Development of hydropower in Ayeyawady RiverDevelopment of hydropower in Ayeyawady River
A Strategic Choice for Myanmar Electric Industry
LI GuangHuaPresidentPresident
CPI Yunnan International Power Investment Co., LTD (CPIYN)17 September, Naypyitaw
ContentsContents
Development of hydropower in Myanmar is needed
Development of hydropower in Upper Ayeyawady river is beneficial
No safety nor environment stop-constraints found
CPIYN is an enterprise with high social responsibility
It is necessary to develop hydropower in It is necessary to develop hydropower in MyanmarMyanmarM l t i i d d f M d l tMore electronic power is needed for Myanmar development
ChinaChina0.7kW/Capita
JapanJapan
EuropeEurope1.3kW/Capita
USA 3kW/Capita
Japan1.3kW/Capita
Myanmar 0.05kW/Capita
•Population 6.5million•Power 3.2 million kW
It is necessary to develop hydropower in MyanmarIt is necessary to develop hydropower in MyanmarPresent energy level cannot satisfy the economic development demands
Hydropower is the best choice in Myanmar energy industry
developmentdevelopment
•Lack of coalHi h ll i
•Rich in water resources (100 000 •High pollutionresources (100,000 MW)
Hydropower(Priority)
Thermal
New EnergyNuclear
•High cost•Constraints on
•Require high technical standard
solar & wind resources
•With rigid criteria
ContentsContents
Development of hydropower in Myanmar is needed
Development of hydropower in Upper Ayeyawady river is beneficial
No safety nor environment stop-constraints found
CPIYN is an enterprise with high social responsibility
Hydropower development in upper Ayeyawady riverHydropower development in upper Ayeyawady riverAn excellent opportunity for social-economic development
Transformto
Yenam
• Total installed capacity 19800 MW
• Total static investment about USD 20 billion
to Myanmar
Yenam
Guanglanhpu
billion
• Completed in15 years.
g p
Hpizaw
WutsokLazaMyanmar Income
Chipwi
Myitsone
USD 160 billionIncome
USD 54 billion
Hydropower development in upper Ayeyawady riverHydropower development in upper Ayeyawady riverImprove transportation and life condition for the people in the project area
750km road will be constructed
Myitkyina-Myitsone Road Nammawhka Bridge
Tough construction of Wutsok – Washawng Myitsone roadTough construction of Wutsok Guanglanhpu Exploration Road
Washawng-Myitsone road surface clearance
Hydropower development in upper Ayeyawady riverHydropower development in upper Ayeyawady riverBenefit local agriculture and industry needs with more hydrological data
Hydrological monitoring network
• 9 hydrological stations, 5 water level t ti d 49 i f ll t ti ill b
Hydrological monitoring network
Phase-II
stations and 49 rainfall stations will be setup in 2011.
• The hydrological data can assist the e yd o og ca da a ca ass s edevelopment of local agriculture and industry needs
Phase-I
Hydrological station Water level station
Hydropower development in upper Ayeyawady riverHydropower development in upper Ayeyawady riverProvide job opportunity for local people
4819
20000
25000
30000
Myanmar staff
Chinese staff
2709
5000
10000
15000
0
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Manpower demands during the construction periodDate 13 Sep 2011
a po e de a ds du g t e co st uct o pe odProject employees
Organizing Myanmar employee to work
Hydropower development in upper Ayeyawady riverHydropower development in upper Ayeyawady riverImprove regional environmental quality
• Clean & renewable hydropower will be transferred y pto China (1.8% of china total power capacity)
• Replace some thermal power production in China
• Improve environmental quality in south china and the area near Myanmar border
ContentsContents
Development of hydropower in Myanmar is needed
Development of hydropower in Upper Ayeyawady river is beneficial
No safety nor environment stop-constraints found
CPIYN is an enterprise with high social responsibility
Dam safety of Myitsone hydropower projectDam safety of Myitsone hydropower projectCarried out large numbers of researchesCarried out large numbers of researchesCarried out large numbers of researchesCarried out large numbers of researches
No. Research contents Time Institutes
Study on regional tectonic stability of hydropower1 Study on regional tectonic stability of hydropower projects of upstream Irrawaddy river 2008~2010 IGCEA
2 Myitsone station site seismic safety evaluation 2007~2008 YNEA, approved by CEA
3 Specific study on faults at dam site 2007~2010 CISPDR
4 Specific study on anti-seismic design of dam 2009~2011 CISPDR, CRSRI, DLUT
Study on reservoir evocation earthquake of5
Study on reservoir evocation earthquake of Irrawaddy river basin and Myitsone hydropower project and monitoring system design
2008~2010 CISPDR
Dam safety of Myitsone hydropower projectDam safety of Myitsone hydropower projectThe seismic tectonic environmentThe seismic tectonic environment
A triangle tectonic domain Including
is formed with the arc-shaped
structure of the north of Sagaing
Fault which is nearly NS-trending,
JiaLi Fault which is NW-trendingJiaLi Fault which is NW-trending
and Red river Fault inside
Myanmar & the Southwest Yunnan,
China
The tectonic domain of Myitsone hydropower station
Dam safety of Myitsone hydropower projectDam safety of Myitsone hydropower projectSeismic tectonic environmentSeismic tectonic environment
No active faults found near the project area!
