A Feb 06 R4 INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR LM & LM-K SERIES AIR HANDLING AND/OR ELECTRIC HEATING UNITS INDOOR AND OUTDOOR MODELS UNIT MODEL NO. ___________________ UNIT SERIAL NO. ___________________ SERVICED BY: _____________________ TEL. NO: __________________________ CANADIAN HEAD OFFICE AND FACTORY USA HEAD OFFICE AND FACTORY CANADIAN EASTERN FACTORY 1401 HASTINGS CRES. SE CALGARY, ALBERTA T2G 4C8 Ph: (403) 287-2590 Fx: (403) 243-5059 Parts Fax: 888-364-2727 32050 W. 83 rd STREET DESOTO, KANSAS 66018 Ph: (913) 583-3181 Fx: (913) 583-1406 1175 TWINNEY DRIVE NEWMARKET, ONTARIO L3Y 5V7 Ph: (905) 898-1114 Fx: (905) 898-7244 Parts Fax: 905-898-1664 SALES OFFICES ACROSS CANADA AND USA Retain instructions with unit and maintain in a legible condition. Please give model number and serial number when contacting factory for information and/or parts. www.engineeredair.com

Transcript of LM & LM-K SERIES - Engineered Air

Page 1: LM & LM-K SERIES - Engineered Air

A

Feb 06 R4

INSTALLATION, OPERATION

AND MAINTENANCE MANUAL

FOR

LM & LM-K SERIES

AIR HANDLING AND/OR ELECTRIC HEATING UNITS

INDOOR AND OUTDOOR MODELS

UNIT MODEL NO. ___________________ UNIT SERIAL NO. ___________________ SERVICED BY: _____________________ TEL. NO: __________________________

CANADIAN HEAD OFFICE AND FACTORY

USA HEAD OFFICE AND FACTORY

CANADIAN EASTERN FACTORY

1401 HASTINGS CRES. SE CALGARY, ALBERTA

T2G 4C8 Ph: (403) 287-2590 Fx: (403) 243-5059

Parts Fax: 888-364-2727

32050 W. 83rd

STREET DESOTO, KANSAS

66018 Ph: (913) 583-3181 Fx: (913) 583-1406

1175 TWINNEY DRIVE NEWMARKET, ONTARIO

L3Y 5V7 Ph: (905) 898-1114 Fx: (905) 898-7244

Parts Fax: 905-898-1664

SALES OFFICES ACROSS CANADA AND USA

Retain instructions with unit and maintain in a legible condition. Please give model number and serial number when contacting

factory for information and/or parts.

www.engineeredair.com

Page 2: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

2 of 24 Feb 06 R4

TABLE OF CONTENTS

YOU HAVE RESPONSIBILITIES TOO ........................................................................................................ 3 INTRODUCTION ......................................................................................................................................... 3 SAFETY PRECAUTIONS ............................................................................................................................ 3 WARRANTY ................................................................................................................................................ 3 PARTS ........................................................................................................................................................ 4 RECEIVING ................................................................................................................................................. 4 TEMPORARY STORAGE ........................................................................................................................... 5 INSTALLATION ........................................................................................................................................... 5 CODES ....................................................................................................................................................... 5 LIFTING ...................................................................................................................................................... 7 MOUNTING ................................................................................................................................................. 8 SHIPPING MATERIALS .............................................................................................................................. 9 ASSEMBLY ................................................................................................................................................. 9 PIPING, ELECTRICAL OR CONTROL SERVICE CONNECTIONS .......................................................... 10 ELECTRICAL INSTALLATION .................................................................................................................. 10 DUCT MOUNTED TE-6000-EA3 TEMPERATURE SENSOR.................................................................... 12 COIL CONNECTIONS ............................................................................................................................... 12 DRAIN TRAPS .......................................................................................................................................... 13 FLUSHING AND DEGREASING OF WATER AND GLYCOL COILS ........................................................ 13 HEAT TRANSFER FLUIDS ....................................................................................................................... 14 BEFORE START-UP ................................................................................................................................. 14 START-UP CHECK LIST ........................................................................................................................... 14 OPERATION ............................................................................................................................................. 16 OPTIONAL ELECTRIC HEAT (LM-K Units) ............................................................................................... 16 CONTROL SETTINGS .............................................................................................................................. 17 MAINTENANCE ........................................................................................................................................ 17 ELECTRICAL ............................................................................................................................................ 18 BELT ADJUSTMENT ................................................................................................................................ 18 SET SCREWS ........................................................................................................................................... 18 BEARING SETSCREW TORQUES ........................................................................................................... 19 LUBRICATION OF FAN BEARINGS ......................................................................................................... 19 LUBRICATION OF DODGE FAN BEARINGS ........................................................................................... 20 MOTOR LUBRICATION ............................................................................................................................ 21 FILTERS ................................................................................................................................................... 22 CONTROLS .............................................................................................................................................. 22 CONTROL ENCLOSURE VENTILATION .................................................................................................. 22 OUTDOOR AIR INTAKES, MIXING SECTIONS AND DAMPERS ............................................................. 23 COILS ....................................................................................................................................................... 23 Dx Coil Bypass Dampers ........................................................................................................................... 23 ELECTRIC HEAT ...................................................................................................................................... 23

© Airtex Manufacturing Partnership. All rights reserved.

Page 3: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

3 of 24 Feb 06 R4

YOU HAVE RESPONSIBILITIES TOO

This installation, operation and maintenance manual can not cover every possibility, situation or eventuality. Regular service, cleaning and maintaining the equipment is necessary. If you are not capable of performing these tasks, hire a qualified service specialist. Failure to perform these duties can cause property damage and/or harm to the building occupants and will void the manufacturers’ warranty.

INTRODUCTION

Engineered Air units are high quality products designed and manufactured to provide many years of trouble-free operation. We recommend that this manual be read thoroughly to ensure proper installation, efficient operation and proper maintenance of this equipment. The submittal record is considered to be part of the Installation, Operation and Maintenance Manual. Please report any omissions to the national service manager.

SAFETY PRECAUTIONS

Read, understand and follow the complete manual before beginning the installation, including all safety precautions and warnings.

Warning:

Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.

Warning: This unit is connected to high voltages. Electrical shock or death could occur if instructions are not followed. This equipment contains moving parts that can start unexpectedly. Injury or death could occur if instructions are not followed. All work should be performed by a qualified technician. Always disconnect and lock out power before servicing. DO NOT bypass any interlock or safety switches under any circumstances.

