List of Cases to be submitted before 2nd Consent Appraisal
Transcript of List of Cases to be submitted before 2nd Consent Appraisal
Sr. No. Name & Address Capital
Investment Applied For Section Page No. Remarks
1 M/s. Hindalco Industries Ltd., (Exp. Project) Sr. No. 95/1, 95/2, Vill- Daheli, Tal- Mouda, Dist - Nagpur
197.34 Crs Establish (Expansion)
JD(APC) 1 to 34
2 M/s. JSW Jaigad Port Ltd., Dhamankhol Bay, A/p- Jaigad, Tal & Dist - Ratnagiri
1644.10 Crs Establish (Expansion)
JD(APC) 35 to 53
3 M/s. Trinity Landmarks LLP. S. No. 339 & Ors., Village Bhugaon, Tal. Mulshi, Dist. Pune
470.00 Crs. Establish RO(HQ) 54 to 61
4 M/s. Kirloskar Ferrous Industries Ltd., Gat No. 12 to 18/1 + 2 and 25/1, Shivshahi Solapur, Tal- North, Solapur
138.58 Crs Renewal JD(APC) 62 to 76
5 M/s. Godrej & Boyce Mfg. Co. Ltd., Gat No. 600,601,605, a/p- Wing, Tal-Khandala, Dist - Satara
137.78 Crs Renewal (Expansion)
JD(APC) 77 to 95
6 M/s. Thyssenkrupp Electric Steel India Pvt. Ltd., A/p- Gonde, Vill- Wadivarhe, Tal- Igatpuri, Dist - Nashik
474.13 Crs Renewal JD(APC) 96 to 112
1 M/s. GE India Industrial Pvt. Ltd., Part of Plot No. F-27, Ranjangaon MIDC, Tal- Shirur, Dist - Pune
90.21 Crs 1st operate (Expansion
& Amalgamatio
n)
JD(APC) 113 to 122
Resubmitted Agenda
List of Cases to be submitted before 2nd Consent Appraisal Committee Meeting of 2013 scheduled on 31.05.2013 at 11.00 am
Fresh Agenda
2 M/s. Enkel Wheels ( India) Ltd., Gat No. 1425, Vill- Shikrapur, Tal- Shirur, Dist - Pune
178.75 Crs Establish (Expansion)
JD(APC) 123 to 129
3 M/s. JSW Infrastructure Ltd., Vill- Nandgaon, Dist - Thane
117.50 Crs Establish JD(APC) 130 to139
4 M/s. Bekaert Industries Pvt. Ltd., B-1, MIDC Ranjangaon, Tal- Shirur, Dist - Pune
346.06 Crs Establish (Expansion)
JD(APC) 140 to 149
5 M/s. Bekaert Industries Pvt. Ltd., B-1, MIDC Ranjangaon , Tal- Shirur, Dist - Pune
249.26 Crs Renewal and 1st operate
for expansion
JD(APC) 150 to 158
6 M/s. MITC Rolling Mills Pvt. Ltd., B-1, MIDC Palkhed, Tal- Dindori, Dist - Nashik
92.3 Crs Establish JD(APC) 159 to 166
7 M/s. Hindustan National Glass & Industries Ltd., F-1, MIDC Malegaon Sinnar, Nashik
719.06 Crs Establish for change in
fuel
JD(APC) 167 to 175
8 M/s. Sudal Industries Ltd., B-11, MIDC Nardana, Tal-0 Sindhkheda, Dist - Dhule
104.55 Crs Establish JD(APC) 176 to 187
9 M/s. RSB Transmissions (I) Ltd., Gat No. 908, Nagar Road, Vill- Sanaswadi, Tal- Shirur, Dist - Pune
79.25 Crs 1st operate with
amalgamation
JD(APC) 188 to 197
10 M/s.Varroc Polymers Pvt. Ltd., (VPPL-II), E-88, MIDC Ranjangaon, Tal- Shirur, Dist - Pune
82.88 Crs Renewal with expansion
JD(APC) 198 to 206
11 M/s. Piaggio Vehicles Pvt. Ltd., E-2 & E-1, MIDC Baramti, Tal- Baramati, Dist - Pune
740.28 Crs Renewal JD(APC) 207 to 220
12 M/s. Sandvik Asia Pvt. Ltd., Mumbai Pune Road, Dapodi, Pune
647.16 Crs Renewal JD(APC) 221 to 228
13 M/s. Piaggio Vehicles Pvt. Ltd., F-19, MIDC Baramati, Tal- Baramati, Dist - Pune
168.40 Crs Renewal JD(APC) 229 to 242
14 M/s. Forbes Marshal Pvt. Ltd., A-34/35, B- 15/16, H-Block, MIDC Pimpri, Pune
81.73 Crs Renewal JD(APC) 243 to 250
15 M/s. Viraj Profiles Ltd., Gut No. G-1/2, 1/3,2, MIDC Boisar-Tarapur, Tal- Palghar, Dist - Thane
299.03 Crs Renewal JD(APC) 251 to 260
16 M/s. Mutual Industries Pvt. Ltd., Gut No. 546/4 & 5, Vill- Shikrapur, Malthan Road, Tal- Shirur, Dist - Pune
84.06 Crs Renewal and 1st operate
for expansion
JD(APC) 261 to 270
17 M/s. Semco Electric Pvt. Ltd., (Unit-II), A-2, MIDC Chakan, Tal- Khed, Dist - Pune
82.65 Crs Renewal JD(APC) 271 to 282
18 M/s. Walchandnagar Industries Ltd., Walchandnagar, Tal- Indapur, Dist - Pune
186.17 Crs Renewal with expansion
JD(APC) 283 to 298
19 M/s. ISMT Ltd., ( Tube Plant) (B). B- 13, MIDC Baramati, Tal- Baramati, Dist - Pune
713.51 Crs Renewal JD(APC) 299 to 306
20 M/s. JBM MA Automotive Pvt. Ltd., C-1, (Part) MIDC Chakan Talegaon Road, Tal- Khed, Dist - Pune
214.53 Crs Renewal with expansion
JD(APC) 307 to 314
21 M/s. Innoventive Industries Ltd., Gat No. 56/3,4,5, Shikrapur Chakan Road, Pimpale Jagtap, Tal- Shirur Dist - Pune
349.28 Crs Renewal and 1st operate
for expansion
JD(APC) 315 to 326
22 M/s. Tata Autocomp Systems Ltd., (Interior and Plastic Division), S No. 280 and 281, Vill- Man, Tal- Mulshi, Dist - Pune
75.41 Crs Renewal JD(APC) 327 to 334
23 M/s. Crompton Greaves Ltd., S. No. 1005, 1007-9, 1011,1013,1014,1019, Kanjurmarg E t M b i
280.06 Crs Renewal JD(APC) 335 to 353
24 M/s. Mahindra & Mahindra Ltd., Tractor Division, Akurli Road, Kandivali, Mumbai
783.79 Crs Renewal JD(APC) 354 to 372
25 M/s. Mahindra & Mahindra Ltd., S. No. 368,369 part 372 to 376, A/p- Talegaon, Tal- Iagatpuri, Dist - Nashik
319.77 Crs Renewal JD(APC) 373 to 382
26 M/s. ABB Ltd., Formerly known as ABB Global Services Ltd., Plot No. 79, MIDC Satpur, Tal & Dist - Nashik
106.76 Crs Renewal JD(APC) 383 to 390
27 M/s. Larsen and Toubro Ltd., Engineering Powai West Campus, Saki Vihar Road , Powai, Mumbai
347.50 Crs Renewal JD(APC) 391 to 406
28 M/s. Larsen and Toubro Ltd., Engineering Powai West Campus, Saki Vihar Road, Powai, Mumbai
286.27 Crs Renewal JD(APC) 407 to 420
29 M/s. Jayaswal Neco Ltd., (Automotive Casting Division), Kh No. 70, 71-A, 71B and 76, Vill- Rhikhairi, 28/9, Mile Stone, Po-
168.79 Crs Renewal JD(APC) 421 to 431
30 M/s. Durabuild Technologies Pvt. Ltd., B-32/1, MIDC Area, Ranjangaon, Tal- Shirur, Dist - Pune
81.61 Crs Renewal JD(APC) 432 to 439
31 M/s. Virgo Engineers, Plot No. 278, Raisoni Park, Tal- Mulshi, Dist - Pune
92.05 Crs Renewal with expansion
JD(APC) 440 to 447
32 M/s. AAM India Mfg. Corporation Pvt. Ltd., Gat No. 787 & 788, Hanga, Tal- Parner, Dist - Ahmednagar
168.35 Crs Renewal JD(APC) 448 to 461
33 M/s. Everest Industries Ltd., 152 & 153, Lakhmapur, Tal- Dindori, Nashik
127.73 Crs Renewal JD(APC) 462 to 471
34 M/s. Endurance Technologies Ltd., Plot No. B-20, Chakan Indl. Area, Vill- Nighoje, Tal- Khed, Dist - Pune
86.34 Crs Renewal JD(APC) 472 to 481
35 M/s. Endurance Technologies Pvt. Ltd., L-6/3, MIDC Waluj, Aurangabad
98.10 Crs 1st operate (Expansion)
JD(APC) 482 to 491
36 M/s. Pimpri Chinchwad Municipal Corporation , EWS Project, Sector 17 & 19 (P), Chikhali, Pune
396.34 Crs. Operate (Part)
RO(HQ) 492 to 505
37 M/s. Pimpri Chinchwad Municipal Corporation Nigadi Project, Sector 22 at Nigadi, Pune
372.15 Crs. 1st Operate RO(HQ) 506 to 513
38 M/s. DSK Vishwa (D.D. Kulkarni Developers Ltd.), Kirkatwadi, Dhayri, Pune
331.73 Crs. 1st Operate (Part)
RO(HQ) 514 to 520
39 M/s.Amit Enterprises Promoters & Builders Pvt. Ltd., Plot No. 16-1 to 16-32 and 16part, 16C part, 16JH part, 16part, 16KH part, 16G part, 16B part, 16CHH part, 16T part & 161 part, Baner, Pune
563.00 Crs. Establish RO(HQ) 521 to 528
40 M/s. Magus Estate & Hotels Ltd., CS No. 114 & extension on 1/136, 1A/136(pt), 1C/136, 1D/136, 1A/136 & 133(pt) & relocation of amenity plots + 13 pt, G/South ward, West, Mumbai
450.00 Crs. Establish RO(HQ) 529 to 540
41 M/s. N Kumar Projects & Infra Pvt. Ltd., VIP Road, Near Alankar Theater, Nagpur
77.98 Crs. Establish RO(HQ) 541 to 552
42 M/s. Neelam Hotel Pvt. Ltd., (Holiday Inn Shirdi), P. No. 106/2-3-4, Nimgaon Korhale, Shirdi, Tal. Rahata, Dist. Ahmednagar
93.18 Crs. Establish RO(HQ) 553 to 560
