Overviewand Case StudyOverviewand Case StudyAline YoungSVP, Quality and Productivity
Linking Lean, Six Sigma and Finance
December 1-3, 2004
Confidential and Proprietary
View To ScopeView To Scope
5000+ Banking Centers Growing Hundreds More
16,000 ATM’s 2 Million+ Small Business Customers Process Over 11 Billion Checks Per Year Served 106 Million Phone Customers Processed 3.4 Million Customer E-mails Automated Telephone System Handled 482 Million Calls. Shifted from Acquisition Strategy to Organic Growth
Confidential and Proprietary
Baseline Assessment
Goal Alignment &High Performance Teams
Process for Customer Focus
Improved Alignment & Focus
Assessment to International Standards
Financial Linkage
The Foundation
6 Variation Reduction
Start
Y2
Y3
Hoshin Planning
Lean Training
Process Excellence
Business Excellence
Communities of Practice
ABM
Lean2
Operational Excellence
Y5
Y4
Breakthrough Mngmt.Y7Best In IndustryIntegration & Acceleration
Y6
Continuous Improvement MaturityContinuous Improvement Maturity
Driving to Higher Standards within Our Products & Processes
Organizational Awareness
We are here.
Confidential and Proprietary
ApproachApproach
Confidential and Proprietary
Burning Platform
SalesFulfillm
ent
Service
Projects
Core Processes
Product 1
Product 2LOB’s
Customer Customer
How to Link the Product to the Value Chain and Financial Impact
Confidential and Proprietary
The Solution The Solution
Operationalizing Process Excellence
DMCActivity-Based
Analysis:LeanOperational
Analysis:Project(s)Execution
MBF's
3 monthsLOB
MBF's
Baselining Standardizing Predictive Impacts $ & Metrics Project Execution
HOSHIN
Lean2
3 months3 months
Closed loop execution methodology.
Confidential and Proprietary
Overview of Lean2Overview of Lean2
Pre-Define Define Measure Analyze Improve Control
Q&P Support LOB Execution
“As-Is” ProcessTotal Opportunity
“To Be” ProcessPlanned Impact
Resourced InitiativesImplementation Plans & Controls
Ev
en
t P
lan
nin
g /
P
rio
riti
zati
on
LO
B E
xe
cu
tiv
e
Re
vie
w
To
llgat
e
To
llgat
e
To
llgat
e
To
llgat
e
To
llgat
e
To
llgat
e
Planning Factors to Consider
•TurboLean National Rollout- develop LOB experts for
replication
•Significant Re-organizations may postpone Lean event
•Technology Alternative --Tech solution better (funding
allocated, <6 months away)
•LOB’s ability to support Lean event
Planning Factors to Consider
•TurboLean National Rollout- develop LOB experts for
replication
•Significant Re-organizations may postpone Lean event
•Technology Alternative --Tech solution better (funding
allocated, <6 months away)
•LOB’s ability to support Lean event
LOB Executive Review• Lean initiatives• Business model fit• Business plan• Business case• Other approaches
LOB Executive Review• Lean initiatives• Business model fit• Business plan• Business case• Other approaches
Confidential and Proprietary
Critical Business CTQ Gap Closed Financially Linked Business Case.
Projects prioritized, benefits calculated,
launched and tracked!
Projects prioritized, benefits calculated,
launched and tracked!
Final 2-weeks:• Measure & Control completed in team conf. calls• Deck finalized, certification tollgate scheduled• Projects launched.
Final 2-weeks:• Measure & Control completed in team conf. calls• Deck finalized, certification tollgate scheduled• Projects launched.
Process Costing• 6-Sigma projects spawned• Implementation plan completed• Root cause feedback loop determined.•Business Case Linked to Roll-Out
Process Costing• 6-Sigma projects spawned• Implementation plan completed• Root cause feedback loop determined.•Business Case Linked to Roll-Out
Sixth week: 3-day offsite
Measure, AnalyzeCompleted.
Tollgate deck done.
Sixth week: 3-day offsite
Measure, AnalyzeCompleted.
Tollgate deck done.