WARRANTY

LIMITED WARRANTY ENGINEERED AIR will furnish without charge, F.O.B. factory, freight collect, replacement parts for, or repairs to products covered herein which prove defective in material or workmanship under normal and proper use for a period of twelve (12) months from the initial start-up or eighteen (18) months from the date of shipment, whichever expires sooner, provided the customer gives ENGINEERED AIR written notice of such defects within such time periods and provided that inspection by ENGINEERED AIR establishes the validity of the claim and all pertinent invoices have been paid in full. The repairs or replacements will be made only when the complete product(s) or part(s) claimed to be defective are returned to ENGINEERED AIR or a depot designated by ENGINEERED AIR, transportation charges prepaid. Repairs or replacements as provided for by this paragraph shall constitute fulfillment of all ENGINEERED AIR's obligations with respect to this warranty. The refrigerant charge is not included in any part of this warranty. This warranty does not apply to any products or parts thereof that have been subject to accident, misuse or unauthorized alterations, or where ENGINEERED AIR's installation and service requirements have not been met. The foregoing warranty is in lieu of all other warranties, express or implied. ENGINEERED AIR specifically disclaims any implied warranty of merchantability and/or fitness for purpose. Under no circumstances shall ENGINEERED AIR be liable to, nor be required to indemnify, Buyer or any third parties for any claims,

Page 4: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

4 of 24 Feb 06 R4

losses, labour, expenses or damages (including special, indirect, incidental, or consequential damages) of any kind, resulting from the performance (or lack thereof) of this Agreement or the use of, or inability to use the goods sold hereunder, including, but not limited to, damages for delay, temporary heating/cooling costs, loss of goodwill, loss of profits or loss of use. Furthermore, the parties agree that the Buyer's sole remedy under this Agreement shall be limited to the limited warranty set forth in the preceding paragraph relating to the repair or replacement of any defective goods. Under no circumstances shall any claim or award against ENGINEERED AIR exceed the original contract price whether awarded through arbitration, litigation or otherwise. ENGINEERED AIR Warranty is void if: 1. The unit is not installed in accordance with this manual. 2. The start-up and operation of the unit is not performed in accordance with this manual. 3. The unit is operated in an atmosphere containing corrosive substances. 4. The unit is allowed to operate during building construction.

PARTS

Warning:

Any replacement part must be of equivalent listing or certification and be functionally equivalent. The replacement part must meet the original’s specification in terms of functionality including certifications, timing, input and output range, accuracy and operation. Failure to replace parts or components with equivalent parts can cause property damage, injury or death.

1. Motors:

Motor manufacturers have service centers that will repair or replace motors as required. 2. Parts Other Than Motors:

Contact the nearest Engineered Air sales office or factory. Be sure to include Model Number, Serial Number, date of installation and nature of failure along with the description of the parts required. Some parts may not be stocked items that must be made or ordered.

RECEIVING

Refer to the back of the packing slip for receiving unit instructions. On receipt of the unit, check for damage. Inspect protective covers for punctures or other signs that there may be internal damage. Remove protective covers and check for internal damage. Replace covers if the unit is not being assembled or installed at this time. Open access doors and check for internal damage. Close access doors when the inspection is complete. All units are pre-tested at the factory immediately prior to shipping and are ensured to be in good operating condition at that time. If damage is found follow the instructions on the packing slip. On receipt of the unit, check electrical characteristics (see rating plate) to make sure the unit voltage is compatible with that available for the unit. All parts for field installation are listed on the shipping order form.

Page 5: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

5 of 24 Feb 06 R4

TEMPORARY STORAGE

If a unit is to be stored prior to installation the following precautions are required:

• Store in a well drained area that will not accumulate surface water. • Store in an area where the unit will not get damaged. • The entire perimeter and any full height cross members of the unit must be supported by a level

surface and the supporting surface must be adequate for supporting the entire weight of the unit. • All protective coverings that were provided for shipping must be in place. • Protect indoor units from rain and snow.

INSTALLATION

Warning: Only equipment bearing a CSA C22.2 No. 213 or UL 1604 rating plate (label) with an accompanying CSA Certification mark is suitable for installation in a hazardous location. The hazardous location must conform with the Class, Division, Group and temperature code (if shown) displayed on the rating plate (label). If not marked as noted above, the unit is not rated for hazardous locations and should not be installed in areas requiring any hazardous location rating.

Caution: All wiring, piping and fuel line installation must be completed by qualified persons in accordance with all federal, state, provincial and/or local codes.

Note: Installation shall be in accordance with this manual and all other associated component and

control Installation, Operation and Maintenance Manuals.

CODES

In Canada: 1. The installation of this unit shall be in accordance with the latest edition of the Canadian Electrical

Code, Part 1 – C.S.A. Standard C22.1, Provincial and Local Codes, and in accordance with the local authorities having jurisdiction.

2. This unit shall be electrically grounded in accordance with the latest edition of the Canadian

Electrical Code, Part 1 – C.S.A. Standard C22.1, Provincial and Local Codes, and in accordance with the local authorities having jurisdiction.

3. The installation of this unit shall be in accordance with the latest edition of the Canadian Natural

Gas and Propane Installation Code, C.S.A. Standard B149.1, Provincial and Local Codes, and in accordance with the local authorities having jurisdiction.

4. In accordance with local authorities having jurisdiction or CSA. Standard B149.1 a readily accessible approved manual shut-off valve shall be installed in either the drop or riser as close as possible to the valve train (gas manifold).

Page 6: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

6 of 24 Feb 06 R4

5. The installation of this unit shall be in accordance with the latest edition of the National Plumbing Code of Canada, Provincial and Local Codes, and in accordance with the local authorities having jurisdiction.

6. The installation of this unit shall be in accordance with all other National, Provincial and Local

Codes, and in accordance with the local authorities having jurisdiction. In USA: 1. The installation of this unit shall be in accordance with the latest edition of the National Electrical

Code (ANSI/NFPA 70), State and Local Codes and in accordance with the local authorities having jurisdiction.

2. This unit shall be electrically grounded in accordance with the latest edition of the National

Electrical Code (ANSI/NFPA 70), State and Local Codes and in accordance with the local authorities having jurisdiction.

3. If the unit has not been provided with an electric disconnect switch, one of adequate ampacity shall

be installed in accordance with Article 430 of the National Electrical Code (ANSI/NFPA 70). 4. The installation of this unit shall be in accordance with the latest edition of the National Fuel Gas

Code ANSI/Z223.1/NFPA 54, State and Local Codes and in accordance with the local authorities having jurisdiction.