43 M/s. Nish Developers Pvt. Ltd., CTS No. 711/71…..3/52 to 53, New Islam Mill Compound Mahadev Palav Marg (Curry Road), Mumbai
595.10 Crs. Operate RO(HQ) 561 to 567
44 M/s. Eon Kharadi Infrastructure Pvt. Ltd., Plot No. 1, S, No, 77, Kharadi Knowledge Park, Kharadi, Pune
882.74 Crs. Renewal RO(HQ) 568 to 579
45 M/s. The Lalit Mumbai, M/s. Bharat Hotels Ltd., Sahara Airport Road, Andheri (E), Mumbai
241.08 Crs. Renewal RO(HQ) 580 to 588
46 M/s. Vamona Developers Pvt. Ltd., S. No. 33/2A/2, 33/ 2B/2 of Wadgon Sheri, Vimannagar, Opp. Giga Space, Pune
673.61 Crs. Renewal RO(HQ) 589 to 601
47 M/s. Eco Motel Hotels Ltd. (Hotel Mercure), S. No. 78(pt) 3, Dasave Circle, Village Dasave, Tal. Mulshi, Dist. Pune
25.68 Crs, Operate AS(T) Lavasa
48 M/s. Ekaant Resort, S. No. 8/1, Village Padlaghar, Tal. Mulshi, Dist. Pune
6.79 Crs. Operate AS(T) Lavasa
49 M/s. Fortune Hotels Ltd., S. No. 42(pt), 43(pt), Vllage Dasave, Tal. Mulshi, Dist. Pune
40.15 Crs. Operate AS(T) Lavasa
50 M/s. Lavasa Bamboo Crafts Ltd., S. No. 60, Post Pathershet, Village Mugaon, Tal. Mulshi, Dist. Pune
1.56 Crs. Operate AS(T) Lavasa
51 M/s. Lavasa Corporation Ltd. (Hot Mix Plant), S. No. 3., Village Koloshi, Tal. Mulshi, Dist. Pune
30.68 Lacs Operate AS(T) Lavasa
52 M/s. Lavasa Corporation Ltd. (Ready Mix Concrete Plant), S. No. 30/4&5, Village Dasave, Tal. Mulshi, Dist. Pune
50.65 Lacs Operate AS(T) Lavasa
53 M/s. Spotless Laundary Services Ltd., S. No. 28, Village Bhoini, Tal. Mulshi, Dist. Pune
18.17 Crs. Operate AS(T) Lavasa
54 M/s. J W Marriot Hotel of Juhu Beach Resort Ltd., Juhu-Tara Road, Mumbai
350.36 Crs. Renewal RO(HQ) 678 to 685
55 M/s. Tata Consultancy Services Ltd., Yantra Park, Pokharan road No. 2, Thane
360.40 Crs. Renewal RO(HQ) 686 to 695
56 M/s. Upper Penganga Project (Sapli Dam), Sapli, Akkade, Belapur, Tal. Kalamnam, Dist. Hingoli
601.57 Crs. Establish RO(HQ) 696 to 703
57 M/s. Calcite Properties Developers Pvt. Ltd., Survey No. 145/2 & 2444, Vill. Nagaon, Tal. Alibag, Dist.
118.50 Crs. Establish RO(HQ) 704 to 711
602 to 677
58 M/s. Bharati Vidyapeeth Educational Complex, Gat No. 1, Mauje Levale, Tal. Mulshi, Pune
451.00 Crs. Establish RO(HQ) 712 to 719
59 M/s. Syntel International P. Ltd.,B-1, B-2, Software Technology Park, Talwade, MIDC, Tal. Haveli, Dist. Pune
599.62 Crs. Renewal RO(HQ) 720 to 727
Section No. of CasesJD(APC) 40JD(WPC) 0AST 7RO(HQ) 18Total 65
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 1
RESUBMISSION AGENDA CAC Item No. 01
Name of the Industry: M/s. Hindalco Industries Limited (Expansion Project), Sr. No.95/1, 95/2, Village Daheli, Tal: Mouda,
Dist: Nagpur. Applied for Consent to Establish for Expansion.
1. Discussed in CAC dated 24.09.2012 and it was decided to review the assessment of pollution load proforma submitted by Industry thorough IIT, Mumbai regarding Certification on “No increase in pollution load” due to expansion.
2. The communication received from the unit on 29.11.2012 submitted that IIT Mumbai does not validate the pollution load increase and will take much time. The unit has requested for grant of consent to Establish based on commitment given by the industry and ready to undertake / implement any additional condition imposed by MPCB prior to commission of new equipment on the basis of IIT Mumbai at latter stage.
3. The case was again discussed in CAC dated 24.12.2012 and decided to keep the case in abeyance till self assessment report of industry for no increase in pollution load is received.
4. The was again discussed in CAC dated 5.3.2013 and it was decided to keep the case in abeyance and resubmit in next CAC after obtaining opinion from Shri Rakesh Kumar, NEERI regarding no increase in pollution load.
5. The proposal is examined by Dr. Rakesh Kumar, NEERI, Mumbai and informed that it is in line.
In view of above, we may put the modified proposal before CAC for further consideration on the grounds that there will not be any change in production quantity as per earlier granted one and decrease in water consumption.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 2
CAC Item No. 02
Name of Industry:- M/s. JSW Jaigad Port Limited, Dhamankhol Bay, A/P:- Jaigad, Tal & Dist:- Ratnagiri The said case was discussed in CAC meeting haeld on 31/1/2012 & 14/2/2012. The
case was approved in CAC meeting of 31/1/2012 and was decided to grant the
consent to establish for Expansion. But the case was again discussed in CAC
meeting of 14/2/2012 as ther is applicability of Moratorium in Ratnagiri district and it
was decided to return the application as Board is unable to consider the case due to
moratorium. Now industry have resubmitted application alongwith the letter of MoEF
& Minutes of 122 Expert Appraisal committee, where in it is stated that this project is
considered as of National importance & is exempted from Moratoruim.
We may place the case before CAC for further discussions.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 3
CAC Item No. 03
Name & Address M/s. Trinity Landmarks LLP,
S. No. 339 and others, Village Bhugaon,
Tal. Mulshi, Dist. Pune
1. Applied for C to E, residential and commercial complex for; Total Plot Area- 264939.00 M2
Total BUA - 425982.00 M2
2. Application received at 21/01/2013 and at HQ 26.03.2013
3. Water Requirement - 2187.00M3/day
Sewage generation - 1750.00 M3/day
8 STP’s proposed - 1760 M3/day
4. Solid Waste generation: Kg/Day
Biodegradable- 6458.00
Onsite segregation and Mechanical composting proposed.
Nonbiodegradable- 2768.0
Sale to authorized recycler.
5. RO has recommended the Case for C to E subject to condition of obtaining EC
6. The firm has not submitted/obtained EC.
7. The cases falls in the purview of CAC, and if considered, may be granted with BG of Rs. 10 lacs for providing STP and MSW processing plant, and no effective steps till EC is obtained.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 4
CAC Item No. 04
Name of the Industry:-
M/s. Kirloskar Ferrous Industries Ltd. Gat No. 12 to 18/1 + 2 and 25/1
Shivshahi Solapur Tal. North Solapur 413 002
• Applied renewal of consent
• Application received at SRO- Solapur on dtd 10/12/2012 and at HQ on 28/01/2013.
• Industrial effluent (cooling) is 4.87 for which ETP provided
• Domestic effluent is 50 CMD from which they have provided STP
• Ventury scrubber to core oven section and wind turbo ventilators provided to different section for control of air pollution
• RO Pune has recommended for grant of consent to operate
• The case was discussed in CAC dt. 19/03/2013 and it was decided to keep the case in abeyance and put up in next CAC with clarification regarding increase in Capital investment and details of Bank guarantee. Accordingly, industry has submitted the same.
• We may grant of consent to operate up to 31/01/2016 with operational BG of Rs. 5/- Lakhs
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 5
CAC Item No. 05
Name of the industry :- M/s. Godrej & Boyce mfg. Co. Ltd. Gat No. 600,601,605, A/P. Wing, Tal. Khandala, Dist. Satara 412 801
• Applied for renewal of consent with expansion
• Application received at SRO- Satara on dtd 01/11/2011 and at HQ on 03/11/2012
• Existing unit consent was valid up to 30/09/2012 & applied for renewal of consent
• Industry located @ 1.3 KM away from A-II class River NIRA. Not satisfy the RRZ distance criteria.
