%  4.6%  0.2%

4  Rice Farmer  6.8% 0.2% 1.9%  4.1%  0.5%

5  Owner of Small dry good shop  4.8% 0.2% 2.7%  1.5%  0.2%

 

Page 27: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 25 of 196 

Table 4‐3: Number of People who Selected One of the Top 5 Professions by Gender in Zone 2UR, Thathom District. 

  Man  Women 

19 ‐ 35 years  36 ‐ 60 years  19 ‐ 35 years  36 ‐ 60 years 

Cattle rancher  23 60 5  11

Weaving  0 0 33  23

Fisherman  15 18 0  1

Rice Farmer  6 10 3  7

Owner of Small dry good shop  1 0 11  6

 

 

 

Table 4‐4: Percentage of PAP by Age Selecting one of the Top 5 Professions by Self‐Resettlers in Thathom District. 

No  Profession Percentage of PAP who selected the profession in total 

and per age group in Years Total  13 – 18   19 ‐ 35   36 ‐ 60   61+  

1  Cattle rancher  29.8% 0.8% 15.7%  12.4%  0.8%

2  Cash crop Farmer  15.7% 0.0% 10.7%  5.0%  0.0%

3  Owner of Small dry good shop  9.1% 0.0% 5.0%  4.1%  0.0%

4  Chicken meat farmer  7.4% 1.7% 3.3%  2.5%  0.0%

5  Rice Farmer  6.6% 0.0% 2.5%  4.1%  0.0%

 

Table 4‐5: Number of People who Selected One of the Top 5 Professions by Gender by Self‐Resettlers in Thathom District. 

  Man  Women 

19 ‐ 35 years  36 ‐ 60 years  19 ‐ 35 years  36 ‐ 60 years 

Cattle rancher  15 12 4  3

Cash crop Farmer  4 3 9  3

Owner of Small dry good shop  1 3 5  2

Chicken meat farmer  2 1 4  2

Rice Farmer  1 3 2  2

 

Page 28: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 26 of 196 

Table 4‐6: Percentage of PAP by Age Selecting one of the Top 5 Professions in Bolikhan District. 

No  Profession Percentage of PAP who selected the profession in total 

and per age group in Years 

Total  13 – 18   19 ‐ 35   36 ‐ 60   61+  1  Cattle rancher  20.0% 0.0% 7.5%  10.4% 2.1%

2  Owner of Small dry good shop  12.5% 0.4% 7.9%  3.8% 0.4%

3  Cash crop Farmer  9.2% 1.7% 5.0%  2.5% 0.0%

4  Chicken meat farmer  7.9% 0.0% 5.0%  2.9% 0.0%

5  Rice Farmer  7.9% 1.3% 2.5%  3.8% 0.4%

 

Table 4‐7: Number of People who Selected One of the Top 5 Professions by Gender in Bolikhan District. 

  Man  Women 

19 ‐ 35 years  36 ‐ 60 years  19 ‐ 35 years  36 ‐ 60 years Cattle rancher  12 17 6  8

Owner of Small dry good shop  5 4 14  5

Cash crop Farmer  4 5 8  1

Chicken meat farmer  3 0 9  7

Rice Farmer  3 4 3  5

 

Table 4‐8: Percentage of PAP by Age Selecting one of the Top 5 Professions in Hom District. 

No  Profession Percentage of PAP who selected the profession in total 

and per age group in Years 

Total  13 – 18   19 ‐ 35   36 ‐ 60   61+  1  Cattle rancher  27.0% 0.9% 10.7%  14.0% 0.9%

2  Owner of Small dry good shop  14.4% 0.0% 10.2%  4.2% 0.0%

3  Government staff  13.5% 0.0% 9.8%  3.7% 0.0%

4  Vegetable Farmer  6.5% 0.5% 3.7%  2.3% 0.0%

5  Chicken meat farmer  4.7% 0.0% 3.3%  1.4% 0.0%

 

Table 4‐9: Number of People who Selected One of the Top 5 Professions by Gender in Hom District. 

  Man  Women 

19 ‐ 35 years  36 ‐ 60 years  19 ‐ 35 years  36 ‐ 60 years 

Page 29: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 27 of 196 

Cattle rancher  14 25 9  5

Owner of Small dry good shop  5 1 17  8

Government staff  16 8 5  0

Vegetable Farmer  5 0 3  5

Chicken meat farmer  2 0 5  3

 

 

 

 

 

Table 4‐10: Number of People by Age Group Selecting One of the Top 5 Professions in Phouhomxay 

No  Profession Number of People by Age Group 

Total  13 – 18   19 ‐ 35   36 ‐ 60   61+  1  Cash crop farmer  41  1  21  19  0 

2  Rubber farmer  36  3  18  13  2 

3  Rice Farmer  20  3  11  6  0 4  Cattle rancher  18  0  10  7  1 5  Cassava farmer  11  0  7  3  1 

 

Table 4‐11: Number of People Selection One of the Top 5 Professions by Gender and Age Group in Phouhomxay 

Profession Man  Women   

Total 19 ‐ 35 years  36 ‐ 60 years  19 ‐ 35 years  36 ‐ 60 years Cash crop farmer  1  18  15  0  34 Rice Farmer  2  5  5    12 Cassava farmer  0  4  2  1  7 Owner of Small dry goods shop  0  5  0  0  5 

Owner of cloth shop  0  4  0  0  4 

 

4.6 CURRENT MARKET CHAIN OF KEY PRODUCTS Key to increased production is a reliable market to sell the product. In order to understand the Current Market Chain of key products, staff from each of the 3 livelihood teams were trained and supported to collect information regarding selected key products, see Chapter 2.3.1 Training on Market  Chain  Assessment.  The  data  collected  represents  the  market  at  the  time  of  data collection. Markets  are  known  to  change  quickly, with  outside  traders  appearing  once  local productions reaches a level making it sufficiently attractive to purchase goods or services.  

Page 30: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 28 of 196 

Markets Chain datasets are collected in up to 4 Excel worksheets per profession, providing the following information: 

1. Worksheet 1: Data on Input Suppliers 2. Worksheet 2: Data on Producers  3. Worksheet 3: Data on Traders 4. Worksheet 5: Data on Sellers and Markets 

 

The flow of the market chain is visualised in market chain flow charts. These flow charts illustrate the required inputs and the flow of outputs. The market chain for the same service or product at each of the project area’s might be slightly different. Different input suppliers and different traders will be operating at the different locations. Therefore, based on the popularity of different professions in each project area, multiple data sets may be produced for a similar profession, based on the local conditions. For example, there are 4 flow charts for cattle farmers (See Figure 4‐2: Market Chain Flowchart for Cattle in Zone 2UR 

  

Figure 4‐3 to Figure 4‐2).  

Obtaining reliable data from traders proved difficult, because they consider trade volumes, trade pricing and their buyers as confidential information. Their knowledge of trade volumes, detailed sale locations and prices is their key resource to their business.  

Most of  the  traders  interviewed  indicated  that  trade  is  limited by production and  that  larger numbers of products can be traded as long as the price is competitive and quality requirements are met. Only the traders buying woven Lao skirts indicated that the market is very competitive and that they face difficulties at times to sell their produce. Thus quality control, reliability of supply, quantity of products and price are key factors of understanding a successful involvement in a profitable market chain.  Seasonality is also a contributing factor, particularly for agricultural products and for demand relying on annual high points such as festivals or community events.   

Page 31: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 29 of 196 

Chapter 4.6.1 to 4.6.11 provide a summary of the findings of the market chain of 11 key products.   

At the time of the data collection, it was found that a PAP mostly works in only one node of the market chain. If, in the future, they can control additional chains, their custody will be expanded so that they can make more profit by taking over more nodes in the chain. During future updates (scheduled  in 2021) of  the Market Chain Analysis,  if such  increase  in occupying market chain nodes occurs, then the value and value added to the product at each node will be calculated and shown in updated Value Chains. 

4.6.1 Cattle 

Cattle farmers buy their inputs from various input suppliers, based on the type of inputs required. Main input suppliers are hardware stores as well  as suppliers of veterinary supplies. Cattle farmers can sell both their cattle as well as the manure produced while raising them. Cattle are bought by traders inside the communities as well as by traders with a truck coming from outside the community.  There are 4 flow charts for cattle farmers (See Figure 4‐2: Market Chain Flowchart for Cattle in Zone 2UR 

  

Figure 4‐3 until Figure 4‐2, one for cattle traders (Figure 4‐6) and one for Cattle Fattening (Figure 4‐7).  

 

Page 32: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 30 of 196 

Figure 4‐2: Market Chain Flowchart for Cattle in Zone 2UR 

  

Figure 4‐3: Market Chain Flowchart for Cattle in Phouhomxay  

 

Page 33: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 31 of 196 

Figure 4‐4: Market Chain Flowchart for Cattle in Phamuang  

  

 

Figure 4‐5: Market Chain Flowchart for Cattle in Hom District 

 

Page 34: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 32 of 196 

 

Figure 4‐6: Market Chain Flowchart for Cattle Trading in Zone 2UR. 

 Figure 4‐7: Market Chain Flowchart for Cattle  for Fattening in Phouhomxay. 

  

Page 35: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 33 of 196 

4.6.2 Pigs 

Pig farmers buy their inputs from various input suppliers, based on the type of inputs required. Main input suppliers are general / hardware stores selling materials, piglet breeders and pig feed as well as suppliers of veterinary supplies. Pig farmers can sell adult pigs or piglets as well as the manure  produced  while  raising  the  pigs.  The  pigs  are  bought  by  both  traders  inside  the communities as well as by traders with a truck coming from outside the community.  There are 2 flow  charts  for pig  farmers  selling adult pigs  (Figure 4‐8 and Figure 4‐9), one  for pig  traders (Figure 4‐10) and one for farmers producing piglets for sale (Figure 4‐11).  

Figure 4‐8: Market Chain Flowchart for Pigs in Zone 2UR. 

  

Page 36: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 34 of 196 

Figure 4‐9: Market Chain Flowchart for Pig in Phouhomxay. 

 Figure 4‐10: Market Chain Flowchart for Pig Trading in Zone 2UR. 

 

Page 37: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 35 of 196 

Figure 4‐11: Market Chain Flowchart for Piglets in Phouhomxay 

  

4.6.3 Chickens 

Chicken  farmers  buy  their  inputs  from  various  input  suppliers,  based  on  the  type  of  inputs required. Main  input suppliers are chick breeders, general stores selling chicken feed, rice mill selling chicken  feed as well as suppliers of veterinary supplies. Chicken  farmers can sell adult chickens as well as the manure produced while raising the chickens. The chickens are directly sold  to  customers by  the  farmers at  a  local market, bought by both  traders  from  inside  the communities as well as by traders coming from outside the community.  There are 4 flow charts for chicken farmers selling adult chickens (Figure 4‐12 until Figure 4‐15 ).  

Page 38: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 36 of 196 

Figure 4‐12: Market Chain Flowchart for Chickens in Zone 2UR 

  

Figure 4‐13: Market Chain Flowchart for Chickens in Phouhomxay 

  

Page 39: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 37 of 196 

Figure 4‐14: Market Chain Flowchart for Chickens in Phamuang 

  

Figure 4‐15: Market Chain Flowchart for Chickens in Hom District 

  

Page 40: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 38 of 196 

 

4.6.4 Fish 

The market chain assessment for fish has been conducted for both fish caught in the reservoir by fishermen as well as fish being raised in cages. Catching fish in the Nam Ngiep reservoir is using a natural resource with raising  fish  in a cage or  fishpond  is a  form of aquaculture. The  inputs required for each technique are very different. The outputs, fish is also different in species and price per kg of fish.  

Figure 4‐16: Market Chain Flowchart for Fish from the Nam Ngiep Reservoir in Zone 2UR 

 

Page 41: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 39 of 196 

Figure 4‐17: Market Chain Flowchart for Fish from the Nam Ngiep Reservoir in Bolikhan 

 Figure 4‐18: Market Chain Flowchart for Fish from the Nam Ngiep Reservoir in Hom 

 

Page 42: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 40 of 196 

 

Figure 4‐19: Market Chain Flowchart for Raising Fish in Cages in Tahuea Village 

  

4.6.5 Water melon 

More than 50% of the resettler families  in Phouhomxay cultivate water melons during the dry season as a cash crop. The  irrigation system allows for  irrigation to be applied after the rice  is harvested. Farmers sell their water melons directly in the village; at the Obayashi workers camp or bring it to the fresh market at Bolikhan. Outside traders also come to buy melons at the farm gate. The main input purchases are the purchase of seeds. 

Page 43: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 41 of 196 

Figure 4‐20: Market Chain Flowchart for Water Melons in Phouhomxay village 

  

4.6.6 Sweet corn 

Sweet corn is a cash crop cultivated directly after the wet season rice harvest in Zone 2UR, mostly for human consumption (it is a different corn variety from the corn used for animal feed). Most of the produce is sold directly to customers at small stalls along the road. The sweet corn for sales along the road  is normally boiled prior to selling, so the buyer will eat  it as a delicious snack. Traders  also  buy  the  sweet  corn  for  human  consumption  at  other  districts.  The main  input purchases are the purchase of seeds. 

Page 44: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 42 of 196 

Figure 4‐21: Market Chain Flowchart for Sweet Corn in Zone 2UR 

 4.6.7 Vegetables 

Vegetables are cultivated in Phouhomxay in a locally made green house. The greenhouse protects against insects and the rain during the wet season. Farmers sell their vegetables directly in the village; at the Phouhomxay Office or bring it to the fresh market at Bolikhan (and small village markets along the way to Bolikhan). Outside traders also come to buy melons at the farm gate. The main input purchases are the purchase of seeds.  

Page 45: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 43 of 196 

 

Figure 4‐22: Market Chain Flowchart for Vegetables from Phouhomxay 

 4.6.8 Pineapple 

Pineapples are an upland crop promoted by the project in Phouhomxay. “Suckers” or the crown of  the  pineapple  were  provided  to  the  resettlers  who  planted  them  on  the  cash  crop  land allocated to them at Phouhomxay. Two years after planting they start bearing fruit in increasing numbers. Sales of the fruit  is made  in the village or the fruits are taken to trader  in Bolikhan, while being sold along the way in the villages the farmer passes through. Because the pineapple plantations are only recently established, production is still in a relatively low volume. Therefore, traders are not yet coming to Phouhomxay to buy the produce.    In other project areas where volumes of  fruit  is produced,  traders  come  to buy  it  at  the  farm  gate.  It  is  therefore  a  safe expectation that pineapple traders will come to Phouhomxay in the next few years as production increases  

Page 46: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 44 of 196 

 

Figure 4‐23: Market Chain Flowchart for Pineapples from Phouhomxay 

  

4.6.9 Mushrooms  

Mushroom farmers produce “Oyster mushrooms” in dedicated mushroom houses. Farmers sell their mushrooms directly at their house or travel through their village and nearby villages to sell directly to customers at their own homes. Current production is still limited and all production is sold directly to families in the village and surrounding communities. No traders are involved yet. 

Page 47: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 45 of 196 

Figure 4‐24: Market Chain Flowchart for Mushrooms from Zone 2UR 

  

4.6.10 Banana processing 

Banana processing takes raw bananas, slice these in thin chips and deep‐fry them in hot cooking oil. The fried banana chips are put in bags of various sizes and sold as a snack in small shops and stalls. The main  inputs the processer needs to buy each time are the raw bananas, cooking oil and fire wood or charcoal.  Sales are made directly in the producer’s own shop as well as through traders.  

 

Figure 4‐25: Market Chain Flowchart for Processed Banana from Phouhomxay 

 

Page 48: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 46 of 196 

 

4.6.11 Woven Lao skirt 

The market of woven skirts  is very complex and there  is a wide range  in prices, based on the materials  used,  patterns woven  and  quality  of  the weaving.  Prices  vary  from  80,000  LAK  to 250,000 LAK per piece (10 to 31 USD), see Table 4‐12 

Table 4‐12: Price Ranges of different Types of Woven Lao Skirts  

Regular 80,000 LAK per piece  Medium 100,000 to 120,000 LAK per piece 

Special  200,000  to  250,000 LAK per piece 

  

Some weaving is conducted by pre‐order, where the trader orders a specific pattern and provides the materials for weaving. In the Zone 2UR, about 70 to 80% of the women weave skirts on a part time basis. Sales are made ad‐hoc in the village, through a trader living in the village or through traders from outside, who come to buy the skirts. The main input purchased by the weavers is the thread. The type and quality of the thread varies, resulting in different qualities and pricing of the end product.   

Page 49: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 47 of 196 

 

Figure 4‐26: Market Chain Flowchart for Woven Lao Skirts from Zone 2UR 

 Figure 4‐27: Market Chain Flowchart for Woven Lao Skirts from Phouhomxay 

 

Page 50: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 48 of 196 

5 PROFESSIONAL PILLARS 5.1 LIVESTOCK RAISING 

A range of livestock raising professions are selected by the PAP. Table 5‐1 until Table 5‐4 provide a  summary  of  the  number  of  PAPs who  selected  one  of  the  professions  in  the  category  of Livestock  raising. Below  follows  a  short  description  of  the main  sub  professions  of  livestock raising. 

Table 5‐1: Number and Gender of PAP selecting a profession in Livestock raising in Bolikhan District.  

No  Profession Number of PAP who selected the profession  

% of all PAPs who selected a profession in the area 

% Male   % Female  

1  Cattle rancher  48  20%  71%  29% 

2 Chicken meat farmer  19  8%  16%  84% 

3  Fish farmer  5  2%  40%  60% 

4  Fighting bull raising  3  1%  100%  0% 

5  Goat farmer  3  1%  67%  33% 

6  Cattle fattening  2  1%  50%  50% 

7  Pig fattening  2  1%  50%  50% 

8  Pig breeder   1  0%  0%  100% 

 

   

Page 51: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 49 of 196 

Table 5‐2: Number and Gender of PAP selecting a profession in Livestock raising in Hom District.  

No  Profession Number of PAP who selected the profession  

% of all PAPs who selected a profession in the area 

% Male   % Female  

1  Cattle rancher  58  27%  71%  29% 

2  Chicken meat farmer  10  5%  20%  80% 

3  Cattle fattening  5  2%  80%  20% 

4  duck egg farmer  3  1%  33%  67% 

5  duck farmer  2  1%  0%  100% 

6  Fighting bull raising  2  1%  100%  0% 

7  Fish farmer  2  1%  100%  0% 

8  Integrated fish and pig farm  1  0%  0%  100% 

 

Table 5‐3: Number and Gender of PAP selecting a profession in Livestock raising in Zone 2UR, Thathom District. 

No  Profession Number of PAP who selected the 

profession  

% of all PAPs who selected a 

profession in the area 

% Male   % Female  

1  Cattle rancher  104 25%  85% 15%

2  Cattle fattening  12 3%  75% 25%

3  Chicken meat farmer  9 2%  11% 89%

4  Goat farmer  7 2%  43% 57%

5 Integrated chicken and vegetable garden farmer  4 1%  0% 100%

6  Piglet producing for sale  4 1%  0% 100%

7  Fish farmer  3 1%  33% 67%

8 Integrated Pig and vegetable farm  3 1%  0% 100%

9  Pig fattening  3 1%  0% 100%

10  Breeder chicken  1 0%  0% 100%

11  Fighting bull raising  1 0%  100% 0%

12  Integrated fish and Pig farm  1 0%  0% 100%

13 Integrated fish and poultry farmer  1 0%  100% 0%

14  Frog Farmer  1 0%  0% 100%

15  Cattle breeding  1 0%  0% 100%

 

 

 

Page 52: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 50 of 196 

Table 5‐4: Number and Gender of PAP selecting a profession in Livestock raising by Self Resettlers in Thathom District. 

No  Profession Number of PAP who selected the 

profession  

% of all PAPs who selected a 

profession in the area 

% Male   % Female  

1  Cattle rancher  36 30% 81%  19%

2  Chicken meat farmer  9 7% 33%  67%

3  Fish farmer  2 2% 50%  50%

4  Chicken egg farmer  2 2% 0%  100%

5  Cattle fattening  1 1% 100%  0%

6  Fighting bull raising  1 1% 100%  0%

7  Goat farmer  1 1% 100%  0%

 

5.1.1 Cattle farmer 

Cattle farming involves a range of techniques to mostly raise cattle for meat consumption. The raising of buffaloes is no longer widely practised, due to higher returns of raising cattle and no longer requiring buffaloes to plough paddy rice fields. Raising cattle for milk production is a niche market in Lao and not practised in the project area. 

Ways to raise cattle can be distinguished by the way animals are obtained and the way they are fed. In the project area, the type of cattle raised is the local cattle bred.   

Obtaining animals. Two different ways are distinguished to obtain animals. The first is through natural birth by female cattle and raising the calf over a period of 3 years until  it reaches the optimum point between age and weight. At this point, a cow has gained  its adult weight and keeping it longer will only increase the cost of feed but no longer increases its value by increasing weight.  The  second  option  is  to  purchase  calf  or  underweight  cattle  and  feed  it  with  high nutritional feed over a limited period of time, normally 3 ‐ 6 months to gain weight rapidly and sell the animal. After sale, a new stock of animals is purchased to repeat the cycle.  

Feeding animals. Three different ways are distinguished to feed animals: (i) free range, (ii) grazing on  improved  pasture  and  (iii)  cut‐and‐carry  feeding  from  feedlots.  Farmers  often  choose  to combine these different techniques and change the method during the different seasons.    

With free range cattle farming, the farmer leaves the animals to wander freely through a large area of land and fend for themselves.  A “farmer” may visit the animals once a month and is more an animal owner than a farmer. This way of feeding is very light on labour inputs but due to high losses and crop damages created by wandering animals, it is also low on productivity and income generation. Lack of suitable land is making this form of cattle feeding less and less viable and it is NOT the recommended practise.  

With grazing on  improved pasture, the farmer establishes a pasture area through fencing and planting a range of pasture plants. Subdivision in smaller feedlots allows for rotation of the area being grazed by the cattle. Cattle can stay overnight at a cattle pen, where they can seek shelter from the weather. At the cattle pen, minerals and supplementary feed can be fed to the animals and their manure collected. This way of feeding is medium intense on labour inputs and due to reduced losses and lack of crop damages created by the animals, it is medium in productivity and income generation. 

Page 53: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 51 of 196 

With a cut‐and‐carry system, the farmer keeps the animals at a central place on the farm and collects various feeds from fodder gardens and feeds this twice a day to the cattle. This system is labour intensive and the farmer can control the amount and type of feed provided to the cattle. By using different feeds, the farmer can balance the diet of the cattle. With cattle housed in the cattle pen, all manure can be collected.  Because of the regular contact between the farmer and the animals, any disease can be detected early on and treated quickly. This way of feeding is the most  labour  intense. With high yielding  fodder gardens,  less  land  is  required  to produce  the required amount of feed to feed a set number of animals. This system is high in labour input and high in productivity and income generation. 

 

5.1.2 Pig farmer 

Pig  farming  in  the project  area  involves  two  types of pigs,  local bred pigs  and mixed breed. Improved variety or “Pink Pigs” are not kept. Pigs can be farmed for two purposes, (i) raising pigs to produce piglets for sale or (ii) raising piglets to adult pigs for meat production. With purpose ii, the piglets can either be produced on the  farm  itself or purchased  from a piglet producing farm.  

Piglets are  raised  to adult pig  size  in approximately 6 months, after which  they are  sold. Pig farming requires a high investment in pig feed. With profit margins per pig being low, a loss of animal to disease is a significant loss of investment. Hygiene and health care are therefore very important on a pig farm. Sourcing quality feed materials  locally can reduce the cost of animal feed. Cultivating feed crops is therefore advised to the farmers.  

By keeping the pigs in improved pens, hygiene can be better controlled and manure collected for use in compost production. This organic fertilizer can be used on a feed lot or sold.   

 

5.1.3 Fish farmer 

A  fish  farmer  is practising aquaculture, raising  fish  in a body of water. Fish  farming  in Laos  is conducted by raising fish in either a pond or a cage floating in a water body. Besides different   ways of  raising  fish,  some  farmers  specialize  in  fish  fingerling production  for  sale, while  the majority of  fish  farmers purchase  fish  fingerlings and  feed them until reaching their optimum weight for sale for consumption. Raising fish for aquariums or show ponds is a niche market not practised in the project area. 

Different fish are raised, based on local conditions and market demand. When raising fish in a pond, often a mix is different fish species is farmed, to use the full food spectrum of the water body.  

Water quality is an important factor in fish farming. Those farming fish in cages in rivers cannot do this during part of the wet season, when high turbidity and low dissolved oxygen during floods pose a serious risk to the fish in the cages.     

In cold weather,  fish tend to eat  less  food and grow slower. The  length of a production cycle therefore differs throughout the year. 

 

Page 54: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 52 of 196 

5.1.4 Poultry farmer 

Poultry farmers are raising chicken or duck. In the project area, chicken farming of native chicken for meat consumption  is the preferred activity. Large commercial companies such as CP have very competitive pricing for eggs and non‐native chicken meat. However, there is still strong local market demand for free range native chicken for meat. Some farmers specialize in production of chicks for sale, while the majority purchase chicks and feed them until reaching their optimum weight for sale for consumption. Sourcing quality feed materials locally can reduce the cost of animal  feed. Cultivating  feed  crops  and/or  processing  locally  available materials  into  feed  is therefore advised to the farmers.  

By keeping the chickens in improved pens, hygiene can be better controlled and manure collected for use in compost production. This compost can be used on a feed lot or sold.   

 

5.1.5 Goat farmer 

Goat farmers are raising goats for meat consumption. Goat milk is a niche product in Laos and not practised in the project area. Farmers normally keep a herd and produce their own goat kids and raise these until reaching their optimum weight for sale for consumption. Goat meat shops are  proliferating  in  the  main  cities  and  a  goat  is  also  often  consumed  during  medium  size celebrations.  

Goats must be kept in a raised pen, to prevent them from foraging in the fields when the grass is wet. Wet feet can quickly lead to sickness of the animal. 

Similar to cattle raising, there are three different ways to  feed the animals:  (i)  free range,  (ii) grazing on improved pasture and (iii) cut‐and‐carry feeding from feedlots. Farmers often choose to combine these different techniques and change the method during the different seasons.    

With free range goat farming, the farmer  leaves the animals to wander freely through a  large area of land and fend for themselves.  A “farmer” may look after the animals at night time, when they return to their pen. The farmer is more an owner than a farmer. This way of feeding is very light on  labour  inputs but due to high  losses (from both disease and road accidents) and crop damages created by the animals,  it  is also  low on productivity and  income generation. Lack of suitable  land  is  making  this  form  of  goat  raising  less  and  less  viable  and  it  is  NOT  the recommended practise.  

With grazing on  improved pasture, the farmer establishes a pasture area through fencing and planting a range of pasture plants. Subdivision in smaller feedlots allows for rotation of the area being grazed by  the goats. Goats need  to stay overnight at a goat pen, where  they can seek shelter from the rain. At the goat pen minerals and supplementary feed can be fed to the animals and their manure collected. This way of feeding is medium intense on labour inputs and due to reduced losses and crop damages created by the animals, it is medium in productivity and income generation. 

With a cut‐and‐carry system, the farmer keeps the animals at a central place on the farm and collects various feeds from fodder gardens and feeds this twice a day to the goats. This system is labour intensive and the farmer can control the amount and type of feed provided to the goat. By using different feeds, the farmer can balance the diet of the goat. With goats housed in the goat pen, all manure can be collected.  Because of the regular contact between the farmer and the animals, any disease can be detected early on and treated. This way of feeding is the most 

Page 55: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 53 of 196 

labour intense. With high yielding fodder gardens, less land is required to produce the required amount of feed to feed a number of animals. Because goats also eat tree leaves, living fences can be planted around the feed lot, increasing fodder production. This system is high in productivity and income generation. 

 

5.2 CROP CULTIVATION A range of crop farming professions are selected by the PAP. Table 5‐5 until Table 5‐8 provide a summary of the number of PAPs who selected one of the professions  in the category of Crop cultivation.  Below follows a short description of the main sub professions of Crop Cultivation. 

Table 5‐5: Number and Gender of PAP selecting a profession  in Crop Cultivation  in Bolikhan District. 

No  Profession Number of PAP who selected the 

profession  

% of all PAPs who selected a 

profession in the area 

% Male   % Female  

1  Cash crop Farmer  22 9% 45%  55%

2  Rice Farmer  19 8% 47%  53%

3  Rubber plantation owner  9 4% 67%  33%

4  pineapple farmer  7 3% 29%  71%

5  Vegetable Farmer  6 3% 0%  100%

6  Agro‐Forestry Farmer  2 1% 50%  50%

7  Fruit tree farmer  1 0% 100%  0%

8  Banana farmer  1 0% 0%  100%

9  Mushroom producer  1 0% 0%  100%

 

Table 5‐6: Number and Gender of PAP selecting a profession in Crop Cultivation in Hom District. 

No  Profession Number of PAP who selected the 

profession  

% of all PAPs who selected a 

profession in the area 

% Male   % Female  

1  Vegetable Farmer  14 7%  36%  64%

2  Rice Farmer  6 3%  33%  67%

3  Rubber plantation owner  6 3%  67%  33%

4  Fruit tree farmer  4 2%  50%  50%

5  Agro‐Forestry Farmer  1 0%  100%  0%

6  Cash crop Farmer  1 0%  0%  100%

7  pineapple farmer  1 0%  0%  100%

 

Table 5‐7: Number and Gender of PAP selecting a profession in Crop Cultivation in Zone 2UR, Thathom District. 

No  Profession Number of PAP who selected the 

profession  

% of all PAPs who selected a 

profession in the area 

% Male   % Female  

Page 56: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 54 of 196 

1  Rice Farmer  28 7%  64%  36%

2  Vegetable Farmer  17 4%  12%  88%

3  Cash crop Farmer  7 2%  43%  57%

4  pineapple farmer  6 1%  17%  83%

5  Banana farmer  5 1%  40%  60%

6  Rubber plantation owner  4 1%  75%  25%

7  Agro‐Forestry Farmer  3 1%  33%  67%

8  Mushroom producer  3 1%  0%  100%

9  Sugar cane farmer  3 1%  0%  100%

10  Fruit tree farmer  1 0%  100%  0%

 

Table 5‐8: Number and Gender of PAP selecting a profession in Crop Cultivation by Self Resettlers in Thathom District. 

No  Profession Number of PAP who selected the 

profession  

% of all PAPs who selected a 

profession in the area 

% Male   % Female  

1  Cash crop Farmer  19 16%  37%  63%

2  Rice Farmer  8 7%  50%  50%

3  Vegetable Farmer  6 5%  17%  83%

4  Fruit tree farmer  4 3%  50%  50%

5  Mushroom producer  2 2%  50%  50%

6  Rubber plantation owner  2 2%  100%  0%

7  pineapple farmer  1 1%  100%  0%

 

5.2.1 Flat land crop farmer 

Flat  land crop  farmers  farm crops on  land which  is  level, either naturally or  levelled  through terracing. This enables irrigation to be applied using simple earthen ditch irrigation or watering by water can while walking a short distance. Farmers are expected to farm at least 2 crop rotation per year, in order to be full time involved in the profession. Below there are the descriptions of 4 different flat land farming professions. 

Rice farmer 

A rice farmer cultivates paddy rice twice a year. To do so, he/she  is required to have  irrigated paddy  fields. A  farmer cultivating only 1 rice crop per year  is classified as a cash crop  farmer, because he will be farming a different crop during the dry season. Through the regular application of  mostly  organic  fertilizer  and  lime,  soil  quality  will  be  steadily  improved  over  time.  This, combine with the use of locally suitable rice varieties will result in good yields. Good Agricultural Practices as promoted by the Ministry of Agriculture will be promoted and applied by the farmer. This includes use of organic herbicides and pest control mechanisms. Continued mechanization of different steps of the production process,  including planting and harvesting will, over time, reduce the labour input per hectare of land cultivated.  

Cash crop farmer 

A cash crop farmer cultivates at  least 2 crops a year, a dry season and wet season crop. Crop rotation  is  essential  to  prevent  a  build‐up  of  negative  soil  conditions,  affecting  productivity. 

Page 57: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 55 of 196 

Water availability and climate conditions during the dry (cold) season are two other important factors determining the suitability for different crops to be cultivated. Local market demand and product pricing will, combined with personal preferences be the final determination factors to what specific crop variety will be cultivated. 

Crops cultivated can  include wet season rice, corn, water‐melon, unions, cucumber and other crops. Through the regular application of mostly organic fertilizer and  lime, soil quality will be steadily improved over time. Large scale mechanization of the production processes of planting and harvesting are not  foreseen  to be widely applied  in  the near  future.   A high  reliance on manual labour is expected to continue over the next 5 to 10 years. Good Agricultural Practices as promoted  by  the  Ministry  of  Agriculture  will  be  promoted  and  applied  by  the  farmer.  This includes use of organic herbicides and pest control mechanisms.      

Vegetable farmer 

A  vegetable  farmer  cultivates green  leafy  vegetables. Because of  the  short production  cycle, multiple cycles can be cultivated throughout the year. Year round water availability is essential for  year  round  production.  Crop  rotation  is  essential  to  prevent  a  build‐up  of  negative  soil conditions, affecting productivity of a specific crop. Through the regular application of mostly organic fertilizer, soil quality will be steadily improved over time. A system of greenhouses can be used  to protect high value crops  from  insects and  rain during  the wet season. Over  time, farmers are expected to expand their variety of crops cultivated and  include more difficult to cultivate crops such as tomatoes. The system of cultivating vegetables in greenhouses is labour intensive and can produce a high output on a limited land area. Good Agricultural Practices as promoted  by  the  Ministry  of  Agriculture  will  be  promoted  and  applied  by  the  farmer.  This includes use of organic herbicides and pest control mechanisms.   

Mushroom farmer 

A mushroom farmer cultivates several types of mushrooms, based on the temperature of each season and availability of raw materials such as rice straw or saw dust. Mushrooms are cultivated in purpose build mushroom houses, where moisture levels are kept high and temperatures kept stable. Mushrooms derive all of their energy and growth materials from their growth medium, through biochemical decomposition processes. The available growth medium determines what type  of  mushroom  can  be  cultivated  on  it.  The  growth  medium  is  seeded  with  mushroom inoculant, which will spawn and grow after approximately 3 weeks.  Most types of mushrooms require sterilization of the growth material, through placing it in a steam container. Working in clean and sterile environment is essential when multiplying mushroom spores into the inoculant. Local market demand, availability of growth medium and familiarity with the different mushroom varieties will determine the varieties of mushrooms produced.  

Careful planning is essential to the overall operation. Because growth materials such as rice straw are available seasonally, sufficient material needs to be stockpiled. To provide a regular supply of mushrooms, a new batch of mushrooms should be started every 3 weeks.   

   

5.2.2 Upland crop farmer 

An upland crop farmer farms land under a slope. Due to its sloping conditions, it is mostly not irrigated and only 1 crop will be produced annually. Most crops farmed are perennial crops, such as Pineapple, Banana, a range of Fruit, Rattan or Sugar Cane. Rubber tree plantations are also included in this category of farming. 

Page 58: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 56 of 196 

Because of  the perennial nature of  the crops  farmed, establishing a  farm will  require several years. This  is a high up‐front  investment, but after  the establishment period, produce can be harvested for a long period of time. Farm maintenance and pest control is an important activity to ensure that investments made are not lost, especially since it will take several years to bring back productivity once  it  is  lost. Agroforestry, or the  inter‐planting of different crops and tree species  is a good practice. A monoculture crop  is  far more  susceptible  to pests and negative climatic events. After establishment of a farm, different techniques to  influence the timing of production will be explained to the farmers, including application of irrigation water and specific fertilizers. The premium paid  for early or  late production makes  such activities economically interesting.  

 

5.3 OFF‐FARM  Off farm professions is a large group, subdivided into 3 different clusters; Trader, Service provider and Government/Private Sector staff.  

5.3.1 Shop owner 

A shop owner has established his/her shop and can be selling the whole spectrum of goods. This includes both wet goods, such as perishable foods and dry goods, which have a longer shelf life.  Most shops are opened at the house plot, either connected to the house or as a separate building. This has the advantage of both security and allowing the shop owner to undertake other tasks, such as food preparation and care of children after school hours. A minority of shop owners have shops at a location other than the housing land, such as at a market. The advantage of having a shop at the market is a likely increase of customers, but it does not allow for other (household) tasks to be performed at the same time.  

 

5.3.2 Restaurant owner 

A restaurant owner has established his/her restaurant and can be selling the whole spectrum of food. It includes noodle soup shops, which sell a specific type of food (Lao noodle soup or “Fue”) or restaurants where a range of different dishes can be ordered.  Restaurants need to be located along  the  road  side,  because  they  rely  on  travellers  as  their  customer  base.  Villages  have insufficient population size to provide sufficient customers for a restaurant.  

 

5.3.3 Service provider 

A service provider provides a specific service to his/her customers. This can be  in the form of employment,  through  a  one‐person  business  or  as  part  of  a  team.  Some  service  providers perform  their  services  from  their own  facility, while others work  at different places.  Service providers include a broad range of professions, such as Chef cook, electrician, carpenter, brick layer,  tour guide,  trader and middleman. Private  sector employee or government  staff are a separate sub group and not considered service providers.  For details, see Annex 1. 

 

5.3.4 Banana chips 

Ripe Bananas can be processes into banana chips through frying them in hot oil. Prior to frying them, each banana is carefully sliced into long, 2mm thick slices. Frying is done in a large wok‐

Page 59: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 57 of 196 

shaped pan above a wood or charcoal fire. Bananas are bought per bunch and delivered to the processing location by a banana trader. The banana chips are sold to local shops as a snack or to wholesalers.   

 

5.3.5 Weaving  

Weaving traditional Lao skirts is a long‐practised tradition and still a popular activity of women in some project zones. 70 to 80% of the women in Zone 2UR weave at some time during the year. However, almost all do so as a part time activity, when they have free time during the day or in the evening. Because of the part time practise, the  income generated  is not  large, but  it  is an important cash income generated by women. Supplemental income such as this can often mean the difference between falling into poverty or not.    

Figure 5‐1: Women Weaving a Lao Skirt, Zone 2UR 

 

Page 60: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 58 of 196 

  

5.4 RISKS  Risks for collapse of a profession can be divided in external risks and internal risks. External risks are beyond the control of a PAP. Internal risks can be managed by the professional.  

Some external risks can be partially managed through group formation and regulations.   Each profession  has  it’s  own  specific  risks. However,  some  generalizations  are  possible.  Common External risk include: 

Professions including production processes have the inherent risk of changing demands in quality or quantity of a product or it’s production process.  

Costs of imported inputs can increase.   Local overproduction can suppress prices.   Adverse weather conditions can damage crops, buildings, interrupt electricity and block 

road access.   Lack of maintenance of public infrastructure such as irrigation systems, farm to market 

roads can render them (partly) unusable  Changing consumption patterns can change demand for a specific product.   Competition by large producers can drive product pricing down, reducing the economic 

benefit.   Disease outbreaks (bird flu, African swine fever) can not only kill livestock but also require 

culling  of  a  stock  to  stop  the  spreading  of  a  disease  or  result  in  a  ban  of  sale  and transportation of livestock.  

Insect or pest outbreaks (Fall army worm for corn, rats, locust) can kill crops and wipe out harvests or result in a ban of sale and transportation of products.  

Delayed or no payment by buyers can result in cashflow problems.    

Common internal risks include: 

losses during the production process due to lack of hygiene  losses during the production process due to lack disease preventive measures including 

vaccinations  lowering production standards,   keeping too many animals compare to the available feed   underestimating cash flow requirements of a business.  

Ways  to minimize  internal  risks will be discussed during  the various  training  sessions on  the business  planning  and  production  process.  During  the  training  on  marketing  and  group formation,  some  external  risks  will  be  covered  and  how  group  formation,  cooperation  and information sharing can reduce some of the risks, such as local over production and competition, as well as keeping up to date with market demand and the timing of such demand.        

      

6 DETAILS OF PROFESSIONS AND ECONOMIC CALCULATIONS The livelihood teams calculate the economics of a by calculating potential income which can be generated,  the  detailed  operating  expenses  required  for  generating  such  income  and depreciation on the required investment. Several assumptions are made for these calculations including: 

Page 61: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 59 of 196 

1) The required land area is available and owned by the PAP. Land values do not change rapidly, so  there  is no “annual profit” generated by  the  increase of value of  the  land holding. 

2) Fixed assets depreciation  is calculated  in a straight  line over the  lifespan of a specific asset. The lifespan varies between assets. 

3) Labour  inputs by  the PAP  are not  calculated  as  a  cost. The Annual Net Profit  is  the remuneration for all labour inputs. 

4) Any produce used for self‐use/self‐consumption at the household level is still considered as income generated.  

5) The capital outlay for the first batch of breeding animals is not included in the economic calculations, since they will be sold at some point of time for meat.    

For each economic calculation, as set of assumptions need to be made on productivity as well as pricing. The best available information for the team is, based on data collected from the Market Chain Assessment  as well  as  standard  agricultural  practises.  This  chapter  lists  the  economic summary of  selected professions. Details of  the  economic  calculation of  the professions  are included in Annex 4. 

6.1 LIVESTOCK 6.1.1 Large Livestock Raising 

Raising large livestock is described in Chapter 5.1.1. For the economic calculation summarized in Table 6‐1 below, a stable herd size of 33 cattle of varying ages  is assumed.  It may take 2 to 4 years to establish such a herd size, depending on the existing number of cattle raised and the investment  in purchasing cattle. A  land area of 7 hectares  is required to establish feed  lots to raise such a herd size. Annex 4 contains the details of the economic calculations. 

Table 6‐1:Summary of Economic Calculation of Raising Cattle on an Annual Basis 

Item  Unit  Number 1) Income       Number of cattle sold per year  Head   9   Weight per head  Kg  150   Price per kg  LAK  40,000   Income from sale of Cattle  LAK  54,000,000   Sale of manure  Kg  10,403   Sale price of manure   LAK per Kg  400   Income from sale of cattle manure  LAK  4,161,200   Total annual income (gross)      

58,161,200  2) Operational expenses         Annual operating expenses  LAK  8,480,000 3) Annual depreciation       Annual depreciation   LAK    

5,969,067  Annual Net Profit  LAK    

43,712,133   

Page 62: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 60 of 196 

As described  in Chapter 5.1.1, another way of raising cattle  is “cattle fattening”. Cattle of  low weight are purchased and provided with good feed, increasing their weight rapidly in 4 months’ time, after which the cattle are sold again. This way, the cattle farmer does not need to maintain a breeding herd and less land area is required. However, annual operating expenses are higher, requiring a good cash flow management. Two rounds of cattle fattening can be conducted per year. 

Table 6‐2: Summary of Economic Calculation of Cattle Fattening on an Annual Basis 

Item  Unit  Number

1) Income (per round)     Number of cattle sold per year  Head   10

  Weight per head  Kg  120

  Price per kg  LAK  40,000

  Income from sale of Cattle  LAK  72,000,000

  Sale of manure  Kg  1,800

  Sale price of manure   LAK per Kg  400

  Income from sale of cattle manure  LAK  720,000

  Total annual income (gross)         72,720,000 2) Operational expenses (per round)       Operating expenses  LAK          54,495,000 3) Annual depreciation (per round)     Depreciation   LAK             4,158,400 Net Profit per round  LAK        18,225,000 Net profit per year (2 rounds)    36,450,000

 

6.1.2 Pig Raising 

Raising pigs is described in Chapter 5.1.2. For the economic calculation summarized in Table 6‐3 below, a farmer  is expected to keep 10 female breeding pigs. It may take 2 to 3 years to fully establish the farm and be able to raise piglets to a weight of 80 kg before selling them. Annual operating expenses are high due to the need to purchase feed (84% of the annual operating cost) and fertilize the breeder pigs (12% of the annual operating cost). Annex 4 contains the details of the economic calculations. 

Table 6‐3: Summary of Economic Calculation of Raising Pigs on an Annual Basis 

Item  Unit  Number

1) Income     Number of pigs sold per year  Head   70

  Weight per head  Kg  70

  Price per kg  LAK  19,000

  Income from sale of pigs  LAK  88,200,000

  Sale of manure  Kg  3,650

  Sale price of manure   LAK per Kg  400

  Income from sale of cattle manure  LAK  1,460,000

  Total annual income (gross)    89,660,000

2) Operational expenses       Annual operating expenses  LAK  55,690,000

3) Annual depreciation   

Page 63: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 61 of 196 

  Annual depreciation   LAK   2,154,593

Annual Net Profit  LAK  31,815,407

 

6.1.3 Chicken Raising 

Raising chickens is described in Chapter 5.1.4. For the economic calculation summarized in  Table 6‐4 below, a breeding flock of 55 birds is assumed. These will produce chicks 3 times per year, with an average of 8 chicks per hatching. Due to some death of chicks, a total of 1200 chickens per year will reach the weight for sale. 90% of the annual operating expenses is various forms of chicken feed. Annex 4 contains the details of the economic calculations 

Table 6‐4: Summary of Economic Calculation of Raising Native Breed Chickens for sale as meet on an Annual Basis 

Item  Unit  Number

1) Income     Number of chicken sold per year  Birds   1,140

  Weight per head  Kg  1.7

  Price per kg  LAK  33,000

  Income from sale of chickens  LAK  63,954,000

  Sale of manure  Kg  900

  Sale price of manure   LAK per Kg  400

  Income from sale of cattle manure  LAK  360,000

  Total annual income (gross)    64,314,000

2) Operational expenses       Annual operating expenses  LAK  29,976,000

3) Annual depreciation     Annual depreciation   LAK  1,847,440

Annual Net Profit  LAK  32,490,560

 

6.1.4 Aquaculture 

Raising fish is described in Chapter 5.1.3 For the economic calculation summarized in   

Table  6‐5  below,  raising  fish  in  ponds,  two  rounds  of  4,800  fingerlings  each  is  considered. Different types of fish are raised to have an optimum balance in the pond. Fish can be sold after reaching an age of 4 months old. Fish fingerlings comprise 30% of the operation costs and fish feed 27% of the operation costs. 

