Transcript of Life Third Countries Marseille Horizon
Life Third Countries IWM Agency - Vlore (Albania)
Horizon 2020 Conference on Municipal
Waste Management
Presentation structure
• Context• Stakeholders and partnership • Life project results and outcome• Partnership relations• Strength and Weakness• Advice
GENERAL CONTEXT TERRITORIAL CONTEXT
ADRIATIC EURO REGION - ALBANIA - VLORE REGION
INSITUTIONAL CONTEXT: AREA OF CROSS BORDER COOPERATION BETWEEN
ITALY AND ALBANIA
DECENTRALISATION ACTION OF ALBANIA GOVERNMENT
PRESENCE OF THE INTERNATIONAL ORGANIZATION IN VLORE TERRITORY (World Bank, UNDP)
TEMATIC CONTEXT
PLANNING ON URBAN SOLID WASTE MANAGEMENT
Adriatic Area
Vlore Region
Urban Waste Management in Vlore 1
Urban Waste management in Vlore 2
LOCAL CONSTRAINS
ALBANIAN LEGISLATION ON WASTE MANAGEMENT NOT FULLY APPLICABLE
REGIONAL AUTHORITY WITH COMPETENCIES ON PLANNING BUT WITHOUT A STRUCTURE ORGANIZATION AND APPROPRIATE PLANNING METHOD
WASTE MANAGEMENT NOT REALLY UNDER CONTROL OF LOCAL INSTITUTIONS
LACK OF FINANCIAL RESOURCES TO SOLVE WASTE MANAGEMENT PROBLEMS
PROJECT IDEA AND PARTNERSHIP
1.WHAT COULD LOCAL STAKEHOLDERS DO?
2. HOW CAN CROSS-BORDER COOPERATION FIND SOLUTION FOR THIS “HARD”
PROBLEMS?
OUR PARTNERSHIP PRINCIPLES
• Coherence of the project contents with each stakeholders policies and priorities
• Coordination with other regional and local structures, possibly involving other national or regional bodies
• Complementarity of the project with other programmes and actions
• Concentration on shared actions
Master Plan on Waste management:
“Vlore and Marche Regional Authorities partnership
Local Needs and constrainsProject generation
-Training and personnel- Define planning methods-Lack of recycling activities
- New dumpsite and treatment plantto manage waste
- Improve public awareness
European Union financialprogramme for
environment and cross border cooperation
Marche Regional Authority
Assistance and co-financing
Vlore Regional authorityCofinancing and Personeel
I nternational agencyI talian GovernmentWorld Bank – UNDP
Albanian Government
Local stakeholders in Vlore Region
I dea and methods to managesolid waste management in
Regional territory
Regional Agency for an Integrated waste management
Project plan - Regional Plan of waste
management -Localization criteria for dumpsite
- Pilot project -Training and
- Awareness campaigns
Linea LIFE Third country + N. 3 Interreg IIIA
cross border projects
Vlore Regional Authority co-financing
Technical Personnel
Marche Regional Authority
co-financing+
Technical assistance
Law 84/01 Italian Ministry for foreign affair World Bank ICZM Prog.
UNOPS Programme
N. 4 town council of Vlore regionsCo-financing
Local Personeel
Integrated Waste Management Agency on Vlore Regional Authority
Main project objectives of Life IWM project.
TO ESTABLISH STRUCTURE ABLE TO COORDINATE AND PLAN WASTE MANAGEMENT WITHIN THE VLORE REGIONAL AUTHORITY THROUGH THE INVOLVEMENT OF THE REGIONAL PERSONNEL.
TO DEFINE USEFUL TECHNICAL TOOLS TO IMPLEMENT AN INTEGRATED WASTE MANAGEMENT.
Results and Output of Life IWM project ACTION: TEAMBUILDING
Training course on Planning principles on waste management
Beneficiary: Network of public officers of all public institutions involved (N.1 Regional Authority + 7
Municipalities + N. 15 people involved).
Results and Output of Life IWM project
ACTION: TRAINING ACTIVITY • Training courses for local planners of the
municipal authorities • Training courses for technicians of waste
collection and transport • Training courses for tourist operators • Training courses for operators and port workers Beneficiaries: all local stakeholders in Vlore
Territory and in other neighbouring territory
Results and Output of Life IWM project
ACTION: PLANNING ACTIVITY • Social and economic analysis • Database and collecting data model • Collecting data on area with waste collecting services • Collecting of all environmental laws in Albania • Defining of sustainable size of local treatment plants • To define several scenario in Vlore region
Beneficiaries = Experts involved(People of local institutions who act with the
assistance of Italian public officers)
Results and Output of Life IWM project
ACTION: LOCALIZATION CRITERIA FOR DUMPSITE
• Localization criteria• Matrix elaboration• Schedul of Municipality areas with GIS System
Beneficiaries: Local Authorities and planners
Results and Output of Life IWM project
ACTION: PILOT PROJECTS
• 1 pilot project for the building up a system of waste separated collection along the seaside of Himara, Saranda and Lukova with more than 500 bins.
