Load Research Project Review of Processes for Round 2 Sampling

16
Load Research Project Review of Processes for Round 2 Sampling Presented by ERCOT Staff To the Profiling Working Group Meeting On April 24, 2007

description

Load Research Project Review of Processes for Round 2 Sampling. Presented by ERCOT Staff To the Profiling Working Group Meeting On April 24, 2007. LRS Topics to Review. VEE Standards Sample Point Replacement Rules and Process Oil/Gas Issues TDSP.csv Record Format - PowerPoint PPT Presentation

Transcript of Load Research Project Review of Processes for Round 2 Sampling

Page 1: Load Research Project  Review of Processes for  Round 2 Sampling

Load Research Project Review of Processes for

Round 2 Sampling

Presented by ERCOT Staff

To the Profiling Working Group Meeting

On April 24, 2007

Page 2: Load Research Project  Review of Processes for  Round 2 Sampling

LRS Topics to Review

VEE Standards

Sample Point Replacement Rules and Process

Oil/Gas Issues

TDSP.csv Record Format

Details of transactions sent by the TDSP

FTP Replacement Software

Primary ERCOT Contacts

Final Comments

Questions?

Page 3: Load Research Project  Review of Processes for  Round 2 Sampling

VEE Standards

ERCOT suggests continuing the use of current IDR standards Avoid confusion with multiple standards

Consistency across TDSP’s

Minimize the multiplication of errors when sample data is extrapolated to the population

Facilitates ERCOT validation upon receipt of data.

The link to the VEE standards is http://www.naesb.org/REQ/req_form.asp click on Uniform Business Practices for Unbundled Electricity Metering, Volume 2 - Published 12/05/00.

Exemptions as specified in Protocols, Section 10.11.3 “TDSP Polled Settlement Meters.”

Page 4: Load Research Project  Review of Processes for  Round 2 Sampling

Sample Point Replacement Rules

A sample point should be replaced for any of the following reasons: Unsafe conditions/vicious animals (Initially or subsequently as a result of a

change) Demolition / service removed / ESIID switches to Inactive status Customer refusal (permission requested only if necessary for access) Equipment / installation issues De-energized 12 months at time of selection De-energized 6 consecutive months after installation Incorrect weather zone (identified after sample selection) Premise switches to BUSIDRRQ Premise has competitively owned NIDR meter

Note: The above list is not meant to be all inclusive. For Round 2, a change in the voltage level no longer triggers a

replacement.

Page 5: Load Research Project  Review of Processes for  Round 2 Sampling

Oil/Gas Issues

ERCOT has screened the sample list to eliminate known oil/gas locations however others most certainly exist.

If an oil/gas point is found during the installation process, then do not install an IDR and go to a replacement sample point.

Be sure to indicate on the reason for replacement that the point was determined to be an oil/gas point.

If a sample point is switched to BUSOGFLT profile type, then the point must be replaced.

Page 6: Load Research Project  Review of Processes for  Round 2 Sampling

Replacement Point Process

Use the following process to replace a sample point:

Submit Remove Recorder (TD05) and a Stop (terminate) Sample Point (LP01) transactions using the TDSP.csv record format for the sample point being replaced. Be sure to include the reason for termination in the LP01. Of course, the TD05 does not need to be sent if no recorder was installed.

Select the replacement sample point IN ORDER from the list (i.e. do not skip sample points because another one down the list is more convenient)

Submit an Install Recorder (TD02) transaction using the TDSP.csv record format for the recorder installed at the replacement point

If no replacement samples are available, please call or send email to the Load Profile Group at ERCOT.

