LIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown).DOC Page 1 of 5 Far North Queensland Regional Roads & Transport Group AGENDA TECHNICAL COMMITTEE MEETING No. 81 to be held Thursday 9 July 2015 at 1pm At Georgetown Shire Hall 1. Opening Remarks and Welcome 2. Apologies 3. Confirmation of Minutes of Previous Technical Committee Meeting 3.1 Minutes of Technical Committee Meeting No.80 held on 22 May 2015 in Yarrabah A copy of the minutes are attached for confirmation as a true and accurate record. 1- 4. Minutes of Previous RRTG Meeting 4.1 RRTG Board meeting scheduled for Monday 1 June 2015 (Cairns). A copy of the minutes are attached for information. 5. Business Arising out of Previous Technical Committee Minutes 5.1 Flying minute re unspent funding 5.2 Black spot PREVIOUS ACTION Brett Martin is to follow up on the outcome of submissions from FNQRRTG Councils. Action to be carried over until next meeting PREVIOUS ACTION David Hamilton is to arrange signing of agreements for Black Spot projects with Cairns and Cassowary Coast. 5.3 RRTG to be utilised as a forum to report on other State funding programs PREVIOUS ACTION Steve Cosatto to forward template documents to Councils for feedback. David Hamilton to identify letter of authorisation to add to the program. 5.4 Project number for Wujal Wujal PREVIOUS ACTION Jo Lencz to provide Wujal Wujal TMR project number. 5.5 State Controlled LRRS 2015/16 program – Brett Martin to provide new table (refer 6.2) Far North Queensland Regional Organisation of Councils

Transcript of LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF...

Page 1: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown).DOC Page 1 of 5

Far North Queensland Regional Roads & Transport Group

AGENDA

TECHNICAL COMMITTEE MEETING No. 81

to be held Thursday 9 July 2015 at 1pm

At Georgetown Shire Hall

1. Opening Remarks and Welcome 2. Apologies 3. Confirmation of Minutes of Previous Technical Committee Meeting

3.1 Minutes of Technical Committee Meeting No.80 held on 22 May 2015 in Yarrabah

A copy of the minutes are attached for confirmation as a true and accurate record. 1-12

4. Minutes of Previous RRTG Meeting 4.1 RRTG Board meeting scheduled for Monday 1 June 2015 (Cairns).

A copy of the minutes are attached for information. 13-18

5. Business Arising out of Previous Technical Committee Minutes 5.1 Flying minute re unspent funding

5.2 Black spot PREVIOUS ACTION

• Brett Martin is to follow up on the outcome of submissions from FNQRRTG Councils. Action to be carried over until next meeting

PREVIOUS ACTION

• David Hamilton is to arrange signing of agreements for Black Spot projects with Cairns and Cassowary Coast.

5.3 RRTG to be utilised as a forum to report on other State funding programs PREVIOUS ACTION

• Steve Cosatto to forward template documents to Councils for feedback. • David Hamilton to identify letter of authorisation to add to the program.

5.4 Project number for Wujal Wujal

PREVIOUS ACTION • Jo Lencz to provide Wujal Wujal TMR project number.

5.5 State Controlled LRRS 2015/16 program – Brett Martin to provide new table (refer 6.2)

Far North Queensland Regional Organisation of Councils

Page 2: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown).DOC Page 2 of 5

5.6 David Hamilton to provide advice regarding criteria applied for prioritisation for Heavy Vehicle Safety and Productivity Program

5.7 Statements of Intent

5.8 Updated traffic counts

5.9 Wujal Wujal Yarrabah priority roads

6. 2014/15 Works Program – Progress Review 6.1 Roads & Transport Alliance TIDS

Refer May Snapshot and FNQRRTG claim spread sheet) 19-21

Page 3: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown).DOC Page 3 of 5

Page 4: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown).DOC Page 4 of 5

6.2 State Controlled LRRS

LGA Project Number Road Project

Progress at 3 Oct 14 22 May 15 - Technical Committee Meeting

Mareeba 264/32B/401 Kennedy Highway (Mareeba-Ravenshoe)

Upgrade guardrail 50-53.2 Design commenced.

Tablelands 264/663/480 Atherton-Herberton Rd Install barriers 9-11.2 (sections) Design completed.

7. 2015/16 to 2018/19 Works Program.

7.1 2015/2016 - Program update ACTION REQUIRED Councils to provide 2015/16 project updates.

7.2 Transfer of unspent funds. (Cairns Aumuller Street project received $81,095 of unspent TIDS funds in 14/15). ACTION REQUIRED Identification of 15/16 project to receive additional funding allocation.

REFER 4 YEAR WORKS PROGRAM.

Page 5: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown).DOC Page 5 of 5

8. Update from the Roads & Transport Alliance

8.1 Operational Review 8.2 ATSI Councils in the RTA

9. Planning –

9.1 TMR (Jen Damon apology) 9.2 CSIRO Transit tool:

10. IPWEAQ Lower Order Asset Design

11. LGAQ Roads & Transport Advisory Group

12. Inland Queensland Roads Action Plan (IQRAP)

13. Training

14. 2014/15 Capability Agreement & Action Plan – Progress Review – attached 22-23

15. Road Safety

16. Joint Purchasing & Resource Sharing

Amanda Hancock to update

§ Supply Ready Mixed Concrete

§ Roadwork Services – NDRRA

§ Road Signage

§ Storm Water-Road Pipes

17. General Business

18. Next RRTG Meeting – No. 46 Date Monday 10 August 2015 Venue Douglas Shire Council, venue tba Time 1.30pm (following the FNQROC Board Meeting)

19. Technical Committee Meeting Dates for 2015 Technical Committee meeting dates and locations for 2015 are proposed to be:

No Date Location 82 Thursday 10 September Cairns 83 Friday 20 November Cairns

STEVE COSATTO FNQROC Regional Infrastructure Projects Coordinator July 2015

Page 6: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 1 of 12

Far North Queensland Regional Roads & Transport Group

MINUTES

TECHNICAL COMMITTEE MEETING No. 80

Held on Friday 22 May 2015 At the Yarrabah Aboriginal Shire Council Works Department, Yarrabah

ATTENDANCE David Goodman (Chair) Cassowary Coast Regional Council (CCRC) Steven Cosatto (Technical

Coordinator) FNQROC

Ray Kirkman Croydon Shire Council Garry Pickering Croydon Shire Council Michael Kriedemann Douglas Shire Council (DSC) Andrew Foster Mareeba Shire Council (MSC) Ashley Greenwood Tablelands Regional Council (TRC) David Hamilton TMR Far North Jo Lencz TMR / RTAPT Darlene Irvine FNQROC Shahab Katebi Yarrabah Aboriginal Shire Council (YASC) Scott Britton LGAQ Rohana Samarasekera Etheridge Shire Council (ESC) Janelle Menzies Yarrabah Aboriginal Shire Council (YASC) Brett Martin TMR Far North APOLOGIES David Trotter Cassowary Coast Regional Council Val Shannon Mareeba Shire Council Ross Mckim Tablelands Regional Council Terry Whitaker Etheridge Shire Council Jaime Guedes Wujal Wujal Aboriginal Shire Council (WWASC) Jen Damon TMR Far North Helius Visser Cairns Regional Council (CRC) 1. Opening Remarks and Welcome

Chair, David Goodman opened the meeting at 10:15 am and thanked Yarrabah Aboriginal Shire Council and introduced YASC Deputy Mayor Mark Wilson who welcomed all to the meeting. Rohana Samarasekera acknowledged the traditional owners of the land in which we were meeting. Steve Cosatto thanked Janelle Menzies and Shahab Katebi from YASC for the organisination of the meeting room and catering.

Far North Queensland Regional Organisation of Councils

1

Page 7: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 2 of 12

2. Apologies As noted above.

3. Confirmation of Minutes of Previous Technical Committee Meeting 3.1 Minutes of Technical Committee Meeting No. 79 held on Friday 27 March 2015 in Cairns

Steve Cosatto advised of an amendment: Previous minutes refer item 7.1 motion regarding transfer of underspent funds from Mareeba Shire Council’s Anzac Avenue and Black Mountain Road projects to Cairns Regional Council’s Aumuller Street Project, minutes showed underspent funds as: “MSC 264/LGSR/19 Anzac Avenue - final claim $73,768 - Underspent - $1,232 MSC 264/LGSR/30 Black Mountain Road - final claim $110,751 - Underspent - $14,249 Total Underspent - $15,491” However the Minutes should have shown the underspent funds as: MSC 264/LGSR/19 Anzac Avenue - final claim $60,751 - Underspent - $14,249 MSC 264/LGSR/30 Black Mountain Road - final claim $123,768 Underspent - $1,232 Total Underspent - $15,491 Steve Cosatto advised the Minutes would be amended accordingly. MOVED Ray Kirkman SECONDED Ashley Greenwood That the minutes of Technical Committee Meeting No. 79 held on 27 March 2015 in Cairns be confirmed as a true and accurate record of the meeting.

