www.clough.com.au Liquefied Natural Gas

Transcript of Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG...

Page 1: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

www.clough.com.au

Liquefied Natural Gas

Page 2: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

At A GLANce

today we employ over 6000 talented people who embody our pursuit of excellence culture. Our focus is on execution excellence to deliver industry leading safety, quality and productivity performance, and provide superior value to our clients.

Our services span the full project life cycle and are delivered through four business divisions – engineering, capital Projects, Jetties and Near Shore Marine, and commissioning and Asset Support.

4

Business Divisions

2MarketSectors

3 Regions

Upstream, downstream, offshore, onshore, oil, gas and LNG and petrochemicals markets Iron ore, coal, precious and other minerals and metals markets

Engineering

Projects

Energy & Chemicals

Capital Projects

Mining & Minerals

WA / NT QLD PNG

Jetties & Near Shore Marine Commissioning & Asset Support

The Clough Business Model

Australian LNG Specialists

clough has serviced the LNG industry for more than 30 years. We built the first LNG load-out jetty for Australia’s North West Shelf and over the years have developed highly specialised project management, engineering, procurement, construction, commissioning and production operations skills, to service the growing demand for LNG.

today clough is one of the most experienced contractors servicing the LNG and cSG markets. Our people are present on every LNG project underway in Australia and Papua New Guinea today, including Gorgon, Ichthys, Queensland curtis, Gladstone, Arrow and the nation building PNG LNG project.

Clough is an engineering and project services contractor servicing the Energy & Chemical and Mining & Mineral markets in Australia and Papua New Guinea. Since 1919, Clough’s dedication to project execution excellence has been the foundation of the company’s success.

Page 3: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

Setting the Benchmark for Productivity

Our clients are calling for better productivity performance from their contractors. clough is responding by setting the industry benchmark for productivity – across every phase of the project life cycle.

With 94 years of construction experience, clough’s engineers know how to design to construct. constructability is built into every engineering design produced. this construction optimised design approach maximises productivity for the execution phase of a project.

We deploy metrics and systems to provide real time reporting on productivity performance, enabling early detection and intervention where productivity issues arise during the execution phase. Productivity is incentivised through project reward systems based on safety, cost and productivity targets.

clough’s independent commissioning services provide clients with a seamless transition from construction to operations, resulting in a flawless start-up of facilities and increased productivity.

And when facilities reach the critical operations phase, our production operations services help deliver safer, cleaner, more efficient operations to improve facility output, uptime and life.

Pursuit of Excellence defines the Clough culture. It is the Clough Way. Excellence is at the centre of our value system, which embodies the areas of people, productivity, customers, ethics and zero harm.

the cLOuGh WAy

Z

ERO

HA

RM

PEOPLE PROD

UC

TIV

ITY

ETHICS CUSTOM

ER

Through a focus on excellence in project

execution, cost efficiency and productivity, we will strive to deliver superior value to our shareholders and become the

industry performance leader in each sector

we operate.

We adopt the highest ethical standards in

line with our Code of Conduct.

We are a people business that

embraces diversity. The training, development and

empowerment of our people drives a high performance

culture where every individual is stretched to

achieve their ultimate potential and is accountable for

business success.

Everyone is responsible for safety. Our goal is

Zero Harm to our people, the environment and the

communities in which we work.

The Clough Way Pursuit of Excellence

We develop strong, win-win relationships with

our customers. Our focus ison delivering excellent

outcomes to achieve every project objective.