• Industrial Effluent Generation is Nil (existing 65 CMD) for which effluent treatment plant provided.
• Domestic Effluent Generation is NIL (existing 65 CMD) for which sewage treatment plant provided
• JVS analysis result of ETP dated 24/01/2012, 31/03/2012 and 15/10/2011are under prescribed limit.
• Adequate height of stack provided to DG set & various stack of existing unit & no additional air pollution control system are required as there is no additional fuel requirement.
• RO Pune has recommended the case for grant Consent
• The case has been discussed in the Consent Appraisal Committee meeting held on 31/01/2013 and decided to issue SCN for refusal for the unit running without consent for last 3 years for the product. SRO Satara submitted the reply 04/04/2013
• We may issue plain renewal of consent & refuse the expansion due to RRZ issue
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 6
CAC Item No. 06
Name of the Industry: Thyssenkrupp Electric Steel India Pvt Ltd. A/p –Gonde, Vill: Wadivarhe, Tal: Igatpuri, Dist: Nashik. 1. Applied for grant of renewal of Consent to Operate on 24.12.2012.
2. Application grant of renewal of Consent to operate at H.Q. on 28.01.2013.
3. Paid Consent fee of Rs.48, 66,310/-.
4. Water Cess paid up to Sept-2012.
5. Environment Statement for the year 2011-2012 submitted.
6. SRO/RO Nashik recommended for grant of renewal of Consent to Operate up to
28.02.2018.
7. This case was discussed in the CAC meeting held on 19.03.2013 and it was
decided to keep case in abeyance and put up in next CAC with verification of C.I.
8. Industry has submitted justification vide letter dated 05.04.2013.Copy of letter is
enclosed.
9. Recommended for grant of renewal of consent to operate up to 28.02.2018 with
submission of operational BG of RS.10 Lakhs.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 7
FRESH AGENDA
CAC Item No. 01
Name of the industry: - M/s. GE India Industrial Private Ltd Part of Plot No. F-27, Ranjangaon MIDC, Tal. Shirur, Dist. Pune
• Applied 1st Consent operate for expansion with amalgamtion
• Application received at SRO- Pune on dtd 28/01/2013 on 16/03/2013
• Existing plant Consent is valid upto 30/04/2015 in GREEN Category & C to E for expansion granted on 27/12/2012
• Industry is located @ 10 KM away from A-II Class River Ghod. Satisfy river distance criteria
• Industrial effluent will be generated from washing activity for which primary treatment is proposed and the treated effluent will be discharged into CETP Ranjangaon.
• For domestic effluent STP of the capacity 15 CMD, treated sewage used on land for gardening within premises.
• Adequate height provided to existing DG Set.
• Industry obtained the member of CHWTSDF MEPL Ranjangaon.
• Regional Officer, Pune, has recommended for the 1st Consent operate for expansion
• We may grant 1st consent to operate for expansion with amalgamation up to 30/04/2014 with imposing BG of 5/- Lakhs towards Operation & Maintenance of pollution control system
• We may place the consent application before CC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 8
CAC Item No. 02
Name of the industry :- M/s. Enkel Wheel (India ) Ltd. Gat No. 1425, Village Shikrapur, Tal. Shirur, Dist Pune 412 208
• Applied for consent to establish for expansion
• Application received at SRO- Pune on dtd 06/02/2013 and at HQ on 14/03/2013
• Existing consent is valid up to 30/04/2014
• Existing domestic effluent qty is 80 CMD( Proposed 1.0 CMD) which will be treated in existing STP having capacity 125 CMD.
• APCS will be provided to Furnace and new DG Set.
• SRO reported that As per existing consent condition industry submitted operational BG of Rs 5/- lacs which is valid up to 30.04.2014.
• Regional officer Pune has recommended the case for grant of C to E for expansion.
• We may grant the consent to establish for expansion.
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 9
CAC Item No. 03
Name of the Industry: M/s. JSW Infrastructure Ltd., Vill. Nandgaon, Dist. Thane.
1. Applied for Consent to establish for construction of cargo Port requiring total plot area is 470 Ha (390 Ha for port and 80 Ha for connectivity by road & rail.).
2. Application received at SRO-Tarapur-I on dtd 13/9/2012 and at HQ on dtd 07/01/2013.
3. Industrial effluent will be nil. 4. Domestic effluent will be 75 CMD. Provided STP. 5. Proposed to provide composting facility for treatment MSW. 6. “Boisar Vikas Manch” has submitted the letter dtd 16.11.2012 in regards,
environmental violation inability of MPCB of grant NOC to Nangaon Port Project of M/s. JSW infrastructure Ltd..
7. SRO reported, project proponent has applied to MoEF for EC accordingly public hearing is conducted on 7.10.2012. And work of construction is not yet started.
8. This office issued query Letter to industry dtd. 12.3.2013 for submission of MMB document & industry has submitted the same.
9. RO/SRO recommended for grant of consent to establish with subject to obtaining EC from MoEF with a condition that Project proponent shall not take any effective step before obtaining EC.
10. HOD Remark – we may grant of consent to establish subject to E.C / MCZMA approval.
We may pace the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 10
CAC Item No. 04
Name of the industry :- M/s. Bekaert Industries Pvt. Ltd. Plot No. B-1, MIDC Ranjagaon, Tal. Shirur, Dist. Pune
• Applied for consent to establish for expansion
• Application received at SRO- Pune on dtd 27/02/2012 and at HQ on 18/04/2012
• Previous consent was valid up to 31/03/2013
• Industry is located @ Ranjangaon MIDC which is 10.0 K.M. from notified river Ghod(Class-A-II) which satisfying RRZ criteria
• Industrial effluent generation will be increased by 6.0 CMD for which they have proposed to install additional Multi Effective Evaporator of 10 CMD capacity. Existing industrial effluent generation is 8 CMD for which they have already provided MEE of 10 CMD capacity.
• Domestic effluent generation will be increased by 2.0 CMD for which existing STP of 50 CMD capacity will be used for treatment. STP comprises of Bar Screen, Oil & Grease Trap, Equalization cum Holding Tank, MBBR Reactor, Tube Settler, PSF, ACF, Chlorination, Treated Water Tank. Treated industrial and domestic effluent will be used on land for gardening.
• As per the consent condition industry has submitted B. G. of Rs. 5 Lakhs which is valid upto 30.09.2013 towards operation and maintenance of ETP and air pollution control devices.
• RO Pune has recommended the case for grant of consent to establish for expansion
• We may grant consent to establish for expansion
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 11
CAC Item No. 05
Name of the industry :- M/s. Bekaert Industries Pvt. Ltd. Plot No. B-1, MIDC Ranjagaon, Tal. Shirur, Dist. Pune
HOD Remarks:- • Applied for renewal of consent and 1st operate for expansion (Partly) with
amalgamation
• Application received at SRO- Pune on dtd 29/01/2012 and at HQ on 15/03/2012
• Previous consent was valid up to 31/03/2013
• Industry obtained consent to establish for expansion on dated 09/02/2009
• Industry stopped the Mfg of one product i.e. Filter cartridges/filter candles/filter elements
• Industrial effluent generation is 8 CMD for which they have provided multiple effect evaporator of capacity 10 CMD
• Sewage generation is 47 CMD for which industry has provided STP of capacity 50 CMD. Treated industrial and domestic effluent is used on land for gardening. Total Land available @ 6.0 Hector
• Industry has LPG base furnace with 18 Mtrs stack height. Further, 2 D. G. Set of 750 KVA and 500 KVA, are provided with HSD as fuel with 18 Mtrs stack height.
• As per the consent condition industry has submitted B. G. of Rs. 5 Lakhs which is valid upto 30.09.2013.
• RO Pune has recommended the case for grant of renewal of consent & 1st operate for expansion with amalgamation for the period upto 31.03.2014.
• We may grant renewal of consent with expansion with extension of existing of Rs. 5/- Lakh up to consent validity
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 12
CAC Item No. 06 Name of Industry : M/s MITC Rolling Mills Pvt.Ltd,
Plot no.B-1, MIDC Palkhed, Tal: Dindori, Dist: Nashik.
1. Application for grant of renewal of consent to operate submitted by industry on 04.11.2012.
2. Application received at H.Q. on 09.01.2013. 3. Recommended case for grant of consent to establish subject to Industry shall
obtain Environmental Clearance
Recommended for grant of consent to establish subject to Industry shall obtain Environmental Clearance.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 13
CAC Item No. 07
Name of Industry : M/s Hindustan National Glass & Industries Ltd, Plot no.F-1, MIDC Malegaon, Sinner,
Nashik, Dist: Nashik.
1. Application for consent to establish for change in fuel submitted by industry on 04.12.2012.
2. Application received at H.Q. on 28.01.2013. 3. Industry is having valid consent up to 31.10.2013. 4. SRO- Nashik has recommended case for consent to establish. 5. Recommended case for grant of consent to establish for change in fuel with
condition that industry shall submit the BG of Rs.5 Lakhs towards compliances of consent conditions
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 14
CAC Item No. 08
Name of the Industry: M/s. Sudal Industries Ltd. Plot no.B-11, MIDC, Nardana, Tal :Sindhkheda,Dist:Dhule.
1. Applied on 10.12.2012 for grant of consent to establish.
2. Application received to HQ on 02.02.2013.
3. RO-Nashik recommended for grant of consent to establish with the
condition of EC.
