List of Vendors

65
Total Exploration & Production Nigeria Limited OFON Phase 2 Project EXHIBIT J Page 1 of 65 CONTRACT No. OFON2/D028 EPCC4 for OFQ Living Quarter Platform EXHIBIT J LIST OF SUBCONTRACTORS and VENDORS EXHIBITS REFERENCE EXHIBITS’ TITLE A SCOPE OF WORK B SCHEDULE OF PRICES C WORK TIME SCHEDULE D PERFORMANCE GUARANTEES E DESIGN DOSSIER F PARTICULAR CONDITIONS FOR THE PERFORMANCE OF THE WORK G CO-ORDINATION PROCEDURE H QUALITY ASSURANCE AND QUALITY CONTROL I COMPANY ITEMS & EARLY CONTRACTS J LIST OF SUBCONTRACTORS and VENDORS K CONTRACTOR’S ORGANISATION & KEY PERSONNEL L HEALTH, SAFETY AND ENVIRONMENT REQUIREMENTS

description

Total Vendors

Transcript of List of Vendors

Page 1: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 1 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

EXHIBIT J

LIST OF SUBCONTRACTORS and VENDORS

EXHIBITS REFERENCE EXHIBITS’ TITLE A SCOPE OF WORK B SCHEDULE OF PRICES C WORK TIME SCHEDULE D PERFORMANCE GUARANTEES E DESIGN DOSSIER F PARTICULAR CONDITIONS FOR THE PERFORMANCE OF THE WORK G CO-ORDINATION PROCEDURE H QUALITY ASSURANCE AND QUALITY CONTROL I COMPANY ITEMS & EARLY CONTRACTS J LIST OF SUBCONTRACTORS and VENDORS K CONTRACTOR’S ORGANISATION & KEY PERSONNEL L HEALTH, SAFETY AND ENVIRONMENT REQUIREMENTS

Page 2: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 2 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

Table Of Contents

1. PREAMBLE...................................................................................................................................................................6

2. APPROVED SUBCONTRACTOR/VENDOR LIST .................................................................................................6

3. PART 1 – SUBCONTRACTORS (OTHER THAN VENDORS)..............................................................................6 3.1 REGISTRATION / CLASSIFICATION AUTHORITY ........................................................................................................6 3.2 CERTIFYING AUTHORITY .........................................................................................................................................6 3.3 ATEX NOTIFIED BODY............................................................................................................................................6 3.4 TRANSPORT VESSELS...............................................................................................................................................6 3.5 PILE DRIVING MONITORING.....................................................................................................................................7 3.6 COMMISSIONING ......................................................................................................................................................7 3.7 ENGINEERING SUPPORT SERVICES ...........................................................................................................................7 3.8 STRUCTURE PRE FABRICATION AND ASSEMBLY ......................................................................................................7 3.9 PIPING – PRE FABRICATION AND ASSEMBLY............................................................................................................7 3.10 MAINTENANCE AND INSPECTION ENGINEERING (MIE) SERVICE..............................................................................7 3.11 OPERATING MANUAL...............................................................................................................................................7 3.12 OVER PRESSURE PROTECTION STUDIES AND FMEA................................................................................................7 3.13 SAFETY ENGINEERING STUDIES (I.E DROPPED OBJECT STUDIES, FERA, HELICO CRASH STUDY, ETC..) .................7 3.14 ELECTRICITY / INSTRUMENTATION (INTEGRATOR)...................................................................................................8 3.15 TELECOM SUBCONTRACTOR ....................................................................................................................................8 3.16 PRE-SURVEY, POSITIONING, POST-SURVEY .............................................................................................................8 3.17 PRE-SURVEY, POSITIONING, POST-SURVEY, ............................................................................................................8 3.18 SURVEYING..........................................................................................................................................................8

3.18.1 Geophysical Surveys.......................................................................................................................................8 3.18.2 Geotechnical Surveys .....................................................................................................................................8

3.19 DIVING SERVICES.....................................................................................................................................................9 3.20 ROV SERVICES ........................................................................................................................................................9 3.21 NON DESTRUCTIVE TESTS........................................................................................................................................9 3.22 AGENCY SERVICES / FORWARDING ..........................................................................................................................9 3.23 WORK VESSELS .......................................................................................................................................................9 3.24 WEATHER FORECAST SERVICES...............................................................................................................................9 3.25 SAFETY ....................................................................................................................................................................9

3.25.1 Life Boat and Davits.......................................................................................................................................9 3.25.2 Life Raft ........................................................................................................................................................10 3.25.3 Fire Fighting Equipment ..............................................................................................................................10

3.26 BOLT TENSIONING..................................................................................................................................................10 3.27 LEAK TESTING........................................................................................................................................................10 3.28 HVAC SUBCONTRACTOR/ENGINEERING ...............................................................................................................10 3.29 METOCEAN SUBCONTRACTOR/INTEGRATOR ......................................................................................................10 3.30 NIGERIAN 3RD PARTY CERTIFIER AND WIRE ROPES FABRICATORS/SUPPLIERS.......................................................11 3.31 LIFTING BARGE ......................................................................................................................................................11 3.32 HOOK-UP BARGE ...................................................................................................................................................11 3.33 ANCHOR HANDLING TUG (AHT) ...........................................................................................................................11 3.34 SUPPLY VESSEL ....................................................................................................................................................11 3.35 CREW BOAT...........................................................................................................................................................11 3.36 FLOATEL ................................................................................................................................................................12 3.37 DIVING SUPPORT VESSEL (DSV) .........................................................................................................................12 3.38 CARGO BARGE ......................................................................................................................................................12

4. PART 2 - VENDORS: .................................................................................................................................................13 4.1 BULK MATERIAL ..............................................................................................................................................13

4.1.1 Structural Pipes (Primary / Secondary) – Bending & Rolling and Standard welded pipes .............................13 4.1.2 Structural Pipes (Primary/secondary) – Seamless Pipes .................................................................................13 4.1.3 Primary and secondary structural plates .........................................................................................................13

Page 3: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 3 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.1.4 Structural Beams/Shapes (primary and secondary) .........................................................................................13 4.2 PRESSURE VESSELS .........................................................................................................................................15

4.2.1 Separators and Scrubbers (Design and Supply)...............................................................................................15 4.2.2 Tubular Heat Exchangers : Suction Coolers, Fuel Gas Coolers......................................................................15 4.2.3 TEG Outlet Scrubber + MP Slug Catcher.......................................................................................................15 4.2.4 Gas Cooler........................................................................................................................................................15 4.2.5 Air Coolers........................................................................................................................................................16 4.2.6 Plate Heat Exchangers .....................................................................................................................................16

4.3 OTHERS EQUIPMENTS .....................................................................................................................................16 4.4 PIPING..................................................................................................................................................................18

4.4.1 Seamless Pipe (φ <16") ....................................................................................................................................18 4.4.2 S.A.W. (Welded) (φ >16") .................................................................................................................................18 4.4.3 Elbows (for risers) ............................................................................................................................................18 4.4.4 Copper Alloyed Piping .....................................................................................................................................18 4.4.5 Copper Alloyed Fittings....................................................................................................................................18 4.4.6 Epoxy Reinforced Fiber Glass Pipes ................................................................................................................19 4.4.7 Low Temperature Carbon Steel Pipes (Seamless)............................................................................................19 4.4.8 Carbon Steel flanges.........................................................................................................................................19 4.4.9 Low Temperature Carbon Steel Fittings ..........................................................................................................19 4.4.10 Very Low Temperature CS Pipe and Fittings...............................................................................................19 4.4.11 Stainless Steel Pipe (Seamless) ....................................................................................................................19 4.4.12 Stainless Steel Pipe (Welded) .......................................................................................................................20 4.4.13 Stainless Steel Fittings..................................................................................................................................20 4.4.14 Stainless Steel Flanges .................................................................................................................................20 4.4.15 Hub Connector (CS).....................................................................................................................................20 4.4.16 Carbon Steel Pipes / Fittings / Weldolets.....................................................................................................20 4.4.17 Hose Connections.........................................................................................................................................21

4.5 VALVES...............................................................................................................................................................21 4.5.1 Gate Valves - Globe Valves ND < 1½" ............................................................................................................21 4.5.2 Gate Valves - Globe Valves ND >2" ................................................................................................................21 4.5.3 Needle Valves....................................................................................................................................................22 4.5.4 Block and Bleed Valves (Ball Valves) (agreement according to GS PVV 142)................................................22 4.5.5 Butterfly Valves Carbon Steel or Ductile Iron Body with Elastomer Seal <150#............................................22 4.5.6 Critical On/Off Valves (Ball valves class “E” as GS PVV 142).......................................................................23 4.5.7 Ball Valves ND < 1½" ......................................................................................................................................23 4.5.8 Ball valves 24" > ND >2" ................................................................................................................................23 4.5.9 Ball Valves ND > 24" .......................................................................................................................................23 4.5.10 Check Valves (VERTICAL LIFT) .................................................................................................................23 4.5.11 Check Valves ................................................................................................................................................24 4.5.12 Wafer Type ...................................................................................................................................................24 4.5.13 Spring Type Safety Valves ............................................................................................................................24 4.5.14 Pilot-Operated Safety Valves .......................................................................................................................25 4.5.15 Rupture Disks / Rupture Disk Assembly.......................................................................................................25 4.5.16 Flame Arrestors............................................................................................................................................25 4.5.17 Flow Control Chokes....................................................................................................................................25

4.6 ARCHITECTURAL .............................................................................................................................................26 4.6.1 Service Lift ........................................................................................................................................................26 4.6.2 Laboratory module ...........................................................................................................................................26 4.6.3 Non Integrated technical Shelter ......................................................................................................................26 4.6.4 Pre-fabricated Toilet ........................................................................................................................................26 4.6.5 Materials and Equipment .................................................................................................................................26

4.7 H.V.A.C ................................................................................................................................................................29 4.7.1 Equipment Class 1 ............................................................................................................................................29 4.7.2 Equipment Class 2 ............................................................................................................................................32 4.7.3 Equipment Class 3 ............................................................................................................................................35 4.7.4 Equipment Class 4 ............................................................................................................................................37

4.8 MACHINERY ......................................................................................................................................................39 4.8.1 Diesel Engine....................................................................................................................................................39 4.8.2 Cranes...............................................................................................................................................................39