Then . . .Two weeks
Team meetings & Prep for the “Blitz”
Then . . .Two weeks
Team meetings & Prep for the “Blitz”
Third week: 2-day offsite
for DefineFirst tollgate deck
Third week: 2-day offsite
for DefineFirst tollgate deck
First two weeks (14 days):
Team Pre-work
First two weeks (14 days):
Team Pre-work
It revs up . . .
The Methodology FlowThe Methodology Flow
Productivity Realized Sooner
Confidential and Proprietary
DeploymentDeployment
Confidential and Proprietary
Define a SMART project to address the business gap identified by your champion
Map the activity of the product to identify ideas for improving flow and eliminating waste
Complete detailed analyses on select opportunities to develop an improved future state
Finalize and pilot solutions; analyze results and improve; plan for deployment
Implement improvements (within project scope) and validate results.• Project Charter
• Project Metrics• Customer Value (VOC)• Obstacles/Enablers• Stakeholder Analysis• Communication Plan• Voice of Associate• E2E Process Map• Project Timeline • Project FMEA• Project Skills Matrix• NIKU Number
• Product/Process Families• Monument Assessment• Demand Profile/Takt• Organizational
Alignment• Detailed E2E Process
Map• Time Value Map • MUDA Costing• Spaghetti/Inventory Map• RTY Analysis • Financial Assessment • List of Current Potential
Improvements• Project Prioritization
Matrix
• Activity of the Associate• Activity of the
Equipment• 5S Analysis• ICE• Risk Assessment (e.g.
FMEA)• Refined Project
Prioritization Matrix• Future State Map • WIIFM Validation• Operational Efficiency
Model• Business Case (COPPO)• Design Approval Process
• Metrics Defined• 5S Implementation• Visual Management• Standard Work• Material Strategy • Demand Profile/Takt • Staffing Requirements• Updated Risk Assmnt• E2E Value Stream Map• Pilot (as required)• Final Cost/Benefit
Analysis • Deployment Plan• Multi Gen Plan (MGP)
• Visual Displays/Controls• Error-proofing• Risk Control Plan• Kaizen Strategy• New Process
Implemented (per project scope)
• Results Documented• Validated Financial
Impact• Process Certification
Timeline linked to MGP• Lessons Learned• Replication Plan
DEFINE MEASURE ANALYZE IMPROVE CONTROL
Launch Project
Focus on Critical Opportunities
Pilot Process Changes
Deploy Improvements
Validate Benefits
ID Business Need
Executible RoadmapExecutible Roadmap
Confidential and Proprietary
Example: Tools and TemplatesExample: Tools and Templates
Phases ActivitiesPre-Work
Present Overview Presentation on Lean Assessment Template
6 Distinguishing elements of Lean2: 1) Focus on Associate & Customer needs through WIIFM 2) Links to financial impacts 3) Operating efficiency linked to metrics 4) Root cause feedback
Explain Lean steps; certification requirements if Lean Leaders will be certified.
Explain the tools: Closed loop productivity link to Hoshin & Turbo Lean Schedule
Do Skills Assessment on team. WARNING: Team members should all be Lean-trained, and it's especially nice if they are green belt trained.
Do Stakeholder Analysis. Draft Huddle document & MGP Enterprise
Collect Organization Chart & Facility Layout
Team contact list, Sample Workplan
Distribute and discuss six interview questions for fishbone (VOA)
Logistics of on-site visit discussed and determined.
Rework is in: Huddle document reviewed and ready; skills assessment, org/facilities/contact list in.
