Load testing of reinforced concrete bridges in the Netherlands

48
Dr. ir. Eva Lantsoght 10/28/2016 1

Transcript of Load testing of reinforced concrete bridges in the Netherlands

  • Dr. ir. Eva Lantsoght

    10/28/2016

    1

  • General overview of work/research since graduating from VUB

    Current research line: (proof) load testing

    10/28/2016 2

  • 2003-2008: burgerlijk ingenieur bouwkunde

    2008-2009: M.S. in structural engineering, Georgia Institute of Technology

    10/28/2016 3

  • 2009-2013: PhD in Civil Engineering

    Concrete Structures research group

    Promotor: Joost Walraven Co-Promotor: Cor van der Veen

    10/28/2016 4

  • Experiments o Shear in reinforced concrete slabs o 156 experiments

    Analytical work

    o Extended Strip Model plastic analysis method for shear in slabs

    o Probability-based improvement for EC shear formula based on experiments

    Practical application

    o Quick Scan for Rijkswaterstaat

    10/28/2016 5

  • 2013 B.Sc. level, 5-year program Teaching (3 courses/semester):

    o Reinforced Concrete I o Reinforced Concrete II o Construction Materials Lab o Design of Pavements o Structural Analysis I

    Research with students for Trabajo de Titulacion

    10/28/2016 6

  • 2013-2016: Profesor auxiliar 2016 (?) - : Profesor

    Investigador Principal Titular after concurso de merecimientos y oposiciones => reduction of teaching, more research

    ACI student chapter ASCE student chapter 2013 2016: Starting ICV-Lab

    10/28/2016 7

  • Research: o Publications of PhD research o Analysis existing bridge Tambura o Torsion in slabs o Digital Image Correlation with

    cheap tools o Chancellor Grant 2015: Extended

    Strip Model o Chancellor Grant 2016: Stop

    criteria load testing (research line TU Delft)

    10/28/2016 8

  • Research lines: o Difficulties:

    contact with Ministry of Public Works? Infomation (structural plans?) Mentality: no interest in existing structures Limited facilities No research group

    o Approach: Desk research Presentations about existing structures and

    maintenance Cooperation through international committees

    10/28/2016 9

  • 2013 now: 0,2 fte Short projects

    Summer 2013:

    o Quick Scan spreadsheets for Rijkswaterstaat

    Summer 2014: o Fatigue of high-strenght concrete:

    proposal for Dutch code o Ruytenschildt Bridge collapse test

    10/28/2016 10

  • Summer 2015: o Effect of ASR on shear- and

    bending moment capacity o Proof load test viaduct Zijlweg o Support for research line proof

    load testing

    10/28/2016 11

  • Summer 2016 o Research line proof load testing o Beam tests + analysis of results o Analysis results of proof load test

    viaduct De Beek o Literature review o Overview previous proof load tests

    in NL o First draft guideline o Vechtbrug: last week collapse

    test

    10/28/2016 12

  • ACI-ASCE 421: Design of reinforced concrete slabs ACI-ASCE 445: Shear & Torsion ACI-DAfStB 445-D: Shear Databases ACI 342: Evaluation of Concrete Bridges and Bridge

    Elements TRB AFF30: Concrete Bridges TRB AFF40: Testing and Evaluation of Transportation

    Structures IABMAS, IALCCE, IABSE, fib 10/28/2016 13

  • Advanced structural engineering

    2 junior engineers Bridges: La Armenia, Los

    Pajaros (ILM), Villorita Buildings Project on concrete masonry

    houses (EQ-resistant) for coast of Ecuador

    10/28/2016 14

  • Introduction o Why proof loading? o Stop criteria?

    Overview of existing guidelines Past proof load tests by TU Delft Recommendations

    o Preparation of proof load tests o Execution of proof load tests

    Summary and conclusions Slab shear experiments, TU Delft

    10/28/2016 15

  • Bridges from 60s and 70s

    The Hague in 1959

    Increased live loads

    common heavy and long truck (600 kN)

    End of service life + larger loads

    10/28/2016 16

  • 10/28/2016 17

  • Diagnostic load testing Proof load testing

    10/28/2016 18

    Barcza ridge, Poland (Olaszek et al., 2012)

    Delaware (Jones, 2011)

  • Diagnostic load testing Calibration of FEM Strain gages over girder

    height Low load levels Rating with updated FEM

    Proof load testing Directly demonstrate that

    bridge fulfils criteria Higher load levels Larger involved risk Follow measurements Stop criteria