Page 4: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

Contract Value

$251 - $400 million

$401 million - $1 billion

>$1 billion

$51 - $250 million

<$50 million

Key

commissioning and Asset Support

engineering

capital Projects

Jetties and Near Shore Marine

clough Offices

* percentages are clough % share in the project

LNG PROJectS

BRISBANe

MeLBOuRNe eNGINeeRING ceNtRe

PeRth

Gorgon LNG ePcM

Bayu-undan Operations & Maintenance

BP tangguh Project

Apache Varanus Island compression Project

Wheatstone hucWheatstone Jetty

Ichthys Offshore IPMS

Ichthys Jetty and MOF

Santos (Fluor) GLNG

QGc QcLNG Woleebee creek Stage 1

Arrow energy MSABarrow Island engineering Services

50%

20%

50%

50%

50%

50%

50%

50%

50%100%

100%

100%

50%

100%

PNG LNG Project Jetty

PNG LNG Project Gas conditioning Plant ePc4

50%

35%

65%PNG LNG Project upstream Infrastructure

Wheatstone ORM

Clough is working on every LNG project under construction in Australia and Papua New Guinea today.

PORt MOReSBy

Page 5: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

The market leader in Jetties and Near Shore Marine.

Oil, Gas and Minerals Import and export Jetties / terminals

Ports and Port Development

Berthing Structures, Quay Walls and Breakwaters

Intake and Outfall Structures / Pipelines

In-house Design and construct capability

Integrated EPC and construct only services.

Process Facilities

Balance of Plant Infrastructure

Power Generation

compression Facilities and Infield Pipelines

Offshore Fabrication capability

Seamless transition from construction to operations.

Onshore and Offshore Pre-commissioning and commissioning

Reliability Modelling

Operational Readiness

Maintenance Management and execution

Shutdowns and turnarounds

Supply chain Management

Operators Maintenance Staff, competency Assurance and training (classroom and e-training)

Full suite of parent Oil and Gas, LNG, and Mining & Minerals engineering and ePc Services

Decommissioning

eNGINeeRING cAPItAL PROJectSJettIeS & NeAR ShORe MARINe

cOMMISSIONING& ASSet SuPPORt

Engineering excellence across every phase.

concept evaluation

Project Feasibility Studies

Basis of Design

Front end engineering Design

Detailed Design

Specialised Process LNG engineering Design

engineering, Procurement, construction and Project Management (ePcM)

Project Management consultant (and Services)

Process Optimisation and Debottlenecking

LNG SeRVIceS

Page 6: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

Clough designs, constructs, commissions, maintains and provides project management services to a comprehensive range of infrastructure for major LNG projects. Our services cover civil infrastructure, unconventional gas, gas processing facilities, liquefaction facilities, load-out jetties, offshore platforms, FPSOs and floating LNG facilities.

3

4

5

LNG VALUE CHAIN

Page 7: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

1

2

6

7

8

CiviL iNfrASTruCTure Roads, bridges, wharves, camps and airports provide critical access to remote LNG project sites. Clough designs and constructs fit for purpose civil infrastructure for LNG projects located in remote and challenging environments.

uNCoNveNTioNAL GAS Clough designs, constructs, commissions and maintains upstream infrastructure for Coal Seam Gas and Shale Gas projects, including gas gathering systems, processing and compression facilities and gas and water pipeline and plant.

GAS ProCeSSiNG PLANTS Since the early 1980s Clough has been delivering full turnkey services to gas processing plants, including Conceptual and Front End Engineering Design, EPC/EPCM, modularisation, fabrication, construction commissioning and production operations services.

LiquefACTioN fACiLiTieS Clough provides high value engineering, project management, commissioning, process optimisation, debottlenecking and maintenance services to liquefaction facilities.

1

2

3

4

LNG LoAdouT JeTTieS BAM Clough is the recognised market leader in jetties and near shore marine design and construction. The Group have over 30 years’ experience in the delivery of LNG approach jetties, module offloading facilities, LNG loading platforms, dolphin berthing structures, roadways, piping support structures and other critical near shore marine infrastructure.

offShore PLATforMS Clough has been providing engineering and project management services to the offshore sector for more than 30 years. Today we design, fabricate, transport, commission, and provide production operations support for offshore platforms.

fPSo Clough provides project management, engineering, procurement, fabrication, hook-up, commissioning and long term production operations support to Floating Production, Storage and Offloading (FPSO) projects.

fLoATiNG LNG Ground breaking floating LNG (FLNG) technology is the next step in the evolution of the LNG industry. Clough has developed high value engineering, project management, commissioning and production operations services to support FLNG requirements.