Page 7: Load Research Project  Review of Processes for  Round 2 Sampling

TDSP.csv Record Format

fld Name Description Len Type Comments ERCOT

only

1 Sample Designation Designation of the sample of which the ESI ID is part of 20 VARCHAR MANDATORY for all operations. Supplied by ERCOT

2 Sample Description Long Description of sample 256 VARCHAR ERCOT creates for internal use Y

3 Operation Code Decode for the operation or even that will be verified within ERCOT internal systems

4 VARCHAR MANDATORY for all operations, For operation code refer to Events Guide

4 ESI ID The ESI ID associated with the sample site and Device ID 36 VARCHAR Must be alphanumeric; Defined by Texas SET Protocols

5 Recorder ID The TDSP-defined identifying number of the IDR, associated with an ESI ID. This should be a one-to-one relationship with ESIIDs

17 VARCHAR MV-90 Recorder ID allows for 20, but ERCOT will be prefixing with TDSP code to prevent any Recorder ID duplications among the TDSPs. Recorder is optional IF AND ONLY IF the ERCOT sample load flag is populated by ERCOT only. Recorder ID is mandatory for all TDSPs

6 Sender Entity sending the information 3 VARCHAR MANDATORY for all operations; 1=ERCOT, 2=TDSP

7 Sample Begin Date 8 Date ERCOT population only when a sample begin date, YYYYMMDD Y

8 Sample Termination Date Termination of a sample. 8 Date ERCOT populate only when a sample has been terminated, Format is YYYYMMDD Y

9 Sample Point Begin Date Date when an ESI ID became an active part of a sample 8 Date Format is YYYYMMDD Y

10 Sample Point Termination Date Date when an ESI ID is no longer participating in a sample 8 Date Format is YYYYMMDD

11 Reason for Sample Point Termination Reason the sample point was terminated from the sample 256 VARCHAR Required if Sample Point Termination Date/Time is specified, else optional

12 IDR Installation Date Date the IDR was installed at a sample point 8 Date Format is YYYYMMDD

13 IDR Removal Date Date the IDR was removed from a sample point 8 Date Format is YYYYMMDD

14 Load Profile Type Load Profile Type in LodeStar 20 VARCHAR Load Profile type in LodeStar as assigned by TDSP per Profile Decision Tree Y

15 Weather Zone Weather Zone based on service address zip code 2 INTEGER Weather Zone in LodeStar as assigned by TDSP per Profile Decision Tree; in numeric form from table decode

Y

16 Service Voltage Secondary or Primary or Transmission service voltage level

1 VARCHAR Defines the service voltage as (S)econdary or (P)rimary or (T)ransmission

17 Stratum Number Stratum number for sample 2 INTEGER ERCOT-defined sample stratum number Y

18 Sequence Number Sequence number for sample sites 30 VARCHAR Sequence number will contain a P (Prime) or R (Replacement) Y

19 TDSP The TDSP number stored in LodeStar 3 INTEGER MANDATORY for all operations, MRE code, Must be 3 characters in length

20 TDSP Rate Class The TDSP defined rate class or tariff under which the ESI ID is served

2 INTEGER The TDSP rate class under which the ESI ID is served; from PUCT website decode

21 Effective Date 100 8 Date MANDATORY for all operations, Format is YYYYMMDD. Use current date if not for TDSP Rate class

Page 8: Load Research Project  Review of Processes for  Round 2 Sampling

Transaction Details – TD02

TD02 – Install IDR

Required Fields in CSV file definition:

Operation Code = Field 3

ESIID = Field 4

Recorder ID (RECID) = Field 5

Sender = Field 6 (2 = TDSP)

IDR Installation Date = Field 12 (CCYYMMDD)

TDSP = Field 19 (MRE Code, Must be 3 characters in length)

Effective Date = Field 21 (CCYYMMDD)

,,TD02,ESIID,RECID,2,,,,,,20071101,,,,,,,065,,20071101

Page 9: Load Research Project  Review of Processes for  Round 2 Sampling

Transaction Details – TD05

TD05 – Remove IDR from Stop Sample Point

Required Fields in CSV file definition:

Operation Code = Field 3

ESIID = Field 4

Recorder ID (RECID) = Field 5

Sender = Field 6 (2 = TDSP)

IDR Removal Date = Field 13 (CCYYMMDD)

TDSP = Field 19 (MRE Code, Must be 3 characters in length)

Effective Date = Field 21 (CCYYMMDD)