5. In accordance with local authorities having jurisdiction or NFPA 54 an accessible approved manual shutoff valve shall be installed within 6 ft (1.8 m) of the valve train (gas manifold).

6. The installation of this unit shall be in accordance with the latest edition of the National Standard

Plumbing Code (NSPC), State and Local Codes and in accordance with the local authorities having jurisdiction.

7. The installation of this unit shall be in accordance with all other National, State and Local Codes, and in accordance with the local authorities having jurisdiction.

Page 7: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

7 of 24 Feb 06 R4

MINIMUM CLEARANCE TO COMBUSTIBLES AND FOR SERVICE IN INCHES (mm)

MODEL COMBUSTIBLE CLEARANCE SERVICE CLEARANCE

TOP FRONT BACK SIDE BOTTOM SERVICE SIDE CONTROL PANEL †

ELECTRIC HEAT 1" (25) 1" (25) 6" (152) 1" (25) 0 UNIT WIDTH + 10" (254)

42" (1067)

FLUID COILS & RECOVERY DEVICES

1" (25) 1" (25) 1" (25) 1" (25) 0 UNIT WIDTH 42" (1067)

OTHER UNITS 1" (25) 1" (25) 1" (25) 1" (25) 0 24" (610) 42" (1067)

† - As required by the Canadian Electrical Code or the National Electrical Code. For Safety and Service, the minimum clearances must be observed.

LIFTING

Engineered Air units are constructed on a structural steel base frame. The unit base frame is equipped with lifting lugs specifically located to facilitate proper lifting of the unit. Spreader bars must be used to keep rigging away from the unit cabinetry. All lifting lugs must be used. If using a lift truck, ONLY lift using the perimeter structural frame. DO NOT allow forks to lift on cabinet or unit floor. Note: There may be bottom mounted components, such as drain piping, that can be easily damaged.

Warning: Injury or death can result from improper rigging and lifting. Rigging and lifting of equipment must be performed by qualified personnel with proper equipment using appropriate and approved safety precautions.

Page 8: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

8 of 24 Feb 06 R4

MOUNTING

Units must be mounted level. Failure to do so can cause water to be trapped in drain pans or operational problems that can void warranty. Failure to do so can result in injury or death, damage the equipment and/or building and can be a cause of poor indoor air quality. Equipment must be installed so that sufficient working clearance and component access is provided. Some units are designed for cantilevered installation. Consult the Submittal Record for specific unit mounting. Consult the Submittal Record for specific unit mounting. Engineered Air units are constructed for three types of mounting: 1. Base mounting – Consult the Submittal Record for type of mounting. Unless the unit is specifically

designed for point or other mounting, the base of the unit must be supported continuously by a mounting support system that is directly below the unit structural base frame and runs the entire length and width of the unit. Refer to the Submittal Record for mounting information. Units 100” (2500mm) wide and under can be supported on each side continuously along the length of the unit. As a minimum, sleepers that are installed perpendicular to the length of the unit must be continuous across the width of the unit and shall be installed at the end lifting point base rails and the lesser of 80” (2000mm) on center or at all lifting points.

2. Suspended mounting – Where units have been designed for suspended mounting, factory provided

connections for hanger rods will be provided. All hanger rod supports must be used. Suspended units must be protected from damage. When installed in aircraft hangers, parking garages or repair garages the installation must comply where applicable with:

a) The Canadian Natural Gas and Propane Installation Code, C.S.A. Standard B149.1 b) The Standard on Aircraft Hangers, ANSI/NFPA 409 c) The Standard on Parking Garages, ANSI/NFPA 88A d) The Standard on Repair Garages, ANSI/NFPA 88B

3. Roof curb mounting – The curbs are constructed of heavy gauge load bearing, galvanized steel,

and must be fully insulated after installation. Wood nailer strips are provided for easy attachment of roof flashing. Gasket material is supplied with the unit and must be field mounted on the curb to seal the joint between the curb and the unit frame. The curb must be supported along its entire perimeter and any full height cross members as shown on the shop drawings. Point loading of curbs is not permissible. The gasket material provided for the curb is closed cell foam. Closed cell foam is dense and does not compress easily. If the unit is split and shipped in sections there will also be gasket material for sealing between sections. The gasket material for splits is open cell foam. It is less dense than the closed cell foam and compresses easily. ONLY USE THE CLOSED CELL FOAM GASKET PROVIDED FOR SEALING THE CURB. Curbs may be broken down for shipping. Field assembly is required by the installing contractor. Bolt all sections together at split joints using hardware provided. The installing contractor must caulk and seal all joint and corner flashings. All flashings and braces that are provided must be installed. DO NOT screw/penetrate joint, corner or adaptor flashings. Refer to assembly instructions sent with roof curb.

Page 9: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

9 of 24 Feb 06 R4

SHIPPING MATERIALS

Remove shipping materials. Shipping materials may include, but are not limited to:

• Protective covers over openings, inlets, condenser coils etc. • Protective covers over split sections if provided. • Tie-down bolts, straps and blocks on fan and compressor vibration isolators. • Tie-down bolts, straps and blocks on tilt equipped heat pipes and enthalpy/desiccant wheels if

supplied. • Indirect fired heat exchangers may be supported with wood for shipping. Remove.

ASSEMBLY

Warning: Assembly of split units requires bolting together the base frame of adjacent sections. This may require personnel to work under the unit during assembly. Injury or death can result from improper support or improper loading of the curb. Additional temporary support shall be provided by the installer for the safety of personnel.

If the unit is split and shipped in sections, the sections must be field assembled. All sections are pre-drilled for assembly. The hardware and gaskets are packed in one of the sections. Apply the gasket, align the sections. The base frame must be bolted together first. Access below the unit for bolting of the base frame must be provided. Once the base frame has been tightly fastened, loosely assemble all the bolts and nuts, and then tighten. Caulk all split lines. Install split joint caps. The inlet hood is designed for field installation. On outdoor units connect the hood to the support flange and attach with appropriate fasteners. Connect all wiring on units that had been split for shipment. The gasket material provided for the split is open cell foam. Open cell foam is light and compresses easily. If the unit is mounted on a curb provided by Engineered Air there will also be gasket material for sealing the curb. The gasket material for curbs is closed cell foam. It is more dense than open cell foam and does not compress as easily. ONLY USE THE OPEN CELL FOAM GASKET PROVIDED FOR SEALING THE SPLIT(S). Split unit wiring All split wiring must be completed by an electrician prior to starting the equipment. A number of different methods are used to reconnect the wiring. Power wire: this wiring is generally not broken or spliced, and will extend from the device back to the contactor or terminal block inside the electrical panel(s). The wire will be tagged to identify which panel it extends to and will be numbered to the corresponding connection. The location of the equipment split line may result in the wire being disconnected at the device it is feeding. The wire bundle will be tagged and identified. Confirm correct rotation of 3 phase devices after the wiring connections has been completed. Control wire: this wire is typically broken near the split line, to be reconnected at either a enclosed terminal block, junction box or extended to a nearby control panel. Each wire or wire bundle will be tagged and numbered to indicate the location it is sent to. Sensor wire shield: The drain wire from the shield must be grounded (at one end only). A ground connection point is available for connection at the point of termination.