For  the economic calculation  summarized  in Table 6‐6 below,  raising  fish  floating cages, one round of 24,000 fingerlings is considered. This requires a total of 10 floating cages. Fish fingerlings comprise 14% of the operation costs and fish feed 81% of the operation costs. Annex 4 contains the details of the economic calculations 

 

Table 6‐5: Summary of Economic Calculation of Raising Fish in Pond on an Annual Basis 

Item  Unit  Number

1) Income   

Page 64: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 62 of 196 

  Number of Fish sold per year  Fish  4,800

  Weight per head  Kg  0.5

  Price per kg  LAK  15,000

  Income from sale of fish  LAK  72,000,000

  Total annual income (gross)    72,000,000

2) Operational expenses       Annual operating expenses  LAK  21,805,000

3) Annual depreciation     Annual depreciation   LAK  8,820,000

Annual Net Profit  LAK  20,687,500

  

Table 6‐6: Summary of Economic Calculation of Raising Fish in Cages on an Annual Basis 

Item  Unit  Number

1) Income     Number of Fish sold per year  Fish  24,000

  Weight per head  Kg  0.7

  Price per kg  LAK  15,000

  Income from sale of fish  LAK  252,000,000

  Total annual income (gross)    252,000,000

2) Operational expenses       Annual operating expenses  LAK  197,630,000

3) Annual depreciation     Annual depreciation   LAK  30,782,857

Annual Net Profit  LAK  154,370,000

  

6.2 CROP CULTIVATION 6.2.1  Paddy Rice Cultivation 

Rice farming is described in Chapter 5.2.1.1 For the economic calculation summarized in   

Table 6‐5 below, a  land area of 2 hectares  is used. Two crops of rice are cultivated. The profit margin of the activity is very low due to the inclusion of organic fertilizer in the Operation Costs. If a farmer can produce organic fertilizer by themselves, profits would increase by 12 million LAK to 17,333,333 LAK per year. Annex 4 contains the details of the economic calculations 

Table 6‐7: Summary of Economic Calculation of Paddy Rice Cultivating in Two Seasons on an Annual Basis 

Item  Unit  Number

1) Income     Production of Rice  Kg  14,000

  Price per kg  LAK  3,000

  Income from sale of rice  LAK  48,000,000

  Total annual income (gross)    48,000,000

2) Operational expenses       Annual operating expenses  LAK  30,442 ,000

Page 65: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 63 of 196 

3) Annual depreciation     Annual depreciation   LAK  898,333

Annual Net Profit  LAK  16,659,667

 

6.2.2 Wet season rice and dry season melon 

Farmers with access  to  irrigation water as  in Phouhomxay, are more and more  interested  to cultivate a cash crop during the dry season.  This type of cash crop farming is described in Chapter 5.2.1.2  For the economic calculation summarized in Table 6‐8  below, a land area of 2 hectares is used. Due to the high labour input requirement of cultivation melons, only 1 hectare is used. Annex 4 contains the details of the economic calculations 

 

Table 6‐8: Summary of Economic Calculation of Cultivating Wet Season Rice and Dry Season Melon on an Annual Basis 

Item  Unit  Number

1) Income     Production of Rice  Kg  8,000

  Price per kg  LAK  3,000

  Income from sale of rice  LAK  24,000,000

  Production of Melon  piece  9,424

  Price per Piece    3,000

  Income from sale of melon    28,272,000

  Total annual income (gross)    52,272,000

2) Operational expenses       Annual operating expenses  LAK  24,366,000

3) Annual depreciation     Annual depreciation   LAK  1,236,833

Annual Net Profit  LAK  26,669,000

 

6.2.3 Wet season rice and dry season sweet corn 

 Dry season cash crop farming is described more fully  in Chapter 5.2.1.2  For the economic calculation summarized in Table 6‐9  below, a land area of 2 hectares is used. Due to the high labour input requirement to cultivate sweet corn, only 1 hectare is used in the calculation. Annex 4 contains the details of the economic calculations 

Table 6‐9: Summary of Economic Calculation of Cultivating Wet Season Rice and Dry Season Sweet corn on an Annual Basis 

Item  Unit  Number

1) Income     Production of Rice  Kg  8,000

  Price per kg  LAK  3,000

  Income from sale of rice  LAK  24,000,000

  Production of sweet corn  ear  9,92000

  Price per Piece    4000

  Income from sale of sweet corn    39,680,000

Page 66: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 64 of 196 

  Total annual income (gross)    63,680,000

2) Operational expenses       Annual operating expenses  LAK  26,151,000

3) Annual depreciation     Annual depreciation   LAK  1,608,000

Annual Net Profit  LAK  35,920,000

 

6.2.4 Mushroom Cultivation 

Mushroom cultivation is described in Chapter 5.2.1.4. For the economic calculation summarized in Table 6‐10 below, two mushroom houses of 3x6 meters are used with 2 cycles of cultivation of 2,000 mushroom bags per house. Annex 4 contains the details of the economic calculations 

Table 6‐10: Summary of Economic Calculation of Mushroom Cultivation on an Annual Basis 

Item  Unit  Number

1) Income     Number of mushroom bags  bag  8,000

  Production of mushrooms  Kg  3,500

  Price per kg  LAK  20,000

  Income from sale of rice  LAK  66,600,000

  Total annual income (gross)    66,600,000

2) Operational expenses       Annual operating expenses  LAK  17,854,700

3) Annual depreciation     Annual depreciation   LAK  3,533,333

Annual Net Profit  LAK  45,211,967

 

6.2.5 Mixed vegetables in greenhouse 

Farming mixed vegetables (e.g. onions, cabbages, pak choi, tomatoes, etc.) is best conducted in dedicated  greenhouses  (see  Chapter  5.2.1.3.)  These  protect  the  vegetables  against  surplus rainfall during  the wet season as well as  insects. A mix of vegetables should be cultivated on rotation  of  the  ground.  For  the  economic  calculation  in    Table  6‐11  below,  a  farm  of  4 greenhouses, each 6x25 meter in size is used. 5 different vegetables are used. The price of most vegetables are lower in the dry season than in the wet season, with differences of up to 50%. A crop  takes  approximately 45 days  to  grow  and 8  crops  can be  cultivated  in  a  year. Annex 4 contains the details of the economic calculations 

Table 6‐11: Summary of Economic Calculation of Vegetable Production on an Annual Basis  

Item  Unit  Number

1) Income     Income from sale of Vegetable A  LAK  7,800,000

  Income from sale of Vegetable B  LAK  21,000,000

  Income from sale of Vegetable C  LAK  15,300,000

  Income from sale of Vegetable D  LAK  3,420,000

  Income from sale of Vegetable E  LAK  2,880,000

  Total annual income (gross)    50,400,000

Page 67: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 65 of 196 

2) Operational expenses       Annual operating expenses  LAK  17,996,000

3) Annual depreciation     Annual depreciation   LAK  3,625,000

Annual Net Profit  LAK  28,779,000

 

6.2.6 Pineapple 

Pineapple farming is a type of upland crop farming described in Chapter 5.2.2. It will take 4 years for a pineapple farm to reach its full production capacity. Careful maintenance and application of organic fertilizer is required to maintain production levels. For the economic calculation below, a farm of 1 hectare is used at a production level achieved in year 4. Annex 4 contains the details of the economic calculations 

  

Table 6‐12: Summary of Economic Calculation of Pineapple Cultivation in average by an Annual Basis  

Item  Unit  Number

1) Income     Number of pineapples produced  Fruits  21,875

  Price per piece  LAK  2,250

  Income from sale of pineapples  LAK  48,437,500

  Average annual income (gross)    48,437,500

2) Operational expenses       Annual operating expenses  LAK  6,485,000

3) Annual depreciation     Annual depreciation   LAK  8,321,000

Annual Net Profit  LAK  33,631,500

 

6.3 RESERVOIR FISHERIES 6.3.1 Fish catch 

Catching fish from the Nam Ngiep reservoir is a form of harvesting a natural resource. Calculating the economics of  this activity  is  very difficult, because daily  fish  catches are  very difficult  to predict, will vary day by day and between different fishermen. The prices of fish will vary by the type of fish and the general taste of the fish, which is influenced by the water quality. Experiences from other reservoirs in Laos indicate that it will take several years for fisheries to stabilize. The Economic calculation made in Table 6‐13 below is therefore based on the current situation and a set of assumptions. Fluctuations in daily catch and type of fish caught has a significant influence on the actual economic return. For the calculation it is assumed that fishing cannot take place from  June to September, because of the weather during the rainy season. A  fishing season  is therefore calculated as being 8 months of the year. A fishing trip takes 2 days, with 10 trips made per month. 30 kg of  fish  is caught per trip, consisting of two types of  fish, selling at different prices. Total  fish  catch over 8‐month period  is 2,400  kg. Annex 4  contains  the details of  the economic calculations 

Page 68: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 66 of 196 

Table 6‐13: Summary of Economic Calculation of Reservoir Fisheries on an Annual Basis  

Item  Unit  Number

1) Income     Catch of Fish type A  Kg  800

  Price per Kg  LAK  20,000

  Income from Fish type A  LAK  16,000,000

  Catch of Fish type B  Kg  1,600

  Price per Kg  LAK  9000

  Income from sale of Fish type B  LAK  14,400,000

  Total annual income (gross)    30,400,000

2) Operational expenses       Annual operating expenses  LAK  17,316,000

3) Annual depreciation     Annual depreciation   LAK  1,736,500

Annual Net Profit  LAK  11,347,500

      

6.4 OFF‐FARM & BUSINESS 6.4.1 Banana Chips 

Banana chips are produced from fresh ripe bananas purchased per bunch. They are sliced in thin slices and deep‐fried in hot cooking oil.  For the economic calculation in Error! Reference source not found. below, it is assumed that frying bananas is implemented 2 times per month, producing 100 kg of fried bananas per time. Preparing for the frying takes time, as well as the sale of produce through delivering it to different vendors. Since the purchase price of the bananas is only a small part of the operating expense (15%), profit  increase can be achieved by  increasing production rather  than  self‐cultivation  of  the  bananas.  Annex  4  contains  the  details  of  the  economic calculations 

Table 6‐14: Summary of Economic Calculation of Banana Chips on an Annual Basis 

Item  Unit  Number

1) Income     Production of Banana Chips  Kg  2400

  Price per Kg  LAK  20,000

  Income from Banana Chips  LAK  48,000,000

  Total annual income (gross)    48,000,000

2) Operational expenses       Annual operating expenses  LAK  15,630,000

3) Annual depreciation     Annual depreciation   LAK  1,083,080

Annual Net Profit  LAK  31,286,920

  

6.4.2 Weaving 

Weaving traditional Lao skirts is a long‐practised tradition and still a popular activity of women in some project zones. Most people who undertake this activity do so only part time. However, for the economic calculation in Table 6‐15 below, it is assumed that the person undertakes this 

Page 69: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 67 of 196 

activity as a full time profession and one skirt is completed in 2 days of weaving. This allows for 156 skirts to be produced per year. The quality of weaving and time required to complete one skirt greatly determine the  income which can be earned by this activity. Annex 4 contains the details of the economic calculations 

Table 6‐15: Summary of Economic Calculation of Weaving Lao Traditional Skirts on an Annual Basis  

Item  Unit  Number

1) Income     Production of woven Lao skirts  Pieces  156

  Price per piece  LAK  100,000

  Income from weaving  LAK  15,600,000

  Total annual income (gross)    15,600,000

2) Operational expenses       Annual operating expenses  LAK  4,290,000

3) Annual depreciation     Annual depreciation   LAK  144,667

Annual Net Profit  LAK  11,165,333

 

6.4.3 Electrician 

The  economics  of working  in  trades  greatly  depends  on  the  amount  of work which  can  be undertaken, especially  for  those who work  independently as  their own  small business. Being known to people and being called to implement works will require producing satisfying work and time to advertise a person’s skills. A good reputation is therefore an essential condition for long term  success.    The  economic  calculation  below,  assumes  an  established  business  situation, achieved after approximately 2 years. Annex 4 contains the details of the economic calculations 

Table 6‐16: Summary of Economic Calculation of Electrician on an Annual Basis  

Item  Unit  Number

1) Income     Installation of electrical points  points  240

  Price  LAK  50,000

  Income of Installation of electrical points 

LAK  12,000,000

  Installation of lights  points  360

  Price  LAK  30,000

  Income of Installation of lights  LAK  10,800,000

  Installation of electricity in a new house 

piece  60

  Price per piece  LAK  500,000

  Income of Installation of electricity in a new house 

LAK 30,000,000

  Total annual income (gross)    52,800,000

2) Operational expenses       Annual operating expenses  LAK  8,340,000

3) Annual depreciation   

Page 70: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 68 of 196 

  Annual depreciation   LAK  2,795,000

Annual Net Profit  LAK  41,665,000

   

6.4.4 Tailor 

The  economics  of working  in  trades  greatly  depends  on  the  amount  of work which  can  be attracted, especially for those who work independently as their own small business. Being known to people and being skilled in producing good quality cloths will require quality sewing and time to advertise a person’s skills. The economic calculation below, assumes an established business situation, achieved after approximately 3 years. For some tailoring the client brings the fabric while for other works, materials will be sold. Repairing or refitting of clothes is also one of the activities undertaken. Annex 4 contains the details of the economic calculations 

Table 6‐17: Summary of Economic Calculation Tailor on an Annual Basis  

Item  Unit  Number

1) Income     Income from a range of various 

clothing and materials produced LAK 

45,600,000

  Total annual income (gross)    45,600,000

2) Operational expenses       Annual operating expenses  LAK  22,488,000

3) Annual depreciation     Annual depreciation   LAK  1,275,000

Annual Net Profit  LAK  21,837,000

 

7 SUPPORT POLICY FOR PROFESSIONAL DEVELOPMENT 7.1 PRINCIPLES OF CONTRIBUTION 

The development of professions  is the natural evolution of the Livelihood program, started  in 2012 with the pilot  farm  in Phouhomxay and expansion of the  livelihood programs started  in 2014. Four years of demonstrations,  trials and capacity building has  introduced concepts  like “production for the market as well as home consumption”, “cultivation of high value dry season cash crops”, “soil  fertility  improvement to  increase production” and “planting  fodder crops  for feeding animals”. After 4 years of test, trials and demonstrations with high inputs by the project to minimize risks for the participants, scaling up of these activities is now required. This expansion requires investment by the PAP themselves, using their compensation funds paid by the company or profits from already established income generating activities.   

The development of a profession requires commitment from the person undertaking the activity. Without his/her full commitment to invest time and resources, the endeavour is likely to not be successful. Any development activity faces the challenge of people participating for  incentives provided by the Project, instead of genuine interest in the activity.   

An internal assessment concluded that: 

A. PAPs mostly lack access to knowledge and experience in order to take livelihood activities to the level of being a profession. In some cases (particularly among women), lack of literacy limits the ability to take a livelihood activity beyond a certain point. 

Page 71: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 69 of 196 

For  the development of professions, NNP1PC  therefore  chose  to have  the  focus of  the inputs provided by the company to be on learning, knowledge transfer and the building of the skills of a PAP.  

B. Because  of  a  long  history  of  past  experiences,  there  is  the  general  expectation (conditioning) of “incentive gifts” when participating in project activities.  

The  project  decided  to  therefore  provide  token  incentive  inputs  to  those  involved  in developing  their  profession,  in  order  to  satisfy  this  expectation.  However,  this  is accompanied by a corresponding insistence on the PAP him/herself providing financial and material inputs both to boost commitment to continuing an activity as well as to enhance understanding of the profit and loss factors involved in income generation. 

 C. There  is a  limitation to the number of people who can be trained and receive adequate 

technical support and on the job training during implementation of a PAPs profession with only a given size of livelihood team members.  

Limited resources mean that not everyone can join the professional development during 2019. Those who cannot join in 2019 are expected to join in 2020 or 2021. See Figure 13‐2.    

 

Based on  the above assessment,  the  following  strategy  is developed  for  the development of professions:   

Strategy: 

1. Majority of inputs are provided by the PAP, using compensation funds or existing assets and labour 

2. Build  on  existing  knowledge,  experiences  and  skills  of  the  PAP,  combined  with experiments,  research  conducted  by  the  company  and  GOL  and  emerging  new technologies 

3. PAPs  choose  the  profession  they want  to  pursue, with  special  attention  provided  to gender and equal opportunities 

4. Professional development  follows  the  strategy of  the Ministry of Agriculture  in being market  oriented,  promotion  of  networking  (including  contract  farming),  local  value adding (processing), the principles of Good Agricultural Practices and increase the use of scientific techniques of modern technology to increase productivity 

5. First step of the development of a profession is detailed planning by the PAP of the activity he/she wants to implement, followed by a step by step implementation of the program over a time frame spanning several years 

6. Technical support will  initially be provided by the project  in cooperation with the GOL, together with experts engaged for specific trainings. Over time, model farmers will take on  the  role of  trainers and providing knowledge  to other  farmers. Not only does  this reduce  dependence  on  Project  inputs,  it  provides  more  long‐term  local  expertise  to resettled households 

7. For vocational training, the company will provide the cost of training. The professional development, such as opening a shop after completing the vocational training needs to be fully covered by the PAP. 

Page 72: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 70 of 196 

Following the successful establishment of a profession, the PAP  is expected to pay 20% of the cost of the incentive gifts provided to him/her to the Village Microfinance System (see section 7.2). This will expend the capital of the Village Microfinance System, so that PAPs can take loans from it to further invest in their activities.    

    

7.2 ACCESS TO FUNDS Except the Resettlers to Phouhomxay, all PAP chose to receive cash compensation for their lost assets so they could restore their livelihoods according to their own individual choice by using the compensation funds. Therefore, the capital investment into the professional development is expected  to  come  from  the  PAP.  For  long  term  access  to  funds  to  expand  operations,  a microfinance  system  is  recommended  to  each  village.  Village  Micro  Finance  Systems  are promoted  since Q1 2018. A  local  consultant was hired  to prepare  the Village Micro  Finance System and conduct a “Training of Trainers”, conducted during Q4 2017 (report number NNP1‐C‐K0601‐RP‐001‐A). Village Micro Finance Systems are currently operating in Bolikhan District in Phouhomxay, Hat Gniun, and Thahuea Villages. In Thathom district Vanghai village has a Micro Finance System. The 3 villages in Zone 2UR have not been successful to organize themselves to establish a micro finance system due to  internal village politics. The Company will continue to offer support and hopes to establish systems once a community is ready to successfully operate them.  

Therefore, it can be summaries that there are the following sources of funding available to PAP: 

1. Villagers’ fund coming from cash compensation and their own effort; 2. Company supported fund in kind, training based on planned livelihood activity; 3. Saving  fund  established  from  the  fund  returned  by  villagers  who  received  livelihood 

support from the project  in kind or cash and also based on agreement from the whole villagers; 

4. Fund supported by 3rd parties through contract farming (mostly in‐kind such as seeds)  

 

7.3 KEY PROJECT INTERVENTION The key project intervention for development of a profession is to provide access to knowledge and facilitate the building of experience. A set of trainings will be  implemented for PAPs who select  a  specific  profession.  Initially,  technical  support  will  be  provided  by  the  project  in cooperation with the GOL, together with experts engaged for specific trainings. Over time, model farmers will take on the role of trainers and providing knowledge to other farmers. 

 

7.3.1 Business plan 

The first training will be the development of a business plan by each individual PAP.  This plan will look into skills the PAP already has, resources available to the PAP both within the family and in  the  (self‐)resettlement  location,  the  production  process  and  seasonality, market  demand, input  requirements  and  expected  economic  return.  Information  from  the  Market  Chain Assessment (Chapter 4.6) and Economic Calculation of a Profession (Chapter 6) are incorporated in this plan. It will also look into practical issues, such as the optimal way for a farm layout. The location of building on a farm plot will determine how well  it can function. A time schedule  is made, to determine the number of years required to build the profession to the size expected by 

Page 73: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 71 of 196 

the PAP. For example, to grow a herd of cattle and establish the required feed plots may take several years until it reaches the size expected by the cattle farmer. This also requires different sorts of support by the Project to the PAP at different stages in his/her livelihoods development.  

During subsequent annual follow‐up and plan refinement, more details will be put in a combined household  plan,  including  an  overall  household  plan  including  an  assessment  of  the contribution % of  imputed or actual  income from different sources. Handicraft production for example might be a small earner, but it might make the difference between debt and no debt in times of economic stress. 

 

7.3.2  Technical Trainings 

Following the establishment of a business plan, a set of technical trainings will be conducted, increasing  the  knowledge  and  skills  of  the  PAP  on  the  techniques  required  for  the  selected profession.   

 

7.3.3  Market training 

Market training will use the information from the Rapid Market Assessment and inform the PAP not only of available markets and potential traders, but also on the principles of market demand and the requirement to produce according to an ever‐changing condition. Good understanding that markets  change every year and how  to  stay on  top of  this  is more  important  for  some professions than others. 

During trainings, assessments will be done of the skills, needs and potential of different PAP Hhs to better understand who is capable of accessing which sections of a market chain.      

 

7.3.4 Economic Training 

Economic  training will  look  into  the economics of  the profession and how  to  increase profits through lowering production costs (reduction of input costs, increasing efficiency of use of inputs and  reduction of production  losses),  increasing production,  increase  the economic use of by‐products and adding value to the final product through quality improvements, processing, timing or packaging, or by taking over more components of a market chain such as transportation to market.     

 

7.3.5 Training on laws and regulations 

When activities grow from a subsistence level livelihood activity to a main profession, the level of regulations covering the activity and  the  level of enforcement of existing  laws  increase.   A temporary,  small,  roadside  stall  selling  food  is unlikely  to be  check  for meeting  the hygiene standards established by the Ministry of Health. However, a registered restaurant is required to meet these standards, be regularly inspected and publicly display the inspection report. Similarly, a cattle farmer raising a few cattle is unlikely inspected to see if his cattle is officially registered and  vaccinated  according  to  the  requirements  of  the  Ministry  of  Agriculture.  However,  a professional farm raising 33 head of cattle with 10 cattle for sale on an annual basis, should fully register their animals to allow for transportation of animals to markets in other districts. These sorts of overheads must also be accounted for in developing business models. 

Page 74: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 72 of 196 

 

7.3.6 Production group 

PAPs  implementing the same profession are encouraged to form production groups. Not only can such groups help to develop an economy of scale, they can allow a group of PAPs to take on more components of a market chain and reduce associated costs (e.g. in storage, transportation, packaging, etc), and will form a network for the PAP for knowledge, exchange of experiences and establish local pricing for the produce. Meeting twice per year, these groups will also conduct the self‐assessment for progress made in the profession during the year and identify and prioritize common issues which need to be resolved the following year.   

 

7.4 SCHOLARSHIP PROGRAM During the first public consultation meetings in affected communities, villagers in all zones of the project area  strongly  requested  the project  to  take  into consideration supporting  the  further education  for  their children. Most parents  see education as  the way out of poverty  for  their children and like to strongly focus on education for their children. Based on this strong focus on further education, a scholarship program is part of the livelihood development program. A total of 30 scholarships are allocated each year, to the best performing students, with a minimum of 12 scholarships (40%) reserved for female students. These scholarships target three main project areas, the 3 villages in the upper reservoir area (Zone 2UR), the Resettlement area including host communities  (Zones  2LR  and  5)  and  the  self‐resettlers.  Scholarships  will  target  3  levels  of education: Technical College, College and University. Of the scholarships 21 scholarships (70%) will be reserved for Hmong students. The Project also applies gender quotas, i.e. at least 40% of scholarships reserved for girls. 

The scholarship value contributes to costs for food, rent, school fees and other minor expenses, covering a period of 9 months per year education system. Scholarships are awarded for a period of 3 or 4 years, depending on the educational system, but are conditional on the progress of the student. This means that if a student drops out, the remaining scholarship funds will stop being provided to the student and will become available to another.  

Upon  graduation,  the  Company  has  preferential  rights  to  employ  graduates  who  used  the scholarship  program  to  obtain  their  diploma,  for  an  employment  period  equivalent  to  the duration  of  the  scholarship.  Areas  of  study  for  which  scholarships  will  be  awarded  will  be influenced by the expected need for the company, in consultation with the communities.  

The scholarship program in Zone 2UR is scheduled to operate for 10 years, from 2014 until the end of the stabilization phase of the Project and for Resettlers it is expected to operate for 15 years, until  the end of  the  income monitoring period, with COD + 10 year as  the  last year of awarding the scholarships.  

Table 7‐1: Summary of Scholarship Programme to date. 

Academic Year Total Number of Scholarships 

Awarded 

Hmong Students 

Hmong Students 

Female Students 

 Female Students 

Hmong Female Students 

September 2014‐June 2015  19  14  74     6  32     3 

September 2015‐June 2016  32  18  56     7  22    3 

Page 75: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 73 of 196 

Academic Year Total Number of Scholarships 

Awarded 

Hmong Students 

Hmong Students 

Female Students 

 Female Students 

Hmong Female Students 

September 2016‐June 2017  30  18  60   14  47    8 

September 2017‐ June 2018  30  21  70  12  40    9 

September 2018‐ June 2019  28  8  29  11  39  2 

Total  139  79  57   50  36  25 Due to the  limited number of high school students graduating during the first years of the scholarship programme, the gender and ethnic target could not be consistently achieved. 

 

7.5 VOCATIONAL TRAINING Vocational training  is separated from the scholarship program because  it covers short training courses which do not require graduation from secondary education. The project works together with vocational training centres  in Vientiane, Bolikhan and Xiengkuang who offer short (3 to 9 months) training programs and boarding for their students. Vocational trainings mostly attract young people interested in a non‐agricultural career, such as mechanics, electricians, truck driver, musician, barber, beautician etc. As outlined in Chapter 6.4.3 and 6.4.4Error! Reference source not found., these professions provide good opportunities for earning income after graduation.  

 

7.6 CONTINUED LEARNING Profession development incentive support is only provided in the first 2 years of the PAP joining a selected profession (See Annex 5, support policy). The years thereafter, inputs from the project will be  technical  training and  follow up, either provided by project staff, government staff or model  farmers. Those who are becoming  skilled professionals will  receive  further  training  to become one of  the model  farmers.  These model  farmers  can  then  train other PAPs  in  their profession.  

Bi‐annual meetings for PAPs who selected the same profession will be conducted in each of the main project zones. During one of the first meetings, indicators will be determined by the PAPs to  distinguish  between  the  3  levels  of  professional  development.  Level  1  of  professional development is the entry level. Level 2 of professional development is the stage where the PAP is incorporating may of the lessons learned, but continues to require technical inputs to build a sustainable profession. Level 3 is the level where the PAP is implementing a profession and on track to continue to do so, while requiring less and less technical support. The bi‐annual meetings for specific professionals will use these indicators to then assign their members to the 3 different categories. Over time, this will demonstrate the progress the group is making towards increasing knowledge,  as well  as  identifying  those  PAP who  are  still  at  level  1  and  2  and may  require additional technical follow‐up and on the job training. Technical follow‐up and house visits will concentrate on those at  level 1 and 2, while those  in  level 3 will be considered for training as model farmers. 

Page 76: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 74 of 196 

Model farmers will be selected by the PAPs, mostly from those who have reached professional level 3. These model farmers will be trained on training techniques, so that over time, they will become the experts providing information to other PAPs.    

Through the bi‐annual professional meeting, PAP continue to be involved with the project, even though material incentive input support is no longer provided. This will provide opportunities for continued  learning,  which  is  essential  for  continued  innovation  and  development  within  a profession.       

 

 

[Describe  a  graduation  policy  in  providing  assistance  ‐  Resettlers  whose  income  generating capacity has already enabled them to restore if not improve their pre‐project income level should graduate from project assistance so that more can be channelled to the laggards. Determining the graduates and the laggards requires monitoring every six months which methodology must be incorporated in Section 11 of this plan] 

7.7 APPROVAL BY GOL On 26 April 2019,  the draft Support Policy prepared by NNP1PC was discussed with  relevant Government counterparts, including: 

1. District Governor of Hom district 2. District Governor of Thathom district 3. District Governor of Bolikhan district  4. Head of RMU – Xaysomboun Province 5. Head of RMU – Bolikhamxay Province 6. 2 District Officers from Hom District responsible for Livelihood support to Self‐Resettlers 7. 2  District  Officers  from  Bolikhan  District  responsible  for  Livelihood  support  to  Self‐

Resettlers 8. 1 District officer from Thathom district responsible for livelihood support to PAP and self‐

resettlers.  

Recommendations made during the one‐day meeting are incorporated in the support policy. The final support policy is attached in  Annex 5 Unofficial Translation of the Support Policy. 

The support policy attached in Annex 5 covers the years 2019 and 2020. During 2020, it will be reviewed  and  updated  as  required  for  the  next  period  of  the  Resettlement  Implementation Period.       

8 END OF RESETTLEMENT IMPLEMENTATION PERIOD ‐ HAND OVER 8.1 THE END OF THE RESETTLEMENT IMPLEMENTATION PERIOD 

CA Annex C, Clause 90 a.i. state that the “Resettlement and Compensation Period will continue until the fifth (5th) anniversary of the Commercial Operation Date, and will be divided into two (2) stages: Preparatory and Construction; and Stabilization”.  

With  the  Commercial  Operation  Date  scheduled  to  be  in  August  2019,  the  end  of  the resettlement Implementation period will be August 2024. 

Experiences throughout Laos have shown that  if a program does not plan  it’s ending from the beginning, positive changes achieved during the program implementation quickly disappear after 

Page 77: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 75 of 196 

the  program  is  closed.  Improvements  made  are  temporary  if  they  are  not  planned  and implemented with sustainability and self‐support as core values. 

NNP1PC will build the capacity of both the PAP and local government to continue to benefit from improvements achieved, even without  the continued presence of company staff. The gradual shift of responsibilities from project to PAP and GOL will continue and accelerate  in the  last 2 years of the Resettlement Implementation Period (see Chapter 13, Figure 13‐1 and  Figure 13‐2).     

Before handing over  the program  to  the GoL, social economic monitoring combined with  the assessment  on  the  achievement  of  livelihood  restoration  conducted  by  the  project  external monitoring  agencies  (IMA,  LTA  and  IAP)  shall  be  conducted  to  assess  if  the  company’s commitments have been substantially achieved at such time. Acceptance of the program by the GOL before handing over to the GOL is required. See Figure 8‐1 

Figure 8‐1: Flowchart on hand over of Livelihood Program to GOL 

  

Page 78: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 76 of 196 

8.2 RECIPIENTS – PAP AND GOL After  the end of  the Resettlement  Implementation Period, both Project Affected People and District Government are expected to continue to carry out their responsibilities independently of the  Project.  PAPs  are  expected  to  not  only  continue  to  carry  out  their  profession,  but  also contribute to the operation and maintenance of village  level community  infrastructure,  in  line with the common practise in Laos. District Government is expected to arrange the operation and maintenance of common property, also common practice in Laos.   

 

8.3 BUILDING CAPACITY TO SUPPORT GOVERNMENT OPERATIONS AFTER HAND OVER Since 2018, NNP1PC and District Authorities are working together closely on implementation of the  livelihood  program.  Through  cooperation  agreements,  DAFO  staff  is  assigned  by  the Provincial Governors to be  involved  in the profession development programs  in all 3 districts, with  financial  support by NNP1PC  to  cover  their Per Diems. Currently, 6  staff  from Bolikhan district are supported to be based at and work in the Phouhomxay resettlement area. In Zone 2UR, 4 district staff are working closely with project staff to  implement the program.  In Hom District, 3 district staff support the self‐resettler program and in Bolikhan District, 2 district staff support the self‐resettler program  in Bolikhan District.   This on‐the‐ground cooperation builds understanding  of  the  program,  creates  ownership with  the  district  and  provides  on  the  job learning opportunities for the staff involved. 

The capacity building program for District Staff targets to build the capacity of a total of 18 staff, 6 per district.   

    

8.4 BUILDING CAPACITY TO SUPPORT PAP OPERATIONS AFTER HAND OVER The training programs for professional development covers all aspects of the profession, from sourcing the required inputs to sale of the final product and required Government permissions (See Chapter 7.3).  

Through the formation of production groups, strength by numbers is created. This will help PAP with a network of information as well as responding more uniformly and with more negotiating strength to traders, supervise quality control of goods and products and provides possibilities to appropriately schedule storage and production to prevent oversupply of the market.  

Model  farmers  are  experts  in  their  profession.  They  will  be  identified  and  their  capacity strengthened to train other professionals. They will become resource persons in the communities and examples for others to follow. They will be a key part of an information network, keeping markets and producers connected, to ensure producers will produce the products expected by the market and introduce new techniques to other professionals.  

The capacity building program for producer groups targets to build the capacity of a total of 30 producer groups, 10 per district.   The capacity building program  for model  farmers targets to build the capacity of a total of 60 model farmers, 20 per district 

 

 

8.5 COMMUNITY DEVELOPMENT PROGRAM FUND The Community Development Program Funds are a requirement listed in the CA, Annex C, Clause 97. As described  in  the REDP  and  subsequent  Zone‐specific Updates,  it  is  intended  to  cover 

Page 79: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 77 of 196 

Community Development Programmes of  the neighbouring communities  including Zone 2UR, Phouhomxay and the host community. If there is clustered self‐resettlement officially established by the GOL, GOL and the Company may decide that part of the funds can be allocated to improve public  services  and  infrastructure  in  these  clusters.  The  procedures  on  how  the  Community Development Program Funds shall be managed and allocated will be decided by the Company and GOL. The details on what projects or activities the Community Development Program Funds will support, shall be determined by each respective beneficiary community in consultation with the Company. 

The  Company  has  initiated  discussions  with  the  Government  on  the  fund  management procedures  and  plan  for  the  utilization  of  the  funds  in  2018  and  expects  to  conclude  these discussions prior to COD. Training of the respective committees involved is intended to start after finalization  of  these  procedures  and  could  start  as  early  as  in  the  second  half  of  2019.  The preparations for payments, such as action plan preparation and activity prioritization are likely to require time and the first payment will therefore most  likely be made  in the second half of 2019. 

The committee for the fund management will be established and appointed by PRLRC. The RMU will play key roles in managing the fund. The fund will be allocated to each eligible village and managed by Village Development Fund Committee. Village Development Committee together with other PAPs in the village will do joint identification of priority activity for the fund. NNP1 will take part in technical support and fund management. 

 

9 INTEGRATION  OF  SPECIAL  CONSIDERATIONS  GIVEN  TO  VULNERABLE HOUSEHOLDS INTO THE PROGRAM Special attention will continue to be provided to vulnerable households. This includes a focus on producing food at the home plot with more intense training and follow‐up. This food production can  include vegetables and  fruits, as well as meat through raising chicken or  fish. For  income generation of vulnerable household will look at activities which are require less labor input and are easy to implement in nature such as raising small animals, cultivating mushrooms and other light activity for income generation. The program will also seek to establish kinship support for cultivation of agricultural  land during periods of high  labour  input, such as ploughing, planting and harvesting. 

Key  to  the  support  is  an  individual  approach,  taking  into  consideration  the  abilities  of  each person, their family and kin‐ship support for long term sustainability. Lessons learned from Nam Theun  2  will  be  incorporated  into  this  program.  Through  timely  addressing  of  small  issues, including  health  and  other  concerns  not  directly  related  to  income  generation,  a  gradual improvement will be achieved for the vulnerable household over time.  

A Senior Officer in the SMO program is responsible to coordinate such integrated approach to the vulnerable households and to ensure that timely support from the various technical team is provided to each vulnerable household. 

Vulnerable households may not achieve the same level of income as other households, but will be at least at a level above the National Poverty Line, meet the CA commitment, and be better off than before the project.           

Page 80: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 78 of 196 

10 INTEGRATION OF GENDER POLICIES INTO THE PROFESSION DEVELOPMENT PROGRAM Gender was mainstreamed into the livelihood programs undertaken since 2014 and will continue to  be  integrated  into  the  professional  development  program.  Through  the  professional development program, each person is asked to what their choice of profession is. This choice is then supported. By working at an individual level, there is close attention to the choice made by women  for their selected profession. Trainings will be provided to the person who selected a specific profession, ensuring that women have equal access to training for development of their selected profession. When  trainings  are provided,  careful  considerations  are made  as  to  the circumstances of both women and men  for  such  training  in  time and  location.  For example, several women from Phouhomxay requested training on tailoring, which NNP1PC organized to be provided by external trainers at the training center in Phouhomxay, because the participants could not leave their families and be trained at a location away from their houses.  

11 MONITORING OF INDICATORS Monitoring of the development of professions will take place at different levels of the program by  different  actors.  This  includes  the  PAP  monitoring  themselves  of  the  progress  of  their profession, the program monitoring overall participation by PAPs  into the program, as well as monitoring  the  progress  in  household  income  through  periodic  Socio  Economic  Surveys. Independent external monitoring is provided by the Independent Monitoring Agency (IMA) and the Independent Advisory Panel (IAP). Different lenders to the Company may conduct their own monitoring at regular intervals. 

11.1 SELF‐MONITORING OF THE ECONOMICS OF A PROFESSION BY PAPS PAPs are supported to prepare their business plan for their profession at the start of their activity. This will set the expected size of the activity and realistic growth targets over time, since  it  is expected to take 3 years or more to fully establish a profession. Record keeping to track progress will be one of the trainings provided, so that each person can keep track of their own progress towards  to  plan  initially  established  and  plan  accordingly.  This  contributes  to  the  overall monitoring, because PAPs generally might under‐report income, as most people are reluctant to let anyone know how much they are earning for reasons including theft and taxation.   

Bi‐annual evaluations made by producer groups / professional groups will allow  for  individual members  to  compare  their  progress  and  successes with  their  peers. During  one  of  the  first meetings,  indicators will  be  determined  by  the  PAPs  to  distinguish  between  the  3  levels  of professional development.  Level 1 of professional development  is  the entry  level.  Level 2 of professional development is the stage where the PAP is incorporating may of the lessons learned, but continues to require technical  inputs to build a sustainable profession. Level 3  is the  level where the PAP is implementing a profession and on track to continue to do so, while requiring less and less technical support. The bi‐annual meetings for specific professionals will use these indicators  to  then  assign  their  members  to  the  3  different  categories.  Over  time,  this  will demonstrate  the  progress  the  group  is  making  towards  increasing  knowledge,  as  well  as identifying those PAP who are still at level 1 and 2 and may require additional technical follow‐up and on the job training. Technical follow‐up, including house visits, will concentrate on those at  level  1  and  2,  while  those  in  level  3  will  be  considered  for  training  as  model  farmers.  Some  suggested  indicators  are  listed  in  Annex  6.  These  are  indicative  only  and  need  to  be developed by the group members themselves. 

Page 81: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 79 of 196 

The results of the bi‐annual meetings and outcome of the allocation of professionals  in the 3 categories will be reported in the regular progress reports produced by NNP1   

    

11.2 PARTICIPATION IN PROFESSION DEVELOPMENT ACTIVITIES The project will monitor participation in activities aimed to develop the professions of PAPs.  This monitoring will measure and allow for reporting into the monthly and quarterly progress report of the number of people who are actively participating in the development of their profession, segregated by zone and gender.   

11.3 MONITORING OF INCOME THROUGH THE BIENNIAL SOCIO‐ECONOMIC SURVEY The Biennial  Socio‐Economic  Survey  (BSES)  is  a detailed  survey undertaken  every 2  years  to measure income, expenditure and consumption of households. The first survey was undertaken in 2014, with follow up surveys conducted in 2017 and 2019 and scheduled surveys for 2021 and each  2  years  thereafter.  This  survey  measures  income,  expenditure  and  consumption  of households, as well as  several parameters of well‐being.  It will be used  to measure progress towards the CA targets. The socio‐economic monitoring team is described in Chapter 12.3.13. 

11.4 EXTERNAL MONITORING Annex C of the CA requires external monitoring of all Project activities, to be carried out by the Independent Advisory Panel  (IAP).    Its  task  is  to assess  twice a year whether  the Project  is  in compliance in its social and environmental mitigation measures with the obligations outlined in the Concession Agreement and to advise on necessary corrective actions. The IAP liaises closely together with RMU and DCC Bolikhan towards this goal. Their reports are publicly available on the Project's website.  The IAP has been appointed and completed its twelfth monitoring mission in December 2018.  

Further monitoring is carried out by the lenders, including by the ADB and the Lenders Technical Advisory  (LTA),  whose  social  experts'  most  recent  visit  was  in  May  2019.  An  Independent Monitoring Agency (IMA) has been recruited by GoL, their first mission of the IMA was conducted in June 2016 and their most recent mission was in February 2019. 

12 PROJECT MANAGEMENT SYSTEMS 12.1 COOPERATION WITH GOL 

The profession development program is implemented in close cooperation with the Government of Laos at various level. It follows the strategy set out by the Ministry of Agriculture to promote production  for  the  market  as  well  as  home  consumption  and  value‐added  product.  It  uses knowledge from provincial level on (i) suitable varieties for production based on local geographic and climatic conditions, (ii) markets and market demand and (iii) local policies of production on for example the reservoir fisheries, transportation and tourism activities. 

Though cooperation agreements, DAFO staff is involved in the profession development programs in all 3 districts, with financial support by NNP1PC to cover their Per Diems to make sure that farming product met minimum standards of MAF.    

12.2 THE INSTITUTIONS While it is the responsibility of the project owners and developers to mitigate any adverse social and environmental  impacts and enhance the  lives and  livelihoods of the people  in the project area,  it  is also  the  task of provincial, district, and village authorities  to be directly  involved  in implementing  resettlement  and  environmental  and  social  development  programs  in  close 

Page 82: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 80 of 196 

consultation with the developer. External monitoring by MONRE (implemented by PONRE staff) and Lenders will further support this process. This includes the public authorities’ monitoring of the effectiveness of the mitigation measures, of public participation and involvement, and of the protection of rights and  livelihoods of the people affected by the Project. Furthermore, to the extent possible mitigation measures and development activities are to be carried out through or with the cooperation of the government at the local, district, provincial and national levels.  

The overall  institutional arrangements  for NNP1 are  laid down  in  the Concession Agreement based  on  standard  arrangements  for  hydropower  projects  in  Laos.  The  institutional arrangements  are  intended  to  ensure  effective  collaboration  and  cooperation  among  the involved  Government  organizations  and  the  Company  and  thereby  support  effective implementation of the environmental and social mitigation measures, development activities, and monitoring programmes, while also building the capacity of local residents, administrative organizations,  and  government  agencies.      The  Project  is  implemented  in  Xaysomboun  and Bolikhamxay provinces, and representatives of both provincial authorities are included in both decision‐making as well as day‐to‐day implementation. 

NNP1  implementation  arrangements  are  set  up  in  such  a  way  as  to  facilitate  a  process  of addressing the concerns and needs of the main stakeholders – the PAPs, the project owners and developers, and the government – and to provide a framework for the participation of PAPs, for the resolution of any grievances that may arise, and for the  involvement of any other project stakeholders in the process. 

At  the project  level,  the Company has established an Environment and Social Division  (ESD), responsible  for  implementing  the  relevant  programs  of  the  mitigation  measures.  An Environmental Management Office (EMO) in the ESD is responsible for environmental mitigation measures and monitoring, while a Social Management Office (SMO) is responsible for social and economic mitigation measures  and monitoring,  including  cooperation with  the  RMU  on  the resettlement process. The SMO encompasses several units: a livelihood restoration team for the resettlement site and host communities; a livelihood restoration team for PAP and Self‐Resettlers in  the upper  reservoir  area  and  Thathom District;  a  livelihood  restoration  team  for  the  self‐resettlers  in  Bolikhan  and  Hom  districts  and  geographically  cross‐cutting  unit  for  social development section. A GIS and information‐analysis‐and‐documentation section, sits with the ESD, to provide services to both EMO and SMO (See Figure 12‐2).  

Government Institutional Arrangements for the Project 

GOL has established the national level organizations responsible for setting policy and directions, for supervising and monitoring NNP1. The project provides additional resources so that these organizations  are  able  to  provide  efficient  and  effective  support  to  the  implementation  and monitoring of the mitigation measures and development programs under the Project. Details of these arrangements can be found in the REDP and subsequent REDP Zone Specific Updates and are not repeated in this plan. 

12.3 OVERALL PROJECT INSTITUTIONAL ARRANGEMENTS 12.3.1 Environment and Social Division 

NNP1PC has established an Environment and Social Division (ESD) of the Project. The ESD consists of  an  Environmental  Management  Office  (EMO)  to  enable  the  Project  to  meet  all  its environmental obligations, and a Social Management Office (SMO) to enable the Project to meet all  of  its  social  obligations.  Details  of  these  arrangements  can  be  found  in  the  REDP  and 

Page 83: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 81 of 196 

subsequent  REDP  Zone  Specific  Updates  and  are  not  repeated  in  this  plan.  The  current Organizational chart of the ESD is shown in Figure 12‐1 

Figure 12‐1: Organisational chart of the ESD, April 2019 

    

12.3.2 Information Management Section 

The  Information  Management  section  is  a  cross‐cutting  section,  cooperating  with  all  other sections in collecting data, managing its storage, analyse data and provide resulting information back  to  the  other  sections.  This  data  will  be  used,  too,  to  compile  the  social  planning  and reporting documents, thereby analysing compliance with national and  international standards and providing advice  to  the  SMO management  team  for a decisive analysis. The  section will furthermore store all information and documentation along data and document security system. Particular attention will be paid to ensuring all data gathered and entered in the Project database, is gender disaggregated. The Information Management section consists of the following 3 Teams: 

Database  Knowledge Management  GIS 

12.3.3 Database Team 

The database team has the following tasks: 

Operation of a database  server  system, which contains all  records on PAP Choices  for Profession,  the  inputs  provided  to  their  professional  development  and  progress  on implementation of the profession.  

Page 84: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 82 of 196 

12.3.4 Knowledge Management Team 

The knowledge management team has the following tasks: 

Maintains final copies of SMO reports, including this report  Request posting of final SMO documents on the company website. 

12.3.5 GIS Team 

The GIS team has the following tasks: 

Production  of  general maps  of  the  project  area,  activity  locations  and  facilities made available upon request 

Production of Land Use and Participatory Land Use Planning (PLUP) tools available for the resettlement area, host communities and Zone 2UR  

12.3.6 Environmental Management Office 

Major tasks of the Environmental Management Office’s (EMO), mentioned here for reasons of comprehensiveness and described in details in the environmental documents, are to collect all the  baseline  data  and  information  and  conduct  subsequent monitoring  of  all  aspects  of  the environment  that could be affected by  the Project,  such as  fish and other aquatic  resources, hydrology, water quality, river bank erosion,  forest cover, etc., and  implement  the mitigation measures in the EMP. 

The Fish Catch Monitoring Program undertaken by the EMO monitors fish and aquatic resource stability  to  alert  SMO of  any environmental  threat  to  a  livelihoods base e.g.  loss of  species, reduction of species. 