    10/28/2016 19

  • Safety philosophy Stop criteria:

    o Further loading not permitted o Failure near o Irreversible damage near

    MSc Thesis W. Vos 10/28/2016 20

  • Apply predetermined load to bridge o Information lacking o Damage due to ASR,

    Proof load testing

    o Immediate approval of bridge

    o Recalculate updated o RC slab bridges

    10/28/2016 21

  • Europe: DAfStB Richtlinie Stop criteria

    o Concrete strain o Steel strain o Crack width and residual

    crack width (new & existing cracks)

    o Residual deflection For flexure Structures with large existing

    cracking?

    10/28/2016 22

  • North America: o Buildings: ACI 437.2M-13 o Bridges: Manual of Bridge

    Rating Through Load Testing (1998)

    ACI 437.2M-13 stop criteria: o Residual deflection o Permanency ratio o Deviation from Linearity Index

    10/28/2016 23

  • Guideline for proof loading of existing bridges for the Netherlands

    Flexure + shear

    Stop criteria?

    10/28/2016 24

  • Proof load tests: o Heidijk 2007 o Medemblik 2009 o Vlijmen-Oost 2013 o Halvemaans Bridge 2014 o Ruytenschildt Bridge 2014 o Viaduct in the Zijlweg 2015 o Viaduct De Beek 2015 o Vecht Bridge 2016 Load test to failure of Ruytenschildt Bridge, summer 2014

    10/28/2016 25

  • Heidijk o RC slab bridge o ASR-induced damage o Loading frame o RWS + TNO

    Medemblik o Girder bridge o BELFA o RWS + TNO + ifem

    10/28/2016 26

  • Video

    10/28/2016 27

  • BELFA Viaduct with ASR-damage Viaduct remained open to

    traffic Disturbs AE measurements TU Delft + ifem:

    measurements Bridge approved

    10/28/2016 28

  • System with load spreader beam

    Bending moment capacity 1 night closure of bridge TU Delft: measurements Bridge from 1930s Approved with proof load test

    10/28/2016 29

  • Existing reinforced concrete slab bridge (1962)

    Test to failure in two spans 4 concentrated load one tandem Cyclic loading protocol Failure only achieved in span 2

    10/28/2016 30

  • Existing bridge Partial demolition and building new bridge

    10/28/2016 31

  • 10/28/2016 32

  • Proof load test for bending moment and shear

    Bridge closed for 1 week Viaduct over highway ASR-induced damage Approved thanks to proof

    load test

    10/28/2016 33

  • No material damage Extensive cracking Proof load test on Span 1 Span 2 over highway Shear and flexure position

    Bridge approved if 7% plastic

    redistribution in Span 2 is OK Check for durability/corrosion

    10/28/2016 34

  • Video

    10/28/2016 35

  • Determination of dimensions Live load: EN 1991-2:2003 RBK load levels

    o Different o Different load factors

    In FEM model o mx over 3 m o v over 4d

    10/28/2016 36

  • Critical position o Bending moment: largest

    moment o Shear: 2.5d from Support

    Required proof load o Same shear or bending

    moment as with load combination

    o Value considered safety level

    10/28/2016 37

  • Cyclic loading scheme o Acoustic emission measurements o Check linearity and reproducibility of measurements o Check residual deformations

    Stop criteria o Evaluated during tests o Research in progress o Criteria for shear failure need to be developed

    10/28/2016 38

  • Beams from Ruytenschildt Bridge o Cyclic loading protocol o Tests: Failure in shear and flexure o Measurements:

    Lasers: deflection of beam LVDTs: crack opening Acoustic emission sensors

    Beams RSB01 after failure (Yang, 2015)

    Yang, Y. (2015). "Experimental Studies on the Structural Behaviours of Beams from Ruytenschildt Bridge," Stevin Report 25.5-15-09, Delft University of Technology, Delft, 76 pp.

