LIMIT OF TREE CLEARING - Middletown, NJ

1
6 AR 7 AR 4 AR AR MV MV MV MV MV MV MV 2 PP PP 3 PP 3 PP LIMIT OF TREE CLEARING LIMIT OF TREE CLEARING LIMIT OF TREE CLEARING LIMIT OF TREE CLEARING SEE TABLE ABOVE FOR ALLOWABLE GRASSES TO BE USED AT THE BIORETENTION SWALE AREAS SEE TABLE ABOVE FOR ALLOWABLE GRASSES TO BE USED AT THE BIORETENTION SWALE AREAS E N G I N E E R I N G, L L C East N- 3R2)E66I2N$L ENGINEER, LLFHQVH NR GE %REN7 N 3$3I, -R 11 South Main Street Marlboro, NJ 07746 Tel: 732.577.0180 6+EE7 N2 2) Point '$7E $6 6+2:N 6C$LE '$7E C+EC.E' %< 3R2-EC7 N80%ER 06L L$N'6C$3E 3L$N 7$; 0$3 6+EE7 N2 %L2C. , L27 02N0287+ C28N7<, NE: -ER6E< 72:N6+I3 2) 0I''LE72:N 4 MARY ELLEN WAY MAJOR SUBDIVISION DECIDUOUS TREE PLANTING NEW PLANT MATERIAL SHALL BE NURSERY GROWN UNLESS SPECIFIED OTHERWISE. ALL PLANTS SHALL BE SET PLUMB AND SHALL BEAR THE SAME RELATIONSHIP TO FINISHED GRADE AS THE PLANTS ORIGINAL GRADE BEFORE. CONTRACTOR SHALL CONTACT UTILITY ENTITIES FOR MARK-OUT OF EXISTING UNDERGROUND UTILITY AND SEWER LINES PRIOR TO THE START OF EXCAVATION ACTIVITIES. NOTIFY THE PROJECT MANAGER IMMEDIATELY OF ANY DISCREPANCIES WITH PROPOSED PLANTING LOCATIONS. SHADE AND EVERGREEN TREES SHALL BE FIELD ADJUSTED TO BE PLANTED AT LEAST 5 (FIVE) FEET FROM ANY CURBING, PAVING OR SIDEWALK. THE LANDSCAPE ARCHITECT AND/OR PROJECT MANAGER SHALL ASSIST IN THE FINAL PLACEMENT OF ALL PLANT MATERIAL AND LOCATION OF PLANTING BEDS TO ENSURE COMPLIANCE WITH DESIGN INTENT UNLESS OTHERWISE INSTRUCTED. SUBSTITUTIONS FOR PLANT MATERIAL IS ACCEPTABLE ONLY IF THE PLANT MATERIAL IS NOT OBTAINABLE AND THE SUBSTITUTIONS ARE APPROVED BY THE LANDSCAPE ARCHITECT, DESIGNER AND/OR THE PROJECT MANAGER. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS, NOTES AND CONTRACT SPECIFICATIONS. THE LANDSCAPE ARCHITECT AND/OR PROJECT MANAGER MAY REVIEW/OVERSEE INSTALLATION PROCEDURES. NEW PLANT MATERIAL SHALL BE GUARANTEED TO BE ALIVE IN GROWING CONDITION FOR A PERIOD OF TWO (2) YEARS FOLLOWING ACCEPTANCE BY THE OWNER(S). PLANT MATERIAL FOUND TO DYING OR DEAD DUE TO NATURAL CAUSES SHALL BE REMOVED AND REPLACED BY THE LANDSCAPE CONTRACTOR. NATURAL CAUSES EXCLUDES UNDERWATERING/OVERWATERING BY OWNER(S) OR IRRIGATION MANAGER. IRRIGATION OF THE PLANTINGS AND SEEDED/SODDED AREAS ARE NOT THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR. THE CONTRACTOR SHALL KEEP THE AREA CLEAN DURING DELIVERY AND INSTALLATION OF PLANT MATERIALS AND REMOVE AND DISPOSE OF OFF-SITE ANY ACCUMULATED DEBRIS OR UNUSED MATERIALS. PLANTING SOIL SHALL BE COMPOSED ONE PART PEAT, ONE PART HUMUS AND ONE PART OF PARENT SOIL (ALL MIXED THOROUGHLY), TO WHICH SHALL BE ADDED AND MIXED IN TWO POUNDS OF BONE MEAL OR ITS EQUIVALENT. GENERAL NOTES: KEY QTY BOTANICAL NAME COMMON NAME SIZE PLANT SCHEDULE min. 3" cal. @ 12" above crown 18 Acer rubrum 'October Glory' October Glory Red Maple AR REMARKS B&B, Straight Central Leader Deciduous Trees 7 Magnolia virginiana Sweetbay Magnolia MV Ornamental Trees B&B, multi-stemmed 10'-12' Ht. EVERGREEN TREE PLANTING 8'-10' Ht 9 Picea Pungens Blue Spruce PP B&B, Heavy Evergreen Trees