A ti f lt i th t dActive fault in the study area (The red line indicates active fault) Seismic tectonic map of the study area
Dam safety of Myitsone hydropower projectDam safety of Myitsone hydropower projectHigh AntiHigh Anti--seismic design standard seismic design standard gg gg
7 degree• Maximum possible seismic intensity at the dam site
9 degree• Designed standard of over 2% probability in 100 years• Checked standard of over 1% probability in 100 years
Dam safety of Myitsone hydropower projectDam safety of Myitsone hydropower projectAntiAnti--seismic measuresseismic measures
Surface outlet flood dischargeSurface outlet flood discharge
Reinforced concrete slope protection grille
Mid-outlet flood discharge
Myitsone spillway damIn case of emergency
Dam safety of Myitsone hydropower projectDam safety of Myitsone hydropower projectAnti-seismic measures – earthquake monitoring system
700 safety monitoring equipment are700 safety monitoring equipment are installed at the dam
To be built during 2013 ~2020
25 remote monitoring seismic stations are to be built at upper area of Irrawaddy River Basin
To be built during 2013 ~2020
Dam safety of Myitsone hydropower projectDam safety of Myitsone hydropower projectAnti-seismic measures – earthquake monitoring system
• Engaged expert committee member of 4 CAE academicians and 7 most authoritative expertsauthoritative experts
• Spent 2 years • Carried out technical consulting on
Myitsone Project Seismic Safety
No safety constraint fond for the Myitsone Dam!
Dam safety of Myitsone hydropower projectDam safety of Myitsone hydropower projectExample: CFRD survived big earthquakeExample: CFRD survived big earthquake
Zipingpu CFRD in China
p g qp g q
Wenchuan earthquake in May 2008
• 156m tall
• 17km from the epicenter of Wenchuan
• Design earthquake level is 8 degree
Zipingpu dam
• Design earthquake level is 8 degree
• The seismic intensity at the dam site 2008 was larger than 8 degree
Lower water level after earthquakeUpstream of the reservoir after earthquake
Environment Impact Assessment (EIA) of the Hydropower development in Upper Ayeyawady River
Many institutes carried out large amount of research work
• CISPDR, IHE, SCBG, SCIEA, China National Academy of Sciences, and Myanmar BANCA were engaged in the EIA & SIA studies.
• Long time and large amount of field survey and investigation has been conducted
Carried out numbers of EIA fieldCarried out numbers of EIA field investigation and study
Environment Impact Assessment (EIA) of the Environment Impact Assessment (EIA) of the Hydropower development in Upper Ayeyawady RiverHydropower development in Upper Ayeyawady River
M j fi di f EIAM j fi di f EIAMajor findings of EIAMajor findings of EIA
• Social-economically beneficial for social, economy and environment in Kachin and y yMyanmar.
• Environmentally safe:
• No stop-constraint was found;
• inundation and hydrological changes will cause effect on water environment, aquatic & terrestrial organisms, and migrants’ production and living; implementation of mitigation measures can effectively mitigated these problems.
