Contents(1) MICE Absorber Status
(2) MICE Absorber Modification
(3) Plan/Schedule
(4) Summary
MICE CM-23 in HARBIN
Shigeru Ishimoto KEK
MICE CM-24, May 31 - June 3, 2009 - RAL
![Page 2: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/2.jpg)
New Absorber Test Area
( KEK North Counter-Hall )
Test Cryostat
2 m3 G-H2 Tank
OLD K2K BEAM LINE
![Page 3: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/3.jpg)
machining after welding
2 heater
2 test windows
4 Mini-flanges
![Page 4: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/4.jpg)
Absorber at MIRAPRO
( Mar-13th, 2009 )
368 mm Error <0.2>
![Page 5: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/5.jpg)
Absorber at MIRAPRO
( Feedthrough and Parts )
G-10 Support Parts
L-H2 In and 30 Pin
Feedthrough
![Page 6: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/6.jpg)
Absorber at MIRAPRO
( Thanks MIRAPRO Technician and Engineer )
Mr. Nakamura
Aluminum Welding Expert
![Page 7: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/7.jpg)
Absorber at MIRAPRO
( He Leak Test )
No He Leak
![Page 8: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/8.jpg)
Absorber at MIRAPRO
( Pressure Test at 3.0 bar )
No N2 Leak at 3.0 bar
![Page 9: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/9.jpg)
Temperature & Level Sensors in the
Absorber
10X2 = 20 wires
In L-H2 in G-H2
2 wires; 5 Thermometers IT = 0.1 mA
2 wires; 5 Level sensors IL = 0.5 or 1.0 mA
(Total ; 20 wires)
10 Cernox 1050-SD
Calibrated 4 - 329K
(Supplied by LBNL)
![Page 10: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/10.jpg)
Sensor and Heater ( Overall )
HTR-25-100W
25.410X2 = 20
D=1/4”
![Page 11: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/11.jpg)
Level Sensor Current
![Page 12: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/12.jpg)
Absorber Assemble
Sensor BlocksCable in groove
soft solder and shrink tubes
Cernox 1050-SD
![Page 13: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/13.jpg)
Absorber Assemble
Aluminum Punching Board
t=0.5 mm
Aluminum Plates t=1
mm
5 Sensor Blocks
![Page 14: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/14.jpg)
Absorber Assemble
Thermometer Blocks
x4
Heaters x2
Connecter x2
L-H2 IN and 30 Pin Connecter
L-H2 OUT
![Page 15: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/15.jpg)
Absorber Assemble
G-10 Support
x8
M.L.I.
L-H2 IN
![Page 16: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/16.jpg)
Absorber Assemble
L-H2 IN
Connecter x2
![Page 17: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/17.jpg)
9.4
9.0
35.0
4.0
5.0
310
47.5
39.0
2.5
422.4
bobbinThermal radiation shield
Magnet cryostat
Large End Flange
386.0
372.4
24
10.4
This solution is to shift the absorber upstream by 10.4mm
0.4mm
Large End Flange locally thinned down to 2.5 mm
AFC Magnet Problem
( Slide by Wing Lau )
Solution 1
25 35 mm
![Page 18: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/18.jpg)
AFC with ABSORBER
Modification Plan
Too Narrow Points
Off Center 10.4 mm
![Page 19: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/19.jpg)
M.L.I. t=3
AFC with ABSORBER Modification Plan
Too Narrow Points
Off Center 10.4 mm
![Page 20: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/20.jpg)
AFC with ABSORBER Modification Plan
Too Narrow Points
Absorber Support Flange on MAGNET CRYOSTAT
![Page 21: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/21.jpg)
AFC with ABSORBER & Large End Flange
Absorber Support Flange on MAGNET CRYOSTAT
Too Narrow Points
![Page 22: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/22.jpg)
Cut 4 Pipes
at +5 mm Line
4 New Elbows; + 15.4 mm Horizontal
(10.4 + 5)
+ 5 mm Vertical
368 mm
Pipes Extension Plan
![Page 23: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/23.jpg)
Pipes Extension Plan
368 + 10.4 mm
4 New Elbows
![Page 24: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/24.jpg)
Disassembled ! ! ( May 20th, 2009 at KEK )
Cut Here
(+5 mm Line)
![Page 25: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/25.jpg)
Absorber Schedule
Absorber Body-#1 Schedule was 3 month delayed due to
pipes modification.
Absorber Body-#2 will be ordered on Jul-Aug 2009.
Absorber Body-#3 will be ordered in FY2010 in Japan.
![Page 26: Liquid H 2 Absorber Production](https://reader036.fdocuments.in/reader036/viewer/2022062410/56815b07550346895dc8b581/html5/thumbnails/26.jpg)
Summary
(1) The first absorber body was successfully fabricated and tested by MIRAPRO. The absorber arrived at KEK on Mar-18th at KEK.
(2) Absorber body assemble was finished at KEK temporally.
(3) Test cryostat preparation and DAQ programming are in progress.
(4) Absorber parts are disassembled to extend 4 pipes +10.4 mm. This solution was accepted by the MICE-TB on May-18th.
(5) We need enough space at large end flange to minimize risk of heat leaks.
(6) Absorber needs a support structure on the magnet cryostat.
(7) Schedule;Absorber Body-#1 Schedule was 3 month delayed due to
pipes modification.
Absorber Body-#2 will be ordered on Jul-Aug 2009.
Absorber Body-#3 will be ordered in FY2010 in Japan.