 

12.3.7 Social Management Office 

The social aspects of the Project are being planned, implemented, and monitored by the Social Management  Office  together  with  PAPs  and  GOL  authorities.  It  encompasses  a  livelihood restoration  section  for  the  resettlement  site;  a  livelihood  restoration  section  for  the  upper reservoir  area;  a  livelihood  restoration  section  for  the  self‐resettlers  in  Bolikhan  and  Hom districts; a geographically cross‐cutting a social development section; an infrastructure section; a Government Relation section; Grievance section and a Socio Economic Monitoring section. 

The  SMO  is  headed  by  a  manager.  His  work  is  assisted  by  a  Social  Specialist,  two  Deputy Managers, each lading a specific section of the SMO program and five Team leaders, each leading a specific team (See Figure 12‐2).  

Page 85: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 83 of 196 

Figure 12‐2: SMO Organizational Chart, April 2019 

 12.3.8 Infrastructure Section 

The Infrastructure section works with the RMU to provide technical and financial assistance in completing all outstanding infrastructure development related to compensation and mitigation measures for host and affected people. 

The Unit  is headed by a Team Leader, who  reports directly  to  the SMO Manager, and works closely with the RMU and other GOL support staff (see below).  

The tasks of the team in the Infrastructure Section include: 

Complete all outstanding  infrastructure development,  including the  irrigation system  in Phouhomxay and the Suspension Bridge in Zone 2UR 

Conduct End of Defects liability period inspections  Provide  technical  input  into  the Operation and Maintenance  schemes  for each of  the 

infrastructure,  including  infrastructure  used  directly  for  livelihoods,  including  the irrigation system in Phouhomxay and agricultural access roads 

12.3.9 Livelihood Teams 

The SMO has established 3 Livelihood Teams, each consisting of a team leader and a number of technical staff. The first team covers the 3 communities in Zone 2UR and the Self‐Resettlers who resettled to Thathom district. The second team covers Resettlers to Phouhomxay and the PAP in the Host communities as well as a general program for Zone 4. The third team covers the Self‐Resettlers in Hom and Bolikhan District. Figure 12‐2Error! Reference source not found. shows the Organizational chart of the SMO as of March 2019. 

Page 86: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 84 of 196 

The Livelihood Teams are the main teams implementing the activities outlined in this Plan.  

 The Bolikhan District Agriculture and Forestry Office has assigned 3 staff from their office to work full time with the NNP1PC team. These staff have skills on agriculture, gardening and livestock raising.  Their  roles  are  to  work  together  with  the  NNP1PC  in  planning,  coordinating  and monitoring of the activities at the resettlement areas.  It  is expected that they will be the key persons for livelihoods development in the future.     

12.3.10 Social Development Team 

The Social Development Team is considered a cross‐cutting team which works in all project zones. Accordingly, most of  the  staff of  the  Social Development  Team will be moving between  the different field offices, depending on the tasks needed to be implemented at that point in time. 

The Social Development Team has the primary responsibility for all health programs, education programs, labour Management and camp followers, vulnerable households and gender & ethnic development. A detailed description of the team is found in the SPD Update 2016. In relation to this Livelihood Master Plan, they provide the scholarships for the scholarship program, ensure gender  mainstreaming  and  assist  when  working  with  the  vulnerable  households  on  their livelihood activities.   

12.3.11 Grievance Team 

The Grievance Team will be responsible on the Developer's side for handling all complaints and grievances  that  may  arise  in  the  course  of  the  implementation  of  the  Environmental Management  Plan,  the  Social  Development  Plan,  and/or  the  Resettlement  and  Ethnic Development Plan, and will endeavour to resolve the problems with the offended parties as well as the Grievance Redress institutions along the Grievance Redress Mechanism outlined below. This includes the following tasks: 

Support the district grievance committee through the provision of relevant project and field data as evidence for Grievance investigations 

Maintain the project record of Grievance cases  If a grievance is found to be valid, to make compensation payments accordingly. 

Following  the  closure of  the  vast majority of Grievances  cases  in 2020,  the  grievance officer position will be phased out after 2020 and the task will be transferred to the Social Manager and relevant GoL Organizations. 

12.3.12 Government Relation and Community Relations Team 

The  government  and  community  relation  team  is  the  team  coordinating  between  the Government counterparts, the community and the SMO. They arrange, prepare for, schedule and follow up with the minutes of meetings for regular coordination meetings as well as for topic specific meeting with the Village representatives, DCC, RMU and PRLRC.   

12.3.13 Socio Economic Monitoring Team 

The  socio‐economic  monitoring  team  is  responsible  for  implementing  the  socio‐economic monitoring  programme,  which  was  initiated  in  2014.  The  programme  consists  of  two  main activities: (i) collection of the baseline survey (2014) and subsequent bi‐annual large‐scale socio‐economic  survey,  the  Biennial  Socio‐Economic  Survey.  This  is  a  detailed  and  large‐scale household survey  (>1400 households) undertaken every  two years by external contractors  to evaluate  household  incomes  and  well‐being  in  accordance  with  CA  requirements;  and  (ii) 

Page 87: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 85 of 196 

implement the Ongoing Social Economic Monitoring survey, which consists of a series of small scale surveys and monitoring activities designed to identify emerging socio‐economic issues and track household well‐being in the short‐term cycle. An international consultant is contracted to analyse the data collected and report on it accordingly.     

13 SCHEDULES During the first survey on selection of profession, 45% of the interviewed people (2,382) selected their preferred professing for further development. 55% did not yet know what profession they wanted  to pursue. There are small  regional differences between  the project Zone as show  in Table 4‐1 

Building a sound foundation for the professions is expected to take 3‐5 years, depending on the profession selected and the personal situation of the PAP, including prior experience, motivation, willingness and ability to adapt, as well as outside factors influencing the success. 

Involvement in building a profession is scheduled to increase over the next 3 years. During 2019, the  NNP1PC  livelihood  teams  target  to  start  involving  a  total  of  615  PAP  in  building  their profession. During 2020 and 2021, these numbers are expected to increase until 1,400 PAP are or have been involved in the program (see Figure 13‐2). Based on current feedback from PAPs, that the remainder are unlikely to be  interested  in participating, due to personal reasons and preferences.  

Capacity building of district staff, producer groups and model farmers will continue during 2019‐2022 with a gradual increase of responsibility for these groups. After successful capacity building, technical support will be increasingly provided by the District staff, producer groups and model farmers during the period 2023‐2024. During this period, NNP1PC staff will gradually phase out of the role of providing technical inputs (see Figure 13‐1).  

  

Figure 13‐1: Roadmap to Development of Professions 

 

Page 88: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 86 of 196 

Figure 13‐2: Time Schedule for development of Professions 

 Note. Level 1 of professional development is the entry level. Level 2 of professional development is the stage where the PAP is incorporating may of the lessons learned, but continues to require technical  inputs  to  build  a  sustainable  profession.  Level  3  is  the  level  where  the  PAP  is implementing  a  profession  and  on  track  to  continue  to  do  so, while  requiring  less  and  less technical support. 

14 OVERALL SMO BUDGET The  environmental  and  social  budgets  are  connected  in  that  by  avoiding,  mitigating,  and minimizing environmental impacts, social impacts will be correspondingly less severe. The social budgets of the Project is USD$14.4M post‐COD during the stabilization phase (REDP Chapter 19 consolidated budget). An amount of USD$1.9M before COD and USD$1.7M after COD is for the contingencies of both environmental and social components. The environmental budget can be found in the EIA. Overall ESD costs and costs for GoL‐Project institutions are also outlined in the EIA. 

The budget is organized along the projected budget in the Concession Agreement. Budget figures are divided into pre‐COD, i.e. before September 2019, and post‐COD stabilization phase (5 years after COD). Additional monitoring will continue until 10 years after COD,  for which additional costs of USD$2.1M are estimated, not included in the overall budget presented. The budget is insofar indicative as all social mitigation measures are limited by scope.  

 

Page 89: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 87 of 196 

Table 14‐1: Overall NNP1 SMO Budget (REDP) with SMO update in November 2019 

Overall Budget Post‐COD 

Stabilization Phase in USD 

Budget utilized up to COD  

Remaining Budget (as of 6 Sep 2019) 

Post COD Budget Sep 2019‐Sep 2029 

Resettlement site development  80,000  14,505,586  610,391  140,000 

Compensation  1,445,000  50,494,705  120,942  1,135,000 

Livelihood restoration programs  3,360,000  2,619,498  599,153  2,809,963 

ESD – SMO incl. staffing  9,466,000  8,422,412  388,043  7,658,953 

Total  14,351,000  76,042,201  1,718,529  11,743,916 ESD Contingencies (SMO + EMO)  1,734,998       

 

Details on reallocation of funds, updates of budgets and disbursement of funds are presented in Chapter 19 of the overall REDP. 

Budget figures provided here are from the main REDP in 2014. 

The  costs  for  implementing  this  Master  Plan  is  covered  by  the  budget  under  “Livelihood restoration programs” for activities and the staffing and operations costs are covered under “ESD – SMO incl. staffing”. 

15 CONCLUSION In  Chapter  4.1  we  set  out  the  conditions  required  for  the  successful  implementation  of  a Livelihood: 

1. Knowledge 2. Resources 3. Experience 4. Motivation 5. Sufficient economic return 6. Ability to overcome difficult times 7. Family and community acceptance 8. Permission of the Authorities 

This plan outlined how these 8 conditions are enhanced: 

Knowledge: The professional development activities focus on building the knowledge of PAPs on key aspects of their activities through a timely scheduled training program, providing training on a range of topics 1 to 2 months in advance of the need to apply them during the agricultural cycle  

Resources: Through  the business planning activity PAPs will get a clear understanding of  the resources required to undertake the activity and how to obtain them   

Experience: The professional development activities will continue to build on experiences gained since starting the livelihood program in 2014. On the job training and technical advice will guide PAPs through the process  

Page 90: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 88 of 196 

Motivation:  PAPs  choose  the  profession  they want  to  pursue,  based  on  their  own  interest. Regular group meetings and visits by  the  technical staff  to provide advice will help PAPs stay motivated on their activity 

Sufficient  economic  return:  The  economic  calculations  in  Chapter  6  show  the  calculated economic  return of  a  profession. At  the  first  stage of  the profession development, business planning, the PAP is clearly informed of the economic potential. If a business plan turns out to be not possible due to input requirements or not meeting the expected economic return, a PAP is advised to reconsider the profession. 

The Market Chain Assessment has in Chapter 4 outlined the markets for various professions in different project zones. Training on marketing of their produce will increase the experiences PAPs have and prepare them for future changes in the market.   

Ability to overcome difficult times: The business plan will cover the seasonality of production or market demand and plan on how to bridge these through savings as well as spreading risk across different  income  sources. Access  to  the  village microfinance  system  can  provide  short  term credit. 

Family  and  community  acceptance:  During  the  business  planning  stage,  impacts  on  the surrounding are taken into consideration. This will include for example planning to location of a large pig shed in a location to not disturb the neighbours with potential disturbance of smell 

Permission of the Authorities: The training program for each Profession will include a training on relevant government regulations, the requirements and how to comply with them. The close cooperation  with  district  authorities  during  Plan  implementation  will  facilitate  better understanding on both sides of the implementation of current and newly issued GOL regulations   

NNP1PC realizes that this Plan outlines the framework of the activities, but that detailed annual planning  is required to adjust the programs to the  local situations as they develop over time, taking  into  consideration  the  actual progress of professional development  as well  as overall changes  in  local, national and  international markets which all  influence  the economy. Annual activity plans will therefore continue to be updated and strategies adjusted to reflect the actual situation on the ground, using the method of adaptive management. 

  

   

Page 91: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 89 of 196 

16 ANNEX Annex 1: List of Professions 

Annex 2: Professional Questionnaire 

Annex 3: PM Decree 309 on Poverty and Development Standard (English Translation) 

Annex 4: Detailed Economic Calculations 

Annex 5: Livelihood Input Support Policy for 2019  

Annex 6: Potential Indicators for PAP to Determine Level of Professional 

 

Page 92: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 90 of 196 

16.1 ANNEX 1 LIST OF PROFESSIONS  

Profession Code  Main category  Sub Category  Profession 

3001  Livestock farmer  Cattle Farmer  Cattle breeding 3001  Livestock farmer  Cattle Farmer  Cattle fattening 3001  Livestock farmer  Cattle Farmer  Cattle rancher 3001  Livestock farmer  Cattle Farmer  Fighting bull raising 3003  Livestock farmer  Pig Farmer  Pig breeder  3003  Livestock farmer  Pig Farmer  Pig fattening 3003  Livestock farmer  Pig Farmer  Piglet producing for sale 3003  Livestock farmer  Pig Farmer  Integrated Pig and vegetable farm 3005  Livestock farmer  Fish  Fish fingerling producer 3005  Livestock farmer  Fish  Fish farmer 3005  Livestock farmer  Fish  Integrated fish and Pig farm 3005  Livestock farmer  Fish  Integrated fish and vegetable farmer 3005  Livestock farmer  Fish  Integrated fish and poultry farmer 3005  Livestock farmer  Fish  Frog Farmer 3004  Livestock farmer  Poultry Farmer  Chicken meat farmer 3004  Livestock farmer  Poultry Farmer  Chicken egg farmer 3004  Livestock farmer  Poultry Farmer  Integrated chicken and vegetable garden farmer 3004  Livestock farmer  Poultry Farmer  duck farmer 3004  Livestock farmer  Poultry Farmer  duck egg farmer 3004  Livestock farmer  Poultry Farmer  Breeder chicken 3004  Livestock farmer  Poultry Farmer  Quail bird 3002  Livestock farmer  Goat Farmer  Goat farmer 3002  Livestock farmer  Goat Farmer  Goat breed farmer 1002  Crop Farmer  Flat land  Vegetable Farmer 1002  Crop Farmer  Flat land  Mushroom producer 1001  Crop Farmer  Flat land  Rice Farmer 1002  Crop Farmer  Flat land  Cash crop Farmer 1002  Crop Farmer  Flat land  Flower farmer 2002  Crop Farmer  Upland  Banana farmer 2002  Crop Farmer  Upland  pineapple farmer 2002  Crop Farmer  Upland  Fruit tree farmer 2001  Crop Farmer  Upland  Rubber plantation owner 2002  Crop Farmer  Upland  Rattan farmer 2002  Crop Farmer  Upland  Agro‐Forestry Farmer 2002  Crop Farmer  Upland  Lemon farmer 2002  Crop Farmer  Upland  Sugar cane farmer 6001  Off Farm  Shop  Owner of Whole sale retailor 6001  Off Farm  Shop  Owner of Small dry good shop 6001  Off Farm  Shop  Owner of construction material shop 6001  Off Farm  Shop  Owner of cloth shop 

Page 93: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 91 of 196 

Profession Code  Main category  Sub Category  Profession 

6007  Off Farm  Shop  Owner of beauty shop 6007  Off Farm  Shop  Owner of Barber shop 6003  Off Farm  Shop  Owner of Motorbike repair shop 6003  Off Farm  Shop  Owner of Car repair shop 

  Off Farm  Shop  Owner of Massage shop 6001  Off Farm  Shop  Owner of Pharmacy 6001  Off Farm  Shop  Owner of Traditional medicine pharmacy 6001  Off Farm  Shop  Owner of Furniture shop 6001  Off Farm  Shop  Owner of Gas station 6006  Off Farm  Shop  Owner of Water factory 6006  Off Farm  Shop  Owner of Ice factory 6004  Off Farm  Shop  Owner of Rice mill 6001  Off Farm  Shop  Owner of tree nursery 6001  Off Farm  Restaurant  Noodle soup shop 6001  Off Farm  Restaurant  Restaurant 6001  Off Farm  Restaurant  Ice cream and fruit juice 6001  Off Farm  Restaurant  Soft Drink Shop 6008  Off Farm  Service provider  Chef Cook 6008  Off Farm  Service provider  Waitress 7002  Off Farm  Service provider  Electrician 7002  Off Farm  Service provider  Air‐condition repair worker 7002  Off Farm  Service provider  Electronic Repair 

  Off Farm  Service provider  Security Guard 6001  Off Farm  Service provider  Vetenary owner 7001  Off Farm  Service provider  Driver 7001  Off Farm  Service provider  Transport Service Owner 

  Off Farm  Service provider  Daily labor  7002  Off Farm  Service provider  Carpenter 7002  Off Farm  Service provider  Brick layer 7004  Off Farm  Service provider  Government staff 7003  Off Farm  Service provider  Employee 5001  Off Farm  Service provider  Middleman 4001  Off Farm  Service provider  Fisherman 

  Off Farm  Service provider  Tour guide   Off Farm  Service provider  Guest house 

6009  Off Farm  Service provider  Weaving 6009  Off Farm  Service provider  Handicraft 6008  Off Farm  Service provider  Boiling whisky 7001  Off Farm  Service provider  Boat driver 7002  Off Farm  Service provider  Owner of Black smith 6009  Off Farm  Service provider  Wood carving 6008  Off Farm  Service provider  Food Processor 6010  Off Farm  Service provider  Tailor 

Page 94: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 92 of 196 

16.2 ANNEX 2 PROFESSION QUESTIONNAIRE  

Cover Page 

  

ລ ລ ຄວ NNP1

ຊ : ລ : ວ

ລ ວ ຄ ຍ: ລ :

ວລ ລ ວລ ວຍ ວ ຊ :

ຄ ຄວ ລ ຊ ລ

ຊ ວ ຄ ຄວ: ຊ ຄ ລ

ຊ : ຍ ວ ຄ ຄວ:

:ລ ຍ ຊ :

Page 95: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 93 of 196 

1. Household Roster 

 

  

1.

ລະຫດບກຄນ

2. ຊ 3. ອາຍເທາໃດ?

4. ເພດ 5.ສະຖານະພາບໃນປະຈບນ

6. ຈານວນມໄດຮບຄາຈາງ 6ເດອນ

ຜານມາ

7. ປະເພດການຈາງງານ 8. ປດຈບນໄດເຂາໂຮງຮຽນ 9. ລະດບການສກສາ 10.ສາຍພວພນກບຫວໜາຄອບຄວ:

1. ຫວຫນ ໄາຄອບຄວ

1. ບລສດນ ໄາງບ1 1. ແດ ໄຽຂ ໄາ 1. ອະນບານ 2. ຽມຍ/ຜວ2. ບລສດອໃ ນ 2. ບໃ >>10 2. ປະຖມ 3. ລກ(ລວມທງລກລ ໄ ງ)

3. ບລສດສໃ ວນບກຄນ 3. ມຕ ໄນ 4. ຫານ (ລກຂອງລກ)

4. ສງກດລດ 4 ມປາຍ 5. ຫານ (ລກຂອງອ ໄາຍ/ຽອ ໄອຍ/ນ ໄອງ)

5. ອໃ ນໆ 6. ພໃ /ມໃ

7. ອ ໄາຍ/ຽອ ໄອຍ/ນ ໄອງ

1. ຍງຢໃ , 8. ລກຽຂຍ/ລກແພ ໄ

2. ຽກດເ໔ໃ , >> ຂ10 9. ຽອ ໄອຍແພ ໄ/ນ ໄອງແພ ໄ/ອ ໄາຍຽຂຍ/ນ ໄອງຽຂຍ

3. ຕາຍ, ຖ ໄາ >> ຜຕໄປ 10. ປໃ /ຍໃ າ/ພໃ ຽຖ ໄາ/ມໃ ຽຖ ໄາ

4. ຍ ໄາຍຽຂ ໄາມາ 11. ພໃ /ມໃ ຂອງ ຽມຍ/ຜວ

1. ຊາຍ 5. ຍ ໄາຍແປບໃ ອນອໃ ນ 12. ພໃ ນ ໄອງອໃ ນໆ

ປ 2. ຍງ 6. ອໃ ນໆ .................... 13. ອໃ ນໆ ....................

1

2

3

4

5

6

7

8

9

10

ລ/ດ

5 ວຊາຊບ/ວທະຍາແລ

/ມະຫາແລ

ຈານວນມໄ, ຖ ໄາ

0 >> ຂ ໄ8

[ລວມທກຄນທໃ ກນຽຂ ໄາ

ຮໃ ວມກນ/ຫາລາຍແດ ໄ

ຮໃ ວມກນ ຽຖງວໃ າຈະອາ

ເສຢໃ ຽຮອນຫງອໃ ນກໃ ຕາມ]

Page 96: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 94 of 196 

 

 

2. Land Ownership 

 

  

   

2.

ລ ຊວ

3.

ລ ?

4. ຊ ວລ

?

5. ລຍ ຄ ຄ

ລວ?

6. 7. ຊ ລ

8. ຄ

ຄ ຊ ວ

ຄ ຄວ ?

9. 12 ,

ຊ ຍ ?

1. 1. 1. ວ 1. ຊ

2. 2. ຊນລະປະທານບບຄອບຄວ(ບໃ ເຊ ໄປໄມນາ◌ໄ) 2. 2. ຊ

3. ຊນລະປະທານບບຄອບຄວນາເຊ ໄປໃ ມ 3. ຍ 3. ຊລ

4. ຊນລະປະທານບບຊມຊນ(ບໃ ເຊ ໄປໄມນາ◌ໄ) 4. 4. ຊລ

5. ຄ 5. ຊນລະປະທານບບຊມຊນນາເຊ ໄປໃ ມ 5. ຊ ຍ 5. ຊ ລ

6. ຊ

7. ຄ ຊ

1.1 1.2 ລ 2

1

2

3

4

5

6

7

8

9

10

ຊ ຄ ຄວ

ຊ ວລ

ຍ ຊ

6. >> 6. ວ ຄ

1. ຄວ

?

1.

2. ວ

3.

4. ວ

Page 97: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 95 of 196 

3. Land Rental 

 

  

1.ທານໄດເຊາດນ ຫ ເຮດກດຈະກາໃສດນຄນອນບ?

3.ດນຕອນນຢໃນບານທານດາລງຊວດບ?

4.ດນຫາງຈາກເຮອນຈກກໂລແມດ?

5.ເຈາໃຊເວລາຈກນາທໄປຫາດນຕອນນ?

6.ທານໄດເຊາດນນມາ ຈກປແລວ?

7.ທານເຊາດນເພອເຮດຫຍງ?

8.ເນອທດນ 9.ແຫລງນາ ທນາມາໃຊສາລບ

ການຜະລດ10.ທານໄດເຮດສນຍາເຊາຫຍງແດ? 11.ອດຕາຄາເຊາເທາໃດຕປ?

1 ຽຊາ/ຽຮດ 1. ມໃ ນ 1. ປກພດ 1. ນ ໄາຝນ 1. ສນຍາປາກຽປາ

2 ບໃ ແດ ໄຽຊໃ າ>> ແປພາກຕໃ ແປ 2. ບໃ ມ 2. ລ ໄ ງສດເຫໃ ຍ2. ຊນລະປະທານບບຄອບຄວ(ບ

ເຊ ໄປໄມນາ◌ໄ)

3. ລ ໄ ງສດນ ໄອຍ3. ຊນລະປະທານບບຄອບຄວນາ

ເຊ ໄປໃ ມ

4. ລ ໄ ງປາ/ກບ4. ຊນລະປະທານບບຊມຊນ(ບ

ເຊ ໄປໄມນາ◌ໄ)

3. ສນຍາຽປນທາງການຢງຢນຈາກອານາດການ

ປກຄອງ

5. ຽຮດທລະກດ5. ຊນລະປະທານບບຊມຊນນາ

ເຊ ໄປໃ ມ6. ຽຮດອນໆ..

2.1 ນາເບຕອນດນ 1.2 ປະເພດດນ ກໂລແມດ ນາທ ປ ມ2 ກບ

21

22

23

24

25

26

27

28

29

30

ຄດແລໃ ຽປນຽງນສດ ຖໄາວໃ າສນຍາ

ຕກລງຽປນວຖ

2.ດນປະເພດໃດທານເຊາ?

1. ດນປກສ ໄາງ

2. ດນສວນ

3. ດນນາ

4. ດນແຮໃ

5. ດນຄງສດ

6. ດນຄມນາ

2. ສນຍາບໃ ຽປນທາງການຕໃ ມການຽຊນ

ລະຫວໃ າງສອງຝໃ າຍ

Page 98: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 96 of 196 

4. Equipment 

 

  

1. ດ

2. ປານກາງ

3. ຊດຊມ

1 ຽຮອພ ໄອມດ ໄວຍຽຄໃ ອງຈກ

2 ຽຮອພາຍ

3 ລດຈກ

4 ລດແຖນາຽດນຕາມ

5 ລດຊງ

6 ລດແຖເຫຍໃ

7 ລດບນທກ 1-3 ຕນ

8 ລດບນທກ ຫລາຍກໃ ວາ 3 ຕນ

9 ລດກະບະ

10 ລດຽກງ

11 ລດປໃ ນຽຂ ໄາ

12 ຮງສຽຂ ໄາ

13 ຽຄໃ ອໃ ງຕດຫຍ ໄາ

14 ປໃ ມນ ໄາ

15 ອໃ ນໆ...................

16 ອໃ ນໆ...................

ສະພາບຂອງອປະກອນ

ລະ

ຫດລາຍການລມນ ທານມບ?

1. ມ

2. ບໃ ມ

ຈານວນອປະກອນ

Page 99: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 97 of 196 

5. Livestock 

 

  

1. ລຽງ01 02 03 04 05 06 07

ຄວາຍ ງວ ໝ ແບ ໄກ ເປດ ສດອນ2

3

4

5

6

7

8

9

10

11

12

13

14

15

16 NA NA NA

17

18

ຜເກບກາຂມນຕອງກວດຄນຈານວນສດລຽງຕາມສດຄດໄລລມນ:

Q3 ‐ Q5 + Q8 + Q10 ‐ Q11 ‐ Q12 + Q13 ‐ Q14 ‐ Q15 = Q4

ຄວາຍ ‐ + + ‐ ‐ + ‐ ‐ =

ງວ ‐ + + ‐ ‐ + ‐ ‐ =

ໝ ‐ + + ‐ ‐ + ‐ ‐ =

‐ + + ‐ ‐ + ‐ ‐ =

1 ລຽງ, 2 ບ

ຈານວນຕ

ຈານວນຕ

ເດອນ,ປຈານວນໂຕ

ລະຫດ

1;2;3

ສດລຽງ

1. ມ 2. ບໃ ມ

ຈານວນຕ

ຈານວນຕ

ຈານວນຕ

ກບ

ຈານວນຕ

ກບ

ຈານວນຕ

ເນ 12 ຽດອນ ຜໃ ານ ມາ, ຈານວນ [ສດ] ຂອງທໃ ານຖກຄນລກ ຈກຕ?

ເນ 12 ຽດອນ ຜໃ ານ ມາ, ຈານວນ [ສດ] ຂອງທໃ ານຕາຍຍ ໄອນພະຍາດ (ທໃ ບໃ ແດ ໄກນ, ທໃ ບໃ ຂາຍ) ມຈກຕ?

ຈານວນຕ

ຈານວນຕ

ຈານວນຕ

ເນ 12 ຽດອນຜໃ ານມາ,[ສດ] ຂອງທໃ ານທໃ ຽກດເ໔ໃ ມຈານວນຈກຕ?

ເນ 12 ຽດອນຜໃ ານມາ, ຈານວນ [ສດ] ທໃ ຂ ໄາ ກນທງ໔ດຈກຕ?

1 ໃນ 12 ເດອນຜານມາ, ສະມາຊກໃນຄວເຮອນຂອງທານໄດລຽງສດ ບ?

2. ບລຽງ >> ພາກຕໄປ

ເນ 12 ຽດອນຜໃ ານມາ, ທໃ ານແດ ໄຊ ໄ [ສດ] ມາລ ໄ ງ ທງ໔ດ ຈກຕ?

ເນ 12 ຽດອນຜໃ ານມາ, ທໃ ານ ແດ ໄຈໃ າຍຽງນຊ ໄ [ສດ] ມາລ ໄ ງ ທງ໔ດ ຽທໃ າເດ?

ເຜມາຊ ໄສດລ ໄ ງຂອງທໃ ານ, (1) ປະຊາຊນ, (2) ພໃ ຄ ໄາຄນກາງ, (3) ພໃ ຄ ໄາຈາກຕະຫລາດ

ເນ 12 ຽດອນຜໃ ານມາ, ຄວຽຮອນຂອງທໃ ານແດ ໄ ລ ໄ ງ [ສດຽຫໃ ານ ໄ] ບໃ ?

12 ຽດອນກໃ ອນ [ສດ] ທໃ ຄວຽຮອນຂອງທໃ ານ ຽປນຽຈ ໄາຂອງມຈານວນຈກຕ(ເນຽດອນນ ໄ ຂອງປກາຍ)?

ປະຈບນນ ໄ [ສດ] ທໃ ຄວຽຮອນຂອງທໃ ານຽປນຽຈ ໄາຂອງ ມຈານວນຈກຕ?

ເນ 12 ຽດອນຜໃ ານມາ ທໃ ານແດ ໄຂາຍ [ສດ] ຈານວນຈກຕ?

ເນ 12 ຽດອນຜໃ ານມາ ທໃ ານ ແດ ໄຽງນຈາກການຂາຍ [ສດ] ຈານວນຽທໃ າເດ?

ຈານວນສດທງ໔ດແດ ໄລ ໄ ງເນຄງສດທໃ ແດ ໄປບປງແວ ໄບ?

ຈານວນສດທງ໔ດ ທໃ ເຫ ໄຽປນຂອງຂວນ ເນແລຍະ 12 ຽດອນ ຜໃ ານມາ ມຈານວນຽທໃ າເດ?

ເນ 12 ຽດອນຜໃ ານມາ, [ສດ] ທໃ ທໃ ານແດ ໄຮບຽປນຂອງຂວນຈາກຄນອ ໃ ນ (ຽຊ ໃ ນຄໃ າ ດອງ, ອໃ ນໆ) ມຈກຕ?

ຈານວນສດ ທໃແດ ໄສກຢາວກຊນ ຈກຕ

ສກຢາວກຊນຄ ໄງສດທ ໄາຍເນຽດອນປເດ

Page 100: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 98 of 196 

6. Aquaculture 

 

  

ລຽງສດນາ

1. ລ ໄ ງ 2. ບໃ ລ ໄ ງ >> ພາກຕໃ ແປ

(2)

1. ໓ອງປຜ ໄາຢາງ 2. ໓ອງຂດ 3. ກະຊງ 4.ອໃ ນໆ

(4)

ລາຍຮບລຽງສດນາ ລະຫດສດນາ 01 02 03 04 05 06 7 8

ປາດກ ປາສະຫວາຍ ປານນ ປາເນ ປາປາກ ປາຽຂງ ກບ ອໃ ນໆ.........

1. ລຽງ6 ເດອນ7 ງວດ

8 ກບ/ກລ

9 ກບ

10 ເນ 12 ຽດອນຜໃ ານມາທໃ ານແດ ໄກນຈກກລ? ກລ

11 ເນ 12 ຽດອນຜໃ ານມາ[ສດນ ໄາ] ທໃ ຽອາເຫ ໄຄນອໃ ນຈກກລ? ກລ

12 ເນ 12 ຽດອນຜໃ ານມາ ທໃ ານແດ ໄຊ ໄອາຫານ [ສດນ ໄາ] /ລວມມນຄໃ າ ມໃ ນຽທໃ າເດ? ກບ

13 ຕ

14 ເນ 12 ຽດອນຜໃ ານມາ ທໃ ານແດ ໄຊ ໄ [ລກປາ/ກບ] /ລວມມນຄໃ າ ມໃ ນຽທໃ າເດ? ກບ

15 ເນ 12 ຽດອນ ຜໃ ານມາ ທໃ ານແດ ໄຈໃ າຍຄໃ າຮງງານເນການລ ໄ ງ ມໃ ນຽທໃ າເດ? ກບ

16 ກບ

17 ຕ

1. ລ ໄ ງ 2. ບາງທ 3. ບໃ ລ ໄ ງ

19 ເຜມາຊ ໄປາ? (1) ປະຊາຊນ, (2) ພໃ ຄໃ າຄນກາງ, (3) ພໃ ຄ ໄາຈາກຕະຫລາດ

ສະຽລໃ ການເຊ ໄຽວລາເນການລ ໄ ງ (ປາ)

(3)

(1)ເນ 12 ຽດອນຜໃ ານມາທໃ ານແດ ໄລ ໄ ງປາ, ກ ໄງ ຫລກບ ຽພໃ ອຂາຍ ຫລ ກນບໃ ?

ຽນ ໄອທໃ ຂອງ໓ອງປາຂອງຽຈ ໄາທງ໔ດ ມໃ ນຽທໃ າເດຕາມດ? (ມ2)

ປະຽພດ໓ອງປາຂອງທໃ ານມໃ ນປະຽພດເດ?

ຽນ ໄອທໃ ໓ອງປາ ທໃ ກາລງລ ໄ ງຢໃ ມໃ ນຽທໃ າເດ? (ມ2)

(5) ເນ 12 ຽດອນຜໃ ານມາ ທໃ ານແດ ໄລ ໄ ງ [ສດນ ໄາ] ບໃ ?ປາ/ກບ

2. ບລຽງ>> ລາຍການຕໄປ

ຈານວນລກປາ/ກບທໃ ປໃ ອຍເນ 12 ຽດອນຜໃ ານມາ ມຈກຕ

18ທໃ ານຍງມຜນທໃ ຈະລ ໄ ງ [ສດນ ໄາ] ຕໃ ແປບ ເນ12 ຽດອນຕໃ ໓ ໄາ?

ເນ 12 ຽດອນຜໃ ານມາ ທໃ ານແດ ໄເຊ ໄຽວລາລ ໄ ງ [ສດນ ໄາ] ຈກງວດ?

ເນ 12 ຽດອນຜໃ ານມາ ມນຄໃ າເນການຂາຍ [ສດນ ໄາ]ມໃ ນຽທໃ າເດ?

ເນ 12 ຽດອນ ຜໃ ານມາ ແດ ໄຈໃ າຍຄໃ າອໃ ນໆ ຽຊໃ ນ ຄໃ າແຟຟໄາ, ປນຂາວ...ມໃ ນຽທໃ າເດ?

ເນ 12 ຽດອນ ຜໃ ານມາ ລກປາແດ ໄຕາຍແປຈກຕ?

ລາຄາສະຽລໃ ຽທໃ າເດ?

Page 101: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 99 of 196 

7. Agricultural Crops 

 

1. ເນ 12 ຽດອນຜໃ ານມາ ທໃ ານແດ ໄປກ ລະ ຽກບກໃ ວຜນລະປກຽຊໃ ນ: ຽຂ ໄາ, ສາລ, ຜກ, ຫມາກແມ ໄ ຫລ ພດຫລບໃ ? ( 1. ປກ; 2. ບໃ ປກ>> ພາກຕໃ ແປ)

(9)ເຜມາຊ ໄຜນຜະລດ

ຂອງທໃ ານ?

(10) ບນຫາ ທໃ ຽກດຂ ໄນເນ

ການຜດ ເນ 12 ຽດອນ

ຜໃ ານມາ:1. ມງແມທາລາຍ2. ພະຍາດທາລາຍ3. ແພຫງລງ

1. ປະຊາຊນ 4. ແພນາຖວມ

2. ພໃ ຄ ໄາມກາງ 5.ຝນຕກ

3. ພໃ ຄ ໄາຢໃ ຕະຫລາດ 6.ພະຍລມ

4. ຄໃ ສນຍາຜກພນ 2 ສໄນ 7. ໔ອກຂ ໄນ

5. 1+3;..... 8. ສດຽຂ ໄາທາລາຍ

ພດ ນາເບຕອນດນ ມ2 ກໂລ ກບ/ກໂລ ກບ % 9. ບໃ ມບນຫາພດຫລກ (ເຂາ, ສາລ, ມນຕນ)

ຽຂ ໄານາປ 1

ຽຂ ໄານາຊງ 2

ສາລອາຫານສດ 3

ສາລຫວານ 4

ມນຕ ໄນ 5

໔າກງາ 6

ອໃ ນໆ........ 7

ພດຜກປະຽພດເບ (ສະລດ,

ຜກບ ໄງ, ຫອມຕໃ າງໆ,

ຜກກາດຊອມ..) 8

໔າກຕງ 9

ຜກທມ 10

ຂງ 11

໔າກຽດອຍ 12

ຖໃ ວດນ 13

໔າກຽຜດ 14

໔າກຖໃ ວ 15

ກະລໃ າປ 16

ຫອມບໃ ວ 17

໔າກກ ໄວຍ 18

໔າກຮໃ ງ 19

໔າກມ 20

໔າກນດ 21

ອ ໄອຍ 22

ຢາສບ 23

໔າກກ ໄ ງ 24

໓າກມໃ ວງ 25

ແມ ໄເຫ ໄ໔າກປະສມປະສານ 26

ຫວາຍ 27

ແຜໃ 28

ອໃ ນໆ........ 29

ຕ ໄນແມ ໄສກ 30

ຕ ໄນຢາງພາລາ 31

ຄ ໄນແມ ໄຽກດສະ໓າ 32

(7) ຄດແລໃ ຈານວນລວມ

ທງຫມດຈາກການ

ຽກບກໃ ວ

Q5*Q6

(3) ຽຈ ໄານາເຊ ໄດນ

ຕອນເດເນການ

ປກພດຽຫໃ ານ ໄ

(8) ຽຈ ໄາແດ ໄຂາຍ

ຜນຜະລດ ຈກ%

ຂອງພດ ທໃແດ ໄ

ຽກບກໃ ວເນ 12

ຽດອນຜໃ ານມາ

(4) ເນ12 ຽດອນທໃ

ຜໃ ານມາຽນ ໄອທໃ ທງ໔ດ

ທໃ ເຊ ໄເນຕໃ ລະພດ

ຽທໃ າເດ ?1. ມໃ ນ

2. ບໃ ມໃ ນ

(2) ເນ 12 ຽດອນທໃ ຜໃ ານມາ ທໃ ານແດ ໄ

ປກຫຽກບກໃ ວ [ພດ] ຫຍງດໃ ຕາມ

ລາຍການລໃ ມນ ໄ?

(5) ເນ12 ຽດອນທໃ ຜໃ ານມາ

ຈ ານວນພດ ທໃ ຽກບກໃ ວ

[ພດ] ທງ໔ດ ມຽທໃ າເດກ

ລ?

[ເຫ ໄຄາດຄະຽນ ຖໄາຍງບໃ ແດ ໄ

ຽກບກໃ ວ]?

(6) ລາຄາສະຽລໃ ຍ

ຂອງ[ພດ]ທໃແດ ໄຂາຍ

ມໃ ນຽທໃ າເດ?

ພດສວນຄວ/ພດຜກ - �ຂຽນເປນລາຍການ5ຊະນດພດປກໃນສວນ�

ໄມໃຫໝາກ/ໄມຊະນດອນ

ເຄອງປາຂອງດງ? ໄດປກ ແລະ ໄດຂາຍລວມ

ພດອນໆ

ລະຫດພດ

Page 102: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 100 of 196 

8. Business income 

 

 

#

ຄາຖາມຫວໜວຍ

1. ຮານເຄອງຂາຍຍອຍ

2. ຮານບລການທວໄປ

3. ຮານປະສມຂາຍຍອຍ ແລະ

ບລການທວໄປ

4. ບລການຂນສງ

5. ຮານລການ ອນເຕເນດ

6. ບລການທອງທຽວ

7. ຫດຖະກາ (ຕາຫກ, ຈກສານ..)

8. ແປຮບອາຫານ

2ປະຽພດທລະກດຍງແດ ໄດາຽນນດຍສະມາ

ຊກເນຄວຽຮອນບໃ ?ແດ ໄ = 1; ບໃແດ ໄ =2

3ມຜ ໄເຫຍໃ ຈກຄນຈາກຄອບຄວແດ ໄຽຮດວກ

ເນທລະກດປກກຕ# ຄນ

4ຽຈ ໄາແດ ໄຈ ໄາງຄນ ທາງນອກມາຽຮດທລະກດ

ຽຈ ໄາຈກຄນ ?# ຄນ

5 ຄໃ າຈ ໄາງທງ໔ດທໃ ທໃ ານແດ ໄຈໃ າຍຽທໃ າເດຕໃ ຽດອນ? ກບ/ຽດອນ

6ລາຍຮບຈາກການຂາຍທງ໔ດ ຽທໃ າເດຕໃ

ຽດອນ ດຍສະຽລໃ ຍ?ກບ/ຽດອນ

7ຄໃ າເຊ ໄຈໃ າຍທງ໔ດສາລບປດເຈການຜະລດ

ເນຕໃ ລະຽດອນ?ກບ/ຽດອນ

8ກາແລຈາກທລະກດ ຫລ ກດຈະກາຕໃ ຽດອນ

ຽທໃ າເດກບ/ຽດອນ

9ເນແລຍະ 12 ຽດອນຜໃ ານມາ ທໃ ານແດ ໄດາຽນນ

ທລະກດຈກຽດອນຽດອນ

ທໃ ານດາຽນນທລະກດ/ກດຈະກາຢໃ ສະຖານທໃ ເດ?

1. ຢໃ ພາຍເນຽຮອນ

2. ຮ ໄານຢໃ ບລຽວນອ ໄອມຂ ໄາງຽຮອນ

3. ຮ ໄານຢໃ ພາຍເນບ ໄານ

4. ຮ ໄານຢໃ ບ ໄານອນ

5. ອໃ ນໆ......

11ເຜຽປນຜ ໄຮບຜດຊອບຫລກເນການດາຽນນທລະ

ກດນ ໄ?ເຊ ໄລະຫດບກຄນ

(1) ມສະມາຊກໃນຄວເຮອນດາເນນທລະກດຂະໜາດນອຍ /ບແມນທລະກດດານກະສກາໃນ 12 ເດອນ? ຕວຢາງ: ຮານຂາຍເຄອງ, ສອມແປງລດຈກ, ເປດຮານອາຫານ?ມ = 1; ບມ =2

10 ສະຖານທໃ

Page 103: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 101 of 196 

9. Prior Participation in NNP1PC Livelihood Activities 

 

ລະຫດ (1) ທໃ ານແດ ໄຽຂ ໄາຮໃ ວມກດຈະກາ

ປບປງຊດການຽປນຢຫຍງດໃ ທາງ

ບລສດນ ໄາງບ1ແດ ໄສໃ ງຽສມ?

(2) ຽຂ ໄາຮໃ ວມປເດ (3) ເຜຽປນຜ ໄຮບຜດຊອບຫລກ

ເນການຈດຕ ໄງປະຕບດກດຈະກາ

ຜໃ ານມາ ຫລ ປດຈບນນ ໄ?

(4) ປນ ໄ ຄອບຄວທໃ ານແດ ໄສບຕໃ

ຈດຕ ໄງປະຕບດກດຈະການ ໄບ?

(5) ທໃ ານແດ ໄຂະຫຍາຍ

ກດຈະກາ ພາຍຫລງການລ

ຽລໃ ມບໃ ?

(6) ຖໄາຫາກບໃ ແດ ໄສບຕໃ ກດຈະກາ ຽຫດຜນຫຍງທໃ ານຈໃ ງ

ຢດຽຊາ?

1. ແດ ໄຽຮດ 1. ແດ ໄຂະຫຍາຍ

2. ບໃ >> ແປຄາຖາມ 6 2. ບໃ ແດ ໄຂະຫຍາຍ

1

2

3

4

5

6

7

8

9

10

ຊໃ ກດຈະກາ ປ ຽລກລະຫດບກຄນ

9. ການເຂາຮວມກດຈະກາປບປງຊວດການເປນຢ

Page 104: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 102 of 196 

10. Personal Profession 

 

 

1. ອາຊບຫລກ

2. ອາຊບສາຮອງ

3. ລາຍຮບຽສມ

ອາຊບຫລກ

ອາຊບສາຮອງ

ອາຊບເສມ

11. ເຜຕອບຄາຖາມຕໃ ຜ ໄສາພາດ? ຊໃ ຜ ໄຖກຜນກະທບ

ລາຍຽຊນຜ ໄຖກຜນກະທບ

12. ຖໄາພໃ ນ ໄອງຕອບຄາຖາມ, ພໃ ນ ໄອງທາງເດ, ນາເຊ ໄ ລະຫດ

ຄອບຄວ:

6. ອາຊບເດຽປນບລມະສດທ

1 ເນການຂະຫຍາຍການ

ຜະລດເນປຫນ ໄາ ອງເສໃ

ທໃ າຮງ, ຄວາມສາມາດ ລະ

ກາລະອກາດ?

8. ເຫ ໄທໃ ານບອກ 4 ຫວຂ ໄຝກ

ອບຮມທໃ ທໃ ານແດ ໄຽຄຍຮນຜໃ ານມາ

ກໃ ວກບອາຊບ ທໃ ທໃ ານຽລອກນ ໄ

9. ຫວຂ ໄຝກອບຮມຫຍງດໃ ເນ

ອະນາຄດທໃ ທໃ ານຄດວໃ າຈາຽປນ

ຽພໃ ອບນລຽປໄາ໔າຍ ຂອງອາຊບທໃ

ແດ ໄຽລອກ

10. ຽປນຫຍງອາຊບ ທໃ ທໃ ານຽລໃ ອກນ ໄ ຈໃ ງບໃ

ບນລຽປໄາ໔າຍແດ ໄຕາມຜນການ ເນແລຍະ

ຜໃ ານມາ?

11. ທໃ ານມນວທາງກ ໄແຂບນຫາຽຫໃ ານ ໄຄ

ນວເດ?ຫວ໓ໃ ວຍ (ສດ,

ຽຮກຕາ ອໃ ນໆ)

ຈານວນ

/ຂະ໓າດ

ກາແລສດທ (ກບ/ປ)

1. ຽລກລະຫດຄວຽຮອນ:

ອາຊບຫຍງດໃ ທໃ ຽຈ ໄາແດ ໄດາຽນນ ຫ ຽຮດເນປະຈບນ?

(ເຫ ໄນາເຊ ໄລະຫດອາຊບສາລບລງລາຍການ)

ລະດບຂອງອາຊບ

ປດຈບນນໄ

(1) ຕວລາວຽອງ, (2) ພໃ ນ ໄອງ

10.ແຜນພດທະນາອາຊບ

3. ລະຫດບກຄນ ຂອງ ຜ ໄຖກສາພາດ

4. ຊໃ ບກຄນ:

7. ຽປໄາ໔າຍເນການພດທະນາກດຈະກາເນປ 2019

2. ຈານວນຜ ໄເຫຍໃ ເນຄອບຄວທງ໔ດເນຽກນສາພາດ:

Page 105: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 103 of 196 

11. Interviewer notes  

 

  

ຄ 1 ຄ 2 ຄ 3 ຄ 4

ຄ ?