,,TD05,ESIID,RECID,2,,,,,,,20070306,,,,,,065,,20070306

Page 10: Load Research Project  Review of Processes for  Round 2 Sampling

Transaction Details – LP01

LP01 - Stop Sample Point Participation In Sample Required Fields in CSV file definition:

Sample Designation = Field 1

Operation Code = Field 3

ESIID = Field 4

Sender = Field 6 (2 = TDSP)

Sample Point Termination Date = Field 10 (CCYYMMDD)

Reason for Sample Point Termination = Field 11

TDSP = Field 19 (MRE Code, Must be 3 characters in length)

Effective Date = Field 21 (CCYYMMDD)

RESLO04,,LP01,ESIID,,1,,,,20071020,Reason for Sample Pt termination in Sample,,,,,,,,065,,20071020

Page 11: Load Research Project  Review of Processes for  Round 2 Sampling

FTP Replacement Software

The FTP Replacement Software - HTTPS protocol:

provides a client-server based approach to allow TDSP’s to send and receive files to/from the ERCOT server

is defined as a PUSH/PULL protocol similar to FTP. The client scripts are used to push and pull data files and reports

uses SSL (Secure Socket Layer 128-bit encryption) to provide secure communications between the TDSP and ERCOT so encryption of data from the TDSP’s will not be required

The FTP Replacement scripts SEND and RECEIVEALL are used by the TDSP’s to communicate with the ERCOT server.

Page 12: Load Research Project  Review of Processes for  Round 2 Sampling

Send Data to ERCOT – SEND Command

The SEND command is used to upload transaction and .LS (interval data cut) files from the TDSP to the TDSP’s mailbox on the ERCOT server.

An upload is considered complete (successful) when the ERCOT server responds to the SEND with a positive delivery Application Acknowledgement indicating a successful status.

An example of a SEND script is as follows:

MPCS SEND -FR 18352904900lr -TO 183529049L -UID 00000000000lr -PWD Lr000000000! -DIR C:\ERCOTFILES\OUT -ARC C:\ERCOTFILES\ARCHIVE -REJ C:\ERCOTFILES\REJECT -URL https://naesb.ercot.com:44337/servlet/lrspilot/ebxml-100 -LOG C:\ERCOTFILES\LOG\MPCSOutboundLOG.TXT

Page 13: Load Research Project  Review of Processes for  Round 2 Sampling

RECEIVEALL data from ERCOT – RECEIVEALL Command

The RECEIVEALL command is used to download files to the TDSP from the TDSP’s mailbox on the ERCOT server.

Retrieved files are stored in the Market Participant’s directory specified by the user in a command line parameter called –DIR.

An example of a RECEIVEALL script is as follows:

MPCS RECEIVEALL -FR 18352904900lr -TO 183529049L -UID 18352904900lr -PWD Lr183529049! -DIR C:\ERCOTFILES\IN -ARC C:\ERCOTFILES\ARCHIVE -REJ C:\ERCOTFILES\REJECT -URL https://naesb.ercot.com:44337/servlet/lrspilot/ebxml-100 -LOG C:\ERCOTFILES\LOG\MPCSInboundLOG.TXT

Page 14: Load Research Project  Review of Processes for  Round 2 Sampling

Primary ERCOT Contacts

Each TDSP should call or email their primary ERCOT contact if they have any questions regarding sample point transactions.

Contact the ERCOT Help Desk with FTP Replacement related questions.

CenterPoint Diana Ott [email protected] x3934

TXU ED Ron Hernandez

[email protected] x6523

TNMP , Sharyland, Nueces EC

Adrian Marquez

[email protected] x3915

AEP Bill Boswell [email protected] x3169

Page 15: Load Research Project  Review of Processes for  Round 2 Sampling

Final Comments

A copy of the “TDSP_CSV Operations Guide 1.4” has been posted under Key Documents for this meeting

Call or email your primary ERCOT contact with questions regarding sample point transactions

Contact the ERCOT Help Desk with FTP Replacement related questions.