CARRIED Steve Cosatto advised the “flying minute” sent to Mayors and CEO’s as a result of the underspent funds would also require amendment - see below. (Email was sent to RRTG Wednesday, 22 April 2015 1:21 PM and was supported). ACTION REQUIRED As there were no scheduled meetings of the RRTG Board until Monday 1 June 2015, Steve Cosatto to forward “flying minute” to RRTG Board members. The FNQRRTG Technical Committee last met on 27 March 2015. At this meeting, the group recommended the transfer of budgetary savings from Mareeba Shire Council’s 2014-15 projects of Black Mountain Road of $1,232 (264/LGSR/30) and Anzac Avenue of $14,259 (264/LGSR/19) totaling $15,491, to the highest priority ranked 2014-15 project, which was Cairns Regional Council’s Aumuller Street upgrade project (214/LGSR/23). The recommendation reads as follows: “Moved: Ray Kirkman Second: Dave Goodman That, for the 2014/15 financial year, the savings from jobs No. 264/LGSR/19 Anzac Avenue ($1,232) and No. 264/LGSR/30 Black Mountain Road ($14,249), totaling $15,491, be transferred to the highest ranked project for 14/15 - Cairns Regional Council project No. 214/LGSR/23 Aumuller Street, and that the 15/16 financial year expenditure amount would decrease by the same amount. Aumuller Street 14/15 allocation would increase from $316,500 to $331,991 and the 2015/16 financial year allocation would decrease from $583,500 to $568,009. CARRIED”

2

Page 8: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 3 of 12

4. Minutes of Previous RRTG meeting

4.1 The next FNQRRTG Board meeting scheduled for 13 April 2015 (Ingham) was postponed and as such there are no minutes. The next FNQRRTG Board meeting will be held in Cairns on 1 June 2015.

5. Business Arising out of Previous Technical Committee Minutes 5.1 Road & Rail Interface Agreements

PREVIOUS ACTION REQUIRED Etheridge is to check and confirm it has a signed Interface Agreement in place. Rohana Samarasekera advised that agreement had been signed and passed through Council.

5.2 Black Spot PREVIOUS ACTION REQUIRED Brett Martin is to follow up on the outcome of submissions from FNQRRTG Councils. Action to be carried over until next meeting Action to be carried over to next meeting. PREVIOUS ACTION REQUIRED David Hamilton is to arrange signing of agreements for Black Spot projects with Cairns and Cassowary Coast. David Hamilton to provide orders for payment and close out reports. David Hamilton advised Black Spot 16/17 submissions are now required by the last week of July and submission documentation had been forwarded onto all RTA Councils. ATSI Councils will receive submission documentation next week. Copy of submission request to be forwarded to FNQROC for distribution.

5.3 RRTG to be utilised as a forum to report on other State funding programs PREVIOUS ACTION REQUIRED David Hamilton proposed to simplify the administration process of funding programs administered by TMR (ie. Black Spot, Bridges Renewal Program, Heavy Vehicle Safety Program and Royalties to Regions) by developing existing documents currently being utilised to administer the ATSI TIDS program templates included (refer attached): 1 - 13

• Funding Agreement Form – Deed of Agreement, • Post Completion Report, • Change of Scope, • Monthly Report Form • Project Management Form, • Acquittal Form,

David Hamilton proposed that this would be an initiative from FNR TMR and encouraged feedback from Councils in the development of the generic documents. David Hamilton advised that should Councils receive funding approval from Federal Government (those which required TMR involvement) LG’s should contact TMR re: “Deed of Agreement” to ensure streamlined administration/payment process. In principle support was offered to the proposal, and David Hamilton to discuss with State and Federal representatives and to provide further advice at next meeting. ACTION REQUIRED

3

Page 9: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 4 of 12

Steve Cosatto to forward template documents to Councils for feedback. Allocation of $1.26 million R4R allocated to CCRC for Wharf is not shown in the TMR Program. ACTION REQUIRED David Hamilton to identify letter of authorization to add to the program.

5.4 RRTG Workshop for new members PREVIOUS ACTION REQUIRED Steve Cosatto to organise a RRTG workshop for new members YASC and WWASC to assist with any queries they may have. Workshop occurred on 29 April 2015 and in attendance was Jo Lencz, Daryl Jones, David Hamilton, Janelle Menzies, Shahab Katebi, David Goodman, Jaime Guedes, Darlene Irvine and myself. Jo Lencz (JL) commented that as the transition process was new to all members ie TMR, RRTG’s and the Aboriginal Councils the workshop was beneficial to all parties. JL advised that any funding allocations to Aboriginal Councils did not require any co-contributions from those Councils. David Goodman commented that the workshop had identified “grey areas” that would need to be amended as they may create difficulties into the future. Shahab Katebi (SK) asked if YASC could forward claim its allocation? JL advised that YASC $47,217 was part of a four year bulk funding arrangement and YASC was able to claim in advance however additional funding for that year would have to come out of total RRTG TIDS funding allocation for that financial year and proposal would need to be accepted by the RRTG. SK advised that YASC was currently seeking funding for resealing works along Back Beach Road approximate value $660,000. JL advised that this forum could assist YASC identify additional Federal and State funding streams.

5.5 Follow up on CSIRO Transit Tool: ACTION REQUIRED Steve Cosatto to follow up with CSIRO regarding the drafting of a project plan (short and longer term). Following the RRTG 27 March meeting Jo Lencz, Jen Damon, Darlene Irvine and Steven Cosatto met with CSIRO representative Andrew Higgins to further consider the capabilities of the program and how they could most benefit the FNQRRTG. Jo Lencz, Darlene Irvine, David Goodman, Jen Damon and Steven Cosatto met again on 29 April 2015. Jen Damon has drafted a project plan which is currently being reviewed. Steve Cosatto has been in discussions with Andrew Higgins who had advised that Tony Abbott announced at Beef Week that $100 million had been set aside for Beef Roads and that the CSIRO Transit Tool would be utilised to prioritise works that identify the greatest impact to the industry. Andrew Higgins added that “The Beef Roads project may take up to 12 months”. Darlene Irvine commented that this gives us time to finalise the FNQRRTG project plan. There was general discussion regarding the Transit Tool. 4

Page 10: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 5 of 12

5.6 WWASC allocation for planning and scoping

PREVIOUS ACTION REQUIRED Jo Lencz to email Jaime Guedes, WWASC, confirming that 14/15 allocation may be utilised for planning and scoping works. Jo Lencz advised that the action point required amendment as there was no 14/15 TIDS allocation for WWASC, financial year in question is 15/16. Jo Lencz advised that Jaime Guedes had been advised.

5.7 In the event that the FNQRRTG receives increases in 15/16 TIDS allocation PREVIOUS ACTIONS REQUIRED • Jo Lencz to advise FNQRRTG of any confirmed increases in TIDS allocation. • In the event that the FNQRRTG receive official advice

o Steve Cosatto will forward Project Prioritisation Tool (PPT) to Councils. o All Councils to review their work programs 15/16 and 16/17 to gauge their ability to

increase capacity should funding permit. o Councils to populate PPT with the additional projects that they wished to be considered

by the FNQRRTG TC, for consideration at the next FNQRRTG TC meeting on Friday 22 May in Atherton.

In consultation with the RAPT Steve Cosatto advised Councils 16 April 2015 via email that it was highly unlikely that there would be any increase in the 15/16 TIDS Allocation. Steve Cosatto referred to a copy of letter from Minister for Main Roads, Mark Bailey, to the Inland Working Action Group (see attached) which advised of additional TIDS allocation for the 16/17 financial year. 14 General discussion – Member Councils should continue the prioritisation of their works programs with a view that additional funds would be available for the 16/17 financial year.

5.8 Following on from James Stewart’s HSC information session regarding unsealed roads: PREVIOUS ACTION REQUIRED Where able Councils to provide unsealed road data to FNQROC or direct to James Stewart.

Steve Cosatto advised that Michael Kriedemann Douglas had forwarded on data to HSC, please contact James Stewart if you are able.

5.9 Etheridge Technical Tour

PREVIOUS ACTION REQUIRED

• Etheridge Shire Council representatives to liaise with Steve Cosatto regarding LRRS

inspection accommodation, meeting room and Technical Committee dinner options. • RRTG TC members to advise if they prefer FNQROC to organise their accommodation. Item discussed in General Business.