ວ ລ ວ ?

ວ ລ ວ ?

?

1. ຍ ຍ 1. ວ ຍ 1. ວ ຍ 1.

2. ຍ 2. ວ 2. ວ

2. ວ ຍຊວຍ

/ ໆ

3. 3. 3. 3.

4. ຍ 4. ວ ຍ 4. ວ ຍ

5. ຍ ຍ 5. ວ 5. ວ

6. ວ 6. ວ

ຄ 5 ຄ

Page 106: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 104 of 196 

16.3 ANNEX 3 PM DECREE 309 ON POVERTY AND DEVELOPMENT STANDARD (ENGLISH TRANSLATION) 

 

Lao People’s Democratic Republic

Peace Independence Democracy Unity Prosperity Prime Minister No 309/PM

Vientiane Capital, Dated on 14/11/2013

Decree on Poverty and Development Standard 2012-2015

- Pursuant to the Law on the Government of Lao PDR No. 02/NA, dated 06 May 2013; - Pursuant to Conclusion of the Government meeting on February 2012, No. 03/GOV, Dated 05

March 2012; - Pursuant to letter of request No. 608/RDC (Rural Development Committee), dated 18

September 2013 of Central level of rural development and Poverty eradication.

Prime Minister agreed to issues:

Chapter 1: General Provision

Article 1: Purpose This decree provides information on standard to measure the poverty, a standard to measure

the development Achievement Standard, Steps and procedure, method on implementation poverty

eradication measure, Responsible organization, purpose and Certifying of poverty free status of

households, Free status of Village and District, households, developed village, large village become

small city in rural area and developed district, This standard is sectors at local and central levels to

have common practice on standard to measure a poverty eradication across the country

Article 2: Definition of “Poverty” and “Development” Poverty mean shortage of basic inputs for daily livelihood for example: lack of food to

consume that affect to villagers are not be able to obtain energy at 2100 kilo Calories per day, lack

of basic clothes to wear, lack permanent living facility or house, lack of medicine for basic curing

of sickness, lack of access to Fundamental education service, lack of condition of access to basic

service network of basic infrastructure.

Page 107: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 105 of 196 

Development mean holistic achievement of development such as: strong and stable

organization system consist of female and male, people are highly aware of political system,

consciously respect and behave accordingly to Laws and regulations, social security is in place,

Infrastructure of social economic have been developed and it is in place, stable and is continuously

expanded, , and sustainable of environmental protection, villagers are be able to access to necessary

service basic and be able to eradicate poverty from them.

Chapter II: Standard to measure poverty

Article 3: a standard unit to measure poverty at individual level .A unit for measurement on individual poverty is a level of individual ‘s average income

per person per month as a base without classifying of gender, age and base on Lao currency to calculate which indicate as following:

- Country average level: 192000 kip per person per month - Rural average level: 180.000 kip per person per month - Urban average level: 240.000 kip per person per month

Article 4: A standard level to measure the poverty at household level Households are classified as poor when a calculation of individual income levels of its

family member’s average income lower than a calculation that indicates in article 3. Household are not classified as poor is a release poverty household

Article 5: A standard to measure the poverty at village level Villages are classified as poor is villages those are shortage of basic condition in

development such as: 1. More than 50% of households in the village are poor; 2. No school facilities in village or children have to walk to school for more than 1 hour; 3. No village’s medicine box, no pharmacy shop, patients have to walk to health center or

nearest district hospital for more than 2 hours; 4. No access to clean water for usage: concrete well tank, borehole, etc; 5. No accessible road for transportation or have only once accessible road that can be access

for only one season, villages those are not classify as poor village is the village which their poor have been eradicated from them.

Article 6: A standard to measure the poverty at district level District is classified as the poor, if there are more than 51% of its villages are poor District is not classified as the poor, it means poverty release district.

Chapter III

A standard to measure achievement of development

Page 108: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 106 of 196 

Article 7: a standard to measure the development of households Household is classified as developed when it achieves standard development condition as

following: 1. Members of household are aware of politic system, have solidarity among them and out

side, consciously respect and implement well on laws and regulation. 2. A household which eradicate from poverty and a stable income source; 3. A peaceful household 4. A household without any criminal relation. 5. No addicted drug relation household 6. A Cultural model household. 7. A healthy model household 8. Its members adopt at least compulsory education qualification (primary and Secondary

level ) for children and adult in age between 15 to 45 years old 9. Have common electricity accessibility for usage inside and outside location 10. A Household who has equal right for male and female and without vandalism with in family

especially for Female and Children.

Article 8: A standard to measure developed Villages A village classify as developed, if it achieves the following criteria and conditions:

1. A strong and steady management system of village consist of male and female, among them consist party unit certify as strong unit, has village administration office, Lao front for construction and public organization regularly implement on task and activities.

2. People of village are aware on political system, consciously respect and behave accordingly to Law and regulation.

3. Number of developed household cover more than 85% of the hold number of household with in the village.

4. Country security protection model village. 5. Nation security protection model village 6. No criminal relation village. 7. No addicted drug village 8. Consist production group and product service group 9. Has financial storage or village revolving fund or can be accessible credit loan service 10. Good access to village map and structure 11. Has steady living location and permanent business places for people. 12. Accessible road to village for all seasons 13. Has electricity network system 14. A healthy model village 15. Primary education qualification achievement village 16. Cultural model village 17. Has office, meeting hall and information center are in place 18. A village with equal right between male and female and with out vandalism practice to

female and children 19. Has public area places to serve all activities with in the village

Article 9: A standard to measure villages to become small district or town in rural area.

Page 109: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 107 of 196 

Large village to become a small district is classified as developed if it achieved the following criteria:

1. Developed village 2. Has all year accessible of transportation road, integrated to other villages and districts 3. Has basic of production and produce of goods with stable system 4. Has permanent market with common buy and sale of good 5. Has post office service or telecommunication service centre 6. Has unit of centre of agriculture and forest service technique 7. Has banking service of certain bank or certain micro-finance service 8. Has village clinic or small hospital; 9. Has community water supply system 10. Has electricity network system 11. Has primary school and Lower secondary school or upper secondary 12. Village in rural and mountaineering area has certain number villagers more 1000 people,

Village at low land rural consist of more than 3000 people.

Article 10: A standard to measure the development district A district classify as developed, if it achieves the following criteria and condition:

1. More than 85% of developed villages and for rural area has large villages become small town at least 2 large villages

2. A strong and stable of district management system consist of female and male has strong district party unit cover more than 85%

3. A tidy, peaceful and strong security system district 4. District has good district infrastructure map, implement according district infrastructure

nicely. 5. Has a strong and steady, continuously expand of Basic economic 6. Be able to cope and stand alone with normal budget expense 7. Has all transported road conveniently, integrated to other districts? 8. District Unit has water supply or community water supply. 9. Has electricity network. 10. Has training centre or any vocational schools 11. Agriculture and forest technique service centre 12. Has a standard hospital 13. Has permanent market with common buy and sell of goods 14. Has post office and telecommunication service systems 15. Has certain service or branch of certain bank. 16. A district which implement equal right of male and female and without vandalism to

female and children.

Chapter IV Implementation arrangement

Article 11: Proposal, Certification of Poverty eradication

1. To propose, certify, households with poverty eradication and as developed household is the village chief propose to district governor to get certification on free from poverty

Page 110: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 108 of 196 

status from district governor, according to inspection, Evaluation and certify from elated sectors of district.

2. To propose, certify, village with poverty eradication and as developed Village is the district governor propose to provincial governor to get certification on free from poverty status from provincial governor, according to inspection, Evaluation and certify from elated sectors of province.

3. To propose, certify, District with poverty eradication and as developed district is the provincial governor propose to prime minister to get certification on free from poverty status from Prime minister, according to inspection, Evaluation and certify from elated sectors of Government central.

Article 12. Improvement and changing of standard Improvement and changing of standard method is to implement as the following:

1. Poverty standard and development standard will be improved and changed according to inflation rate crisis, living cost and the expansion of social-economic in each period.

2. Rural development and poverty eradication committee at central level in collaborate with related ministries, on research, improve standard of poverty and standard of development and propose to government on consideration;

3. Every end of 5 years period of government social economic implementation plan have to review, audit, inspect and evaluation at national level.

Chapter V Final provision

Article 13. Implementation arrangement

It is the responsibility of central level of rural development and poverty reduction committee, collaborate with ministry of planning and investment issue introduction document on implementation arrangement this decree together with following, support, checking, evaluate and report out come of implementation arrangement on standard to government annually.

It is the responsibility of related ministries, central organization, and Vientiane capital. And provinces in the whole countries, on actual practice according roles and responsibilities and report out come of implementation arrangement on standard to central level of rural development and poverty reduction committee annually in order to summarize to government.

Ministries, central organization, local authorities every level in the whole country please acknowledge and strictly implement this decree. Article 14 Effective

This decree is to replace with the decree 201/GOV, dated 25 April 2012 and Decree number 354/PM, dated 06 August 2012 and become effective from date of signature onward, any certain regulation, decree if is not corresponded with this decree is all being cancelled

Prime minister

Thongsing Thammavong

Page 111: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 109 of 196 

16.4 ANNEX 4 DETAILS OF ECONOMIC CALCULATIONS 16.4.1 Detailed Economic Calculations of Livestock 

Cattle: Breeding, raising and selling Cattle (3 to 4 yrs) 

 

  

Occupation 1  Raising cattle to sell   

Basic description of economic calculations

ອາຊບ 1

Occupation 1

ຄາອະທບາຍພນຖານຂອງການໄລລຽງເສດຖະກດ

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

Table 1 : Summary of Production, Costs and Income

ອາຍການລຽງ: 1-3 ປ ວ ວຍ 4 ປ ວ ວຍ

1 ລກງວ

1.1 ລກງວ 9 9

1.2 ນ ໄາຫນກຂາຍ 150 kg/3ປ/ຕ 150 kg/3ປ/ຕ

1.3 ລາຄາຂາຍ 40,000 kip/kg 40,000 kip/kg

1.4 ລາຍຮບລວມຂາຍລກງວ 54,000,000 kip 54,000,000 kip

2 ຂງວ(ມລະ 10 k g/365)

2.1 ຂາຍຂ ໄງວ(1.5 ກລ/ມ ໄ) 5,475 ກລ 10,403 ກລ

2.2 ລາຄາຂາຍ 400 kip/kg 400 kip/kg

2.3 ລາຍຮບລວມຂາຂງວ 2,190,000 kip 4,161,200 kip

2.4 ລາຍຮບລວມເບອງຕນ 56,190,000                 kip 58,161,200     kip

3 ຄໃ າເຊ ໄຈໃ າຍ ການຜະລດ 8,480,000                   kip 8,480,000           kip

4 ການຽຊ ໃ ອມມນຄໃ າຄງທໃ 5,969,067                   kip 5,969,067           kip

5 ລາຍຮບສດທ 41,740,933                 43,712,133        

2.ການລ ໄ ງມໃ ພນ 10ຕ ລະ ພໃ ພນ 01,ລ ໄ ງລກຽກດ ປລະ 9 ຕ,

1. ເນລະດຝນ(ຽດອນ 5-10) ງວຈະລ ໄ ງຢສວນຫຍ ໄາ (7ha) ສໃວນລະດລ ໄງ (ຽດອນ11-4) ງວຈະກນຫຍ ໄາຫໄງລະຫຍ ໄາ໔ກ

ລຽງງວລາດ ຂາຍລກ

Raising Cattle to sell

Page 112: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 110 of 196 

1.  During rainy season (May to Oct.) the cattle raisie on the pastured (7ha) but during dry season  (Nov ‐ Apr) the cattle feeding by hay and silages  

2. No. of animal at the first step 10 female cattle, 1 bull and got 9 calves by annual  Table 1 : Summary of Production, Costs and Income 

 

Duration year 1-3 unit year 4 unit

1) Income

Number of cattle sold per year 9 9 

Weight per head (3 year old cattle) 150 Kg/3years/Head 150  Kg/3year/Head

Price per kg 40,000 LAK 40,000  LAK

Income from sale of cattle 54,000,000 LAK 54,000,000  LAK

Sale of manure 5,475 Kg 10,403  Kg

Price of manure 400 LAK per Kg 400  LAK per Kg

Income from sale of cattle manure 2,190,000 LAK 4,161,200  LAK

Total annual income (gross)  

56,190,000  LAK  

58,161,200   LAK

2) Annual operating expenses  

8,480,001  LAK   

8,480,000   LAK

3) Annual depreciation  

5,969,067  LAK   

5,969,068   LAK

Annual Net Profit  

41,740,932  LAK  

43,712,132   LAK

 

 

Page 113: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 111 of 196 

 

  

 

ອາຊບ 1 ລຽງງວລາດ ຕາຕະລາງ 2: ຮອບວຽນ ການລຽງງວ  Table 2: Cattle Raising Production CyclesOccupation 1 Raising Cattle 

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

ຊ 1 x

ວ 1 (9 ) x x x x x x x x ເກດ

- ຍ 1ໂຕ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 150 150 40,000 6,000,000           

ລ ວ 10 - ຍ 9ໂຕ 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 150 1,350 40,000 54,000,000         

ຊ 2 x

ວ 1 (9 ) x x x x x x x x x ເກດ

- ຍ 1ໂຕ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 150 150 40,000 6,000,000           

ລ ວ 10 - ຍ 9ໂຕ 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 150 1,350 40,000 54,000,000         

ຊ 3 x

ວ 1 (9 ) x x x x x x x x x ເກດ

- ຍ 1ໂຕ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 150 150 40,000 6,000,000           

ລ ວ 10 - ຍ 9ໂຕ 9 9 9 9 9 9 9 9 9 9 9 9 9 9 150 1,350 40,000 54,000,000         

ຊ 4 x

ວ 1 (9 ) x x x x x x x x x ເກດ

- ຍ 1ໂຕ 1 2 150 150 40,000 6,000,000           

ລ ວ 10 - ຍ 9ໂຕ 9 9 150 1,350 40,000 54,000,000         

10 10 10 10 10 10 10 10 10 19 19 19 19 19 19 19 19 19 19 19 19 26 26 26 26 26 26 26 26 26 26 26 26 33 33 33 33 33 33 33 33 33 33 33 33

( ລ / )

ລວ ( ລ)

ລ ຄ

ຍລ ຍ ລວ

ລ ວ 10

ວ ວ

4ລ ຍ

1 2 3

Page 114: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 112 of 196 

Occupation 1 Raising Cattle   Table 2: Cattle Raising Production Cycles

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

phase 1 breeding x

 1 cow pregnant(9 months) x x x x x x x x born

born 1 head 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 150 150 40,000 6,000,000            

 10 breeders born 9 head 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9   150 1,050 40,000 42,000,000          

phase 2 breeding x

 1 cow pregnant(9 months) x x x x x x x x x born

born 1 haed 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 150 150 40,000 6,000,000            

 10 breeders born 7 head 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 150 1,050 40,000 42,000,000          

phase 3 breeding x

 1 cow pregnant(9 months) x x x x x x x x x bord

born 1 head 1 2 3 4 5 6 7 8 9 10 11 12 13 14 150 150 40,000 6,000,000            

 10 breeders born 7 head 7 7 7 7 7 7 7 7 7 7 7 7 7 7 150 1,050 40,000 42000000

phase 4 breeding x

 1 cow pregnant(9 months) x x x x x x x x x bord

born 1 head 1 2 160 160 40,000 6,400,000            

 10 breeders born 7 head 7 7 160 1,050 40,000 42000000

10 10 10 10 10 10 10 10 10 19 19 19 19 19 19 19 19 19 19 19 19 26 26 26 26 26 26 26 26 26 26 26 26 33 33 33 33 33 33 33 33 33 33 33 33

wieght/kg/h

ead

wieght total(kg)

price to sell

total income

if raising 10 head

Number in the herd

year 4Item

year 1 year 2 year 3

Page 115: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 113 of 196 

 

  

ອາຊບ 1

Occupation 1

type unit Nr price/unit total l ife span/yrs Resid' value Ann. Deprec'n

ລ/ດ ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊປ ມນຄາເຫລອ ເຊອມມນຄາ/ປ

1 ສາງຄອກງວ (6x8ມ)

1.1 ຽສາແມໄກໃ ນຫ ໄອນ (2,50 ຫລ 2.80ມ) ແມໄຽນ ໄອຂງ ຽສາ 8 50,000                    400,000  5 80,000                      

1.2 ແມໄ (4x8x5=16) (5x10x3.5=12) ແມໄຂ ໄາວ ລະ ສຍວ ມດ 122           16,000                 1,952,000  10 195,200                    

1.3 ແມໄ (5x15x5 =8) ແມໄຄສອງ ລະ ແມໄຄໃ ມດ 40 20,000                    800,000  10 80,000                      

1.4 ສງກະສ 12 foot ຜນ 44 35,000                1,540,000  5 308,000                    

1.5 ຊ ໄຽຫລກຕະປ(ຽບ ໄ 4,8,10) ກລ 8 12,000                      96,000  5 19,200                      

1.6 ຄໃ າຮງງານ ຮບຽ໔າ                    500,000 

ລວມຍອຍ 5,288,000               682,400                    

2 ສາງສວນຫຍາ (7 ເຮກຕາ)

2.1 ຫລກຮ ໄວ(ລວງອ ໄອມ 1,200 ມ) ແມໄກໃ ນຫ ໄອນ ຫລກ 800 10,000 8,000,000               5 1,600,000                

2.2 ຫນາມຽຫລກ(ລ ໄອມ 1,200ມ) ແທ ຄໄງ 60 100,000 6,000,000               5 1,200,000                

2.3 ຫລກຮ ໄວ(ບໃ ງ 4 ຫລອກ) ແມໄກໃ ນຫ ໄອນ ຫລກ 350 10,000 3,500,000               5 700,000                    

2.4 ຫນາມຽຫລກ(ບໃ ງລອກ) ແທ ຄໄງ 35 100,000 3,500,000               5 700,000                    

2.5 ຄໃ າຮງງານລ ໄອມຮໄວ ຈໄາງຮບຽ໔າ ຄ ໄງ 1      5,500,000    5,500,000              

2.6 ຖໃ າງອານາແມດນຄງສດ ຈໄາງຮບຽ໔າ ຽຮກຕາ 7      1,200,000    8,400,000              

ລວມຍອຍ 34,900,000            4,200,000                

3 ປກຫຍາລຽງສດ

3.1 ຊໄທໃ ອນພນຫຍ ໄາຽນຽປຍ 1 ຽຮກຕາ ຕໃ ນ 3 1,000,000    3,000,000              

3.2 ຊໄກໃ ນຫຍ ໄາຣຊ ກລ 182 30,000 5,460,000              

3.3 ຄໃ າຮງງານປກຫຍ ໄາ ຈໄາງຮບຽ໔າ 1 2,000,000    2,000,000              

3.4 ຽຄໃ ອງຕດຫຍ ໄາເຫ ໄງວກນ ຄ 1 800,000 800,000                  3 266,667                    

3.5 ຽຄໃ ອງບດຫຍ ໄາ ຄ 1 1,500,000 1,500,000               3 500,000                    

3.6 ຖງຢາງ໔ກຫຍ ໄາ (200 ລດ) 10 200,000 2,000,000               10 200,000                    

ລວມຍອຍ 14,760,000            966,667                    

4 ລະບບນາ

4.1 ອາງນ ໄາເຫ ໄງວຢສວນຫຍ ໄາ ອໃ າງ 4 150,000        600,000                  5 120,000                    

ລວມຍອຍ 600,000                  120,000                    

5 ຊງວແມ

5.1 ງວມໃ ລະ ຜ ໄ ງວລາດ ຕ 11 3,500,000 38,500,000           

5.2 ນ ໄາຫນກຂາຍ ກລ/ຕ/ປ 170

5.3 ລາຄາຊ ໄ ກບ/ກລ 40,000

ລວມຍອຍ 38,500,000           

ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 94,048,000            5,969,067                

ຕາຕະລາງ 3: ມນຄາຂອງການລງທນຄງທ

ລຽງງວລາດ ຂາຍລກ

Raising Cattle to sell

ຄດແລໃ ຽຊ ໃ ອມມນຄໃ າ/ປ

Table 3:  Fixed Investments/Costs

Page 116: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 114 of 196 

  

Occupation 1

Table 3:  Fixed Investments/Costs

No Fixed Inv estments/Costs T ype Unit N r P rice/unit T otal life span/yrs Resid' v alue Ann. Deprec'n

1 Cow stall (5x8m)

1.1 hard wood pole (2,50 or 2.80m) hardwood pole 8 50,000                   400,000  5 80,000                     

1.2 woods (4x8x5x1 6) (5x1 0x3.5=1 2) lumbers M 122           16,000                 1,952,000  10 195,200                   

1.3 woods (5x1 5x5x8) lumbers M 40 20,000                   800,000  10 80,000                     

1.4 Zinc 1 2 foot Thai Sheet 44 35,000                1,540,000  5 308,000                   

1.5 Nails(Nr 4, 8, 1 0) Thai Kg 8 12,000                     96,000  5 19,200                     

1.6 Wages                   500,000 

Subtotal5,288,000              682,400                   

2 Pastu re land clearance and fence estab lishmen t(7 Ha)

2.1 Fencing(approx 1 ,200 m) hardwoods Pole 800 1 0,0008,000,000               5 1,600,000                

2.2 Barbed wire(approx 1 ,200 m) Vietnam Roll 60 1 00,0006,000,000               5 1,200,000                

2.3 Fence pole (pasture dividen 4 blocks) hardwoods Pole 350 1 0,0003,500,000               5 700,000                   

2.4 Barbed wire(pasture dividen 4 blocks) Vietnam Roll 35 1 00,000 3,500,000               5 700,000                   

2.5 Wages for fencing Hire a

contractor Time

1      5,500,000     5,500,000              

2.6 Soil cleaning Individuals Ha 7      1,200,000     8,400,000              

Subtotal34,900,000            4,200,000                

3 G rass p lan ting

3.1Napier grass 1 Ha Tone 3 1,000,000     3,000,000              

3.2Ruzi grass seeds Kg 1 82

30,000 5,460,000              

3.3 Wages for grass planting Hire a

contractor1 2,000,000     2,000,000              

3.4Cutting grass machine

Thai piece 1 800,000800,000                  3 266,666.67              

3.5Crushing grass machine

Thai piece 1 1 ,500,0001,500,000               3 500,000.00              

3.6Tank for fermented grass

Thai piece 1 0 200,0002,000,000               10 200,000.00              

Subtotal 14,760,000            966,667                   

4 W ater system

4.1 Water tank tank 4 150,000        600,000                  5 120,000                   

Subtotal 600,000                  120,000                   

5 Buy female cattle

5.1Cattle female and bull cattle local Head

11 3,500,000 38,500,000           

5.2weight to sell Kg/Head/Y

170

5.3Price LAK

40,000

Subtotal 38,500,000           

Fixed value calculated depreciation 94,048,000            5,969,067                

Raising Cattle to sell

Calculate the cost / year

Page 117: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 115 of 196   

ອາຊບ 1 ລຽງງວລາດ ຂາຍລກ

Occupation 1 Raising Cattle to sell

Table 4: Variable (production) costs)

ຈານວນ ລາຄາ ລວມ

ລ/ Variable Inputs ປດໃຈ ການຜະລດ ປະເພດ ຫ/ນ Nr Price Total

1 ການປງແຕງອາຫານ

1.1 ກໄອນຮໃທາດ ສາຽລດຮບ ກໄອນ 48 25,000 1,200,000    

1.2 ກາກນ ໄາຕານ ຕກ 12 60,000 720,000       

1.3 ປຍ 46:00:00 ຽປາ 1 270,000 270,000       

ລວມຍອຍ 2,190,000    

2 ຢາປອງກນ ແລະ ປນປວ

2.1 ຽຕ ໄາຮມຽລອດ ສກລບ໓ງ ກໄວ 4 25,000              100,000       

2.2   ຂ ໄປນ,ຂ ໄາມໃ ທໄອງ ກບ 1 150,000            150,000       

2.3 ຽພນສະຽຕບ 50 ຽຊຽຊ ກໄວ 1 120,000            120,000       

2.4 ອອກຊຽຕຕາຊກຄນ 50 ຽຊຽຊ ກໄວ 1 80,000              80,000         

2.5 ສະລໃ ງ 10 ຽຊຽຊ ລະ ຽຂມ ຊດ 1 150,000            150,000       

ຮງງານຕນຽອງ ວນງານ 20 70,000               

ລວມຍອຍ 600,000       

3 ອປະກອນສາລບລຽງງວ

3.1 ຽຊອກ ມດຫລໃ ງລະທງຽພາງວ ຄ ໄງ 1 130,000            130,000       

ລວມຍອຍ ລວມຍອຍ 130,000       

4 ປບປງສວນຫຍາ

4.1 ຂ ໄງວເສໃສວນຫຍ ໄາ ກລ 2,000            400                   800,000       

4.2 ເສໃ ຝນສວນຫຍ ໄາ 2 ຮງງານ ມ ໄ 14 70,000              980,000       

4.3 ການກາຈດວດສະພດສວນຫຍ ໄາ ຮບເໝາ ຽຮກຕາ 7 500,000            3,500,000    

ລວມຍອຍ 5,280,000    

5 ການບວລະບດຮກສາ

5.1 ຍາມຝນລ ໄ ງເນສວນຫໄຍ ໄາ ໃຊເວລາ 2 ຊວໂມງ

5.2 ລ ໄ ງງວ(183*2/8) 1ປ ຮງງານຕນຽອງ ວນງານ 25 70,000             

5.3 ຍາມລ ໄງລ ໄ ງປໃ ກນຫຍ ໄາທາມະຊາດໃຊເວລາ 4 ຊວໂມງ

5.4 ລ ໄ ງງວ(182*8) 1ປ ຮງງານຕນຽອງ ວນງານ 182 70,000             

ລວມຍອຍ ‐               

6 ການຕະຫລາດຈາຫນາຍ

6.1 ຕດຕໃ ອອກຂາຍ ບດຕ ໃ ມຽງນ ບດ 3 10,000              30,000         

ຽອກະສານຊ ໄຂາຍ ຄ ໄງ 1 250,000                 250,000       

ລວມຍອຍ 280,000       

8,480,000    

ລ 4: ລ ລ ຄ ລ ລ

ຄາໃຊຈາຍຊປດໄຈການຜະລດ

Page 118: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 116 of 196 

 

Occupation 1 Raising cattle to sell

Table 4: Variable (production) costs)

No Production facto rs T ype Unit Nr Price (Kip) Total

1 An imal food p rocessing

1.1 Mineral lick completed box 48 25,000 1,200,000      

1.2 Molasses bottles 12 60,000 720,000          

1.3 Urea 46:00:00 Sack 1 270,000 270,000          

Subtotal 2,190,000      

2 Vaccine and med icine

2.1Hemorrhargic Septicimia vaccine

inject under skin Bottle4 25,000                 

100,000          

2.2   Deworming Box 1 150,000                150,000          

2.3 Pendistrep L.A (50 ml) Bottle 1 120,000                120,000          

2.4 Oxcetatraclcine (50 ml) Bottle 1 80,000                  80,000            

2.5 syringe and needle Set 1 150,000                150,000          

Self-employment Days 20 70,000                 

Subtotal 600,000          

3 Equipment for cattle raising

3.1 Rope Roll 1 130,000                130,000          

Subtotal 130,000          

4 Pastu re imp rovemen t

4.1 put the fertilizer of manure Kg 2,000                400                        800,000          

4.2 put themanure 2 labor Days 14 70,000                  980,000          

4.3 Weed removal in the pasture contractor Ha 7 500,000                3,500,000      

ລວມຍ ຍ 5,280,000      

5 M ain tenance

5.1 rainy season raise in pasture working2 hou r a day

5.2 cattle raising(1 83*2/8) 1 year Self-employment Days 25 70,000                 

5.3 dry season raise in natural pasture working 4 hou r a day

5.4 cattle raising(1 82*8) 1 year Self-employment Days 182 70,000                 

Subtotal ‐                   

6 M arketing

6.1 Contact out for sale telephone card piece 3 10,000                  30,000            

6.2 Document for sale Time 1 250,000                250,000          

Subtotal 280,000          

8,480,000      Total Variable costs

Page 119: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 117 of 196 

Cattle: Cattle Fattening 

 

ອາຊບ 1.2

Occupation 1.2

ຄາອະທບາຍພນຖານຂອງການໄລລຽງເສດຖະກດ

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

Table 1 : Summary of Production, Costs and Income

ອາຍການລຽງ: 4 ເດອນ

1 ງວທອມ

1.1 ຈ/ນງວທໃ ລ ໄ ງ 10 ຕ

1.2 ນ ໄາຫນກຊ ໄຽບ ໄອງຕ ໄນ 120 ກລ/ຕ

1.3 ນ ໄາຫນກສດທໄາຍຂາຍອອກ 180 ກລ/ຕ/4ຽດອນ

1.4 ລາຄາຂາຍ 40,000 ກບ/ກລ

1.5 ລາຍຮບຈາກການຂາຍງວ 72,000,000 ກບ

2 ຂງວ

2.1 ຂາຍຂ ໄງວຫໄງ (1.5 ກລ/ມ ໄ) 1,800 ກລ

2.2 ລາຄາຂາຍ 400 ກບ/ກລ

2.3 ລາຍຮບຈາກການຂາຍຂງວ 720,000 ກບ/ກລ

3 ລາຍຮບລວມເບອງຕນ 72,720,000 ກບ

4 ຄໃ າເຊ ໄຈໃ າຍ ການຜະລດ 54,495,000 ກບ

5 ການຽຊ ໃ ອມມນຄໃ າຄງທໃ 4,158,400

ລາຍຮບສດທ 18,225,000 ຕ1ຊດ

1.ການລ ໄ ງງວ ທອມ 10ຕ, 3 ຊດ/ປ, (ລຽງຂງຄອກ)

ລຽງທອມງວ

Cattle fattening

Page 120: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 118 of 196 

 

  

ອາຊບ 1.2 ຕາຕະລາງ 2: ຮອບວຽນ ການທອມງວ  Table 2: Cattle Fattening CyclesOccupation 1

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

x x x x x x x

ຊດທ 1 ຊ ໄງວ x 120                 1,200                40,000          48,000,000             

ທອມງວ 10 ຕ ລໄ ງທອມ x x x x ‐                            

ຂາຍອອກ x 180 1,800 40,000 72,000,000             

ຊດທ 2 ຊ ໄງວ x 120                 1,200                40,000          48,000,000             

ທອມງວ 10 ຕ ລໄ ງທອມ x x x x ‐                            

ຂາຍອອກ x 180 1,800 40,000 72,000,000             

ຊດທ 3 ຊ ໄງວ x 120                 1,200                40,000          48,000,000             

ທອມງວ 10 ຕ ລໄ ງທອມ x x x x ‐                            

ຂາຍອອກ x 180 1,800 40,000 72,000,000             

144,000,000

216,000,000

72,000,000

ກະກມການທງ໔ດ (ກມພ ໄນທໃ +ລໄອມ

ຮ ໄວ+ສໄາງຄອກ+ປກຫຍໄາ+ບວລະບດ)

ລຽງທອມງວ

Cattle fattening

ລ ຍ ລວ ( )ລາຍການ1 2

ຍ / ( ລ 10 /ຊ /3 ຊ

( ລ / )

ລວ ( ລ)

ລ ຄ

ຍ ( )

Page 121: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 119 of 196  

ອາຊບ 1.2

Occupation 1.2

Table 3: Fixed Investments/Costs

ລ/ດ ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ ມນຄາເຫລອ ຄດໄລເຊອມມນຄາ/ປ

1 ສາງຄອກງວ (5ມx10)

1.1 ຽສາແມໄກໃ ນຫ ໄອນ (2 ຫລ 2.5ມ) ແມໄຽນ ໄອຂງ ຽສາ 8 50,000               400,000  5 80,000                            

1.2 ແມໄ (4x8x5x16) (5x10x3.5x12) ແມໄປຮບ ມດ 222                16,000             3,552,000  5 710,400                         

1.3 ແມໄ (5x15x5x8) ແມໄບຮບ ມດ 40 20,000               800,000  5 160,000                         

1.4 ສງກະສ 12 foot ແທ ຜນ 52 35,000            1,820,000  5 364,000                         

1.5 ຊມງ ຕໃ ນ 1 700,000               700,000  5 140,000                         

1.6 ຮໃ + ຊາຍ (ຫກລ ໄນ ໄອຍ) ລດ 1 700,000               700,000  5 140,000                         

1.7 ຊ ໄຽຫລກຕະປ(ຽບ ໄ 10) ກລ 10 12,000               120,000  5 24,000                            

1.8 ຄໃ າຮງງານ(2ຄນ) ວນງານ 20 70,000                          1,400,000  5 280,000                         

1.9 ຕະປຕອກສງກະສ ກບ 15 10,000                             150,000  5 30,000                            

ລວມຍອຍ 9,642,000          1,928,400                      

2 ສາງສວນຫຍາ (1 ຮຕ)

2.1 ຫລກຮໄວ(ລວງອ ໄອມ 400 ມ) ຫລກ 200 10,000 2,000,000          5 400,000                         

2.2 ຫນາມຽຫລກ(ລ ໄອມ 400 ມ) ແທ ຄໄງ 20 100,000 2,000,000          5 400,000                         

2.3 ຄໃ າຮງງານຮບຽຫມາ ຮຕ 1 1,000,000         1,000,000         

‐                      

ລວມຍອຍ 5,000,000          800,000                         

3 ປກຫຍາລຽງສດ

3.1 ບກຽບກພໄນທໃ ສວນຫຍ ໄາ ຽຮກຕາ 1 1,200,000         1,200,000         

3.2 ຊໄທໃ ອນພນຫຍ ໄາຽນຽປຍ 4 ແລໃ ຕໃ ນ 2 1,000,000         2,000,000         

3.3 ຊໄກໃ ນກນ, ມລາຕ2, ຣຊ ກລ 6 90,000 540,000             

3.4 ຄໃ າຮງງານປກຫຍ ໄາ ຮບຽ໔າ 1 1,000,000         1,000,000         

3.5 ຖງ໔ກຫຍ ໄາ (200 ລດ) 10 200,000             2,000,000          10 200,000                         

ລວມຍອຍ 5,540,000          200,000                         

4 ລະບບນາ

4.1 ອໃ າງນ ໄາເຫໄງວກນຢຄອກ ອໃ າງ 2 150,000             300,000              10 30,000                            

4.2 ລະບບນ ໄາ ສາລບ ຫດນ ໄາສວນຫຍ ໄາ ຊດ 2 3,000,000         6,000,000          5 1,200,000                      

ລວມຍອຍ 6,300,000          1,230,000                      

5 ລະບບໄຟຟາ

5.1 ອປະກອນແຟຟໄາ ຊດ 3 100,000             300,000              3 100,000                         

ລວມຍອຍ 300,000              100,000                         

6 ອປະກອນ

6.1 ຽຄ ໃ ອງຕດຫຍ ໄາ ຽຄອງ 1 800,000             800,000              5 160,000                         

ຽຄ ໃ ອງບດຫຍ ໄາ ຽຄອງ 1 1,500,000         1,500,000          5 300,000                         

ລ ໄຍ ໄ ອນ 1 150,000             150,000              3 50,000                            

ລວມຍອຍ 2,300,000          460,000                         

ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 26,482,000        4,158,400                      ຄດແລໃ ຽຊ ໃ ອມມນຄໃ າ/ປ

ລຽງທອມງວ,

ຕາຕະລາງ 3: ມນຄາຂອງການລງທນຄງທ

Cattle fattening

Page 122: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 120 of 196 

ອາຊບ 1.2 ວ

Occupation 1.2 type 1: free range

ລ 4: ລ ລ ຄ ລ ລ

Table 4: Variable (production) costs)ຈານວນ ລາຄາ ລວມ

ລ/ ປດໃຈ ການຜະລດ ປະເພດ ຫ/ນ Nr price total

1 ແນວພນສດ

1.1 ຊ ໄງວລາດ (ງວຈໃອຍ) ພ ໄນຽມອງ ຕ 10 3,000,000 30,000,000     

ນ ໄາຫນກ(120 ກລ/ຕ) ກລ 120

ຄາດຄະຽນເຫໄແດ ໄນ ໄາຫນກ(ຕລະ 60 ກລ) ກລ/ຕ 180

ລວມຍອຍ 30,000,000     

2 ນາ ແລະ ອາຫານ

2.1 ຫດນ ໄາ ຮງງານ ຄ ໄງ 16 70,000 1,120,000       

2.2 ກໄອນຮໃທາດ ສາຽລດຮບ ກລ 20 5,000 100,000           

ອາຫານຽຂ ໄມຂ ໄນ ສາຽລດຮບ ກລ 2,400    5,000 12,000,000     

ກາກນ ໄາຕານ ຕກ 12          60,000 720,000           

ຖງ໔ກຫຍ ໄາ ອນ 10          200,000 2,000,000       

ປຍຢຽຣຍ 46:00:00 ຽປາ 1            280,000 280,000           

ຽຟອງຫໄງ ຕໃ ນ 5            200,000 1,000,000       

ລວມຍອຍ ລວມຍອຍ 17,220,000     

3 ຢາປອງກນ ແລະປນປວ

3.1 ຽຕ ໄາຮມຽລອດ ກ ໄວ 2 5,000              10,000             

3.1 ຂ ໄປນ,ຂ ໄາມໃ ທໄອງ ລະ ເບແມໄເນຕ Ivermec F ກ ໄວ 1 180,000         180,000           

ຽພນສະຽຕບ LA ກ ໄວ 1 100,000         100,000           

ລວມຍອຍ ລວມຍອຍ 290,000           

4 ຂນທະບຽນງວ ແລະ ການຕອນງວ

4.1 ຽຊອກ ມດຫລໃ ງລະທງຽພາງວ ຄງ 1 130,000         130,000           

ລວມຍອຍ ລວມຍອຍ 130,000           

5 ການບວລະບດຮກສາ

5.1 ເຫໄອາຫານງວ(120*4/8) 4 ຽດອນ ຮງງານຄອບຄວ ວນງານ 60 70,000            4,200,000       

ລວມຍອຍ 4,200,000       

6 ການຜະລດອາຫານຫຍາ

  ເສໃ ຝນສວນຫຍ ໄາ ຂ ໄງວຫໄງ ກລ 1,000    400                  400,000           

ເສໃ ຝນສວນຫຍ ໄາ ວນງານ 10 70,000            700,000           

  ຮງງານຕດຫຍ ໄາ ຽຮດຫຍ ໄາ໔ກ ວນງານ 10 70,000            700,000           

ນ ໄາມນເສໃ ຈກຕດຫຍ ໄາ ລດ 50 9,500              475,000           

  ນ ໄາມນ 2T ຕກ 5 20,000 100,000           

ລວມຍອຍ ລວມຍອຍ 2,375,000       

7 ການຕະຫລາດຈາຫນາຍ

7.1 ຕດຕໃ ພໃ ຄ ໄາຽພ ໃ ອຈາ໓ໃ າຍສດຂາຍ ຄ ໄງ 3 10,000            30,000             

7.2 ຽອກະສານຊ ໄຂາຍ ຄ ໄງ 1 250,000         250,000           

ລວມຍອຍ ລວມຍອຍ 280,000           

54,495,000     

ລຽງທອມງວ, 4 ເດອນ

Cattle fattening, 4 months

ຄາໃຊຈາຍຊປດໄຈການຜະລດ

Page 123: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 121 of 196 

Pig:  Breeding and selling a 1 year 

 

 

ຕາຕະລາງ 1: ຄາດຫມາຍ ລາຍຮບ ປະຈາປ ຕາຕະລາງ 2: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ 

ລາຍຮບສດທ 1 ປ ລາຍຮບສດທ 2 ປ ລາຍຮບສດທ 3 ປ ອາຍການລໄ ງ: ປທໃ 1 ວ ວຍ ອາຍການລໄ ງ: ປທໃ 2 ວ ວຍ ອາຍການລໄ ງ: ປທໃ 3 ວ ວຍ

ຄອບຄວA, 1 ຄນ 26,396,990 119,646,990 143,646,990 1 ໔ຂນ ໔ຂນ ໔ຂນ

1.1 ຂາຍ໔ຂນ 70 ຕ ຂາຍ໔ຂນ 140 ຕ ຂາຍ໔ຂນ 140 ຕ

ລວມຄາດຫມາຍ 26,396,990 119,646,990 143,646,990 1.2 ນ ໄາຫນກຂາຍ 70 ກລ/ຕ ນ ໄາຫນກຂາຍ 70 ກລ/ຕ ນ ໄາຫນກຂາຍ 70 ກລ/ຕ

1.3 ນ ໄາຫນກລວມ 4,900 ກລ ນ ໄາຫນກລວມ 9,800 ກລ ນ ໄາຫນກລວມ 9,800 ກລ

1.4 ລາຄາຂາຍ 18,000 ກບ ລາຄາຂາຍ 18,000 ກບ ລາຄາຂາຍ 18,000 ກບ

ລວມມນຄໃ າ 176,400,000 ກບ

ຂາຍມໃ ພນ໔ອອກ 10 ຕ

ນ ໄາຫນກຂາຍ 150 ກລ/ຕ

ນ ໄາຫນກລວມ 1,500 ກລ

ລາຄາຂາຍ 16,000 ກບ

ລວມມນຄໃ າ 24,000,000 ກບ

2 ລາຍຮບຈາກການຂາຍໝ 88,200,000 ກບ ລາຍຮບຈາກການຂາຍໝ 176,400,000 ກບ ລາຍຮບຈາກການຂາຍໝ 200,400,000 ກບ

2.1 ຂຫມ ຂຫມ ຂຫມ2.2 ຂາຍຂ ໄຫມ(365*10) 3,650 ກລ ຂາຍຂ ໄຫມ(365*15) 3,650 ກລ ຂາຍຂ ໄຫມ(365*15) 3,650 ກລ

2.3 ລາຄາຂາຍ 400 ກບ/ກລ ລາຄາຂາຍ 400 ກບ/ກລ ລາຄາຂາຍ 400 ກບ/ກລ

3 ລາຍຮບຈາກການຂາຍຂ 1,460,000 ກບ ລາຍຮບຈາກການຂາຍຂ 1,460,000 ກບ ລາຍຮບຈາກການຂາຍຂ 1,460,000 ກບ

3.1 ລາຍຮບລວມຽບ ໄອງຕນ 89,660,000 ກບ ລາຍຮບລວມຽບ ໄອງຕນ 177,860,000 ກບ ລາຍຮບລວມຽບ ໄອງຕນ 201,860,000 ກບ3.2 ຄໃ າເຊໄຈໃ າຍ ການຜະລດ 60,740,000 ກບ ຄໃ າເຊ ໄຈໃ າຍ ການຜະລດ 55,690,000 ກບ ຄໃ າເຊ ໄຈໃ າຍ ການຜະລດ 55,690,000 ກບ

3.3 ການຽຊໃ ອມມນຄໃ າຄງທໃ 2,523,010 ກບ ການຽຊໃ ອມມນຄໃ າຄງທໃ 2,523,010 ກບ ການຽຊໃ ອມມນຄໃ າຄງທໃ 2,523,010 ກບ

ລາຍຮບສດທ 26,396,990 ກບ ລາຍຮບສດທ 119,646,990 ກບ ລາຍຮບສດທ 143,646,990 ກບ

ອາຊບ ລຽງຫມລາດ ສາຫລບຂາຍລກ

ລ ລ ຍລ 1 ( 2 ຄ ), ລ ວ 10

ລ ຍ 3 , ວ ຊ

Page 124: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 122 of 196 

 

 

  

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

ຊດທໃ 1 ປະສມພນ x

ຫມ 1 ຕ ຖພາ(3:3:3 ຽດອນ) x x x x(ຽກດ)

ຽກດ-ເຫຍໃ 7 ຕ x x x x x x x(ຂາຍ) 70 70 18,000 1,260,000           ຖໄາລ ໄ ງຫມ 10 ຕ ຽກດ-ເຫຍໃ 70 ຕ x x x x x x x(ຂາຍ) 70 4,900 18,000 88,200,000         

ຊດທໃ 2 ປະສມພນ x

ຫມ 1 ຕ ຖພາ(3:3:3 ຽດອນ) x x x x(ຽກດ)

ຽກດ-ເຫຍໃ 7 ຕ x x x x x x x(ຂາຍ) 70 70 18,000 1,260,000           ຖໄາລ ໄ ງຫມ 10 ຕ ຽກດ-ເຫຍໃ 70 ຕ x x x x x x x(ຂາຍ) 70 4900 18,000 88,200,000         

ຊດທໃ 3 ປະສມພນ x

ຫມ 1 ຕ ຖພາ(3:3:3 ຽດອນ) x x x x(ຽກດ)

ຽກດ-ເຫຍໃ 7 ຕ x x x x x x x(ຂາຍ) 70 70 18,000 1,260,000           ຖໄາລ ໄ ງຫມ 10 ຕ ຽກດ-ເຫຍໃ 70 ຕ x x x x x x x(ຂາຍ) 70 4,900 18,000 88,200,000         

ຊດທໃ 4 ປະສມພນ x

ຫມ 1 ຕ ຖພາ(3:3:3 ຽດອນ) x x x x(ຽກດ)

ຽກດ-ເຫຍໃ 7 ຕ x x x x x x x(ຂາຍ) 70 70 18,000 1,260,000           ຖໄາລ ໄ ງຫມ 10 ຕ ຽກດ-ເຫຍໃ 70 ຕ x x x x x x x(ຂາຍ) 70 4,900 18,000 88,200,000         

ຊດທໃ 5 ປະສມພນ x

ຫມ 1 ຕ ຖພາ(3:3:3 ຽດອນ) x x x x(ຽກດ)

ຽກດ-ເຫຍໃ 7 ຕ x x x x x x x(ຂາຍ) 70 70 18,000 1,260,000           ຖໄາລ ໄ ງຫມ 10 ຕ ຽກດ-ເຫຍໃ 70 ຕ x x x x x x x(ຂາຍ) 70 4900 18,000 88,200,000         

80 80 80 80 80 10 70 80 80 80 80 80 10 70 80 80 80 80 80 80 10 70

ນາຫນກລວມ(ກລ) ລາຄາຂາຍ ລາຍຮບລວມລາຍການ ປ 1 ປ 2 ປ 3 ນາຫນກ(ກໂລ/ໂຕ)