Page 10: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

10 of 24 Feb 06 R4

All loose wiring must be securely fastened to the equipment casing upon completion.

PIPING, ELECTRICAL OR CONTROL SERVICE CONNECTIONS

DO NOT install anything that will interfere with equipment access or the rating plate. Engineered Air equipment is constructed with cabinet and floors designed to prevent water from entering the building through the installed unit. When ordered, factory installed pipe chases and/or electrical chases are built into the unit floor. Factory chases are provided with covers that need to be replaced and sealed after piping and electrical connections are made. THE FLOOR OF THE UNIT HAS BEEN MADE WATER-RESISTANT. DO NOT CUT OR DRILL HOLES IN THE FLOOR OR USE PENETRATING FASTENERS. All penetrations through the unit walls must be caulked and sealed to prevent air and/or water from entering the unit.

ELECTRICAL INSTALLATION

DO NOT install anything that will interfere with equipment access or the rating plate. The unit must be electrically grounded and all wiring must be installed in accordance with the National Electrical Code, ANSI/NFPA 70, and/or the Canadian Electric Code CSA 22-1 and to the approval of the authorities having jurisdiction. THE FLOOR OF THE UNIT HAS BEEN MADE WATER-RESISTANT. DO NOT CUT OR DRILL HOLES IN THE FLOOR OR USE PENETRATING FASTENERS. Field wiring diagrams, internal wiring diagrams and operating functions are included in the control cabinet. The power requirements are indicated on the rating plate. Where field wiring of control circuits is required, take care to size the field wiring for a maximum 10% voltage drop. The control circuit ampacity is noted on the field wiring diagram. See the field wiring diagram for requirements for shielded or twisted pair wire for solid state devices.

Caution: Temporary Power Generation The warranty will be void if the voltage being fed from any temporary generator is not within 10% of the nominal rated nameplate voltage and voltage imbalance shall be limited to 2%. A power monitor shall be installed by others to properly monitor power quality and conditions. All generator sets shall be provided with overcurrent and earth-fault protection. The protective apparatus should be capable of interrupting, without damage, any short-circuit current that may occur.

Warning: No unspecified external load shall be added to the control transformer circuit(s) or to the main power circuit(s).

Page 11: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

11 of 24 Feb 06 R4

Recommended 24V Field Wiring Size: Copper conductors only

Circuit Load

(Amps) (1)

Maximum Total Length of Run

< 50 Ft < 100 Ft < 150 Ft < 200 Ft < 250 Ft < 300 Ft < 350 Ft < 400 Ft < 450 Ft < 500 Ft

(~ 15 m) (~ 30 m) (~ 45 m) (~ 60 m) (~ 75 m) (~ 90 m) (~ 105 m) (~ 120 m) (~ 135 m) (~ 150 m)

1 16 AWG 16 AWG 16 AWG 16 AWG 16 AWG 16 AWG 14 AWG 14 AWG 14 AWG 12 AWG

2 16 AWG 16 AWG 16 AWG 14 AWG 12 AWG 12 AWG 12 AWG 10 AWG 10 AWG 10 AWG

3 16 AWG 16 AWG 14 AWG 12 AWG 12 AWG 10 AWG 10 AWG 10 AWG

4 16 AWG 14 AWG 12 AWG 10 AWG 10 AWG 10 AWG

5 16 AWG 12 AWG 12 AWG 10 AWG

6 16 AWG 12 AWG 10 AWG 10 AWG

7 14 AWG 12 AWG 10 AWG

8 14 AWG 10 AWG 10 AWG

9 14 AWG 10 AWG

10 12 AWG 10 AWG

11 12 AWG 10 AWG

12 12 AWG 10 AWG

13 12 AWG

14 12 AWG

15 12 AWG

Notes: 1) The field wiring load depends on the actual load on a particular control circuit the field wiring is

connected to. Refer to the internal wiring diagram of the unit. 2) The table above is based on a maximum 10% voltage drop on a 24V control circuit. Wire size was

calculated using the following formula: CM = (25 x I x L ) / V Where CM is circular mils of conductor for a constant load of I amps, wire length L in feet from the unit to the field device and back, and voltage drop V.

When connecting to a three phase power supply, check for the correct rotation of all motors and fans. If the rotation is incorrect, reverse the rotation at the incoming power only. All electrical conduit outlets in the control panel must be sealed to prevent moist building air from migrating to the control panel. All penetrations through the unit walls must be caulked and sealed to prevent air and/or water from entering the unit.

Page 12: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

12 of 24 Feb 06 R4

DUCT MOUNTED TE-6000-EA3 TEMPERATURE SENSOR

Some applications require field installed discharge air sensors. The sensor strip must be parallel to the air flow. The sensor should be mounted near the center of a straight duct 5 to 10 feet (1500 to 3000mm) downstream of the supply air connection to the Engineered Air unit. Avoid installing near duct transitions or elbows. Use twisted pair or shielded wiring. The ground shield should be grounded only at the unit control panel end. Protect the opposite end ground and any unused wire with electrical tape. When installing an Engineered Air TE-6000-EA3 duct mounted temperature sensor, the sensor strip must be parallel to the air flow as shown.

COIL CONNECTIONS

This equipment may require field connection of water, steam or refrigerant coils. For proper operation airflow must be counterflow to the flow of the fluid. The inlet water connection is normally at the bottom of one header and the outlet water connection at the top of the other header. The steam connection is at the middle of the supply header and the condensate is at the bottom of the other header.

Caution:

Use a backup wrench on threaded coil connections when installing piping.