How and when to Link the Tools is Critical To Quality
Confidential and Proprietary
“Attain profitable growth through innovative products backed by unparalleled service”Strategy:
Value Chain:
Core Process
BuildProduct
Marketing/Sales
Product Researchand Development
Distribution CustomerService
Repair andOverhaul
• Customer focus• Speed
CoreCompetencies:
• Leading edge products
• Cost effectivemanufacturing
• International focus• Market knowledge
• Flexibility• Low cost
• Effective services• Innovation
CriticalSuccessFactors:
• Application of leading edge technology
• Focus on product niches• Understanding of global
product requirements
• Effective factorycapacity
• Customer perceived product innovation
• Entry into global marketing
• Responsiveness to complaints
• Quality of problem support
• Effective use of space and locations
• Low cost effective repair
• Operations Integration
MeasurementCategories:
• Developmental efficiency
• Innovation
• Capacity• Cost effectiveness
• Efficiency of shipping and warehousing
• Advertising effectiveness
• Market penetration• Sales force coverage
• Response time• Quality
• Quality• Cost • Flexibility
PossibleMeasures:
• Market share• Product contribution• Promotion spending
• Cost of and % of unused capacity
• Process Costs (set-up, planning, moving material)
• Development lead time• Development cost• Beta test dates• Availability dates• No. of New products• Customer satisfaction
• Cost per type of shipment• Inventory turns• # of incorrect shipments
• Turnaround time• Cost• Number of defects
• % of customer calls handled in 24 hours
• Time to resolve problems• Customer value added• Warranty cost• No. of maintenance calls
Identifies $ Predictive Impact By Process Step
Example: Activity Based Process Costing
Confidential and Proprietary
Customer Weight 2 2 2 2 2 2 2 2 2 2
Business Weight 1 1 1 1 1 1 1 1 1 5
Rating Factors
Cost of Project
DurationHuman
Resources Required
Impact to % Unresolved
Impact to C Sat
Competitive Position
Community
Sort Number Project Name
Revenue Enhanceme
ntSavings
Cost Avoidance
3 Project C 3 1 1 1 1 1 1 1 1 1
6 Project D 3 1 1 1 1 1 1 1 1 15 Project A 3 1 1 5 1 1 1 1 1 54 Project B 5 1 1 1 1 1 1 1 1 12 Project E 1 1 1 4 1 1 1 1 1 11 Project F 1 1 1 1 1 1 1 1 1 17
Cost to Serve/Cost Per Problem
Project Prioritization Matrix
Initiatives Prioritized by Risk/RewardInitiatives Prioritized by Risk/Reward
Initiatives are prioritized according to Impact on LOB MBF’s and Objectives.
Confidential and Proprietary
Predictive Impact ModelingPredictive Impact Modeling
Begininning Inventory (B) 10396
Inventory or Backlog (I) 10368
Average Daily Progress Against Backlog 1 (RR) 1058
Number of Days in Period (D) 19
(V) in Avg Daily Volume 1056
10386Event Volume (EV) 0 0.98
10178
51.67%
Skill Level A Skill Level B Skill Level C
FTE 125 0 0 125
CP = Capability 8.46 12 2 8.46
Complexity Level Easy Medium Hard
Complexity Mix 1 0 0
Per day 1058 0 0 1058
"What If Scenario"
Scenario Analysis
Linked To Metrics
Confidential and Proprietary
ResultsResults
Confidential and Proprietary
Closed-Loop ProductivityClosed-Loop Productivity
Reduce $ COPQ ($XMM)
# of New Incidence 2
2
OperatingEfficiency
Reduce Unresolved Problem Incidence Rate by X%
Level 3 Performance Measures
Level 2 Detailed Measures
= New Measures
Initiative’sLevel 1Business Outcomes
HoshinBusiness
Objectives
Aged Cases
Productivity Per FTE
# of Research Cases
Number of Stepsfor a Given Activity
DecreaseCost
1.2.2 ProblemResolution
1.2.3 Lean E2E Completion Time
Total $ COPQ
Total $ Cost Per FTE
Total $ Cost Per Problem
Cycle Timeto Complete Activity
# of Times ActivityRequired a Handoff
Takt Time
# of Cases Resolved Per Day
# of Cases Processed Per FTE Per Day
Current “As Is” Metrics
Gap “To Be” Metrics$ Losses Per FTE
1
3
4
5
79
10
7
11
6
12
Confidential and Proprietary
Business Case Proof of ConceptBusiness Case Proof of Concept
As is Process Steps As is Costs To Be Process Steps To Be CostsTo be Savings Opportunity
Intiative Groups
Open Mail Open Mail $0.00 1,2,5,10
Sort Mail Sort Mail $0.00 1,2,5,10
Transport Transport $0.00 1,2,5,10,11
Data Entry Data Entry $0.00 1,2,5,10,11,12
Assign Cases $0.00 2,3,5,10
Print Trip Tickets $0.00 2,3,5,10
Sort Work $0.00 2,3,5,10
Transport $0.00 2,3,5,10
Prioritize Prioritize $0.00 2,5,10
Research Research $0.00 1,2,3,4,5,10
Create Documentation Create Documentation $0.00 2,4,5,7,10
Update Case Update Case $0.00 2,5,6,10
Batch $0.00 2,5,7,10
Close Case Close Case $0.00 2,5,7,10
Sort $0.00 2,5,6,10,11
Recon output $0.00Management Information
Management Information
$0.00 2,5
Root Cause / FeedbackRoot Cause / Feedback
$0.00
Total Opportunity $0.00
$ Predictive Impacts
Of “To Be” Linked to
Initiatives.