Page 4: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 4 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.8.3 Turbo Generator...............................................................................................................................................39 4.8.4 Waste Heat Recovery Unit................................................................................................................................39 4.8.5 Overhead Travel & Jib Cranes.........................................................................................................................39 4.8.6 Hoists (suitable for Hazardous Area)...............................................................................................................39 4.8.7 Emergency Generator (Packaging) ..................................................................................................................40 4.8.8 Fire Water Pump Package................................................................................................................................40 4.8.9 Air Compressor Units (Packaging) ..................................................................................................................40 4.8.10 Compressor ..................................................................................................................................................40 4.8.11 Centrifugal Pumps General Purpose ...........................................................................................................40 4.8.12 Centrifugal Pumps special purpose..............................................................................................................41 4.8.13 Vertical Pumps , Jockey and Sea Water lift, Sea Water Cooling .................................................................41 4.8.14 Reverse Osmosis HP feed pump :.................................................................................................................41 4.8.15 Open and close drain Vessel Pumps, Sump Tank Pumps - Sump Caisson Pumps.......................................41 4.8.16 Diesel Oil Pumps..........................................................................................................................................41 4.8.17 Mixers...........................................................................................................................................................42

4.9 TELECOMMUNICATIONS................................................................................................................................43 4.9.1 Public address and general alarm system ........................................................................................................43 4.9.2 Flameproof loudspeakers .................................................................................................................................43 4.9.3 Flameproof flashing beacons ...........................................................................................................................43 4.9.4 Telephone PBX .................................................................................................................................................43 4.9.5 Telephone equipment (analog, numeric, DECT) ..............................................................................................43 4.9.6 Flameproof telephone equipment .....................................................................................................................43 4.9.7 Facsimile Terminals .........................................................................................................................................43 4.9.8 Data equipment.................................................................................................................................................43 4.9.9 Marine VHF / FM radio (mobile, portative) ....................................................................................................43 4.9.10 Aeronautical VHF / AM radio (mobile, portative) .......................................................................................43 4.9.11 UHF, VHF radio repeaters / base stations/trunking systems and TETRA...................................................44 4.9.12 Hand- portable Radios .................................................................................................................................44 4.9.13 MF/HF transceivers .....................................................................................................................................44 4.9.14 Non directional beacon ................................................................................................................................44 4.9.15 DIGITAL LOS Radio relay system ...............................................................................................................44 4.9.16 Satellite Communications.............................................................................................................................44 4.9.17 Radar............................................................................................................................................................44 4.9.18 Radar beacon (RACON)...............................................................................................................................44 4.9.19 GMDSS.........................................................................................................................................................44 4.9.20 Entertainment video satellite antenna tracking system ................................................................................44 4.9.21 Entertainment ...............................................................................................................................................44 4.9.22 CCTV............................................................................................................................................................45 4.9.23 GPS equipment .............................................................................................................................................45 4.9.24 Deleted .........................................................................................................................................................45 4.9.25 Voice and data cabling for building(copper and fiber optic cables)............................................................45 4.9.26 OPTICAL fibre .............................................................................................................................................45 4.9.27 Antennas .......................................................................................................................................................45 4.9.28 Transmission lines, feeders, wave guide, coaxstop, connectors...................................................................45 4.9.29 Access Control Systems / POB .....................................................................................................................45 4.9.30 Racks ............................................................................................................................................................45 4.9.31 Digital multiplexer .......................................................................................................................................45

4.10 ELECTRICAL ......................................................................................................................................................46 4.10.1 GENERATORS .............................................................................................................................................46 4.10.2 MOTORS ......................................................................................................................................................46 4.10.3 TRANSFORMERS ........................................................................................................................................46 4.10.4 Switchboards and distribution boards .........................................................................................................47 4.10.5 Electrical cables ...........................................................................................................................................48 4.10.6 Cable ladder & trays ....................................................................................................................................49 4.10.7 Auxiliary electrical equipment .....................................................................................................................49 4.10.8 Industrial Lighting fittings............................................................................................................................51 4.10.9 Heating Equipment.......................................................................................................................................51 4.10.10 U.P.S. -Rectifiers and inverters (including batteries)- .................................................................................52 4.10.11 Soft Starters and VFD’s ...............................................................................................................................52

Page 5: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 5 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.10.12 Solar panel systems (including batteries).....................................................................................................52 4.10.13 Navigation aids and obstruction lights (including control panel)................................................................53 4.10.14 ORGA Electromagnetic hazards ..................................................................................................................53 4.10.15 Third party verification (for independent inspection of electrical installation) ...........................................53

4.11 INSTRUMENTATION.........................................................................................................................................54 4.11.1 ICSS simulator..............................................................................................................................................54 4.11.2 Flow Measurement .......................................................................................................................................54 4.11.3 Level Measurement.......................................................................................................................................55 4.11.4 Pressure Measurement .................................................................................................................................55 4.11.5 Temperature Measurement...........................................................................................................................55 4.11.6 Vibration, Displacement, Speed, Noise, Torque...........................................................................................56 4.11.7 Measurement Accessories ............................................................................................................................56 4.11.8 Position Measurement..................................................................................................................................57 4.11.9 Control Valves (including Accessories) .......................................................................................................57 4.11.10 Solenoid Valves - Pilot Valves......................................................................................................................58 4.11.11 Pressure Reducers........................................................................................................................................58 4.11.12 Actuators and Accessories............................................................................................................................59 4.11.13 Electrical Actuators......................................................................................................................................59 4.11.14 Deluge valve skids ........................................................................................................................................59 4.11.15 Analysers ......................................................................................................................................................60 4.11.16 Oil in Water Analyser...................................................................................................................................60 4.11.17 Sampling systems (Liquids Sampling Systems) ............................................................................................60 4.11.18 Compact or Standard Metering Skids with Prover ......................................................................................60 4.11.19 Electrical Link Equipment............................................................................................................................60 4.11.20 Hydraulic or Pneumatic Link Equipment.....................................................................................................60 4.11.21 Programmable Logic Controllers ................................................................................................................61 4.11.22 Distributed Control System ..........................................................................................................................61 4.11.23 Safety Barriers, Push-buttons.......................................................................................................................61 4.11.24 Hydraulic Automatisms ................................................................................................................................62 4.11.25 Fire Detectors...............................................................................................................................................62 4.11.26 Gas Detectors (H2S, Gas Combustible) ......................................................................................................62 4.11.27 Fusible Lines Supporting (Wellhead Area) ..................................................................................................62 4.11.28 Instrument Cabinet .......................................................................................................................................62

4.12 COATING AND PROTECTION..........................................................................................................................63 4.12.1 Passive Fire Protection ................................................................................................................................63 4.12.2 Insulation......................................................................................................................................................63 4.12.3 Paint .............................................................................................................................................................63 4.12.4 Pipe External Lining Works .........................................................................................................................63 4.12.5 Welding Joints Coating ................................................................................................................................63 4.12.6 Internal Corrosion Monitoring Equipment ..................................................................................................63 4.12.7 Corrosion inhibitors .....................................................................................................................................64 4.12.8 Chemicals for Hydraulic Test Water Treatment...........................................................................................64 4.12.9 Cathodic Protection - Anodes ......................................................................................................................64 4.12.10 Cathodic Protection Monitoring Equipment ................................................................................................64 4.12.11 JACKET APPURTENANCES.......................................................................................................................64 4.12.12 COATING / INSULATION YARD APPLICATION ......................................................................................64 4.12.13 FIBER GLASS PIPING YARD ASSEMBLY .................................................................................................65

Page 6: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 6 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

1. Preamble CONTRACTOR shall select SUBCONTRACTORS from the listing contained herein for the associated part of the WORK. These SUBCONTRACTORS are deemed APPROVED. However, CONTRACTOR may propose additional SUBCONTRACTORS for APPROVAL which shall not be unreasonably withheld. COMPANY may exercise the right of APPROVAL for lower tier suppliers supplying SUBCONTRACTORS. All materials supplied for the WORK shall be new.

2. APPROVED SUBCONTRACTOR/VENDOR list Subcontracting shall comply with Article 11 of the AGREEMENT.

3. PART 1 – SUBCONTRACTORS (other than VENDORS) Note: Nigerian Service providers shall be used whenever available and competitive.

3.1 Registration / Classification Authority a. GERMANISHER LLOYD b. BUREAU VERITAS c. AMERICAN BUREAU OF SHIPPING d. DET NORSKE VERITAS e. LLOYDS REGISTER OF SHIPPING

3.2 Certifying Authority a. GERMANISHER LLOYD b. BUREAU VERITAS c. AMERICAN BUREAU OF SHIPPING d. DET NORSKE VERITAS e. LLOYDS REGISTER OF SHIPPING f. APAVE

3.3 ATEX Notified Body Refer to list included in GS ELE 079

3.4 Transport Vessels a. TIDEWATER b. CROWLEY MARINE c. LKL BOA d. DOCKWISE e. NMA/COSCO f. GIANT MARINE/SMIT g. JUMBO h. AMT

Page 7: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 7 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

3.5 Pile Driving Monitoring a. TNO b. THALES c. FUGRO FRANCE d. GRLWEAP e. SOMEHSA Geosciences

3.6 Commissioning a. CEGELEC b. SPIE OGS c. VINCI ENERGIES

3.7 Engineering Support Services a. DELTATEK (Nigeria) b. CRESTVILLE c. NETCO (Nigeria) d. CAKASA (Nigeria)

3.8 Structure Pre Fabrication and Assembly To be advised

3.9 Piping – Pre Fabrication and Assembly To be advised

3.10 Maintenance and Inspection Engineering (MIE) Service a. DIETSMAN

3.11 Operating Manual a. IMPAQT CONSEIL b. AMEC SPIE ( IPEDEX) c. CANT

3.12 Over Pressure Protection Studies and FMEA a. FRACTAL b. LIGERON/SONOVISION

3.13 Safety Engineering Studies (i.e Dropped Object Studies, FERA, Helico Crash Study, etc..) a. BUREAU VERITAS b. DNV c. ARC d. ATKINS e. VECTRA

Page 8: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 8 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

f. GENESIS g. ODZ CONSULTANTS

3.14 Electricity / Instrumentation (Integrator) a. SNEF b. CEGELEC c. AMEC SPIE d. VINCI ENERGIES / JETEC (GTIE)

3.15 Telecom Subcontractor a. CEGELEC b. SPIE OGS c. THALES SECURITY SYSTEM

3.16 Pre-Survey, Positioning, Post-Survey a. FUGRO SURVEY B.V. b. RACAL SURVEY LIMITED c. GARDLINE SURVEYS LTD d. STOLT COMEX SEAWAY

3.17 Pre-Survey, Positioning, Post-Survey, a. FUGRO GEOS. b. ID-SCOPE c. GARDLINE SURVEYS LTD d. IXSURVEY SAS e. BMT Scientific Marine Services, Inc f. EVANS-HAMILTON Inc g. MUIR MATHESON h. MSI - Metocean Services International i. Woods Hole Group

3.18 SURVEYING 3.18.1 Geophysical Surveys

a. GEOTEAM-WIMPOL (FUGRO) b. OCEANICS (Ex - GEOSITE SURVEYS) c. SVITZER (BRITSURVEY) d. GARDLINE SURVEYS e. RACAL

3.18.2 Geotechnical Surveys

a. FUGRO MC CLELLAND ENGINEERS B.V (Netherlands) b. GEOCEAN (France)

Page 9: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 9 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

c. SAGE (U.K.)

