LIU Workpackages

1
LIU-PSB 1 Management K.Hanke, Deputy B.Mikulec LIU-PSB 2 PSB Beam dynamics E.Benedetto LIU-PSB 3 Magnets A.Newborough LIU-PSB 4 RF systems A.Findlay LIU-PSB 5 Power Convertors S.Pittet LIU-PSB 6 Beam instrumentation J.Tan LIU-PSB 7 Beam Intercepting Devices C.Maglioni, Alt. A.Masi LIU-PSB 8 Vacuum System J.Hansen LIU-PSB 9 LINAC4 to PSB transfer line and PSB injection systems W.Weterings LIU-PSB 10 PSB Extraction system and PSB-PS transfer line J.Borburgh LIU-PSB 11 Controls J.Betz LIU-PSB 12 Electrical Systems S.Bertolasi LIU-PSB 13 Cooling and Ventilation M.Obrecht LIU-PSB 14 Installation, Transport and handling C.Bertone, J-L.Grenard LIU-PSB 15 Civil Engineering L.A.Lopez- Hernandez LIU-PSB 16 Radiation Protection R.Froeschl LIU-PSB 17 Machine Interlocks B.Puccio LIU-PSB 18 Alarms N.A. LIU-PSB 19 Access Systems, Doors N.A. LIU-PSB LIU-PS 1 Management S.Gilardoni, Deputy H.Damerau LIU-PS 2 Beam dynamics G.Sterbini LIU-PS 3 Magnets D.Bodart LIU-PS 4 RF systems H.Dameau, C.Rossi, A.Blas LIU-PS 5 Power Converters S.Pittet LIU-PS 6 Beam instrumentatio n S.Bart Pedersen LIU-PS 7 Beam Intercepting Devices A.Masi, Alt. O.Aberle LIU-PS 8 Vacuum System J.Hansen LIU-PS 9 Injection J.Borburgh LIU-PS 10 Extraction and transfer J.Borburgh LIU-PS 11 Controls M.Gourber-Pace LIU-PS 12 Electrical Systems J.Devine LIU-PS 13 Cooling and Ventilation M.Nonis LIU-PS 14 Installation, Transport and handling C.Bertone LIU-PS 15 Civil Engineering L.A.Lopez- Hernandez LIU-PS 16 Radiation Protection J.Vollaire, F.Szoncso LIU-PS 17 Machine Interlocks B.Puccio LIU-PS 18 Alarms S.Grau LIU-PS 19 Access Systems, Doors R.Nunes LIU-PS 20 Survey T.Dobers LIU-PS Commissioning LIU-SPS 1 Management B.Goddard, Deputy E.Shaposhnikova LIU-SPS 2 Beam dynamics E.Shaposhnikova LIU-SPS 3 Magnets J.Bauche LIU-SPS 4 RF systems P.Baudrenghien, E.Montesinos, W.Hofle, T.Bohl LIU-SPS 5 Power Convertors K.Kahle LIU-SPS 6 Beam instrumentati on L.Jensen LIU-SPS 7 Beam loss control V.Kain LIU-SPS 8 Electron cloud mitigation M.Taborelli LIU-SPS 9 Beam transfer systems B.Goddard LIU-SPS 10 Vacuum System J.A.Ferreira Somoza LIU-SPS 11 Controls M.Gourber-Pace LIU-SPS 12 Electrical Systems J.Pierlot LIU-SPS 13 Cooling and Ventilation M.Battistin LIU-SPS 14 Installation, Transport and handling I.Rühl LIU-SPS 15 Civil Engineering L.A.Lopez- Hernandez, J.Osborne LIU-SPS 16 Radiation Protection H.Vincke LIU-SPS 17 Machine Interlocks B.Pucio LIU-SPS 18 Alarms N.A. LIU-SPS Access LIU Workpackages LIU-ION 1 Management D.Manglunki Deputy E.B.Hozer LIU-ION 2 Beam dynamics N.A LIU-ION 3 Magnets B.Bodart LIU-ION 4 RF systems W. Hofle LIU-ION 5 Power Convertors J.M.Cravero LIU-ION 6 Beam instrumentati on LIU-ION 7 Ion dumps & stoppers R. Losito LIU-ION 8 Vacuum System LIU-ION 9 Ion Injection B.Goddard LIU-ION 10 LIU-ION 11 Controls N.A. LIU-ION 12 Electrical Systems LIU-ION 13 Cooling and Ventilation S. Deleval LIU-ION 14 Installation, Transport and handling I.Rühl LIU-ION 15 Civil Engineering LIU-ION 16 Radiation Protection LIU-ION 17 Machine Interlocks B.Pucio LIU-ION 18 Alarms N.A. LIU-ION 19 Access Systems, Doors N.A. LIU-ION Survey N.A LIU Project Project Leader Malika MEDDAHI Deputy Project Leader Giovanni RUMOLO LIU Project Team J.COUPARD, A.DELEU, A.FUNKEN, R.GAROBY, S.GILARDONI, B.GODDARD, K.HANKE, D.MANGLUNKI, M.MEDDAHI, G.RUMOLO, M.TAVLET, M.VRETENAR LIU Project Safety Officer A.FUNKEN LIU Planning & installation coordination Activity coordinator: J. COUPARD Deputy coordinator: S. MATAGUEZ Coordination meeting on Thursday at 10:30 https://espace.cern.ch/liu-project/li u-psb / Coordination meeting on Tuesday at 15:30 https://espace.cern.ch/liu-project /liu-ps / Coordination meeting on Wednesday at 10:30 https:// espace.cern.ch/liu-project/liu-sps/default. aspx Coordination meeting : bi- monthly LINAC4 Project Project Leader M.VRETENAR Deputy Project Leader A.LOMBARDI http://linac4-project.web.cern.ch/linac4 -project / LIU PSB coordination Activity coordinator: K.HANKE Deputy coordinator: B.MIKULEC LIU PS coordination Activity coordinator: S.GILARDONI Deputy coordinator: H.DAMERAU LIU SPS coordination Activity coordinator: B.GODDARD Deputy coordinator: E.SHAPOSHNIKOVA LIU ION coordination Activity coordinator: D.MANGLUNKI Deputy coordinator: B.HOLZER Accelerators and Technology Sector Director : Frédérick BORDRY Coordination meeting: bi-monthly https:// espace.cern.ch/liu-project/liu-sps/default. aspx 1 August 2014 Edms Id 1403771 LIU-PM-PP-0030