Confidential and Proprietary
Linkage of Lean, Six Sigma and FinanceLinkage of Lean, Six Sigma and Finance
Operationalizing Business Excellence
DMCActivity-Based
Analysis:Lean
Operational Analysis:
Project(s)Execution
MBF's
3 monthsLOB
MBF's
Baselining Standardizing Predictive Impacts $ & Metrics Project Execution
HOSHIN
Lean2
3 months3 months
Repeatable as a methodology, drives standardized Processes, prioritizes at all levels, modeling and VISIBLE Financial Benefits!
Confidential and Proprietary
How to Embed DNAHow to Embed DNA
Confidential and Proprietary
Team Structure
Purpose: LOB/ Process team associates assigned to Lean2 event for data collection,
tool usage, solution design. Allocated for percent of time to the event.
Basic Functions: Process Owner Change Manager Finance Technical Lead
• Basic Skills: Lean operational analysis Target area design Target area implementation Owns Launch area refinement Project result tracking
Confidential and Proprietary
Process governed by toll gate reviews (face-to-face meetings on site or via conference call with web meeting)
Business leaders and tool experts to participate in reviews Executive review after Analyze commits resources and timetable for
projects Flow review at Improve for proofing and funding decision
“Pain point” generated activities priority for planning LOB pull for an event. Event Driven by Management issue
“Well Visit Check-up” activities driven by Annual assessment scheduled between Hoshin and Goals setting. Actions triggered by Assessor scorecard monitoring
Event Management System
Confidential and Proprietary
Training structured and experiential: Classroom OJT training prior to and during the event at the site
Maturity through experiential path: A Candidate progresses through certification and leadership by
participating in an experiential “New Flight” program. As “Shadow-Apprentice”, a representative from another LOB, joins
the candidates who are helping lead a Lean2 event in their business, and “shadows” them.
As a “Co-Pilot”, the LOB member assists the Lean Expert or Leader in conducting the event.
As a “Pilot” the LOB member now leads the event “solo” as a certified Lean Leader.
Communities of Practice: Cross-sharing and leveraging value streams
Training and Certification - Example
Confidential and Proprietary
Lessons LearnedLessons Learned
Confidential and Proprietary
Lessons Learned: People & DeliverablesLessons Learned: People & Deliverables
People:
Process Owner is an active team member (driving all work products).
• Two Lean Facilitators
Training at the event allows for optimal learning.
• Involve Lean candidates in activities to drive results
Finance partner on extended team from Day 1
Deliverables:Review on Day 1 of each site visit.
•Assumptions about what materials to use and how they link must be challenged for each audience, ex. Takt, WIIFM.
Pre-plan and Pre-schedule all interviews and associate activity monitoring
Confidential and Proprietary
. Communication: Hold tollgates with Executives Onsite
Lessons Learned:Communication & ToolsLessons Learned:Communication & Tools
Tools:•Plan logistics well.
Use the WIIFM-WIIFT. It’s a very good VOA tool.
•Provide a clear understanding of each tool, its use and how the tools
interrelate both intra- and inter-phase.
Walk the process (visit the business site). Especially for AOA, AOP, & AOE.
•Keep the agenda flexible, and use check off boxes as requirements are
accomplished.
Confidential and Proprietary
Case StudyCase Study
Confidential and Proprietary
Case Study LOBCase Study LOB
Business Case: The functions are predominately manual in nature and account for a combined FTE of 190. These FTE process approximately 729,174 customer requests per month using different processes. These requests are currently organized into 166 functions. In addition, it is estimated that the combination of dissimilar processes and reporting between the three sites has created Non-Value Added activities and waste within the processes.
