Light Rail Transit - UC
Transcript of Light Rail Transit - UC
Hyde Park Plaza
LEED Point Distribution Poster size: 36 x 52 Caption text Myriad Pro 14pt
Heading (Myriad 50 bold)
Pictures used in the poster should not exceed more than 200 dpi. Include any references and sources if using pictures from the internet/books/other sources Save the poster as Adobe PDF (or Print it as a PDF) Open saved Adobe PDF in Acrobat to check layout, spelling, grammar, and sizing Submit poster files to drop box. Richards industries Cincinnati Gear Save poster file and linked images on disk for later submission. File Naming Protocol: studentlastname_F13.pdf
Light Rail Transit
Wasson Way
N
Single Track 1
Number of times a train crosses road per hour
60
Number of parcel acquisitioned
Edw
ards
Rd 71
Erie Ave
Red
Ban
k R
d
Mar
burg
Ave
Observatory Ave
Little Miami River
Hyde Park Plaza
Rookwood Commons
18min 27sec
$160M
$5.1M
81K (cy) 1463
59
2
4
Erie Ave
Red
Ban
k R
d
Mar
burg
Ave
Observatory Ave
Little Miami River
Rookwood Commons
Design Option 1 is a single track with a 14’ useable width spanning the initial 4 mile length of the Wasson Way Corridor. The exterior stations are designed with both turnouts and track sidings for future implementation with the I-71 Line to the West and the Oasis Line to the East. Option 1 is significantly less expensive and requires less maintenance than the other four options; however, the maximum passenger wait time is the highest at 18.5 minutes. The single track design would require significant track expansion should ridership drastically increase in the next 30 years.
3 4 5
3 2
1
Turnout at Hyde Park Plaza 3Rookwood Commons
Hyde Park Plaza
Edw
ards
Rd
Design Option 3 is a single track with a 14’ useable width with turnouts and track sidings at Xavier Station, Hyde Park Plaza Station, and Red Bank Station. As with the other design options, Option 3 allows for the future implementation with the I-71 and Oasis Lines. Option 3 allows for trains to be simultaneously stopped at Hyde Park Plaza station should the need arise. Option 3 has an intermediate construction and maintenance cost, as well as an intermediate maximum wait time of 14.7 minutes. Option 3 would require significant expansion in the future should ridership drastically increase in the next 30 years.
58 14min 42sec
$188M
$9.5M
98K (cy) 1837
115
4
1.16
Hyde Park Plaza
Hyde Park Plaza Rookwood Wasson Rd
Turnouts at Hyde Park Plaza & Rookwood 4Rookwood Commons
Hyde Park Plaza
Edw
ards
Rd
Design Option 4 is a single track with a 14’ useable width with turnouts and track sidings at Xavier Station, Rookwood Station, Hyde Park Plaza Station, and Red Bank Station. Option 4 allows for trains to be stopped simultaneously at any of the four stations should the need arise. As with the other design options, Option 4 allows for the future implementation of the I-71 and Oasis Lines. Option 4 offers an intermediate construction and maintenance cost, while being tied for the second smallest maximum wait time at 12.3 minutes. Should ridership increases require additional track, expansion would be required between all stations.
56 12min 18 sec
$189M
$9.6M
115K (cy) 2195
106
4
1.16
Hyde Park Plaza
Hyde Park Plaza Rookwood Wasson Rd
Double Track between Hyde Park Plaza & Rookwood 5Rookwood Commons
Hyde Park Plaza
Edw
ards
Rd
Design Option 5 is a mixture of a single track with a 14’ useable width between Xavier Station & Rookwood Station, a double track with a 27.5’ useable width between Rookwood Station & Hyde Park Plaza Station, and back to a single track with a 14’ useable width between Hyde Park Plaza Station & Red Bank Station. As with the other design options, Option 5 allows for the future implementation of the I-71 and Oasis Lines. Option 5 is tied for the second smallest maximum wait time at 12.3 minutes. Option 5 allows for simultaneous train traffic between the two interior stations. Should ridership increases require additional track, expansion would not be required between the interior stations; however, it would be required at the exterior stations.
56 12min 18sec
$190M
$9.6M
117K (cy) 2195
112
4 (15)
0.84
Hyde Park Plaza Rookwood Wasson Rd
Double Track 2
51 8min 32sec
$227M
$10.2M
133K (cy) 3162
118
6 (17)
0
Design Option 2 is a double track with a 27.5’ useable width spanning the initial 4 mile length of the Wasson Way Corridor. As with Option 1, the exterior stations are designed with track sidings for future implementation with the I-71 and Oasis Lines. In addition to the exterior station sidings, the interior stations can facilitate two trains stopped simultaneously should the need arise. Option 2 is the most expensive; however, the maximum passenger wait time is significantly less than the other options at 8.5 minutes. While more expensive initially, Option 2 offers greater insurance should ridership drastically increase in the next 30 years.
Track Design Options
Maximum Rider Wait Time
Construction Cost
Operating Cost
Earthwork (cy) I’m Not Really Sure Yet
20
Number of Parcel Acquisitions
Number of LRT Vehicles
Success Criteria Score
40
10
10 10
10
10
Matt Eagle Travis Hunt Jayson Lindsay Rocco Lombardi Justin Straub Zach Weber CVE 5002 Spring Semester 2014
Niehoff Urban Studio Movement in the City - Wasson Way
Construction Cost & Volume of Earthwork
Community Opposition (Number of Parcel Acquisitions)
Safety (Number of Road Crossings per Hour)
Resiliency (Number of LRT Vehicles &
Affected Stations)
Maximum Rider Wait Time
Operating Cost
Success Criteria
2
Edw
ards
Rd
3
4
71
Wasson Way
N
Wasson Way
N
N
N
N
Map Legend Industrial
Residential
Greenspace
Commercial
Institutional
1 Xavier LRT Station
2 Rookwood LRT Station
3 Hyde Park Plaza LRT Station
4 Red Bank LRT Station
LRT Track
Roadway NOTE: Maps not to scale.
10 Rider Capacity
Hyde Park Plaza
1
4