description

Accelerators and Technology Sector Director : Frédérick BORDRY. LIU Project Project Leader Malika MEDDAHI Deputy Project Leader Giovanni RUMOLO. LIU Project Safety Officer A.FUNKEN. LIU Planning & installation coordination Activity coordinator: J. COUPARD - PowerPoint PPT Presentation

Transcript of LIU Workpackages

Page 1: LIU  Workpackages

LIU-PSB 1 Management K.Hanke,Deputy B.Mikulec

LIU-PSB 2 PSB Beam dynamics E.Benedetto

LIU-PSB 3 Magnets A.Newborough

LIU-PSB 4 RF systems A.Findlay

LIU-PSB 5 Power Convertors S.Pittet

LIU-PSB 6 Beam instrumentation J.Tan

LIU-PSB 7 Beam Intercepting Devices C.Maglioni,Alt. A.Masi

LIU-PSB 8 Vacuum System J.Hansen

LIU-PSB 9 LINAC4 to PSB transfer lineand PSB injection systems W.Weterings

LIU-PSB 10 PSB Extraction systemand PSB-PS transfer line J.Borburgh

LIU-PSB 11 Controls J.Betz

LIU-PSB 12 Electrical Systems S.Bertolasi

LIU-PSB 13 Cooling and Ventilation M.Obrecht

LIU-PSB 14 Installation, Transportand handling

C.Bertone,J-L.Grenard

LIU-PSB 15 Civil Engineering L.A.Lopez-Hernandez

LIU-PSB 16 Radiation Protection R.Froeschl

LIU-PSB 17 Machine Interlocks B.Puccio

LIU-PSB 18 Alarms N.A.

LIU-PSB 19 Access Systems, Doors N.A.