• The environment will be strictly protected during the project construction y p g p jprocess; rare local animal and plant species will be protected.
Impact on downstream areaImpact on downstream area
• Negligible effect to runoff: initial impounded Fl diNegligible effect to runoff: initial impounded
water is 2.8% of the annual runoff
• Improve irrigation, navigation conditions
and water supply with dry season water
Flooding season
and water supply with dry season water
compensation to downstream area: 16%
flow increase in dry season
• Prevent salt water intrusion at the estuary
Dry seasonDry
seasonTo better benefit sustainable development in Myanmar, we will conduct
more researches on impact on downstream areaPrevent salt water intrusion at the estuary
area in dry season
• Improve flood safety level at downstream
area: May ~ Oct, 3.5% decreasing to thearea: May Oct, 3.5% decreasing to the
average flow, from 5 year to 20 years at
Myitkyina Change of flow rate before and after Myitsone project
Impact on downstream areaImpact on downstream area
A dynamic equilibrium system
• The last cascade reservoir in Ayeyawady river
• The maximum height of Myitsone is 139.5m
• Reservoir storage 12.4 billion m3 Construction a reservoir will not affect the mass-balance of the river flowthe mass balance of the river flow
ContentsContents
Development of hydropower in Myanmar is needed
Development of hydropower in Upper Ayeyawady river is beneficial
No safety nor environment stop-constraints found
CPIYN is an enterprise with high social responsibility
CPI is an enterprise with high social responsibilitiesCPI is an enterprise with high social responsibilitiesEstablished a project team with the Established a project team with the top expert top expert from Chinafrom Chinap jp j p pp p
•CISPDRN h D i I i
Leading design companies
•Northwest Design Institute,•KHIDI
H d Pl i G l I tit t f Chi
Consultancy•Hydropower Planning General Institute of China•Chengdu survey, design company•COLENCO of Switzerland, NEWJEC of Japan
Review•Hydropower Planning General Institute of China•CPI Expert committee composed of top experts of China
Review
Supervision•Mid-south design institute of china
p
•Chinese Academy of Water Sciences Geological Research Institute of China National
Research •Chinese Academy of Water Sciences, Geological Research Institute of China National
Earthquake Bureau Tsinghua University, Tianjin University, Hohai University •SANTAC, BANCA, Yangon University
CPI is an enterprise with high social responsibilitiesCPI is an enterprise with high social responsibilitiesResettlementResettlement
Map of Reservoir Inundation and Resettlement Statistics
Resettlement house plan
Military Attaché from Many Countries Hearing Report on Construction and
Resettlement of Myitsone Project
CPI is an enterprise with high social responsibilitiesCPI is an enterprise with high social responsibilitiesResettlementResettlementResettlementResettlement
• <20,000 people to be resettledp p• Cost about 1% of investment • Principle: respect fully the
desires of the relocated people, ensure their living standard will
New resettlement village in Myitsone dam site
New church
gnot be lower than their original level and is improved
• Government of Myanmar and CPI are committed to long-termgassistance and supports for the relocated people
• USD 25 million has been invested, the relocated people’s
N h it l ith l t d
p plife standard has been improved remarkably
• Resettlement work for Myitsone New hospital with completed
medical facilitiesNew school
ydam site area is finished
CPI is an enterprise with high social responsibilitiesCPI is an enterprise with high social responsibilities
Assisting local people in enhancing their infrastructureAssisting local people in enhancing their infrastructure
Chipwi Road Upgraded from Clay-bound Macadam pavement to concrete pavement
New Border Gate at Panwa
CPI is an enterprise with high social responsibilitiesCPI is an enterprise with high social responsibilities
Other contributionsOther contributions
Spare time entertainment
• Create more job opportunities• Create conditions for local
Spare time entertainmentbusiness development
• Contribute to disaster relief
Project staff assisting in fire fighting in Myitkyina
Others
Preliminary
Myitsone
Chipwi
Under construction
Preliminary period
For more information:
Chipwi nge
I i
Under construction
For more information:
http://www.uachc.com/In operation