1

2

3

4

5

6

7

8

KeY

engineering Capital Projects Jetties and Near Shore Marine Commissioning and Asset Support

Page 8: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

GORGON LNG PROJECT ICHTHYS IPMSQCLNG ARGYLE AND BELLEVUE DESIGN

BP TANGGUH ARROW MSA

CLIENT chevron Australia INPeX Queensland Gas company (QGc) BP Berau Arrow energy

LOCATION Barrow Island, Western Australia Offshore Darwin, Northern territory Surat Basin, Queensland Bintuni Bay, West Papua, IndonesiaSurat and Bowen Basin, Queensland

CONTRACTING ENTITY

Kellogg Joint Venture Gorgon (KJVG) clough DORIS clough (self-execute) clough (self-execute) clough (self-execute)

SCOPE ePcM, as part of the KJVG, for all downstream facilities on the chevron-operated Gorgon Project – one of the world’s largest natural gas projects and the largest single resource development in Australia’s history.

Integrated Project Management Services overseeing the detailed design, procurement, fabrication, commissioning, tow to site, and offshore hook-up of the central Processing Facility and FPSO.

Detailed engineering and design for two compression stations at the Argyle and Bellevue Field, a cornerstone facility for QGc’s flagship QcLNG project.

Basis of Design for a 3rd LNG train (t3), mechanical engineering studies and supporting scope development, definition and procurement.

Master Services Agreement for conceptual studies, FeeD and detailed design work across multiple projects.

eNGINeeRING

PROJect eXPeRIeNce

Engineering excellence across every phaseFrom concept and feasibility studies through design, delivery, and long term production operations and optimisation, Clough’s engineering experts add value to every phase of the project life cycle.

Our 400 engineers and technical staff offer the full spectrum of engineering services including:

§ consulting Services encompassing conceptual and feasibility studies, business solutions, specialised plant studies, geospatial services, hSe in design and specialised LNG solutions developed over 30 years of service to the Australian LNG industry.

§ engineering Services including basis of design, Front end engineering Design (FeeD), project specification, 3D design and multidiscipline engineering.

§ engineering led Project Services including project management, detailed design, procurement and construction management.

Our engineering services are underpinned by an engineering culture focussed on continuous improvement, strong engineering systems and processes and decades of experience in designing to Australian quality standards.

Page 9: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

PROJect eXPeRIeNce

GORGON LNG PROJECT ICHTHYS IPMSQCLNG ARGYLE AND BELLEVUE DESIGN

BP TANGGUH ARROW MSA

CLIENT chevron Australia INPeX Queensland Gas company (QGc) BP Berau Arrow energy

LOCATION Barrow Island, Western Australia Offshore Darwin, Northern territory Surat Basin, Queensland Bintuni Bay, West Papua, IndonesiaSurat and Bowen Basin, Queensland

CONTRACTING ENTITY

Kellogg Joint Venture Gorgon (KJVG) clough DORIS clough (self-execute) clough (self-execute) clough (self-execute)

SCOPE ePcM, as part of the KJVG, for all downstream facilities on the chevron-operated Gorgon Project – one of the world’s largest natural gas projects and the largest single resource development in Australia’s history.

Integrated Project Management Services overseeing the detailed design, procurement, fabrication, commissioning, tow to site, and offshore hook-up of the central Processing Facility and FPSO.

Detailed engineering and design for two compression stations at the Argyle and Bellevue Field, a cornerstone facility for QGc’s flagship QcLNG project.

Basis of Design for a 3rd LNG train (t3), mechanical engineering studies and supporting scope development, definition and procurement.