3.19 Diving Services a. COOPERTIVA NAZIONALE SOMMOZZATORI b. RANA c. SMIT OCTO d. OCEANEERING INTERNATIONAL e. STOLTOFFSHORE f. SONSUB INTERATIONAL LTD g. SBM

3.20 ROV Services a. OCEANEERING INTERNATIONAL b. SONSUB INTERNATIONAL LTD

3.21 Non Destructive Tests a. OCEANEERING INTERNATIONAL b. SAIPEM S.P.A. c. SGS QUALITEST d. INSTITUT de SOUDURE

3.22 Agency Services / Forwarding a. PANALPINA WORLD TRANSPORT (NIG) LTD b. SDV c. DANZAS d. ALRAIN

3.23 Work Vessels a. ABC MARITIME b. INTERSHIP c. SMIT d. TIDEWATER

3.24 Weather Forecast Services a. METEOMER b. OCEANROUTE

3.25 Safety 3.25.1 Life Boat and Davits

a. SCHAT-DAVIT / HARDING b. ACEBI / NORSAFE

Page 10: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 10 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

3.25.2 Life Raft c. ANGEVINIERE d. RFD LTD

3.25.3 Fire Fighting Equipment

e. PROTEC FEU f. ANGUS FIRE LTD g. SICLI h. SILVANI i. WORMALD j. CHUBB k. DESAUTEL l. ALBACH ALCO m. AUTOCHIM n. IMBALVALVE

3.26 Bolt tensioning a. HALLIBURTON b. BJ SERVICES COMPANY c. SCHLUMBERGER

3.27 Leak testing a. HALLIBURTON b. BJ SERVICES COMPANY c. SCHLUMBERGER

3.28 HVAC Subcontractor/Engineering a. AC Marine (Norway) b. Direct Engineering Service (DESMO – Australia) c. Hi Air (Korea)

3.29 METOCEAN Subcontractor/Integrator

a. MUIR MATHESON (Aberdeen - UK) b. GEMS Survey Ltd (UK) c. MetOcean Engineers Pty Ltd (Australia) d. Ocean Data Technologies (USA)

Page 11: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 11 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

3.30 Nigerian 3rd Party Certifier and Wire Ropes Fabricators/Suppliers

Inspection or type of Certification

Name of 3rd Party Certifier NDT (MPI & DPI)

Lifting gears & Equipment

Load Testing

Welded Components

Crane/Forklift Driver

AMOSCO Yes Yes Yes Bureau Verities Yes Yes Yes Curranatta Marine Yes Detagulf Global Service Yes Yes Yes Global Lifting Yes Yes Yes JC International Yes Yes Yes Yes Juva Oil Yes Yes Engineering Automation Tech Yes Yes Yes Oil Field Specialist Ltd. Yes Yes Proofload Yes Yes Yes Reliant Scan Yes SGS Yes Yes Temaris Multilink Nig. Ltd. Yes Siramex Nigeria Ltd. Yes Petronella Nig. Ltd. Yes PAC Testing Yes Odekole Yes Yes Advance Inspection Technlogy Yes Standard Inspection & Testing Yes Yes Yes Yes Wire Ropes Fabricators/Suppliers: - Afri Ropes - Nigerian Ropes - Romson Nigeria Limited - Gani International - Easton Ropes

3.31 Lifting barge

To be advised

3.32 Hook-up barge

To be advised

3.33 Anchor Handling Tug (AHT)

To be advised

3.34 Supply vessel

To be advised

3.35 Crew boat

To be advised

Page 12: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 12 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

3.36 Floatel

To be advised

3.37 Diving Support Vessel (DSV)

To be advised

3.38 Cargo Barge

To be advised

Page 13: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 13 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4. PART 2 - VENDORS:

4.1 BULK MATERIAL 4.1.1 Structural Pipes (Primary / Secondary) – Bending & Rolling and Standard welded pipes

a. EISENBAU KRAMER (Germany) b. ENNDTEBRUCKER EISENWERK (EEW) Germany c. BERGROHR (Germany) d. JFE (Kawasaki + NKK )(Japan) e. Nippon Steel (Japan) f. JSW (Japan) g. Europipe (Germany, France) h. TENARIS (Confab-Brazil) i. ILVA (Italy) j. WELSPUN (India) k. CORUS (UK) l. SAW Pipes Ltd (India)

4.1.2 Structural Pipes (Primary/secondary) – Seamless Pipes a. SUMITOMO METAL (Japan) b. TENARIS (Japan-NKK, Mexico-TAMSA, Argentina-SIDERCA, Italy-Dalmine) c. Valourec & Mannesmann (Germany – France)

4.1.3 Primary and secondary structural plates a. THYSSEN b. GTS (France) c. DILLINGER (Germany) d. ILVA (Italy) e. SUMITOMO METAL (Japan) f. Nippon Steel (Japan) g. JFE (Kawasaki + NKK) (Japan) h. SALZGITTER (Germany) i. VOEST ALPINE (Austria) j. POSCO (Korea) k. AZOVSTAHL (Ukrainia)

4.1.4 Structural Beams/Shapes (primary and secondary) a. SALZGITTER b. MANNESMANN c. DILLINGER d. CORUS e. ARCELOR

Page 14: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 14 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

f. ARBED g. NSC (Japan) h. KAWASAKI (Japan) i. NKK (Japan) j. SUMITOMO (Japan)

Page 15: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 15 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.2 PRESSURE VESSELS 4.2.1 Separators and Scrubbers (Design and Supply)

a. BSB b. CAC DEGREMONT c. NATCO d. PROCESS SYSTEM e. PROSERNAT f. CITBA g. KVAERNER HEURTEY h. PECO i. FOURE LAGADEC j. CAMOM k. OFFICINA LUIGI RESTA l. DELAUNAY m. CEFA n. ONEX o. TISSOT p. NORDON q. SORENAM r. ACM s. GESLOT t. DORMAN LONG ENGINEERING LTD u. NIGERDOCK NIG.PLC

4.2.2 Tubular Heat Exchangers : Suction Coolers, Fuel Gas Coolers a. GUERTON b. CAC DEGREMONT c. FOURE LAGADEC d. DELAUNAY e. ASET f. ONEX

4.2.3 TEG Outlet Scrubber + MP Slug Catcher a. BELLELI b. ATB CALDERIA c. ROSETTI MARINO SPA.

4.2.4 Gas Cooler a. GEA b. BRONSWERK HEAT TRANSFER

Page 16: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 16 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

c. OLMI SPA d. FBM (Italy) e. OFFICINA LUIGI RESTA f. FOURE LAGADEC g. DELAUNAY

4.2.5 Air Coolers a. BTT b. HAMON D'HONT c. BRONSWERK HEAT TRANSFER

4.2.6 Plate Heat Exchangers a. ALFA LAVAL b. PACKINOX c. GEA

4.3 OTHERS EQUIPMENTS 4.3.1.1 Chlorination Unit

a. SOCREMATIC b. UNITEC WEMCO/METROL (BAKER HUGHES) c. ELECTROCATALYTIC (UK) d. KREBS

4.3.1.2 Chemical Injection Unit 4.3.1.2.1 Piping Arrangement Supplier

a. CAMOM b. CITBA c. NORDON d. ONEX (Parthenay) e. SIRM (Rouen)

4.3.1.2.2 Pump Supplier a. BRAN ET LUEBBE b. DKM (CLEXTRAL) c. DOSAPRO d. LEWA e. FINDER-PMH

4.3.1.3 Tote Tanks a. GALLAY

Page 17: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 17 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.3.1.4 Fuel Gas Filters a. PALL INDUSTRIE

4.3.1.5 Water Injection Filter Package / Vacuum De-aeration Package / Sand Filters a. US FILTER FRANCE b. AXSIA SERCK BAKER c. ONDEO d. ETA PROCESS e. HICK HARGRAVE f. BAKER HUGHES PROCESS SYSTEMS g. RELLUMIX

4.3.1.6 Air blower a. HIBON BOC EDWARDS b. AERZEN

4.3.1.7 Filtration membranes a. HYDRANAUTICS b. POLYMEM c. X- FLOW d. DOW e. TORAY

4.3.1.8 Pig Trap Closures a. T.D. WILLIAMSON b. HUBER YALE c. G.D. ENGINEERING

4.3.1.9 Flares a. JOHN ZINK b. E.E.T.

4.3.1.10 Burner Boom a. Schlumberger b. Power Well Services c. Halliburton

Page 18: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 18 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.4 PIPING 4.4.1 Seamless Pipe (φ <16")

a. KAWASAKI b. NKK (MARUBENI) c. NIPPON STEEL CORPORATION (ITOCHU) d. SUMITOMO e. VALLOUREC MANNESMANN TUBES f. TENARIS

4.4.2 S.A.W. (Welded) (φ >16") a. EUROPIPE b. KAWASAKI c. NKK (MARUBENI) d. ILVA e. SUMITOMO(Ob) f. NIPPON STEEL CORPORATION g. EINSENBAUKRAMMER h. TENARIS i. DST (Dalmine Siderca Tamsa) (After Survey/Audit)

4.4.3 Elbows (for risers) a. MANNESMANN b. FABRICOM c. NORDON

4.4.4 Copper Alloyed Piping a. BRONZE INDUSTRIEL b. FARMERS COPPER c. V.D.M. + MECALLOY d. SCHULTZ USA e. YORKSHIRE IMPERIAL ALLOY f. CUSTOM ALLOY g. NAUTIC STEEL UK h. ALLOY PIPING AND FITTING i. LE BRONZE (France)

4.4.5 Copper Alloyed Fittings a. BRONZE INDUSTRIEL b. NEW ORLEANS COPPER c. MECALLOY d. FARMERS COPPER

Page 19: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 19 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

e. CUSTOM ALLOY f. SCHULTZ USA g. ALLOY PIPING AND FITTING h. FEDERAL FLANGE i. NAUTIC STEEL UK

4.4.6 Epoxy Reinforced Fiber Glass Pipes a. AMERON b. WAVIN (FUTURPIPE)

4.4.7 Low Temperature Carbon Steel Pipes (Seamless) a. SCHULTZ b. DALMINE c. SIDERCA d. TAMSA

4.4.8 Carbon Steel flanges a. GALPERTI b. M.G.I. c. MILESI d. VECTOR INTERNATIONAL e. BRUCK f. LINVIC g. ULMA h. GELDBACH

