Light Rail Transit - UC

1
Hyde Park Plaza Light Rail Transit Single Track 1 60 Edwards Rd 71 Erie Ave Red Bank Rd Marburg Ave Observatory Ave Little Miami River Hyde Park Plaza Rookwood Commons 18min 27sec $160M $5.1M 81K (cy) 1463 59 2 4 Erie Ave Red Bank Rd Marburg Ave Observatory Ave Little Miami River Rookwood Commons Design Option 1 is a single track with a 14’ useable width spanning the initial 4 mile length of the Wasson Way Corridor. The exterior stations are designed with both turnouts and track sidings for future implementation with the I-71 Line to the West and the Oasis Line to the East. Option 1 is significantly less expensive and requires less maintenance than the other four options; however, the maximum passenger wait time is the highest at 18.5 minutes. The single track design would require significant track expansion should ridership drastically increase in the next 30 years. 3 4 5 3 2 1 Turnout at Hyde Park Plaza 3 Rookwood Commons Hyde Park Plaza Edwards Rd Design Option 3 is a single track with a 14’ useable width with turnouts and track sidings at Xavier Station, Hyde Park Plaza Station, and Red Bank Station. As with the other design options, Option 3 allows for the future implementation with the I-71 and Oasis Lines. Option 3 allows for trains to be simultaneously stopped at Hyde Park Plaza station should the need arise. Option 3 has an intermediate construction and maintenance cost, as well as an intermediate maximum wait time of 14.7 minutes. Option 3 would require significant expansion in the future should ridership drastically increase in the next 30 years. 58 14min 42sec $188M $9.5M 98K (cy) 1837 115 4 1.16 Hyde Park Plaza Hyde Park Plaza Rookwood Wasson Rd Turnouts at Hyde Park Plaza & Rookwood 4 Rookwood Commons Hyde Park Plaza Edwards Rd Design Option 4 is a single track with a 14’ useable width with turnouts and track sidings at Xavier Station, Rookwood Station, Hyde Park Plaza Station, and Red Bank Station. Option 4 allows for trains to be stopped simultaneously at any of the four stations should the need arise. As with the other design options, Option 4 allows for the future implementation of the I-71 and Oasis Lines. Option 4 offers an intermediate construction and maintenance cost, while being tied for the second smallest maximum wait time at 12.3 minutes. Should ridership increases require additional track, expansion would be required between all stations. 56 12min 18 sec $189M $9.6M 115K (cy) 2195 106 4 1.16 Hyde Park Plaza Hyde Park Plaza Rookwood Wasson Rd Double Track between Hyde Park Plaza & Rookwood 5 Rookwood Commons Hyde Park Plaza Edwards Rd Design Option 5 is a mixture of a single track with a 14’ useable width between Xavier Station & Rookwood Station, a double track with a 27.5’ useable width between Rookwood Station & Hyde Park Plaza Station, and back to a single track with a 14’ useable width between Hyde Park Plaza Station & Red Bank Station. As with the other design options, Option 5 allows for the future implementation of the I-71 and Oasis Lines. Option 5 is tied for the second smallest maximum wait time at 12.3 minutes. Option 5 allows for simultaneous train traffic between the two interior stations. Should ridership increases require additional track, expansion would not be required between the interior stations; however, it would be required at the exterior stations. 56 12min 18sec $190M $9.6M 117K (cy) 2195 112 4 (15) 0.84 Hyde Park Plaza Rookwood Wasson Rd Double Track 2 51 8min 32sec $227M $10.2M 133K (cy) 3162 118 6 (17) 0 Design Option 2 is a double track with a 27.5’ useable width spanning the initial 4 mile length of the Wasson Way Corridor. As with Option 1, the exterior stations are designed with track sidings for future implementation with the I-71 and Oasis Lines. In addition to the exterior station sidings, the interior stations can facilitate two trains stopped simultaneously should the need arise. Option 2 is the most expensive; however, the maximum passenger wait time is significantly less than the other options at 8.5 minutes. While more expensive initially, Option 2 offers greater insurance should ridership drastically increase in the next 30 years. Track Design Options 40 10 10 10 10 10 Matt Eagle Travis Hunt Jayson Lindsay Rocco Lombardi Justin Straub Zach Weber CVE 5002 Spring Semester 2014 Niehoff Urban Studio Movement in the City - Wasson Way Construction Cost & Volume of Earthwork Community Opposition (Number of Parcel Acquisitions) Safety (Number of Road Crossings per Hour) Resiliency (Number of LRT Vehicles & Affected Stations) Maximum Rider Wait Time Operating Cost Success Criteria 2 Edwards Rd 3 4 71 Wasson Way N Wasson Way N N N N Map Legend Industrial Residential Greenspace Commercial Institutional 1 Xavier LRT Station 2 Rookwood LRT Station 3 Hyde Park Plaza LRT Station 4 Red Bank LRT Station LRT Track Roadway NOTE: Maps not to scale. 10 Rider Capacity Hyde Park Plaza 1 4

Transcript of Light Rail Transit - UC

Page 1: Light Rail Transit - UC

Hyde Park Plaza

LEED Point Distribution Poster size: 36 x 52 Caption text Myriad Pro 14pt

Heading (Myriad 50 bold)

Pictures used in the poster should not exceed more than 200 dpi. Include any references and sources if using pictures from the internet/books/other sources Save the poster as Adobe PDF (or Print it as a PDF) Open saved Adobe PDF in Acrobat to check layout, spelling, grammar, and sizing Submit poster files to drop box. Richards industries Cincinnati Gear Save poster file and linked images on disk for later submission. File Naming Protocol: studentlastname_F13.pdf