Transcript of LIMIT OF TREE CLEARING - Middletown, NJ

Page 1: LIMIT OF TREE CLEARING - Middletown, NJ

6 AR

7 AR

4 AR

AR

MV

MV

MV

MV

MV

MV

MV

2 PP

PP

3 PP

3 PP

LIMIT OF TREE CLEARING

LIMIT OF TREE CLEARING

LIMIT OF TREE CLEARING

LIMIT OF TREE CLEARING

SEE TABLE ABOVE FOR

ALLOWABLE GRASSES TO BE

USED AT THE BIORETENTION

SWALE AREAS

SEE TABLE ABOVE FOR

ALLOWABLE GRASSES TO BE

USED AT THE BIORETENTION

SWALE AREAS

E N G I N E E R I N G, L L CEast

N.J. PROFESSIONAL ENGINEER, License No. 24GE04732700BRENT N. PAPI, JR.

11 South Main Street

Marlboro, NJ 07746

Tel: 732.577.0180

SHEET NO. 7 OF 13

Point

DATEAS SHOWNSCALE:

DATE:

12/20/19CHECKED BY:

PROJECT NUMBER:

M.S.L.

LANDSCAPE PLAN

TAX MAP SHEET NO. 132

BLOCK 828, LOT 9.02

MONMOUTH COUNTY, NEW JERSEYTOWNSHIP OF MIDDLETOWN

4 MARY ELLEN WAY

02/20/2018-225

MAJOR SUBDIVISION

DECIDUOUS TREE PLANTING

NEW PLANT MATERIAL SHALL BE NURSERY GROWN UNLESS

SPECIFIED OTHERWISE. ALL PLANTS SHALL BE SET PLUMB AND

SHALL BEAR THE SAME RELATIONSHIP TO FINISHED GRADE AS THE

PLANTS ORIGINAL GRADE BEFORE.

CONTRACTOR SHALL CONTACT UTILITY ENTITIES FOR MARK-OUT OF

EXISTING UNDERGROUND UTILITY AND SEWER LINES PRIOR TO THE

START OF EXCAVATION ACTIVITIES. NOTIFY THE PROJECT MANAGER

IMMEDIATELY OF ANY DISCREPANCIES WITH PROPOSED PLANTING

LOCATIONS.

SHADE AND EVERGREEN TREES SHALL BE FIELD ADJUSTED TO BE

PLANTED AT LEAST 5 (FIVE) FEET FROM ANY CURBING, PAVING OR

SIDEWALK. THE LANDSCAPE ARCHITECT AND/OR PROJECT MANAGER

SHALL ASSIST IN THE FINAL PLACEMENT OF ALL PLANT MATERIAL

AND LOCATION OF PLANTING BEDS TO ENSURE COMPLIANCE WITH

DESIGN INTENT UNLESS OTHERWISE INSTRUCTED.