4.4.9 Low Temperature Carbon Steel Fittings a. TECHNOFORGE b. PETROL RACCORDI c. MEGA d. BENKAN e. DELCORTE f. IRC

4.4.10 Very Low Temperature CS Pipe and Fittings To be advise

4.4.11 Stainless Steel Pipe (Seamless) a. DMV b. KAWASAKI c. TUBACEX d. SANDVICK

Page 20: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 20 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.4.12 Stainless Steel Pipe (Welded) a. BUTTING b. SANDVICK c. WESTEALLENWERK d. SUMITOMO e. NIPPON STEEL

4.4.13 Stainless Steel Fittings a. GAM RACCORDI b. GALPERTI c. BUTTING d. MELESSI e. BRUCK f. RGB STAINLESS g. SCHULZ h. COPROSIDER / IBF i. PHOCEENE j. ICARUS k. MARDALE l. SCHOLLER BECKMAN

4.4.14 Stainless Steel Flanges a. GALPERTI b. M.G.I. c. MILESI d. VECTOR INTERNATIONAL

4.4.15 Hub Connector (CS) a. GRAYLOCK b. TECLOCK c. GALPERTI

4.4.16 Carbon Steel Pipes / Fittings / Weldolets a. KAWASAKI b. NKK c. NIPPON STEEL d. SUMITOMO e. VALLOUREC MANNESMANN f. TENARIS g. EUROPIPE h. ILVA

Page 21: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 21 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

i. PREUSSAG j. CONFAB k. EBK (PIPES) l. TECHNOFORGE (FITTINGS) m. BENKAN (FITTINGS) n. PETROL RACCORDI (FITTINGS) o. DELCORTE (WELDOLETS) (CS only) p. GALPERTI q. MEGA (WELDOLETS)

4.4.17 Hose Connections a. KSB AMRI b. FM INDUSTRIES c. ICARUS S.A.

4.5 VALVES 4.5.1 Gate Valves - Globe Valves ND < 1½" 4.5.1.1 Carbon Steel & Stainless Steel < 2500#

a. OMB b. SACCAP - SAPAG c. VELAN (Canada) d. DESCOTE (Tyco Group) e. GACHOT- KEYSTONE (< 900#) (Tyco Group) f. ROFORGE g. B.F.E SPA h. DOUGLAS CHERO i. VOGT

4.5.1.2 Copper Alloys < 300# a. COYARD

4.5.2 Gate Valves - Globe Valves ND >2" 4.5.2.1 Carbon Steel or Light Alloy Steel ≤ 2500#

a. SA MALBRANQUE b. PETROL VALVES c. VANATOME (Gate) d. DESCOTE e. BEL VALVES f. HINDLE COCKBURNS(SS <600#)(Tyco GROUP) g. GACHOT KEYSTONE (<600#)(Tyco GROUP) h. GROVE i. PACIFIC VALVES j. VOGT

Page 22: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 22 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

k. SACCAP-COYARD

4.5.2.2 Copper Alloy <300# a. COYARD b. GACHOT c. VOGT

4.5.3 Needle Valves 4.5.3.1 API 3000 to 10000

a. KEYSTONE b. SACCAP -SAPAG c. THOMPSON VALVES d. VANATOME e. ROFORGE f. OLIVER g. KEROTEST

4.5.3.2 Block-Valves for Pressure Gauges a. VANATOME b. OLIVER VALVES (= API 15000)

4.5.4 Block and Bleed Valves (Ball Valves) (agreement according to GS PVV 142) a. OLIVER (less than 2’’) b. GALPERTI (less than 2’’) c. KEYSTONE d. KENMAC e. SACCAP

4.5.5 Butterfly Valves Carbon Steel or Ductile Iron Body with Elastomer Seal <150# a. OLIVER (less than 2’’) b. VRACO c. KEYSTONE (TYCO Group) d. GRINEL e. WINVALVES (Tyco Group) f. BURRACO g. SAPAG h. HINDLE COCKBURNS (Tyco Group) i. KSB / AMRI Model DANAIS S.F j. NELES JAMESBURY k. SAPPAG (TYCO Group) l. METSO

Page 23: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 23 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.5.6 Critical On/Off Valves (Ball valves class “E” as GS PVV 142) a. FLOW CONTROL TECHNOLOGIES (Tyco GROUP) b. GROVE c. SRI d. TORMENE

4.5.7 Ball Valves ND < 1½" F = Floating ball - A = Trunnion ball a. GACHOT = 300# (F)

b. ARGUS = 600# (F)

c. DAFRAM = 300# (F)

d. OMS SALERI = 1500# (A/F)

e. WORCESTER = 1500# (F)

f. STARLINE = 2500# (A/F)

g. SRI = 2500# (A)

h. OMB

4.5.8 Ball valves 24" > ND >2" F = Floating ball - A = Trunnion ball Fire safe API 607 or BS 6755 or TFE

a. THEVIGNOT (A) b. Flow Control Technologies (FCT) (A) (tyco) c. SRI d. GROVE (A) e. TORMENE

4.5.9 Ball Valves ND > 24" a. GROVE b. FLOW CONTROL TECHNOLOGIES (Tyco GROUP) c. TORMENE

4.5.10 Check Valves (VERTICAL LIFT) 4.5.10.1 Nominal Diameter < ½"

a. DESCOTE = 1500# b. SACCAP- SAPAG = 1500# c. ROFORGE = 800# d. MAVINOX = 800# e. DOUGLAS CHERO = 2500#

f. KEYSTONE = 1500#

g. SEGAULT = 1500#

h. B.F.E SPA

Page 24: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 24 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.5.10.2 Nominal Diameter > = 2" a. MANIVOX b. DESCOTE 2" 1500# c. RAIMONDI = 2500#

d. SEGAULT = 1500#

e. SNRI = 600#

4.5.11 Check Valves 4.5.11.1 Alloyed and Non-alloyed Steel-Flanged Swing type

a. MALBRANQUE = 2500# b. GEC ALSTHOM SAPAG = 24" - 10000PSI

c. KF = 2500#

d. HINDLE = 600#

4.5.12 WafeR Type a. BURACCO TYPE SEPAME DAUPHIN b. KEYSTONE c. STOCKHAM d. GOODWIN UK e. FCT (Tyco) f. KSB AMRI g. ARS

4.5.12.1 Copper Alloys a. COYARD

4.5.12.2 Axial Displacement = 2500# a. STOCKHAM b. WHESSOE = 150# c. MOKVELD d. VANATOME

4.5.13 Spring Type Safety Valves a. FISHER CONTROLS b. ANDERSON-GREENWOOD c. WEIR Valves d. FMC e. SEBIM f. MI BAILEY BIRKETT g. GEC ALSTHOM SAPAG

Page 25: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 25 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.5.14 Pilot-Operated Safety Valves a. ANDERSON GREENWOOD KEYSTONE b. SEBIM c. MI BAILEY BIRKETT d. JEAN LASSERRE e. FMC

4.5.15 Rupture Disks / Rupture Disk Assembly a. ELFAB HUGUE b. REMBE c. OSECO d. VANATOME e. FIKE FRANCE f. CONTINENTAL DISC g. BS&B SAFETY SYSTEMS

4.5.16 Flame Arrestors a. WHESSOE b. F.M.C. c. PROTEGO (STEIBLE): Carbon steel body d. AMAL (ALSATEC)

4.5.17 Flow Control Chokes a. CAMERON WILLIS CC 30-40 b. MASTER FLO VALVES c. SPM (ST PYRENEENNE DE MECANIQUE) d. MOKWELD e. F.M.C.

Page 26: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 26 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.6 ARCHITECTURAL

(CONTRACTOR to refer to documents NG-018-Q1-ENG-414012 and NG-018-Q1-LQU-000004)

4.6.1 Service Lift

a. To be advised

4.6.2 Laboratory module To be advised

4.6.3 Non Integrated technical Shelter a. SETRAM INTERNATIONAL – Group DIETSMANN

4.6.4 Pre-fabricated Toilet To be advised

4.6.5 Materials and Equipment 4.6.5.1 Coating

a. CAF CO (CAFCOTE 800/280) b. Chartek 7

4.6.5.2 Floors - Composite A60 To be advised

4.6.5.3 Insulation To be advised

4.6.5.4 Partition Walls To be advised

4.6.5.5 Blast wall To be advised

4.6.5.6 Omega Joints To be advised

4.6.5.7 Edge Seating To be advised

4.6.5.8 External Doors To be advised

Page 27: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 27 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.6.5.9 Internal Doors B15 To be advised

4.6.5.10 Windows A60 To be advised

4.6.5.11 Windows B15 To be advised

4.6.5.12 Fire Retardant Joints To be advised

4.6.5.13 False ceiling To be advised

4.6.5.14 False floor To be advised

4.6.5.15 Ceiling, Floors and walls finishing To be advised

4.6.5.16 Architectural elements (lightings, decoration ornament, etc.) To be advised

4.6.5.17 Kitchen Equipment To be advised

4.6.5.18 Medical Equipment To be advised

4.6.5.19 Fitness Centre Equipment To be advised

4.6.5.20 Furniture (office tables, chairs, achieve racks, TV flat screen, etc)

To be advised

4.6.5.21 Freeze and Cold Storage

To be advised

4.6.5.22 Waster Grinder/Macenerator To be advised

Page 28: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 28 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.6.5.23 Waster Compactor To be advised

4.6.5.24 Laundry Equipment To be advised

4.6.5.25 Dish Washing machines To be advised

4.6.5.26 Helicopter Fuel Package (storage tank, pump station and distribution system)

To be advised

4.6.5.27 Diesel Treatment Package

To be advised

4.6.5.28 Desalination Unit To be advised

4.6.5.29 Potable Water Treatment Package To be advised

4.6.5.30 Sewage Treatment Package (cruise type) To be advised

4.6.5.31 Tech. Room – Miscellaneous Cabinets

4.6.5.32.Modular cabin

To be advised

a. ABB SPIE TABLEAUX b. DTS c. PEPPERL + FUCHS d. MTL INSTRUMENTS SARL e. SCHNEIDER ELECTRIC (SETBT)

Page 29: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 29 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.7 H.V.A.C

4.7.1 Equipment Class 1 Equipment must be designed and built as COMPANY’s requirements. The Manufacturer must be the one indicated in the list. The equipment must be issued from Factory for which the address is indicated in the present document. No deviation regarding the Manufacturer selection.