Page 125: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 123 of 196 

 

ລ/ດ ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ ມນຄາເຫລອ ການຄດໄລເຊອມມນຄາ/ປ

1 ການສາງຄອກ ແມພນ(2.5 x20ມ)   ຖາວອນ

1.1 ຽສາຊມງ (2 ຫລ2.5ມ) ຊຽມນຽປນຕ ໄນ ມດ 20                             30,000                      600,000  10 ‐                                        60,000                               

1.2 ແມໄຈງ80 x 5 ມ ແມໄຈງ ລາ 80                               5,000                      400,000  10 ‐                                        40,000                               1.3 ແມໄ 150 x 5 ມ ອໄມຄອກ໔ ແມໄຈງ ລາ 150                               5,000                      750,000  10 ‐                                        75,000                               

1.4 ສງກະສ ສງສລາວ ຜນ 100                             25,000                  2,500,000  10 ‐                                        250,000                             1.5 ຊມງ ລາວ ຕໃ ນ 1                           700,000                      700,000  10 ‐                                        70,000                               1.6 ຫນ (ລດເຫຍໃ ) ລດ 1                           400,000                      400,000  10 ‐                                        40,000                               

1.7 ຊາຍ (ລດເຫຍໃ ) ລດ 1 300,000                                             300,000  10 ‐                                        30,000                               1.8 ຊ ໄຽຫລກຕະປ (ຽບ ໄ 5,6,10) ລະ ຕະປກ ໄບ ກລ 5 12,000                                                  60,000  10 ‐                                        6,000                                  1.9 ຄໃ າຮງງານ(ບບຽ໔າ) ຫງ 1 2,000,000                                      2,000,000 

ລວມຍອຍ 7,710,000                571,000                             

2 ການສາງຄອກຂນລກໝ (4 x20ມ)   ຖາວອນ2.1 ຽສາຊມງ (2 ຫລ2.5ມ) ຊຽມນຽປນຕ ໄນ ມດ 40                             30,000                  1,200,000  10 ‐                                        120,000                             2.2 ແມໄຈງ 100 x 5 ມ ແມໄຈງ ລາ 100                               5,000                      500,000  10 ‐                                        50,000                               

2.3 ແມໄຈງອ ໄມຄອກ 300 x 5 ມ ແມໄຈງ ລາ 300                               5,000                  1,500,000  10 ‐                                        150,000                             2.4 ສງກະສ ຜນ 100                             25,000                  2,500,000  10 ‐                                        250,000                             2.5 ຊມງ ຕໃ ນ 2                           700,000                  1,400,000  10 ‐                                        140,000                             

2.6 ຫນ (ລດເຫຍໃ ) ລດ 2                           400,000                      800,000  10 ‐                                        80,000                               2.7 ຊາຍ (ລດເຫຍໃ ) ລດ 2 300,000                                             600,000  10 ‐                                        60,000                               

2.8 ຊ ໄຽຫລກຕະປ (ຽບ ໄ 5,6,10) ລະ ຕະປກ ໄບ ກລ 13 12,000                                                156,000  10 ‐                                        15,600                               2.9 ຄໃ າຮງງານ(ບບຽ໔າ) ຫງ 1 2,000,000                      2,000,000               

ລວມຍອຍ 10,656,000              865,600                             

3 ການສາງສາງເກບມຽງເຄອງ (4 x5ມ)   ຖາວອນ3.1 ຽສາຊມງ (3ມ) ຊຽມນຽປນຕ ໄນ ມດ 6                             30,000                      180,000  10 ‐                                        18,000                               

3.2 ແມໄ ຈງ 15 x 5 ມ ແມໄຈງ ຽສ ໄນ 15                               5,000                        75,000  10 ‐                                        7,500                                  3.3 ບໃ ອກອໄມຄອກ໔ =332 ກ ໄອນ ກ ໄອນ ມດ 332                               1,800                      597,600  10 ‐                                        59,760                               

3.4 ລກກະຈ ຊຽລກ ອນ 1                             50,000                        50,000  10 ‐                                        5,000                                  3.5 ປະຕສໃ າງ ແມໄຄນ ຊດ 1                           200,000                      200,000  10 ‐                                        20,000                               3.6 ສງກະສ ຜນ 30                             25,000                      750,000  10 ‐                                        75,000                               

3.7 ຊມງ ຽປາ 10                             35,000                      350,000  10 ‐                                        35,000                               3.8 ຫນ (ລດເຫຍໃ ) ຽຄໃ ງລດ 1                           200,000                      200,000  10 ‐                                        20,000                               3.9 ຊາຍ (ລດເຫຍໃ ) ຽຄໃ ງລດ 1 150,000                                             150,000  10 ‐                                        15,000                               

3.1 ຊ ໄຽຫລກຕະປ (ຽບ ໄ 5,6,10) ລະ ຕະປກ ໄບ ກລ 2 12,000                                                  24,000  10 ‐                                        2,400                                  3.11 ຄໃ າຮງງານ(ບບຽ໔າ) ຫງ 1 700,000                                             700,000 

ລວມຍອຍ 3,276,600                257,660                             

4 ລະບບໄຟຟາ ຖາວອນ4.1 ສາຍແຟ ຄໄງ 2 270,000 540,000                    8 ‐                                        67,500                               4.2 ສະວກແຟ ອນ 2 40,000 80,000                      4 ‐                                        20,000                               4.3 ກະດານແຟ ປໄນ 2 30,000 60,000                      6 ‐                                        10,000                               

4.4 ດອກແຟ ດອກ 4 20,000 80,000                      1 ‐                                        80,000                               4.5 ຄໃ າຮງງານຮບຽຫມາ) ຮງງານ 3 70,000                            210,000                    ‐                                       

177,500                             ລວມຍອຍ 970,000                   

5 ລະບບນາ ຖາວອນ5.1 ກອກນ ໄາ ກອກ 6 25,000                            150,000                    3 ‐                                        50,000                               

5.2 ທໃ pvc ອນ 8 18,000                            144,000                    4 ‐                                        36,000                               5.3 ຂ ໄຕໃ pvc ອນ 10 4,000                              40,000                      4 ‐                                        10,000                               5.4 ຽລອຍຕດທໃ pvc ອນ 1 35,000                            35,000                      5 ‐                                        7,000                                  

5.5 ຂນ ໄາເຫ ໄ໔ ອນ 6 8,000                              48,000                      2 ‐                                        24,000                               5.6 ຖງເສໃ ນ ໄາເຫ ໄ໔ ອນ 3 150,000                         450,000                    4 ‐                                        112,500                             

5.7 ກາວ ປໃ ອງ 2 15,000                            30,000                      4 ‐                                        7,500                                  5.8 ຄໃ າຮງງານ(2ຄນ) ຮງງານ 2 70,000                            140,000                    0 ‐                                       

1,037,000                247,000                             

6 ຊຫມແມ

6.1 ຫມແມ ຫມລາດ ຕ 10 700,000                         7,000,000               ລວມຍອຍ 7,000,000               

7 ອປະກອນທຈາເປນເຂາໃນການລຽງໝ

7.1 ສະຫໃ ງ ລະ ຽຂມສກຢາ ອນ 2 70,000                            140,000                    3 23,333                               

7.2 ມດຕດ ອນ 2 25,000                            50,000                      2 12,500                               190,000                    35,833                               

30,839,600              2,154,593                         

ຕາຕະລາງ 3: ມນຄາຂອງການລງທນຄງທ

Page 126: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 124 of 196 

 

  

 

 

 

 

 

 

ລ 4: ລ ລ ຄ ລ ລ

I ປດໃຈ ການຜະລດ ປະເພດ ຫວຫນວຍ ຈານວນ ລາຄາ ລວມ

1 ອາຫານ

1.2 ຮາ 50% (365*2.5ກລ*10ຕ/ມໃ ພນ) ກລ 23,600 1,500 35,400,000

1.3 ມນຕ ໄນຫ ໄງ 30% (365*1.5ກລ*70ຕ) ກລ 14,100 1,300 18,330,000

1.4 ສາລ 20 % (365*1.5ກລ*70ຕ) ກລ 9,500 2,500 23,750,000

1.5 ອາຫານ໔ນມ ຽປໄາ 20 170,000 3,400,000

ລວມຍອຍ 80,880,000

2 ຄາເຊາພພນໝ

2.1 ຽຊໃ າພໃ ພນ໔ ຽຊໃ າຽພໃ ອປະສມພນ ໔ພໃ ພນດ ຄ ໄງ 20 200,000 4,000,000

4,000,000

3 ຢາປອງກນ ແລະປນປວ

3.1 ຢາວກຊນ: ອະຫວາ໔ (Swine fever) 1ກໆອງເຫຍໃ /50ml ກໃອງ 3 20,000 60,000

3.2 ຢາກໄແຂ ໄ໔ occidecine/50ml ກໃອງ 2 45,000 90,000

3.3 ເຫໄທາດຽຫກ 1 ກໆອງ/10ml ກໃອງ 8 25,000 200,000

3.4 ຢາຂ ໄາມໃ ທໄອງ (Ivomac) 1ກໆອງນ ໄອຍ/10ml ກໃອງ 3 65,000 195,000

3.5 ວຕາມນບາລງ (B-complete) 1ກໆອງເຫຍໃ /50ml ກໃອງ 3 25,000 75,000

ລວມຍອຍ 620,000

4 ການບວລະບດຮກສາ

4.1 ປະສມອາຫານ ລະເຫ ໄອາຫານ(365*4/8) ວນງານ 182 50,000

4.2 ການອານາແມຄອກຫມ (365*1/8) ວນງານ 45 50,000

4.3 ຽກບຂ ໄຫມ-ຜະລດຝນ(365*2/8) ວນງານ 91 50,000

ລວມຍອຍ -

5 ສອມແປງ ແລະ ບວລະບດຮກສາຄອກໝ

5.1 ຄໃ າເຊ ໄຈໃ າຍ ລະ ສໄອມປງແຟຟໄາ ຽດອນ 12 50,000 600,000

5.2 ຄໃ າເຊ ໄຈໃ າຍລະ ສໄອມປງລະບບນ ໄາ ຽດອນ 12 30,000 360,000

5.3 ການສອໃ ໄມປງຮກສາຖະນນ(2ຄນ/1ຄ ໄງ ) ຮງງານ ວນງານ 10 50,000 500,000

5.4 ການສອໃ ໄມປງຄອກ໔ (1ຄນ/6ຄ ໄງ ) ຮງງານ ວນງານ 6 50,000 300,000

5.5 ລວມຍອຍ 1,760,000

6 ຄາໄຊຈາຍອນໆ

6.1 ຈໃ າຍຄໃ າກະສແຟຟໄາ ຄໃ າແຟຟໄາຕໃ ລະຽດອນ ຽດອນ 12 100,000 1,200,000

ລວມຍອຍ 1,200,000

6 ການຕະຫລາດຈາຫນາຍ

6.1 ຕດຕໃ ອອກຂາຍ (ຂາຍກບທໃ ລະ ມໃ ຄ ໄາມາຊໃ ) ຮງງານ 6 50,000 300,000

ລວມຍອຍ 300,000

ປດແຈການລງທນທງຫມດ 88,760,000

Page 127: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 125 of 196 

Pig Fattening:  

 

 

ອາຊບ 2.2

Occupation 2.2

ຄາອະທບາຍພນຖານຂອງການໄລລຽງເສດຖະກດຈານວນລຽງ: 20 ຕ

ອາຍການລໄ ງ: 3ຽດອນ ຜນຜະລດ 20x45 kg=900kg

ຕາຕະລາງ 2: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

Table 1 : Summary of Production, Costs and Income

ຊະນດ ຈ/ນ ຫ/ຫນ

1 ຫມລາດ

1.1 ຈ/ນຫມທໃ ລ ໄ ງ 20 ຕ

1.2 ນ ໄາຫນກຊ ໄມາຽບ ໄອງຕ ໄນ 35 ກລ

1.3 ນ ໄາຫນກຂາຍ 45 ກລ/ຕ

1.4 ລາຄາຂາຍ 20,000 ກລ/ກບ

1.5 ລາຍຮບຈາກການຂາຍ 18,000,000 ກບ

2 ຂຫມ

2.1 ຂາຍຂ ໄຫມ(90*15) 1,350 ກລ

2.2 ລາຄາຂາຍ 300 ກບ/ກລ

2.3 ລາຍຮບຈາກການຂາຍຂຫມ 405,000 ກບ

3 ລາຍຮບລວມເບອງຕນ 18,405,000 ກບ

4 ຄໃ າເຊ ໄຈໃ າຍ ການຜະລດ 15,935,000 ກບ

5 ການຽຊ ໃ ອມມນຄໃ າວດຖຄງທໃ 2,163,667

6 ລາຍຮບສດທ 306,333

ລຽງຫມລາດລຽງຂມ

Pig Fattening

ຕລະ 35 ກລ

Page 128: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 126 of 196  

ອາຊບ 2.2

Occupation 2.2

ຕາຕະລາງ 3: ມນຄາຂອງການລງທນຄງທ

type unit Nr price/unit total l ife span/yrs Resid' value Ann. Deprec'n

ລ/ດ ການລງທນຄງທປະ

ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ ມນຄາເຫລອ ການຄດໄ ລເຊອມມນຄາ/ປ

1 ການສາງຄອກ (2.5 x 20ມ)

1.1 ຽສາຊມງ (2 ຫລ2.5ມ) ຕ ໄນ 10 35,000                350,000 

1.2 ແມໄ 4x8 ລະ 5x10 ລາ 30          150,000              4,500,000 

1.3 ສງກະສ ຜນ 30 35000             1,050,000 

1.4 ຊມງ ຕໃ ນ 1.5 700,000             1,050,000 

1.5 ຫນ (ລດນໄອຍ) ລດ 1 300000                300,000 

1.6 ຊາຍ (ລດນໄອຍ) ລດ 1 200000                200,000 

1.7 ຊ ໄຽຫລກຕະປ (ຽບ ໄ 5,6,10) ກລ 10 10,000                100,000 

1.8 ຄໃ າຮງງານ(2ຄນ) ວນງານ 10 80,000                          800,000 

ລວມຍອຍ 8,350,000           10 ລວມຍອຍ 835,000                                

2 ລະບບໄຟຟາ

2.1 ສາຍແຟ ຄໄງ 2 100,000 200,000               8 25,000                                  

2.1 ສະວກແຟ ອນ 1 50,000 50,000                 4 12,500                                  

2.1 ກະດານແຟ ປໄນ 1 25,000 25,000                 6 4,167                                     

2.1 ດອກແຟ ດອກ 2 20,000           40,000                 1 40,000                                  

2.1 ຄໃ າຮງງານຮບຽຫມາ) ຮງງານ 3 80,000           240,000              

555,000               ລວມຍອຍ 81,667                                  

5 ລະບບນາ

5.1 ກອກນ ໄາ ກອກ 6 25,000           150,000               3 ‐                50,000                                  

5.2 ທໃ pvc ອນ 8 18,000           144,000               4 ‐                36,000                                  

5.3 ຂ ໄຕໃ pvc ອນ 10 4,000             40,000                 4 ‐                10,000                                  

5.4 ຽລອຍຕດທໃ pvc ອນ 1 35,000           35,000                 5 ‐                7,000                                     

5.5 ຂນ ໄາເຫ ໄ໔ ອນ 6 8,000             48,000                 2 ‐                24,000                                  

5.6 ຖງເສໃ ນ ໄາເຫ ໄ໔ ອນ 3 150,000        450,000               4 ‐                112,500                                

5.7 ກາວ ປໃ ອງ 2 15,000           30,000                 4 ‐                7,500                                     

5.8 ຄໃ າຮງງານ(2ຄນ) ຮງງານ 2 70,000           140,000               0 ‐               

1,037,000           ລວມຍອຍ 247,000                                

4 ເຄອງຈກ

4.1 ຈກປະສມອາຫານ ຽຄໃ ອງ 1 8,000,000     8,000,000           5 3,000,000 1,000,000                            

8,000,000           ລວມຍອຍ 1,000,000                            

ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 17,942,000         2,163,667                            ຄດແລໃ ຽຊ ໃ ອມມນຄໃ າ/ປ

ລຽງຫມລາດລຽງຂມ

Pig Fattening

Table 3:  Fixed Investments/Costs

Page 129: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 127 of 196 

ອາຊບ 2.2 ລຽງຫມລາດລຽງຂມ ຈານວນລຽງ: 20 ຕ

Occupation 2.2 Pig Fattening ອາຍການລໄ ງ: 3ຽດອນ ຜນຜະລດ 20x45 kg=900kg

ລ 4: ລ ລ ຄ ລ ລ

Table 4: Variable (production) costs

type Unit Nr price total

  Variable Inputs/Costs ປດໃຈ ການຜະລດ ປະເພດ ຫວຫນວຍ ຈານວນ ລາຄາ ລວມ

1 Breed  ແນວພນສດ

1.1 purchase piglet ຫມລາດ (ລ ໄ ງຫມຂມ) ຫມລາດ(ຫມຈໃ ອຍ) ຕ 20 500,000 10,000,000        ນ ໄາຫນກ(35 ກລ ຕໃຕ) ກລ 35

ຄາດຄະຽນນ ໄາຫນກຈະແດ ໄ ກລ/ຕ 45

ລວມຍອຍ ລວມຍອຍ 10,000,000        

2  feed ອາຫານ

2.1 ຄເສໃ ອາຫານ ຕກ 5 5,000 25,000               ສາລ,ມນຕ ໄນ,ບອນ,ເບມນດ ໄາງ (90*1.5kg*20ຕ) ກລ 2,700 1,500 4,050,000          

ລວມຍອຍ 4,075,000          

3  Vaccination etc ຢາປອງກນ ແລະປນປວ

3.1  Vaccination  ສກຢາວກຊ ອະຫວາຫມ ກໃ ອງ 10 5,000      50,000               

3.1 de‐worming ຢາຂ ໄາມໃ ທໄອງ ຜງ 10 10,000    100,000             

ລວມຍອຍ 150,000             

4 pig Care ການບວລະບດຮກສາ

4.1 Care ຫມ(90*2/8) ຮງງານຕນຽອງ ວນງານ 22 50,000    1,100,000          

4.2 ອານາແມ ຂ ໄຫມ ຮງງານຕນຽອງ ວນງານ ??

ຽອາຽຟອງຫໄງ/ຫຍ ໄາຫໄງປະສມກບຂ ໄຫມ ວນງານ ??

ລວມຍອຍ 1,100,000          

5

5.1 ຄໃ າເຊ ໄຈໃ າຍ ລະສ ໄອມປງແຟຟໄາ ຽດອນ 3 50,000 150,000             ຄໃ າເຊ ໄຈໃ າຍລະສ ໄອມປງລະບບນ ໄາ ຽດອນ 3 20,000 60,000               ການສອໃ ໄມປງຮກສາຖະນນ ຮງງານ ວນງານ 3 50,000 150,000             

ລວມຍອຍ 360,000             

6 Maketing ການຕະຫລາດຈາຫນາຍ

6.1  traders contract ຕດຕໃ ອອກຂາຍ (ຂາຍກບທໃ ) ຮງງານຕນຽອງ ວນງານ 5 50,000    250,000             

ລວມຍອຍ 250,000             

Total Variable costs 15,935,000        

ວ ລວ ? ? ? ວນງານ

ຄາໃຊຈາຍຊປດໄຈການຜະລດ

ການສອມແປງຮກສາລະບບ

ຕລະ 35 ກລ

Page 130: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 128 of 196 

Raising Native Chicken 

ອາຊບ 3 ລຽງໄກລາດຂາຍ

Occupation 3 Raising Native Chicken

ຄາອະທບາຍພນຖານຂອງການໄລລຽງເສດຖະກດ

# ມໃ ພນ ຕໃລະຕຜະລດລກສະຽລ ໃ ຍ 3ຄ ໄງຕໃ ປ ລະ

# ຕໃລະຄ ໄງຜະລດລກສະຽລ ໃ ຍແດ ໄ 8 ຕ/ມໃ ພນ

# ຮອບວນ ການລໄ ງແກໃ ພາຍເນ1ປ (3 ຮອບ/ປ)

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

Table 1 : Summary of Production, Costs and Income

ອາຍການລຽງ: 1 ປ

ລກໄກ

ຂາຍລກແກໃ (50*24)ຜະລດແດ ໄ 1,200 ຕ

ຽປຽຊນການຕາຍ 5 ຽປຽຊນ 60 ຕ

ຈານວນແກໃ ທໃ ແດ ໄຂາຍຕວຈງ 1,140 ຕ

ນ ໄາຫນກຂາຍ 1.7 ກລ/ຕ

ລາຄາຂາຍ 33,000 ກບ

ລາຍຮບຈາກການຂາຍ 63,954,000 ກບ

ຂາຍຂ ໄແກໃ (3 ງວດ) 900 ກລ

ລາຄາຂາຍ 400 ກບ/ກລ

ລາຍຮບຈາກການຂາຍຂໄກ 360,000 ກບ

ລາຍຮບລວມເບອງຕນ 64,314,000 ກບ

ຄໃ າເຊ ໄຈໃ າຍ ການຜະລດ 27,786,000 ກບ

ການຽຊ ໃ ອມມນຄໃ າຄງທໃ 2,047,440 ກບ

ລາຍຮບສດທ 34,480,560 ກບ

# ລ ໄ ງແກໃ ມໃ ພນ 50 ຕ, ພໃ ພນ 25 ຕ, (ຮກສາພໃ ມໃ ພນແດ ໄ 3 ປ)

Page 131: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 129 of 196 

 

  

 

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

ຊດທໃ 1 ປະສມພນ+ແຂໃ x x x

ແກໃ ຝກແຂໃ x x x

ຖໄາວໃ າແກໃ 400 ຕ ຽກດ-ເຫຍໃ 400 x x x 380 400 x x x 380 400 x x x 380 1.7 1,140 33,000 63,954,000     

ຊດທໃ 2 ປະສມພນ+ແຂໃ x x x

ແກໃ ຝກແຂໃ x x x

ຖໄາວໃ າແກໃ 400 ຕ ຽກດ-ເຫຍໃ 400 x x x 380 400 x x x 380 400 x x x 380 1.7 1,140 33,000 63,954,000     

ຊດທໃ 3 ປະສມພນ+ແຂໃ x x x

ແກໃ ຝກແຂໃ x x x

ຖໄາວໃ າແກໃ 400 ຕ ຽກດ-ເຫຍໃ 400 x x x 380 400 x x x 380 400 x x x 380 1.7 1,140 33,000 63,954,000     

63,954,000     

ລາຍຮບລວມ(ກບ)

ປທ 2 ປທ 1

ຮອບວຽນ ການລຽງໄກ ພາຍໃນ1ປ (3 ຮອບ/ປ)

ລາຍການປທ 3 ນາຫນກ

(ກໂລ/ໂຕ)

ນາຫນກລວມ(k g)

ລາຄາຂາຍ/

ກໂລ

Page 132: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 130 of 196 

 

ອາຊບ 3 ລຽງໄກລາດຂາຍ

Occupation 3

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທTable 2: Fixed Investments/Costs

ລ/ດ ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ ມນຄໃ າຽຫອ ມນຄໃ າຽຊໃ ອມ

1 ສາງຄອກແມພນ (4x5ມ)

1.1 ຽສາສມງ໓ໄາ 15 ຍາວ 3ມ ຽສາສາຽລດຮບ 6 ຽສາ ມດ 18 30,000 540,000 10 54,000

1.2 ສງກາສ ສງກາສລາວ 12 ຟດ ຜໃ ນ 20 38,000 760,000 6 126,667

1.3 ຕະປກບ ຂອງລາວ ກລ 1 25,000 25,000 6 4,167

1.4 ຕະປ 6 ຂອງລາວ ກລ 1 12,000 12,000 7 1,714

1.5 ຕະປ 8 ຂອງລາວ ກລ 2 12,000 24,000 7 3,429

1.6 ຕາ໓ໃ າງອ ໄອມຄອກແກໃ ຂອງຫວດ ຄໄງ 3 175,000 525,000 7 75,000

1.7 ບານພບ ຂອງຫວດ ອນ 3 5,000 15,000 7 2,143

1.8 ແມໄ 5x10= 16ຽສ ໄນຍາວ 6ມ ຕາມທ ໄອງຖໃ ນ ມດ 50 15,000 750,000 7 107,143

1.9 ແມໄ 4x8= 12ຽສ ໄນຍາວ 5ມ ຕາມທ ໄອງຖໃ ນ ມດ 40 10,000 400,000 7 57,143

ຄໃ າສ ໄາງຄອກມໃ ພນແກໃ (4x5ມ) ຫງ 40 600,000 600,000 7 85,714

ລວມຍອຍ 3,651,000 517,119

2 ສາງຄອກໄກ (6x9ມ)

2.1 ຽສາສມງ໓ໄາ 15 ຍາວ 3ມ ຽສາສາຽລດຮບ 8 ຽສາ ມດ 24 30,000 720,000 10 72,000

2.2 ສງກາສ ສງກາສລາວ 12 ຟດ ຜໃ ນ 33 38,000 1,254,000 10 125,400

2.3 ຕະປກບ ຂອງລາວ ກລ 2 25,000 50,000 10 5,000

2.4 ຕະປ 6 ຂອງລາວ ກລ 2 12,000 24,000 7 3,429

2.5 ຕະປ 8 ຂອງລາວ ກລ 2 12,000 24,000 7 3,429

2.6 ຕາ໓ໃ າງອ ໄອມຄອກແກໃ ຂອງຫວດ ຄໄງ 3 175,000 525,000 7 75,000

2.7 ບານພບ ຂອງຫວດ ອນ 6 5,000 30,000 7 4,286

2.8 ແມໄ 5x10= 16ຽສ ໄນຍາວ 6ມ ຕາມທ ໄອງຖໃ ນ ມດ 96 15,000 1,440,000 10 144,000

2.9 ແມໄ 4x8= 12ຽສ ໄນຍາວ 5ມ ຕາມທ ໄອງຖໃ ນ ມດ 60 10,000 600,000 10 60,000

ສໄາງຄອກແກໃ (6x9ມ) ຫງ 40 800,000 800,000 7 114,286

ລວມຍອຍ 5,467,000 606,829

3 ລະບບໄຟຟາ

3.1 ສາຍແຟ ຂອງແທ ຄໄງ 1 270,000 270,000 20 13,500

3.2 ກະດານແຟ ຂອງແທ ປໄນ 2 25,000 50,000 3 16,667

3.3 ປກສບ ຂອງແທ ອນ 2 10,000 20,000 3 6,667

3.4 ສະວກແຟ ຂອງແທ ອນ 2 25,000 50,000 3 16,667

3.5 ດອກແຟ 60 ວດ ຂອງແທ ດອກ 8 10,000 80,000 3 26,667

3.6 ຫວປກສບ ຂອງແທ ອນ 4 3,000 12,000 3 4,000

3.7 ຽທບຄນສາຍແຟ ຂອງແທ ອນ 1 5,000 5,000 3 1,667

ລວມຍອຍ 487,000 85,833

4 ລະບບນາ

4.1 ທໃ pvc 18 mm ແທ ອນ 5 12,000 60,000 5 12,000

4.2 ກາວ ແທ ປໃ ອງ 1 5,000 5,000 5 1,000

4.3 ຂ ໄຕໃ ແທ ອນ 6 3,000 18,000 5 3,600

4.4 ຫວກໃ ອກ ແທ ອນ 1 15,000 15,000 2 7,500

4.5 ແດນ ໄາ ແທ ອນ 1 150,000 150,000 4 37,500

4.6 ກອກນ ໄາ ຂອງແທ ກອກ 2 15,000 30,000 3 10,000

ລວມຍອຍ 278,000 71,600

5 ເຄອງຈກ

5.1 ຕ ໄຝກແຂໃ ຂອງລາວ ຽຄໃ ອງ 1 1,500,000 1,500,000 6 700,000 266,667

5.2 ຈກບດອາຫານ ຂອງລາວ ຽຄໃ ອງ 1 800,000 800,000 6 300,000 166,667

5.3 ຄອກອານບານ ຂອງລາວ ຄອກ 1 200,000 200,000 2 100,000

ລວມຍອຍ 2,500,000 533,333

6 ອປະກອນ

6.1 ຊ ໄວານ ລາວ ດວງ 1 25,000 25,000 5 5,000

6.2 ພໄາ ລາວ ດວງ 1 25,000 25,000 5 5,000

6.3 ຈກ ລາວ ດວງ 1 30,000 30,000 5 6,000

6.4 ຮາງອາຫານ ແທ ອນ 6 25,000 150,000 3 50,000

6.5 ຕກນ ໄາ ແທ ອນ 6 25,000 150,000 3 50,000

6.6 ໓ໃ າງຂວ ແທ ກ ໄ 10 35,000 350,000 3 116,667

ລວມຍອຍ 5,730,000 232,667

7 ແນວພນໄກລາດ

7.1 ຊ ໄແກໃ ພໃ ມໃ ພນ ຕ 75 60,000 4,500,000                         

ລວມຍອຍ 4,500,000                          -

20,113,000 2,047,440

Page 133: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 131 of 196 

  

      

ອາຊບ 3 ລຽງໄກລາດຂາຍ

ຈານວນພແມພນລຽງ: 75ຕ ເຫ ໄລກ 1,200 ຕ/ປ

ອາຍການລຽງ: 1 ປ

ລ/ດ ປດໃຈ ການຜະລດ ປະເພດ ຫ/ນ ຈານວນ ລາຄາ ລວມເປນກບ

1 ອາຫານ1.1 ຽຂໄາຽປອກ ຽກອມໃ ພນ (365*0,12*75) ກລ 3,285 3,000 9,855,000

1.2 ມນຕໄນຫ ໄງ (365*5) ກລ 1,825 1,000 1,825,000

1.3 ຽຂໄາປນ (365*4) ກລ 1,460 2,000 2,920,000

1.4 ອາຫານສາຽລດຮບ(ອາຫານ໔ນ ໄອຍ) (365*6) ກລ 2,190 5,000 10,950,000

ລວມຍອຍ 25,550,000

2 ຢາປອງກນ ແລະປນປວ2.1 ຢາວກຊ ອະຫວາສດປກ ກໃອງ 12 18,000 216,000

2.2 ນວຄາຽຊນອໃ ອນ ຊດ 23 18,000 414,000

2.3 ນວຄາຽຊນກໃ ຊດ 12 18,000 216,000

2.4 ປນຂາວ ຽປາ 4 35,000 140,000

2.5 ວຕາມໃ ນ ຊອງ 20 30,000 600,000

ລວມຍອຍ 1,586,000

3 ການບວລະບດຮກສາ3.1 ອານາແມຄອກ ຮງງານຕນຽອງ 12 70,000 840,000

3.2 ກບຮອງພໄນຄອກ ຽປາ 50 2,000 100,000

ລວມຍອຍ -

4 ຄາໃຊຈາຍອນໆ

4.1 ຄໃ າແຟຟໄາ ຄ ໄງ 12 50,000 600,000

ລວມຍອຍ 600,000

5 ການຕະຫາດ ບດທລະສບ 5 10,000 50,000

ລວມຍອຍ 50,000

ມນຄໃ າປດເຈ ການຜະລດ 27,786,000

ຕາຕະລາງ 4: ຂນຕອນການຜະລດ ແລະມນຄາການຜະລດປະຈາລະດການ

Page 134: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 132 of 196 

16.4.2 Detailed Economic Calculations of Fish 

Fishing in NN1 Reservoir:    

 

ອາຊບ ຫາປາໃນອາງOccupation  Reservoir Fishing

ຄາອະທບາຍພນຖານຂອງການໄລລຽງເສດຖະກດກດຈະກາຫາປາໃນອາງ

# ຊວງເວລາ ຫາປາ ແມນ 8 ເດອນ, ຕ 1 ປ (ເລມຫາປາແຕ ເດອນ 10 ຫາ ເດອນ 5)

# ສວນເດອນ 6 ຫາ ເດອນ 9 ແມນລະດຝນ, ບສາມາດອອກຫາປາໄດ# ໜງເດອນແມນໄປຫາປາໄດ 10 ຄງ ແລະ 8 ເດອນ ເທາກບ 80 ຄງ# ແຕລະຄງຈບປາໄດສະເລຍ 30 ກໂລ# ປະເພດປາໜງ ເຊນ: ປາກດ, ປາຫາດ ແມນຈບໄດ 10 ກລ/ຄງ# ປະເພດປາເກດ ເຊນ: ປາສດ, ປາປາກ, ປາຫງໜາມ.. ແມນຈບໄດ 20 ກລ/ຄງ

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

Table 1 : Summary of Production, Costs and Income

ຄງ/ຖຽວ ໄລຍະເວລາ ຈບ ຫວໜວຍ

1 ຄ ໄງ 2 ມ ໄ 30 ກ ລ

80 ຄ ໄງ 8 ຽດອນ 2,400 ກ ລ

ລ , / /

ຈບ ໄ ດ ໃນ 8 ເດອນ (= 1 ປ)

1 ປາໜງ 800 ກ ລ

ລາຄາ 20,000 ກບ/ກ ລ

2 ປາເກດ 1,600                          ກ ລ

ລາຄາ 9,000 ກບ/ກ ລ

3 ລາຍຮບລວມເບອງຕນ 30,400,000 ກບ

ການ ຄດໄລ ລາຍຮບສດທ

4 ຄໃ າເຊ ໄຈໃ າຍຊ ໄ ໄປດແຈການຜະລດ 17,316,000 ກບ

5 ການຽຊ ໃ ອມຂອງມນຄໃ າວດຖຄງທໃ 1,736,500 ກບ

6 ລາຍຮບສດທ 11,347,500 ກບ

ແຮງງານລວມ 170 ມ ໄ

ຄາແຮງງານຂອງຕນເອງ 66,750            ກບ/ມ ໄ

Page 135: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 133 of 196 

  

 

 

ອາຊບ ຫາປາໃນອາງ

Occupation  Reservoir Fishing

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທTable 2: Fixed Investments/Costs

Annual  depreciation

Fixed Investment Type Unit Qty Price Total cost Usefull years Residual value

ລ/ດ ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ-ປ ມນຄາເຫລອ

1 ເຄອງມຫາປາຄງທ

1.1 ຽຮອ ຽຮອແມໄຄວາມຍາວ 9 ມດ ລາ 1  3,000,000       3,000,000  5 0 600,000                   

1.2 ຈກຽຮອຫາງ ແທ/Honda 9 ຮງ ຽຄໃ ອງ 1  4,400,000       4,400,000  10 0 440,000                   

1.3 ຖງນ ໄາກ ໄອນ ຖງ 200 ລດ ຖງ 1 720,000         720,000  5 0 144,000                   

ລວມຍອຍ 8,120,000    1,184,000               

2 ອປະກອນ,ເຄອງມຕງທພກ ແລະ ອປະກອນອໆ

2.1 ຊ ໄອປະກອນຕ ໄງຄໃ ມຄບຊດ ຊດ 1 500,000 500,000        2 0 250,000                   

2.2 ມດ ດວງ 1 50,000 50,000          2 0 25,000                     

2.3 ມດຕດ ດວງ 1 15,000 15,000          2 0 7,500                        

2.4 ຊງຊງ (ຂະ໓າດ 50 ກລ) ອນ 1 150,000 150,000        2 0 75,000                     

2.5 ຄມຕດຫວ(ບດຽຕລໃ ) ອນ 2 75,000 150,000        2 0 75,000                     

2.6 ກະຕໃ ອງຕກປາ ອນ 2 15,000 30,000          2 0 15,000                     

2.7 ກະຕໃ າເສໃ ປາ ໓ໃ ວຍ 2 30,000       60,000          2 0 30,000                     

2.8 ຽສ ໄອຊຊບ ຜນ 1 150,000 150,000        2 0 75,000                     

ລວມຍອຍ 1,105,000    552,500                   

9,225,000    1,736,500               

fixed investment  depreciated ມນຄໃ າ ຄງທໃ ທໃແດ ໄຄດແລໃ ມນຄໃ າຽສໃ ອມ 9,225,000    ຄດແລໃ ກໃ ານຽສໃ ອມມນຄໃ າ 1 ປ 1,736,500               

depreciation per 1 year

ການຄດໄລເຊອມມນຄາ/ປ

Page 136: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 134 of 196 

  

 

 

 

 

 

ອາຊບ ຫາປາໃນອາງOccupation  Reservoir Fishing

ຕາຕະລາງ 3: ຂນຕອນການຜະລດ ແລະ ມນຄາການລງທນໜນວຽນ

Table 3: Production Steps, Inputs and variable costຫາປາໃນອາງ g igggg

ໄລລຽງເສດຖະກດການຫາປາໃນອາງ ໃນຊວງເວລາ 8 ເດອນ Nr Price Total

ລ/ດ Variable Inputs ປດໃຈ ການຜະລດ ປະເພດ ຫວໜວຍ ຈານວນ ລາຄາ ລວມ

1 ເຄອງມຫາປາ(ປະເພດມອງ)

1.1 ຊ ໄມອງຄບຊດ ຂະ໓າດ 4 ຽຊນ ຍາວ 100 ມດ, ຽລກ 2 ມດ ຕອນ 2 195,000 390,000

1.2 ຊ ໄມອງຄບຊດ ຂະ໓າດ 5 ຽຊນ ຍາວ 100 ມດ, ຽລກ 2.5 ມດ ຕອນ 2 195,000 390,000

1.3 ຊ ໄມອງຄບຊດ ຂະ໓າດ 6 ຽຊນ ຍາວ 100 ມດ, ຽລກ 3 ມດ ຕອນ 2 195,000 390,000

1.4 ຊ ໄມອງຄບຊດ ຂະ໓າດ 7 ຽຊນ ຍາວ 100 ມດ, ຽລກ 3.5 ມດ ຕອນ 2 195,000 390,000

1.5 ຊ ໄມອງຄບຊດ ຂະ໓າດ 8 ຽຊນ ຍາວ 100 ມດ, ຽລກ 4 ມດ ຕອນ 2 195,000 390,000

1.6 ຊ ໄມອງຄບຊດ ຂະ໓າດ 9 ຽຊນຍາວ 100 ມດ, ຽລກ 4.5 ມດ ຕອນ 2 195,000 390,000

1.7 ຊ ໄມອງຄບຊດ ຂະ໓າດ 11 ຽຊນ ຍາວ 100 ມດ, ຽລກ 5.5 ມດ ຕອນ 2 235,000   470,000

1.8 ຊ ໄມອງຄບຊດ ຂະ໓າດ 12 ຽຊນ ຍາວ 100 ມດ, ຽລກ 6 ມດ ຕອນ 2 235,000   470,000

1.9 ຊ ໄມອງຄບຊດ ຂະ໓າດ 14 ຽຊນ ຍາວ 100 ມດ, ຽລກ 7 ມດ ຕອນ 2 235,000   470,000

ລວມຍອຍ 3,750,000

2 ຄາໃຊຈາຍໃນການຫາປາ

2.1 ຊ ໄນ ໄາມນເສໃ ຈກຽຮອ, ສາລບ 80 ຄ ໄງ ເນ 8 ຽດອນ ອດຊງ ລດ 960 10,000 9,600,000

2.2 ຊ ໄນ ໄາກໄອນ ສາລບ 80 ຄ ໄງ ເນ 8 ຽດອນ ນ ໄາກໄອນ ທໃ ງ 400 8,000 3,200,000

2.3 ຮງງານ ຮງງານຽອງ (ຜ ໄດວ) ມ ໄ 160 50,000

2.4 (80 ຄ ໄງ, ຕໃ ລະຄ ໄງ = 2 ມໄ = 160 ມໄ(ຕໃ ບໃ ແດ ໄຄດແລໃ ຽພາະຽປນຮງງານຕຽອງ)

ລວມຍອຍ 12,800,000

3 ການຕະຫລາດຈາຫນາຍ

2.1 ຕດຕໃ ອອກຂາຍ (ຂາຍກບທໃ ) ຮງງານຽອງ(ຜ ໄດວ) ມ ໄ 10 50,000

2.2 ຄໃ າທລະສບ ຽດອນ 8 20,000 160,000

ລວມຍອຍ 160,000

4 ຄາໃຊຈາຍອນໆ

ບາລງຮກສາຊບສນຄງທໃ ປໃ ນນ ໄາມນຽຄ ໃ ອງຈກ ລະ ບາລງຮກສາທໃ ວແປ ຄ ໄງ 8 60,000 480,000

ບນທກຂ ໄມນ ປໄມບນທກ ຫວ 2 8,000 16,000

ຈກຄດແລໃ ຽພ ໃ ອຄານວນ ອນ 1 50,000 50,000

ຄໃ າເບອານຍາດຫາປາ ປ 1 30,000     30,000

ທະບນຽຮອ ປ 1 30,000     30,000

ລວມຍອຍ 606,000

Total Variable costs, 8 months ຄໃ າເຊ ໄຈໃ າຍຊ ໄປດແຈການຜະລດ, 8 ຽດອນ 17,316,000                

ວ ລວ 170 ມ ໄ

Page 137: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 135 of 196 

Raising Fish in Cages:   

 

  

 

 

 

 

ອາຊບ 7

Occupation 7

ຄາອະທບາຍພນຖານຂອງການໄລລຽງເສດຖະກດກດຈະກາປາກະຊງActivity Profile # 1 ກະຊງ ຂະ໓າດ =ກໄວາງ 3 ມດ x ຍາວ 4 x ຽລກ 2

# ຈານວນ 10 ກະຊງ (1 ກະຊງ/ປາ 3,000 ຕ)

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍແລະລາຍໄດTable 1 : Summary of Production, Costs and Income

ການຜະລດ, ຫ/ນ 10 ຊ

ປານນ໔ນ ຕ 30,000

ຽປຽຊ ໃ ນການລອດຕາຍ % 80

ຈານວນປາລອດຕາຍ ຕ 24000

ອາຍການລ ໄ ງ: ຽດອນ 4

ຜນຜະລດ/4 ຽດອນ/1 ຕ ກລ 0.7

ຜນຜະລດ/4 ຽດອນ (2 cycle) ກລ 16,800

ລາຄາ ກບ/ກລ 15,000

ລາຍຮບລວມເບອງຕນ ກບ 252,000,000

.