4. Industry has applied for mfg of Aluminium Alloy, rods, Billets, clad steel
wire products - 96,000 T/Year.[> 30,000 T/A].In the mfg process they
have proposed to use Alluminium ingot and Alluminium Scrap as a raw
material. mainly The mfg process mainly consisting furnace charging
,degassing/grain refiring and hot top casting activity. They have propose
to use 4 nos. of oil fired skelner type furnace –capacity of each furnace -
15 T ,Hence case was referred to committee constituted by the Board to
confirm applicability of EC .
5. Consent to establish may be granted after decision of Boards EC
committee regarding applicability of EC.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 15
CAC Item No. 09
Name of Industry : M/s. RSB Transmissions (I) Ltd., Gat No. 908 Nagar Road, Village Sanaswadi,
Tal. Shirur, Dist. Pune 412 208
• Applied for 1st consent to operate with amalgamation
• Application received at SRO- Pune on dtd 24/12/2012 and at HQ on 13/02/2013.
• Existing consent is valid up to 30/06/2013 of M/s RSB Transmission.
• Now M/s Harnam Engineering merged with M/s RSB and M/s RSB has applied for 1st consent to operate for expansion
• The effluent generated from pre washing and post washing components, industry has provided ETP of 12 CMD capacity comprising collection, oil skimmer, filtration, treated effluent used on land for gardening.
• For domestic effluent STP of 30 CMD is provided and by clubbing M/s Harnam Engineering there is only increase in effluent by 1.6 CMD and total effluent is now become 26.6 CMD.
• Industry has provided fume extraction system with 30 mtrs stack height for existing heat treatment furnace and new addition of 4 furnaces, DG Set & shot blasting adequate height of stack provided.
• Shot blasting unit provided with in built dust collector. Dry paint booth provided with close room and vent.
• M/s Harnam Engineering submitted BG of Rs. 25000/- which is valid upto24.06.2013.
• Regional Officer, Pune, has forwarded the case regarding amalgamation of consent may be taken at HQ level.
• We may grant 1st consent to operate up to with amalgamation up to 30/06/2013 with forfeiting of exiting BG of Rs. 25000/- & taking another BG of Rs. 5/- Lakhs towards Operation & maintenance
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 16
CAC Item No. 10
Name of the industry: M/s. Varroc Polymers Pvt. Ltd. (VPPL-II). E-88, MIDC Ranjangaon, Tal-Shirur, Dist-Pune.412 220
• Applied for renewal of consent with expansion
• Application received at SRO- Pune II on dtd 07/06/2012 and at HQ on 13/02/2013
• Previously consent was valid up to 31/05/2012
• Generation of Industrial effluent is 2.5 CMD & domestic effluent 61 CMD for which they have provided combine ETP & STP (Capacity of 70.0 CMD).
• APCS is provided to DG Set. Industry has shown the paint booth in application form, but as per visit report & their request letter they have stopped the painting activity.
• SRO Pune –II reported that, industry has already carried out expansion of the unit and started production without Boards consent to establish.
• Regional officer Pune has forwarded the case for Decision regarding grant of consent may be taken at HQ level as the industry has done expansion without obtaining consent to establish from the Board.
• We may issue SCN for refusal of consent
• We may place the consent application before CC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 17
CAC Item No. 11
Name of the industry: M/s. Piaggio Vehicles Pvt. Ltd. E-2 & F-1, MIDC Baramati, Tal. Baramati, Dist. Pune 413 133
• Applied for renewal of consent
• Previous consent was valid up to 31/03/2013
• Application received at SRO-Pune-I on dtd 27/02/2013 and at HQ on 02/04/2013.
• Trade effluent generation is 623 CMD for which effluent treatment plant consisting of primary, secondary and tertiary treatment system provided.
• For domestic effluent 288 CMD sewage treatment plant provided
• Water curtain with scrubber to paint booth section provided.
• As per earlier consent condition industry has submitted B.G of 2.0Lakhs for provision of APC to paint booth which is valid up to 29/05/2013.
• Regional officer Pune recommended the case for grant of renewal of consent by imposing appropriate Bank guarantee towards operation & maintenance of ETP
• We may grant of renewal of consent with operational BG of Rs. 5/- Lakhs
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 18
CAC Item No. 12
Name of the Industry: M/s. Sandvik Asia Privet Limited., Mumbai-Pune Road, Dapodi, Pune 412 220
• Applied renewal of consent
• Application received at SRO- PC on dtd 19/01/2013 and at HQ on 28/02/2013.
• Industry located @ 0.1 KM away from river Pawana (A-IV Class) attract RRZ
• Industrial effluent is 70.0 CMD & Domestic effluent is 180.0 CMD for which they have provided combine ETP & STP.
• Analysis results of JVS dated 30/03/2012,20/04/2012 are within the prescribed consent limits (copy enclosed).
• APC’s are provided to DG Set, process stack & paint booth section
• RO Pune has forwarded the case to HQ for Decision regarding grant of renewal of consent to operate with enhancement in C.I.
• We may issue SCN for refusal of consent.
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 19
CAC Item No. 13
Name of the industry: M/s. Piaggio Vehicles Pvt. Ltd. F-19, MIDC Baramati, Tal. Baramati, Dist. Pune 413 133
• Applied for renewal of consent
• Application received at SRO-Pune-I on dtd 28/01/2013 and at HQ on 25/03/2013.
• Previous consent was valid up to 31/03/2013
• Indl. Effluent quantity increased from 60.30 CMD to 115 CMD for which they have provided effluent treatment plant and Dom. Effluent increased from 45 CMD to 65 CMD provided sewage treatment plant.
• Industry has provided water curtain with scrubber to paint booth section as APC.
• Regional officer Pune Recommended for grant of consent after submission details for increase in Indl. and Dom. Effluent
• We may grant of renewal of consent 31/03/2014 With operational BG OF Rs. 5/- Lakhs
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 20
CAC Item No. 14
Name of the industry: M/s. Forbes Marshal Pvt.Ltd. Plot No.A-34/35,B-15/16,H-Block MIDC Pimpri,Dist-Pune 411 018
• Applied for renewal of consent
• Application received at SRO- Pune on dtd 20/12/2012 and at HQ on 28/01/2013
• Previously consent was valid up to 30/04/2011
• Generation of Industrial effluent is NIL
• Domestic effluent generation is 18 CMD. SRO Reported that industry has started the work of STP of capacity 30 CMD & said work will be completed by 15/01/2013.
• Industry is having closed dry type paint booth & to which bag filteration dust collector provided.
• Regional officer Pune has recommended for grant of renewal of consent to operate for period upto 30.04.2017.
• We may grant renewal of consent up to 30/04/2016 with operational BG of Rs. 5/- Lakhs & Company Board Resolution
• We may place the consent application before CC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 21
CAC Item No. 15
Name of the Industry: M/s Viraj Profiles Ltd., Gut No. G – 1/2, 1/3, 2, MIDC Boisar – Tarapur, Tal. Palghar, Dist. Thane.
1. Applied for renewal of Consent to operate. 2. Application received at SRO-Tarapur-I on dtd 28.12.2012 and at HQ on dtd
20.2.2013. 3. Previous consent was valid upto 31/12/2012. 4. Industrial effluent is 61 CMD. Provided ETP disposal of MIDC drain connected
to CETP. 5. JVS results of Water sample on dtd 27.6.2012, 11.07.2012,. Which is
consented limit. 6. Domestic effluent is 9 CMD. Provided Septic tank and soak pit. 7. Industry has provided scrubber, dust collector & bag filter. 8. SRO reported that, 1) The industry is replacing the old induction furnace with
latest advance technology AVP auto induction furnace to control Air pollution. 2) P.D was issued vide No. MPCB/ROT/PD/80 dtd 10.01.2012 for fugitive emission and causing air pollution & Interim direction was issued vide no. MPCB/ROT/ID/B-333 dtd 7.02.2012 and submitted of B.G. of Rs. 8 lacs.
9. This office issued query Letter to industry dtd. 22/2/2013 for submission of consent fee & industry has submitted the same.
10. SRO recommended that grant of consent for 31.12.2013. 11. HOD Remark – we may grant renewal of consent upto 31/12/2013 with
the condition of extension of B.G. upto consent validity period. 12. We may pace the consent application before CAC for further
consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 22
CAC Item No. 16
Name of the Industry: M/s. Mutual Industries Pvt.Ltd. Gut no.546/4 & 5,Village-Shikrapur,Malthan Rd.
Tal-Shirur,Dist-Pune 412 208
• Applied for renewal of consent and 1st consent to operate for expansion with amalgamation
• Application received at SRO- Pune on dtd 30/01/2013 and at HQ on 02/04/2013.
• Previous consent was valid up to 31/01/2013 and obtained C to E for expansion on 10/10/2012.
• Industrial effluent generation is 19 CMD for which ETP of capacity 25 CMD consist of primary followed by tertiary treatment provided.
• Domestic effluent generation 6 CMD for STP Provided
• Treated industrial effluent is use for gardening along with treated domestic effluent.
• Adequate height of stack provided to DG Sets, water curtain with adequate height of stack provided to paint booth.
• Regional officer has recommended for grant of renewal of consent with amalgamation for expansion
• We may grant of renewal of consent with amalgamation with operational BG of Rs. 5/- Lakhs
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 23
CAC Item No. 17
Name of the Industry: M/s. Semco Electric Pvt. Ltd. (Unit II), Plot No. A-2, MIDC Chakan, Tal- Khed, Dist- Pune 410 501
• Applied renewal of consent
• Application received at SRO- Pune on dtd 01/02/2013 and at HQ on 25/03/2013.