5

Page 11: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 6 of 12

6. 2014/15 Works Program – Progress Review

6.1 Roads & Transport Alliance TIDS:

Council representatives provided a progress update for 2014/2015 RTA TIDS projects at the meeting – see table below.

• Review of on going projects. • CRC will be submitting a significant claim at the end of May for work on Aumuller Street project. • CCRC - Shrock’s Bridge Rehabilitation practical completion on May 22,

§ Dave Goodman advised that there would be approx $35,000 (± $2,500, exact savings to be identified within the fortnight). • Cook Shire Council had advised that they expected to submit a final claim for the Hope Street works at the end of May. • MSC advised that all projects had been completed and claimed.

§ MSC 264/LGSR/19 Anzac Av - final claim $60,751 – Under spend - $14,249 § MSC 264/LGSR/30 Black Mountain Road - final claim $123,768 Under spend - $1,232 – Total under spend ($15,491)

• TRC 264/LGSR/9 Claimed to date $269,234 have recently submitted another claim to DTMR for $46k for April and the remainder of the approach works are under construction and scheduled for completion 29 May 2015. TRC to raise final invoice ASAP in June.

§ Ashley Greenwood advised that there may a small amount of under spend funds from the project, amount yet to be confirmed.

6

Page 12: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 7 of 12

Darlene Irvine advised that Wujal Wujal have spent $30,000 in survey work, project management and scoping of China Camp Road in the belief that their funding commenced in the current 14/15 financial year. She had advised Wujal Wujal that she would make a request to the FNQRRTG TC to consider transferring any available under spent funds to Wujal Wujal. She advised that it was difficult to prioritise the project as they have commenced, this process is required to know what the project is, to be prioritised. Following general discussion, group consensus was that should the RRTG transfer underspent funds to the China Camp Road project that process would not to be consistent with the group’s current guidelines, ie transfer to the highest priority ranked project or one which spans two concurrent financial years. It was felt the group had to consistently apply the process across all members. Given the group could not prioritise the Wujal Wujal project, and that underspent funds from CCRC and TRC projects were yet to be confirmed, DI proposed that to simplify and expedite the transfer process of unspent funds from projects between now and the end of the 14/15 financial year, that underspent funds be automatically transferred to the Cairns Regional Council Aumuller Street project and for Steve Cosatto to liaise with Councils and TMR to ensure TIDS Allocation is fully claimed by 30 June 2015. The reallocation of funds for the 15/16 year to be considered at the RRTG TC 10 July meeting once exact expenditure was confirmed.

MOVED Ray Kirkman SECONDED David Goodman Any under spent TIDS funds from FNQRRTG 14/15 projects be automatically transferred to Cairns Regional Council Aumuller Street project214/LGSR/23. RRTG Technical Coordinator, Steve Cosatto to liaise with Councils and TMR to ensure TIDS Allocation is fully claimed by 30 June 2015. The re-allocation of the 14/15 TIDS funding for the 15/16 year be considered by the RRTG TC at their first meeting of the 15/16 financial year.

CARRIED

Financial Performance snapshot from Roads and Transport Alliance.

Based on claims forecasts provided by Councils FNQRRTG expects to be fully claimed by end of financial year. 7

Page 13: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 8 of 12

6.2 State Controlled LRRS ACTION REQUIRED TMR will be required to give a brief report on details of 2015/2016 reseal and structures projects on the state controlled LRRS network when available. Brett Martin advised of changes see table below to the 14/15 program and that there were no new projects to add. A new table will be created for next meeting.

LGA Project Number Road Project

Progress at 3 Oct 14 22 May 15 - Technical Committee Meeting

Cassowary Coast 216/8204/652 Tully-Hull Rd Surface enrichments

5.59-8.27

Tender process in progress – expected to be completed by Xmas 14. Project complete

Douglas 214/6504/650 Port Douglas Rd Rehabilitation & overlay 0-5.96 (sections)

Tender process in progress – expected to be completed by Xmas 14. Project complete

Mareeba 264/32B/401 Kennedy Highway (Mareeba-Ravenshoe)

Upgrade guardrail 50-53.2 Design not commenced.

Tablelands 264/663/480 Atherton-Herberton Rd Install barriers 9-11.2 (sections) Design completed.

7. 2015/16 to 2018/19 Works Program

7.1 Copy of correspondence: From the Minister for Main Roads, Road Safety and Ports, and Minister for Energy and Water Supply Mark Bailey to Glenys Schuntner, Chief Executive Officer of Regional Development Australia North Queensland – refer 2nd paragraph proposed increased in TIDS funding commencing 2016/2017. Refer letter attached. 15-17

7.2 Inclusion of Yarrabah and Wujal Wujal bulk allocation amounts: From 2015/16 onwards inclusion of Yarrabah ($47,217) and Wujal Wujal ($29,273) into the program. ACTION REQUIRED Jo Lencz to provide Wujal Wujal TMR project number.

8. Update from the Roads & Transport Alliance

8.1 Operational Review

Jo Lencz advised that there were now additional staffing resources available for the project. The review would include ATSI funding into the TIDS allocation. Current focus of the review was identifying opportunities to increase efficiency and reducing timelines regarding funding applications. The proposed draft date was approximately end of June/July. The draft would be forwarded to all RRTG’s for feedback.

8.2 ATSI Councils in the RTA Refer item No’s. 5.4, 5.6, 7.3, 8.1.

8.3 Feature project. TRC nominated Job No #65 Tully Falls Rd Lawyer Creek. Ashley Greenwood advised project yet to commence. 8

Page 14: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 9 of 12

9. Update – Jen Damon TMR Planning No new advice.

10. IPWEAQ Lower Order Asset Design

No new advice.

11. LGAQ Roads & Transport Advisory Group David Goodman (DG) advised the group had commenced a review of the cost sharing arrangement between TMR and Councils. As DG would be on leave at the time of the next meeting it was noted Darlene Irvine would be his proxy.

12. Inland Queensland Roads Action Plan (RDA) Steve Cosatto provided a summary update from email received on Wednesday 13 May 2015 from Glenys Schuntner, Chief Executive Officer of RDA Townsville and North West Queensland. • 24 Councils (including NWRRTG Councils) have committed to paying up to $5,000+ GST for

the IQRAP consultancy. (Original target of 40 Councils to commit to total project cost of $200,000). • Need to give a deadline 31 May 2015 or very soon after. • Based on the eight RRTGs that signed up, only Cassowary Coast and Cook have decided to

not join the project on a Council basis.

13. Training LGAQ Diploma of LG Administration (Asset Management)

Steve Cosatto advised the Asset Management group had just completed the second three-day block on 12, 13 & 14 May, which focused on connectivity of Asset Management plans to Corporate Plans and Annual Reports. There was a focus on service levels, community expectations and how that information should be utilised in the financial and operational management of assets.

14. 2014/15 Capability Agreement & Action Plan – Progress Review

14.1 15/16 Recommendation to FNQRRTG for adoption (refer document) Steve Cosatto advised that amendments had been made - see Capability Agreement & Action Plan document attached for amendments. 18-19

15. Road Safety (Standing Agenda Item)

A general discussion was held regarding Minister’s public comments regarding Road Safety being a priority, International Road Assessment Program (IRAP) and what is replacing Net Risk.

16. Joint Purchasing & Resource Sharing (Standing Agenda Item)

16.1 2015/16 Reseal tender closed on Friday. 16.2 LGM infrastructure insurance.

LGAQ through LGM will be offering Council’s the option to self-insure Assets. Similar to the self-insurance schemes for liabilities. The Assets Fund will provide cover across all classes of a Member’s asset exposures, including: a) Industrial Special Risks (Property Protection);

9

Page 15: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 10 of 12

b) Comprehensive Motor Vehicle; c) Equipment & Machinery Breakdown; d) Marine; and e) Personal Accident & Corporate Travel. The scheme will commence on 30 June 2015, provided there is a sustainable number of participants.

17. General Business

17.1 Vacant Deputy Chair position - nominations from the floor.

Ray Kirkman nominated Ashley Greenwood, who accepted the nomination. There being no further nominations Ashley Greenwood was selected.

17.2 Update from Darlene Irvine.

17.2.1 Hann Highway funding update – Prime Minister announced upgrading of the Hann –

FNQROC had written a letter thanking the Prime Minister and seeking additional details.

17.2.2 Northern Australia Infrastructure Audit – Darlene Irvine to document a synopsis for

the Board. 17.2.3 Productivity Commission report on Disaster Funding. Darlene Irvine to document a

synopsis for the Board.