ຄໃ າເຊ ໄຈໃ າຍຊ ໄປດແຈ ການຜະລດ ກບ 197,630,000

ການຽຊ ໃ ອມຂອງມນຄໃ າວດຖຄງທໃ ກບ 30,782,857

ລາຍຮບສດທ ກບ 54,370,000

2.5 ຊ 135,925,000

ລຽງປາກະຊງ

Gasang  (cage) Fish  farmer

Page 138: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 136 of 196 

  

 

 

 

ອາຊບ

Occupation

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທTable 2: Fixed Investments/Costs

Fixed Investment Type Unit Qty price total cost usefull years residual value annual depreciationລ/ດ ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍການໃຊ-ປ ມນຄາເຫລອ ຄດໄລເຊອມມນຄາ/ປ

1 ກະຕຽມກະຊງປາ

1.1 ກະຊ ໃ ງປາຄບຊດ ຊດ ຊດ 10 5,000,000                     50,000,000                         3  16,666,667                

1.2 ສ ໄາງຽຮອນພກະຊ ໃ ງ ຮບຽ໔າ ຄງ 1 7,500,000                       7,500,000                         3  2,500,000                  

1.3 ສ ໄອມປງທາງລງທໃ າ ຮບຽ໔າ ຄ ໄງ 1 300,000                             300,000 

ລວມຍອຍ 57,800,000            3                       ລວມຍອຍ 19,266,667                

2 ລະບບໄຟຟາ

2.1 ສາຍແຟ ຄ ໄງ 1 100,000 100,000                 3                       33,333                       

2.1 ສະວກແຟ ອນ 2 50,000 100,000                 3                       33,333                       

2.1 ກະດານແຟ ປໄນ 2 25,000 50,000                   1                       50,000                       

2.1 ດອກແຟ ດອກ 10 20,000              200,000                 1 200,000                     

2.1 ຄໃ າຮງງານຮບຽຫມາ) ຮງງານ 4 80,000              320,000                

ລວມຍອຍ 770,000                 5                       ລວມຍອຍ 316,667                     

3 F ish La nd ing

3.1 ຄ ຊ ລ ຊ 5 1,000,000 5,000,000 5 1,000,000

ລວມຍອຍ 5,000,000              5                       ລວມຍອຍ 1,000,000                  

4 ສງທກສາງ

4.1 ສ ໄາງຽຮອນພກ ງ 1 30.000.000 30.000.0000 15                    

4.2 ສາງອາຫານ ງ 1 10.000.000 10.000.000 15                    

ລວມຍອຍ 40,000,000            15                     ລວມຍອຍ 2,666,667                  

5 ການຂນສງ

5.1 ລດຂນສ ໃ ງ HYUNDAI ຄ 1 50,000,000 50,000,000            7                      

ລວມຍອຍ 50,000,000            7                       ລວມຍອຍ 7,142,857                  

6 ເກບກ ແລະ ການຕະລາດ

6.1

1,000 ລ 1 1,200,000 1,200,000 5

6.2 ຊ ຊ 1 750,000 750,000 5

ລວມຍອຍ 1,950,000              5                       ລວມຍອຍ 390,000                     

ລວມ 154,750,000          ລວມ 30,782,857                

fixed investment  depreciated ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 154,750,000          ຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 1 ປ 30,782,857                

ລຽງປາກະຊງ (4ເດອນຂາຍ)

Gasang Fish  farmer

Page 139: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 137 of 196 

 

ອາຊບ

Occupation

 

ຕ 4 ເດອນ/ຊດ

Nr price total

ລ/ ລ ປະເພດ ຫ/ນ ຈານວນ ລາຄາ ລວມ

1 ແນວພນສດ

1.1 ຊ ໄລກປານນ 30,000 900 27,000,000       

ລວມຍອຍ ລວມຍອຍ 27,000,000       

2 ອາຫານ

2.1 ຫວອາຫານ (ຽບ 441) 20  ລ 200 150,000 30,000,000       

2.2 ຫວອາຫານ (ຽບ 442) 400 135,000 54,000,000       

2.3 ຫວອາຫານ (ຽບ 443) 600 130,000 78,000,000       

ລວມຍອຍ ລວມຍອຍ 162,000,000     

3 ອປະກອນ ເຄອງມ

3.1 ຽຄ ໃ ອງຕກປາ ອນ 4 5,000 20,000

3.2 ກະຕໃ າບນຈປາ ຫນໃວຍ 4 25,000 100,000

3.3 ຖງສ ໄປາຂາຍ(50ລດ) ຖງ 4 100,000 400,000

3.4 ຄ ຫນໃວຍ 4 15,000 60,000

3.5 ຊງ ອນ 1 300,000 300,000

3.6 ຄໃ າປໃ ນອກຊໃ ຄ ໄງ 20 50,000 1,000,000

ລວມຍອຍ ລວມຍອຍ 1,880,000         

6 ການບວລະບດຮກສາ າ ລຽງ ລ າ

6.1 ຮງງານຽກອປາ ຮງງານຽອງ ວນງານ 30 70,000

ລວມຍອຍ ລວມຍອຍ ‐                   

7 ການຕະຫລາດຈາຫນາຍ

7.1 ຕດຕໃ ມໃ ຄ ໄາຂາຍອອກ (ຂາຍກບທໃ ) ຮງງານ 4 50,000 200,000

7.2 ຄໃ າທລະຊບ ບດທລະສບ ບດ 20 10,000 200,000

7.3 ຄໃ ານ ໄາມນລດ ກາຊວນ ລດ 1000 8,000 8,000,000

ລວມຍອຍ ລວມຍອຍ 400,000

8 ຄາໃຊຈາຍອນໆ

8.1 ພາສທໃ ດນ

8.2 ຊໃອມລະຮກສາ ຊບສນຄງທໃ ຄ ໄງ ກບ 2 500,000 1,000,000

8.3 ຮງງານຈ ໄາງ ປະຈາ ຄນ 1 4 1,200,000 4,800,000

8.4 ຄໃ າທານມພນທະຕໃ າງໆ ປ 1 100,000 100,000

8.5 ຄໃ າທາງ,ກວດກາຽຕກນກ ປ 1 250,000 250,000

8.6 ແຟຟໄາ ຽດອນ 4 50,000 200,000

8.7 ຄໃ ານ ໄາ ຽດອນ 4 20,000 80,000

ລວມຍອຍ 6,350,000         

Total Variable costs ຄໃ າເຊ ໄຈໃ າຍປດແຈການຜະລດຊດນງ 197,630,000     

ລ 3: ລ ລ ຄ ລ ລ

ລຽງປາກະຊງ (3ເດອນຂາຍ)

Fish Gasang  farmer

Table 3: Production Steps, Inputs and variable cost

Page 140: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 138 of 196 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ຕາຕະລາງ 2: ຮອບວຽນ ການລຽງປາກະຊງ ພາຍໃນ1ປ (2 ຮອບ/ປ)

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

ຊດທ 1 ຊ ໄປານ ໄອຍຽຂ ໄາມາ x

30,000 ຕ ລໄ ງ ນໄອຍ -ເຫຍໃ x x x x x x

ຂາຍອອກ x x x 1 50,400        15,000 756,000,000             

ຊດທ 2 ຊ ໄປານ ໄອຍຽຂ ໄາມາ x x x

30,000 ຕ ລໄ ງ ນໄອຍ -ເຫຍໃ x x x x x x x x x x x x

ຂາຍອອກ x x x 1 50,400        15,000 756,000,000             

ຊດທ 3 ຊ ໄປານ ໄອຍຽຂ ໄາມາ x x x

30,000 ຕ ລໄ ງ ນໄອຍ -ເຫຍໃ x x x x x x x x x x

ຂາຍອອກ x 24000 1 50,400        15,000 756,000,000             

24000 24,000

24,000

24,000

ປທ 1 ປທ 2 ປທ 3 ນາຫນກ(ກໂລ/ໂຕ)

ລາຄາຂາຍ/ກໂລ

ລາຍຮບ ລວມ(ກບ)ລາຍການ

24,000 24,000

ນາຫນກ

ລວມ(k g)

Page 141: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 139 of 196 

Raising Fish in Ponds  

  

ອາຊບ 8

Occupation 8

ຄາອະທບາຍພນຖານຂອງການໄລລຽງເສດຖະກດກດຈະກາລຽງປາ

1 ເນປ໓ໃ ງຈະລ ໄ ງແດ ໄ 2 ຮອບວນ ເນ 1 ປ

2 ກະກມ໓ອງກໃ ອນປໃ ອຍປາເຊ ໄຽວລາ 1 ຽດອນ

3 ແລຍະການຂາຍປາເນ໓ອງ 1 ຽດອນເຫໄ໔ດ

4 ແລຍະການລ ໄ ງມໃ ນ 4-5 ຽດອນ ຂາຍ

5 ກະກມ໓ອງກໃ ອນປໃ ອຍຮອບ 2 ອກ 1 ຽດອນ

6 ແລຍະການຂາຍປາເນ໓ອງ 1 ຽດອນເຫໄ໔ດ

7 ແລຍະການລ ໄ ງມໃ ນ 4-5 ຽດອນ ຂາຍ

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

ລ , ວ ວຍ / ຍ4,000

1,000

ລ 1,000

ອດຕາການລອດຕາຍ ຽປຽຊນ 80

ປາຍງຽຫອ ຕ 4,800

ອາຍການລໄ ງ: ຽດອນ/ຊດ 4

ນ ໄາ໓ກປາສະຽລໃ ຍ 4 ຽດອນ/ຕ ກລ 1

ຜນnຜະລດ/4ຽດອນ ກລ 2,400

ລາຄາ ກບ/ກລ 15,000

ລາຍຮບລວມເບອງຕນ/ຮອບ ກບ 36,000,000 ຕໃ 1 ຮອບ/4ຽດອນ

ລາຍຮບລວມເບອງຕນ/ປ ກບ 72,000,000 ຕໃ 2 ຮອບ/ 1 ປ

ຄໃ າເຊ ໄຈໃ າຍຊ ໄ ໄປດແຈການຜະລດ ກບ 21,805,000 ຕໃ 1 ປ

ການຽຊ ໃ ອມຂອງມນຄໃ າວດຖຄງທໃ ກບ 8,820,000 ຕໃ 1 ປ

ລາຍຮບສດທ ກບ 20,687,500 ຕໃ 2 ຮອບ/ 1 ປ

ແຮງງານລວມ 100 ວນງານ ຕໃ 2 ຮອບ/ 1 ປ

ຜນຕອບແທນຕມຕກບແຮງງານຂອງຕນເອງ ກບ/ວນ ຕໃ 2 ຮອບ/ 1 ປ

ລຽງປາຫນອງ

Fish Pond Raising  farmer

Page 142: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 140 of 196 

 

  

 

 

 

 

ອາຊບ 8

Occupation 8

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທ

Table 2: Fixed Investments/Costs

annual depreciation

ລ/ດ ການລງທນຄງທ ປະເພດ ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ-ປ ມນຄາເຫລອການຄດໄລເຊອມມນຄາ/ປ

1 ຂດຫນອງປາ

1.1 ຊ ໄດນຂດ໓ອງ (2 ແລໃ ) ແລໃ 2 30,000,000 60,000,000 30 60000000

1.2 ຄໃ າລດຈກຂດຫນອງປາ ມດກ ໄອນ 4,500 5,000              22,500,000  10 2,250,000                 

82,500,000             ລວມຍອຍ 2,250,000

2 ລະບບໄຟຟາ

2.1 ສາຍແຟ (2*4) ຄ ໄງ 2 100,000 200,000                   3 66,666.67                 

2.2 ສະວດແຟ ອນ 2 50,000 100,000                   3 33,333.33                 

2.3 ກະດານແຟ ປໄນ 2 25,000 50,000                     1 50,000.00                 

2.4 ດອກແຟ (20 ວດ) ດອກ 10 20,000            200,000                   1 200,000.00              

2.5 ຄໃ າຮງງານຮບຽຫມາຕດຕ ໄງແຟຟໄາ) ຄ ໄງ 1 500,000          500,000                  

1,050,000               1 ລວມຍອຍ 350,000                    

3 ລະບບນາ

3.1 ຂດຄອງນ ໄາຈາກຊນລະປະທານມາຫາຫນອງ ຄ ໄງ 1 2,000,000 2,000,000               10 200,000                    

3.2 ວາວປດຽປດນ ໄາ ກອກ 2 100,000 200,000                   5 40,000                       

3.3 ທໃ pvc (100ມມ) ທໃ 10 100,000          1,000,000               5 200,000                    

3.4 ກາວຕດ ປໃ ອງ 10 10,000 100,000                   5 20,000                       

3.5 ຊ ຕໃ ນ 1 700,000                    700,000  10 70,000                       

3.6 +ຊ ຍ (ລ ຍ) 6 ລ ຍ ລດ 1 600000                    600,000  10 60,000                       

3.7 ຊ ລ ກລ 5 10,000                       50,000  5 10,000                       

3.8 ຄ ຄ ໄງ 1 1,600,000                      1,600,000  5 320000

4,250,000               ລວມຍອຍ 920,000                    

4 ເຄອງຈກ

4.1 ຽຄອງບດອາຫານປາ ຽຄໃ ອງ 1 2,500,000      2,500,000               5 500,000 400,000                    

2,500,000                 ລວມຍອຍ 400,000                    

5 ລດຂນສງປາ

5.1 ລດຫໃ ນເດຂນສ ໃ ງປາ HYUNDAI ຄ 1 50,000,000 50,000,000             10 5,000,000       4,500,000                 

5.2 ບ ໄງອກຊ ຽຄໃ ອງ 1 1,500,000      1,500,000               5 500,000 200,000                    

5.3 ຖງຂນສ ໃ ງລກປາ, ສ ໃ ງປາຂາຍ 1000 ລດ ຖງ 1 1,200,000      1,200,000               5 200,000 200,000                    

50,000,000             ລວມຍອຍ 4,900,000                 

ລວມ 140,300,000           ລວມ 8,820,000                 

ລຽງປາຫນອງ(4ເດອນຂາຍ)

Fish Pond Raising  farmer

Page 143: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 141 of 196   

ອາຊບ

Occupation

ຕ 4 ເດອນ/ 1 ຊດ

Nr price total

ລ/ ປດໃຈ ການຜະລດ ປະເພດ ຫ/ນ ຈານວນ ລາຄາ ລວມ

1 ແນວພນສດ

1.1 ຊ ໄລກປາ ປານນຫມນ ຕ 4000 900 3,600,000            

ປາປາກ ຕ 1000 300 300,000                

ປາມະລການ ຕ 1000 300 300,000                

ຮງງານຽອງ ວນງານ ????

ລວມຍອຍ 4,200,000            

2 ລະບບນາ

2.1 ຄໃ າເຊ ໄນ ໄາຊນລະປະທານ ປ 1 100,000 100,000                

ຮງງານຽອງ ວນງານ ????

ລວມຍອຍ 100,000                

3 ປບປງນາໃນ ຫນອງປາ

3.1 ຝນຍຽລຍ(46.00.00) ກລ 100           6,000 600,000                

3.2 ປນຂາວ ກລ 600           2,000 1,200,000            

3.4 ຝໃ ນຄອກ ກລ 3,000        500 1,500,000            

ຮງງານ ຮງງານຽອງ ວນງານ 10

ລວມຍອຍ 3,300,000            

4 ອາຫານ

4.1 ຫວອາຫານປານ ໄອຍ (ຽບ 441) 20 ກລ/ຽປາ ຽປາ 10 150,000         1,500,000            

4.2 ຫວອາຫານ ປາລ ໄນ (ຽບ 442) ຽປາ 25 140,000         3,500,000            

4.3 ຫວອາຫານປາເຫໃ ຍ (ຽບ 443) ຽປາ 30 135,000         4,050,000            

ຢາຕ ໄານຽຊ ໄອ ຄ ໄງ 4 100,000         400,000                

ລວມຍອຍ 9,450,000            

5 ອປະກອນ ເຄອງມ

5.1 ຽຄ ໃ ອງຈບປາ(ດາງກວດ) ດາງກວດ ດາງ 1 1,000,000      1,000,000            

5.2 ຽຄ ໃ ອງຕກປາ ກະຕໆອງ ອນ 2 5,000 10,000                  

5.3 ກະຕໃ າບນຈປາ ຫນໃ ວຍ 2 25,000 50,000                  

5.4 ຖງສ ໄປາຂາຍ(50ລດ) ຖງ 2 100,000 200,000                

5.5 ຄ ຫນໃ ວຍ 2 15,000 30,000                  

5.6 ຊງ ອນ 1 300,000 300,000                

ລວມຍອຍ 1,590,000            

6 ການບວລະບດຮກສາ

6.1 ລ ໄ ງປາ(120*2/8) 4ຽດອນ ຮງງານຽອງ ວນງານ 45 50,000            2,250,000            

ລວມຍອຍ 2,250,000            

7 ການຈບປາ ແລະ ການຕະຫາດ

ຮງງານຊໃວຍຈບປາ(ຈ ໄາງ) ມ ໄ ຮງງານຈ ໄາງ 10 50,000            500,000                

ຮງງານຽອງ ວນງານ

ຍານພາຫະນະຽພ ໃ ອສ ໃ ງປາ ຄໃ ານ ໄາມນ ກາຊວນ 4 ທໃ ວ ລດ 200 8,000              1,600,000            

ຮງງານຽອງ ວນງານ

7.1 ຕດຕໃ ອອກຂາຍ (ຂາຍກບທໃ ) ຮງງານ 4 50,000            200,000                

7.2 ຄໃ າແທລະສບ 5 20,000            100,000                

ລວມຍອຍ 2,400,000            

8 ຄາໃຊຈາຍອນໆ

8.1 ພາສທໃ ດນ1 ປ/ຮຕ ພາສ 1 40000 40,000                  

8.2 ຊໃອມລະຮກສາ ຊບສນຄງທໃ 1,000,000            

8.3 ຄໃ າທານມພນທະຕໃ າງໆ

8.4 ຄໃ າທາງ,ກວດກາຽຕກນກ 2 250,000 125,000                

8.5 ປະກນແພລດ/3ຽດອນ ປະກນແພ ປ 1 400,000 100,000                

8.6 ແຟຟໄາ 4 ຽດອນ 4 25000 100,000                

8.7 ຄໃ ານ ໄາ ປ 1 150000 150,000                

8.8 ຄໃ າສ ໄອມປງ/ 3 ຽດອນ ຽທໃ ອ 1 300,000 300,000                

ລວມຍອຍ 1,815,000            

Total Variable costs, 1 round ຄໃ າເຊ ໄຈໃ າຍຊ ໄປດແຈການຜະລດຊດນ ໃ ງ 21,805,000          

55 ວນງານ

ລ 3: ລ ລ ຄ ລ ລ

Table 3:  Production Steps, Inputs and variable cost

ລຽງປາຫນອງ(4ເດອນຂາຍ)

Fish Pond Raising  farmer

ວ ລວ

Page 144: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 142 of 196 

16.4.3 Detailed Economic Calculations of Crop farming 

Wet Season rice, Dry season options: Rice, watermelon, sweet corn  

  

Occupation 10.1Detail Wet season paddy rice Dry season  paddy rice Total

Area (Ha) 2 2 2

Yield (Kg/Ha) 4,000                                         4,000                                          4,000                                            Production (Kg) 8,000                                         8,000                                          16,000                                          Price (Kip) 3,000                                         3,000                                          6,000                                            Gross income (Kip) 24,000,000                              24,000,000                               48,000,000                                 Total variable cost (Kip) 15,221,000                              15,221,000                               30,442,000                                 Total depreciation (Kip) 449,167                                    ‐                                              449,167                                       Net annual income 8,329,833                                8,779,000                                  17,108,833                                 

Occupation 10.2Detail Wet season rice Dry season  water melon Total

Area (Ha) 2 1

Yield (Kg/Ha) 4,000                                         9,424                                         Production (Kg) 8,000                                         9,424                                          17,424                                          Price (Kip) 3,000                                         3,000                                          3,000                                            Gross income (Kip) 24,000,000                              28,272,000                               52,272,000                                 Total variable cost (Kip) 15,031,000                              9,335,000                                  24,366,000                                 Total depreciation (Kip) 898,333                                    338,500                                     1,236,833                                    Net annual income 8,070,667                                18,598,500                               26,669,167                                 

Occupation 10.3Detail Wet season rice Dry season  sweet corn Total

Area (Ha) 2 1

Yield (Kg/Ha) 4,000                                         4,960                                         Production (Kg) 8,000                                         9,920                                          17,920                                          Price (Kip) 3,000                                         4,000                                          7,000                                            Gross income (Kip) 24,000,000                              39,680,000                               63,680,000                                 Total variable cost (Kip) 15,221,000                              10,930,000                               26,151,000                                 Total depreciation (Kip) 898,333                                    709,833                                     1,608,167                                    Net annual income 7,880,667                                28,040,167                               35,920,833                                 

Cash crop farmer (Wet season rice and dry season water melon)

Cash crop farmer (Wet season rice and dry season water melon)

Cash crop farmer (Wet season rice and dry season water melon)

Page 145: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 143 of 196 

  

  Occupation 10.1 2 hectare

No. Inv e s tment in the fix a s s T y p e Unit Amount P ric e (K ip) T o ta l Life s pa n/y ea r R e s idua l v a lue Annua l de pre c ia tion

1 Fencing 560*1=560 m

1.1 F enc ed pole

1.2 Cutting pole Hard wood pole psc 300 10,000                             3,000,000                 

1.3 Cutting pole By own day 500 ‐                            

1.4 Concrete pole 1 .5m*1 5*1 5cm pole 56 ‐                             

1.5 Barb wire 80 m roll 30 85,000 2,550,000                 

1.6 Hole digging By own day 10 ‐                            

1.7 Set up the fence By own day 10

Sub-total 5,550,000                10 none 555,000

2 Build ing cons truc tion

2.1 Rice store construction Iron sheet 1 2,000,000                      2,000,000               

Sub‐total 2,000,000                10 200,000.00

3 E quipment

3.1 hoe Thai made pcs 2 40,000                            80,000                      3 26,666.67

3.2 fork Thai made pcs 2 20,000                            40,000                      3 13,333.33

3.3 Knife Thai made pcs 2 25,000                            50,000                      3 16,666.67

3.4 Plad Thai made pcs 2 40,000                            80,000                      3 26,666.67

3.5 Spraying tank Thai made pcs 1 180,000                          180,000                    3 60,000.00

Sub‐total 430,000                    143,333

898,333

7,980,000                Annual depreciation 898,333                                  

Table 3: Fix cost

 Rice farmer 

Page 146: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 144 of 196 

 

Occupation 11 2 hectares Occupation 11 2 hectares

Wetseason rice cultivation Dry season rice cultivationNo. Production steps/Inputs types unit Nr price total No. Production steps/Inputs types unit Nr price total

1 rice seedling nursery (20ມX 40ມ) 1 rice seedling nursery (20ມX 40ມ)

purchase seeds Kg 120 7,000 840,000                    purchase seeds ຊ ວ Kg 120 7,000 840,000          

nusery land prep nusery land prep

Ploughing cost by hand tractor  time 1             100,000 100,000                    Ploughing cost by hand tractor  ລ time 1                100,000 100,000          

> labour by own day > labour by own day

1.3 water 1.3 water ເອານາເຂາຕາກາby own day by own day

1.4 fertilizer and fertilization 1.4 fertilizer and fertilization ຊ ລ

Animal manure buying Kg 200 500              100,000                    Animal manure buying Kg 200 500                 100,000          

by own day ‐                             by own day ‐                   

1.5 sowing by own day 1.5 sowing by own day

1.6 Care by own day 1.6 Care by own day

1.7 uproot and bundlingseedling Paid day ‐                             1.7 uproot and bundlingseedling Paid day ‐                   

1,040,000                  ລວ ຍ 1,040,000        

2 Paddy  Land prep 2 Paddy  Land prep ການຕຽມດນນາ2.1 repair irrigation weir/canals Community 2.1 repair irrigation weir/canals Community

by own day by own day

2.2 repairs  paddy bunds 2.2 repairs  paddy bunds ປານປາຄນນາ

by own day by own day

2.3 plough the land 2.3 plough the land ໄຖ

Option 1: own tractor, khwai lek Paid time 2             1,250,000 2,500,000                Option 1: own tractor, khwai lek Paid time 2                1,250,000 2,500,000      

2.4 apply basal fertilizer 2.4 apply basal fertilizer ຄbasal manure Animal manure ton 4 1,000,000 4,000,000                  basal manure Animal manuton 4 1,000,000 4,000,000        

basal manure application Paid day 3             50,000 150,000                     basal manure application Paid day 3                50,000 150,000           

chemical fetiliser  by own day ‐                              chemical fetiliser  by own day ‐                    

Sub‐total 6,650,000                  Sub‐total 6,650,000        

3 Planting 3 Planting

3.1 transplant seedlings Paid day 25 50,000 1,250,000                  3.1 transplant seedlings Paid day 25 50,000 1,250,000      

Sub‐total 1,250,000                  Sub‐total 1,250,000        

4 fertlizer and insect control  4 fertlizer and insect control  ຊ ລ ຄ4.1 chemical fetiliser  46:00:00 bag 4 185,000 740,000                     4.1 chemical fetiliser  46:00:00 bag 4 185,000 740,000           

4.2 chemical fetiliser  15:15:15 bag 4 300,000 1,200,000                  4.2 chemical fetiliser  15:15:15 bag 4 300,000 1,200,000        

4.3 Fertilizer spraying by own day ‐                              4.3 Fertilizer spraying by own day ‐                    

insecticide Chemical box 2 30,000 60,000                       insecticide Chemical box 2 30,000 60,000             

4.4 insecticide Bio litre 3 20,000 60,000                       4.4 insecticide Bio litre 3 20,000 60,000             

4.5 Insecticide spraying by own day 4.5 Insecticide spraying by own day

Sub‐total 2,060,000                Sub‐total 2,060,000      

5 Crop care 5 Crop care ວລ5.1 1st weeding by own day 5.1 1st weeding by own day

5.2 2nd weednng by own day ‐                             5.2 2nd weednng by own day ‐                   

5.3 water by own day 5.3 water by own day

6 harvesting 6 harvesting ວ6.1 cutting Paid day 25 50,000        1,250,000                6.1 cutting Paid day 25 50,000           1,250,000      

6.2 gathering and field hangng  Paid day 10 50,000        500,000                    6.2 gathering and field hangng  Paid day 10 50,000           500,000          

6.3 threshing, winnowing, bagging Paid 2 850,000     1,700,000                6.3 threshing, winnowing, bagging Paid 2 850,000         1,700,000      

6.4 purchase bags bag 170 1,000          170,000                    6.4 purchase bags ຊ ໄຽປໆາພລາດສຕ bag 170 1,000              170,000          

6.5 transport to storage Paid round 2 100,000     200,000                    6.5 transport to storage Paid round 2 100,000         200,000          

Sub‐total 3,820,000                Sub‐total 3,820,000      

7 other  costs 7 other  costs ຍ ໆ7.1 land tax Annual ha 2             40,000        80,000                      7.1 land tax Annual ha 2                40,000           80,000            

7.2 water fee Season time 1             300,000     300,000                    7.2 water fee Season time 1                300,000         300,000          

7.3 telephone  Mobile phone card 2             10,000        20,000                      7.3 telephone  Mobile phon card 2                10,000           20,000            

7.4 notebook 100 page book 1             1,000          1,000                         7.4 notebook 100 page book 1                1,000              1,000               

Sub‐total 401,000                    Sub‐total 401,000          

 Cost of Production Inputs 15,221,000               Cost of Production Inputs 15,221,000    

Wet Season Rice farmer

Table 4.1: Production Steps, Inputs and variable cost

Dry season Rice farmer

Table 4.1: Production Steps, Inputs and variable cost

Page 147: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 145 of 196 

 

Occupation 10.2

ຕາຕະລາງ 3: ຂນຕອນການຜະລດ ແລະ ມນຄາການຜະລດປະຈາລະດການ

types unit Nr price total

ລ/ດ Production Inputs ປດໃຈ ການຜະລດ ປະເພດ ຫວຫນວຍ ຈານວນ ລາຄາ ລວມ

1 Repair irrigation caປານຄອງເຫມອງ1.1 ຮງງານສໄອມປງຄອງຽ໔ອງ ວ 3

‐                     2

2.1 Applying manure ຮງງານເ ສໃ ຝໃ ນຄອກ ວ 4 50,000 200,000                   200,000             

3 ການຕຽມພນທ3.1 ຈ ໄາງລດແຖນາ ຽພ ໃ ອປງຮໃອງຄ ລະ ຄອງນ ໄາ ລດແຖນາຽດນຕາມ ຄ ໄງ 1            1,000,000     1,000,000          3.2 ຈ ໄາງຄນປງຄອງ ລະ ຽຮດ໓ານ ຈ ໄາງ ຮງງານ 20          50,000 1,000,000          

ລວມຍອຍ 2,000,000          4 ອປະກອນໝນວຽນ4.1 ນວພນ໔າກມ ກາດາວທອງ ປໆອງ 2            250,000 500,000             4.2 ຖງຢາງກໄາຽບ ໄຍ ການາງຟໄາ ກລ 15          25,000 375,000             4.3 ຝໃ ນ 15:15:15 ຽປາ 3            300,000 900,000             4.4 ຝໃ ນ ຽລ ໃ ງ 46:00:00 ຽປາ 3            180,000 540,000             4.5 ຝໃ ນ ຄອກ ມນສດ ກລ 3,500     500 1,750,000          4.6 ປນຂາວ ຝໃ ນຜງ ຖງ 60          10,000 600,000             4.7 ຽຟອງ ຽຟອງຽຂ ໄາ ລດແຖ 10          50,000 500,000             4.8 ຽປາເສໃ ໔າກມ ຜໄາຢາງ ໓ໃ ວຍ 900        1,000 900,000             4.9 ຢາປໄອງກນບ ໄງ ກາຈດ ຊອງ 10          30,000 300,000             5 ຖງຢາງເສໃ ໔າກມ ຖງຢາງ ຕບ 10          13,000 130,000             

ລວມຍອຍ 6,495,000          5 ການກາເບຍ ແລະ ການປກ5.1 ກໄາຽບ ໄຍ໔າກມ ຮງງານຽອງ ວນງານ 5           5.2 ປກ ຮງງານຽອງ ວນງານ 5           5.3 ເສໃ ຝໃ ນ 1 5:1 5:1 5/ຝໃ ນຄອກ/ຫວໃ ານປນຂາວ ຮງງານຽອງ ວນງານ 4           5.4 ຮງງານຄມຽຟອງ ຮງງານຽອງ ວນງານ 5           

ລວມຍອຍ ລວມຍອຍ ‐                     6 ການບວລະບກຮກສາ6.1 ການຽອານ ໄາຽຂ ໄາ ຮງງານຽອງ ວນງານ 10          ‐                     6.2 ການຽສຍຫໄຍາ 2 ຄ ໄງ… ຮງງານຽອງ ວນງານ 10          ‐                     6.3 ຊດຢາຈາກດບ ໄງ ຮງງານຈ ໄາງ ວນງານ 2            50,000 100,000             

ລວມຍອຍ 100,000             7 ເກບກຽວ

7.1 ຽກບກໃ ວ ຮງງານຽອງ ວນງານ 5 ‐                     7.2 ຈ ໄາງລດແຖຽດນຕາມຂນຍ ໄາຍຜນຜະລດ ຈ ໄາງ ວນງານ 4 100,000 400,000             

ລວມຍອຍ ລວມຍອຍ 400,000             8 ຄາໃຊຈາຍອນໆ 2

8.1 ປໄມບນທກ 1 10,000          10,000               8.2 ທໃ ດນ ພາສທໃ ດນ ຄ ໄງ 1 20,000          20,000               8.3 ຄໃ ານ ໄາ ນ ໄາ ຊປທ ຄ ໄງ 1 60,000          60,000               

ລວມຍອຍ 90,000               9 Marketing ການຕະຫລາດ9.1 ການຕດຕໃ ຫາພໃ ຄ ໄາ ຽພ ໃ ອຂາຍຜນຜະລດ ບດທລະສບ ບດ 5            10,000          50,000               

9.2 ການຂາຍຜນຜະລດ ຮງງານຽອງ ວນງານ 5           

ລວມຍອຍ ລວມຍອຍ 50,000               

 Cost of Production Inputs ຄາໃຊຈາຍໃນການຜະລດ 9,335,000               

Table 3: Production Steps, Inputs and variable co

Cash crop farmer( wet season rice and dry Season Water Melon)

Page 148: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 146 of 196 

ອາຊບ 10.3 2-1 ເຮກຕາ

Occupation 10.3 2-1 ha

ຕາຕະລາງ 3: ຂນຕອນການຜະລດ ແລະ ມນຄາການຜະລດປະຈາລະດການ DS Sweet Corn

ອາຍ 70 ມ ໄ

ໄລຍະຫາງ 0.4 ມ x .75 ມ = 33,000 ຕນຕເຮກຕາ

types unit Nr price total

ລ/ດ Production steps/Inputs ປດໃຈ ການຜະລດ ປະເພດ ຫວຫນວຍ ຈານວນ ລາຄາ ລວມ

1 repair irrigation canals ປານຄອງເຫມອງ

ຮງງານຽອງ ວນງານ 5 70,000

ລວມຍອຍ ‐                     

2  basal fertilizer ຝນຄອກຮອງພນ

buy manure ຊ ໄ ຝໃ ນຄອກ ຝໃ ນຄອກ ຕໃນ 4 500,000 2,000,000          

spread manure ການເສໃ (ລາດ)ຝໃ ນຄອກ ຮງງານຽອງ ວນງານ 4 70,000

ລວມຍອຍ 2,000,000          

3 plough the land ໄຖ

Option 1: own tractor, khwai l ທາງເລອກ 1: ລດໄຖເດນຕາມຂອງຕນເອງ

> fuel ນ ໄາມນຽຊ ໄອແຟ 40 8,000 320,000             

> labour ຮງ ງານ ຮງງານຽອງ ວນງານ 4 70,000

Option 1: hire tractor ທາງເລອກ 2: ຈາງລດໄຖນາ

ລວມຍອຍ 320,000             

4 harrow  ຄາດ,

Hand tractor  ລດແຖຽດນຕາມຂອງຕນຽອງ

> fuel ນ ໄາມນຽຊ ໄອແຟ 40 8,000 320,000             

> labour ຮງ ງານ ຮງງານຽອງ ວນງານ 4 70,000

Option 1: hire tractor ທາງເລອກ 2: ຈາງລດໄຖນາ

ລວມຍອຍ 320,000             

5 make planting row/water furr ເຮດຫນານ/ຮອງລະບາຍ

Hand tractor  ລດແຖຽດນຕາມຂອງຕນຽອງ

> fuel ນ ໄາມນຽຊ ໄອແຟ 40 8,000 320,000             

> labour ຮງ ງານ ຮງງານຽອງ ວນງານ 4 70,000

ລວມຍອຍ 320,000             

6 Planting ການປກ

purchase sweet corn seed  ຊ ແນວພນ ສາ ລ ຫວານ ?? ກລ/ຽຮກຕາ 20 175,000        3,500,000          

purchase hoes  to dig holes ຊ ໄ ຈກ 3 x 60 ອນ 2 40,000          80,000               

purchase fertl izer for holes ຊ ໄ ປໆຍ 3 x 60 ກລ/ຽຮກຕາ 6 250,000        1,500,000          

dig holes,  ຂດຂມ ຮງງານຈ ໄາງ ວນງານ 3 70,000          210,000             

apply ferti l izer in hole ເຊ ໄ ປໆຍ ຮງງານຈ ໄາງ ວນງານ 3 70,000          210,000             

plant and cover seeds ປກ ລະ ກວມຽອາ ນວພນ ຮງງານຈ ໄາງ ວນງານ 3 70,000          210,000             

or "ຊກ ນວພນ "

ລວມຍອຍ 5,710,000          

7 fertlizer and insect control  ການໃຊຝນແລະຢາເຄມ

ຝໃ ນຽລໃ ງການຈະຽລນຽຕບຕ ຮງງານຈ ໄາງ ວນງານ 6 70,000          420,000             00‐00‐60 3 180,000 540,000

15‐15‐15 3 250,000 750,000

ລວມຍອຍ 1,710,000          

8 Crop care ການບວລະບດຮກສາ

Weeding, 1st time ຽສຍຫຍ ໄາຄ ໄງທໃ 1 ຮງງານຈ ໄາງ ວນງານ 10 70,000          700,000             

Weeding, 2nd  time ຽສຍຫຍ ໄາຄ ໄງທໃ 2 ຮງງານຈ ໄາງ ວນງານ 10 70,000          700,000             

watering, once per week ຽອານ ໄາຽຂ ໄາ (ຫດນ ໄາ), ຫນໃ ງຕໃ ອາທດ ຮງງານຽອງ ວນງານ 10 70,000         ລວມຍອຍ 1,400,000          

9 harvesting ການເກບກຽວ

cutting (200 fruit/pers  day) ຽກບກໃ ວ (200 ໓ໃ ວຍ/ມ ໄ/ຄນ) ຮງງານຈ ໄາງ 25 70,000          1,750,000          

transport to storage ຂນສ ໃ ງແວ ໄຢໃ ຕບ ລດຽດນຕາມ ‐                     

> fuel ນ ໄາມນຽຊ ໄອແຟ 15 8,000 120,000             

> labour ຮງ ງານ ຮງງານຽອງ ວນງານ 4

ລວມຍອຍ 1,870,000          

10 marketing ການຕະຫລາດ

ບດທລະສບ ບດ 4 10,000          40,000               

ລວມຍອຍ ລວມຍອຍ 40,000               

Total Variable costs 13,690,000        

35 ວນງານ

Table 3: Production Steps, Inputs and variable

ວ ລວ

ຄາໃຊຈາຍຊປດໄຈການຜະລດ

ປກສາ ລ ຫວານລະດແລງ

ຊາວກະສກອນເຮດນາ ແລະ ປກສາ ລ ຫວານລະດແລງ

Wet season Rice (2ha) ‐ Dry season sweet corn

Page 149: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 147 of 196 

Vegetables: 

 

 

Table 1: Vegetable Production and Profit

# 6 greenhouses# 1 Greenhouse is  6 x 25 m # Planting surface of 900 m2 (6 green houses)

Dry Seasonal Vegetable production Nov, Dec, Jan, Feb, Mar, Apr of the year

4 times of harvest during the 6 months

ຊະນດຜກຈ/ນຜນຜະລດໃນລະດແລງ

ໜວບ ລາຄາ (ກບ) ຈ/ນເງນ

ຜກກາດຊອມ 600                    ກລ 5,000         3,000,000               ຜກຫອມບວ 600                    ກລ 15,000       9,000,000               ຜກຫອມປອມ 420                    ກລ 15,000       6,300,000               ຜກກາດຂວ 300                    ກລ 5,000         1,500,000               ຫອມລາບ 90                      ກລ 10,000       900,000                  

Wet Seasonal Vegetable Production May, Jun, Jul, Aug, Sep and Oct of the year

ຊະນດຜກຈ/ນຜນຜນຜະລດໃນຊວງລະດຝນ

ໜວບ ລາຄາ (ກບ) ຈ/ນເງນ (ກບ)

ຜກກາດຊອມ 480                    ກລ 10,000       4,800,000               ຜກຫອມບວ 480                    ກລ 25,000       12,000,000             ຜກຫອມປອມ 300                    ກລ 30,000       9,000,000               ຜກກາດຂວ 240                    ກລ 6,000         1,440,000               ຫອມລາບ 90                      ກລ 22,000       1,980,000               

ຊະນດຜກ ຈານວນເງນ (ກບ)

ຜກກາດຊອມ 7,800,000               ຜກຫອມບວ 21,000,000             ຜກຫອມປອມ 15,300,000             ຜກກາດຂວ 2,940,000               ຫອມລາບ 2,880,000               

ລວມລາຍຮບລວມ 49,920,000             

ຄາໃຊຈາຍຊປດໄຈການຜະລດ 17,996,000             ມນຄາເສອມຂອງວດຖຄງທ 3,625,000               

ລາຍໄດສດທ 28,299,000             

ລວມລາຍຮບສດທ/ປ Net Profit/Year 28,299,000             

ລາຍຮບລວມຈາກແຕລະຊະນດຜກພາຍໃນປ

Page 150: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 148 of 196 

  

   

  Occupation 11

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທTable 2: Fixed Investments/Costs

types unit Nr price/unit total l ife span/yrs residual  value annual  depreciation

Nr Type/sub‐type ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃ ຊ ມນຄາເຫລອ ຄດໄ ລເຊອມມນຄາ/ປ

1 Greenhouse ສນຍາເພອສາງ 4 iເຮອນຮມ

1.1 local materialsຈໄາງຮງງານ

ວນງານ 30             50,000          1,500,000  4                              ‐    375,000                           

1.2 wooden post

1.3 wood for wall and roof

        1,500,000                               ‐    375,000                  

2 Tool and Equipment for Greenhouse

1 Plastic sheet ຜໄາຢາງ ຊ 1.5 4,500,000 6,750,000         4 1,687,500               

2 Net to protect insect ມ ໄງ ຊ 1 4,000,000 4,000,000         4 1,000,000               

3 Rope ຽຊອກ ຊ ລ 18 20,000 360,000            4 90,000                    

4 Nail ຕະປ ຊ ລ 30 12,000 360,000            4 90,000                    

5 Plastic tank ຖງເ ສໃ ນ ໄາ ຊ 6 35,000 210,000            4 52,500                    

6 Sprayer tank ບ ໄງສດ ຊ 1 180,000 180,000            4 45,000                    

      11,860,000  2,965,000               

3 Irrigation System ລະບບຊນລະປະທານ

3.1 ຽຮດຽອງ                      ‐   

3.2 ຊ ໄ 100       2,500            250,000  4

3.3 ປໃ ມ (ແດ) ຊ ໄ ຽຄໃ ອງ 1 500,000          500,000            4

           750,000  4 187,500                  

4 Tools ເຄອງມ

4.1 ຈກ ຊ ໄ ດວງ 2 40,000            80,000              4 20,000                    

4.2 ຊວໄານ ຊ ໄ ອນ 2 25,000            50,000              4 12,500                    

4.3 ຄາດ ຊ ໄ ດວງ 2 20,000            40,000              4 10,000                    

4.4 ພໄາ ຊ ໄ ດວງ 2 30,000            60,000              4 15,000                    

4.5 ວ ຊ ໄ 4 25,000 100,000            4 25,000                    

4.6 ວ ວ ຊ ໄ 4 15,000                          60,000  4 15,000                    

390,000            97,500                    

ລວມ 3,625,000               

fixed investment depreciated 14,500,000       depreciation per 1 year 3,625,000               

Vegetable Growing in Greenhouse

Page 151: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 149 of 196 

  

Sweet Corn 

 

900 m2

ລ 3: ລ ລ ຄ ລ ລ

ອາຍ 30‐60 ມໄ/ຊດ 45 day

Nr price total

ລ/ດ Production nputs ປດໃຈ ການຜະລດ types ປະເພດ unit ວ ວຍ ຈານວນ ລາຄາ ລວມ

1 Soil preparation ກຽມດນiເຮອນຮມ

1.1 ການຂດດນ ຽພ ໃ ອຕາກ ຮງງານຽອງ labour day ວ 5                         

1.2 ການກມ໓ານ ຮງງານຽອງ labour day ວ 5                     

ລວມຍອຍ ‐                                 2 Basal fertilizer ການໃສຝນຮອງພນ

2.1 Manure ຝນຄອກ/ຝນບໃ ມ tone 0.8                   500,000 375,000                        

2.2 Lime ປນຂາວ kg ລ 45                    1,300 58,500                          

2.3 ຮງງານຽອງ Labour day ວ 1                       

ລວມຍອຍ 433,500                        

3 Plot Preparation ການກຽມດນ

3.1 ການຂດດນ ຽພ ໃ ອຕາກ ຮງງານຽອງ Labour day ວ 5                     

3.2 ການກມ໓ານ ຮງງານຽອງ Labour day ວ 5                     

ລວມຍອຍ ‐                                 

4 Planting ແນວພນ ແລະ ການປກ 600 ຕາແມດ4.1 ຜກກາດຊອມ can 2                      10,000 20,000                          

4.2 ຜກຫອມບ ໃ ວ kg ລ 20                    25,000 500,000                        

4.3 ຜກຫອມປໄອມ kg ລ 4                      40,000 160,000                        

4.4 ຜກກາດຂວ can 3                      10,000 30,000                          

4.5 ຫອມລາບ kg ລ 5                      20,000 100,000                        

4.6 ການກໄາຽບ ໄຍ ຮງງານຽອງ Labour day ວ 1                     

4.7 ການບງ ຮງງານຽອງ Labour day ວ 2                     

ລວມຍອຍ 810,000                        5 fertlizer and insect control  ການໃຊຝນແລະຢາເຄມ

5.1 ຝໃ ນຽລ ໃ ງການຈະຽລນຽຕບຕ

5.2 ຝໃ ນຽຄມ 00-00-60 Kg ກລ 30                     3,600 108,000                        

5.3 ຮງງານເສໃ ຝໃ ນ ຮງງານຽອງ Labour day ວ 1                      

5.4 ຢາປໄອງກນມງແມ ໄສດຕພດ ຊວະພາບ Set ຊດ 1                       180,000 180,000                        

5.5 ຮງງານສດຢາ ຮງງານຽອງ Labour day ວ 1                      

ລວມຍອຍ 288,000                        

6 Crop care ການບວລະບດຮກສາ6.1 Weeding, 1st time ຽສຍຫຍ ໄາ ຮງງານຽອງ Labour day ວ 4

6.2 Watering, daily ຽອານ ໄາຽຂ ໄາ (ຫດນ ໄາ), ທກໆວນ ຮງງານຽອງ Labour day ວ 4

ລວມຍອຍ ‐                                 

7 harvesting ການເກບກຽວ7.1 ຽກບກໃ ວ ລະ ຫ ໄມຫໃ ຮງງານຽອງ Labour day ວ 5 ‐                                 

ລວມຍອຍ ‐                                 

8 marketing ການຕະຫລາດ8.1 ຄ ບດຽຕມຽງນ 3 10,000                                          30,000                          

8.2 ຖງຢາງເສໃ ຜກ ຖງຢາງ ພ 40                    10,000                                          400,000                        

8.3 ຮງງານຂາຍຜກ ຮງງານຽອງ labour day ວ 3                     

ລວມຍອຍ 430,000                        

 Cost of Production Inputs ຄາໃ ຊຈາຍໃນການຜະລດ 2,249,500                    

  42 ວນງານ cost for 1 crop (57 days) 2,249,500                    

cost for 8 crops (1 year) 17,996,000                  

ວ ລວ

Table 3:  Production Steps, Inputs and variable cost

Occupation 11 Vegetable Growing in Greenhouse

Page 152: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 150 of 196 

  

 

P lante d are a ຈານວນ 0.32 ຮຕ/ຮອບ (2ໄລ)

P lante d space 80cmx50cm = 0.4ຕາແມດ/ຕນ

N o. o f p lant pe r ra i 8 ,000 ຕນ/2ໄລ

P lante d tim e 2 ເດອນເຄງ/ຄງ (75 ວນ)

P roduction pe r tim e 1.600 ກໂລ/ຄງ

P roduction pe r ye ar 6.400 ກໂລ/ປ

T ype o f co rn ສາລຫວານຂາວ/ຫວານເຫອງ

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

Table : Summary of Production, Costs and Income

ຜະລດ ຄງທ 1:  Nov‐Jan ຄງທ 2: Jan‐Mar ຄງທ 3 Mar‐May ຄງທ 4  May‐Jul

area Ha 0.32                       0.32                    0.32                        0.32                 

yield kg 1,600                     1,600                  1,600                      1,600               

price kip/kg 4,000                     4,000                  4,000                      4,000               

gross income kip 6,400,000              6,400,000           6,400,000               6,400,000        

total variable cost > from Table 2 2,380,000              2,380,000           2,380,000               2,380,000        

total depreciation > from Table 1 49,325                   49,325 49,325 49,325

Net income 3,970,675              3,970,675           3,970,675               3,970,675        

Net Annual Income 15,882,700      

Occupation 12 Sweet corn farmers 

Page 153: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 151 of 196 

  

 

 

 

 

 

 

 

 

 

  Occupation 12

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທTable 2: Fixed Investments/Costs

Fixed Investments types unit Nr price/unit tota l l i fe  span/yrs res idua l  value annual  depreciation

ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃ ຊ-ປ ມນຄາເຫລອ ຄດໄລເຊອມມນຄາ/ປ

1 ມນຄາການເຮດຮວ

ຮາວຮ ໄວ ຽຫກ໓າມ/ກ ໄ - ກ ໄ 11           85,000          935,000  10                        93,500 

ຊ ໄແມ ໄຫກ ແມ ໄກໃ ນລ ໄອນ ຫກ 113             6,000          678,000  10                        67,800 

     1,613,000    ລວມຍອຍ                      161,300 

2 ອປະກອນ

ຕະປ ຽບ 5 ຽຫກ ກລ 3           15,000            45,000  5

ຂ ໄອນຕ ຽຫກ ດວງ 1           30,000            30,000  5

ຈກ ດວງ 1         40,000           40,000  5

ຊ ໄວານ ດວງ 1         40,000           40,000  5

ພໄາ ດວງ 1         25,000           25,000  5

        180,000  5 ລວມຍອຍ                        36,000 

3 ຊລດໄຖເດນຕາມ

‐                   ລວມຍອຍ                                ‐   

ລວມ 1,793,000      ລວມ 197,300                     

fixed investment  depreciated ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 1,793,000      ຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 1 ປ 197,300                     

Sweet corn farmers 

Page 154: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 152 of 196 

  

Occupation 12 Sweet corn growing 0.32 ha

ຕາຕະລາງ 3: ຂນຕອນການຜະລດ ແລະ ມນຄາການຜະລດປະຈາລະດການ

types unit Nr price total

ລ/ດ Production Inputs ປດໃຈ ການຜະລດ ປະເພດ ຫວຫນວຍ ຈານວນ ລາຄາ ລວມ1 ການຕຽມພນທ1.1 ຖາງ/ຈດ/ອະນາແມ ຮງງານຽອງ ວນງານ 6            ‐                     1.2 ການແຖດນ ລະ ຍກຄ (3 ຄ ໄງ) ຮງງານຽອງ ວນງານ 3            ‐                     1.3 ແຖດນ ລະ ຍກຄ (4 ຄ ໄງ) ຈ ໄາງ ຄ ໄງ 4            300,000 1,200,000          

