HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 1
Site Investigation Report Trial of Increasing LVLD Voltage Level
Alwan Ramadan WX289116, July-31-2015
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 2
Site ID : 90574
Site Name : Manggarai Utara
Category Site : End site
Site information
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 3
View of Equipments
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 4
View of Equipments
APM30H DC Power System Battery Rack
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 5
View details Rectifier Systems
Equipment Connected 3*30 Rectifier Modules
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 6
View of Battery Banks
Connected to Rectifier System
2 Bank Battery * 100Ah
ACME-F 12NDF100
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 7
Battery Current Measurement
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 8
Load measurement on Rectifier System
Load BTS and NodeB = 26.6 A
Load BTS and NodeB
Connected to
RFC1
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 9
Load measurement on Rectifier System
Load RTN= 2.73 A Load FAN = 0.25 A
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 10
Load measurement on Rectifier System
Load FAN
Load RTN
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 11
View Source information's Current Loads: Rectifier System = 30.96 A
DC Voltage
53.51 Load Current
RECT
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 12
Begin Trial Test LLVD parameter setting Through M2000 (Before)
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 13
Begin Trial Test LLVD parameter setting Through M2000 (After)
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 14
Load measurement on Rectifier System (AFTER / LLVD OPEN)
View status of DC Voltage a moment after switch off AC Source. We can see images above, when the Voltage goes down and reached 48.7 VDC, The loads (BTS) Disconnected (0.5 Adc).
Output Voltage Load BTS and Node B after LLVD Open
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 15
Load measurement on Rectifier System (AFTER / LLVD OPEN)
Load
Disconnected
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 16
View of Loads current
Value of DC Current
on RECT SYST =
8.66 A
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 17
Load Measurements of the Transmissions
The Priority loads still On, during LLVD Open.
Load FAN Load RTN
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 18
Final Conclusion:
The parameter level for LLVD and BLVD set directly to the Rectifier
system on site.
The LLVD and BLVD level parameter set only through M2000 and directly
test on site with switch OFF AC Source for the Rectifier.
The Trial of Decreasing Voltage level with setting the LVD parameter was
successful.
The NON Priority loads (BTS) which connected to RECTIFIER System
(APM30) are disconnected when the voltage drop to 49.0 VDC (base on
parameter set through M2000)
The Priority Loads which connected to RECTIFIER System (APM30) still
ON.
HUAWEI TECHNOLOGIES CO., LTD. Huawei proprietary. No spread without permission. Page 19
End of Report