• Previous consent is valid up to 31/03/2013
• Generation of Industrial effluent is 97.70 CMD and Domestic Effluent generation is 100.90 CMD for which they have provided combine ETP for the treatment of industrial as well as domestic effluent. For the effluent generating from painting activities they have provided primary ETP and then it is taken to secondary and tertiary treatment. ETP consist of collection tank, oil trapper, reaction tank, tube settler, bio reactor, clarifier, treated water tank, pressure sand filter and SDB. Out of 97.7 CMD Treated effluent, 85 CMD recycled in process and remaining 12.7 CMD is used on land for gardening within premises
• Industry has provided water curtain with stack to paint booth, adequate height of stack to DG Set, Oven, meting furnace, shot blasting provided with dust collector and scrubber provided to pretreatment section.
• RO Pune has recommended the case for grant of renewal of consent to operate for the period upto 31.03.2014.
• We may grant consent to operate with imposing BG of 5/- Lakhs towards Operation & Maintenance of pollution control system
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 24
CAC Item No. 18
Name of the industry : M/s. Walchandnagar Industries Ltd. Walchandnagar,Tal-Indapur,Dist-Pune 413 114
• Applied for renewal of consent with expansion
• Application received at SRO- Pune on dtd 09/08/2012 and at HQ on 02/04/2013
• Previous consent was valid up to 31/07/2011 in GREEN category.
• Generation industrial effluent such as coolent (Quantity not mentioned). SRO Pune -I reported that at present coolent is being discharged without treatment with domestic effluent.
• SRO reported that as per the consent, water consumption for domestic purpose is 2800 CMD and effluent generation is 454 CMD whereas actual water consumption for domestic purpose is an average 5728 CMD as per irrigation bill for the month of Nov. to Feb. 2012.
• Industry has near about 60-70 acres of land available for gardening purpose.
• For domestic effluent industry has provided following treatment facility at 06 locations.
• JVS result of on 30/10/2012 submitted in which one location parameter of BOD (140) COD (288) is exceeded the consented standards
• Industry has 02 nos.LDO fired furnace followed by 14 mtrs. Chimney.
• Industry has carried out shot blasting activity in temporary shed without any air pollution control system.
• RO Pune recommended for grant for renewal of consent after obtaining undertaking along with time bound programme form the industry to provide full-fledged STP for treatment of domestic sewerage generated from the industry.
• We may issue SCN for refusal of consent
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 25
CAC Item No. 19
Name of the Industry: M/s. ISMT Ltd. Tube Plant (B), Plot No. B-13, MIDC Baramati, Tal- Baramati, Dist Pune 413133
• Applied renewal of consent
• Application received at SRO- Pune on dtd 17/01/2013 and at HQ on 14/03/2013.
• Previous consent was valid up to 31/10/2011
• Industrial effluent generation is 150 CMD for which ETP is provided with primary, secondary and tertiary treatment, SRO reported that tertiary treatment is not in operation.
• For 32 CMD domestic effluent industry has provided septic tank & soak pit.
• SRO Pune I reported that industry has not provided STP, even after issuance of notices/instructions, industry has not submitted the compliance of the same.
• JVS analysis result on 27/09/2012,22/08/2012 and 18/07/2012 submitted. parameter of pH, TDS,Chloride and sulphate not meeting the prescribed standards
• Industry has one Rotary Hearth Furnace,Thermic Fluid Heater,Quenching and Tempering furnaces each one is with adequate stack heights.
• Industry has installed scrubber at pickling section
• Industry has two nos. of D.G sets with adequate stack heights
• SRO Pune I reported that As per previous consent condition No.11 Industry has submitted BG of Rs1/- Lac which is valid up to 31/03/2013.
• RO Pune/SRO Pune-I recommended the case for grant of consent to renewal, subject to provision of STP, existing ETP upgradation and appropriate B.G for O&M of ETP and satisfactory reply of query
• We may place the consent application before CAC for further discussion.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 26
CAC Item No. 20
Name of the Industry: M/s. JBM MA AUTOMOTIVE PVT.LTD., C - 1 (Part) MIDC Chakan Talegaon Road
Tal - Khed Dist – Pune 410 501
• Applied renewal of consent with expansion
• Application received at SRO- Pune on dtd 07/01/2013 and at HQ on 14/03/2013.
• Previous consent was valid up to 30/04/2012 in GREEN Category
• Now as per the revised CPCB guidelines sheet metal components with fabrication is under red category.
• Industry located @ 3.0 KM away from River Indrayani (A-II Class) Satisfy the distance criteria
• Industrial effluent generation is NIL
• For 40 CMD domestic effluent industry has provided septic tank & soak pit STP & industry has started work of STP and it will be completed up to April end
• RO Pune recommended the case for grant of Renewal of consent with expansion by obtaining BG for providing STP in time bound manner.
• As work is not completed of STP we may issue SCN for refusal of consent.
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 27
CAC Item No. 21
Name of the industry : M/s. Innoventive Industries Ltd. Gat No. 56/3,4,5, Shikrapur Chakan Road, Pimpale Jagtap, Tal. Shirur, Dist Pune 412 208
• Applied for renewal of consent and 1st consent to operate for expansion with
amalgamation
• Application received at SRO- Pune on dtd 31/01/2013 and at HQ on 16/03/2013
• Existing plant consent was valid up to 30/01/2013 in Orange category
• Industry has obtained consent to establish for expansion 1st on 04/12/2012
• Industry located @ 2.5 KM away from River VEL. Satisfy the distance criteria.
• Industrial effluent generation is NIL (Existing NIL)
• Domestic effluent generation is 45 CMD for which sewage treatment plant provided.
• APCS in the form of stack of adequate height provided to DG Sets and Hot water generator.
• As per existing consent industry has submitted BG of Rs. 5 lac for O & M which is valid up to 28/05/2013 and also submitted Board resolution.
• We may grant renewal of consent with 1st consent to operate for expansion with amalgamation up to 31/12/2014
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 28
CAC Item No. 22
Name of the industry : M/s. Tata Autocomp Systems Ltd. (Interior and Plastic Division), S.No. 280 and 281, Village- Mann,
Tal- Mulshi, Dist- Pune 411 057
• Applied for renewal of consent
• Application received at SRO- Pune on dtd 02/02/2013 and at HQ on 16/03/2013
• Previous consent was valid up to 31/03/2013
• Industrial effluent is 1.5 CMD for which they have provided ETP comprising of Primary, Secondary & Tertiary treatment.
• Domestic effluent is 28.0 CMD for which they have provided STP comprising primary, secondary & tertiary treatment facility.
• Industry has provided stack of 10.0 mtrs ht each for paint booth.
• DG Sets of 500 KVA- 2 Nos & 250 KVA installed for which stack of 4.5 mtrs above roof each provided along with aquatics enclosure.
• RO Pune has recommended the case for grant of renewal with enhancement in CI.
• We may grant renewal of consent upto 31/03/2016 with operational BG of Rs. 5/- Lakh
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 29
CAC Item No. 23
Name of Industry : M/s. Crompton Greaves Ltd, Survey no.1005, 1007-9, 1011, 1013,1014,1017,1019 Kanjurmarg East, Mumbai-400042.
1. Application for grant of renewal of consent to operate submitted by industry on
21.12.2012.
2. Application received at H.Q. on 09.04.2013.
3. Industry has submitted Environmental statement for the period 2011-2012.
4. RO- Mumbai has recommended case for grant of consent to operate subject to
verification of no increase in production quantity.
5. Recommended to issue SCN for refusal for grant of consent to operate for non
provision of STP, Non submission of no increase in pollution load.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 30
CAC Item No. 24
Name of Industry : M/s. Mahindra and Mahindra Ltd [Tractor Division], Akurli Road, Kandivali (E) Mumbai-400101.
1. Application for grant of renewal of consent to operate submitted by industry on 08.03.2013.
2. Application received at H.Q. on 18.04.2013. 3. Industry has submitted Environmental statement for the period 2011-2012. 4. RO- Mumbai has recommended case for grant of consent to operate up to
30.04.2015.
Recommended case for grant of renewal of consent to operate for up to 30.04.2015 with extension of existing BG up to consent validity period.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 31
CAC Item No. 25
Name of Industry : M/s. Mahindra and Mahindra Ltd, Survey no.368, 369 part 372 to 376 A/p –Talegaon, Tal: Igatpuri, Dist: Nashik
1. Application for grant of renewal of consent to operate submitted by industry on 13.03.2013.
2. Application received at H.Q. on 09.04.2013. 3. Industry has submitted Environmental statement for the period 2011-2012. 4. RO- Nashik has recommended case for grant of consent to operate up to
30.09.2014 subject to submission of additional consent fees as per Sectorial approach circular.
5. Recommended case for grant of renewal of consent to operate for up to 30.09.2014 with condition that industry shall submit additional consent fees towards increase in CI and BG of Rs.5 Lakhs towards compliances of consent conditions.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 32
CAC Item No. 26
Name of Industry : M/s. ABB Ltd, [Formerly known as ABB Global Services Ltd]
Plot no.79, MIDC, Satpur, Tal & Dist: Nashik
1. Application for grant of renewal of consent to operate submitted by industry on 02.02.2013.
2. Application received at H.Q. on 18.04.2013. 3. Industry has submitted Environmental statement for the period 2011-2012. 4. RO- Nashik has recommended case for grant of consent to operate up to
30.04.2016 subject to submission of additional consent fees. 5. Recommended case for grant of renewal of consent to operate for up to
30.04.2016 with condition that industry shall submit additional consent fees and extension of existing BG up to 30.04.2016.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 33
CAC Item No. 27
Name of Industry : M/s. Larsen and Toubro Ltd. Powai East compus, Saki Vihar Road, Powai, Mumbai-400 072.