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

1 Balancing Valves Tour & Andersson Commercial Office: Koning Albert I Iaan/Avenue Roi Albert I, 50 – B.10 B. 1780 WEMMEL – Belgium Phone: +32 2 4602224 Fax: +32 2 4603331

2 Chilled Water Piping Insulation

Pittsburgh Corning

Commercial Office: Parc Silic – 5 rue Saarien – BP40125 94523 Rungis – France Phone: +33 1 56347000 Fax: +33 1 56347001

3 Chilled Water Units Insulation (refrigerating piping and evaporator)

Armacell France Commercial Office: 1A rue du point du jour 21800 Chevigny Saint Sauveur – France Phone: +33 3 80489380 Fax: +33 3 80463679

4 Constant Air Volume Box

5 Variable Volume box 6 Temperature Control

(when integrated into constant/variable volume box)

7 Fire Damper (A class and H class). Note: for actuation system refer to component used in the system.

8 Kitchen Hood 9 Dish Wash Hood 10 Pressure Relief Damper

Halton Marine Commercial Office: Technoparc Futura BP102 62402 Béthune – France Phone: +33 3 21555217 Fax: +33 3 21555217 Technical-commercial contact: Fabrice DELDREVE Factory: Pulltikati 2 15700 Lahti - Finland

11 Fan (for laboratory) KC Ventilatoren Factory: KC Ventilatoren GmbH Berggarten 1 D-56427 Siershahn – Germany Phone: +49 2623 600681 Fax: +49 2623 600791

Page 30: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 30 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

12 Flexible Ducts F2A Commercial Office: ZA des 2B – Chemin des Barmettes 01360 Beligneux – France Phone: +33 4 78065472 Fax: +33 4 78065345 Technical-commercial contact: Laurent MICHEL Factory: LTI Zone Industrielle no. 1 61300 L’aigle – France

13 Gaskets (between duct flanges)

Zvalum

Product name = Pyrocryl Note: for fire dampers, when another product is required

by approved certificate, the product indicated in the certificated shall be used.

Commercial Office: Den Braven France BP 20114 60881 Le Meux – France Phone: +33 3 44916868

14 Junction Box (for fire dampers)

Walsall Commercial Office: Cornwallis Road West Bromwich – West Midlands B70 7DX – United Kingdom Phone: ++44 121 5006161 Fax: +44 121 5006300

15 HVAC – Plate Heat Exchanger (with high differential pressure – max 10 bar)

Alva Laval Commercial Office: 13 rue Vladimir Jankelevitch 77184 Emerainville – France Phone: +33 1 64117788 Fax: +33 1 64629456

16 Pressure Gauge Bourdon Sedeme Commercial Office: 125 rue de la Marre – BP 70214 41103 Vendome cedex – France Phone: +33 2 54737475 Fax: +33 2 54737474

17 Proximity Switch Pepperl + Fuch Commercial Office: 12 avenue des Tropiques 91955 Courtabeoeuf cedex – France Phone: +33 1 60921313 Fax: +33 1 60921325

Page 31: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 31 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

18 Refrigerating Compressor (centrifugal Compressor)

Carrier Factory: Carrier Charlotte 9701 Old Stateville Road Charlotte, NC 28269 – USA Or Carrier China 868 Yangtai Road, Boashan Shanghai 201901 – China Technical-commercial contact: Anselme BOLZAN Phone: +33 4 72252121 Fax: +33 4 72252244

19 Refrigerating Compressor (scroll Compressor)

Copeland Commercial Office: 8 alle du Moulin Berger 69134 Ecully – France Phone: +33 4 78668570 Fax: +33 4 78668571

20 Refrigerating Circuit Safety Valves

Castel Commercial Office: Via Provinciale, 2 – 4 20060 – Pessano – Milano – Italy Phone: +39 02 957021 Fax: +39 02 95741317

21 Sealant (for ducting and piping insulation)

Foster Commercial Office: Temati France Zone Artizanale du pays des Achards – La Bele Eugenie 85150 La Chapelle Achard – France Phone: +33 2 51094542 Fax: +33 2 51312597 Technical-commercial contact: Michel LE GALLOU Factory: Beverwijl (holland) – Dusseldorf (Germany) – Chicago (USA)

22 HVAC – Temperature Gauge

Wika Commercial Office: Parc d’Affaires des Bellvues « Eragny Parc » Immeuble Colorado 8 rue Rosa Luxembourg – BP80261 95610 Eragny-sur-Oise – France Phone: +33 1 34308484 Fax: +33 1 34308494

23 HVAC – Water Flow Rate Controller (for Chilled Water unit evaporator)

IFM Commercial Office: Immeuble Uranus 1 - 3 rue Jean Richepin 93192 Noisy Le Grand – France Phone: +33 1 41678080

Page 32: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 32 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.7.2 Equipment Class 2

Equipment must be designed and built as COMPANY’s requirements. The Manufacturer must be the one of manufactures indicated in the list. The equipment must be issued from Factory for which the address is indicated in the present document. No deviation regarding the Manufacturer selection.

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

1 Adhesive (for ducting and piping insulation)

Foster Commercial Office: Temati France Zone Artizanale du pays des Achards – La Bele Eugenie 85150 La Chapelle Achard – France Phone: +33 2 51094542 Fax: +33 2 51312597 Technical-commercial contact: Michel LE GALLOU Factory: Beverwijl (holland) – Dusseldorf (Germany) – Chicago (USA)

2 HVAC – Plate Heat Exchanger (with low differential pressure – max 4 bar)

Ciat Factory: Zone Industrielle de Coron 01300 Belley – France Phone: +33 4 79424242 Fax: +33 4 79424009 Technical-commercial contact: CHOPARD

3 Air Handling Unit Flaktwood Commercial Office: PO Box 49347 Dubai – UAE Phone: +971 4 2995060 Fax: +971 4 2995704 Technical-commercial contact: Koushik DASTIDAR Factory: SE-551 Jonkoping – Sweden

Halton Marine Commercial Office: Technoparc Futura BP102 62402 Béthune – France Phone: +33 3 21555217 Fax: +33 3 21555217 Technical-commercial contact: Fabrice DELDREVE Factory: Pulltikati 2 15700 Lahti - Finland

4 Balancing Damper

F2A Commercial Office: ZA des 2B – Chemin des Barmettes 01360 Beligneux – France Phone: +33 4 78065472 Fax: +33 4 78065345 Technical-commercial contact: Laurent MICHEL Factory: LTI Zone Industrielle no. 1 61300 L’aigle – France

Page 33: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 33 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

Carrier Factory: BP49, route de Thil 01122 Montluel - France Technical-commercial contact: Anselme BOLZAN Phone: +33 4 72252121 Fax: +33 4 72252244

5 Chilled Water Unit

CIAT Factory: BP14, 01350 Culoz – France Phone: +33 4 79424242 Fax: +33 4 79424009 Technical-commercial contact: CHOPARD

6 Diffuser (air supply) 7 Grille (air intake, air

exhaust, air circulation)

Halton Marine Commercial Office: Technoparc Futura BP102 62402 Béthune – France Phone: +33 3 21555217 Fax: +33 3 21555217 Technical-commercial contact: Fabrice DELDREVE Factory: Halton Oy Haltonintie 1 – 3 47400 Kausal – Findland

or Halton SAS SBU Crepy-en-Valois ZI, 12 rue st Germain – BP60144 60801 Crepy-en-Valois cedex - France

8 Fan (for blown air, air handling units, exhaust fans except for laboratory)

Solyvent - Flaktwoods

Commercial Office: 143 rue dela Republique – BP67 69882 Meyzieu – France Phone: +33 4 72451440 Fax: +33 6 82579401 Technical-commercial contact: Jean Francois BOUZIAT Factory: 143 rue dela Republique – BP67 69882 Meyzieu – France

9 Louver Halton Marine Commercial Office: Technoparc Futura BP102 62402 Béthune – France Phone: +33 3 21555217 Fax: +33 3 21555217 Technical-commercial contact: Fabrice DELDREVE Factory: Pulltikati 2

Page 34: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 34 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

15700 Lahti - Finland

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

Bitzer Factory: Mercedes Strasse 72108 Rottenburg - Germany

10 Refrigerating Compressor (reciprocating and screw compressor)

Carrier Factory: Carlyte Compressor 1440 Rock Mountain Boulevard Stone Mountain GA30083 – USA Or Carrier China 868 Yangtai Road, Boashan Shanghai 201901 – China Technical-commercial contact: Anselme BOLZAN Phone: +33 4 72252121 Fax: +33 4 72252244

Halton Marine Commercial Office: Technoparc Futura BP102 62402 Béthune – France Phone: +33 3 21555217 Fax: +33 3 21555217 Technical-commercial contact: Fabrice DELDREVE Factory: Pulltikati 2 15700 Lahti - Finland

11 Shut-off damper

F2A Commercial Office: ZA des 2B – Chemin des Barmettes 01360 Beligneux – France Phone: +33 4 78065472 Fax: +33 4 78065345 Technical-commercial contact: Laurent MICHEL Factory: LTI Zone Industrielle no. 1 61300 L’aigle – France

Page 35: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 35 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.7.3 Equipment Class 3 Equipment must be designed and built as COMPANY’s requirements. The Manufacturer must be the one of manufactures indicated in the list. The equipment must be issued from one of Manufacturer’s Factory. No deviation regarding the Manufacturer selection.

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

1 Actuator (electrical actuator) (for fire damper, for shut-off damper, when electrically actuated)

Schischek Commercial Office: 108 rue Damremont 75018 Paris – France Phone: +33 1 42526102 Fax: +33 1 42546116 Technical-commercial contact: Gerard BERJONNEAU Factory: Schischek GmbH Mühlsteig 45, Gewerbegebiet V D - 90 579 Langenzenn – Germany

2 Actuator (electrical actuator) (for shut-off valves)

L. Bernard Commercial Office: 4 rue d’Arsonval 95505 Gonesse – France Phone: +33 1 34077100 Fax: +33 1 34077101

CIAT Factory: BP14, 01350 Culoz – France Phone: +33 4 79424242 Fax: +33 4 79424009 Technical-commercial contact: CHOPARD

3 Air Handling Unit

GEA Happel Commercial Office: 45 avenue de l’Europe 59436 Roncq cedex – France Phone: +33 3 20689020 Fax: +33 3 20945737

Camfil farr Commercial Office: 77 – 81 Boulevard de la Republique 92257 La Garenne Colobes – France Phone: +33 1 46524840 Fax: +33 1 46524802 Technical-commercial contact: Raphael MARGEZ

4 Air Filter

American Air Filter Premaberg Commercial Office:

22/24 High Street Halstead Essex – COP2AP – United Kingdom Phone: +44 1787 475651 Fax: +44 1787 475046

5 Coalescer Filter

Tissmetal Factory: 31 rue du Val Clair Parc Industriel Pompelle – BP36 51683 Reims cedex 2 – France Phone: +33 3 26402121 Fax: +33 3 26402456

Page 36: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 36 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

