LIPAc status reportEPICS Integration and Commissioning

+ RFQ LCS status at INFN/LNL

Alvaro MarquetaLIPAc Project Team

on behalf of the LIPAc Control Systems family

36 m

EPICS Fall Meeting 2014, Saclay

Page 2: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta EPICS Fall Meeting 2014, Saclay 2

Introduction to IFMIF/LIPAc

LIPAc -> Linear IFMIF Particle Accelerator

IFMIF -> International Fusion Materials Irradiation Facility

(the fusion relevant neutron source)

Page 3: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 3EPICS Fall Meeting 2014, Saclay

The first wall of the reactor vessel shallabsorb neutrons energy

andbreed tritium

ITER first wall will present <2 dpa at the end of its operational life

In a Fusion power plant~150 dpa within 5 years are expected

Existing neutron sources do not provide the needed answers

Neutrons in first wall

Section of Vacuum Vessel of a Tokamak

Page 4: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 4EPICS Fall Meeting 2014, Saclay

Deuterons at 40 MeV collide on a liquid Li screen

flowing at 15 m/s

IFMIF concept

A flux of 1018 n·m-2s-1 is stripped

with a broad peak at 14 MeV

EVEDA Phase: LIPAc

Page 5: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 5EPICS Fall Meeting 2014, Saclay

Injector + LEBTCEA Saclay

RFQINFN

JAEA Tokai MEBTCIEMAT Madrid

SRF LinacCEA Saclay

CIEMAT MadridHEBT

CIEMAT Madrid BDCIEMAT Madrid

DiagnosticsCEA Saclay

CIEMAT MadridRF Power

CIEMAT MadridCEA Saclay

SCK Mol

36 m

★ Rokkasho

Installed and commissioned in Rokkasho

EVEDA phase: LIPAc

Accelerator facility validation

Page 6: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 6EPICS Fall Meeting 2014, Saclay

IFMIF/LIPAc Main Actors

IFMIF/EVEDAA fruitful Japanese- European International collaboration

(under the Broader Approach Agreement)

LIPAc contributions:

Japanese implementing agency

European implementing agency

(European coordinator)Central systems: - Network infrastructure- Central control system- Machine Protection system- Personnel Protection system- Timing system

Local control systems: - Injector + LEBT- RFQ- LLRF- MEBT - + (…)Beam Instrumentation

Page 7: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 7EPICS Fall Meeting 2014, Saclay

Local Control Systems

Injector + LEBTCEA Saclay

RFQINFN

JAEA Tokai MEBTCIEMAT Madrid

SRF LinacCEA Saclay

CIEMAT MadridHEBT

CIEMAT Madrid BDCIEMAT Madrid

DiagnosticsCEA Saclay

CIEMAT MadridRF Power

CIEMAT MadridCEA Saclay

Overview of LIPAc Control Systems

Central Control System

Inje

ctor

RFQ

MEB

T

SRF

LIN

AC

HEB

T

RF P

ower

LLRF

Beam

Inst

rum

enta

tion

MPS PPS

Timing System

EPIC

S En

viro

nmen

tH

ardw

ired

Envi

ronm

ent

LAN

Page 8: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 8EPICS Fall Meeting 2014, Saclay

LIPAc Control System: Main characteristics

• Modular design, following the architecture of the whole LIPAc, based on procurement ‘in-kind’: ₋ independent subsystems with common interface.

• Based on EPICS and CSS for software applications (OPI, archiving, alarms…)₋ common standardized EPICS platform

• Around 20.000 process variables managed globally₋ considered medium size facility

• MPS fastest response (beam shutdown, hardwired loop) of around 20us₋ But also has to manage slower PLC signals

Overview of LIPAc Control Systems

Page 9: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 9EPICS Fall Meeting 2014, Saclay

Local Control SystemsStandard LCS architecture (standalone configuration)- European contribution, coordinated by CEA- EPICS standardization though guidelines, common EPICS/CSS platform- Delivered in local configuration to Rokkasho (to undergo acceptance tests before integration)

EPICSApps

OPCServer

PLCVME

Field equipment(fast process)

Field equipment(slow process)

Profibus DP I/O signals

S7 Protocol

Channel Access Protocol

Modbus TCP I/O signals

Page 10: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta EPICS Fall Meeting 2014, Saclay 10

LIPAc Schedule2015 20162014

LIPAc Phase #1

Injector checkout

Beam commissioning

LIPAc Phase #2

RFQ Installation

Phase #2 commissioning

MEBT & D-plate Installation

LIPAc Phase #3HEBT & Bdump Installation

Phase #3 commissioning

SRF Linac Installation

LIPAc Phase #4

Page 11: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 11EPICS Fall Meeting 2014, Saclay

LIPAc Central Control System (Phase I):

Overview of LIPAc Control Systems

Courtesy of:

Page 12: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta EPICS Fall Meeting 2014, Saclay 12

Central Control System OutlineCCS will consist of a number of services…

CCSLocal + Global OPIs, with key parameters from each LCS, global permits, etc.

Centralized alarm manager, thus integration of all alarms from LCSs + actions

Centralized archiving system, logging all EPICS variables (inc. MPS/PPS)

Operator applications environment, still to be decided… + SVN manager

Server for SNL execution+ management of Operation States

Page 13: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 13EPICS Fall Meeting 2014, Saclay

EPICS integration: topIFMIF tree

Application tree (Db, Gui, etc…)

IOC tree

All GUIs

All database files (Db)Configuration files of topIFMIF

Page 14: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 14EPICS Fall Meeting 2014, Saclay

Local Control Systems

LCS Integration Process

EPICSApps

OPCServer

PLCVME

Field equipment(fast process)

Field equipment(slow process)

Profibus DP I/O signals

S7 Protocol

Channel Access Protocol

Modbus TCP I/O signals

switch

CCSEPICS Servers

Page 15: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 15EPICS Fall Meeting 2014, Saclay

RFQ LCS Architecture

Page 16: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 16EPICS Fall Meeting 2014, Saclay

Service: provisioning system

Page 17: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 17EPICS Fall Meeting 2014, Saclay

EPICS GUIs

Page 18: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 18EPICS Fall Meeting 2014, Saclay

Service: Surveillance

Page 19: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta 19EPICS Fall Meeting 2014, Saclay

Service: Monitoring

Possibility to check EPICS Variables

Detailed Information

Special thanks to Mauro Giacchini and his team…

Page 20: LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

A. Marqueta EPICS Fall Meeting 2014, Saclay 20

Thank you

Thank you for your attention

www.ifmif.orgFollow us at wikipedia!