Lean Objectives:Decrease End to End Completion Time Reduction in Operating CostSustained Process Quality
Timeline:DM: 1 monthAI: 1 month Pilot: 1 month Implement/C: 1 month
Gross Benefits:
Total 40% of Opportunity
Net Benefits:
Total 20% of Opportunity
4 Months Total
Confidential and Proprietary
Voice Of Associate - WIIFMVoice Of Associate - WIIFM
Efficient Resolution of Customer Inquiries
Card Holder Education (+)
Duplicate Requests (-)
Incomplete Customer Info (-)
Good Work Distribution (+)
Sharing Printers (-)
More Automation (+)
Onsite Storage (+)
Culture Improving (+)Flex Time (+)
Manual Filing (-)
SLA (-)
Volume Reporting (-)
Teamwork (+)
Communication (+)
External Partners (-)
Rumor Mill (-)System Stability (-) Tracking Pending (-)
Standards To High (-)
Policy & Procedure MethodsMother Nature
Technology People Measurements
What are the Pain Points?
Confidential and Proprietary
0%
46%53%
0%
1%
Store Trans Inspect NV Process VA Process
Time Value MapTime Value Map
Muda Costing Template utilized to link in the Financials.
Confidential and Proprietary
High Level Process Map/ScopeHigh Level Process Map/ScopePhoenix Correspondence
Support Functions
Associate
2 Review MIS
9 DocumentAction
1 AccessSystem
10 GenerateResponse
4 Sort WorkIs Prioritization
Necessary7 ProcessRequest
12 TransportWork
11 Prepare toMail
5 PrioritizeWork
6 AnalyzeWork
3 ReceiveWork
Business ValueAdd
Value Add
Non Value Add
InformationSystems
Product Flow
Metric Alignment
Mgmt Interaction
13 Wrap UpEnd of Day
14 InspectOutput
8 AuthorizeTransaction
ManageInformation
MonitorEquipment
CoachAssociates
105655 70207 41332 18375 16943 13290 9510 4536
37.8 25.1 14.8 6.6 6.1 4.7 3.4 1.6
37.8 62.8 77.6 84.2 90.2 95.0 98.4 100.0
0
100000
200000
0
20
40
60
80
100
Defect
CountPercentCum %
Perc
ent
Cou
nt
Pareto Chart for CategoryDemand Profile
Mail Sort 37.8%
Acct Maint - Simple 25.1%
Acct Maint - Complex 14.8%
Monetary Adj 6.6%
Letters 6.1%
Prod Change/Consol 4.7%
Rewards Prod 3.4%
Information Req 1.6%
17 Steps 4 VA
Confidential and Proprietary
Process/Product FamiliesProcess/Product Families
Centers process similar work through different processes
Site I
3 Primary Teams
9 sub groupings
Grouped by Request Type
28 Total Functions Performed
Site II
4 Primary Teams
9 sub groupings
Grouped by Request Type
72 Total Functions Performed
Site III
4 Primary Teams
11 sub groupings
Grouped by Request Difficulty and Flow
66 Total Functions Performed
Pilot To Be Product / Process Alignment
Functions Grouped in 3 categories: Primary (80 Functions), Exceptions (28 Functions), Specialty (57 Functions)
2 types of teams: Primary/Exceptions Teams, and Specialty Teams
Designed to reduce processing time, counting, sorting, and transportation.
AS-ISAS-IS
TO-BETO-BE
Confidential and Proprietary
Phoenix Correspondence
Su
pp
ort
Fu
nct
ion
sA
sso
cia
te
2 Review MIS
9 DocumentAction
1 AccessSystem
10 GenerateResponse
4 Sort WorkIs Prioritization
Necessary7 ProcessRequest
12 TransportWork
11 Prepare toMail
5 PrioritizeWork
6 AnalyzeWork
3 ReceiveWork
13 Wrap UpEnd of Day
14 InspectOutput
8 AuthorizeTransaction
ManageInformation
MonitorEquipment
CoachAssociates
Site I As-IsE2E Map
Site II As-IsE2E Map
Site III As-IsE2E MapNorfolk Correspondence
Su
ppo
rtF
un
ctio
ns
Ass
oci
ate
9 Store Work
6 ProcessWork
10 PrintDocuments
5 Sort Work
11 DocumentMIS
Back Up Editor
8 Batch Work
DatabaseManagement
4 AnalyzeWork
2 Review MIS1 Log On to
System
12 Log offSystem
Assign Work
7 Read Email /Scoop
3 ReceiveWork
CoachAssociates
QualityAssurance
ImplementProjects
Christiana Correspondence
Su
ppo
rt F
unct
ion
sA
ssoc
iate
2 TransportWork
1 Log OnSystem
4 ProcessRequest
7 Update MIS5 Sort / Store
Work6 Validate
Work3 Analyze
Work8 Log OffSystem
ManageInformation
MonitorEquipment
CoachAssociates
Pilot To Be E2E Map
Improvement Impacts Transportation is reduced by over 80% per day Counting and Sorting will be reduced to one time per day from an average of 4 times per day Grouping of functions based on difficulty allows for processing with a maximum of 2 handoffs. E2E completion time is projected to reach 1 day with all possible functions.