6 HVAC – Differential Pressure Gauge (for air filter clogging measurement)

Dwyer Commercial Office: PO Box 373, 102 Indiana Hwy. 212 Michigan City, IN 46361 – USA Phone: +1 219 879 8000 Fax: +1 219 872 9057

7 HVAC – Differential Pressure Gauge (for piping)

Bourdon Sedeme Commercial Office: 125 rue de la Marre – BP70214 41103 Vendome cedex - France Phone: +33 2 54737475 Fax: +33 2 54737474

8 Duct Isolation (mineral wool)

Saint –Gobain Isover

Commercial Office: Bat. A Ilot Alsace – 7, place de Saverne 92415 Coubevoie - France Phone: +33 1 56370267 Fax: +33 1 21555217 Technical-commercial contact: Alain LARDILLAT

Danfoss Commercial Office: 7 avenue Roger Hennequin ZA de Trappes Elancourt – BP58 78193 Trappes cedex - France Phone: +33 1 30625000 Fax: +33 1 30697470

9

Expansion Valve (for refrigerating circuit)

Sporlan Commercial Office: 36 rue Eugene Dupuis Europare/Tec Parc 94043 Creteil cedex - France Phone: +33 1 345147300 Fax: +33 1 48776230

10 Fan (for blown air, air handling units, exhaust fans except for laboratory)

Gebhardt Commercial Office: 81 Route de Grigny 91136 Ris Orangis cedex - France Phone: +33 1 69021403 Fax: +33 1 69252885

11 Louver Trox Commercial Office: 2 place Marcel Thirouin 94150 Rungis (ville) - France Phone: +33 1 56705454 Fax: +33 1 46871528

12 Manual valve (for fire damper electrically actuated)

Pressmair Commercial Office: Via Pasquino 29/A Renazzo di Cento (FE) - Italy Phone: +39 51 900122 Fax: +39 51 909635

13 Pressure Cut-out (refrigerating system)

Georgin Commercial Office: 14 – 16 rue Pierre Semard 92320 Chatillon - France Phone: +33 1 46126000 Fax: +33 1 47359398

Page 37: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 37 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

Castel Commercial Office: Via Provinciale 2 – 4 20060 Pessano – Milano – Italy Phone: +39 02 957021 Fax: +39 02 95741317

14 Refrigerating Valve (stop valve)

Le robinet frigorifique francais

Commercial Office: La Chappelle 73330 Domessin - France Phone: +33 4 76 328732 Fax: +33 4 76373529

Norgren Herion Commercial Office: Z.I. de Noisiel 1 – BP22 77422 Marne La Vallee cedex 2 - France Phone: +33 1 60059212 Fax: +33 1 60060852

15 Solenoid valve (for fire damper electrically actuated)

Pressmair Commercial Office: Via Pasquino 29/A Renazzo di Cento (FE) - Italy Phone: +39 51 900122 Fax: +39 51 909635

16 Temperature Control Trend Commercial Office: 9 avenue du Marais Parc de Algorithmes – Immeuble Sophocle 95815 Argenteuil - France Phone: +33 1 39964964 Fax: +33 1 39964951

18 Butterfly valve Danfoss Socla Commercial Office: BP 273 71107 Chalon-Saone - France Phone: +33 3 85974242 Fax: +33 3 85979742

Allen Bradley Scheinder Telemecanique

17 PLC

Siemens

4.7.4 Equipment Class 4 Equipment must be designed and built as COMPANY’s requirements. CONTRACTOR can select one of the listed Manufacturer or submit another for APPROVAL. A technical dossier dedicated to the equipment (including installation, operating and maintenance aspects) shall be submitted for manufacturer’s APPROVAL. CONTRACTOR shall not use this kind of equipment until the APPROVAL is granted from COMPANY.

Product / Equip / Material

Manufacturer / Vendor Name

Manufacturer/Vendor Address

1 Air Filter (sand) GE- Energy Altair Inlet System

Commercial Office: V3 Omega Park Alton, GU34 2QE – United Kingdom

Page 38: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 38 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

Phone: +44 1420 595857 Fax: +44 1420 541298 Technical-commercial contact: Gerald WOODWARD

Page 39: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 39 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.8 MACHINERY

4.8.1 Diesel Engine a. CATERPILLAR b. WARTISALA c. CUMMINS d. MTU e. WAUKESHA

4.8.2 Cranes HYDRALIFT – BLM

15 rue de la Metallurgie 44482 Carquefou Cedex France Telp: +33 (0)2 40 68 36 00 Fax: +33 (0)2 40 68 36 10 Contact : Mr. G. Musset

4.8.3 Turbo Generator a. DRESSER RAND b. NUOVO PIGNONE c. ROLLS ROYCE POWER ENGINEERING

4.8.4 Waste Heat Recovery Unit a. ALSTOM POWER b. M.E ENGINEERING

4.8.5 Overhead Travel & Jib Cranes a. ALCOMA S.A b. INGERSOLL RAND MATERIAL HANDLING c. DEMAG CRANES & COMPONENTS d. EXO INTERNATIONAL e. JD NEUHAUS

4.8.6 Hoists (suitable for Hazardous Area) a. VICTORY b. E.C.A LEVAGE c. MORRIS MECHANICAL d. NEUHAUS e. VERLINDE f. ALCOMA SA g. INGERSOL RAND MATERIAL HANDLING h. DEMAG CRANES & COMPONENTS i. EXO INTERNATIONAL

Page 40: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 40 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.8.7 Emergency Generator (Packaging) a. ENERIA b. 2H ENERGY c. SDMO INDUSTRIES d. FG WILSON e. WARTSILA (Over 2MW) f. BERGERAT MONNOYEUR g. HOUVENAGHEL h. LEROY SOMER

4.8.8 Fire Water Pump Package FLOWSERVE POMPES 13, rue Maurice Trintignant 72234 Arnage Cedex FRANCE Contact: Mr.Lucien FAUVEL/Francois DERVOUT

4.8.9 Air Compressor Units (Packaging) a. ATLAS COPCO b. FLUIDE SERVICE c. ERVOR d. INGERSOLL RAND

4.8.10 Compressor a. ATLAS COPCO b. AERZEN c. MAN TURBO d. SULLAIR e. ERVOR f. COMPAIR LUCHARD g. INGERSOLL RAND h. CREYSSENSAC i. DRESSER RAND j. SIEMENS INDUSTRIAL TURBOMACHINERY k. THERMODYN

4.8.11 Centrifugal Pumps General Purpose a. SULZER b. KSB SA c. FLOWSERVE d. TEXTRON DAVID BROWN GUINARD PUMPS e. WEIR f. STERLING S.P.P: Pumps g. NIJHUIS

Page 41: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 41 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

h. GABBIONETA TSPA i. ENSIVAL j. GOULDS FRANCE k. JOHNSON PUMP

4.8.12 Centrifugal Pumps special purpose

a. FLOWSERVE b. TEXTRON DAVID BROWN GUINARD PUMPS c. SULZER PUMPS d. WEIR e. KSB f. ENSIVAL g. PERONI h. SEEPEX

4.8.13 Vertical Pumps , Jockey and Sea Water lift, Sea Water Cooling a. TEXTRON DAVID BROWN GUINARD PUMPS b. FLOWSERVE (PLEUGER) c. WEIR d. STERLING S.P.P Pumps e. KSB f. SULZER

4.8.14 Reverse Osmosis HP feed pump : a. CAT PUMP b. GRUNDFOSS c. WORTHINGTON

4.8.15 Open and close drain Vessel Pumps, Sump Tank Pumps - Sump Caisson Pumps a. MONO PUMPS b. PCM MOINEAU c. STEIBLE d. BORNEMANN e. MOYNO f. IMO g. ALLWEILR

4.8.16 Diesel Oil Pumps a. MOUVEX b. IMO c. FLOWSERVE d. PCM MOINEAU POMPES

Page 42: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 42 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.8.17 Mixers a. DOSAPRO MILTON ROY b. PLENTY c. LEWA

Page 43: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 43 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.9 TELECOMMUNICATIONS 4.9.1 Public address and general alarm system

a. BOUYER b. VODEC (ABCELEC)

4.9.2 Flameproof loudspeakers a. DNH b. MEDC c. BOUYER

4.9.3 Flameproof flashing beacons a. SPECTOR LUMENEX b. MEDC c. DNH

4.9.4 Telephone PBX a. ALCATEL

4.9.5 Telephone equipment (analog, numeric, DECT) a. ALCATEL

4.9.6 Flameproof telephone equipment a. FUNKE-HUSTER-FERNSIG b. GAI-TRONICS (DAC) c. LELAS

4.9.7 Facsimile Terminals a. SAGEM b. CANON

4.9.8 Data equipment a. CISCO

4.9.9 Marine VHF / FM radio (mobile, portative) a. SKANTI b. SAILOR c. MOTOROLA

4.9.10 Aeronautical VHF / AM radio (mobile, portative) a. TELERAD

Page 44: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 44 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.9.11 UHF, VHF radio repeaters / base stations/trunking systems and TETRA (Same as existing installation)

4.9.12 Hand- portable Radios (Same as existing installation)

4.9.13 MF/HF transceivers a. SKANTI b. SAILOR

4.9.14 Non directional beacon a. TELERAD

4.9.15 DIGITAL LOS Radio relay system a. HARRIS b. AIRSPAN

4.9.16 Satellite Communications a. NERA b. IRIDIUM c. THURAYA

4.9.17 Radar a. FURUNO b. THALES c. KELVIN HUGUES d. RAYTHEON

4.9.18 Radar beacon (RACON) a. TIDELAND b. THALES

4.9.19 GMDSS a. SAILOR

4.9.20 Entertainment video satellite antenna tracking system a. SEATEL

4.9.21 Entertainment a. F2E SOSELMAR b. ABECelec

Page 45: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 45 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.9.22 CCTV a. COEX b. HERNIS c. AB Celec