1. Application for renewal of consent to operate submitted by industry on 11.02.2013.
2. Application received at H.Q.on14.03.2013. 3. Industry has paid water cess up to 31.05.2012. 4. Industry has submitted Environment Statement for year 2011-12. 5. RO-Mumbai has recommended case for renewal of consent to operate up to
28.02.2015.
Recommended case for grant of renewal of consent to operate up to 28.02.2015 with condition that industry shall submit BG of Rs.5 Lakhs towards O &M of pollution control systems and submission of additional consent fees.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 34
CAC Item No. 28
Name of Industry : M/s. Larsen and Toubro Ltd. Powai West compus, Saki Vihar Road, Powai, Mumbai-400 072.
1. Application for renewal of consent to operate submitted by industry on 07.12.2013.
2. Application received at H.Q. on 14.03.2013. 3. Industry has paid water cess up to 31.05.2012. 4. Industry has submitted Environment Statement for year 2011-12. 5. RO-Mumbai has recommended case for renewal of consent to operate subject
to submission of necessary information from industry. 6. Recommended case for grant of renewal of consent to operate up to
31.12.2015. With submission of BG of Rs.5 Lakhs towards operational and maintenance of pollution control systems and compliance of consent condition.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 35
CAC Item No. 29
Name of the Industry: M/s. Jayaswal Neco Limited (Automotive Casting Division)Kh. Nos.70,71-A, 71B and 76, Vill: Ruikhairi, 28/9, Mile Stone, Mouza: Ruikhairi, PO: Butibori, Wardha Road, Dist: Nagpur. .
Applied for renewal of consent.
1. Earlier consent was valid up to 31.01.2013.
2. JVS results are exceeding the standards.
We may grant renewal up to 31.12.2014 with condition of forfeiting of existing
Bank Guarantee due to exceeding of JVS results and obtain additional Bank
Guarantee of Rs. 5/- Lakhs towards Operation and Maintenance of air pollution
control system. .
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 36
CAC Item No. 30
Name of the industry: M/s. Durabuild Technologies Pvt. Ltd. B-32/1, MIDC Aera , Ranjangoan, Tal. Shirur, Dist. Pune 412 220
• Applied for renewal of consent
• Application received at SRO-Pune-I on dtd 01/04/2013 and at HQ on 23/04/2013.
• Previous consent was valid up to 28/02/2013
• Indl. Effluent quantity 1.5 CMD for which they have provided effluent treatment plant and Dom. Effluent 7.5CMD provided sewage treatment plant.
• Industry has provided LPG base boiler with 14 Mtrs stack height. D. G. Set of 250 KVA with HSD as fuel with 6.0 Mtrs., stack height. Industry has two chambered incinerator having stack height of 20 Mtrs.
• Regional officer Pune recommended for grant of renewal of consent to operate
with enhancement in C.I. for the period upto 28.02.2014
• We may grant of renewal of consent 28/02/2014 With operational BG OF Rs. 5/- Lakhs
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 37
CAC Item No. 31
Name of the industry: M/s. Virgo Engineers, Plot No. 278, Raisoni Park, Tal:- Mulshi, Dist:- Pune 411057
• Applied for renewal of consent with expansion.
• Application received at SRO-Pune-I on dtd 22/02/2013 and at HQ on 18/04/2013.
• Previous consent was valid up to 30/09/2011
• Indl. Effluent quantity 4.5 CMD for which they have provided effluent treatment plant of 5.0 CMD capacity and Dom. Effluent 41.0 CMD provided sewage treatment plant of 55 CMD capacity.
• Industry has provided APCs to paint booth, shot blasting unit and DG sets.
• Regional officer Pune recommended for grant of renewal of consent with expansion subject to submission of reply to queries raised by SRO.
• We may issue SCN for refusal of consent .
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 38
CAC Item No. 32
Name of the Industry: M/s AAM India Manufacturing Corporation Pvt Ltd , Gat No. 787 & 788, Hanga, Tal- Parner Dist: Ahmadnagar.
1. Applied for grant of renewal of consent to operate with Amalgamation at SRO
Ahmednagar on 18.02.2013.
2. Application for grant of consent to operate received to HQ on 18.04.2013.
3. Industry is having valid consent up to 31.10.2013 and consent to establish.
4. SRO- Nashik has recommended case for grant of Renewal of consent to
operate and decision regarding the expansion may be taken at H.Q.level..
5. Renewal of consent to operate with expansion may be granted up to
31.03.2016 with the condition that submission of BG of Rs.5 Lakhs towards the
operation and maintenance of pollution control system.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 39
CAC Item No. 33
Name of the Industry: M/s Everest Industries Ltd., 152 & 153, Lakhmapur, Tal- Dindori, Dist: Nashik.
1. Applied for grant of renewal of consent to operate with RO-Nashik on
29.01.2013.
2. Application for grant of consent to operate received to HQ on 09.04.2013.
3. Industry is having valid consent up to 31.10.2013.
4. Industry has paid water cess up to Aug-2012.
5. Industry has submitted Environmental statement for year 2011-2012.
6. Recommended grant of Renewal of consent to operate upto 31.03.2016 with
the condition that submission of BG of towards the operation and maintenance
of STP.
7. Recommended to issue SCN for refusal for grant of renewal of consent to operate.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 40
CAC Item No. 34
Name of the Industry: M/s. Endurance Technologies Ltd. Plot no. B-20, Chakan Industrial Area,
Vill-Nighoje, Tal-Khed, Dist:- Pune 410 501
• Applied for renewal operate
• Application received at SRO- Pune on dtd 21/01/2013 and at HQ on 16/03/2013.
• Generation of Industrial effluent is 40.0 CMD
• Domestic Effluent is 45.0 CMD
• Combined ETP provided for the treatment of industrial and domestic effluent. Treated effluent is used for toilet flushing and remaining used on land for gardening within premises
• APCS in form of water curtain with stack provided to paint booth, dust collector followed by stack provided to shot blasting section, for degreasing fume extraction system with adequate height stack provided, acoustic enclosure with stack provided to DG Set,
• RO Pune has recommended the case for grant of renewal of consent to operate by imposing operational BG.
• We may grant consent to operate up to 28/02/2016 with imposing BG of 5/- Lakhs towards Operation & Maintenance of pollution control system
• We may place the consent application before CAC for further consideration.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 41
CAC Item No. 35
Name of Industry: M/s. Endurance Technologies Pvt. Ltd. , Plot No. L-6/3, MIDC Waluj, Aurangabad.
1. Applied for renewal of consent with first operate for expansion. 2. Existing consent valid upto 28/2/2013 and have obtained consent to establish
for expansion. 3. The CI is Rs. 98.10 crores and existing CI including expansion was Rs. 85.5
crores, increase is of Rs. 12.60 crores, it is due to actual cost of expansion, 4. Provided ETP, JVS results are within limit. 5. Stack air monitoring results are exceeding the limits. 6. Ro recommended forfeiture of existing BG of Rs. 1.0 lacs and to obtain fresh
BG of Rs. 2.0 lacs. 7. We may forfeit the existing BG and obtain fresh BG of Rs. 5.0 lacs. 8. We may place the case before CAC for further discussions.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 42
CAC Item No. 36
Name of the Industry: Pimpri Chinchwad Municipal Corporation EWS Project
Sector 17 and 19 (P) Chikhali, Pune
1. Application for consent to 1st Operate 114 nos. of buildings
Plot Area – 2,53,018.50 M2
Total BUA (FSI) – not furnished
Total Construction Area – not furnished
2. Application received at SRO 16/02/2013 at HQ on 16/04/2013
3. Water Consumption – Water requirement is - 4536 CMD
Sewage generation is – 3629 CMD
Separate STP is not provided and Corporation has proposed to treat the sewage generated at this site in their designated STPs provided for the area.
4. The Solid Waste generation -
Biodegradable -8232 kg/day- Composting
Non- Biodegradable -3528 kg/day
Separate MSW processing plant is not provided and Corporation has proposed to treat the MSW generated at this site in their designated Composting Plant at Moshi.
5. Consent may be granted with standard condition of BG
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 43
CAC Item No. 37
Name of the Industry: Pimpri Chinchwad Municipal Corporation Nigad Project
Sector 22, Nigadi, Pune
1. Application for consent to 1st Operate for for 35 Nos. of Buildings on;
Plot Area – 3,98,624.06 M2
Total BUA (FSI) – not furnished
Total Construction Area – not furnished
4. Application received at SRO 18/02/2013 at HQ on 16/04/2013
5. Water Consumption – Water requirement is - 1930.71 CMD
Sewage generation is – 1544.57 CMD
Separate STP is not provided and Corporation has proposed to treat the sewage generated at this site in their designated STPs provided for the area.
4. The Solid Waste generation -
Biodegradable -1960 kg/day- Composting
Non- Biodegradable -840 kg/day
Separate MSW processing plant is not provided and Corporation has proposed to treat the MSW generated at this site in their designated Composting Plant at Moshi.