ລວມຍອຍ 1,200,000          4 ແນວພນ ແລະ ອປະກອນໝນວຽນ4.1 ນວພນສາລຫວານ(໓ວ) White sweet corn kg 16 180,000 2,880,000          4.2 ນວພນສາລຫວານ Super sweet corn kg 8 200,000 1,600,000          4.3 ຖງຢາງ ຢາງ ຕບ 20 10,000 200,000             4.4 ຝໃ ນ 1 5:1 5:1 5 ຽປາ 4 300,000 1,200,000          4.5 ຝໃ ນ ຽລ ໃ ງ 46:00:00 ຽປາ 2 180,000 360,000             4.6 ຝໃ ນ ຄອກ ມນສດ ກລ 1,600 500 800,000             4.7 ປນຂາວ ຝໃ ນຜງ ຖງ 40 10,000 400,000             4.8 ຜໄາຢາງຂາວ ການຄມ໓ານ ກ ໄ 2 200,000 400,000             4.9 ຽປາເສໃ ຝກສາລ ຜ ໄາຢາງ ໓ໃ ວຍ 50 1,000 50,000               

ລວມຍອຍ 7,890,000          5 ການປກ5.1 ປກ ຮງງານຽອງ ວນງານ 3            ‐                     5.2 ເສໃ ຝໃ ນ 1 5:1 5:1 5/ຝໃ ນຄອກ/ຫວໃ ານປນຂາວ ຮງງານຽອງ ວນງານ 3           5.3 ການຄມຜໄາຢາງ ຮງງານຽອງ ວນງານ 2           

ລວມຍອຍ ລວມຍອຍ ‐                     6 ການບວລະບກຮກສາ6.1 ການຽອານ ໄາຽຂ ໄາ ຮງງານຽອງ ວນງານ 4 ‐                     6.2 ການຽສຍຫໄຍາ 2 ຄ ໄງ… ຮງງານຽອງ ວນງານ 6 ‐                     

ລວມຍອຍ ‐                     7 ເກບກຽວ

7.1 ຽກບກໃ ວ (ປດຝກ) ຮງງານຽອງ ວນງານ 8 ‐                     7.2 ຈ ໄາງລດແຖຽດນຕາມຂນຍ ໄາຍຜນຜະລດ ຈ ໄາງ ມ ໄ 3 100,000 300,000             

ລວມຍອຍ ລວມຍອຍ 300,000             8 ຄາໃຊຈາຍອນໆ 2

8.1 ປໄມບນທກ 1 10,000          10,000               8.2 ຄໃ າລ ໄຍຫໄ ນນ ໄາມນລດແຖ ລດ 0 10,000          ‐                     8.3 ທໃ ດນ ພາສທໃ ດນ ຄ ໄງ 1 10,000          10,000               8.4 ຄໃ ານ ໄາ ນ ໄາ ຊປທ ຄ ໄງ 1 10,000          10,000               

ລວມຍອຍ 30,000               9 marketing ການຕະຫລາດ9.1 ຕດຕໃ ມໃ ຄ ໄາ ບດທລະສບ ບດ 10 10,000          100,000             

9.2 ການຂາຍຜນຜະລດ ຮງງານຽອງ ວນງານ 3

ລວມຍອຍ ລວມຍອຍ 100,000             

 Cost of Production Inputs ຄາໃຊຈາຍໃນການຜະລດ 9,520,000               

Table 3: Production Steps, Inputs and variable co

Page 155: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 153 of 196 

Pineapple: 

 

  

 

Occupation 16

ຮບແບບຂອງກດຈະກາ1: ø¡Á«¸-©È¼¸ Plant Slips  : Single rows  

2: ແລຍະປກ 0.4 m x 1 m plant spacing

3: ຕ ໄນຕໃ ຽຮກຕາ 25,000 Nr.plants per hectare

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍແລະລາຍໄດ

Table 1: Summary of Production, Costs and Income

 Area ຽນ ໄອທໃ (ຮຕ) 1 1 1 1Cropping year ຜນຜະລດປະຈາປ ó-êó 1 ó-êó 2 ó-êó 3 ó-êó 4

Yieldສະມດຕະພາບຜນຜະລດ

(໓ໃ ວຍ/ຮຕ)12,500           25,000 25,000 25,000

Price per fruit ລາຄາຂາຍ (ກບ/໓ໆວຍ) 2,500             2,500             2,500              1,500             

Gross income/ha ລາຍຮບຈາກຜນຜະລດ 31,250,000    62,500,000    62,500,000     37,500,000    

Total variable cost ຄໃ າເຊ ໄຈໃ າຍປດແຈການຜະລດ 8,135,000      9,035,000 5,750,000 3,020,000

Total depreciation ລວມມນຄໃ າຽສ ໃ ອມ 8,321,000      8,321,000      8,321,000       8,321,000      

Total Net income ລາຍຮບສດທ 14,794,000    45,144,000    48,429,000     26,159,000    

Pineapple Farmer

Page 156: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 154 of 196 

  

Occupation 16

Table 2: Fixed Investments/Costs

  types unit Nr price total life span/yrs residual value annual depreciation

Nr Fixed Investment ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃ ຊ-ປ ມນຄາເຫລອ ຄດໄລເຊອມມນຄາ/ປ

1 Land ທຊດນ

1.1   ຊ ໄ ໄຽນອທໃ ສວນປກ ດນສວນ ha 1                      ‐    ຖາວອນ                      ‐     

                     ‐    ລວມຍອຍ

2 Fencing   ການລອມຮວ

2.1 Option 1

2.2 ຕດຫລກຮ ໄວແ ມໄກໃ ນ200 ຫລກ ງງາ ວນງານ 5 50,000            250,000           

2.3 ຮາວຮ ໄວ(1 00 ຮາວ) ຮງງານ ວນງານ 5 50,000 250,000           

2.4 ຊ ໄ ໄຫລກຊມງ 1.5mX15cm ລ 200 35,000 7,000,000        

2.5 ຊ ໄຽຫລກຫນາມ( ລໄອມ 4ຮາວ) 80ມດ ຄ ໄງ 25 85,000 2,125,000        

2.6 ຽຫກຕະປ ຽບ 5 ກໆດ 1 180,000 180,000           

2.7 ຂດຂມຝງຫລກຮ ໄວ ຮງງານ ວນງານ 5 50,000 250,000           

2.8 ລໄອມຮ ໄວ ຮງງານ ວນງານ 5 50,000 250,000           

10,305,000       5 ລວມຍອຍ 2,061,000                        

3 Buildings ອາຄານ (ລວມທງໄຟຟາ)

3.1 Store for grading, packing ຫ ໄອງຍກປະຽພດ, ຫ ໄມຫໃ ສງກະສ 1,500,000        

1,500,000         5 ລວມຍອຍ 300,000                           

4 Plantating ການປກ

4.1 ຽບ ໄຍ໔າກນດ ໓ໃ ຂ ໄາງ ຽບ ໄຍ   25,000  600       15,000,000 

      15,000,000  4 ລວມຍອຍ 3,750,000                        

5 Machinery ເຄອງຈກ

5.1 Rent the 2 wheel  tractor ເຊາລດໄຖເດນຕາມ 15 100000 1,500,000         1 1,500,000                        

5.2 Grass cutting machine ຈກຕດຫ ໄຍາ/ເບມດ 2,500,000         5 500,000                           

ລວມຍອຍ 4,000,000             2,000,000                        

6 Tools ເຄອງມ

6.1 ພໄາ ດວງ 4 35000 140,000           

6.2 ພໄາຂ ດວງ 2 30,000 60,000             

6.3 ຈກ ອນ 2 80,000            160,000           

6.4 ຊວານ ດວງ 2 50,000 100,000           

6.5 ສມ ດວງ 2 35,000 70,000             

6.6 ຄໄອນຕ ດວງ 2 50,000 100,000           

ລວມຍອຍ 630,000            3 ລວມຍອຍ 210,000                           

ລວມ 31,435,000       ລວມ 8,321,000.00                  

ມນຄໃ າ ຄງທໃ ທໃ ແ ດ ໄຄດແລໃ ການຽສ ໃ ອມມນຄໃ າຕໃ ລະຊດ 16,435,000           depreciation per 1 year 8,321,000                        

100X4=400 m

ຫລກຮວໄມ,ຫລກຊມງ, ລວດນາມມາກຈບ

Pineapple Farmer

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທ

fixed investment depreciated

Page 157: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 155 of 196 

  

 

 

 

 

Occupation 16

Table 3: Production Steps, Inputs and variable cost¯ó-êó 1 ¯ó-êó 2 ¯ó-êó 3 ¯ó-êó 4

Îɾ-¸¼¡ ¯½-À²© ¹ö¸-Îȸ¨ ¥¿-−¸− ì¾-£¾ À¯ñ− -À¤ò− ¥¿-−¸− ì¾-£¾ À¯ñ− -À¤ò− ¥¿-−¸− ì¾-£¾ À¯ñ− -À¤ò− ¥¿-−¸− ì¾-£¾ À¯ñ− -À¤ò− ¡¼-´-©ò− Ä»È-À쉾 À»ñ¡-ª¾ 1«¾¤-¯ÈȾ Á»¤-¤¾− ñ−/£ö− 20 50,000 1,000,000 0          

, ລ Á»¤-¤¾− ñ− -/£ö− 20 50,000 1,000,000 0          

ລ ຄ ìö©-Ä« 1 Àêº 0 1,500,000 0 0

ຄ ຊ ໄຝໃ ນຄອກຮອງພ ໄນ ຕນ 1 500,000 500,000 0

ຫໃວານຝໃ ນ Á»¤-¤¾− ñ− -/£ö− 5 50,000 250,000 5 50,000 250,000 8 50,000 400,000 8 50,000 400,000

ບນທກຝໃ ນແປເສໃ ສວນກ ໄວຍ ລດແຖຽດນຕາມ ລ 20 10,000 200,000 10 10,000 100,000 10 10,000 100,000 5 10,000 50,000

ລວມຍອຍ 2,950,000 350,000 500,000 450,000

¡¾−- ø¡¸¾¤-Á« -¯ø¡(40x1) Á»¤-¤¾− ñ− -/£ö− 3 0 0 0 0 0

§œ-Á− -²ñ− ²ñ− - າ ງ À®˜¼- 25,000 0 0 0     0 0

£È¾-Á»¤-¤¾− -¯ø¡ Á»¤-¤¾− ñ− -/£ö− 5 50,000 250,000 0 0 0

ລວມຍອຍ 250,000 0 0 0

. §œ-±÷È− Áì½ μ¾-À설 Œ-- ±÷È− -À£- ó μ ø-Àì¨ 46%(50 ລ) ຽປາ 1 185,000 185,000 1.5          185,000 277,500 2 185,000 370,000 2 185,000 370,000

Œ-- ±÷È− -À£- ó 15.15.15(50 ລ) ຽປາ 10 300,000 3,000,000 10.0        300,000 3,000,000 10 300,000 3,000,000 2 300,000 600,000

Œ-- μ¾-À설ºº¡©º¡ ºó-Àê-¦ 3% ìò© 1 50,000 50,000 1.5          50,000 75,000 2 50,000 100,000 2 50,000 100,000

Œ-- ±÷È− -£º¡ 0 0 0 0

ລວມຍອຍ 3,235,000 3,352,500 3,470,000 1,070,000

®ö¸-ì½-®ñ©-»ñ¡-¦¾Œ-- À¦¨-¹¨É¾ I Á»¤-¤¾− ñ− -¤¾− 5 50,000 250,000 5 50,000 250,000 5 50,000 250,000 5 50,000 250,000

ຕດຫ ໄຍາ ຈກ (ນ ໄາມນ) ລດ 10 10,000 100,000 10 10,000 100,000 15 10,000 150,000 15 10,000 150,000

Œ-- À¦¨-¹¨É¾ II Á»¤-¤¾− ñ− -¤¾− 5 50,000 250,000 5 50,000 250,000 5 50,000 250,000 5 50,000 250,000

ຕດຫ ໄຍາ ຈກ (ນ ໄາມນ) ລດ 10 10,000 100,000 10 10,000 100,000 15 10,000 150,000 15 10,000 150,000

Œ-- À¦¨-¹¨É¾ III Á»¤-¤¾− ñ− -¤¾− 5 50,000 250,000 5 50,000 250,000

ຕດຫ ໄຍາ ຈກ (ນ ໄາມນ) ລດ 10 10,000 100,000 10 10,000 100,000

ລວມຍອຍ 1,050,000 7,755,000 800,000 800,000

¡¾− -À¡ñ®-¡È¼¸Œ-- ªñ©-¹´¾¡ Á»¤-¤¾− À»ñ¡-ª¾ 5 50,000 250,000 10 50,000 500,000 10 50,000 500,000 5 50,000 250,000

ຂນອອກຈາກສວນ Á»¤-¤¾− À»ñ¡-ª¾ 5 50,000 250,000 4 50,000 200,000 5 50,000 250,000 5 50,000 250,000

ຽຄໃ ອນຍໄາຍ ນ ໄາມນ(ລດແຖຽດນຕາມ) 5 10,000 50,000 8 10,000 80,000 8 10,000 80,000 5 10,000 50,000

ລວມຍອຍ 550,000 780,000 830,000 550,000

ການຕະຫລາດ

ຕດຕໃ ພວພນພໃ ຄ ໄາ ບດຕໃ ມມນຄໃ າທ ບດ 1 50,000 50,000 1 50,000 50,000 1 50,000 50,000 1 50,000 50,000

ຽລາະຂາຍ ຮງງານ ວນງານ 0 0 50,000 0 0 50,000 0 0 50,000 0

ຽອາເ ສໃ ລດແ ຖ ນ ໄາມນ(ລດແຖຽດນຕາມ) ລດ 5 10,000 50,000 10 10,000 100,000 10 10,000 100,000 10 10,000 100,000

ລວມຍອຍ 100,000 150,000 150,000 150,000

8,135,000 9,035,000 5,750,000 3,020,000

 

8,135,000 17,170,000 22,920,000 25,940,000ຄາໃຊຈາຍ -ສະສມ

ຄາໃຊຈາຍໃນການຜະລດ 1 ປ

Pineapple Farmer

ຕາຕະລາງ 3: ຂນຕອນການຜະລດ ແລະມນຄາປດໄຈການຜະລດປະຈາລະດການ

Page 158: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 156 of 196 

Banana 

 

  

 

Occupation 15 1 ha 

ຮບແບບຂອງກດຈະກາ 1: ແນວພນກວຍ ກວຍນາ2: ໄລຍະປກ 3 x 3 m3: ຈ/ນຕນຕເຮກຕາ 1,100

ງ ພ ລມລ ະ ມ ະ າ າ ພ າງມ ຄາ ພມ ຊ : ວ , າ , າລ, າ ລະ ໆ

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍແລະລາຍໄດ

Table 1: Summary of Production, Costs and Income

Area ຽນ ໄອທໃ (ຮຕ) 1 1 1 ha

Annual yield ຜນຜະລດປະຈາປ ¯ó-êó 1 ¯ó-êó 2 ¯ó-êó 3

Rice yield ຜນຜະລດ ຽຂ ໄາ 1,500                        ‐                    0

Banana yield ຜນຜະລດ ກໄວຍ 3,000                3000 ເຄອ/ຮຕ

Banana flower ຂາຍປກວ ໄຍ 2,000                2500

price/kheua ລາຄາຂາຍ/À£õº 3,000                        10,000              10,000                 ¡ó®/À£õº

Banana flower price ລາຄາປກໄວຍ 500                   500                     

Gross income/ha ລາຍຮບຈາກຜນຜະລດ 4,500,000                 31,000,000       31,250,000         

Total variable cost ຄໃ າເຊ ໄຈໃ າຍປດແຈການຜະລດ 3,047,500                 1,800,000         1,985,000 > from Table 3

Total depreciation ລວມການຽຊ ໃ ອມມນຄໃ າ 2,689,552                 146,667            146,667               > from Table 2

Total Net income ລາຍຮບສດທ (1,237,052)                29,053,333       29,118,333          4‐5‐6

Banana farmer

Page 159: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 157 of 196 

 

  

 

 

 

 

 

Occupation 15 1 hectares

Table 2: Fixed Investments/Costs

  types unit Nr price total l ife span/yrs residual value annual depreciation

Nr Fixed Investment ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃ ຊ-ປ ມນຄາເຫລອ ຄດໄລເຊອມມນຄາ/ປ

1 Land ທຊດນ

1.1   ຊ ໄ ໄຽນອທໃ ສວນປກ                     ‐    ຖາວອນ                                   ‐     

                    ‐    ລວມຍອຍ

2 Fencing   ການລອມຮວ

2.1 Option 1

ຊ ໄ ໄຫລກແມໄກໃ ນລ ໄອນ 1.5mX15cm ລ 200 10,000 2,000,000       

ຊ ໄຽຫລກຫນາມ( ລໄອມ 4ຮາວ) 80ມດ ຄໄງ 25 85,000 2,125,000       

ຽຫກຕະປ ຽບ 5 ກດ 1 18,000 18,000            

ຂດຂມຝງຫລກ ລະ ລໄອມຮ ໄວ ຮງງານ ຫກ 200 5,000 1,000,000       

5,143,000        5 ລວມຍອຍ 1,028,600                      

3 Buildings ອາຄານ (ລວມທງໄຟຟາ)

3.1 Store for grading, packing ຫ ໄອງຍກປະຽພດ, ຫ ໄມຫໃ ມງສງກະສ,ອໄມຕະ,ຽສາແ ມ ໄ 1,500,000       

1,500,000        7 ລວມຍອຍ 214,286                         

4 ແນວພນ

໓ໃ ກ ໄວຍນ ໄາ 1100 3000 3300000 3 ລວມຍອຍ 1100000

5 Machinery ເຄອງຈກ

5.1 Tractor payment ລດໄຖເດນຕາມ ຈໄາງລດແຖ ມ ໄ 5 1 00,000.0 500,000 0 #D IV /0!

5.20    Grass cutting machine ຈກຕດຫ ໄຍາ/ເບມດ ໓ໃ ວຍ 1 .00 1 ,000,000 1 ,000,000 5.00 200,000.00

ລວມຍອຍ 1,500,000            200,000                         

6 Tools ເຄອງມ

6.1 ພໄາ ດວງ 4 35000 140,000          

6.2 ພໄາຂ ດວງ 2 35,000 70,000            

6.3 ຈກ ອນ 2 40,000                80,000            

6.4 ຊວານ ດວງ 2 30,000 60,000            

6.5 ສມ ດວງ 2 20,000 40,000            

6.6 ຄໄອນຕ ດວງ 2 25,000 50,000            

ລວມຍອຍ 440,000           3 ລວມຍອຍ 146,667                         

ລວມ 11,883,000      ລວມ 2,689,552.38                

ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າຕະລະຊດ 8,583,000            depreciation per 1 year 2,689,552                      

‐                        

4 to 5  years

ຫລກຮວໄມແກນ, ໜາມໝາຫຈບ

fixed investment not depreciated ມນຄໃ າຄງທໃ ຖາວອນທໃ ບໃ ມການຽສ ໃ ອມມນຄໃ າ

Nr years to recover non-depreciated fixed investments ການຄດແລໃ ຈານວນຊດທໃ ຄມມນຄໃ າກບຄນ

Banana farmer

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທ

fixed investment depreciated

100X4=400 m

Page 160: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 158 of 196 

 

Occupation 15

ລ 3: ລ ລ ຄ ລ ລ

ó-êó 1 ó-êó 2 ó-êó 3ລ/ດ Îɾ-¸¼¡ ¯½-À²© ¹ö¸-Îȸ¨ ¥¿-−¸− ì¾-£¾ À¯ñ− -À¤ò− ¥¿-−¸− ì¾-£¾ À¯ñ− -À¤ò− ¥¿-−¸− ì¾-£¾ À¯ñ− -À¤ò−1 ¡¼-´-©ò−1.1 «¾¡-«¾¤ Á»¤-¤¾− ñ−/£ö− 15 0 0          

1.2 »œ, ¥ø©, º½-−¾-Ä´ ຮງງານ ວນງານ 8 0 0          

1.3 ຄ ຊ ໄຝໃ ນຄອກຮອງພ ໄນ ຕໃ ນ 3 400,000 1,200,000 1 400,000

1.4 ຫໃວານຝໃ ນ ຮງງານ ວນງານ 5 0 3 0 0 0

1.5 ຂນຝໃ ນແ ປເສໃ ສວນກ ໄວຍ ຈໄາງລດແຖຽດນຕາມ ມ ໄ 1 100,000 100,000 0 0

ລວມຍໃ ອຍ 1,300,000 400,000 0

2 §œ-Á−¸-²ñ−2.1 ຊÁ− -²ñ− -À ¾Ä»È ຽຂ ໄາແຮໃ ກລ 45 3,500 157,500 0 0

ລວມຍໃ ອຍ 157,500 0 0

3 ການປກ3.1 ຂນຫນໃ ຽຂ ໄາສວນ ຈໄາງລດແຖຽດນຕາມ ມ 1 100,000 100,000 0 0

3.2 ຂດຂມປກ Á»¤-¤¾− ວນງານ 8 0 0 0

3.3 ແລຍະປກ 4 x 4 m = 1 1 00 ຂມ/ຽຮກຕາ 0 0

3.4 ປກຽຂ ໄາແຮໃ ຮງງານ ວນງານ 15 0 0 0

ລວມຍໃ ອຍ 100,000 0 0

4 ໃ ສຝນຮອງພນ ແລະ ເລງ      

4.1 ຊ ( ວຍ) 15:15:15 /50 ລ 3 300,000 900,000 2 300,000 600,000 2 300,000 600,000

4.2 ຊ ລ ( ວຍ) 46:00:00 /50 ລ 2 185,000 370,000 0 1 185,000 185,000

4.3 ຊ ວ ( ວຍ) /5 ລ 20 10,000 200,000

4.4 ວ 8

ລວມຍໃ ອຍ 1,470,000 600,000 785,000

5 ¡¾−-®ö¸-ì½-®ñ©-»ñ¡-¦¾5.1 ຽສຍຫຍໄາ ຄ ໄງທໃ 1 ຮງງານ ວນງານ 10 0 4 0 4 0

ນ ໄາມນ(ຈກ) ລດ 10,000 15 10,000 150,000 10 10,000 100,000

5.2 ຽສຍຫຍໄາ ຄ ໄງທໃ 2 ຮງງານ ວນງານ 5 0 3 0 3 0

ນ ໄາມນ(ຈກ) ລດ 12 10,000 120,000 8 10,000 80,000

ລວມຍໃ ອຍ 0 270,000 180,000

6 À¡ñ®-¡øÉ-À າ -Ļȫ‰¸-©ò−6.1 ວ ວ 8 0

6.2 ວ 4 0

6.3 ລ ວ , ລ ວ 10 0

ລວມຍໃ ອຍ 0 0 0

7 À¡ñ®-¡øÉøÉ-Ï-¾¡¡É¸¨7.1 ຽກບກ ໄຫມາກກ ໄວຍ ລະ ຂນບໄາຍ ວ   10 0 15 0

7.2 ຂນກ ໄວຍອອກຈາກສວນ ລດແຖຽດນຕາມ ຖໃ ວ 8 20,000 160,000 15 20,000 300,000

7.3 ການຄດ ລະຽກບມໄ ນ ວ 5 70,000 350,000 10 70,000 700,000

ລວມຍໃ ອຍ 0 510,000 1,000,000

8 າ ະ ລາ

8.1 ຕດຕໃ ພວພນພໃ ຄ ໄາ ຮງງານ ວນງານ 1 20,000 20,000 1 20,000 20,000 1 20,000 20,000

ລວມຍໃ ອຍ 20,000 20,000 20,000

3,047,500 1,800,000 1,985,000

3,047,500 4,847,500 6,832,500

Banana farmer

ຄາໃຊຈາຍປດໄຈການຜະລດ

ຄາໃຊຈາຍ -ສະສມ

Table 3: Production Steps, Inputs and variable cost

Page 161: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 159 of 196 

Mushroom 

 

   

ອາຊບ 14 ກອນປກເຫດ ຊະນດເຫດທປກ

Occupation 14 Mushroom Growing ເຫດນາງຟາ

1 ຂະຫນາດ ເຮອນປກເຫດ  3m x 6 m =  18m2 ບນຈໃດ 2000 ກອນ

2 ຈ/ນເຮອນປກເຫດ 2 ຫງ ບນຈໃດ 4000 ກອນ

3 ໃຊເວລາທາການຜະລດ 6 ເດອນ/ຄງ 4000 ກອນ/ຄງ

4 ສາມາດຜະລດໃດ 2 ຄງ/ປ   8000 ກອນ/ປ

How many days for 1 ຄງ

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍແລະລາຍໄດ

Table 1 : Summary of Production, Costs and Income

ຄງຜະລດ >>> ຄງທ 1 (ລະດແລງ) ຄງທ 2 (ລະດຝນ) ລວມ 2 ຄງ

1 Nr. of bags 4,000.00                       4,000.00                         8,000                 

2 production(kg) 1,700                            1,800                              3,500                 

3 price(kip/kg) 18,000                          20,000                           

4 gross income (kip) 30,600,000                   36,000,000                     66,600,000        

5 total variable cost(kip) 8,927,350                     8,927,350                       17,854,700         > from Table 3

6 total "annual" depreciation(kip) 3,533,333                     3,533,333           > from Table 2

Net annualincome(kip) 18,139,317                   27,072,650                     45,211,967          

ແຮງງານລວມ 81 ວນງານ

ຜນຕອບແທນຕມຕກບແຮງງານຂອງຕນເອງ 558,172                          ກບ/ວນ

ການດນດຽງລາຍຮບລວມເບອງຕນ - ຕາມລາຄາຫ ລ ປະສດທພາບການປຽນແປງ

ຈານວນ (ກໂລ) 17,000 20,000 23,000

2,500 42,500,000                     50,000,000         57,500,000      

ຜນຜະລດ (ກໂລ) 3,000 51,000,000                     60,000,000         69,000,000      

3,500 59,500,000                     70,000,000         80,500,000      

ລາຄາ

ລາຄາຂາຍ(1ກບ/ກໂລ)

Page 162: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 160 of 196 

 

    

ອາຊບ 14 ຊາວກະສກອນປກເຫດ

  Occupation 14 Mushroom growing

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທ

Table 2: Fixed Investments/Costs

Fixed Investment types unit Nr price/unit total life span‐yrs residual value annual depreciation

ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ-ປ ມນຄາເຫລອ ຄດໄລເຊອມມນຄາ/ປ

1 ໂຮງເຮອນ

ຂະ໓າດ 3 ມ* 6 ມ

ຄງສ ໄາງຽຮດດ ໄວຍແມ ໄ,ມງດ ໄວຍ

ກະຽບ ໄອງຂອງລາວ,ອມດ ໄວຍ

ຫຍ ໄາ

2   4,000,000     8,000,000  5                   1,600,000 

   8,000,000                    1,600,000 

2 ອປະກອນປກເຫດຄງທ

ກະຝຍຽຫກຟຍນ ໄາມນຽປໃ າຂະ໓າດບນຈ

200 ລດ ຂອງແທອນ 4       250,000    1,000,000 

ຽຫກຂງຜ ໄາຂອງແທ ຂະ໓າດ

Ø 2 mmຄ ໄງ 1       50,000         50,000 

ຈກ ຂອງແທ ຫຍໃ ຫ ໄກາຂ ໄ ດວງ 2       40,000         80,000 

ຊ ໄວານ ຂອງແທ ອນ 1       40,000         40,000 

ພໄາ ພ ໄາງອມ ຂອງລາວ ດວງ 2       25,000         50,000 

ຄຂວດຄກວດຢາງ ສາລບເຊ ໄປກຽຫດ

ຫຍໃ ຫ ໄຂອງລາວຽປາ 6       80,000       480,000 

ຕະກງ ຂອງລາວ ອນ 2       25,000         50,000 

ບວຫນ ໄາ ຫຍໃ ຫ ໄຂອງລາວ ອນ 2       25,000         50,000 

ຜໄາກນສງ 80% ຫຍໃ ຫ ໄຂອງແທ ມ 25     4,000       100,000 

   1,900,000  2                     ‐                         950,000 

3 ຊລດຈກ

ລດຈກ ຫຍໃ ຫ ໄຂອງຈນ ຄ 1       5,000,000    5,000,000  5           250,000                       950,000 

   5,000,000                       950,000 

4 ອປະກອນ

ຊງຊ ໃ ງ 60 ກລ ຫຍໃ ຫ ໄຂອງຈນ 1       100,000       100,000  3                        33,333 

      100,000                           33,333 

Total 15,000,000                    3,533,333 

fixed investment  depreciated ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 15,000,000  ຄດແລໃ ກໃ ານຽສ ໃ ອມມນຄໃ າ 1 ປ 3,533,333                  depreciation per 1 year

Page 163: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 161 of 196 

ອາຊບ 14 4,000 ກໄອນ House size 3m x 6 m= 3  ງ

Occupation 14 4,000

ຕາຕະລາງ 3: ຂນຕອນການຜະລດ ແລະ ມນຄາການຜະລດປະຈາລະດການ

Table 3: Production Steps, Inputs and variable cost

unit Nr price total

ລ/ດ ລ types ວ ວຍ ຈານວນ ລາຄາ ລວມ

1 ວ ( ລ ລ ຄ )

ຂ ໄຽລ ໃ ອຍ ແມໃ ໄຽນ ໄອອໃອນ ລດ 3 200,000 600,000             ປນຂາວ ກລ 8 10,000          80,000               ອາຫານຽສມດອກຽຫດ ກວດ 2 35,000          70,000               ຽຂ ໄາປນ ກລ 150 2,000            300,000             ພເ໔ໃ ກລ 40 5,600            224,000             ດຽກອ ກລ 20 25,000          500,000             ຢບຊາ ກລ 80 5,600            448,000             ຮາອໃອນ ກລ 200 1,200 240,000             ນ ໄາສະອາດ ມ3 0.07 5,000 350                    

ຽຊ ໄອຽຫດ ຂວດ 200 6,000 1,200,000          ລວມຍອຍ 3,662,350          

2 ອປະກອນ- (ສາລບໃຊຄງດຽວ)

ຖງຢາງ 7x11 ວ ລ 40 25,000 1,000,000          

ສາລ ລ 6 20,000 120,000             

ຽຈ ໄຍ ລ 15 1,000 15,000               

ຢາງຢດ 6 30,000 180,000             

ຽຫ ໄາຽກ ໄາສບ ລ 6 60,000 360,000             

ຜ ໄາຢາງຂາວ (ປກຽບ ໄາຽຫດ ຽພ ໃ ອຄວບຄມອນະພມ) 2               50,000 100,000             

ລວມຍອຍ 1,775,000          

3 ການຜະລດເບາເຫດ/ຄງ

ລ ຍ ຮງງານງຕນຽອງ ວນງານ 3               70,000         

ຫໃ າຍຽບ ໄາ ຈ ໄາງຄນຫໃ າຍ ຽບ ໄາ 4,000        500 2,000,000          

໓ໄງຽບ ໄາຽຫດ ຮງງານງຕນຽອງ ວນງານ 10             70,000

ຟນ ຕດຽອງ ມດກໄອນ 9               100,000       ລວມຍອຍ 2,000,000          

4 ການເຂຍເຊອ

ຽຂໃ ຍຽຊ ໄອ ຮງງານງຕນຽອງ ວນງານ 3               70,000

ລວມຍອຍ

5 ການອະນບານ/ບມເຊອ

ຂນເບາເຂາບອນບມເຊອ ຮງງານງຕນຽອງ ວນງານ 3 70,000         

ການຕດຕາມຽວລາບ ໃ ມຽຊ ໄອ ຮງງານງຕນຽອງ ວນງານ 10 70,000         

‐                     

ລວມຍອຍ

6 ການເປດດອກ

ຽຄ ໃ ອນຍ ໄາຍຽຂ ໄາຮງຽຮອນ ຮງງານງຕນຽອງ ວນງານ 3 70,000         

ລວມຍອຍ

7 ບວລະບດຮກສາ

ຫດນ ໄາ,ຕດຕໃ ງ ຮງງານຕນຽອງ ວນງານ 20 70,000

ຊາວກະສກອນປກເຫດ

Mushroom Growing

Page 164: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 162 of 196 

16.4.4 Detailed Economic Calculations of Off‐Farm Professions 

Weaving 

 

  

 

 

 

 

ອາຊບ ຕາຫກOccupation  Weaving

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍແລະລາຍໄດ

Table 1: Summary of Production, Costs and Income

ປດຈບນ ແຜນ-ໃນອະນາຄດ

ປະລມານການຜ/ລ 3 ມ ໄ /ຜນ

ຕາໄ ດ ໃນ 1 ເດອນ 13 ຜນ

ຕາໄ ດ ໃນ 1 ປ 156 ຜນ

ລາຍລະອຽດ ຕປ ຕເດອນ

ຈານວນກໃ ທໃ ນາເຊ ໄ 1

ຈານວນຽຄອທໃ ນາເຊ ໄ 9 0.75

ຈານວນຜນຜະລດ (ຜນ) 156 13

ລາຄາຂາຍ (ກບ) 100,000 100,000

ລາຍຮບເບອງຕນ (ກບ) 15,600,000 1,300,000

ມນຄໃ າຽສ ໃ ອມຂອງອປະກອນ 144,667 12,055.6

ມນຄໃ າປດແຈການຜະລດ 4,290,000 357,500.0

ລາຍຮບສດທ (ກບ) 11,165,333 930,444

ປະສດຕພາບໃນການຜະລດ ສນໄໝຫາບ

Page 165: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 163 of 196 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

ອາຊບ

Occupation 

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທ ກລະນ 156 ຜນ/ປ

Table 2:  Fixed Investments/Costs

Types Unit Nr Price/unit Total Life span/yrs Residual value Annual depreciationການລງທນຄງທ ປະເພດ ຫວໜວຍ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ ມນຄາເຫລອ ມນຄາເສອມຂອງອປະກອນ/ປ

1

ກໃ ອນ 1            300,000               300,000  10                           ‐    30,000                                          

ກະສວຍ ອນ 4              15,000                 60,000  3                           ‐    20,000                                          

ປໄນດາບ ອນ 1              15,000                 15,000  3                           ‐    5,000                                            

ແມ ໄຄໃ າພ ໄນ ອນ 1              20,000                 20,000  5                           ‐    4,000                                            

ປໄນນ ໃ ງ ຜໃ ນ 1              20,000                 20,000  10                           ‐    2,000                                            

ກງຄວ ໄາງ ອນ 1             15,000                15,000  5                           ‐    3,000                                            

ພໃ ນຫໃ ອດ ອນ 1             100,000              100,000  5                           ‐    20,000                                          

ຟມ 25 ອນ 1 270,000                        270,000  5                           ‐    54,000                                          

ມດຕດ ອນ 1 20,000                20,000  3                           ‐    6,667                                            

ລວມ 820,000 - 144,667                                        

Fixed investment  depreciated ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ມນຄໃ າຽສໃ ອມ 820,000 ຄດແລໃມນຄໃ າຽສ ໃ ອມ/ປ 144,667                                        

ຕາຫກ

Weaving

Page 166: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 164 of 196 

 

  

 

 

 

 

 

 

Banana Processing 

 

ອາຊບ ຕາຫກ

Occupation  Weaving

ຕາຕະລາງ 3: ຂນຕອນການຜະລດ ແລະ ມນຄາປດໄຈການຜະລດ 1 ປ

Table 3: Production Steps, Inputs and variable costs 

ປດຈບນ ແຜນ-ໃນອະນາຄດ

ປະລມານການຜະລດ 2-3ມ ໄ /ຜນ

ຕາໄ ດ ໃນ 1 ເດອນ 13 ຜນ

ຕາໄ ດ ໃນ 1 ປ 156 ຜນ

ຈານວນເຄອນາທໃຊ 9 ຽຄອ

Unit Nr Price/Unit Total Total T ota l

ລ/ດ ປດໃຈ ການຜະລດ ປະເພດ ຫວຫນວຍ ຈານວນ ລາຄາ/ໜວຍ ລວມລາຍຈາຍ/ປ ລາຍຈາຍ/ເດອນ ລາຍຈາຍ/ເຄອ

1 ກະກຽມການຕາຫກ

ຄດລາຍ ຄໃ າຈ ໄາງ ແມ ໄ 50 3,000 150,000                  12,500           

150,000                  12,500           

2 ດາເນນການຜະລດ ‐                 

ຝໄາຍຽກາະ ຝໄາຍທຽລ ແນ 156 7,000 1,092,000               91,000            121,333

ຝໄາຍຕໃ າ ຝໄາຍທຽລ ແນ 234 7,000 1,638,000               136,500          182,000

ສບຫກ ຝໄາຍທຽລ ຽຄອ 9 70,000 630,000                 

ຽຄອຫກ ຝໄາຍທຽລ ຽຄອ 9 80,000 720,000                  80,000

ແຟຟໄາ ຽດອນ 12 5,000 60,000                    5,000              6,667

ຮງງານຕໃ າຫກ ຮງງານຕນຽອງ ມ ໄ 192 50,000 ‐                          ‐                  -

4,140,000               232,500         

3 ຄາໃຊຈາຍອນໆ

ຄາໂທລະສບ 3 10,000 360,000                  30,000           

360,000                  30,000           

Total ລວມ 4,290,000               245,000         

ກລະນ 156 ຜນ/ປ

ປະສດຕພາບໃນການຜະລດ ສນໄໝຫາບ

Page 167: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 165 of 196 

  

ອາຊບ

Occupation  

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

Table 1: Summary of Production, Costs and Income

ປດຈບນ ແຜນ-ໃນອະນາຄດ

ການຜະລດຊດ 2ມ ໄ

ກາການຜະລດ ໃນ 1 ເດອນ 2 ຊດ/ຽດອນ

ປະລະມານການຜະລດໃນ 1 ຄງ 100 ກລ

ປະລມານການຜນຜະລດ ໃນ 1 ເດອນ, 200 ກລ

ການຜະລດ ໃນ 1 ປ 2,400 ກລ

ລາຍລະອຽດ ຕປ ຕເດອນ

ຈານວນຜນຜະລດ (ກລ) 2,400                           200                                  

ລາຄາຂາຍ (ກລ/ກບ) 20,000                         20,000                             

ລາຍຮບເບອງຕນ (ກບ) 48,000,000                  4,000,000                        

ຄດແລໃ ມນຄໃ າຽສໃ ອມຂອງອປະກອນ/ປ 1,083,080                    90,257                             

ຄດແລໃ ລາຍຈໃ າຍ/ປ (ທນ໔ນວນ) 15,630,000                  1,302,500                        

ລາຍຮບສດທ (ກບ) 31,286,920                  2,607,243                        

ປະສດຕພາບໃນການຜະລດ

ແປຮບກວຍ(ກວຍອບເນຍ)

Banana Processing

Page 168: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 166 of 196 

 

ອາຊບ Occupation 

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທTable 2:  Fixed Investments/Costs

Type Unit Nr Price/Unit Total Life span/yrs Residual value Ann. Depreciat'n

ການລງທນຄງທ ປະເພດ ຫວໜວຍ ຈ/ນ ລາຄາ/ໜວຍ ລວມ ອາຍນາໃຊ-ປ ມນຄາເຫລອ

2 ໂຮງເຮອນຜະລດ ຂະໜາດ 3ແມດ x 6 ແມດ ຫງ 1                     ‐     

2 ຫອງ: 1 ຫອງປງແຕງ ແລະ 1 ຫອງບມກວຍ ແລະ ເກບອປະກອນ)

ຽສາ ຊມງ ຕ ໄນ 6          35,000             210,000 

ດນບໆອກ ກໄອນ 500            1,500             750,000 

ຊ ມງ ຽປາ 10          30,000             300,000 

ສງກະສ 12 ຟດ ຜໃ ນ 32          40,000          1,280,000 

ແມ ໄສຍວ ຽສ ໄນ 12          15,000             180,000 

ແມ ໄຂ ໄາວ ຽສ ໄນ 12          15,000             180,000 

ຕະປ ລ 4          12,000               48,000 

ຊດບານປະຕ ຊດ 2        350,000             700,000 

ຕາ໓ໃ າງຽຫກ ກ ໄ 1        185,000             185,000 

ຄໃ າຊໃ າງ 1     3,000,000          3,000,000 

ລວ ຍ ຍ         6,833,000  ຖາວອນ

3 ອປະກອນ    

ຽຕາແຟ ຽຕາຊມງ ໓ໃ ວຍ 2        200,000             400,000  5 79,999               

໔ ໄຂາງເຫຍໃ ຽບ 24 ໔ໃ ວຍ 2        250,000             500,000  5                     ‐    99,999               

ກະດ ໄງ ອນ 4          15,000               60,000  2                     ‐    29,999               

ຕະກງເຫຍໃ (ກະຕອງຕກ) ອນ 2          50,000             100,000  3                     ‐    33,332               

ຕະຫວເຫຍໃ ອນ 2          30,000               60,000  3                     ‐    19,999               

ມດ 2 ຄມ ອນ 2          10,000               20,000  3                     ‐    6,666                 

ກະທ ໄງແມ ໄແຜໃ ອນ 4 50,000                     200,000  3                     ‐    66,666               

ມດຊອຍ ອນ 2 15,000                       30,000  3                     ‐    9,999                 

ຂງ ອນ 1 25,000                       25,000  3                     ‐    8,332                 

ຊາມ ອນ 2 50,000                     100,000  5                     ‐    19,999               

ຖງມ ຄໃ 2 5,000            10,000             1                     ‐    9,999                 

ຜໄາກນຽປໄອນ ຜນ 2 15,000          30,000             3                     ‐    9,999                 

ຽຄ ໃ ອງລດປາກຖງ ຽຄ ໃ ອງ ຽຄ ໃ ອງ 1 250,000        250,000           5                     ‐    49,999               

ຊງ 5 ກລ ຽຄ ໃ ອງ 1 100,000        100,000           6                     ‐    16,666               

ຽຄ ໃ ອງຊອຍກໄວຍ ຽຄ ໃ ອງ 1 150,000        150,000           7                     ‐    21,428               

ລວ ຍ ຍ         2,035,000               483,080 

4 ພາຫະນະ

ລດຈກ ຄນ 1 11,000,000   11,000,000      10 5,000,000        600,000             

ລວ ຍ ຍ       11,000,000               600,000 

ລວມທງຫມດ 19,868,000            1,083,080               

ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ມນຄໃ າຽສ ໃ ອມ 13,035,000          1,083,080               

ແປຮບກວຍ(ກວຍອບເນຍ)

Banana Processing

ຄດແລໃມນຄໃ າຽສ ໃ ອມ/ປ

ຄດໄລເຊອມມນຄາ/ປ

Page 169: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 167 of 196 

  

 

ອາຊບ

Occupation 

ຕາຕະລາງ 3: ຂນຕອນການຜະລດ ແລະມນຄາປດໄຈການຜະລດປະຈາລະດການ

Table 3: Production Steps, Inputs and variable cost

Types Unit Nr Price Total Total

ລ/ດ ປດໃຈ ການຜະລດ ປະເພດ ຫວຫນວຍ ຈານວນ ລາຄາ ລາຍຈາຍ/ເດອນ ລວມລາຍຈາຍ/ປ

1 ກະກຽມວດຖດບ ແລະ ອປະກອນປງແຕງ

ກ ໄວຍ ກ ໄວຍນ ໄາ ຫວ 140 1,500 210,000                           2,520,000                                  ນ ໄາມນ ປຣາມ ລດ 24 7,000 168,000                           2,016,000                                  ຽນຍ ທມ ຖງ 24 17,000 408,000                           4,896,000                                  ຽກອ ກລ 1 3,000 3,000                                36,000                                        ນ ໄາຕານ ຊາຍດງ ກລ 6 8,000 48,000                             576,000                                     ຖງຢາງ (ບນຈ 12 ກລ/ຖງ) ຕບ 1 15,000 15,000                             180,000                                     

ຖງ 1 ລ (ບນຈ 1 ກລ/ຖງ) ຕບ 2 12,000 24,000                             288,000                                     

ຢາງມດ ຖງ 1 1,500 1,500                                18,000                                        ສະຕກຽກ ຜໃ ນ 2 75,000 150,000                           1,800,000                                  ຖໃ ານດງແຟ ຽປາ 4 35,000 140,000                           1,680,000                                  

‐                                              ‐                                    ‐                                              

ລວມ 1,167,500                       14,010,000                               2 ດາເນນການແປຮບກວຍ ‐                                              

ຄໃ າແຟຟໄາ ຽດອນ 1 5,000 5,000                                60,000                                        ຄໃ ານ ໄາ ຽດອນ 1 10,000 10,000                             120,000                                     ຄໃ າຮງງານ ຮງງານຕນຽອງ ມ ໄ 8 70,000 ‐                                    ‐                                              

ລວມ 15,000                             180,000                                     3 ດາເນນການ ຕະຫາດ

ຄໃ າຮງງານ ຮງງານຕນຽອງ ມ ໄ 2 70,000 ‐                                    ‐                                              ຄໃ ານ ໄາມນລດ ຖໄ ວ 2 50,000 100,000                           1,200,000                                  ຄໃ າທລະສບ ຽດອນ 1 20,000 20,000                             240,000                                     

ລວມ 120,000                           1,440,000                                  

Total ລວມທງຫມດ 1,302,500                       15,630,000                               ແຮງງານຕນເອງລວມ 10 10 ວນງານຽດອນ

ສາລບຫນງເດອນ

ແປຮບກວຍ (ກວຍອບເນຍ)

Banana Processing

calculation for 1 month

Page 170: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 168 of 196 

Tailor 

 

  

ອາຊບ ຊາງຕດຫຍບ  Occupation  Tailor

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍ ແລະ ລາຍໄດ

ປະເພດ ຈານວນ/ເດອນ ຄາ ຜາ ແພ ຄາຫຍບ ລາຄາຂາຍ/ຜນ ລວມເງນ/ເດອນ ລວມເງນ/ປ

1 ຕດຫຍບສ ໄງ(ພຮ ໄານຽອງ) 4 200,000    200,000         800,000             9,600,000           

2 ຄໃ າຕດສ ໄງ 2 150,000    150,000         300,000             3,600,000           

3 ຕດສ ໄນແ໔ 8 60,000      60,000           480,000             5,760,000           

4 ຕດສ ໄນສາຽລດ 8 40,000      40,000           320,000             3,840,000           

5 ຕດຽສ ໄອແ໔(ພຮ ໄານຽອງ) 5 180,000    180,000         900,000             10,800,000         