As Is and To Be E2E Process MapAs Is and To Be E2E Process Map
Confidential and Proprietary
Spaghetti Chart As Is and To BeSpaghetti Chart As Is and To Be
Site To Be 91 miles per yr.
Site As-Is 624 miles per yr.
Confidential and Proprietary
5S Strategy
Kanban/Bus Route work delivery plan
Work mix change from functional to skill-based
Elimination of up-front counting and sorting
Alignment of function names across all sites
Automated MIS tracking
Implementation of ImprovementsImplementation of Improvements
Primary/Completed
Exception/Completed
SpecialtyReroutes
Confidential and Proprietary
2010Subgroup 0
6
5
4
3
2
1
0
Indiv
idual
Val
ue
1
Mean=1.538
UCL=2.868
LCL=0.2087
Standard Practice LEAN Practice
2
1
0
Mov
ing R
ange
1
R=0.5
UCL=1.634
LCL=0
Standard Practice LEAN Practice
I and MR Chart for Days to Reso by Time Period
Pilot Results ImmediatePilot Results Immediate
Confidential and Proprietary
Baseline Data: Average 5.8 Days to resolve “end-to-end completion time”
Improvement results:
•Productivity increased from 25 pieces /hr to 28 pieces /hr
•Call center savings in reduced follow up calls (7% of daily volume = approx 890 calls/day)
•Reduced the average days to resolve (ADR) from 5.8 to 1.5 (74% reduction)
Baseline Data: Average 5.8 Days to resolve “end-to-end completion time”
Improvement results:
•Productivity increased from 25 pieces /hr to 28 pieces /hr
•Call center savings in reduced follow up calls (7% of daily volume = approx 890 calls/day)
•Reduced the average days to resolve (ADR) from 5.8 to 1.5 (74% reduction)
Productivity
0.0
2.0
4.0
6.0
8.0
Pre-Lean 5.8
Post Lean 1.50
Days to Resolve
Summary of Improvements -Example Summary of Improvements -Example
Confidential and Proprietary
Attendance/Meeting Name
Exec Business Review (Exec, UL, TL)
Exec Business Review Practice (UL's, TL's)
Dashboard Meeting (UL's, TL's, Sups) Town Hall Sessions
Coaching Sessions Floor Meeting Team Meetings
Frequency: Formal Meeting Quarterly Quarterly Monthly Quarterly Monthly Monthly Monthly
Frequency: Informal Meeting Quarterly
2 weeks prior to Exec BR N/A 2 days prior
Frequency may increased based on need
Frequency may increased based on need N/A
Meeting Method Video Conf Video Conf Video Conf Conference RoomsManager Office Work area
Conference Room
Review consists of: 1, 1,2,4,5 1,2,4,5 2 4,5 3 1,2,3,5Follow-up (Yes/No) Y Y N N Y N NPrior Meeting Review Y Y N Y N N N
Meeting Ownership
Rotate between site leaders
Rotate between site leaders
Site Team Leaders Site Unit Leaders
Team Leaders and Supervisors
Vary depending on message
Site Team Leaders
Documentation
Change Management Review ProcessChange Management Review Process
Confidential and Proprietary
3. Average Processing Volume measured by Department, Team & Associate
2. Variance to Forecasted Volumes Totals:• Weekly by Function Type
• Daily by Total Department Volume
1. Average Processing Time per:
• Department
• Team
• Associate
• Functional Department
• Functional Team
• Functional Associate
Control Plan MetricsControl Plan MetricsControl Plan MetricsControl Plan Metrics
Control Plan monitors three major metric areas monitor the “health” of the process as it happens :