17.3 Heavy Vehicle Safety and Productivity Program.

Referencing a recent funding application from MSC regarding Chewko Road MSC was advised that Chewko Road was not rated as a high priority by the State Criteria and as such they were unsuccessful. Chewko is a LRRS road and a vital economic road to MSC and the region. RRTG requested advice from State representatives regarding what criteria is applied for prioritisation in the HVSPP funding program.

ACTION REQUIRED Dave Hamilton was to make enquiries and to provide advice.

17.4 Bridges Renewal Program Criteria update:

No new advice.

17.5 Summary of current funding arrangements:

1. Black Spot Program - $60 million allocated annually and for the next two years an extra $100 million being allocated in 2015–16 and 2016–17. http://investment.infrastructure.gov.au/funding/blackspots/

2. Bridges Renewal Program - $300 million over 4 years from 2015–16 http://investment.infrastructure.gov.au/funding/bridgesrenewal/index.aspx

3. Heavy Vehicle Safety and Productivity Program - a further $200 million from 2014–15 to 2018–19. http://investment.infrastructure.gov.au/funding/heavyvehicles/

4. Northern Australia Beef Roads - $100million https://www.pm.gov.au/media/2015-05-08/new-100-million-northern-australia-beef-roads-fund

5. Roads to Recovery Program - $350 million allocated annually (until 2018–19) as well as a double allocation with an extra $350 million being funded in 2015–16. http://investment.infrastructure.gov.au/funding/r2r/

6. Drought Assistance for Regional Communities and Farmers - $333 million support package www.agriculture.gov.au/drought

7. Financial Assistance Grants to Local Governments - an estimated $2.3 billion each year to Councils across Australia over three years. http://www.regional.gov.au/local/assistance/index.aspx

10

Page 16: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 11 of 12

8. National Stronger Regions Fund - $1billion funding over 5 years will begin from 2015–16 http://investment.infrastructure.gov.au/funding/NSRF/

17.6 Notification to Local Governments re upcoming Transport Infrastructure Contract - Sole Invitation.

Jo Lencz provided advice on this matter, refer to attached email. 20-21 17.7 Statements of Intent – documents require updating with reference to the Operational

Guidelines.

SOI to be held over until next meeting with the aim of updating by June 2016

17.8 AADT/ Traffic Counts – currently require review – see attached. 22-26 ACTION REQUIRED Council’s to provide updated traffic counts to Steve Cosatto.

17.9 2015 Technical Road Trip Itinerary:

Item Date/Time Meet TRC Council car park Thursday 9 July – 8:30 am Meet Georgetown Thursday 9 July – 12:30 pm RRTG TC Meeting No.81 – (lunch to be provided) (Shire Hall - 43 St George Street)

Thursday 9 July – 1pm - 5pm

Dinner at Golf Club Thursday 9 July approx. 7pm start Meet at Etheridge Shire Council Works Department

Friday 10 July 8am

Tour to Cobbold Gorge - LRRS inspection Lunch at Cobbold Gorge Depart Cobbold Gorge At leisure

Currently FNQROC are holding 10 rooms at Latara Motel in Georgetown ($135 per night) (3 rooms left as at 26 May 2015), and 10 rooms at Midway Caravan Park ($80 per night). Please advise your preference - first in best dressed. Transport consensus is that most people would prefer to take their own vehicles. Please advise if you need a lift.

17.10 Update from members

Road Alliance update: Please refer to Department of State Development website: http://www.statedevelopment.qld.gov.au/regional-development/building-our-regions.html

Funding of $200 million is available for the program over two years from 2016-17 (i.e. $100 million per annum). There are four focussed infrastructure funds under the program. The three new funds which are managed by the department, include: 1. Regional Capital Fund ($70 million over two years) 2. Royalties for Resource Producing Communities Fund ($55 million over two years) 3. Remote Communities Infrastructure Fund ($15 million over 2 years). The fourth fund is the Transport Infrastructure Development Scheme (TIDS), which includes an additional $60 million in funding available over two years. TIDS will continue to be managed by the Department of Transport and Main Roads and information about TIDS is available at www.tmr.qld.gov.au ( http://www.tmr.qld.gov.au/).

11

Page 17: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FNQRRTG TC Minutes No. 80 – 22 May 2015 (Yarrabah) Page 12 of 12

General discussion followed regarding the fact that this extra funding advice is on the DSDIP website - ie. will this additional funding be prioritised as per current Road Alliance guidelines or will there be an alternative mechanism? RRTG TC wished to advise the Board of their satisfaction with the current process associated with TIDS allocation that we believe is working effectively and fairly and seek clarification in regard to the additional $60mil over two years. Cairns Regional Council: Michael Ringer advised that Job No. 95 Aumuller Street scheduled for 2019/2020 (construct additional lanes Mulgrave Road to Mann Street) would be removed from the works program as CRC has opted to accelerate the project and totally fund the project. Croydon Shire Council: Proposed that YASC and WWASC provide their intended RRTG works program which may attract TIDS or other funding over the next four years for review amongst RRTG TC. ACTION Wujal Wujal and Yarrabah to identify their priority roads and projects and advised Steve Cosatto. Etheridge Shire Council: Rohana Samarasekera advised that ESC had acknowledged the Board endorsed 4 years works program.

FNQROC: Advised of IPWEA one day course Grants, Funding and Risk Workshop for Commonwealth and State Government Grants to be held in Cairns Tuesday 2 June 2015.

18. Next FNQRRTG Meeting – No. 4

Original meeting planned for Ingham was postponed due to pre and post meeting travel requirements:

Date Monday 1 June 2015 Venue Civic Reception Room, Cairns Regional Council, Spence Street, Cairns Time 1.30pm (following the FNQROC Board Meeting)

19. Technical Committee Meeting Dates for 2015 Technical Committee meeting dates and locations for 2015 is proposed and

No Date Location 81 Friday 10 July Georgetown 82 Thursday 10 September Cairns 83 Friday 20 November Cairns

Minutes prepared by STEVE COSATTO FNQROC Regional Infrastructure Projects Coordinator May 2015

12

Page 18: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4747438-v4-FNQRRTG_Minutes_No__47_-_1_June_2015_(Cairns).DOC Page 1 of 6

Far North Queensland Regional Organisation of Councils

Far North Queensland Regional Roads and Transport Group

MINUTES

REGIONAL ROADS AND TRANSPORT GROUP MEETING No. 47

Held on Monday 1 June 2015

at the Cairns Regional Council Chambers, Spence Street, Cairns ATTENDANCE Cr Peter Scott (Chair) Cook Shire Council (Mayor)

Mr Tim Cronin Cook Shire Council (CEO) Cr Bill Shannon (Deputy Chair) Cassowary Coast Regional Council (Mayor) Mr Terry Brennan Cassowary Coast Regional Council (CEO) Cr John Schilling Cairns Regional Council Cr Julia Leu Douglas Shire Council (Mayor) Ms Linda Cardew Douglas Shire Council (CEO) Cr Will Attwood Etheridge Shire Council (Mayor) Mr Michael Kitzelmann Etheridge Shire Council (CEO) Mr Peter Franks Mareeba Shire Council (CEO) Mr Brett Martin TMR Far North (arrived 2.05pm) Ms Jo Lencz TMR RAPT Team Ms Joanne Jacobson Croydon Shire Council (CEO) Cr Rosa Lee Long Tablelands Regional Council (Mayor) Mr Ian Church Tablelands Regional Council (CEO) Mr Alan Neilan Wujal Wujal Aboriginal Shire Council (CEO)

Mr Scott Britton LGAQ Mr Luke Hannan LGAQ Ms Darlene Irvine FNQROC Mr Steven Cosatto FNQROC Ms Amanda Hancock FNQROC Ms Sandra McCormack FNQROC

APOLOGIES Mr Tony Potter TMR Far North (Regional Director) Mr David Goodman (TC Chair) Cassowary Coast Regional Council

Cr Tom Gilmore Mareeba Shire Council (Mayor) Cr Trevor Pickering Croydon Shire Council (Mayor) Cr Clifford Harrigan Wujal Wujal Aboriginal Shire Council (Mayor)

1. Opening Remarks and Welcome Chair, Cr Scott, opened the meeting at 1.35pm and welcomed everyone.

2. Apologies As noted above.

13

Page 19: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4747438-v4-FNQRRTG_Minutes_No__47_-_1_June_2015_(Cairns).DOC Page 2 of 6

3. Minutes of Previous Meetings 3.1 Minutes of FNQRRTG Meeting No. 46 held on 9 February 2015 in Cairns

MOVED Cr Bill Shannon SECONDED Cr Will Attwood That the Minutes of RRTG Meeting No. 46 held on 9 February 2015 in Cairns be confirmed as a true and accurate record of the meeting.