Light Rail Transit

Wasson Way

N

Single Track 1

Number of times a train crosses road per hour

60

Number of parcel acquisitioned

Edw

ards

Rd 71

Erie Ave

Red

Ban

k R

d

Mar

burg

Ave

Observatory Ave

Little Miami River

Hyde Park Plaza

Rookwood Commons

18min 27sec

$160M

$5.1M

81K (cy) 1463

59

2

4

Erie Ave

Red

Ban

k R

d

Mar

burg

Ave

Observatory Ave

Little Miami River

Rookwood Commons

Design Option 1 is a single track with a 14’ useable width spanning the initial 4 mile length of the Wasson Way Corridor. The exterior stations are designed with both turnouts and track sidings for future implementation with the I-71 Line to the West and the Oasis Line to the East. Option 1 is significantly less expensive and requires less maintenance than the other four options; however, the maximum passenger wait time is the highest at 18.5 minutes. The single track design would require significant track expansion should ridership drastically increase in the next 30 years.

3 4 5

3 2

1

Turnout at Hyde Park Plaza 3Rookwood Commons

Hyde Park Plaza

Edw

ards

Rd

Design Option 3 is a single track with a 14’ useable width with turnouts and track sidings at Xavier Station, Hyde Park Plaza Station, and Red Bank Station. As with the other design options, Option 3 allows for the future implementation with the I-71 and Oasis Lines. Option 3 allows for trains to be simultaneously stopped at Hyde Park Plaza station should the need arise. Option 3 has an intermediate construction and maintenance cost, as well as an intermediate maximum wait time of 14.7 minutes. Option 3 would require significant expansion in the future should ridership drastically increase in the next 30 years.

58 14min 42sec

$188M

$9.5M

98K (cy) 1837

115

4

1.16

Hyde Park Plaza

Hyde Park Plaza Rookwood Wasson Rd

Turnouts at Hyde Park Plaza & Rookwood 4Rookwood Commons

Hyde Park Plaza

Edw

ards

Rd

Design Option 4 is a single track with a 14’ useable width with turnouts and track sidings at Xavier Station, Rookwood Station, Hyde Park Plaza Station, and Red Bank Station. Option 4 allows for trains to be stopped simultaneously at any of the four stations should the need arise. As with the other design options, Option 4 allows for the future implementation of the I-71 and Oasis Lines. Option 4 offers an intermediate construction and maintenance cost, while being tied for the second smallest maximum wait time at 12.3 minutes. Should ridership increases require additional track, expansion would be required between all stations.

56 12min 18 sec

$189M

$9.6M

115K (cy) 2195

106

4

1.16

Hyde Park Plaza

Hyde Park Plaza Rookwood Wasson Rd

Double Track between Hyde Park Plaza & Rookwood 5Rookwood Commons

Hyde Park Plaza

Edw

ards

Rd

Design Option 5 is a mixture of a single track with a 14’ useable width between Xavier Station & Rookwood Station, a double track with a 27.5’ useable width between Rookwood Station & Hyde Park Plaza Station, and back to a single track with a 14’ useable width between Hyde Park Plaza Station & Red Bank Station. As with the other design options, Option 5 allows for the future implementation of the I-71 and Oasis Lines. Option 5 is tied for the second smallest maximum wait time at 12.3 minutes. Option 5 allows for simultaneous train traffic between the two interior stations. Should ridership increases require additional track, expansion would not be required between the interior stations; however, it would be required at the exterior stations.

56 12min 18sec

$190M

$9.6M

117K (cy) 2195

112

4 (15)

0.84

Hyde Park Plaza Rookwood Wasson Rd

Double Track 2

51 8min 32sec

$227M

$10.2M

133K (cy) 3162

118

6 (17)

0

Design Option 2 is a double track with a 27.5’ useable width spanning the initial 4 mile length of the Wasson Way Corridor. As with Option 1, the exterior stations are designed with track sidings for future implementation with the I-71 and Oasis Lines. In addition to the exterior station sidings, the interior stations can facilitate two trains stopped simultaneously should the need arise. Option 2 is the most expensive; however, the maximum passenger wait time is significantly less than the other options at 8.5 minutes. While more expensive initially, Option 2 offers greater insurance should ridership drastically increase in the next 30 years.

Track Design Options

Maximum Rider Wait Time

Construction Cost

Operating Cost

Earthwork (cy) I’m Not Really Sure Yet

20

Number of Parcel Acquisitions

Number of LRT Vehicles

Success Criteria Score

40

10

10 10

10

10

Matt Eagle Travis Hunt Jayson Lindsay Rocco Lombardi Justin Straub Zach Weber CVE 5002 Spring Semester 2014

Niehoff Urban Studio Movement in the City - Wasson Way

Construction Cost & Volume of Earthwork

Community Opposition (Number of Parcel Acquisitions)

Safety (Number of Road Crossings per Hour)

Resiliency (Number of LRT Vehicles &

Affected Stations)

Maximum Rider Wait Time

Operating Cost

Success Criteria

2

Edw

ards

Rd

3

4

71

Wasson Way

N

Wasson Way

N

N

N

N

Map Legend Industrial

Residential

Greenspace

Commercial

Institutional

1 Xavier LRT Station

2 Rookwood LRT Station

3 Hyde Park Plaza LRT Station

4 Red Bank LRT Station

LRT Track

Roadway NOTE: Maps not to scale.

10 Rider Capacity

Hyde Park Plaza

1

4