6 ຄໃ າຕດຽສ ໄອແ໔ 5 120,000    120,000         600,000             7,200,000           

7 ຄໃ າຕດຽສ ໄອທາມະດາ 5 80,000      80,000           400,000             4,800,000           

ລາຍຮບລວມເບອງຕນ/ເດອນ 3,800,000          45,600,000         

ຄດແລໃລາຍຈໃ າຍ/ປ (ທນ໔ນວນ) 1,874,000          22,488,000         

ຄດແລໃມນຄໃ າຽສ ໃ ອມຂອງອປະກອນ/ປ 106,250             1,275,000           

ລາຍຮບສດທ Profit 1,819,750          21,837,000         

ເດອນ ປ

Page 171: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 169 of 196 

 

  

 

 

ຕາຕະລາງ 2: ມນຄາຂອງການລງທນຄງທ

ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ-ປ ມນຄາເຫລອ ດໄລເຊອມມນຄາ

I ຮານຕດຫຍບ ຢເຮອນ

ປບປງສະຖານທໃ ຕດຫຍບ 4 x 4 ງ 1 1,000,000 1,000,000 ຖາວອນ 0 0

ປໄາຍຮ ໄານ 05 x 1,5 ຜໃ ນ 1 100,000 100,000 ຖາວອນ 0 0

1,100,000 ຖາວອນ ລວມຍອຍ 0

II ອປະກອນ

ຽຄໃ ອງປ ໄາກະດມ ອນ 1 250,000             250,000  ຖາວອນ

ຽຊອກວດທກ ຽສ ໄນ ອນ 2            10,000                20,000  2 10,000         

ຈກຊກແຟຟໄາ ກາ ຊງຽກ ໓ໃ ວຍ 1 3,400,000          3,400,000  10 340,000       

ຈກຫຍບແຟຟໄາ ກາ ຊງຽກ ໓ໃ ວຍ 1 3,000,000          3,000,000  10 300,000       

ຽຂມຈກຫຍບ ດວງ ກບ 2 25,000               50,000  1 50,000         

ຽຂມສອຍ ດວງ ກບ 2            10,000                20,000  2 10,000         

ຽຫກກ ໄງ ກາ TW ອນ 2              5,000                10,000  2 5,000           

ຽຫກມ ໄາງດ ໄາຍ ກາ TW ອນ 2              5,000                10,000  2 5,000           

ມດຕດພ ກາ ກະຕໃ າຍ ດວງ 4            35,000              140,000  2 70,000         

ມດຕດຽຈ ໄຍ ກາ ຊ ໄາງ ດວງ 2            15,000                30,000  2 15,000         

ມດກບ ກາ TW ດວງ 2            10,000                20,000  2 10,000         

ຽຂມມດ ດວງ ຜໃ ນ 5              3,000                15,000  2 7,500           

ແມ ໄບນທດຄ ໄງ ກາ TW ອນ 2              5,000                10,000  2 5,000           

ແມ ໄບນທດມນ ກາ TW ອນ 2            35,000                70,000  2 35,000         

ແມ ໄບນທດຊ ໃ ກາ Hatori ອນ 2            15,000                30,000  2 15,000         

ຽຕາລດ ອນ 2 150,000             300,000  2 150,000       

ຕະລດຽຄ ໃ ອງ ໓ໃ ວຍ 2 140,000             280,000  2 140,000       

ກະສວຍ ອນ 2 15,000               30,000  1 30,000         

ຕ ໄເສໃ ຽຄ ໃ ອງ ໓ໃ ວຍ 1 600,000             600,000  10 60,000         

ຂຽກາະຽຄ ໃ ອງ ຫ 5 7,000 35,000 2 17500

         8,320,000  ລວມຍອຍ 1,275,000    

ລວມ 9,420,000          ລວມ 1,275,000    

ມນຄໃ າ ຄງທໃ ທໃ ແດ ໄຄດແລໃ ມນຄໃ າຽສ ໃ ອມ/ຊດ 8,320,000 1,275,000    

ມນຄໃ າການຄງທໃ ຖາວອນທໃ ບໃ ແລມນຄໃ າຽສໃ ອມ 1,100,000          106,250       

ຄດແລຈານວນປທໃ ຄ ໄມທນຄນ 0.05                   ປ

ມການຽສ ໃ ອມມນຄໃ າ/ຽດອນ

ມການຽສ ໃ ອມມນຄໃ າ/ປ

Page 172: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 170 of 196 

 

ອາຊບ ຊາງຕດຫຍບ

ລ 3: ລ ລ ຄ ລ ລ ອາຍກດຈະກາ 28 ມ

ລ/ດ ປດໃຈການຜະລດ ປະເພດ ຫວຫນວຍ ຈານວນ ລາຄາ ລວມ

1 ອປະກອນ ຫ ວດສະດ

ກ ໄດ ໄາຍ ກ ໄ 5 35,000 175,000

ຽຈ ໄຍສ ຜໃ ນ 15 5,000 75,000

ຽຈ ໄຍ A0 ເບ 10 1,000 10,000

ກະດມຢາງ ຽມດ 50 1,000 50,000

ກະດມປໃ າ ຽມດ 100 1,500 150,000

ຊບສ ໄງ ຽສ ໄນ 22 2,000 44,000

ປໄງຂດ ອນ 2 5,000 10,000

ສດ ກບ 1 7,000 7,000

ບກ ກບ 1 7,000 7,000

ຂຽກາະສ ໄນ ລະ ສ ໄງ ກບ 1 35,000 35,000

ນ ໄາມນເສໃຈກຫຍບ ຕກ 1 50,000 50,000

ກາວຽຈ ໄຍ ມດ 5 15,000 75,000

ພກາວ ມດ 51 4,000 204,000

ຽຂມຫຍບ ກບ 1 10,000 10,000

ພສ ໄງ ມດ 6 35,000 210,000

ພຽສ ໄອ ມດ 11 50,000 550,000

ພຂງ ມດ 3 7,000 21,000

ນ ໄາຢາລດຜ ໄາທາມະດາ ຕກ 2 8,000 16,000

ນ ໄາຢາລດຜ ໄາແ໔ ຕກ 1 15,000 15,000

ລວມຍອຍ 1,714,000

2 ຄາເຊາຂອງຮານ

ລວມຍອຍ3 ແຮງງານ

ຮງງານຕນຽອງ ມ ໄ 28 70,000

ລວມຍອຍ -

4 ຄາພາສອາກອນ

ຄໃ າພາສອາກອນ ຽດອນ 1 10,000 10,000

10,000

5 ຄາໄຟຟາ

ຄໃ າແຟຟໄາ ຽດອນ 1 100,000 100,000

ລວມຍອຍ 100,000

6 ຄານາ

-

ລວມຍອຍ -

7 ຄາໂທລະສບ

ຄໃ າທລະສບ 1 ກບ 1 50,000 50,000

ລວມຍອຍ 50,000

ແຮງງານຕນເອງລວມ 28 ມ ໄ/ຽດອນ 336 ມ ໄ/ປ

ຄາໃຊຈາຍໃນການຜະລດ

Page 173: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 171 of 196 

Electrician   

 

ອາຊບ 23 ຊາງໄຟຟາ Currently  ‐ low level of work  Occupation 23 Electrician

ຕາຕະລາງ 1: ສະຫລບການຜະລດ, ຄາໃຊຈາຍແລະລາຍໄດ

Table 1: Summary of Production, Costs and Income

ປະເພດ ຈານວນອປະກອນ ຈານວນເງນ ຄາແຮງງານ ຈານວນ ຫ/ໜ ລວມເປນເງນ

2 ຕດຕງກະດານໄຟ ຫາເຮອນຄວ 143,000         50,000          2 ຈດ 100,000             

ກະດານແຟ 2 100,000        

ສະວກຂາວ ປດ ຽປດດອກແຟ 2 10,000          

ຫວປກສບແຟ 4 8,000            

ສະຕດຽຕໃ 4 20,000          

ສະກໆອດດາ 1 5,000            

3 ປຽນດອກໄຟ 365,000         30,000          10 ຄ ໄງ 300,000             

ດອກແຟ 10 350,000        

ສະຕດຽຕໃ 2 10,000          

ສະກໆອດດາ 1 5,000            

4 ຕໄຟເຂາຫາໂຮງສເຂາ 322,000         200,000        1 ຄ ໄງ 200,000             

ກບກອດສາຍແຟຟໄາ 1 10,000          

ກອງລອຍ(໓ໄາກາກ) 1 50,000          

ສະວກຽກດາ 1 30,000          

ສາຍແຟຟໄາ 2,5 1 180,000        

໓ອນຢາງ ຽບ 8,10 1 10,000          

ຫວປກສບແຟ 2 4,000            

ນອດດາ 1 10,000          

ຕະປຄອນກດ ຽບ 8, 10 1 18,000          

ສະກໆອດດາ 2                            10,000          

ທນໝນວຽນ 830,000            

600,000             

ຄດໄລເຊອມມນຄາ/ເດອນ monthly depreciat'n  ຕາຕະລາງ 3: 232,917        

ລາຍຮບສດທ/ເດອນ Profit 367,083        

ລວມລາຍຮບຈາກການບລການ

Page 174: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 172 of 196 

 

ອາຊບ 23 ຊາງໄຟຟາ Future  ‐ high/full  level or workload  Occupation 23 Electrician

ຕາຕະລາງ 1: ສະຫບການໃຫບລການ

Table 1: Summary of Service Provisionາ ລ າ

ປະເພດ ຈານວນອປະກອນ ຈານວນເງນ ຄາແຮງງານ ຈານວນ ຫ/ໜ ລວມເປນເງນ

2 ຕດຕງກະດານໄຟ ຫາເຮອນຄວ 2,705,000            50,000              20 ຈດ 1,000,000             

ກະດານແຟ 20 2,000,000           

ສະວກຂາວ ປດ ຽປດດອກແຟ 20 200,000              

ຫວປກສບແຟ 40 80,000                

ສະຕດຽຕໃ 40 400,000              

ສະກໆອດດາ 5 25,000                

3 ປຽນດອກໄຟ 1,375,000            30,000              30 ຄ ໄງ 900,000                

ດອກແຟ 30 1,050,000           

ສະຕດຽຕໃ 30 300,000              

ສະກໆອດດາ 5 25,000                

4 ເດນລະບບໄຟໃນຄວເຮອນ 988,000               500,000            5 ຄ ໄງ 2,500,000             

ກບກອດສາຍແຟຟໄາ 5 50,000                

ກອງລອຍ(໓ໄາກາກ) 5 250,000              

ສະວກຽກດາ 5 150,000              

ສາຍແຟຟໄາ 2,5 2 360,000              

໓ອນຢາງ ຽບ 8,10 2 20,000                

ຫວປກສບແຟ 10 20,000                

ນອດດາ 2 20,000                

ຕະປຄອນກດ ຽບ 8, 10 1 18,000                

ສະກໆອດດາ 10                           100,000              

ທນໝນວຽນ 5,068,000           

4,400,000             

ຕາຕະລາງ 2: ຄາໃຊຈາຍປະຈາເດອນ Table 2: monthly operating costsOperating cost ຈານວນລດ ລາຄາ ມນຄາ

1 motorbike fuel 40 8,000                   320,000                

2 motobike repair 1 50,000                 50,000                  

3 telephone  1 100,000               100,000                

4 ປະກນແພຄນ 1 50,000                 50,000                  

5 ຽສຍຄໃ າທາງ/year 1 15,000                 15,000                  

6 insurance ລດ/Month 1 160,000               160,000                ມນຄາລວມ 695,000                

ຄດໄລເຊອມມນຄາ/ເດອນ monthly depreciat'n  ຕາຕະລາງ 3: 232,917                ລາຍຮບສດທ/ ເດອນ Profit 3,472,083             

ລວມລາຍຮບຈາກການບລການ

ແລຍະຽວລາ 22 ວນ/ຽດອນ

over a 1 month period

Page 175: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 173 of 196 

 

  

 

 

ຕາຕະລາງ 3: ມນຄາຂອງການລງທນຄງທ

 

Nr types unit Nr price/uni t total l i fe  span/yrs residual value annual depreciation

ການລງທນຄງທ ປະເພດ ຫ/ຫນ ຈ/ນ ລາຄາ ລວມທງຫມດ ອາຍນາໃຊ ມນຄາເຫລອ ຄດໄລເຊອມມນຄາ/ປ

1 ລດຈກ ຄນ 1 11,500,000     11,500,000         10 1,150,000                 

ລວມຍອຍ 1,150,000                 

2 ກອງໃສອປະກອນ ກບ 2 150,000          300,000              3 100,000                    

ລວມຍອຍ 100,000                    

3 ອປະກອນ

ມຽຕໃ ທກແຟ ອນ 1           900,000               900,000  2 450,000                    

ສະວານຽຈາະ ອນ 1 500,000              500,000  1 500,000                    

ຄມຕດສາຍແຟ ອນ 1 150,000              150,000  1 150,000                    

ຄມລວມ ອນ 2             50,000               100,000  2 50,000                      

ຄມປກຫມ ອນ 1             60,000                 60,000  2 30,000                      

ຂ ໄນແດ ອນ 1           300,000               300,000  5 60,000                      

ຖງມ ອນ 1             15,000                 15,000  1 15,000                      

ມດຕດສາຍແຟ ດວງ 1             30,000                 30,000  2 15,000                      

ຖງເສໃ ຽຄ ໃ ອງມ ໓ໃ ວຍ 1           120,000               120,000  1 120,000                    

ຕລະບດຈໃ ມ ອນ 1             30,000                 30,000  2 15,000                      

ຕລະບດປ ອນ 1             30,000                 30,000  2 15,000                      

ຄ ໄອນຕຢາງນ ໄອຍ ອນ 1 50,000                50,000  2 25,000                      

ຕລະປດຍາມແຟ ອນ 1 25,000                25,000  2 12,500                      

ສະກດ ອນ 1 25,000                25,000  2 12,500                      

ຄ ໄອນຕເຫໃ ຍ ອນ 1 50,000                50,000  2   25,000                      

ລວມຍອຍ 1,495,000                 

2 ການສສານ

ທລະສບ ໓ໃ ວຍ 1 150,000                       150,000  3 50,000                      

ລວມຍອຍ 50,000                      

ລວມ 14,335,000         ລວມ 2,795,000                 

xed investment depreciated ມນຄໃ າ ຄງທໃ ທໃແດ ໄຄດແລໃ ກໃ ານຽສໃ ອມມນຄໃ າ 14,335,000              ມການຽສ ໃ ອມມນຄໃ າ/ປ 2,795,000                         

ມການເສອມມນຄາ/ເດອນ 232,917                             

ອາຊບ 23

Occupation 23

ຊາງໄຟຟາ

Electrician Table3:  Fixed Investments/Costs

Page 176: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 174 of 196 

16.5 ANNEX 5 UNOFFICIAL TRANSLATION OF THE SUPPORT POLICY  

 ສາທາລະນະລດ ປະຊາທປະໄຕ ປະຊາຊນລາວ  

ສນຕພາບ ເອກະລາດ ປະຊາທປະໄຕ ເອກະພາບ ວດທະນາຖາວອນ ====000==== 

 ແຂວງໄຊສມບນ ເລກທ.............../ຈຂ. ຊບ ປະທານຄະນະກາມະການຍກຍ ໄາຍຈດສນ ລະ ຟໄນຟຊວດການຽປນ ແຊສມບນ, ວນທ

..................... ຢໃ ຂອງປະຊາຊນທໃ ແດ ໄຮບຜນກະທບຈາກຄງການຽຂໃ ອນແຟຟໄານ ໄາງບ1  

ຂການດ ຮາງນະໂຍບາຍການສະໜບສະໜນກດຈະກາການປບປງຊວດການເປນຢ 

ຄອບຄວຜທ ໄດຮບຜນການທບຈາກໂຄງການໄຟຟານາງຽບ 1 ປ 2019 

 - ອງຕາມ: ສນຍາສາປະທານ (CA) ຄງການຽຂໃ ອນແຟຟໄານ ໄາງບ 1 ລະຫວໃ າງລດຖະບານ ຫໃ ງ ສປປ ລາວ ກບ

ບລສດ ແຟຟໄານ ໄາງບ 1, ສະບບລງວນທ 27 ສງຫາ 2013 

- ອງຕາມ: ການຍກຍ ໄາຍຈດສນ ລະຜນພດທະນາຊນຽຜໃ າ (REDP) ສະບບປບປງເ໔ໃ ເນຽດອນ ມຖນາ 

2014ມາດຕາ 17.4 ວໃ າດ ໄວຍຜນການງບປະມານ ລະການຽງນ ລະ ດຍອງເສໃ ການຕກລງຽຫນດຽປນ ຽອ

ກະພາບກນຂອງກອງປະຊມຄະນະປະສານຄງການຂ ໄນຽມອງ, ຂ ໄນຂວງ ລະ ຄະນະບລຫານງານຄງການ

ແຟຟໄານ ໄາງບ1  

ເຈາແຂວງໄຊສມບນ  ປະທານຄະນະກາມະການຍກຍ ໄາຍຈດສນ ລະ ຟໄນຟຊວດການຽປນຢໃ ຂອງປະຊາຊນທໃ ແດ ໄຮບຜນກະທບຈາກຄງການ

ຽຂໃ ອນແຟຟໄານ ໄາງບ1 ອອກຂ ໄການດ:  

I.ຈດປະສງ 

  ຈດປະສງ ຂອງຂ ໄການດສະບບນ ໄ ຽພໃ ອຽສມສ ໄາງເຫ ໄຄອບຄວຜ ໄທໃ ແດ ໄຮບຜນກະທບຈາກຄງການ ຽຂໃ ອນແຟຟໄາ

ນ ໄາງບ1 ເຫ ໄມຖານະຊວດການຽປນຢໃ ທໃ ດຂ ໄນຽທໃ ອລະກ ໄາວ ຊໃ ງມລາຍລະອດຄດໃ ງລໃ ມນ ໄ: 

Page 177: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 175 of 196 

I. Base conditions:  

A. PAPs lack access to knowledge B. Incentive support required C. Limited budget 

II.  Strategy: 

1. Majority of inputs are provided by the PAP, using compensation funds or existing assets and labour 

2. Build on existing knowledge, experiences and skills of the PAP, combined with experiments, research conducted by the company and GOL and emerging new technologies 

3. PAPs choose the profession they want to pursue, with special attention provided to gender and equal opportunities 

4. Professional development follows the strategy of the Ministry of Agriculture in being market oriented, promotion of networking (including contract farming), local value adding (processing), the principles of Good Agricultural Practices and increase the use of scientific techniques of modern technology to increase productivity 

5. First step of the development of a profession is detailed planning by the PAP of the activity he/she wants to implement, followed by a step by step implementation of the program over a time frame spanning several years 

6. Technical support will initially be provided by the project in cooperation with the GOL, together with experts engaged for specific trainings. Over time, model farmers will take on the role of trainers and providing knowledge to other farmers. Not only does this reduce dependence on Project inputs, it provides more long‐term local expertise to resettled households 

III. Policy: 

For professional training, the company will provide the cost of training. The professional development, such as opening a shop after completing the training is fully covered by the PAPs. 

   

Page 178: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 176 of 196 

IV. Policy to support for crop cultivation related professions:  

1. Home Sweet Home Production  2019 

No.  Necessary inputs  Details  Unit  Number 

1  Technical Knowledge 

1. Training: Soil fertility improvement through production of compost, bio‐extract (liquid) 1 time per year  

day  1 

2. Training: Techniques on maintenance vegetable garden (apply compost, bio‐extract for soil improvement and herbal pesticides to repellent insects)   

day  1 

2 Tool or 

Equipment /family 

1. Provision of vegetable seeds, with a total of 10 varieties: lettuce; green mustard; white mustard; Chinese cabbage; parsley; onion; coriander; pumpkin; sweet gourd; better gourd 

package  10 

2. Plastic roof sheets for 75% ( 1 roll)  meter  20 3. Nylon nets to protect vegetables from chickens  roll  2 4. Bio fertilizer (1 bag of 20 KG)  bag  2 5. Lime (1 bag of 5 KG)  bag  2 6. EM (1 bottle of 1 liter)  bottle  1 7. Molasses (1 bottle of 5 liters)  bottle  1 8. Plastic sheets for raising catfish   meter  6 9. Empty bag      piece  20 10. Fingerlings (small fishes)  head  500 11. Industrial fish feeds no. 1 and no.2 (one sack each)  sack  2 12. Plastic sheet for roofing to protect for the rain

(provide in year 2) meter  10 

3  Evaluation  Assist the group to evaluate its activity and select the model farmer 1 time  day  1 

 

   

Page 179: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 177 of 196 

2. Rice Cultivation in 2019 

No  Necessary inputs  Details  Unit  Number 

1  Technical knowledge 

1. Training:  Course on Cost‐Benefit Analysis and Business Development Plan (1 time/year) 

day   1 

2. Training: Group management and rule development 1 time   day   1 

3. Training: Rice cultivation techniques (land preparation, seedbed, transplanting, compost and bio‐extract production 1 time/year 

day   1 

4. Training: Course on water management, fertilizer application, pest and disease control 1 time per year 

day   1 

5. Training: Course on techniques on rice harvest and rice seed selecting and keeping 1 time  

day   1 

6. Training: Course on Good Agriculture Practices (GAP) for rice in year 1 and 2   day   4 

2  Motivation 

Study trip and sharing lessons and practices within group  day  1 

Study trip and sharing lessons and practices outside group (in year 2)  day   

Tools  or equipment/ family 

1. Rice seed provision (once time)  KG  60 

2. Bio‐fertilizer (1 sack/20 KG)  KG  5 

3. Lime (1 bag/5 KG)  bag  30 

4. EM  bottle  1 

5. Molasses   bottle  1 

6. Sprayer (provided only one time)  piece  1 

7. Plastic water tank (100 liters in year 2)  piece  1 

8. Plastic water tank (5 ‐ 10 liters)  piece  3 

4  Marketing Group meeting 1 time very two months   day  4 

Market information, networking within group 1 time per year      

 

   

Page 180: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 178 of 196 

3. Paddy rice and cash crop production 2019 

No  Necessary inputs Details  Unit  Number

1  

Technical knowledge 

1. Training: Course on economic calculation and production plan development 1 time  

Day  1 

2. Group management and rule development 1 time   Day  1 

3. Training: Soil fertility improvement 1 time   Day  1 

4. Training: Techniques: land preparation, planting techniques and maintenance: (rice, water melon/cucumber/bean and maize)  

Day  2 

5. Training: Maintenance (weeding, fertilizer application, water management and pest and disease control  

Day  1 

6. Training: Course on harvesting and post‐harvesting as seed keeping  

Day  1 

7. Training: Course on Good Agriculture Practices (GAP) 

Day  4 

2  Motivation 

1. Exchange experiences inside area   Day  1 2. Exchange lessons learnt outside area 

for group committees and model farmers 

Day  2 

3  Capacity for group 

1. Assist the group and provide inputs    Day  4 

2. Activity evaluation at the year end and select the model farmer  Day  1 

4   Tools  or equipment 

1. Provision of rice/vegetable seeds (not exceeded the amount of 400,000 LAK) 

Kg/bag  1 

2. Bio‐fertilizer (1 sack/20 KG)  sack  4 

3. Lime  (1 sack /5 KG)  sack  10 

4. EM    (1 bottle/1 liter)  bottle  1 

5. Molasses (1 bottle/6 liter)  bottle  1 

6. Wood vinegar   bottle  1 

5  Marketing Provision of inputs    Day  4 

Provide the market information to group (2 times each year) 

   

 

Page 181: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 179 of 196 

4. Rubber tree cultivation 2019   

No  Necessary inputs Details  Unit  Number

1  Technical knowledge 

1. Training: Course on economic calculation  Day  1 

2.Training: Course on soil fertility improvement   Day  1 

3. Training: Course on planting technique and tapping latex. 

Day  1 

4. Training: Course on maintenance (weeding and fertilizer application for 1 time. 

Day  1 

5. Training: Course on pre‐processing (recommended to start in year 5 for farmers planting rubber at the beginning) 

Day   

6. Training: Course on latex processing (recommended to start in year 2 for farmers have tapped latex already) 

Day   

2  Motivation  1. Exchange lessons learnt outside area   Day  1 

3  Tools  or equipment 

1. Provision of rubber saplings  Sapling  500 

2. Chemical fertilizer: 15:15:15 (50 Kg)  Sack  1 

3. Lime (1 bag / 5Kg)  Sack  10 

4  Marketing 

1. Exchange on market and networking 1 time   Day  1 

2. Activity evaluation at the year end and select the model farmers    Day  1 

 

 

 

   

Page 182: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 180 of 196 

 

5. Upland crop production (Banana/pineapple/sugar can/cassava) 2019   

No  Necessary inputs  Details  Unit  Number

1  

Technical knowledge 

1. Training: Course on economic calculation   day  1 2. Training: Course on group improvement through rule development for 1 time  day  1 

3. Training: Course on soil fertility improvement and demonstration establishment 1 time  

day  1 

4. Training: Course on nursery establishment and planting techniques   day  1 

5. Training: Course on maintenance (weeding, fertilizer, pruning, pest and disease control) and harvesting for 1 time. 

day  1 

6. Training: Course on contract farming  day  1 

2  Motivation 

1. Exchange lessons learnt outside area for 1 time   day  1 

2. Support the group and provide inputs for 1 time  Day  1 

3  Tools or equipment 

1. Provision of plant banana/sugar can/pineapple/rattan (based on the market demand/not available in local) not exceeded the amount of 300,000 LAK 

Plant part  100 

2. Chemical fertilizer 15:15:15 (1 sack)  Sack  1 

3. Lime (1 sack/ 5Kg)  Sack  10 

4. EM (1 bottle/ 1 liter)  Bottle  1 

5. Molasses (1 bottle / 6 Liter)  Bottle  1 

6. Tool as plastic container (volume 5‐10 liters) 

Piece  1 

4  Marketing 1. Support the group to evaluate the activity at the year end and select model famers for 1 time   day  1 

2. Marketing Exchange for 1 time   Day  4     

Page 183: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 181 of 196 

6. Integrated fruit tree cultivation 2019   

No  Necessary inputs  Details  Unit  Number

1  

Technical knowledge 

1. Training: Course on economic calculation for 1 time  

day  1 

2. Training: Course on improve the group committees and rule for group management 1 time  

day  1 

3. Training:  Course on soil fertility improvement and compost production 1 time 

day  1 

4. Training: Course on integrated fruit tree growing technique  day  1 

5. Training: Course on maintenance (weeding, fertilizer, water management, pest and disease control for 1 time) 

day  1 

6. Training: Course on fruit tree propagation (grafting, budding and pruning) including on‐the‐job‐training 1 time, in year 3  

day  ‐ 

2  Motivation 

1. Exchange lessons learnt inside area for 1 time  Day  1 

1. Exchange lessons learnt outside area 1 time (for group head committees and model farmers, in year 3) 

Day  1 

3  Tools  or equipment 

1. Fruit tree saplings (not exceeded amount of 1,200,000 LAK)  Sapling  60 

2. Chemical fertilizer  15:15:15 (10 Kg)  Kg  10 3. Chemical fertilizer 46:00:00 (15 Kg)  Kg  10 4. Lime (1bag / 5 Kg)  Sack  5 5. EM   (1 bottle/ 1 liter)  bottle  1 6. Molasses (1 bottle / 6 liters)  bottle  1 7. Knife for propagation (in year 2)  Piece  1 8.  Cutter for propagation (in year 2)  Piece  1 9.  Plastic tap for propagation (in year 2)  Roll  1 10.  Plastic container (Capacity 100 liters)  Piece  1 11.  Plastic container (capacity 5‐10 liters) in 

year 2 Piece   

Support  0 

4  Marketing 

1. Support the group management   Day  2 2. Assist to evaluate the activity at the year end 

and select the model farmers for 1 time   Day  1 

3. Exchange the market information and networking 1time   day  1 

 

   

Page 184: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 182 of 196 

V. Policy support for Livestock raising related professions:  

1. Cattle farming 2019  

No  Necessary inputs  Details  Unit  Number 

1 Technical knowledge 

1. Training: Course on grazing land management

(cattle farming and farm management including animal manure management) for 1 time/ during first 3 months continue in 3 years) 

Day  1 

2. Training: Course on supplemental feed preparation and grass fermentation (implement yearly until year 5) 

Day  1 

3. Training: Course on Use of vaccine and medicines for animal treatment (1 time/year until year 5, recommended to implement in first 4 months) 

Day  1 

4. Training: Course on business development plan and economic calculation (1 time/year, recommendation for implementation in 2‐3 months, during first 3 years) 

Day  1 

5. Disseminate the rule for animal management and animal registration (animal mobilization, in the first 3 years) 

Day  1 

6. Training: Course on cattle farm management (2 times/year/group, through 5 years) 

Day  1 

7. Training: Course on risk management (year 2‐3)   8. Training: Course on contract farming (if the investor interested) 

   

2  Motivation 

1.  Exchange lessons learnt inside project areas (for individual person select the occupation) yearly, through 3 years 

Day  1 

2. Exchange lessons learnt outside project areas      (specific for model farmers) 

   

3  

Tools or equipment

 

1. EM (1 bottle/1 liter) through 3 years  bottle  1 2. Molasses (1 bottle/5 litters) through 3 years  Bottle  1 3. Bone powder (5 kg) for first 3 years  Kg  5 4. Fertilizer as UREA 10 Kg   Kg  10 5. Tool for male animal castration 1 set for year 3    6. Battery for electrical fence control for grazing land (year3 )  

   

4  Animal feed 

  Grass seed: Ruzi 17Kg/Ha   Kg  17 Other grasses: Stylo, pigeon pea (5 Kg)   Kg  5 Vegetative grasses: Napier 100 parts/piece/HH for first year 

 Piece  100 

Page 185: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 183 of 196 

Haemorrhagic septicaemia 1 bottle 15/CC (depend on number of total animals) 

Set  1 

Vaccines for foot and mouth disease for 1 bottle 25/CC (depend on number of total animals) 

Set  1 

‐ De‐worm 1 package/1 bag/40g (depend on number of total animals) 

Set  1 

5  Marketing 

Establish cattle farming group (yearly)  time  4 Marketing information, every 6 months/year   Provide the information of services and necessary          Inputs 

   

Networking for sharing techniques (start in year 2)    

Marketing Network (start in year 3)       

Page 186: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 184 of 196 

     2. Goat raising 2019  

No  Necessary inputs  Details  Unit  Number 

1 Technical knowledge 

1. Training: Course on grazing land and farm management (Goat raising and manure treatment)

(1 time/year, recommended for first 4 months; continue until year 3) 

day  1 

2. Training: Course on EM production for supplementary feed preparation and grass fermentation (yearly through year 5) 

day  1 

3. Training: Course on use of vaccines and medicines for treatment (1 time/yea and continue through year 5) 

day  1 

4. Training: Course on business plan development and economic calculation (1 time/year, recommended for 2‐3 months, within 3 years) 

Day  1 

5. Disseminate the rule and animal registration (animal mobilization, within 2 years) 

Day  1 

6. Training: Course on animal improvement after year 2 

   

7. Training: Course on goat raising group management (group committees, 2 times/year/group, through 5 years) 

Day  1 

8. Training: Course on risk management for goat raising (within  2‐3 years)  Day  1 

2  Motivation 

1. Exchange lessons learnt outside areas (for individual person select the occupation) yearly, for first 2 years 

Day  1 

2. Exchange lessons learnt outside areas (1 time/year, starts from year 2 for model farmers and group heads) 

   

3 Tools or 

equipment 

1. Bone powder 2 Kg (within 3 years)  Kg  2 2. EM (1 bottle/1 liter)  Bottle  1 3. Molasses 1 bottle/5 liters  Bottle  1 4. Lime 2 bags, 8 Kg/bag  Kg  1 5. Electrical shock for grazing fence (in year 2)    

4 Animal feed 

1. Grass seed: Ruzi 3 Kg/1,600 m2   Kg  3 2. Grass seed: Guinee 3 Kg/1,600m2   Kg  3 3. Leucaena leucocephala  Kg  1 4. Pigeon pea     Kg  1 5. Grass seed: Stylo 1 Kg   Kg  1 6. Israeli grass (Napier)  piece  50 Haemorrhagic septicaemia 1 bottle 15/CC (depend on the total animals) 

set  1 

Page 187: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 185 of 196 

Vaccine and medicine for treatment 

Vaccine for foot and mouth disease 1 bottle 25/CC (depend on the total animals) 

set  1 

‐ De‐worm (piper worm) 1 package/1 bag/40g (depend on total animals) 

set  1 

5  Marketing Establish goat raising group (yearly implementation)  time  4 Provide the service information and inputs (6 months/time) 

   

 

   

Page 188: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 186 of 196 

3. Pig raising 2019   

No  Necessary inputs  Details  Unit  Number 

1  Technical knowledge 

1. Training: Course on pig raising and pig bred selection techniques (first 3 months) 

day  1 

2. Training: Course on pig delivery and small pig nursing (first 3 months)  

day  1 

3. Training: Course on feed preparation for fattening and grass fermentation for pig feed

(yearly, continue through year 5) day  1 

4. Training: Course on pig disease, use of vaccines and medicines for treatment (yearly, continue to year 5) 

day  1 

5. Training: Course on business plan development and economic calculation (1 time/year, recommended for 4‐5 months, during year 3) 

day  1 

6. Training: Course on pig raising group and management (2 times/year/group, through 5 years) 

day  1 

7. Training: Course on farm management (1 time/year, within first 3 years) 

Day  1 

8. Training: Course on bio‐gas (1 time/year, first year 3 ‐ 4) 

   

2  Motivation 

1. Exchange lessons learnt inside areas (1 time/year for individual person, through 5 years) 

time  1 

2. Exchange lessons learnt outside the areas (model farmers and group head in year 2) 

   

3 Tools 

or equipment 

1. Israeli Napier   Piece  100 2. Stylo  Kg  2 3. EM (1 bottle/1 liter  bottle  1 4. Molasses 1 bottle/5 liter  bottle  1 5. Lime (10 Kg/bag)  sack  2 6. Plastic pipe for gas stove (year 3)  mater  10 7. Plastic pipe foe gas stove (year 3)  meter  3 8. Gas stove (year 3)  Piece  1 

4 Vaccines and Medicine for treatment 

1. Vaccines: (Swine fever) 1 bottle/100ml   set  1 2. Iron 1 bottle/10ml  set  1 3. De‐worm (Ivomac) 1 bottle/10ml  set  1 4. Vitamin (B‐complete) 1 bottle/100ml   set  1 5. Siring 1 piece/10cc, needle 1 box size 5/2,5cm  piece  5 

5  Marketing 

Establish and pig raising group improvement         (yearly) 

time  4 

Provide service information and inputs           (6 month/time) 

   

Page 189: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 187 of 196 

 

5. Poultry raisin for commercialization 2019  

No  Necessary inputs  Details  Unit  Number 

1 Technical knowledge 

1. Training: Course on poultry farm management (1 time/year, recommended starts year 1 ‐2) 

day  1 

2. Training: Course poultry raising techniques and poultry bred selection (year 3) 

day  1 

3. Training: Course on chick nursing (starts year 3) 

day  1 

4. Training: Course on raising insects for poultry feed (every year through 5 years) 

day  1 

5. Training: Course on poultry diseases, vaccines and medicines for treatment (1 time/year, through 5 years) 

day  2 

6. Training: Course on business plan development and economic calculation (1 time/year, recommended 4‐5 months, during 3 years) 

day  1 

7. Training: Course on poultry raising group management (2 times/year/group, through 5 years) 

day  1 

8. Training: Course on use of egg hatching machines ( 1 time/year/group, in year 2) 

 

9. Poultry bred improvement (1 time/year, recommended year 3) 

2  Motivation 

1. Exchange lessons learnt inside areas (year 1) 

day  1 

2. Exchange lessons learnt outside areas (model farmers and group heads, in year 2) 

3 Tools 

or equipment 

1. Provision of small size of egg hatching machines (in year 2) 

Piece  1 

2. EM (1 bottle/1 liter)  bottle  1 3. Molasses (1 bottle/5 liters)  bottle  1 4. Lime for 2 bags, 8 Kg/ bag (year 3)  bag  2 5. Sprayer (manual)  piece  1 

4 Vaccines and medicines for treatment 

1. Vaccine (Fowl cholera) bottle/50ml (support only one time) 

bottle  2 

2. Vaccine (Newcastle M) bottle/50ml   Bottle  2 3. Vaccine (Newcastle F) bottle/50ml   bottle  2 4. Fungi for bacteria 1 bottle/300g (for year 3) 

Bottle  2 

Page 190: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 188 of 196 

5. De‐worm (piper warm) bag/50g   Bag  5 6. Vitamin (Tree MIX) 1 bag/200g   Bag  2 7. Siring 1 piece/10cc, Needle 1 box size 10/2,5cm 

box  10 

5  Marketing 

Establish and poultry raising group improvement (yearly) 

Time  4 

Provide market information, every 6 months  

Provide service information and inputs, every 6 months  

 

 

   

Page 191: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 189 of 196 

6. Fish raising 2019  

No  Necessary inputs  Details  Unit  Number 

1 Technical knowledge 

1. Training: Course on fish pond management (1 time/year, recommended to start year 3) 

Day  1 

2. Training: Course on green water improvement for blooming phlyto and zoo planktons for fishes (1 time/year, recommended to start in year 2) 

Day  1 

3. Training: Course on raise the earth worm/insects for fish feeding (1 time/year, recommended to start through 5 years) 

Day  1 

4. Training: Course on fish raising techniques and fingerling nursing in the first year (1 time/year and continue to year 3) 

Day  1 

5. Training: Course on feed production and supplemental feed preparation (1 time/year, start in year 2) 

Day  1 

6. Training: Course on fish brood stock selection and raising techniques (1 time/year in year 2) 

Day  1 

7. Training: Course on fish diseases, use of vitamin and medicine for treatment (1 time/year and continue doing through 5 years) 

Day  1 

8. Training:  Course on business plan development and economic calculation (1 time/year, recommended doing in July and August, during 3) 

Day  1 

9. Training: Course on service providing and group management (2 times/year/group, through 5 years) 

Day  1 

 2  Motivation 

Exchange lessons learnt inside area (1 time/year) 

Day  1 

Exchange lessons learnt outside areas (model farmers) 

     

3  Tools or equipment 

1. Lime (5 sack, 25 Kg/sack  Sack   5 2. Nylon net size 2.7mx3m  Piece  1 3. Green net to protect fish enemy size 60cm

x30m  roll  4 

4  Fingerlings  1. Fingerlings (tilapia, common carp, silver barb)  head  1,000 

5  Marketing 1. Group establishment and improvement

(every year) time  3 

 

   

Page 192: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 190 of 196 

VI. Policy support for Off‐Farm related professions: 

1. Food Processing 2019 

No  Necessary inputs  Details  Unit  Number 

1 Technical knowledge 

1. Training: Course on food processing techniques 1 time/year, recommended to start in Aug through 3 years 

Day  3 

2. Training: Course on packaging and store   Day  1 3. Training: Market and Service Providing   Day  1 4. Training: Course on business plan development and economic calculation1 time/year, recommended after training completed and implement yearly 

Day  1 

5. Training: Course on administration and accounting 1 time, recommended to start in April through 3 years 

Day  1 

6. Training: Couse on group management 2 times/year/group through 5 years 

Day  1 

7. Training: Course on food safety and relevant legislations   

Day  1 

2 Provision of inputs 

Provision of necessary tool/equipment only one time (not exceeded amount of 500,000 LAK) 

Set  1 

Design and print logo only one time  set  1 

3 Experience 

and Motivation 

1. Exchange lessons learnt outside area with others who have successful experiences 1 time/year/product, recommended to start in year 2 2. Conduct meeting to share lessons learnt and experience 1 time/year, through 5 years. 

day  1 

4  Marketing 

1. Group formation and improvement (yearly) 2. Provide the market information every 6 months  3. Assist to establish the market network 4. Strengthening knowledge and skills accessing to marketing 4 times/year  

Day  8 

 

   

Page 193: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 191 of 196 

2. Weaving 2019 No  Necessary inputs  Details  Unit  Number 

1  Technical knowledge 

1. Training: Course on technical design and style 1 time/year, recommended to start in Feb during 3 years  

Day  2 

2. Training: Course on dying techniques and Lao skirt production 1 time/year, recommended to implement in Feb, during 3 years 

Day  2 

3. Training: Course on business plan development, economic calculation and accounting 1 time/year, recommended to implement in March of year 

Day  1 

4. Training: Course on Group Management and Accounting 2 times/year, recommended to implement in Feb and Nov, during 3 years 

Day  1 

2  Tools or equipment 

Labelling and logo Day  1 

3  Experience and Motivation 

1. Exchange lessons learnt outside with other who are successful in business 1 time/year, during 3 years (group committees) 

Day  1 

4  Marketing 

1. Group formation and group improvement yearly through 5 years 2. Provide market information, every 3 months (yearly) 3. Support market networking  4. Strengthening knowledge and skills accessing to market 4 times /year, during 5 years 

Day  4 

 

   

Page 194: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 192 of 196 

3. Service provider 2019 No  Necessary inputs  Details  Unit  Number 

1  Technical knowledge 

1. Training: Course on business plan development and economic calculation 1 time/year, recommended to implement in 3 years 

Day  1 

2. Training: Course on administration and accounting 1 time/year, recommended in 3 years 

Day  1 

3. Training: Course on to arrange the shop, ordering products, provide services and select the products 

Day  1 

4. Disseminate the rule and taxation  Day  1 

2  Experience and Motivation 

1. Exchange lessons learnt on providing services, shop arrangement and good sale in year 1 or 2  

Day  2 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 195: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 193 of 196 

VII. Policy to support skill development related professions 

No  Training Topics  Unit  Quantity

1  Training: Course on tailor 1 time/year/person, time spend for 2 months and recommended to implement in March to May  time/person  1 

2  Training; Course on beauty/make up 1 time/year/person, time spend for 2 months and recommended to implement in Feb to April  time/person  1 

3 Training: Couse on air‐conditioner repair and installation (1 time/year/person), time spend for 6 months and recommended to implement in March to Aug 

time/person  1 

4  Training: Course on electronic repair 1 time/year/person, time spend for 6 months and recommended to implement in March to Aug  time/person  1 

5  Training: Course on carpenter 1 time/year/person, time spend for 6 months and recommended to implement in March to Aug  time/person  1 

6 Training: Course on mortar and brick layer 1 time/year/person, time spend for 6 months and recommended to implement in March to Aug 

time/person  1 

7  Training: course on wheeling 1 time/year/person, time spend for 6 months and recommended to implement in March to Aug  time/person  1 

8 Training: Course on motorbike and car repair 1 time/year/person, time spend for 6 months and recommended to implement in March to Aug 

time/person  1 

9  Training: Course on black smith 1 time/year/person  time/person  1 10  Training: Other courses, based on the personal needs  time/person  1 

11 Training: Course on business plan development and economic calculation 1 time/year/1 day (after completed vocational training course for first 2 years) 

Time  1 

12 Training: Course on business management and accounting 1 day (after completed vocational training course for first 2 years) 

Time  1 

13  Training: Course on CV and job application preparation    1 

14  Travel from home to training place 1 round trip  Round  2  

 

 

 

 

 

 

VIII. Remarks: 

Page 196: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 194 of 196 

1  If on household has two persons selected the same occupation, both of them can receive the trainings and receive the input support only one person for one set. 

2  If on household has many persons selected the different occupations, they can receive two sets of input supports (for 2 UR, self‐resettlement area, Zone 4,5). 

3  If on household has many persons selected the different occupations, they can receive three sets of input supports (for Phouhomxay).  

4  If individual person would extend his/her occupation, the NNP1PC will facilitate the processes.  

5  Activity for Home Sweet Home is for households have low incomes and are risky, especially self‐resettlers 

6  Pay 20% of input supports back into the village revolving fund, for those who have an occupation have to pay back the money 20 % after running the business in year 2.  

7  For occupation development, the NNP1PC support the knowledge and skills, he/she has to invest by his/her own money. 

8  

To support for training for personal person at the village level, NNP1PC will support the food, drinking water, tools but there is not included daily allowance. However, the work for community and outside the village, the NNP1PC will pay for daily allowance.  This support policy is internal used to implement the livelihood occupations for PAPs in the period of two years (2019‐2020)   

Governor of Xaysomboun Province  (Steering Committee for Resettlement and Livelihoods for Project Affected People of NNP1) 

   

  

 

 

   

Page 197: Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 ... · Project Number: 41924-014 Loan Number: 3153 and 3154 December 2019 Loans Nam Ngiep 1 Power Company Limited Nam Ngiep 1 Hydropower

Nam Ngiep 1 Hydropower Project                            Master Plan for Livelihood Development 

                                   Final – 19 December 2019   

 

Document No. NNP1‐C‐K0601‐RP‐002‐A                                                Page 195 of 196 

16.6 ANNEX 6 POTENTIAL INDICATORS FOR PAP TO DETERMINE LEVEL OF PROFESSIONAL  

Below listed Indicators are indicative only. Each professional group will need to establish their own indicators through a participatory process. 

Level  Potential Indicators 

Level 1 of professional development is the entry level 

PAP has selected a Profession.  PAP has prepared his/her business plan.  PAP has at least 75% of the required initial inputs 

required according to the business plan.  PAP has attended at least 2 training sessions organized by 

the project. Level 2 of professional development is the stage where the PAP is incorporating may of the lessons learned, but continues to require technical inputs to build a sustainable profession 

PAP is implementing business plan and has achieved 60% of the annual targets set out in the business plan. 

PAP has obtained least 90% of the required initial inputs.  PAP is aware how to obtained the inputs required for 

next production cycles.  PAP has attended at least 50% of the relevant training 

sessions organized by the project.  PAP is successfully implementing 75% of the lessons from 

the trainings.  PAP is earning at least 50% of target income as set in the 

personal business plan. Level 3 is the level where the PAP is implementing a profession and on track to continue to do so, while requiring less and less technical support. 

PAP has updated the business plan setting new targets based on lessons learned from the past implementation. 

PAP is successfully obtaining all inputs required for next production cycles. 

PAP has attended at least 90% of the relevant training sessions organized by the project. 

PAP is successfully implementing 85% of the lessons from the trainings. 

PAP is successfully reducing input costs, production losses and increasing production.  

PAP is earning at least 85% of target income as set in the personal business plan. 

Model Farmer  PAP has updated the business plan setting new targets based on lessons learned from the past implementation. 

PAP is successfully obtaining all inputs required for next production cycles. 

PAP can explain technical lessons to others.  PAP can identify issues and potential, analyse available 

information and formulate a step‐by‐step Action Plan.  PAP can inspire others to follow proven techniques.  PAP can seek new information using internet and arrange 