CARRIED

3.2 Minutes of Technical Committee Meeting No. 79 held on 27 March 2015 in Cairns RESOLVED

That the Minutes of Technical Committee Meeting No. 79 held on 27 March 2015 in Cairns be received and noted.

3.3 Correction to Minutes of Technical Committee Meeting No. 79 held on 27 March 2015 in

Cairns

MOVED Cr John Schilling SECONDED Cr Bill Shannon That the Flying Minute sent to members on 22 April 2015 be amended to show the transfer of underspent funds on MSC’s Anzac Avenue and Black Mountain Road projects to CRC’s Aumuller Street project as follows:

“MSC 264/LGSR/19 Anzac Ave - final claim $60,751 - underspend $14,249 MSC 264/LGSR/30 Black Mountain Rd - final claim $123,768 - underspend $1,232 Total underspend - $15,491”

CARRIED 4. Business Arising out of Previous RRTG Minutes

4.1 LGAQ Diploma of Local Government (Asset Management) Steven Cosatto advised:

• The course was fully subscribed by members of Councils who put forward names within the timeframe required.

• Despite attempts there was no extra place available for Cook Shire Council.

5. Update from the Roads & Transport Alliance 5.1 2014/15 RTA TIDS Expenditure

Jo Lencz advised:

• There would be a funding increase to TIDS, however by how much and when this would start would not be announced until after the budget is handed down in July.

• There had been reports that TIDS would be managed by the Department of State Development (DSD), however that is incorrect and TIDS management would stay with DTMR, but regular reporting on the TIDS progress would need to be made to DSD.

Scott Britton advised:

• The annual rotation of the RATB chair had occurred – the new Board chair is Greg Hallam.

14

Page 20: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4747438-v4-FNQRRTG_Minutes_No__47_-_1_June_2015_(Cairns).DOC Page 3 of 6

• The last RTAB meeting was held on 1 May 2015. At the time of the Board meeting expenditure claims and accruals of TIDS accounted for 83% of the program.

• Steve Cosatto advised that through the RRTG TC actual expenditure claims were at 76%.

• The external consultant who had been engaged to conduct the guideline review was no longer engaged. Consequently the Roads & Transport Alliance Project Team was now conducting the review in-house.

• State-Wide Capability Development Fund – about $500 is left in the fund for this financial year and so the $600,000 was well used. He encouraged the FNQRRTG to consider and apply for funding early in 2015-16.

• Bridges to Renewal - LGAQ has partnered with IPWEA to put together a training package with a Canberra-based consultant to travel throughout the State and provide training on how best to apply for the B2R and other funding programs. There is a training course in Cairns on 2 June 2015. The communication was made by IPWEA to council engineers. Discussion was held about not sufficient notice being given about this course.

5.2 ATSI Councils in the RTA Jo Lencz advised:

• There had been some confusion over funding arrangements for ATSI Councils participating in the alliance. All correspondence indicated that as the invitation went out in mid to late 2014 the funding allocation would start in the 2015/16 year. Funding for 2015/16 cannot be claimed in 2014/15.

• The FNQRRTG should ensure Aboriginal councils are guided through process, perhaps through either training or mentoring with councils and/or DTMR.

• Funding can be banked over a number of years. Any funding which is spent within an ATSI council boundary does not need to be matched. Should ATSI TIDS be banked into the RRTG bucket and used by another Council it has to be matched.

ATSI TIDS allocations do need to be considered alongside other funding sources that it can be put with. Alan Neilan said:

• WWASC has been an active member of RRTG for a number of years. What has changed is DTMR’s acceptance of what projects can be nominated and this had caused a cash flow issue for council. WWASC has done some design work on the roads it has nominated. It has lost a year of putting up projects in this transition phase.

• Which ATSI TIDS projects had been funded for which ATSI councils 2014/15? Jo Lencz will investigate and report back.

• WWASC would nominate two priority roads for their Council - China Camp Road and the reseal of the bypass road.

ACTION REQUIRED Jo Lencz to provide WWASC with information regarding which ATSI TIDS projects had been funded for which ATSI councils and for what purpose, during 2014-15.

15

Page 21: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4747438-v4-FNQRRTG_Minutes_No__47_-_1_June_2015_(Cairns).DOC Page 4 of 6

6. 2014/15 Works Program - Progress Review

6.1 Automatic transfer of underspent 2014-15 funds to CRC’s Aumuller St project:

• Steven Cosatto said CCRC anticipating an underspend on the Shrock’s Creek project and TRC anticipated an underspend on the Lawyer Creek upgrade, between now and the end of the financial year.

• To save the need for flying minutes for these, the TC recommended the RRTG provides a motion to allow for the automatic transfers of the underspent funds to the next highest ranked project in the program being CRC’s Aumuller Street upgrade.

• Steven Cosatto will liaise with DMTR, CCRC, TRC and CRC to ensure those funds were properly transferred.

• The actions would be dealt with formally at the next FNQRRTG Technical Committee on 9 July 2015 and the next FNQRRTG Board meeting on 10 August 2015.

MOVED Cr John Schilling SECONDED Cr Bill Shannon That any underspent funds on CCRC’s Shrock’s Creek project no. 216/LGSR/31 and TRC’s Lawyer Creek project no. 264/LGSR/9be transferred to CRC’s Aumuller Street project no. 214/LGSR/23.

CARRIED

7. 2015/16 to 2018/19 Work Program Development

Steven Cosatto said Yarrabah Aboriginal Shire Council’s and Wujal Wujal Aboriginal Shire Council’s program annual TIDS allocations ($47,217 and $29,273 respectively) had now been included into the FNQRRTG four year program.

Brett Martin arrived at 2.05pm

8. Inland Queensland Roads Action Plan (IQRAP)

Steven Cosatto advised that 24 councils, out of a target of 40 have committed to paying up to $5,000+ GST for the IQRAP consultancy (Inland Queensland Roads Action Plan), they have advised their deadline would be 31 May or very soon after.

9. 2015-16 Capability Agreement & Action Plan Steven Cosatto said a new plan had been prepared for 2015-16.

MOVED Cr Will Attwood SECONDED Cr Julia Leu

That the 2015-16 Capability Agreement and Action Plan be adopted.

CARRIED 10. Joint Purchasing & Resource Sharing

Amanda Hancock advised five member councils (CRC, CCRC, DSC, MSC & TRC) were participating in a 2015-16 Regional Bitumen Reseal program. The Technical Committee has made recommendations and reports would go to Council meetings in June 2015 and the program would start on 1 July 2015.

16

Page 22: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4747438-v4-FNQRRTG_Minutes_No__47_-_1_June_2015_(Cairns).DOC Page 5 of 6

11. Road Safety Cr Attwood said ESC had been working with DTMR to highlight as a safety issue a 56km section of single lane and a small amount of double lane roadway on the Gulf Developmental Road between Mt Surprise and the Gilbert River Bridge.

12. Business Arising from Previous Minutes

12.1 Guard Rails:

Cr Attwood said:

• Council had been asking that DTMR install guard rails on 11 crossings between Mt Surprise and Georgetown which have unguarded concrete bollard edges.

• ESC could install the guard rails if need be.

• Ratepayers and QPS were demanding safer treatments be applied.

Brett Martin said:

• The crossings are deemed compliant according to the current standards with the exception of signage.

• The cost of lead guard rail installation was $45,000 per site and DTMR required a further $540,000 to complete the works.

• DTMR will look at the whole solution, whether that is guard rail installation. Risk assessments will be done ‘fairly quickly’.

ACTION REQUIRED DTMR to keep the group and ESC updated on this issue.

12.2 110km/h Zones – Gulf Developmental Road

Brett Martin advised:

• DTMR had been unable to review the roads last year as construction projects were in progress. Expected to undertake a full review and provide advice to RRTG by August/September 2015.

ACTION REQUIRED DTMR to keep the group updated on this issue.

13. State Controlled LRRS

Brett Martin said details would not be known until the State budget is released. Most of the works would be reseal works.

ACTION REQUIRED DTMR to keep the group updated on this issue.

14. Asset Management

Steve Cosatto advised:

• The second block of the Asset Management Diploma course has been completed.

• Further information is expected regarding NDRRA betterment being a requirement in asset management plans.

17

Page 23: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

LIVE-#4747438-v4-FNQRRTG_Minutes_No__47_-_1_June_2015_(Cairns).DOC Page 6 of 6

15. General Business 15.1 Funding update:

Jo Lencz advised that DTMR was seeking clarity regarding funding updates but nothing could be confirmed until the State Government budget to be released on 14 July 2015.