SUBSTITUTIONS FOR PLANT MATERIAL IS ACCEPTABLE ONLY IF THE

PLANT MATERIAL IS NOT OBTAINABLE AND THE SUBSTITUTIONS ARE

APPROVED BY THE LANDSCAPE ARCHITECT, DESIGNER AND/OR THE

PROJECT MANAGER.

ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS, NOTES

AND CONTRACT SPECIFICATIONS. THE LANDSCAPE ARCHITECT

AND/OR PROJECT MANAGER MAY REVIEW/OVERSEE INSTALLATION

PROCEDURES.

NEW PLANT MATERIAL SHALL BE GUARANTEED TO BE ALIVE IN

GROWING CONDITION FOR A PERIOD OF TWO (2) YEARS FOLLOWING

ACCEPTANCE BY THE OWNER(S). PLANT MATERIAL FOUND TO DYING

OR DEAD DUE TO NATURAL CAUSES SHALL BE REMOVED AND

REPLACED BY THE LANDSCAPE CONTRACTOR. NATURAL CAUSES

EXCLUDES UNDERWATERING/OVERWATERING BY OWNER(S) OR

IRRIGATION MANAGER. IRRIGATION OF THE PLANTINGS AND

SEEDED/SODDED AREAS ARE NOT THE RESPONSIBILITY OF THE

LANDSCAPE CONTRACTOR.

THE CONTRACTOR SHALL KEEP THE AREA CLEAN DURING DELIVERY

AND INSTALLATION OF PLANT MATERIALS AND REMOVE AND

DISPOSE OF OFF-SITE ANY ACCUMULATED DEBRIS OR UNUSED

MATERIALS.

PLANTING SOIL SHALL BE COMPOSED ONE PART PEAT, ONE PART

HUMUS AND ONE PART OF PARENT SOIL (ALL MIXED THOROUGHLY),

TO WHICH SHALL BE ADDED AND MIXED IN TWO POUNDS OF BONE

MEAL OR ITS EQUIVALENT.

GENERAL NOTES:

KEY QTY BOTANICAL NAME COMMON NAME SIZEPLANT SCHEDULE

min. 3" cal. @ 12" above crown18 Acer rubrum 'October Glory' October Glory Red MapleAR

REMARKS

B&B, Straight Central Leader

Deciduous Trees

7 Magnolia virginiana Sweetbay MagnoliaMV

Ornamental Trees

B&B, multi-stemmed10'-12' Ht.