Confidential and Proprietary
Leveraging the ImprovementsLeveraging the Improvements
ID Task Name Duration Start Finish Successors Predecessors Resource Names
1 CSS Full Lean Implementation 10 days Thu 9/16/04 Wed 9/29/04
2 1. All associates will be categorized as a AMR 1,2,3 10 days Thu 9/16/04 Wed 9/29/04
3 1 Define Skill Criteria 1 day Fri 9/17/04 Fri 9/17/04 4
4 1 Review and Update Function List by AMR Title 1 day Thu 9/16/04 Thu 9/16/04 5SS,3
5 1 Associate Skill Assessment 1 day Thu 9/16/04 Thu 9/16/04 6SS 4SS
6 1 Assign Associate to AMR Categories 1 day Thu 9/16/04 Thu 9/16/04 7SS 5SS
7 1 Assign Associates to Manager 1 day Thu 9/16/04 Thu 9/16/04 8SS 6SS
8 1 Train associates based on skills assessment 10 days Thu 9/16/04 Wed 9/29/04 7SS
9 2. Physical Layout changes will be complete for AMR associates 3 days Thu 9/16/04 Mon 9/20/04
10 2 Identify Associate Locations 1 day Thu 9/16/04 Thu 9/16/04
14 2 Physical move of associates 1 day Thu 9/16/04 Thu 9/16/04
15 2 Purchase/Locate Kanban materials 3 days Thu 9/16/04 Mon 9/20/04
16 2 Purchase/Locate Carts 3 days Thu 9/16/04 Mon 9/20/04
17 2 Implement 5S strategy 1 day Thu 9/16/04 Thu 9/16/04
18 3. Consistent MIS tracking and reporting system 10 days Thu 9/16/04 Wed 9/29/04
19 3 Develop Training for associates 1 day Thu 9/16/04 Thu 9/16/04
20 3 Deliver MIS training for associates 1 day Thu 9/16/04 Thu 9/16/04 Elaine Womack
21 3 Develop Reports 10 days Thu 9/16/04 Wed 9/29/04 Elaine Womack
22 3 Create standard formulas for all three sites 10 days Thu 9/16/04 Wed 9/29/04 Elaine Womack
23 3 Identify metrics required to monitor implementation success 1 day Thu 9/16/04 Thu 9/16/04
24 4. Define Department roles 1 day Thu 9/16/04 Thu 9/16/04
25 4 Create Consistent Lean Procedures for AMR 1,2,3, TL, Supervisor, Cart Person1 day Thu 9/16/04 Thu 9/16/04 Teree Brennan,Elaine Womack,Kathy Ervin
26 4 Identify MIS 1 day Thu 9/16/04 Thu 9/16/04
27 4 Identify Quality Owner 1 day Thu 9/16/04 Thu 9/16/04
28 4 Identify/Assign Project Management Resource 1 day Thu 9/16/04 Thu 9/16/04
29 4 Identify/Assign Communications Specialist 1 day Thu 9/16/04 Thu 9/16/04
30 5. Determine Staffing Requirements 1 day Thu 9/16/04 Thu 9/16/04
31 5 Define Cart Staffing Requirements 1 day Thu 9/16/04 Thu 9/16/04
32 5 Define Volumes per AMR associate type 1 day Thu 9/16/04 Thu 9/16/04
33 5 Determine TAKT for Cart Distribution 1 day Thu 9/16/04 Thu 9/16/04
ID
1
2
3
4
5
6
7
8
9
10
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
6%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
0%
100%
100%
100%
100%
0%
0%
0%
0%
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FSep 12, '04 Sep 19, '04 Sep 26, '04 Oct 3, '04 Oct 10, '04 Oct 17, '04
Confidential and Proprietary
Increase associate satisfaction/ownership due to increased knowledge/skills
Increased responsiveness to customer demand by managing to volumes rather than functions
Facilitates forecasting/planning based on data Development/advancement opportunities Three Other Solution Services sites are
implementing approach
Pilot WinsPilot Wins
Confidential and Proprietary
QuestionsQuestions