15.2 DTMR and Local Government Cost Sharing Arrangement:

Darlene Irvine said cost sharing agreement between Local Governments and DTMR is to be reviewed. The current agreement is voluntary. The review starts in June 2015.

15.3 Cape York Infrastructure Plan - Peninsula Developmental Road:

• Cr Scott asked DTMR for an update. • Brett Martin said the matter was currently on hold due to an ongoing legal matter

regarding a Cape York Land Council native title claim. DTMR is going ahead with design but a contractor cannot be appointed as yet. About 48km was completed last year.

• It should be noted that Jackie Trad, Deputy Premier and Minister for Transport, said the Federal Government would provide $48 million in the 2015/2016 year for the Peninsula Developmental Road.

15.4 Bloomfield Track Steering Committee:

Cr Leu said another meeting was scheduled for 5 June 2015. All stakeholders are engaged and appear to be happy.

15.5 Captain Cook Highway Group:

Cr Scott said a group was attempting to make the Captain Cook Highway an iconic road and he agreed this deserved attention, especially considering the 250th anniversary of the landing of Captain Cook would be held in 2020 potentially creating an increase in traffic along this highway.

16. Next Technical Committee Meeting – No. 81 Date Thursday 9 July 2015 Venue Etheridge Shire Council, Georgetown Time (to be advised)

17. Next RRTG Meeting – No. 48 (if required – to be advised) Date Monday 10 August 2015 Venue Douglas Shire Council (venue to be advised) Time 1.30pm

18. Meeting Closure There being no further business, Cr Scott closed the meeting at 2.30pm and thanked everyone for attending.

18

Page 24: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FAR NORTH QUEENSLAND REGIONAL ROADS & TRANSPORT GROUP2015/16 to 2018/19 Works Program TOTALS Allocation 3,048,322 3,048,322 3,048,322 3,048,322

Listed Below 856,641 2,967,227 3,048,322 3,048,322 3,048,322Difference from Allocation 81,095 0 0 0

Denotes Non LRRS ProjectsNon LRRS Maximum Allocation 609,664 609,664 609,664 609,664

20% Listed Below 0 0 467,600 449,900 555,000Difference from Allocation 609,664 142,064 159,764 54,664

Project Number Record ID Rank Start End LG$

TMR$

Other$

2014-15or prior 2015-16 2016-17 2017-18 2018-19

FNQRRTG LRRS TIDS 264/LGSR/39 RRTG Funded RRG administration 512,974 512,974 216,046 74,232 74,232 74,232 74,232

214-000107-002 93 42 Cairns LRRS TIDS 214/LGSR/23 Aumuller Street At-grade intersection improvement (Gatton Street intersection) 2.23 2.23 4,100,000 1,400,000 950,000 1,750,000 447,595 502,405

216-001376-007 34 59 Cassowary Coast LRRS TIDS 216/LGSR/40 Tully Gorge Road At-grade intersection improvement (Tea Plantation Road)

10.310.05

10.410.15 200,000 100,000 100,000 0 100,000

216-001376-023 81 1 Cassowary Coast LRRS TIDS 216/LGSR/21 Tully Gorge Road Structural rehabilitation (Tully River Bridge) 37.19 37.3 950,000 475,000 475,000 0 475,000

220-000014-001 83 70 Cook LRRS TIDS 220/LGSR/10 Hope Street (Seagrem-Walker) Bikeway / Footpath construction 0 2 490,000 245,000 245,000 193,000 52,000

000-000002-100 98 22 Cook LRRS TIDS 220/LGSR/11 Bloomfield Road Construct to new 2 lane sealed standard 3 4 480,000 240,000 240,000 0 240,000

221-000411-002 109 14 Croydon LRRS TIDS 221/LGSR/6 Croydon Richmond Road Construct to new 2 lane sealed standard 176.5 180.5 698,000 349,000 349,000 0 349,000

275-831003-002 128 21 Douglas LRRS TIDS 275/LGSR/1 Cape Tribulation to Bloomfield Road Reconstruct pavement 19.7 19.75 50,000 25,000 25,000 0 25,000

275-831003-003 129 19 Douglas LRRS TIDS 275/LGSR/2 Cape Tribulation to Bloomfield Road Construct to seal standard 300,000 150,000 150,000 0 150,000

264-000880-002 77 38 Tablelands LRRS TIDS 264/LGSR/35 Gunnawarra Road Construct to new 2 lane sealed standard 8.5 9.5 300,000 150,000 150,000 0 150,000119-001455-006 5 34 Tablelands LRRS TIDS 264/LGSR/13 Danbulla Forest Drive Upgrade bridge (Kauri Creek) 9.49 9.51 750,000 375,000 375,000 0 375,000

277-001142-001 1 72 Mareeba LRRS TIDS 264/LGSR/11 Chewko Road Widen and seal (Paglietta Road to Narcotic Creek Road) 8.9 10.7 590,000 295,000 295,000 0 295,000

Yarrabah LRRS TIDS D03/LGSZ/2 47,217Wujal Wujal LRRS TIDS 29,273

264-001445-021 122 3 Tablelands LRRS TIDS Danbulla Forest Drive Replace bridge (Unnamed Creek) 14.2 14.22 700,000 350,000 350,000 0 103,100 246,900277-001731-023 2 4 Mareeba LRRS TIDS 264/LGSB/2 Springmount Road Upgrade bridge (Walsh River) 7.1 7.33 890,000 445,000 445,000 0 445,000

275-831003-004 136 10 Douglas LRRS TIDS Cape Tribulation to Bloomfield Road Construct to seal standard 13.41 13.75 510,000 255,000 255,000 0 255,000

59--001310-002 4 11 Tablelands LRRS TIDS Cashmere - Kirrama Road Replace bridge and approaches (Herbert River) 23 24 650,000 325,000 325,000 0 325,000

264-001310-005 123 12 Tablelands LRRS TIDS Cashmere - Kirrama Road Replace bridge (Herbert River - Crossing No.2) 26.43 26.44 200,000 100,000 100,000 0 100,000

221-000411-003 110 14 Croydon LRRS TIDS Croydon Richmond Road Construct to new 2 lane sealed standard 134.2 138.2 698,000 349,000 349,000 0 349,000

214-000758-001 90 17 Cairns LRRS TIDS 214/LGSR/20 Florence Street Bikeway / Footpath construction 0.14 0.53 45,000 22,500 22,500 0 22,500

226-000531-002 131 23 Etheridge LRRS TIDS Forsayth-Einasleigh Road Construct to new 2 lane sealed standard 27.767 30.067 686,600 343,300 343,300 0 343,300

226-000531-003 132 24 Etheridge LRRS TIDS Forsayth-Einasleigh Road Construct to new 2 lane sealed standard 30.067 32.367 686,600 343,300 343,300 0 343,300

Yarrabah LRRS TIDS D03/LGSZ/2 47,217Wujal Wujal LRRS TIDS 29,273

000-000002-108 106 25 Cook Non LRRS TIDS Railway Avenue Construct to new 2 lane sealed standard 1.33 2.66 640,000 320,000 320,000 0 320,000

000-000002-109 107 25 Cook Non LRRS TIDS Railway Avenue Construct to new 2 lane sealed standard 2.66 4 640,000 320,000 320,000 0 147,600 172,400

PPT Details LocalGovernment Program

TMRProjectNumber

Road ProjectWork Description

Chainage Total$

Contributions Allocation Year

Page 1 of 3 19

Page 25: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FAR NORTH QUEENSLAND REGIONAL ROADS & TRANSPORT GROUP2015/16 to 2018/19 Works Program TOTALS Allocation 3,048,322 3,048,322 3,048,322 3,048,322

Listed Below 856,641 2,967,227 3,048,322 3,048,322 3,048,322Difference from Allocation 81,095 0 0 0

Denotes Non LRRS ProjectsNon LRRS Maximum Allocation 609,664 609,664 609,664 609,664

20% Listed Below 0 0 467,600 449,900 555,000Difference from Allocation 609,664 142,064 159,764 54,664

Project Number Record ID Rank Start End LG$

TMR$

Other$

2014-15or prior 2015-16 2016-17 2017-18 2018-19

PPT Details LocalGovernment Program

TMRProjectNumber

Road ProjectWork Description

Chainage Total$

Contributions Allocation Year

264-002050-001 121 2 Tablelands LRRS TIDS Sluice Creek Road Replace bridge (Snake Creek) 0.2 0.21 850,000 425,000 425,000 0 425,000

226-000531-004 133 27 Etheridge LRRS TIDS Forsayth-Einasleigh Road Construct to new 2 lane sealed standard 32.367 34.367 686,600 343,300 343,300 0 343,300