EVERGREEN TREE PLANTING

8'-10' Ht9 Picea Pungens Blue SprucePP B&B, Heavy

Evergreen Trees

AutoCAD SHX Text
MARY ELLEN WAY
AutoCAD SHX Text
(50' RIGHT-OF-WAY PER CASE #32-25)
AutoCAD SHX Text
GAS MTR.
AutoCAD SHX Text
ELEC. MTR.
AutoCAD SHX Text
WAT. MTR.
AutoCAD SHX Text
WATER SPIGOT
AutoCAD SHX Text
2 A/C UNITS
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
ASPHALT DRIVEWAY
AutoCAD SHX Text
ASPHALT DRIVEWAY
AutoCAD SHX Text
IRON BAR BENT FOUND 0.24'S 0.72'W
AutoCAD SHX Text
IRON BAR FOUND 0.14'S
AutoCAD SHX Text
IRON BAR FOUND
AutoCAD SHX Text
IRON BAR FOUND
AutoCAD SHX Text
P.O.B.
AutoCAD SHX Text
WOOD DECK
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
TC= BC=
AutoCAD SHX Text
x
AutoCAD SHX Text
TC= BC=
AutoCAD SHX Text
x
AutoCAD SHX Text
TC= BC=
AutoCAD SHX Text
x
AutoCAD SHX Text
TC= BC=
AutoCAD SHX Text
TC= BC=
AutoCAD SHX Text
x
AutoCAD SHX Text
TC= BC=
AutoCAD SHX Text
x
AutoCAD SHX Text
TC= BC=
AutoCAD SHX Text
x
AutoCAD SHX Text
50' WETLANDS BUFFER (TYPICAL)
AutoCAD SHX Text
DRAINAGE PIPE
AutoCAD SHX Text
50' WETLANDS BUFFER (TYPICAL)
AutoCAD SHX Text
6" DIP WATER MAIN PER NJAW MARK-UP
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
50.0'
AutoCAD SHX Text
50.0'
AutoCAD SHX Text
PROP. DWELLING 2 STORY FRAME
AutoCAD SHX Text
PROP. DWELLING 2 STORY FRAME
AutoCAD SHX Text
FRESHWATER WETLANDS CLASS I CRITICAL AREA 82,912 SF
AutoCAD SHX Text
WETLAND BUFFER CLASS II CRITICAL AREA 47,172 SF
AutoCAD SHX Text
50' WETLAND BUFFER
AutoCAD SHX Text
FRESHWATER WETLAND LINE
AutoCAD SHX Text
50' WETLAND BUFFER
AutoCAD SHX Text
FRESHWATER WETLAND LINE
AutoCAD SHX Text
PROPOSED SUBDIVISION LINE
AutoCAD SHX Text
PROPOSED SUBDIVISION LINE
AutoCAD SHX Text
EXISTING 2-STORY DWELLING TO REMAIN
AutoCAD SHX Text
BIORETENTION SWALE
AutoCAD SHX Text
BIORETENTION SWALE
AutoCAD SHX Text
BIORETENTION SWALE
AutoCAD SHX Text
DETENTION BASIN
AutoCAD SHX Text
SAWCUT LINE (TYP)
AutoCAD SHX Text
82
AutoCAD SHX Text
81
AutoCAD SHX Text
80
AutoCAD SHX Text
79
AutoCAD SHX Text
78
AutoCAD SHX Text
77
AutoCAD SHX Text
76
AutoCAD SHX Text
75
AutoCAD SHX Text
74
AutoCAD SHX Text
82
AutoCAD SHX Text
73
AutoCAD SHX Text
80
AutoCAD SHX Text
81
AutoCAD SHX Text
82
AutoCAD SHX Text
82
AutoCAD SHX Text
83
AutoCAD SHX Text
84
AutoCAD SHX Text
84
AutoCAD SHX Text
85
AutoCAD SHX Text
85
AutoCAD SHX Text
85
AutoCAD SHX Text
85.50
AutoCAD SHX Text
x
AutoCAD SHX Text
HP
AutoCAD SHX Text
85.50
AutoCAD SHX Text
x
AutoCAD SHX Text
HP
AutoCAD SHX Text
80
AutoCAD SHX Text
78
AutoCAD SHX Text
78
AutoCAD SHX Text
79
AutoCAD SHX Text
78
AutoCAD SHX Text
79
AutoCAD SHX Text
77
AutoCAD SHX Text
79.00
AutoCAD SHX Text
x
AutoCAD SHX Text
80.00
AutoCAD SHX Text
x
AutoCAD SHX Text
81
AutoCAD SHX Text
82.00
AutoCAD SHX Text
x
AutoCAD SHX Text
81.50
AutoCAD SHX Text
x
AutoCAD SHX Text
78.00
AutoCAD SHX Text
x
AutoCAD SHX Text
77.00
AutoCAD SHX Text
x
AutoCAD SHX Text
76.00
AutoCAD SHX Text
x
AutoCAD SHX Text
75.00
AutoCAD SHX Text