• 25 sites for the separated waste collection located within the schools of the Vlore Region.
• 1 ecological island for the used oil collection in the Port of Durres.
• 1 pilot project for the used paper collection through a system of bins and an ad hoc truck.
Beneficiaries: Local Authorities and citizens
Results and Output of Life IWM project
ACTION: AWARENESS ACTIVITIES • Illustrated “waste book” for schools and students • An education plan for teachers• A Training course for teachers on environmental
education
• Public campaign on waste collection
• Beneficiaries: all local stakeholders in Vlore Territory including citizens and schools
Main outputs – Regional Plan
Main outputs - Education Plan
Agency and structure
Pilot projects
Awareness
Pilot projects
Localization criteria - GIS Application
Localization criteria - GIS Application
Localization criteria - GIS Application
STRENGTHS
1. Ownership by the local stakeholders. The action was agreed among all partners.
2. The initiative corresponds to the territorial “vocation and needs ”
3. Real joint assessment and implementation.4. Good results in terms of multiplier effect5. High capacity to create financial sinergies with
International and National donors.6. High involvement by the local beneficiaries in
particular with awareness activity.
WEAKNESS
• Personnel of Regional office under the effect of “political spoil system”
• Regional Authority too weak in Albania in terms of resources
• Lack of good dialogue with private sectors.
ADVICE
• It is very important to mantain an integrated approach in waste management projects.
• To obtain political ownership of the projects at all levels.
• Financial sinergy is essential • To improve the role of public officers of
European local authorities as tutor with Third countries partnership.
ADVICE
• To create always a specific common goal for each group of stakeholders or public administrator
• Try to organize training as a workshop to solve specific technical problems.
• Don’t forget project management• Do not undervalue the power of children to
spread practical concept to other family members.
Thank you very much for your attention
Paolo Rotoni Marche Regional Authority
SE.A Technical GruopTel. + 39 0718062316 M.P +39 [email protected]
Physical evaluation
Physical Evaluation of the Waste Vlora District
10.0%4.0%
14.8%
0.7%
11.8%1.6%20.8%
17.9%
18.4%
Paper and Cardboard
Textile
Plastic
Metals
Glass
Iron
Organic
Granular Materials
Others
Regional Plan IndexTable of Content
Chapter 1—Introduction
Chapter 2-- Legal Framework2.1 European References
2.1.1 The 6th European Program for the Environment 2.1.2 European Instruction on Waste
2.2 Italian Legislation2.3 Albanian Legislation
Chapter 3—Analysis3.1 General View of Albania
3.1.1 Macroeconomics Dynamics 3.1.2 Demographic Prospective
Regional Plan IndexChapter 3—Analysis (from previous page)
3.1.3 Production of solid urban waste in Albania3.1.4 The composition of the solid Urban Waste (RUW) in Albania
3.2 Vlora District3.2.1 Administrative and Demographic view of Vlora District3.2.2 The Economic View – Typology of the Companies
3.2.3 Health Services3.2.4.Educational Sector3.2.5 General View of Tourist Market in Vlora District3.2.6 Waste Management system in Vlora District3.2.7 The Average Composition of Urban Waste in Vlora
District3.2.8 The Locations of Waste dumpsite in Vlora District3.2.9 Existing recycling activities in Vlora District3.2.10. Conclusions for the Analytical Part
Regional Plan IndexPart II - The Project Scheme The Plan for the Waste Management in Vlora DistrictChapter 4 – Scheme of Regional Planning
4.1 Preliminary Evaluations4.2 Methodology4.3 Forecast of Waste Production for the Upcoming Years4.4 Scheme of the plants
4.4.1 Prediction of the separated waste flows and recycle 4.5 Data on the Organic Plant Typologies4.6 The Use of the Qualified Compost4.7 Other alternatives for Recycling plants 4.8 Cost evaluation
4.8.1 Costs evaluation for a compost and bio-mechanical treatment plants4.8.2 Cost Evaluation for the Dumpsite Plant
Chapter 5 – The Localization criteria for dumpsite and treatament plantsChapter 6 – Regulation for the Organization of Recycling systemChapter 7 – Promoting, Educational and Informative ActivitiesChapter 8 - Conclusions
Illustrated book on Waste
Illustrated book on Waste
Potential dumpsite of WB
Saranda survey