264-001310-004 69 5 Tablelands LRRS TIDS 264/LGSR/26 Cashmere-Kirrama Road Upgrade bridge (Big Swamp Creek) 69.7 69.71 230,000 115,000 115,000 0 115,000

275-831003-005 137 6 Douglas LRRS TIDS Cape Tribulation to Bloomfield Road Construct to new 2 lane sealed standard 0 1.85 668,000 334,000 334,000 0 167,000 167,000

277-001142-002 76 7 Mareeba LRRS TIDS 264/LGSR/34 Chewko Road Upgrade bridge (Atherton Creek) 2.7 2.73 700,000 350,000 350,000 0 350,000264-000880-001 70 8 Tablelands LRRS TIDS 264/LGSR/27 Gunnawarra Road Upgrade bridge (Bell's Creek) 31.6 31.63 560,000 280,000 280,000 0 280,000

221-000411-004 111 13 Croydon LRRS TIDS Croydon Richmond Road Construct to new 2 lane sealed standard 138.2 142.3 698,000 349,000 349,000 0 349,000

214-000227-001 57 18 Cairns LRRS TIDS 214/LGSR/12 The Boulders Road Strengthen bridge (Bridge No.1) 3.38 3.41 100,000 50,000 50,000 0 50,000214-000227-002 58 20 Cairns LRRS TIDS 214/LGSR/13 The Boulders Road Strengthen bridge (Bridge No.2) 3.44 3.46 100,000 50,000 50,000 0 50,000

216-000615-002 51 40 Cassowary Coast LRRS TIDS 216/LGSR/52 Walter Lever Estate Road Rehabilitate and widen 0.75 1.5 300,300 150,150 150,150 0 43,400

216-009999-002 86 41 Cassowary Coast LRRS TIDS 216/LGSR/56 Butler Street Reconstruct pavement 0.44 0.58 550,000 275,000 275,000 0 275,000

000-000002-105 103 30 Cook Non LRRS TIDS Poison Creek Road Construct to new 2 lane sealed standard 2.80

(Minke Rd)4 555,000 277,500 277,500 0 277,500

Yarrabah LRRS TIDS D03/LGSZ/2 47,217Wujal Wujal LRRS TIDS 29,273

264-001420-001 75 9 Tablelands LRRS TIDS 264/LGSR/32 Curtain Fig Tree Road Upgrade bridge (Leslie Creek) 3.5 3.52 1,350,000 675,000 675,000 0 675,000

226-000531-005 134 28 Etheridge LRRS TIDS Forsayth-Einasleigh Road Construct to new 2 lane sealed standard 34.367 36.267 686,600 343,300 343,300 0 343,300

226-000531-006 135 28 Etheridge LRRS TIDS Forsayth-Einasleigh Road Construct to new 2 lane sealed standard 36.267 38.167 686,600 343,300 343,300 0

221-000411-005 112 14 Croydon LRRS TIDS Croydon Richmond Road Construct to new 2 lane sealed standard 189.5 193.5 698,000 349,000 349,000 0 349,000

000-000002-106 104 30 Cook Non LRRS TIDS Poison Creek Road Construct to new 2 lane sealed standard 4 5.2 555,000 277,500 277,500 0 277,500

000-000002-107 105 30 Cook Non LRRS TIDS Poison Creek Road Construct to new 2 lane sealed standard 5.2 6.4 555,000 277,500 277,500 0 277,500

277-001731-024 3 33 Mareeba LRRS TIDS 264/LGSR/4 Springmount Road Upgrade bridge (Oaky Creek) 10.43 10.5 770,000 385,000 385,000 0 385,000119-001455-019 6 35 Tablelands LRRS TIDS 264/LGSR/14 Danbulla Forest Drive Upgrade bridge (Robson Creek) 13.19 13.22 1,020,000 510,000 510,000 0

214-000107-003 94 36 Cairns LRRS TIDS 214/LGSR/24 Aumuller Street Construct additional lanes (Mann Street to Gatton Street) 1.53 1.26 1,000,000 500,000 500,000 0 423,300

Yarrabah LRRS TIDS D03/LGSZ/2 47,217Wujal Wujal LRRS TIDS 29,273

Page 2 of 3 20

Page 26: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

FAR NORTH QUEENSLAND REGIONAL ROADS & TRANSPORT GROUP2015/16 to 2018/19 Works Program TOTALS Allocation 3,048,322 3,048,322 3,048,322 3,048,322

Listed Below 856,641 2,967,227 3,048,322 3,048,322 3,048,322Difference from Allocation 81,095 0 0 0

Denotes Non LRRS ProjectsNon LRRS Maximum Allocation 609,664 609,664 609,664 609,664

20% Listed Below 0 0 467,600 449,900 555,000Difference from Allocation 609,664 142,064 159,764 54,664

Project Number Record ID Rank Start End LG$

TMR$

Other$

2014-15or prior 2015-16 2016-17 2017-18 2018-19

PPT Details LocalGovernment Program

TMRProjectNumber

Road ProjectWork Description

Chainage Total$

Contributions Allocation Year

214-000107-004 95 36 Cairns LRRS TIDS Aumuller Street Construct additional lanes (Mulgrave Road t Mann Street) 1.255 1.65 1,000,000 500,000 500,000 0

264-000880-003 78 38 Tablelands LRRS TIDS 264/LGSR/36 Gunnawarra Road Construct to new 2 lane sealed standard 7.5 8.5 300,000 150,000 150,000 0

277-001437-047 61 43 Mareeba LRRS TIDS 264/LGSR/21 Leadingham Creek Road Upgrade floodway (Pinnacle Creek) 6.9 7 130,000 65,000 65,000 0

66--000236-006 22 44 Cassowary Coast LRRS TIDS 216/LGSR/30 Flying Fish Point Road Widen and seal (3.95 to Bay Road) 3.95 4.8 648,000 324,000 324,000 0

220-000012-001 139 45 Cook LRRS TIDS Battlecamp Road Construct to new 2 lane sealed standard 6.8 9.13 890,000 445,000 445,000 0216-001376-002 32 46 Cassowary Coast LRRS TIDS 216/LGSR/11 Tully Gorge Road Widen and seal 0.03 0.8 650,000 325,000 325,000 0216-001263-003 31 47 Cassowary Coast LRRS TIDS 216/LGSR/37 Upper Murray Road Widen and seal 1.5 2.21 300,000 150,000 150,000 0

220-000002-110 140 48 Cook Non LRRS TIDS Charlotte Street Shoulder sealing 2.32 2.93 820,000 410,000 410,000 0

264-001455-020 84 49 Tablelands LRRS TIDS 264/LGSR/38 Danbulla Forest Drive Construct to new 2 lane sealed standard (Existing seal to Platypus Rock turnoff) 3 3.7 350,000 175,000 175,000 0

216-009999-003 115 50 Cassowary Coast Non LRRS TIDS 216/LGSR/38 Butler Street Construct roundabout (Bryant Road & Watkins

Street) 0.97 1,300,000 650,000 650,000 0

264-000233-002 117 51 Tablelands LRRS TIDS Theresa Creek Road At-grade intersection improvement (Moregatta Road) 2.8 2.9 200,000 100,000 100,000 0

66--000059-002 17 52 Cassowary Coast LRRS TIDS 216/LGSR/27 Bingil Bay Road Rehabilitate and widen 6.71 7.69 1,365,000 682,500 682,500 0

66--000236-004 21 53 Cassowary Coast LRRS TIDS 216/LGSR/29 Flying Fish Point Road Construct roundabout (Bay Road) 5.15 5.2 1,100,000 550,000 550,000 0

000-000002-103 101 54 Cook Non LRRS TIDS Poison Creek Road Concrete overlay on deck 6.35 6.366 30,000 15,000 15,000 0

66--000426-003 11 55 Cassowary Coast LRRS TIDS 216/LGSR/22 Mourilyan Road Construct roundabout (Mart Street) 1.76 1.79 1,100,000 550,000 550,000 0

000-000002-101 99 56 Cook Non LRRS TIDS Archer Point Road Install culvert 2.42 2.436 100,000 50,000 50,000 0

66--000236-003 20 57 Cassowary Coast LRRS TIDS 216/LGSR/28 Flying Fish Point Road Widen and seal (Fern Avenue to Bay Road) 4.9 5.15 305,760 152,880 152,880 0

000-000002-102 100 58 Cook Non LRRS TIDS Archer Point Road Install culvert 47.4 47.65 150,000 75,000 75,000 0