5. Consent may be granted with standard condition of BG
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 44
CAC Item No. 38
Name of the Industry: M/s DSK Vishwa (D.D. Kulkarni Developers Ltd.) Kirkatwadi, Dhyari, Pune
1. Application for consent to 1st Operate in part for Plot Area – 3,73,754.20 M2
Total Construction Area – 2,28,727.37 M2
2. Application received at RO 04/03/2013 at HQ on 10/04/2013 3. EC obtained vide No. SEAC-2010/CR.880/TC.2 dt. 20/10/2011 for; Plot Area – 3,73,754.20 M2
Total BUA (FSI) – 3,08,143.20 M2 Total Construction Area – 4,61,458.32 M2
4. Water Consumption –
Water requirement is – 1889.00 CMD Sewage generation is – 1511.00 CMD STP provided – 2 STPs of capacity - 1000.00 + 1250 .00 CMD
5. The Solid Waste generation -
Biodegradable – 4405 kg/day- Onsite Composting provided
Non- Biodegradable –1907 kg/day 6. Ro has recommended the case for grant of consent to operate in part.
7. The case may considered with BG of Rs. 10 lacs for provision of MSW processing plant and STP
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 45
CAC Item No. 39
Name of Industry: M/s. Amit Enterprises Promoters & Builders Pvt. Ltd. , Plot. No. 16-1to16-32 and 16part, 16C part, 16JH part, 16part, 16KH part, 16G part, 16B part, 16CHH part, 16T part & 16J part, Baner, Pune.
1. Application for consent to establish for: Total Plot area – 70482.00 M2 Total Built up area – 136720.95 M2 Total Construction Area – 138261.00 M2
2. Application received at SRO on 02/03/2013 and at HQ on 16/04/2013 3. EC obtained vide No. SEAC-2011/CR-971/TC-2 dt. 27/11/2012 for;
Total Plot area – 70482.00 M2
BUA – 136720.95 M2
4. Water requirement is -698 CMD
Sewage generation is -539 CMD 2 Nos. of STPs proposed of capacity 400 CMD and 175 CMD.
5. MSW generation: Non –Biodegradable Waste - 784.8 kg/day Biodegradable Waste -1177.0 kg/day
Onsite MSW processing plant is proposed.
6. Regional Officer has recommended the case for establish. 7. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for providing MSW
processing plant and STP.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 46
CAC Item No. 40
Name of Industry: M/s. Magus Estate & Hotels Ltd. S. No. 114 and extension on 1/136,1A/136(pt),1C/136,1D/136,1A/136 &133(pt) relocation of amenity plots+133 pt, G/South ward, Worli, Mumbai
1. Application for consent to establish (II Phase) for: Total Plot area – 17,243.43 M2 Total BUA (FSI) – 36,142.00 M2 Total Construction Area – 80,155.08 M2 (Height – 187.17 M)
CI - 45000.00 Lacs
2. Application received at SRO on 11/03/2013 and at HQ on 12/04/2013 3. EC obtained vide No. SEAC-2010/CR.562/TC.2 dt. 20/10/2011 for; Plot Area – 17,243.43 M2
Total BUA (FSI) – 36,142.00 M2 Total Construction Area – 80,155.00 M2 (Height – 186.17 M)
CI - 100000.00 Lacs
4. Water requirement is -127 CMD
Sewage generation is - CMD STP proposed -320 CMD
5. MSW generation: Biodegradable -233.43 kg/day- (Onsite composting proposed) Non- Biodegradable -213.56 kg/day
6. SRO reports that the firm has reduced the height of the building from 370 mtrs. to 187.17 mtrs. due to restriction by civil aviation, hence proposed capital investment in the II Phase of the project has been decreased to 450 Crs.
7. However EC is granted for 186.17 mtrs. with CI of Rs. 1000 Crs. 8. The firm has not submitted the details of existing Hotel activity such as;
a) Total plot and construction areas b) Whether any previous consent has been obtained or not, c) Details STP and MSW plant and d) Reduction in C.I.
9. RO has recommended the case for Establish 10. Submitted before CAC for decision
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 47
CAC Item No. 41
Name & Address of Industry M/s. N Kumar Projects & Infra. Pvt. Ltd VIP Road, Near Alankar Theater, Nagpur
1. Red/LSI/Proposed construction of Hotel, Restaurant and Swimming Pool activity (114 rooms) for:
Total Plot area is – Not furnished
Total Built up area - Not furnished
2. Application received at SRO on 04/05/2012 and at HQ on 19/05/2012
Water Consumption –
Domestic –153 CMD
Sewage generation –98 CMD
STP Proposed –Capacity not furnished
Cooling –30 CMD
3. The Solid Waste generation -24 Kg/Day
4. The case was placed before CC, meeting held on 04/01/2013. SCN was issued as per directions of CC on 01/02/2013. Thereafter reminder was issued on 08/04/2013, reply still awaited.
5. SRO has recommended the case for grant of consent to establish.
6. Application may be refused for non submission of reply to SCN and Reminder.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 48
CAC Item No. 42
Name of the Industry: M/s. Neelam Hotel Pvt. Ltd.
(Holiday Inn Shirdi), P.No. 106/2-3-4, Nimgaon Korhale, Shirdi,
Tal- Rahata, Dist- Ahmednagar
1. Application for consent to Establsih for
Construction of Hotel Five Star with laundry and Swimming Pool activity (152 rooms) for:
Total Plot area is – 18,600.00 M2
Total Built up area - 6784.00 M2
3. Application received at SRO 20/03/2013 at HQ on 05/04/2013
4. Water Consumption – Domestic - 115 CMD
Sewage generation - 55 CMD
Industrial - 151 CMD
Effluent Gen. 34 CMD
STP Proposed – 200 CMD
5. The Solid Waste generation -
Bio degradable- 500 Kg/Day
Composting Proposed
Dry Garbage- 500 Kg/Day
6. Ro has recommended the case for C to E.
7. Consent may be granted with BG of Rs. 10 lacs for providing MSW processing plant and STP.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 49
CAC Item No. 43
Name & Address of the Industry M/s. Nish Developers Pvt. Ltd. CTS No. 71 1/71…. 3/52 to 53, New Islam Mill Compound, Mahadev Palav Marg (Curry Road) Mumbai
1. Application for 1st consent to operate in part. 2. Application received at SRO on 25/03/2012 and at HQ 05/04/2013 3. C to E issued vide No.379 dt.11/09/2008 for; Total Plot area – 34,697.00 M2 BUA – 1,38,787.74 M2 4. EC obtained vide No. SEAC-2010/CR.880/TC.2 dt. 20/10/2011 for; Total Plot area – 34,697.00 M2 BUA – 1,38,787.74 M2 Total Construction Area – 3,75,113.13 M2
5. Now applied for: Plot Area – 26,247.12 M2 Construction Area – 18,627.62 M2
5. Water requirement is – 380.00 CMD Sewage generation is – 350.00 CMD STP provided – capacity not furnished
6. MSW generation: quantities not furnished 7. RO has recommended the case for grant of consent to operate in part.
8. Consent may be granted with BG of Rs. 10 Lakhs for O & M of STP and provision and thereafter
operation of MSW plant and submission of undertaking on part construction.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 50
CAC Item No. 44
Name of Industry: M/s Eon Kharadi Infrastructure Pvt. Ltd., Plot no. 1`, S.No. 77, Kharadi Knowledge Park, Kharadi, Pune-411014
1. Proposal of Ro Pune for 1st C to O.
2. The application of the firm is not received with the proposal from the Pune. Letter has been issued to Ro Pune on 12/12/2011
3. Application Received at SRO on 23/12/10 and the proposal of Ro Pune is received at HQ
on 30/11/2011.
4. The project proponent has obtained EC of GOI vide No. 21-57/2006-IA.III dt. 17/05/2006.
5. The C to E is issued on 09/08/2010
6. Industry has provided adequate STP.
7. RO has recommended the case for grant of consent to operate.
8. Consent may be granted condition of obtaining BG of Rs. 10 lacs and necessary fees as
per GR dt.25/08/2011.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 51
CAC Item No. 45
Name of Industry: The Lalit Mumbai,
M/s. Bharat Hotels Ltd.
Sahara Airport Road, Andheri (E), Mumbai
1. Resubmission case was placed before 31/01/2013; it was decided to issue SCN for refusal regarding clarification for ETP and decrease in CI.
2. Application received at SRO on 30/11/2012 and at HQ on 21/12/2012
3. The firm has replied to SCN vide letter dated 05/03/2013; wherein there is no clarification on the reasons for decrease in CI, shifting to ozonisation Method for Swimming Pool and also firm has not provided MSW processing plant.
4. RO has recommended upto 31/05/2014 after receipt of fees of rs. 2,41,080/-
5. Consent may be renewed with the condition of obtaining BG of Rs. 10 Lacs for operation and maintenance of STP and MSW processing plant and shifting to Ozonisation methods for Swimming Pool.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 52
CAC Item No. 46
Name of Industry: M/s Vamona Developers Pvt. Ltd. ,
S.No. 33/ 2A/2, 33/ 2B/2 of Wadgon Sheri,
Vimannagar, Opp. Giga Space, Pune
1. Application for renewal of consent for
Total Plot area -- 79,881.00 M2
Total Construction area --60,436.28 M2
2. Application received at SRO on 28/02/2012 and at HQ on
3. Previous consent valid upto31/03/2013 for;
Total Plot area - 79,881.00 M2
Total Construction area - 60,436.28 M2
3. The firm has obtained EC vide No. SEAC 2010/CR.62/TC.2 dt. 30/06/2010.
4. The firm has not complied with the previous consent conditions of
a. Submitting Affidavit on built up area and total construction area in consensus with Environmental Clearance.
b. Environmental Statement
c. Water analysis report
d. Payment of CESS
e. Details on 80 % water recycling and affixing of separate meter therein for records.