4.9.23 GPS equipment a. TRIMBLE b. THALES

4.9.24 Deleted

4.9.25 Voice and data cabling for building(copper and fiber optic cables) a. INFRAPLUS

4.9.26 OPTICAL fibre a. ALCATEL b. SAGEM c. SIEMENS

4.9.27 Antennas a. ANDREW b. PROCOM c. RFS d. MAT EQUIPMENT

4.9.28 Transmission lines, feeders, wave guide, coaxstop, connectors a. ANDREW b. RFS

4.9.29 Access Control Systems / POB (to be compatible with IGG and the existing system)

4.9.30 Racks a. RITTAL

4.9.30.1 Solar equipment a. SOLARCOM b. SIEMENS

4.9.31 Digital multiplexer a. RAD (KiloMux) b. VERSO (ACT)

Page 46: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 46 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.10 ELECTRICAL 4.10.1 GENERATORS 4.10.1.1 Electrical HV Generators

a. ALSTOM b. ABB c. ACI ROBICON (ANSALDO) d. BRUSH BEM Ltd. e. FRAMATOME ANP (JEUMONT) f. SIEMENS

4.10.1.2 Electrical LV Generators a. ABB b. ALSTOM c. BRUSH BEM Ltd. d. LEROY SOMER e. SIEMENS

4.10.2 MOTORS 4.10.2.1 HV Motors

a. ABB b. ACI ROBICON (ANSALDO) c. ALSTOM d. FRAMATOME ANP (JEUMONT) e. LEROY SOMMER f. LOHER g. SCHORCH h. SIEMENS

4.10.2.2 LV Motors a. ABB b. ALSTOM c. LEROY SOMER d. LOHER e. SCHORCH f. SIEMENS

4.10.3 TRANSFORMERS 4.10.3.1 Power transformers

a. ABB b. ALSTOM c. BRUSH TRANSFORMERS

Page 47: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 47 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

d. CELDUC e. HELMKE f. SCHNEIDER ELECTRIC g. SCT PAUWELLS

4.10.3.2 Small Power transformers a. CELDUC b. LEGRAND c. SCHENEIDER ELECTRIC

4.10.4 Switchboards and distribution boards 4.10.4.1 HV Switchboards

a. ABB b. ALSTOM c. SIEMENS d. SCHNEIDER ELECTRIC

4.10.4.2 LV Switchboards a. ABB / SPIE TABLEAUX b. ALSTOM c. SIEMENS d. SCHNEIDER ELECTRIC e. HAZEMEYER

4.10.4.3 Switchboards for hazardous area a. COOPER MENVIER b. EGS ATX c. STAHL d. TECHNOR ATEX

4.10.4.4 Cabinets and Distribution boards a. ABB / SPIE TABLEAUX b. ALSTOM c. LEGRAND d. RITTAL e. SCHNEIDER ELECTRIC (UNELEC)

4.10.4.5 Pyrotechnic Breakers a. ABB CALOR EMAG b. G&W

Page 48: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 48 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.10.4.6 LV Breakers and contactors a. ABB b. GENERAL ELECTRIC (UNELEC) c. SCHNEIDER ELECTRIC d. SIEMENS

4.10.4.7 Protection relays a. ABB b. ALSTOM c. BAESLER ELECTRIC d. GENERAL ELECTRIC e. MICRO ENER f. SCHNEIDER ELECTRIC S.A. g. SIEMENS

4.10.4.8 Fuses a. ALSTOM b. GOULD GENERAL ELECTRIC c. LEGRAND d. SCHNEIDER ELECTRIC e. SIEMENS f. SOCOMEC g. WESTINGHOUSE

4.10.4.9 Modular switch room and cabins a. ABB/SPIE TABLEAUX b. ALSTOM c. BOSSARD d. HOUVENAGHEL e. SCHNEIDER ELECTRIC f. SETRAM/DIETSMAN

4.10.5 Electrical cables 4.10.5.1 Subsea

a. ABB NORSK KABLE b. AEI c. FUJIKURA d. FURUKAWA e. HITACHI f. NEXANS g. NOKIA h. SAGEM

Page 49: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 49 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

i. SUMITOMO j. PIRELLI

4.10.5.2 LV and HV cables and Connection Accessories a. NEXANS b. SAGEM c. PIRELLI d. BICC e. DENKI WIRE & CABLES f. CURTIS WIRE & CABLES g. NIGERCHIN WIRE & CABLES h. CABLEMETAL NIG LTD i. JOELIS WIRE & CABLES j. NIGERIA WIRE & CABLES k. COLEMAN WIRE & CABLES

4.10.6 Cable ladder & trays 4.10.6.1 GRP

a. EBO SYSTEM b. ENDURO c. PLC COMPOSITES / CHAMPION d. PLANET WATTOHM

4.10.6.2 Aluminium a. BI LINE b. C.E.S. c. KENSTEEL

4.10.6.3 Stainless Steel To be advised

4.10.6.4 Steel To be advised

4.10.7 Auxiliary electrical equipment 4.10.7.1 Junction Boxes, control stations, etc.. (for industrial use)

a. EGS ATX b. COOPER MENVIER c. DTS d. STAHL

Page 50: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 50 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.10.7.2 Cable terMinals a. ENTRELEC b. LEGRAND c. PHOENIX CONTACT d. WAGO e. WEIDMULLER

4.10.7.3 Sockets Outlets (Outdoor) a. EGS ATX b. DTS c. STAHL d. COOPER MENVIER e. MARECHAL

4.10.7.4 Socket Outlets (Indoor) a. LEGRAND

4.10.7.5 Cable Glands a. EGS ATX b. CAPRI c. HAWKE d. BICC e. PEPPERS

4.10.7.6 MCT a. AFIMES b. BRATTBERG c. HAWKE d. ROXTEC

4.10.7.7 Terminal blocs a. ENTRELEC b. LEGRAND c. PHOENIX d. WAGO e. WEIDMULLER

4.10.7.8 Wiring Terminations and Sealed Junction Boxes a. SERTILEC b. RAYCHEM c. SIMEL d. 3M

Page 51: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 51 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

e. AMP

4.10.7.9 HV Termination Plugs a. ELASTIMOLD b. PIRELLI c. RAYCHEM d. 3M e. NEXANS

4.10.7.10 Flexible metallic conduits a. CAPRI

4.10.7.11 LV metering transformers a. RS b. SCHNEIDER ELECTRIC

4.10.7.12 EEx “p” purge and pressurisation control system a. EUROPEX b. EXPO

4.10.7.13 Safety kits for switchroom a. CATU

4.10.8 Industrial Lighting fittings a. COOPER MENVIER b. DTS c. GLAMOX d. EGS ATX e. CHALMIIT LIGHTING f. STAHL g. TECHNOR h. VICTOR

4.10.9 Heating Equipment 4.10.9.1 Electric Heaters

a. ELTRON CHROMALOX b. ETIREX c. FLEXELEC d. VULCANIC

4.10.9.2 Electric Heat Tracing a. THERMON b. RAYCHEM

Page 52: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 52 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.10.10 U.P.S. -Rectifiers and inverters (including batteries)-

a. A.E.E.S. b. CHLORIDE c. GUTOR ELECTRONICS d. SAFT e. SGTE-WESTINGHOUSE f. SOCOMEC

4.10.11 Soft Starters and VFD’s 4.10.11.1 LV

a. LEROY SOMER b. ABB c. ALSTOM d. SCHNEIDER ELECTRIC e. SIEMENS

4.10.11.2 HV a. ROCKWELL b. ABB c. SIEMENS d. ALSTOM e. ASI ROBICON

4.10.11.3 Power distribution control system (PDCS) f. ABB g. ALSTOM h. SCHNEIDER ELECTRIC i. SIEMENS

4.10.12 Solar panel systems (including batteries) a. BP SOLAR b. R & S (SHELL SOLAR) c. SOLARCOM d. TOTAL ENERGIE

Page 53: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 53 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.10.13 Navigation aids and obstruction lights (including control panel) 4.10.14 ORGA Electromagnetic hazards 4.10.14.1 Lightning risk evaluation

e. APAVE f. LIGHTNING ELIMINATOR & CONSULTANT Inc

4.10.14.2 EMC evaluation g. ALSTOM

4.10.15 Third party verification (for independent inspection of electrical installation) h. APAVE i. BUREAU VERITAS j. DNV

Page 54: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 54 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.11 INSTRUMENTATION 4.11.1 ICSS simulator

a. R.S.I (Réalisation en sytémique Industriel)

4.11.2 Flow Measurement 4.11.2.1 Flow Elements

1. ORIFICE PLATES & RESTRICTION ORIFICE a. BERGER SA b. SPM (SOCIETE PYRENEENNE DE METALLURGIE) c. MECATHERMIC INDUSTRIE SA d. DANIEL MEASUREMENT & CONTROL (USA)

2. PITOT TUBE (ANNUBAR) FLOW ELEMENTS a. SYSTEME C INDUSTRIE b. EMERSON

3. V-CONE FLOW ELEMENTS a. DEBIMETRIE A & T b. Mc CROMETER

4.11.2.2 Electronic Differential Pressure Transmitters a. FOXBORO 823 IDP b. EMERSON 3051 C c. YOKOGAWA Dpharp EJX/EJA d. HONEYWELL ST 3000

4.11.2.3 Full Bore Turbine Flow Meters (General Liquids) a. FAURE HERMAN TZN-HELIFLU (For metering skids) b. FOXBORO 81-82 c. DANIEL CR-PT

4.11.2.4 Vortex Flow Meters a. FOXBORO E 83 b. YOKOGAWA Y F100 YEWFLOW c. EMERSON 8800

4.11.2.5 Electromagnetic Flow Meters a. KROHNE K 480, K 380, K 280 b. ELSAG BAILEY 10 D 1422, 25, 40, 55 c. YOKOGAWA ADMAG 202-205

4.11.2.6 Mass Flow Meters (Coriolis) a. YOKOGAWA ROTAMASS b. EMERSON MICROMOTION

Page 55: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 55 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.11.2.7 Multivariable Mass Flow Transmitters a. EMERSON 3095MV

4.11.3 Level Measurement 4.11.3.1 Differential Pressure Transmitters

(refer to Electronic Differential Transmitters list above)

4.11.3.2 Level Transmitters for Sump Caisson a. ENDRESS HAUSER b. VEGA

4.11.3.3 Capacitance Transmitters a. ENDRESS HAUSER SILOMETER FMC 470 Z b. VEGA NIVOTESTER FTC 380 Z

4.11.3.4 Level Switch (for Mechanical Seal Leakage Detector) a. AUXITROL

4.11.3.5 Level Gauge a. TCEM b. RINKAL c. KROHNE Magnetic float type BM26

4.11.4 Pressure Measurement 4.11.4.1 Electronic Transmitters

a. EMERSON 3051C-1151 b. YOKOGAWA DPharp EJX/EJA c. FOXBORO 823 d. HONEYWELL ST3000

4.11.4.2 Pressure gauges a. BOURDON b. WIKA c. DRESSER

4.11.5 Temperature Measurement 4.11.5.1 Temperature Sensing Elements - Skin Thermocouples

a. AUXITROL b. BERGER c. THERMOCOUPLE PRODUCTS COMPANY

Page 56: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 56 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.11.5.2 Temperature Transmitters - Electronic Transmitters a. ABB b. BERGER c. EMERSON d. FOXBORO