    Beams RSB02B after failure (Yang, 2015)

    10/28/2016 39

  • RSB 01F 02A 02B 03F 03A d (mm) 503 515.5 520 521 515 Ac (m2) 0.290 0.297 0.307 0.596 0.537 Rebar 422

    419 422 419

    422 519

    922 819

    722 819

    l 0.91% 0.89% 0.96% 0.95% 0.92%

    10/28/2016 40

  • Analysis of stop criteria ACI 437.2M-13 and DAfStB Richtlinie for RSB03F Flexure test

    ACI 437.2M-13 Criterion

    Load (kN) DAfStB Criterion

    Load (kN)

    r 340 r 150 Ipr >Pu w new crack 300

    IDL 250 Strain - PACI,st 250 PDA,st 150

    Pu 606.6 Pu 606.6 PACI,st/Pu 0.41 PDA,st/Pu 0.25

    Tersteeg, R. H. D. (2015). "Proefbelastingen op betonnen bruggen," B.Sc. Thesis, Delft University of Technology, Delft, The Netherlands, pp. 69.

    10/28/2016 41

  • Analysis of stop criteria ACI 437.2M-13 and DAfStB Richtlinie for RSB03A Shear test

    ACI 437.2M-13 Criterion

    Load (kN) DAfStB Criterion

    Load (kN)

    r >Pu r >Pu Ipr >Pu w new crack 690

    IDL 390 Strain - PACI,st 390 PDA,st 690

    Pu 706.7 Pu 706.7 PACI,st/Pu 0.55 PDA,st/Pu 0.98

    Tersteeg, R. H. D. (2015). "Proefbelastingen op betonnen bruggen," B.Sc. Thesis, Delft University of Technology, Delft, The Netherlands, pp. 69.

    10/28/2016 42

  • Use cyclic load protocol o Study linearity and repeatability of results

    Flexure: Stop criteria exceeded long before failure o Suitable stop criteria

    Crack width criterion from DAfStB + add lower bound Residual deflection DAfStB / ACI 437.2M-13 + minimum load level Deviation from Linearity ACI 437.2M-13: consistent performance except for

    retested beam BUT: Deviation from Linearity and Permanency Ratio depend on applied loading

    protocol

    Shear: o Need to develop stop criteria o Research on acoustic emission measurements

    10/28/2016 43

  • Controlled experiments in laboratory

    Heavily instrumented beams Beams: part of series of

    shear tests Study of stop criteria and

    loading protocol o Interrelated!

    First proposal for stop criteria for guideline

    10/28/2016 44

  • Previously cracked in bending moment or not? Failure mechanism Uncracked Cracked Flexural failure Concrete strains

    wmax 0.5 mm wres 0.1 mm Stiffness reduction 25 % Deformation profiles Load-displacement graph

    Concrete strains wmax 0.5 mm wres 0.1 mm Stiffness reduction 5 % Deformation profiles Load-displacement graph

    Shear failure Concrete strains wmax 0.3 mm Stiffness reduction 5 % Deformation profiles Load-displacement graph

    Concrete strains Stiffness reduction 5 % Deformation profiles Load-displacement graph

    10/28/2016 45

  • 10/28/2016 46

  • Proof loading to approve existing bridges

    Existing guidelines: o Only flexure o Cracked structures?

    Research on stop criteria Determination of maximum proof

    load o LFEA o Different safety levels

    Execution o Cyclic loading protocol o Safely applying large loads

    Viaduct Zijlweg, tested in summer 2015

    10/28/2016 47

  • Contact:

    Eva Lantsoght

    [email protected] // [email protected]

    10/28/2016 48

    mailto:[email protected]:[email protected]

    Load testing of reinforced concrete bridges in the NetherlandsOverviewBackgroundTU DelftTU Delft: ResearchUniversidad San Francisco de QuitoUniversidad San Francisco de QuitoUniversidad San Francisco de QuitoUniversidad San Francisco de QuitoResearch at TU DelftResearch at TU DelftResearch at TU DelftInternational collaborationAdstrenOverview Load TestingWhy load testing? (1)Why load testing? (2)Types of load testing (1)Types of load testing (2)Stop criteriaProof load testing of bridgesExisting Guidelines for proof loadingExisting Guidelines for proof loadingResearch needTU Delft Proof Load TestsHeidijk & MedemblikMedemblik ifem + BELFAVlijmen-OostHalvemaans BridgeRuytenschildt Bridge (1)Ruytenschildt Bridge (2)Ruytenschildt Bridge (3)Viaduct ZijlwegViaduct de Beek (1)Viaduct De Beek (2)Preparation steps (1)Preparation steps (2)Execution stepsLab testing for analysis (1)Lab testing for analysis (2)Lab Testing for analysis (2)Lab Testing for analysis (3)RecommendationsStop criteria (1)Stop criteria (2)Stop criteria (3)Summary and conclusionsSlide Number 48