For refrigerant coils, all piping is to be installed by a qualified refrigeration mechanic. All refrigeration specialties shall be installed using good refrigeration installation and design practices. Recovery, reuse, recycling, reclamation, and safe disposal of refrigerant is the only acceptable practice today. Venting of refrigerant into the atmosphere during installation or servicing is unacceptable. To avoid damage, use an accepted refrigerant recovery system whenever removing refrigerant. When working with refrigerants you must comply with all local government safety and environmental laws.

Page 13: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

13 of 24 Feb 06 R4

DRAIN TRAPS

Each drain connection requires a separate drain trap supplied and installed by the contractor. For a trap to work properly, it must be primed. During freezing periods, primed traps may need to be heat traced or drain and plug the trap when not in use. If a drain connection has a smaller pipe inside, connect to the outer pipe only. Ensure that the trap is of adequate depth to operate against a static that includes the extra pressure drop for dirty filters.

Warning: Failure to properly trap each connection can result in drain pan flooding, standing water in unit, building damage, injury or death, cause poor air quality or other problems.

In some applications (e.g. heat recovery units) there may be additional drain connections inside the curb intended to be connected to the building drainage system. These drains must be connected and properly trapped. Cooling coil drain pans may have multiple drain connections extending outside the unit casing. Multiple drains may be connected to a common drain providing that each drain is individually trapped and vented to avoid problems from drains in different pressure zones. The drain must be properly sized and sloped. Size drain trap with the following minimum requirements: a) Units With Draw Through Drain Pans:

H1 = Negative Static

† x 1.5 + 3.5” (89mm)

H2 = Negative Static† x 0.75 + 2.5” (64mm)

b) Units With Blow Through Drain Pans:

H2 = Maximum Positive Static

† x 1.5

H1 = H2 + 0.5” (13mm) † Static Water Column (WC) in inches or mm

including fully loaded filters.

Ensure adequate clearance for properly sized drain traps.

FLUSHING AND DEGREASING OF WATER AND GLYCOL COILS

Coil tubing may contain material or residue from manufacturing, transportation or storage. To prevent possible damage to other components in the system, the coils must be flushed and degreased. Consult a qualified water treatment specialist.

H1

H2

H1

H2

VENT & PRIMINGFUNNEL

TO DRAIN

OPTIONALCLEAN OUT

ATMOSPHERIC

Page 14: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

14 of 24 Feb 06 R4

HEAT TRANSFER FLUIDS

The coil(s) provided have been selected for use with a specific heat transfer fluid as shown on the Submittal Record. Use of other fluids will result in different performance and can damage the coil(s). It is imperative to properly select and apply heat transfer fluids used in heating and cooling systems. Untreated, improperly treated or improper use of fluids or use of fluids not approved for use in commercial heating and cooling systems can damage coils and system components. For selection and application of heat transfer fluids, always follow the manufacturers’ recommendations including treatment, mixing and filling. Warranty will be void if coil damage results from misapplication or improper treatment of the heat transfer fluid. Some systems may use CPVC piping. Do not use propylene glycol with CPVC.

BEFORE START-UP Remove tie-down bolts, straps and blocks on fan and compressor vibration isolators, tilt equipped heat pipes and enthalpy/desiccant wheels if supplied.

START-UP CHECK LIST

Warning: This unit is connected to high voltages. Electrical shock or death could occur if instructions are not followed. This equipment contains moving parts that can start unexpectedly. Injury or death could occur if instructions are not followed. All work should be performed by a qualified technician. Always disconnect and lock out power before servicing. DO NOT bypass any interlock or safety switches under any circumstances.

The start-up and operation must be in accordance with safe practices. Start-up must be performed by qualified personnel. Complete attached start-up record. 1. Set all associated electrical switches, controls, thermostats and main disconnect switch to “OFF”

position. 2. Close all manual valves and field piping valves.

3. Confirm that all shipping materials have been removed. See any supplemental instructions shipped with the unit to help identify possible locations.

Check all bearings, drive and fan set screws for tightness. See TABLE I 4. Check drive alignment and belt tension. Refer to Maintenance, page 17. 5. Inspect all electrical wiring, both field and factory installed, for loose connections. Ensure fire alarm

contact is installed, or jumpered if not required. 6. Turn disconnect switch ON (control switch is still off) and check the supply voltage. Voltage must be

within 10% of rating plate. If not, contact the installing electrical contractor and have the voltage condition corrected before continuing start-up.

7. Check all fan motors for correct rotation. If incorrect, reverse rotation on incoming power only. 8. Set thermostat or controller to the “OFF” position and turn unit control switch “ON”.

Page 15: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

15 of 24 Feb 06 R4

9. Check the amperage draw of each motor and compressor. Refer to unit or motor rating plate for full

load amps. At the unit, check and record the voltage while it is running. For 3 phase power the phase to phase voltage imbalance should be less than 2%. A 2% voltage imbalance can cause up to a 10% current imbalance that will overheat motor windings. To calculate voltage imbalance (NEMA method) refer to the following example: Phase to phase voltage readings: 235V 236V 230V The average Voltage between legs is 233.7V (235+236+230)/3 Highest voltage deviation from average is: 233.7V – 230V = 3.7V Voltage imbalance percentage = Highest deviation divided by average X 100 3.7 / 233.7 x 100 = 1.6% This imbalance is less than 2% and therefore is OK If voltage imbalance is greater than two percent (2%), turn off main disconnect and contact the installing electrical contractor to have the voltage condition corrected.

10. Enable heating and/or cooling; refer to unit function for correct sequence and operation. 11. Confirm field wiring voltage drop is less than 10% when equipment is operating. 12. For the unit to operate properly a system air balance must be performed to ensure correct air flow.

Failure to do so can damage the equipment and/or building and can be a cause of poor indoor air quality.

13. Damper sections:

a) Flat mixing dampers:

Both the fresh air and return air dampers are fully open when the dampers are at a 45° angle when fully stroked. This provides optimum mixing of the air streams for this damper arrangement.

b) Angle mixing damper:

Angle mixing section dampers open to an angle of 90° when fully stroked. This provides optimum mixing of the air streams for this damper arrangement.

14. Some units are equipped with an adjustable coil air bypass. This must be field adjusted during the

system air balance to ensure proper air flow across the coil. Adjust the bypass to achieve coil pressure drop as stated on the submittal and/or the unit function sheet.

15. Check setting of fan limit control(s). Adjust high limit to value indicated below unless wiring diagram

shows a different value. High Limit 180°F (82°C) Fan Switch ON 125°F (52°C) OFF 90°F (32°C)

16. Set all controls to the settings indicated on the wiring diagram. 17. Re-install all access panels. 18. Remove any packing material or debris and dispose appropriately.