4.11.5.3 Temperature Switches 4.11.5.4 Temperature Gauges

a. BOURDON b. DESJARDINS c. DRESSER

4.11.6 Vibration, Displacement, Speed, Noise, Torque 4.11.6.1 Vibration and Displacement Transmitters

a. BRUEL & KJAER b. DYMAC c. VIBROMETER d. BENTLY NEVADA

4.11.6.2 Monitoring Systems a. BENTLY NEVADA 3500

4.11.7 Measurement Accessories 4.11.7.1 Instrument Ball Valves

a. AQUITAINE SERVICE b. AUTOCLAVE ENGINEERS For high press (> 200 bars) c. GACHOT (V9SF-V16) d. HOKE e. TROUVAY CAUVIN (BTC) f. ANDERSON GREENWOOD g. KF h. WHITEY i. NUPRO j. PARKER HANIFIN

4.11.7.2 Instrument Manifolds 1. FOR DIFFERENTIAL PRESSURE MEASUREMENT

a. AQUITAINE SERVICE b. MECATHERMIC (MA13) c. HOKE d. PARKER e. ANDERSON GREENWOOD

Page 57: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 57 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

f. KF g. HUBER

2. FOR PRESSURE MEASUREMENT a. AQUITAINE SERVICE (AQUITEST) b. SERIC

4.11.7.3 Instrument Needle Valves a. AQUITAINE SERVICE b. HOKE c. TROUVAY CAUVIN d. ANDERSON GREENWOOD e. KF f. HUBER

4.11.8 Position Measurement 4.11.8.1 Intrusion Detection

a. EAT

4.11.8.2 Intrusive Pig-Signallers a. GD ENGINEERING b. PECO c. TD WILLIAMSON

4.11.9 Control Valves (including Accessories) 4.11.9.1 Single or Double Seat Valves

a. EMERSON 1250 GL - A Type b. DRESSER MASONEILAN 10 000 – 20 000 c. VALTEK MQ - MP - MK2

4.11.9.2 Cage Guided Valves a. EMERSON ES, ET, EC, EAC, EAS, EZ, DBQ, EHS b. DRESSER MASONEILAN 40 000 – 41 000 c. VALTEK REVCA MK2

4.11.9.3 Butterfly Control Valves a. KSB - AMRI b. DRESSER MASONEILAN MINITORK 37 000 c. EMERSON 8500

4.11.9.4 Rotary Valves a. EMERSON V 500 – 8510

Page 58: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 58 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.11.9.5 Eccentric Rotating Plug a. DRESSER MASONEILAN CAMFLEX 2 b. MASONEILAN VARIMAX 31 000 (2 to 16" std or LO DB) c. EMERSON 42 000 CENTEC

4.11.9.6 Micro Flow a. DRESSER MASONEILAN VARIPACK 28 000

a. High Pressure Drop a. DRESSER MASONEILAN Multistage gas : 77 000, Oil : 78 000 - Water : VTR 79 000 / FR 7600 b. EMERSON 7600 c. CCI DRAG 100

4.11.10 Solenoid Valves - Pilot Valves 4.11.10.1 Solenoid Valves

b. ASCO-JOUCOMATIC c. PARKER-LUCIFER d. BIFOLD

4.11.10.2 Pilot Valves

4.11.10.2.1 Pneumatic a. JOUCOMATIC 54 X Pneumatic b. MONTIER AUTOMATISME c. VERSA

4.11.10.2.2 Hydraulic a. REXROTH b. BIFOLD c. FLUIDPOWER

4.11.11 Pressure Reducers 4.11.11.1 Gas-Tight Pressure Reducers

a. EMERSON 630 - 627 - 1301 F b. MECATHERMIC c. TESCOM

4.11.11.2 Self-Controlled Valves a. EMERSON b. MECATHERMIC c. IMF

4.11.11.3 Air Filters-Pressure Regulators a. EMERSON 67 FR - 67 AF SR Stainless steel b. DRESSER MASONEILAN 77.4 Stainless steel

Page 59: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 59 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

c. MECATHERMIC FD 13.20671

4.11.12 Actuators and Accessories 4.11.12.1 Actuators

1. PNEUMATIC QUARTER TURN a. KSB - AMRI for KSB AMRI valves b. BETTIS / CAI c. FRANCE OPERATOR SRD d. BIFFI

2. PNEUMATIC MULTITURN a. BETTIS / CAI b. CAMERON c. ROTORK

3. HYDRAULIC a. BETTIS / CAI b. FRANCE OPERATOR / SEBIM c. LEDEEN d. TYCO / BIFFI

4.11.12.2 Pilot Valves Refer to Solenoid Valve – Pilot Valves list above

4.11.12.3 Lubricating Systems a. GLOBE b. MARTONAIR c. MECATHERMIC

4.11.13 Electrical Actuators a. ROTORK b. BERNARD c. TYCO / BIFFI

4.11.14 Deluge valve skids a. PROTEC FEU b. ANGUS FIR LTD c. AUTOMATISMES SICLI d. SILVANI ANTICENDI e. FBF FRANCE f. WORMALD ANSUL LTD g. KSB AMRI

Page 60: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 60 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.11.15 Analysers 1. MOISTURE

a. PANASONIC b. ENDRESS-HAUSER

2. CHROMATOGRAPH: WITH METERING SKID 3. DENSITY

a. ENDRESS-HAUSER

4.11.16 Oil in Water Analyser a. SYSTEME C INDUSTRIE b. SERES c. POLYMETRON SA

4.11.17 Sampling systems (Liquids Sampling Systems) a. CLIFMOCK b. JISKOOT

4.11.18 Compact or Standard Metering Skids with Prover a. FAURE HERMAN b. BRISTOL MECI c. ALDERLEY PROCESS TECHNOLOGIES

4.11.19 Electrical Link Equipment 4.11.19.1 Instrumentation cables, Trays, Ladders

Refer to Electrical list

4.11.19.2 Junction Boxes Waterproof-increased Safety a. EGS ATX (Former LEGRAND ATX) Polyester b. ROSE c. STAHL

4.11.19.3 Terminals Blocks a. ENTRELEC b. WAGO c. WEIDMULLER d. PHOENIX CONTACT

4.11.20 Hydraulic or Pneumatic Link Equipment 4.11.20.1 Connectors

1. FOR STAINLESS STEEL TUBES a. SWAGELOK

Page 61: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 61 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

2. QUICK CONNECTORS a. PARKER HANNIFIN b. STAUBLI c. SWAGELOCK d. MINERVA / MINIMEEL e. AUTOCLAVE ENGINEERS (HP)

4.11.20.2 Instrument Pipes / Tubes a. PRECITUBE b. SANDVICK c. FINE TUBES

4.11.21 Programmable Logic Controllers 4.11.21.1 Standard PLC

a. SIEMENS (S7 – 400) b. ROCKWELL

4.11.21.2 Safety PLC

a. TRICONEX b. HIMA c. ICS d. YOKOGAWA PROSAFE RS e. HONEYWELL Safety Manager

4.11.22 Distributed Control System a. FOXBORO IAS b. YOKOGAWA Centum c. ABB ADVANT d. HONEYWELL EXPERION PKS e. Emerson Delta V

4.11.23 Safety Barriers, Push-buttons 4.11.23.1 Converters, Isolators, Intrinsic Barriers

a. MTL b. PEPPERL & FUCHS

4.11.23.2 Control Buttons a. CEAG b. SCHNEIDER ELECTRIC c. STAHL

Page 62: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 62 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.11.23.3 ESD Push-buttons a. CEAG b. SCHNEIDER ELECTRIC c. MEDC

4.11.24 Hydraulic Automatisms 4.11.24.1 Wellhead Control Panels

a. FLUIDES SERVICES b. BAKER c. CAMERON d. AUTOCON e. PETROTECH f. WORMALD

4.11.25 Fire Detectors 4.11.25.1 Ionisation & Optical Smoke Detectors

a. SIEMENS (CERBERUS) F6-F7 b. GENERAL MONITORS c. KIDDE

4.11.25.2 Flame Detectors UV/IR a. DETTRONICS b. DRAEGER BRANDT c. GENERAL MONITORS

4.11.26 Gas Detectors (H2S, Gas Combustible) a. DRAEGER BRANDT EXYTRON 5010 b. GENERAL MONITORS S4100C

4.11.27 Fusible Lines Supporting (Wellhead Area) a. WICHARD

4.11.28 Instrument Cabinet a. RITTAL

Page 63: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 63 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.12 COATING AND PROTECTION 4.12.1 Passive Fire Protection

a. P.P.G (AMERON) b. TEXTRON INTERNATIONAL c. MANDOVAL

4.12.2 Insulation 4.12.2.1 Expanded Cellular Glass for TOPSIDES

a. PITTS BURGH CORNING

4.12.2.2 Mastic and Adhesive for TOPSIDES a. BITUMES SPECIAUX b. FOSTER

4.12.2.3 Insulation for PIPELINES a. LOGSTOR ROR b. BREDERO SHAW (Note1)

4.12.3 Paint in accordance with GS COR 350

4.12.4 Pipe External Lining Works 4.12.4.1 Polyethylene/Polypropylene

a. EUPEC b. MANNESMANN c. SOCOTHERM d. SOCOTUB

4.12.4.2 Epoxy Powder Resin

a. MANNESMANN

4.12.4.3 Glass Reinforced Epoxy NEOPRENE(Risers) a. TRELLE BORG

4.12.5 Welding Joints Coating a. RAYCHEM b. CANUSA

4.12.6 Internal Corrosion Monitoring Equipment a. ROHRBACK COSASCO

Page 64: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 64 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.12.7 Corrosion inhibitors a. ATOFINA CECA b. ONDEO c. REP d. BAKER-PETROLITE e. DYNEA f. CLARIANT (formely IROS) g. CONDEA

4.12.8 Chemicals for Hydraulic Test Water Treatment a. CECA PROCHINOR (Note 1)

4.12.9 Cathodic Protection - Anodes a. JOTUN b. ALICO c. BAC d. METEC e. TRIDENT

4.12.10 Cathodic Protection Monitoring Equipment a. IPSI b. CODICAT c. JOTUN

4.12.11 JACKET APPURTENANCES 4.12.11.1 Shock Absorbers and Jacket Leg Fenders (Note 1)

a. PAULSTRA b. EPI INC c. PIRELLI d. FENDER CARE MIDDLE EAST LLC e. BRIDGESTONE INDUSTRIAL LTD

4.12.11.2 Jacket Safety Nets (Note 1) To be advised

4.12.12 COATING / INSULATION YARD APPLICATION a. NISSCO PAINTING DEPT b. LASSARAT c. PRECIOZZO

Page 65: List of Vendors

Total Exploration & Production Nigeria Limited OFON Phase 2 Project

EXHIBIT J Page 65 of 65

CONTRACT No. OFON2/D028

EPCC4 for OFQ Living Quarter Platform

4.12.13 FIBER GLASS PIPING YARD ASSEMBLY a. SBPI b. WAVIN (FUTUREPIPE) c. EUROPIPE