277-001008-078 9 60 Mareeba LRRS TIDS 264/LGSR/17 Ootann Road Upgrade floodway (Rocky Tate River) 47 47.06 350,000 175,000 175,000 0216-001261-002 29 61 Cassowary Coast LRRS TIDS 216/LGSR/35 Murray Falls Road Widen and seal 0 3.18 1,400,000 700,000 700,000 0119-001420-002 8 62 Tablelands LRRS TIDS 264/LGSR/16 Curtain Fig Tree Road Widen and overlay 3.5 4.4 260,000 130,000 130,000 0

277-001567-001 64 63 Mareeba LRRS TIDS 264/LGSR/23 Myola Road Widen and seal (Warrill Creek to Owens Creek) 3.2 4.7 740,000 370,000 370,000 0

216-001261-003 30 64 Cassowary Coast LRRS TIDS 216/LGSR/36 Murray Falls Road Reshape & seal 3.18 3.7 211,000 105,500 105,500 0

264-001515-006 62 65 Tablelands LRRS TIDS 264/LGSR/22 East Barron Road Widen and overlay (Includes Claringbold Road intersection) 6.7 7.8 350,000 175,000 175,000 0

214-000002-001 91 66 Cairns LRRS TIDS 214/LGSR/21 Cook Street Widen and overlay 0.43 0.78 1,000,000 500,000 500,000 0277-001142-003 67 67 Mareeba LRRS TIDS 264/LGSR/24 Chewko Road Widen and seal 12.4 14.4 1,190,000 595,000 595,000 0

000-000002-104 102 68 Cook Non LRRS TIDS Charlotte Street Asphalt resurfacing (<75mm) Bank St Seaview 455,000 227,500 227,500 0

277-FRAZER-018 114 69 Mareeba Non LRRS TIDS 264/LGSR/18 Fraser Road, Mt Molloy Widen & seal including kerb & channel 0.28 0.51 250,000 125,000 125,000 0

264-PARKVI-001 125 71 Tablelands Non LRRS TIDS

Parkview Street & First Avenue(Atherton SHS)

Footpath construction (Parkview Street - Ch 100 to Tower Avenue (150m), First Avenue - Twelth Avenue to Maunds Street (450m))

0 0.6 165,000 82,500 82,500 0

264-SIXTH--001 126 73 Tablelands Non LRRS TIDS

Sixth Avenue(Atherton SHS)

Footpath construction (First Avenue to end of road) 0 0.3 80,000 40,000 40,000 0

Page 3 of 3 21

Page 27: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

Page 1 of 2

Far North Queensland Regional Roads & Transport Group

.

CAPABILITY AGREEMENT & ACTION PLAN – 2015/2016 PROGRESS REVIEW – Please note – costs shown are external costs only to FNQRRTG and don’t include members’ time costs

Current Capability

Level (at 30/06/15)

Desired Capability

Level (by 30/06/16)

Agreed Actions How will this Action get your RRTG to the Desired Capability Level?

Costing (Informal

Estimate) & Funding Source*

Accountable Officer Timeframe for Completion PROGRESS

OPERATIONAL EFFECTIVENESS

HIGH at 30/06/15

HIGH Secretariat / administrative support.

Ensures RRTG functions successfully and effectively. Information sharing, communication, and relationship between members will be maintained and improved. Regional focus will be enhanced.

$74,232 (RRTG Capability) FNQROC Ongoing

Minimum of 6 x TC meetings to be held and scheduled in advance. Nil

Regional Infrastructure Project Coordinator (RIPC)

30 June 2016

Minimum of 4 x RRTG meetings to be held and scheduled in advance. Nil RIPC 30 June 2016

Each member to be represented at minimum 5 out of 6 TC meetings. Nil TC Members Each TC Meeting.

Each member to be represented at minimum 3 out of 4 RRTG meetings. Nil RRTG Members Each RRTG

Meeting.

Agendas of meetings to be documented and distributed. Nil RIPC

One week prior to each TC and RRTG

Meeting.

Minutes of meetings to be documented and distributed. Nil RIPC

Two weeks following each TC and RRTG

Meeting.

RTAPT to be represented at minimum 5 out of 6 TC meetings.

Ensures RRTG is up to date with Roads Alliance initiatives and actions.

Nil RTAPT Each TC Meeting.

RTAPT to be represented at minimum 3 out of 4 RRTG meetings. Nil RTAPT Each RRTG

Meeting.

All RTA documentation (correspondence, circulars, technical notes, reports etc) to be distributed to all members.

Nil RIPC As required

Information session on the RTA for new TC members when existing TC members are replaced.

Ensures knowledge of overall Roads Alliance partnership and specifically FNQRRTG operations are understood. Ensures member and consequently FNQRRTG will not be hindered due to staff turnover. Ensures “ownership” of Roads Alliance at the political level.

Nil RIPC As required

Information session on the RTA for new RRTG members appointed to RRTG. Nil RIPC As required

Review Capability Agreement & Action Plan at each TC Meeting and present review to each RRTG Meeting.

Ensures RRTG capability is maintained and improved. Nil RIPC

TC Members Each TC Meeting.

PROGRAM DEVELOPMENT MODERATE

to HIGH at 30/06/15

MODERATE

TO HIGH

Review and update LRRS Statements of Intent. Regional investment strategy will be relevant and current. Nil TC Members

RIPC 30 June 2016

Inspection of LRRS network. Knowledge of the network by each RRTG member will be adequate for discussion and decision making.

Nil TC Members 30 June 2016

Presentation of 2015/16 (and beyond) TMR LRRS works program to TC Meeting.

Compliance with the RTA Operational Guidelines will be met. Nil TC Members from

TMR Far North October 2014 TC Meeting

Confirm detailed design is complete for 2016/17 projects.

Timely expenditure of TIDS expenditure rates will be in line with new ‘Use it or lose it’ mantra of the RTAB.

Nil TC Members 30 June 2016

22

Page 28: LIVE-#4776751-v1-FNQRRTG TC Agenda No 81 - 9 July · PDF fileLIVE-#4776751-v1-FNQRRTG_TC_Agenda_No__81_-_9_July_2015_(Georgetown) ... Shahab Katebi Yarrabah Aboriginal Shire Council

Page 2 of 2

Current Capability

Level (at 30/06/15)

Desired Capability

Level (by 30/06/16)

Agreed Actions How will this Action get your RRTG to the Desired Capability Level?

Costing (Informal

Estimate) & Funding Source*

Accountable Officer Timeframe for Completion PROGRESS

Develop 2015/16 to 2018/19 Roads Alliance TIDS works program using PPT and other tools.

Defensible and robust works programs will be produced in accordance with new TIDS Policy. LGs will have an increased knowledge and greater input into TMR works program on the LRRS network.

Nil TC Members RIPC 28 February 2016

Regular review of design progress, construction planning, construction progress and expenditure progress of the 2015/16 works program.

Potential underspend of TIDS funding will be detected early and action taken to rectify. Works program will be amended and funding will be reallocated to ensure TIDS funding is spent expeditiously.

Nil TC Members RIPC Each TC Meeting.

Training for TC members in use of PPT.

TC members’ skills will increase and consequently input data will be more accurate and adequate, thus more robust works programs will be developed.

Nil RTAPT to Deliver As required

Regular submission of TIDS claims to TMR. TIDS expenditure rates will be satisfactory. Nil TC Members Quarterly as a minimum.

ROAD SAFETY

(MODERATE at 30/06/15)

MODERATE

TMR Road Safety representative to attend TC Meetings.

TC members will be aware of regional road safety strategies, initiatives and programs. Ensures road safety will be considered and treated collaboratively.

Nil TMR Each TC Meeting.

Analysis of road crash data by individual TC members and review by RRTG. Road safety problems on the LRRS network will be

identified and addressed in a prioritised and defensible manner.

Nil TC Members Ongoing

Treatments or projects scheduled (capital or maintenance) from road crash data analysis. Nil TC Members Ongoing

JOINT PURCHASING & RESOURCE SHARING

(MODERATE to HIGH

at 30/06/15)

HIGH Retention of Regional Procurement Officer.

Joint purchasing opportunities and potential regional efficiencies will be identified and capitalised upon.

Nil FNQROC Ongoing

ASSET MANAGEMENT

(MODERATE at 30/06/15)

MODERATE

Undertake traffic counts on LRRS network.

Traffic data on LRRS network will be of high quality and accurate. Staff will obtain formal qualification and asset management planning skills will be improved.

Nil TC Members Ongoing

Undertake traffic counts on LRRS network. Traffic data on LRRS network will be of high quality and accurate. Nil TC Members Ongoing

GENERAL

Reviewed by Steven Cosatto (FNQRRTG Technical Coordinator) 22/05/2015

23