Page 16: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

16 of 24 Feb 06 R4

OPERATION

Warning: This unit is connected to high voltages. Electrical shock or death could occur if instructions are not followed. This equipment contains moving parts that can start unexpectedly. Injury or death could occur if instructions are not followed. All work should be performed by a qualified technician. Always disconnect and lock out power before servicing. DO NOT bypass any interlock or safety switches under any circumstances.

Warning: Proper commissioning and start-up of the air handling system is the responsibility of the installing contractor. It is recommended that an air balance be completed by a certified air balancing contractor to insure the air volume being delivered matches the unit rating plate. Failure to perform a proper air balance can cause injury or death, damage to the equipment, property damage, system operational problems, or be a cause of poor air quality. Moisture carry over can result from improper air flow.

This unit may incorporate one or more functions and a variety of controls and options to suit individual requirements. A description of the unit functions and options is shown on the Electrical Data Sheet and unit wiring diagram. Carefully check your wiring diagram to verify that all remote controls are properly located and correctly field wired. Some equipment may contain programmable unitary controllers or programmable logic controllers (PLC). Additional information can be obtained from the specific programmable control manufacturer. Often this information is available from the control manufacturer’s website.

OPTIONAL ELECTRIC HEAT (LM-K Units)

1. When the supply air fan is running and supplying the required volume of air, the air flow proving

switch will be closed. 2. Electric heat coils may operate as a heater and/or with dehumidification as reheat. 3. An LM-K electric heating unit incorporates an air proving switch, access section door switches and

two high limit controls. These controls prevent the heat from operating under low and no air flow conditions. On normal shut down the fan will delay off to cool the heating element.

4. Typically LM-K units use an Engineered Air HTRAC controller. Check the HTRAC manual for

additional information. 5. If the electric heater is controlled by a Silicon Controlled Rectifier (SCR) refer to the manufacturer’s

Operation Manual provided.

Page 17: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

17 of 24 Feb 06 R4

CONTROL SETTINGS

The following settings of the adjustable controls are acceptable for most applications. Refer to unit function and wiring diagram for settings specific to your unit. Single and two stage ductstat: 55 – 70°F (13 – 21°C). Single, two stage and modulating space thermostat: 68 – 74°F (20 –23°C). Remote temperature selector: 60 – 70°F (16 – 21°C). Mixed air temperature controller: 55°F (13°C). Low discharge air limit: 40°F (5°C). Ambient control: 50 – 70°F (10 – 21°C). Economizer ambient changeover control: 70 – 75°F (21 – 24°C).

MAINTENANCE

Warning: This unit is connected to high voltages. Electrical shock or death could occur if instructions are not followed. This equipment contains moving parts that can start unexpectedly. Injury or death could occur if instructions are not followed. All work should be performed by a qualified technician. Always disconnect and lock out power before servicing. DO NOT bypass any interlock or safety switches under any circumstances.

Warning: Follow the cleaning instructions and recommended inspection schedule to reduce the risk of mold or other bacterial growth. Property damage or personal injury claims may result from mold or biological growth arising from improper installation, inadequate maintenance, or failure to inspect. Engineered Air has no responsibility for and makes no express or implied warranties regarding mold or bacterial growth or any other indoor air quality issues. If mold or biological growth is present, determine and fix the cause. Properly remove and dispose of the contamination. Properly clean and sanitize the affected area using only approved sanitizers suitable for HVAC equipment.

To provide a maintenance history, It is recommended that the owner have a maintenance file for each unit. The following maintenance instructions are to be carried out each spring and fall or as otherwise indicated by qualified service personnel.

Caution:

Label all wires prior to removal when servicing controls or critical components. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

Page 18: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

18 of 24 Feb 06 R4

ELECTRICAL

1. Check all wiring for loose connections. 2. Check voltage at unit (while in operation). 3. Check amperage draw against unit rating plate. 4. Where possible, all contactors should be inspected to ensure that contacts are clean and are

making good contact. If contacts are abnormally pitted or burned badly, replace contactor. Single phasing and motor burnouts can result from bad contacts.

BELT ADJUSTMENT

For maximum belt and bearing life, pulley alignment and belt tension must be properly maintained. Only replace with belts of the proper type and size. NOTE: If belts are too tight or improperly aligned, the life expectancy of the motor(s), fan bearings and belt(s) are reduced. Alignment: Pulleys must be aligned to within 1/16” per foot (1mm per 760mm) of span. FOR FANS EQUIPPED WITH SPIDER BRACKETS: A properly adjusted V-belt rides the inside of the pulley faces. Because the sides of the belt wedge in the pulleys, the V-belt does not have to be extremely tight. It should be as loose as possible without slipping in the pulley grooves. Belt deflection: 3/4 “ (19mm) for each foot (300mm) of span between the pulleys. FOR FANS EQUIPPED WITH PILLOW BLOCK BEARINGS: Belt Deflection: Allow 1/64” (0.4mm) of deflection for each 1” (25.4 mm) of span length.

CAUTION: Excessive belt tension is the most frequent cause of belt wear, bearing wear and noise.

SET SCREWS

Check set screws on fan wheel, fan bearings, fan and motor pulleys for looseness on the shaft. Tighten where required. IT IS IMPORTANT TO PERFORM THIS CHECK BEFORE INITIAL START-UP, AFTER A RUN-IN PERIOD OF 2 WEEKS AND THEN ON 4 MONTH INTERVALS.

CAUTION: OVERTIGHTENING SET SCREWS CAN DAMAGE BEARINGS.

DEFLECTION

SPAN

Page 19: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

19 of 24 Feb 06 R4

BEARING SETSCREW TORQUES

TABLE I

Shaft diameter NTN KOYO NTN KOYO DODGE

Type UC SERIES

(set screw)

UK SERIES

(adapter sleeve locknut) SC 203-215 SERIES

3/4" (19mm) 35 in-lb (3.9 Nm) 35 in-lb (4.0 Nm) Install the washer and lock nut; tighten the nut fully by hand.

Apply a punch or screw driver into the notch of the nut and tap it with a hammer. Stop tapping after the nut has turned 60° to 90°. Do not strike the seal.

Bend the tab on the rim of the washer, which is in line with the notch of the nut.

If a tab does no line up with a notch, tighten the nut further. DO NOT BACK THE NUT OFF.