LIU-PSB 20 Survey T.Dobers

LIU-PSB 21 Commissioning and Operation B.Mikulec

LIU-PSB 22 Dismantling K.Hanke

LIU-PSB 23 Half-Sector Test,Stripping Foil Test B.Mikulec

LIU-PS 1 Management S.Gilardoni,Deputy H.Damerau

LIU-PS 2 Beam dynamics G.Sterbini

LIU-PS 3 Magnets D.Bodart

LIU-PS 4 RF systems H.Dameau, C.Rossi, A.Blas

LIU-PS 5 Power Converters S.Pittet

LIU-PS 6 Beam instrumentation S.Bart Pedersen

LIU-PS 7 Beam Intercepting Devices A.Masi, Alt. O.Aberle

LIU-PS 8 Vacuum System J.Hansen

LIU-PS 9 Injection J.Borburgh

LIU-PS 10 Extraction and transfer J.Borburgh

LIU-PS 11 Controls M.Gourber-Pace

LIU-PS 12 Electrical Systems J.Devine

LIU-PS 13 Cooling and Ventilation M.Nonis

LIU-PS 14 Installation, Transport and handling C.Bertone

LIU-PS 15 Civil Engineering L.A.Lopez-Hernandez

LIU-PS 16 Radiation Protection J.Vollaire, F.Szoncso

LIU-PS 17 Machine Interlocks B.Puccio

LIU-PS 18 Alarms S.Grau

LIU-PS 19 Access Systems, Doors R.Nunes

LIU-PS 20 Survey T.Dobers

LIU-PS 21 Commissioning and Operation R.Steerenberg

LIU-PS 22 Dismantling S.Gilardoni

LIU-SPS 1 Management B.Goddard,Deputy E.Shaposhnikova

LIU-SPS 2 Beam dynamics E.Shaposhnikova

LIU-SPS 3 Magnets J.Bauche

LIU-SPS 4 RF systemsP.Baudrenghien, E.Montesinos, W.Hofle, T.Bohl

LIU-SPS 5 Power Convertors K.Kahle

LIU-SPS 6 Beam instrumentation L.Jensen

LIU-SPS 7 Beam loss control V.Kain

LIU-SPS 8 Electron cloud mitigation M.Taborelli

LIU-SPS 9 Beam transfer systems B.Goddard

LIU-SPS 10 Vacuum System J.A.Ferreira Somoza

LIU-SPS 11 Controls M.Gourber-Pace

LIU-SPS 12 Electrical Systems J.Pierlot

LIU-SPS 13 Cooling and Ventilation M.Battistin

LIU-SPS 14Installation, Transport and handling

I.Rühl

LIU-SPS 15 Civil Engineering L.A.Lopez-Hernandez, J.Osborne

LIU-SPS 16 Radiation Protection H.Vincke

LIU-SPS 17 Machine Interlocks B.Pucio

LIU-SPS 18 Alarms N.A.

LIU-SPS 19 Access Systems, Doors N.A.

LIU-SPS 20 Survey P.Bestmann

LIU-SPS 21 Commissioning and Operation K.Cornelis, V.Kain

LIU-SPS 22 Dismantling B.Goddard

LIU

Wor

kpac

kage

s

LIU-ION 1 Management D.ManglunkiDeputy E.B.Hozer

LIU-ION 2 Beam dynamics N.A

LIU-ION 3 Magnets B.Bodart

LIU-ION 4 RF systems W. Hofle

LIU-ION 5 Power Convertors J.M.Cravero

LIU-ION 6 Beam instrumentation

LIU-ION 7 Ion dumps & stoppers R. Losito

LIU-ION 8 Vacuum System

LIU-ION 9 Ion Injection B.Goddard

LIU-ION 10

LIU-ION 11 Controls N.A.

LIU-ION 12 Electrical Systems

LIU-ION 13 Cooling and Ventilation S. Deleval

LIU-ION 14Installation, Transport and handling

I.Rühl

LIU-ION 15 Civil Engineering

LIU-ION 16 Radiation Protection

LIU-ION 17 Machine Interlocks B.Pucio

LIU-ION 18 Alarms N.A.

LIU-ION 19 Access Systems, Doors N.A.

LIU-ION 20 Survey N.A

LIU-ION 21 Commissioning and Operation

N.A

LIU-ION 22 Dismantling N.A

LIU-ION 23 Source developments D.Küchler

LIU ProjectProject Leader Malika MEDDAHI

Deputy Project Leader Giovanni RUMOLO

LIU Project TeamJ.COUPARD, A.DELEU, A.FUNKEN, R.GAROBY, S.GILARDONI,

B.GODDARD, K.HANKE, D.MANGLUNKI, M.MEDDAHI, G.RUMOLO, M.TAVLET, M.VRETENAR

LIU Project Safety OfficerA.FUNKEN

LIU Planning & installation coordination Activity coordinator: J. COUPARD

Deputy coordinator: S. MATAGUEZ

Coordination meeting on Thursday at 10:30https://espace.cern.ch/liu-project/liu-psb/

Coordination meeting on Tuesday at 15:30https://espace.cern.ch/liu-project/liu-ps/

Coordination meeting on Wednesday at 10:30https://espace.cern.ch/liu-project/liu-sps/default.aspx

Coordination meeting : bi-monthly

LINAC4 ProjectProject Leader M.VRETENARDeputy Project Leader A.LOMBARDIhttp://linac4-project.web.cern.ch/linac4-project/

LIU PSB coordinationActivity coordinator: K.HANKE

Deputy coordinator: B.MIKULEC

LIU PS coordinationActivity coordinator: S.GILARDONIDeputy coordinator: H.DAMERAU

LIU SPS coordinationActivity coordinator: B.GODDARD

Deputy coordinator: E.SHAPOSHNIKOVA

LIU ION coordinationActivity coordinator: D.MANGLUNKI

Deputy coordinator: B.HOLZER

Accelerators and Technology Sector Director : Frédérick BORDRY

Coordination meeting: bi-monthlyhttps://espace.cern.ch/liu-project/liu-sps/default.aspx

1 August 2014Edms Id 1403771LIU-PM-PP-0030