Version 1.0: April 1, 2020 Prepared for: City of Barrie Prepared by: Michael J. Matz, LC, PMP
Background Moon-Matz Ltd. was retained to carry out an illumination analysis for proposed roadway lighting along the proposed Dunlop Street West improvements between Sarjeant Drive and Anne Street to the City of Barrie Standards.
Illumination Design Standards The City of Barrie is responsible for the street lighting requirements and as such has adopted the American National Standard Practice for Roadway Lighting “ANSI/ IESNA RP-8-18”. This lighting standard serves as the basis for design and provides recommended practices for roadway illumination. The client requested that Dunlop Street W. be classified as a “Major” road with a “medium” nighttime pedestrian conflict level.
Recommendations: In order to meet the required design criteria, Moon-Matz Ltd. recommends the installation of thirty-five (35) 149w LED luminaires (General Electric) and 2.4m arms mounted on six (6) hydro poles and twenty-nine (29) additional free standing poles. Our results can be seen in the photometric analysis package LC-R-02.
Estimate: Our estimate for luminaires, arms, poles, wiring, conduit, power supply and existing electrical removals is $250,000.00 + HST. Note that our estimate does not include engineering design fees, traffic signals and hydro poles.
The CITY of BARRIE
PREPARED FOR:
PREPARED BY:
DUNLOP STREET WEST EAPROJECT DESCRIPTION:
LIGHTING CALCULATION NAME:
LC-R-02
ROADWAY ILLUMINATON
SUMMARY:
MARCH 2020
CALCULATION DATE:
SUMMARY
N.T.S.SCALE:
1 of 3CALC. BY: M.M. SHT. No.:
LC-R-02
FOR
REFERENCE
STATUSNORTH
PREPARED FOR:
LTG. CALC:
5832
2020.03.02
PROJ. No.:
DATE:
The CITY of BARRIE
LUMINAIRE ASSEMBLY
P.M.SL-C9.9-2.4-400 (D) *
WATTAGE
ARM LENGTH (m)
POLE HEIGHT (m) **
POLE MATERIAL
S = STEEL
C = CONCRETE
W = WOOD
A = ALUMINIUM
POLE TYPE
SL = STREET LIGHTING
TS = TRAFFIC SIGNAL
HP = HYDRO POLE
LIGHTING OWNER
C = CITY
T = TOWN
R = REGION
STATUS
P = PROPOSED
E = EXISTING
F = FUTURE
T = TEMPORARY
R = RELOCATED
XR = TO BE RELOCATED
X = TO BE REMOVED
** LUMINAIRE MOUNTING HEIGHT WHEN ON HYDRO POLES
* DENOTES DECORATIVE LUMINAIRE
DESIGN CRITERIA CALCULATION RESULTS CONT.
FULL ROADWAY ILLUMINATION (LUMINANCE):RP-8-18DESIGN STANDARD USED:
WESTBOUND 1, EASTBOUND 1, WESTBOUND BRIDGE STRUCTURE,
EASTBOUND BRIDGE STRUCTURE, WESTBOUND 2, EASTBOUND 2
LOCATION:
FULL ROADWAY ILLUMINATION:
CALC. METHOD: LUMINANCE
0.35.0:1MAJOR MED
UNIFORMITY
RATIO
Lmax./Lmin.
ROAD AND PEDESTRIAN
CONFLICT AREA
ROAD PED. CON.
MIN. AVG.
VALUES
UNIFORMITY
RATIO
Lavg./Lmin.
VEILING LUMINANCE
RATIO
Lvmax./Lavg.
3.0:10.9
Lavg.
(cd/m²)
CALCULATION RESULTS
FULL ROADWAY ILLUMINATION (LUMINANCE):
LEGEND
WESTBOUND 1
EASTBOUND 1
KEY PLAN
MT
O R
AM
P
MT
O R
AM
P
DUNLOP STREET W.
DUNLOP STREET W.
WESTBOUND 2
EASTBOUND 2
WESTBOUND BRIDGE STRUCTURE
EASTBOUND BRIDGE STRUCTURE
DATE:
PROJ. No.:
LTG. CALC:
PREPARED FOR:
NORTH STATUS
FOR
REFERENCE
SHT. No.:CALC. BY: 3of2
SCALE: 1:500
DUNLOP STREET W
M.M.
N
The CITY of BARRIE
DUNLOP STREET W
EASTBOUND 1
DUNLOP STREET W
SA
RJE
AN
T
DR
IV
E
H
W
Y
400
R
A
M
P
WESTBOUND 1
MA
TC
H LIN
E 'A
'
MA
TC
H LIN
E 'B
' - S
HE
ET
3
MA
TC
H LIN
E 'A
'
EASTBOUND BRIDGE
STRUCTURE
LC-R-02
5832
2020.03.02
WESTBOUND BRIDGE
STRUCTURE
DATE:
PROJ. No.:
LTG. CALC:
PREPARED FOR:
NORTH STATUS
FOR
REFERENCE
SHT. No.:CALC. BY: 3of3
SCALE: 1:500
DUNLOP STREET W.
M.M.
The CITY of BARRIE
MA
TC
H LIN
E 'B
'
DUNLOP STREET W
HA
RT
DR
IV
E
LC-R-02
5832
2020.03.02
MT
O
RA
MP
EASTBOUND 2
WESTBOUND 2
N