66 - 80 in-lb (7.5 - 9 Nm)

1" (25mm) 35 in-lb (3.9 Nm) 35 in-lb (4.0 Nm) 126 - 156 in-lb (14 -18 Nm)

1 3/16" (30mm) 43 in-lb (4.9 Nm) 35 in-lb (4.0 Nm) 126 - 156 in-lb (14 -18 Nm)

1 7/16" (37mm) 51 in-lb (5.8 Nm) 75 in-lb (8.5 Nm) 126 - 156 in-lb (14 -18 Nm)

1 11/16"(43mm) 69 in-lb (7.8 Nm) 75 in-lb (8.5 Nm) 228 - 272 in-lb (26 -31 Nm)

1 15/16"(49mm) 69 in-lb (7.8 Nm) 155 in-lb (17.5 Nm) 228 - 272 in-lb (26 -31 Nm)

2 3/16"(56mm) 87 in-lb (9.8 Nm) 155 in-lb (17.5 Nm) 228 - 272 in-lb (26 -31 Nm)

2 7/16"(62mm) 147 in-lb (16.6 Nm) 155 in-lb (17.5 Nm) 228 - 272 in-lb (26 -31 Nm)

2 11/16"(68mm) 173 in-lb (19.6 Nm) 248 in-lb (28.0 Nm) 228 - 272 in-lb (26 -31 Nm)

2 15/16"(75mm) 173 in-lb (19.6 Nm) 248 in-lb (28.0 Nm) 228 - 272 in-lb (26 -31 Nm)

Refer to bearing manufacturers’ literature for all other types of bearings.

LUBRICATION OF FAN BEARINGS

Some fans have permanently lubricated sealed ball bearings which should not require lubrication. These bearings are factory packed 30 to 50% full. Bearings that require lubrication should be greased while the bearing is rotating slowly, with the following quantities of a lithium base lubricant. DO NOT OVERGREASE. DO NOT USE NON-LITHIUM BASED GREASE. Extended lubrication lines may be provided. Tubing is not factory filled. RECOMMENDATIONS FOR BALL BEARINGS

Bearing Temperature ° F (°C)

Re-Greasing Interval

Clean Dusty Dusty & Wet

Under 120 (50) 2 ½ Years Yearly 4 Months

Under 158 (70) Yearly 4 Months 1 Month

Shaft Dia. 3/4"

(19mm) 1"

(25mm) 1 3/16"

(30mm) 1 7/16"

(37mm) 1 11/16" (43mm)

1 15/16" (49mm)

2 7/16" (62mm)

2 15/16" (75mm)

Grease 0.06 oz.

(1.8g) 0.12 oz.

(3.3g) 0.20 oz.

(5.6g) 0.23 oz.

(6.5g) 0.27 oz.

(7.7g) 0.36 oz. (10.3g)

0.53 oz. (14.9g)

1.00 oz. (31.0g)

For additional information refer to the fan and/or bearing manufacturers’ literature.

Page 20: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

20 of 24 Feb 06 R4

LUBRICATION OF DODGE FAN BEARINGS

Suggested Re-lubrication Schedule (Months)* for Dodge Ball Bearing Pillow Block

Speed (RPM) 500 1000 1500 2000 2500 3000 3500 4000 4500

Shaft DIA.

½” - 1 1/16” 6 6 5 3 3 2 2 2 1

1 15/16” – 2 7/16” 6 5 4 2 2 1 1 1 1

2 11/16” – 2 5/16” 5 4 3 2 1 1 1

3 7/16” – 3 15/16” 4 3 2 1 1

* Suggested initial greasing interval. . If safety permits, re-lubricate while running until some purging occurs at seals. Adjust lubrication frequency depending on condition of purged grease. Hours of operation, temperature and surrounding conditions will affect the re-lubrication frequency required. For 24 hour operation double the lubrication frequency. Lubricate with a multipurpose NLGI No. 2 or No. 3 ball bearing grease having rust inhibitors, antioxidant additives and a minimum viscosity of 500 SSU at 100°F (38°C). Some examples of grease having these properties are: Shell Alvania RL 2 Mobil Mobilith SHC220 Exxon Ronex MP Lubricate bearings prior to extended shutdown or storage and rotate shaft monthly to aid corrosion protection.

Suggested Re-lubrication Schedule (Months)* for Dodge Spherical Roller Bearing - Solid Pillow Block

Speed (RPM) 500 1000 1500 2000 2500 3000 3500 4000 4500

Shaft DIA.

1 3/16” – 1 7/16” 6 4 4 2 1 1 1 1 1/2

1 11/16” – 2 3/16” 4 2 1 1/2 1 1/2 1/2 1/2 1/2 1/2

2 7/16” – 3 7/16” 3 1 1/2 1 1/2 1/2 1/4 1/4

3 15/16” – 4 15/16” 2 1/2 1 1/2 1/4

* Suggested initial greasing interval. If safety permits, re-lubricate while running until some purging occurs at seals. Adjust lubrication frequency depending on condition of purged grease. Hours of operation, temperature and surrounding conditions will affect the re-lubrication frequency required. For 24 hour operation double the lubrication frequency. Lubricate with a multipurpose roller bearing NLGI No. 2 having rust inhibitors and antioxidant additives, and a minimum oil viscosity of 500 SSU at 100°F. Some examples of grease having these properties are: Shell Alvania No. 2 Mobil Mobilith AW2 Mobilith SHC100 Texaco Premium RB2 American Rykon Premium 2

Page 21: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

21 of 24 Feb 06 R4

Lubricate bearings prior to extended shutdown or storage and rotate shaft monthly to aid corrosion protection.

Suggested Re-lubrication Schedule (Months)* for Dodge Spherical Roller Bearing – Split Pillow Blocks

Speed (RPM) 500 750 1000 1500 2000 2500 3000 3500 4000 ** oz.

Shaft DIA.

