Line Crew Optimisation Methodology

10
Line Crew Optimisation The Methodology www.optimumfx.com

Transcript of Line Crew Optimisation Methodology

Page 1: Line Crew Optimisation Methodology

Line Crew Optimisation

The Methodology

www.optimumfx.com

Page 2: Line Crew Optimisation Methodology

What is Line Crew Optimisation?

• Ineffective line control is a hidden waste

• Line Crew Optimisation helps your production line to achieve the best balance between maximum efficiency (OEE) and both direct/indirect labour cost and quality

• It can help to establish the current state in order to improve the effectiveness of processes and therefore optimise performance this is part of a continuous improvement approach!

 • The key customer requirements are drivers of line crew optimisation, i.e. any activity

that consumes time, resources, or space but does not add any value to the product or the process is defined as waste, as the customer is not willing to pay for this

• Line Crew Optimisation is a process that reviews and optimises the established flow patterns, links process steps in order to minimise cycle times and travel distance, and eliminates crossover points in order to achieve a continuous flow process

Page 3: Line Crew Optimisation Methodology

Key principles

• Each person is given the same amount of work

• Everyone completes their given work packages to meet customer requirement

• Deviations are compensated

• Nobody is overworked

• Nobody is waiting

• Everyone is working as a team in a balanced way

Page 4: Line Crew Optimisation Methodology

Process inputs to analyse “as-is” state

• Site layouts

• Machine specifications

• Line and factory process flow charts (raw materials, finished goods, changeovers, etc.)

• Existing standard operating procedures for the line (SOPs)

• Process maps

• Target time for each activity

• Team Roles and Job Descriptions

• Capacity Planning

Page 5: Line Crew Optimisation Methodology

Process Step 1: Establish the reasoning behind existing crewing levels

• What are the establised crewing levels?

• Does each person in the shift know what they are responsible for, and is there a written description of tasks?

• Is the principle of multi-manning being applied, i.e. the possibility of operators to swap roles and cover for colleagues when absent?

• What are the key cyclic activities that take place, for example how often does material need to be replenished?

• What rules do the shifts follow to ensure that work is evenly balanced?

• Has the crew size of a line ever been reduced or otherwise changed? What improvements were made to allow this modification in crewing?

Page 6: Line Crew Optimisation Methodology

Process Step 2: Map the Existing Line processes ‘As is’

• SIPOC is a term that uses the first letter of the five pieces in a process map: 

Suppliers to the processInputs provided by the suppliersProcess Steps – the main steps of the processOutputs for the customerCustomers of the process

• A SIPOC “as-is” map will identify the outputs to the customers and the volumes required

• It will also assign responsibility for the suppliers of required inputs to the process

It provides a structured way to understand if changes to crewing will have any impact on processing inputs into the defined outputs for delivery to

customers

Page 7: Line Crew Optimisation Methodology

Process Step 3: Identify and eliminate the “8 Wastes”

Page 8: Line Crew Optimisation Methodology

Process Step 3.1: Focus areas for review

• Motion EconomyMotion economy is maximized by minimising walk patterns, ideally with a U shape machine layout. Motion can be visually analysed and optimised using a spaghetti diagram

• Time allocationA DILO ("Day in the Life Of") study helps to highlight where and why non-value add activities occur within a specific role, over the duration of a day

• Flow DesignDistances between raw material storage areas and secondary lines should be minimal with the correct amount of materials and spare parts ready and at the operator’s disposal

• Skill BuildingMulti-machine training makes it easy to replace any absentee. It is recommended that factory areas are zoned by colour, and each employee displays on their name badge the colour of the zones they are qualified to work in. This is a simple visual tool that makes labour allocation and skills balancing very easy on a day to day basis as the supervisor does not need to refer to skills matrix if they need to move people around the production line

• Functional IntegrationOperators should have skills to solve problems in a structured way in multi-disciplinary teams

• Standard operating procedures (SOPs)SOPs define how each step of the operation is to be done to minimise process variation

• Activity durationRecord time taken for all activities on a Cycle Time Sheet and consolidate the value-added activities using an activity listing template to improve workflow by combining, restructuring and automating processes

Page 9: Line Crew Optimisation Methodology

Process Step 4: Define the “to-be” state

• Complete a process diagram of the new “to-be” state displaying the revised organisation and flows

• Standardise work methods and use the process information on other similar lines

• Complete a closure checklist to ensure all key processes have been evaluated

• Show the new crewing in a visual way and communicate this to the team, e.g. SIC, RACI, KPIs, etc. 

Page 10: Line Crew Optimisation Methodology

Process outputs of the newly defined “to-be” state

• Optimised work flows

• Standardised processes

• Optimised crew location and numbers

• Work is balanced between workforce

• Outputs meet customer requirements

• Nobody is overworked or waiting

• Consistent quality of output at minimum cost

• Defined Skills Matrix showing existing skills, as well as highlighting missing skills

• Defined Training Plan according to missing skills