Master Services Agreement for conceptual studies, FeeD and detailed design work across multiple projects.

cAPItAL PROJectS

QUEENSLAND CURTIS LIQUEFIED NATURAL GAS (QCLNG) 8 + 2 PHASE 1

GLNG K128 UPSTREAM FACILITIES

PNG LNG GAS GATHERING PLANT EPC4

PNG LNG UPSTREAM INFRASTRUCTURE

CLIENT Queensland Gas company (QGc) Santos / Fluor Australia exxonMobil exxonMobil

LOCATION Surat Basin, Queensland Surat Basin, QueenslandSouthern highlands, Papua New Guinea

Southern highlands, Papua New Guinea

CONTRACTING ENTITY transfield Services clough JV clough Downer JV cBI clough JV clough curtain JV

SCOPE early site civil works and front end planning for the construction phase of compression facilities.

construction of 400 kilometres of gas and water transmission pipelines, two compression facilities, six water storage dams, an 800-person camp and expansion of existing compression facilities.

engineering, procurement and construction work for the gas conditioning plant, nearby wellheads and associated piping and infrastructure.

construction of critical upstream infrastructure across 12 geographically dispersed sites in PNG. Scope included roads, bridges, wharves, laydown and camp areas, gas pipelines and wellpads.

PROJect eXPeRIeNce

Integrated EPC and construct only servicesOur capital Projects business delivers a fully integrated engineering, Procurement and construction (ePc) service, or any part thereof, including Design and construct and construct-only solutions, to effectively deliver on client safety, quality, cost and schedule objectives.

this service is underpinned by nine decades of project management experience and leading edge project management systems.

through our Sattahip Fabrication yard in thailand, clough also provides high quality, low cost fabrication of highly engineered modularised structures for energy and resources projects.

We are committed to the concept of Zero Harm to our people, the environment and the communities in which we work.

Page 10: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

JettIeS & NeAR ShORe MARINe

WHEATSTONE JETTYICHTHYS LNG PRODUCT LOADING JETTY

ICHTHYS MODULE OFFLOADING FACILITY

PNG LNG JETTY PLUTO LNG JETTY

CLIENT BechtelJGc corporation, KBR and chiyoda corporation Joint Venture (JKc JV)

JGc corporation, KBR and chiyoda corporation Joint Venture (JKc JV)

chiyoda JGc Joint Venture Woodside energy Limited

LOCATION Onslow, Western Australia Darwin, Northern territory Darwin, Northern territory Gulf of Papua, Papua New Guinea Karratha, Western Australia

CONTRACTING ENTITY BAM clough BAM clough BAM clough BAM clough BAM clough

SCOPE Design and construction of a 1.2 kilometre jetty with operations and product loading platforms, a single LNG and condensate load-out berth, and associated piping modules and piping installation.

Design and construction of two separate vessel load-out berths, one for LNG carriers and a second for LPG / condensate carriers.

Design and construction of the Ichthys LNG Project Module Offloading Facility (MOF), a key facility for offloading modules supplied under other subcontracts to assemble the LNG liquefaction plant.

Design and construction of a 2.4 kilometre trestle with substation platform, loading platform and single berth. Scope included fabrication and construction of the topsides at clough’s Sattahip Fabrication yard.

Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

PROJect eXPeRIeNce

The market leader in Jetties and Near Shore MarineWith a reputation for design and construction excellence, BAM Clough is the market leader in jetty and near shore marine project delivery in Australia and Papua New Guinea.

Since 1964 BAM clough have been combining worldwide resources with local project delivery expertise to deliver jetty and near shore marine projects for some of the world’s largest energy and resource clients.

With a worldwide talent pool of over 30,000 people, state of the art design and construction methods and technologically advanced equipment, BAM clough present a low risk, high quality option for near shore marine challenges, ensuring every project is delivered safely, on time, within budget, and to the highest quality standards.

BAM clough leverages the worldwide resources of each partner to design and construct near shore marine facilities for major resource projects. Resources include Pt BAM Decorient in Indonesia for large-scale precast concrete fabrication, clough’s Sattahip Fabrication yard in thailand for structural steel and module fabrication, BAM’s Delta Marine consultants in the Netherlands for marine design and clough’s engineering team in Australia for civil and structural design.