1 7/16” – 1 15/16” 6 4 1/2 4 4 3 1/2 2 1/2 2 1/2 1 1 0.05

2 3/16” – 2 11/16” 5 4 1/2 4 2 1/2 2 1/2 1 1/2 1/2 1/4 1/4 0.75

2 15/16” – 3 15/16” 4 1/2 4 3 1/2 2 1/2 1 1/2 1 1/2 2.00

4 7/16” – 4 15/16” 4 4 2 1/2 1 1/2 4.00

5 7/16” – 5 15/16” 4 2 1/2 1 1/2 1 7.00

* Suggested initial greasing interval. Remove bearing cap and observe condition of used grease. Adjust lubrication frequency as needed. Hours of operation, temperature and surrounding conditions will affect the re-lubrication frequency required. Clean and repack bearing annually. Remove old grease, pack bearing full and fill housing reservoirs on both sides of bearing to bottom of shaft. For 24 hour operation double the lubrication frequency. ** Grease to be added at each interval. Lubricate with a multipurpose roller bearing NLGI No. 2 having rust inhibitors and antioxidant additives, and a minimum oil viscosity of 500 SSU at 100°F. Some examples of grease having these properties are: Shell Alvania No. 2 Mobil Mobilith AW2 Mobilith SHC100 Texaco Premium RB2 American Rykon Premium 2 Lubricate bearings prior to extended shutdown or storage and rotate shaft monthly to aid corrosion protection. Static Oil Lubrication Use only highest quality mineral oil with a minimum viscosity of 100 SSU at the oil’s operating temperature. The oil’s operating temperature is approximately 10°F greater than the bearing’s housing. SAE values having this viscosity at the following operating temperature are: 150° - SAE 20 160° - SAE 30 180° - SAE 40 Static oil level should be at the center of the lower-most roller (do not overfill). Complete lubrication change should be made annually.

MOTOR LUBRICATION

Refer to motor manufacturer for lubrication recommendations. On motors having grease drain plugs, remove the plugs and operate the motor for 15 minutes before replacing plugs. DO NOT OVER GREASE.

Page 22: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

22 of 24 Feb 06 R4

RECOMMENDED MOTOR LUBRICATION INTERVALS

Hours Service Per Day

Up to 7.5 HP Up to 5.6 kW

10 to 40 HP 7.5 to 29.8 kW

Over 40 HP Over 29.8 kW

Less than 12 5 Years 3 Years 1.5 Years

More than 12 2 Years 1 Year 9 Months

NOTE: Motors that run in severe conditions should be greased as specified by the motor manufacturer.

FILTERS

Filter-changing intervals can be based on the pressure drop across the filter or by calendar scheduling or visual inspection. Scheduled intervals should be between one and six months, depending on the pollutant loading from indoor and outdoor air. More-frequent changes may be required during the economizer season. Units that operate with high levels of outside air should have filters removed (or moved to winter filter location if available) during the winter months in areas that have heavy frost or snow. Plugged or excessively dirty filters can cause damage to the equipment. See submittal record for filter quantities, sizes and types. Use same size and type for replacement. A. High Velocity Permanent:

It is important that the filters be checked and cleaned regularly during the period immediately following installation, in order to determine the best service interval. To clean, rinse with water. Shake off excess water and re-install. These filters do not require an oil adhesive.

B. Pleated Throwaway and/or Replaceable Media (Cartridge, Bag):

Replacement filters can be obtained from any Engineered Air representative. In some applications the used filters/media may contain chemical or biological hazards. All local, regional and national regulations for safety and disposal should always be followed.

VFD ENCLOSURE Filters may be located on the air inlet of VFD enclosures. Filter-changing intervals can be based on calendar scheduling or visual inspection. Scheduled intervals should be between one and six months, depending on the pollutant loading in the enclosure area.

CONTROLS

Annually clean and recalibrate all controls, check for proper operation, and repair or replace any faulty controls. Check all damper hardware settings every three months. Replace blown fuses with equivalent size and type fuse. Failure to do so can result in damage to the unit.

CONTROL ENCLOSURE VENTILATION

Control enclosures are often ventilated in summer to provide component cooling. A manually adjustable slide damper is provided for adjustment and seasonal shut off. The slide damper should be closed for winter operation and opened for summer operation.

Page 23: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

23 of 24 Feb 06 R4

OUTDOOR AIR INTAKES, MIXING SECTIONS AND DAMPERS

Outdoor air intakes, screens, and adjacent areas shall be checked semi-annually for cleanliness, integrity and proper operation. Adjust dampers where required.

COILS

Inspect coils and drain pans for cleanliness and biological growth once per year during the cooling season or more often as required.

Warning: Dirty coils can be a cause of poor air quality. Failure to maintain clean coils can cause injury or death, damage to the equipment, property damage or system operational problems. Moisture carry over can result from dirty coils.

The external surface of finned coils can be cleaned using a low pressure water spray and a brush. Coil fins are easily damaged. Do not use high pressure steam or water to clean coils; it will permanently damage the coil. When using cleaning additives or solutions they must be compatible with the coil materials or coatings. Use a fin comb to straighten any damaged or bent fins. Coil Winterization: Water coils that are not in use must be protected from freezing. Coils should be drained and blown out with compressed air and then filled and drained several times with appropriate strength pre-mixed inhibited HVAC glycol or other suitable fluid. Do not use propylene glycol with CPVC piping.

Dx Coil Bypass Dampers

Engineered Air cooling equipment may be provided with application specific DX coil bypass dampers. If bypass dampers are set to allow excessive air to bypass the DX coil, the system will operate with lower suction pressure and capacity than designed, which could lead to coil freezing. If bypass dampers are set to allow excessive air through the DX coil, elevated suction temperatures could cause premature wear on compressors. Bypass dampers must be field adjusted to match the static pressure drop provided in the Unit Function, after equipment airflow is balanced. Adhering to this procedure will ensure proper airflow across the DX coil when mechanical cooling is operating.

ELECTRIC HEAT

Warning: This unit is connected to high voltages. Electrical shock or death could occur if instructions are not followed. This equipment contains moving parts that can start unexpectedly. Injury or death could occur if instructions are not followed. All work should be performed by a qualified technician. Always disconnect power before servicing. DO NOT bypass any interlock or safety switches under any circumstances.

Ensure that sufficient airflow as marked on the unit rating plate is passing through the heater. Overheating damage can be caused by insufficient airflow. Visual Inspection: Signs of potential problems: Dust accumulation on the coil, signs of overheating on the heater frame, traces of water or rust on the electric heater control box. The open coil elements are self-cleaning and require no maintenance. They should be given a yearly visual inspection. Elements viewed in the dark with the unit operating should not have areas that are glowing bright red.

Page 24: LM & LM-K SERIES - Engineered Air

A LM & LM-K MANUAL

24 of 24 Feb 06 R4

Electrical Inspection:

Two weeks after startup, all electrical connections to heating elements, contactors, terminals and main power lugs should be checked and tightened. These connections should be checked monthly for the first four months and twice per heating season thereafter. Off Season Maintenance: Where tubular heating elements are used it is strongly recommended that you start the heating system from time to time. This will prevent moisture from migrating through the terminal gaskets and into the heating elements.