x
AutoCAD SHX Text
74.00
AutoCAD SHX Text
x
AutoCAD SHX Text
73.00
AutoCAD SHX Text
x
AutoCAD SHX Text
72.00
AutoCAD SHX Text
x
AutoCAD SHX Text
79.50
AutoCAD SHX Text
x
AutoCAD SHX Text
79.50
AutoCAD SHX Text
x
AutoCAD SHX Text
80
AutoCAD SHX Text
79
AutoCAD SHX Text
80
AutoCAD SHX Text
HW INV 78.00
AutoCAD SHX Text
HW INV 77.00
AutoCAD SHX Text
56 LF 15" RCP CLASS V @ 0.50%
AutoCAD SHX Text
HW INV 78.50
AutoCAD SHX Text
50 LF 15" RCP CLASS V @ 1.0%
AutoCAD SHX Text
RIP RAP LEVEE (TYP) ELEV. 0.5' BELOW TOP OF CHANNEL 9' WIDE x 3' THICK MIN. 6" DIA. STONE
AutoCAD SHX Text
80
AutoCAD SHX Text
HW INV 77.30
AutoCAD SHX Text
77
AutoCAD SHX Text
79
AutoCAD SHX Text
78
AutoCAD SHX Text
79.80
AutoCAD SHX Text
x
AutoCAD SHX Text
81
AutoCAD SHX Text
80
AutoCAD SHX Text
79
AutoCAD SHX Text
83
AutoCAD SHX Text
84
AutoCAD SHX Text
C
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
THE PURPOSE ORIGINALLY INTENDED, WITHOUT THE WRITTEN PERMISSION OF EAST POINT ENGINEERING, IS PROHIBITED.
AutoCAD SHX Text
THE COPYING OR REUSE OF THIS DOCUMENT, OR PORTIONS THEREOF, FOR OTHER THAN THE ORIGINAL PROJECT OR
AutoCAD SHX Text
COPYRIGHT 2020, EAST POINT ENGINEERING, LLC - ALL RIGHTS RESERVED
AutoCAD SHX Text
N.J. CERTIFICATE OF AUTH. No. 24GA28169800
AutoCAD SHX Text
1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
0
AutoCAD SHX Text
30
AutoCAD SHX Text
30
AutoCAD SHX Text
60
AutoCAD SHX Text
30
AutoCAD SHX Text
120
AutoCAD SHX Text
15
AutoCAD SHX Text
NJSPCS NAD1983
AutoCAD SHX Text
2.5 X BALL DIA. MIN.
AutoCAD SHX Text
2" MINIMUM DEPTH MULCH
AutoCAD SHX Text
SET TOP OF ROOTBALL FLUSH TO GRADE OR 1-2" HIGHER IN SLOWLY DRAINING SOILS.
AutoCAD SHX Text
PLANTING SOIL AS SPECIFIED
AutoCAD SHX Text
SET ROOT BALL ON UNEXCAVATED OR TAMPED SOIL.
AutoCAD SHX Text
4" HIGH EARTH SAUCER BEYOND EDGE OF ROOT BALL.
AutoCAD SHX Text
TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT.
AutoCAD SHX Text
IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE ROOT BALL, CUT THE WIRE BASKET IN FOUR PLACES AND FOLD DOWN 200mm (8") INTO PLANTING HOLE.
AutoCAD SHX Text
REMOVE ALL TWINE, ROPE, WIRE, AND BURLAP FROM TOP HALF OF ROOT BALL AND ALL NON-BIODEGRADABLE MATERIAL.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
8.
AutoCAD SHX Text
2.5 X BALL DIA. MIN.
AutoCAD SHX Text
REMOVE ALL TWINE, ROPE, WIRE, AND BURLAP FROM TOP HALF OF ROOT BALL AND ALL NON-BIODEGRADABLE MATERIAL.
AutoCAD SHX Text
IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE ROOT BALL, CUT THE WIRE BASKET IN FOUR PLACES AND FOLD DOWN 8" INTO PLANTING HOLE.
AutoCAD SHX Text
TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT.
AutoCAD SHX Text
SET ROOT BALL ON UNEXCAVATED OR TAMPED SOIL.
AutoCAD SHX Text
PLANTING SOIL AS SPECIFIED
AutoCAD SHX Text
SET TOP OF ROOTBALL FLUSH TO GRADE OR 1-2" HIGHER IN SLOWLY DRAINING SOILS.
AutoCAD SHX Text
2" MINIMUM DEPTH MULCH
AutoCAD SHX Text
100mm (4") HIGH EARTH SAUCER BEYOND EDGE OF ROOT BALL.