5. The firm has shown increase in C.I. of the project from 54976 to Rs. 673.61 Crs., without any justification.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 53
CAC Item No. 47 to CAC Item No. 53 (LAVASA)
Name of Industry: M/s. Lavasa Corporation Ltd., (Parent Organization) Tal. Mulshi & Velhe, Dist. Pune. Sub-Units/ Industries in development of Phase-I of Hill Station over 2,000 Ha. Area: 1.M/s Eco Motel Hotels Ltd. (Hotel Mercure ), S.No. 78(pt),3, Dasave Circle, Village Dasave, 2.M/s Ekaant Resort, S.No. 8/1, Village Padlaghar, 3.M/s Fortune Hotels Ltd., S.No. 42(pt),43(pt), Village Dasave, 4.M/s Lavasa Bamboo Crafts Ltd., S.No. 60, Post Pathershet, Village Mugaon, 5.M/s Lavasa Corporation Ltd.(Hot Mix Plant), S.No.3, Village Koloshi, 6.M/s Lavasa Corporation Ltd.(RMC Plant), S.No.30/4&5, Village Dasave, 7.M/s Spotless Laundary Services Ltd., S.No.28, Village Bhoini,
1. Application for grant of Consent to Establish/Operate for various Sub-Units / Industries in Phase-I of Lavasa Hill Station over 2,000 Ha. area by M/s Lavasa Corporation Ltd. at Tal. Mulshi Dist. Pune were received at R.O. (Pune) in between 9th July 2010 and
8th May 2012. 2. Board vide Consent No. BO/Pune-2/O/CC-3 dtd. 5/01/2005 has granted Consent to
Operate under “Orange” category with the validity upto 30/04/2014 to M/s Lavasa Corporation Ltd. for development of land of 17 villages as a Tourism Project on 6181.3743 Hectares with incidental utilities and services.
3. MoEF, GoI vide letter F. No. 21-9/2011-IA.III dtd. 9/11/2011 has accorded Environmental Clearance for development of 1st phase of Hill Station Township on a plot area of 2,000 Hectares at village Mulshi and Velhe Talukas, Dist. Pune, Maharashtra by M/s Lavasa Corporation Ltd.
4. Applications of the Hotels (3 Nos.) were handled by A.S.(Tech.) Section; applications of Hot Mix Plant, RMC Plant and Bamboo Craft Works were handled by J.D. (APC) Section and that of Laundry was handled by R.O.(HQ) Section.
5. These files were routed to Legal wing for opinion about applicability of RRZ Policy / EC and kept pending due to action initiated by MoEF on M/s Lavasa Corpn., Court cases
and absence of guidelines. 6. Upon receipt of written request dtd. 27/12/2012 from Chief Planner, Lavasa Corp. Ltd.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 54
Hon’ble Chairman & Member Secretary has instructed to expedite the disposal of pending applications.
7. Hon’ble Member Secretary discussed the issues of pendency with SLO, AS(T), JD(APC) & RO(HQ) on 28/02/13 and entrusted job of preparing guidelines for quick disposal of the applications with SLO.
8. SLO has prepared guidelines on 14/03/13 and forwarded to Member Secretary through RO(HQ)/JD(APC)/JD(WPC).
9. Hon’ble Member Secretary instructed AS(T) on 2/04/13 to prepare combined agenda of the pending 7 Nos. applications of M/s Lavasa Corporation Ltd., Phase-I Hill station project for placing these cases in the ensuing CAC meeting for taking further decision of grant of Consent to Operate to these units.
10. R.O.(Pune) has forwarded these cases for taking suitable decision as the matter is also pending at CJM, Pune and High Court, Mumbai.
11. It is felt that we may treat M/S Lawasa Corporation Ltd. as a township and the activities which are being operated under separate management can be given separate consent as we issued in the corporation areas, as per the delegation of power. The remaining activities can be covered under Lawasa Corporation and can be issued combine consent for the entire project. The policy decision in this regards may be taken in CAC.
12. As far as responsibility for omission or non compliances in respect of waste management will be jointly and several. Also as per the consent condition no. 12, the proponent is suppose to pay the consent fees every after two year based on the investment made. However they have failed to do so. Hence as per the present fee calculations, the proponent needs to pay the consent fee of Rs. 27,23,500/-.
13. The consent to operate issued earlier to M/s. Lawasa Corporation Ltd. needs to be amended as per the E.C. granted to them. Fresh Consent to Operate may be granted pto 30/04/2014 to parent Company M/s Lavasa Corporation Ltd. for development of the Phase-I of the Hill Station over 2,000 Ha area as per Environmental Clearance granted by MoEF, GoI vide letter F. No. 21-9/2011-IA.III dtd. 9/11/2011 with overriding effects over earlier Consent to Operate granted by the Board dtd. 5/01/2005 after recovering difference of the Consent fees of Rs. 27,23,500/- subject to condition of compliance of the EC conditions and submission of B.G. of Rs. 10.0 Lakhs towards compliance of Consent conditions / 0&M of pollution control facility. Consent to Operate may also be granted for 7 Nos. sub-units / industries in Phase-I of Lavasa upto 30/04/2014 after recovering difference of the Consent fees as per Chart enclosed.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 55
CAC Item No. 54
Name of Industry: M/s J W Marriot Hotel of Juhu Beach Resort Ltd, , Juhu - Tara Road, Mumbai-49
1. Application for Renewal of consent 2. Application received at SRO on 29/12/2012 and at HQ at 20/03/2013. 3. Resubmission Case, was placed before CAC of 19/03/2013, wherein it was decided
to keep the case in abeyance and put up to next CAC with reply to letters dated 04/01/2013, 16/01/2013 and 07/02/2013
4. Reminder letter written issued on 04/05/2013, reply awaited.
5. Submitted before CAC for decision
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 56
CAC Item No. 55
Name of Industry : M/s Tata Consultancy Services Ltd. , Yantra Park, Pokharan Road No.02, Thane
1. Application for renewal of consent 2. Application received at SRO on 30/09/2011 and at HQ on 30/03/2012.
3. Resubmission case was placed before CAC of 22/03/2013, wherein it was decided to keep the case in abeyance and put up to next CAC after examination of applicability of EIA notification
3. In minutes of discussion held in legal dept, on 25/02/2013 it is mentioned that the plinth has been completed prior to 2004 and on that basis Board has informed to firm that the project does not attracts EIA notification and MPCB has already granted consent to operate on 23/03/2010 valid upto 23/03/2012.
4. Submitted before CAC.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 57
CAC Item No. 56
Name and Address of the Industry: Upper Penganga Project (Sapli Dam) Sapli, Akhada Balapur, Tq. Kalamnuri,
Dist. Hingoli
HOD Remarks:
1. Applied for consent to establish for proposed Sapli Dam, Upper Penganga Project.
2. Application received at SRO on 14/01/2013 and at HQ 01/02/2013
3. The firm has not obtained EC.
4. Waste water generation is Nil
5. Solid waste generation is Nil.
6. RO has recommended the case for C to E subject to condition of obtaining EC
7. Consent may be granted with BG of Rs. 10 lakhs for consent conditions and not ot take any effective steps till EC is obtained.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 58
CAC Item No. 57
Name & Address of the Industry: Calcite Proprerties developer Pvt Ltd,
Survey No. 1452/2 & 2444,
Vill. Nagaon, Tal. Alibag, Dist. Raigad
HOD Remarks
1. Resubmission Case was placed before CAC of 12/03/2013, wherein it was decided to get clarification regarding recycling of effluent and plantation.
2. The application recived at SRO on 22/01/2013 and at HQ on 20/03/2013
3. The firm has sufficient land for reuse the treated effluent.
4. The firm has obtained EC vide No.11-62/2010-1A-III dated 26/12/2012
5. RO has recommended the case for grant of C to E
6. Consent may be granted with BG of Rs. 10 lakhs for provision of MSW processing plant and STP.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 59
CAC Item No. 58
Name & Address M/s. Bharati Vidyapeeth Educational Complex,
Gat No. 1, Mauje Levale, Tal- Mulshi, Pune
1. Applied for C to E, Education complex Project Total Plot Area- 11,29,100 M2
Total Construction area - 18,526.98 M2
2. Application received at 08/11/2012 and at HQ 18/12/2012
3. Water Requirement: 1082 CMD
Effluent Generation: 710 CMD
STP Proposed 710 CMD
4. Solid Waste generation: Bio degradable: 1980.50 Kg/D
OWC Proposed.
Non-biodegradable: 1980.50 Kg/D
Sale to authorized party
STP Sludge: 710 Kg/D
Use as Manure
5. RO has recommended the Case for C to E.
6. RRZ clearance not submitted.
7. Consent may be granted with the condition of obtaining BG of Rs. 10 lakhs for Provision of STP and MSW processing plant and submission of RRZ clearance.
Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013 60
CAC Item No. 59
Name of the Industry: M/s Syntel International P. Ltd.
B-1, B-2, Softaware Technology Park, Talwade, MIDC, Tal. Haveli, Dist. Pune
1. Resubmission Case, was placed before CAC of 08/01/2013 with decision to issue SCN for non Payment of Cess, non Submission of Environmental Statement, non submission of RRZ clearance, and not providing adequate Sewage treatment plant.
2. Application received at SRO on 20/09/2012 and at HQ 18/12/2012
3. The industry has replied vide letter dated 19/02/2013 wherein it is mentioned that, they have paid Cess, have submitted Env. Statement, Env. Clearance and rectified the problem involved with STP. The solid waste disposal arrangement is with PCMC for which they are paying the requisite fees to PCMC annually.
4. The project proponent has obtained EC vide No. SEAC 2010/CR.858/TC.2 dt.12/06/2012.
5. RO has Recommended for renewal of consent.
6. RRZ clearance not submitted.
7. Submitted before CAC further decision