Page 11: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

cOMMISSIONING & ASSet SuPPORt

WHEATSTONE JETTYICHTHYS LNG PRODUCT LOADING JETTY

ICHTHYS MODULE OFFLOADING FACILITY

PNG LNG JETTY PLUTO LNG JETTY

CLIENT BechtelJGc corporation, KBR and chiyoda corporation Joint Venture (JKc JV)

JGc corporation, KBR and chiyoda corporation Joint Venture (JKc JV)

chiyoda JGc Joint Venture Woodside energy Limited

LOCATION Onslow, Western Australia Darwin, Northern territory Darwin, Northern territory Gulf of Papua, Papua New Guinea Karratha, Western Australia

CONTRACTING ENTITY BAM clough BAM clough BAM clough BAM clough BAM clough

SCOPE Design and construction of a 1.2 kilometre jetty with operations and product loading platforms, a single LNG and condensate load-out berth, and associated piping modules and piping installation.

Design and construction of two separate vessel load-out berths, one for LNG carriers and a second for LPG / condensate carriers.

Design and construction of the Ichthys LNG Project Module Offloading Facility (MOF), a key facility for offloading modules supplied under other subcontracts to assemble the LNG liquefaction plant.

Design and construction of a 2.4 kilometre trestle with substation platform, loading platform and single berth. Scope included fabrication and construction of the topsides at clough’s Sattahip Fabrication yard.

Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

WHEATSTONE ORMWHEATSTONE HOOK-UP AND COMMISSIONING

BAYU-UNDAN OPERATIONS AND MAINTENANCE

APLNG UPSTREAM COMMISSIONING

GLADSTONE LNG COMMISSIONING MANAGEMENT SERVICES

CLIENT chevron Australia chevron Australia conocoPhillips Australia Pty Ltd Origin Santos

LOCATION Onslow, Western Australia Onslow, Western Australia timor SeaSurat and Bowen Basins, Queensland

Surat Basin, Queensland

CONTRACTING ENTITY clough AMec clough clough AMec e2o e2o

SCOPE Building the maintenance database, assuring operational readiness for the offshore facilities, development of operations procedures and training and development programs, and engineering and support services.

Provision of an independent commissioning team to assist the client with pre-commissioning, commissioning of integrated float over deck systems, offshore hook-up, and start-up assistance.

Operations and maintenance services for conocoPhillips Bayu-undan facilities consisting of a floating storage, offloading facility and three fixed platforms.

commissioning, structural design and implementation of the completions / commissioning management software (ccMS).

commissioning management services for the upstream field development, and commissioning of the pipeline for the upstream project.

PROJect eXPeRIeNce

Seamless transition from construction to operations Clough’s commissioning and production operations services help major energy and resource clients seamlessly transition from construction to operations.

In January 2013 clough acquired e2o, combining the strengths of two of Australia’s leading commissioning contractors. today clough and e2o offer independent commissioning services that provide a complete technical solution for onshore and offshore pre-commissioning, hook-up, commissioning, completions and hazardous area inspection requirements. this includes all aspects of commissioning from mechanical completion through to commissioning and final test runs.

the clough AMec joint venture delivers production operations solutions for the operation, maintenance and upgrade of energy infrastructure across the Australasian oil and gas industry.

By leveraging the capabilities and capacity of parent companies clough and AMec, the Group offer a full suite of engineering, ePc and specialist LNG capabilities. Services include operations readiness and support, maintenance management and engineering support, shutdown and turnarounds, work packing, logistics support, multidiscipline engineering and decommissioning.

Page 12: Liquefied Natural Gas - · PDF filePNG LNG Project Gas conditioning Plant ePc4 50% 35% PNG LNG Project 65% upstream Infrastructure Wheatstone ORM Clough is working on every LNG project

www.clough.com.au

58 Mounts Bay Road Perth, Western Australia 6000

T +61 8 9281 9281F +61 8 9281 9943E [email protected]

Level 6, 301 Coronation Drive Milton, Queensland 4064

T +61 7 3858 7000F +61 7 3858 7050E [email protected]

PERTH OFFICE BRISBANE OFFICE