Linac Status
May 19, 2015Time Meeting
D. Raparia
![Page 2: Linac Status May 19, 2015 Time Meeting D. Raparia.](https://reader035.fdocuments.in/reader035/viewer/2022072015/56649eb55503460f94bbe515/html5/thumbnails/2.jpg)
D. Raparia2
Status Linac running in good condition for polarized proton program and
BLIP
After last week OPPIS maintenance is low polarization but improving by time, will be determined today if maintenance is needed tomorrow behind APEX
Mod-3 driver keeps tripping since last Thursday
![Page 3: Linac Status May 19, 2015 Time Meeting D. Raparia.](https://reader035.fdocuments.in/reader035/viewer/2022072015/56649eb55503460f94bbe515/html5/thumbnails/3.jpg)
Average Current and Beam on HRS for BLIP
D. Raparia3
5/9/15 5/10/15 5/11/15 5/12/15 5/13/15 5/14/15 5/15/15 5/16/15 5/17/15 5/18/15 5/19/150
24
48
72
96
120
Average current (μA)
Beam on (HRS/day)
Target Change
Research Target, Mod 3 driver cart and SCR fan
NM065 chipmunk fail
![Page 4: Linac Status May 19, 2015 Time Meeting D. Raparia.](https://reader035.fdocuments.in/reader035/viewer/2022072015/56649eb55503460f94bbe515/html5/thumbnails/4.jpg)
Mod-3 Driver trips
- Replaced SCR fan
- Paced 100 uF cap across air flow switch,- Replace driver cart- Replace filament bias power supply- Replaced air flow switch- Bypass “4616 bias fault” , to get fault below - Jennings fault, rewire Jennings switch - Adjusted Filament bias voltage
D. Raparia4
![Page 5: Linac Status May 19, 2015 Time Meeting D. Raparia.](https://reader035.fdocuments.in/reader035/viewer/2022072015/56649eb55503460f94bbe515/html5/thumbnails/5.jpg)
FWHM (mm) at Harp 1 and 2
D. Raparia5
5/8/15 5/10/15 5/12/15 5/14/15 5/16/15 5/18/15 5/20/150
5
10
15
20
25
30
H1_FWHM_xH1_FWHM_yH2_FWHM_XH2_FWHM_y
![Page 6: Linac Status May 19, 2015 Time Meeting D. Raparia.](https://reader035.fdocuments.in/reader035/viewer/2022072015/56649eb55503460f94bbe515/html5/thumbnails/6.jpg)
Beam Center (mm) at Harp1 and 2
D. Raparia6
5/8/15 5/10/15 5/12/15 5/14/15 5/16/15 5/18/15 5/20/15
-3
-2
-1
0
1
2
3
4
5
6
H1XcH1YcH2XcH2Yc
![Page 7: Linac Status May 19, 2015 Time Meeting D. Raparia.](https://reader035.fdocuments.in/reader035/viewer/2022072015/56649eb55503460f94bbe515/html5/thumbnails/7.jpg)
7
Beamline Location
1. plunging harp2. 6.50” collimator3. bellows (3x)4. raster magnet5. steering magnets (existing, 2x)6. 4.00” collimator
7. plunging harp (opposite side)8. laser profile monitor9. beam current transformers (2x)10. beam position monitor11. beryllium window (existing)12. aluminum bellows (existing)
21’14’
![Page 8: Linac Status May 19, 2015 Time Meeting D. Raparia.](https://reader035.fdocuments.in/reader035/viewer/2022072015/56649eb55503460f94bbe515/html5/thumbnails/8.jpg)
HARP1
D. Raparia8
![Page 9: Linac Status May 19, 2015 Time Meeting D. Raparia.](https://reader035.fdocuments.in/reader035/viewer/2022072015/56649eb55503460f94bbe515/html5/thumbnails/9.jpg)
HARP2
D. Raparia9