LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 1
Level-1 Trigger Upgrade Status
Wesley Smith, U. Wisconsin
US CMS Project Management Group
December 18, 2013
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 2
L5 - MPCM Software and Firmware Start 401.04.03.02.01 2013-11-01 Initial firmware version is ready, software for test stand is being built.
L5 - MPCM Production Start 401.04.03.02.02 2013-11-01 Started, 2 pre-production mezzanines are at Rice and being tested. All the parts
except optical transmitters are at Rice. Should be ready to start assembly in a few weeks.
L5 -Start MPC-EMUTF Optical Fibers 401.04.03.03 2013-11-01 Short optical pigtails for MPC boards are at Rice. Out of 36 trunk cables for the
EMUTF 27 have been delivered to CERN and tested there. The remaining longest 100+ m cables are expected from Draca in January. Installation at p.5 is planned for spring.
L5 -Start Muon Sorter 401.04.03.06 2013-11-01 Preliminary work on hardware design started.
L5 -Start Trigger Production 401.04.03.06 2013-11-01 Started, covered above
L5-Start MSM Production 401.04.03.06.02 2013-11-01 Not started yet
18 Dec. 2013, Wesley Smith
L5 Active Mu. Trig. Milestones - Rice
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 3
Muon Port Card Status (1)
Received 90 optical pigtails from CERN in November Fabricated 81 new front panels
All parts for 80 mezzanine boards have been ordered and most of them are already at Rice. Optical transmitters from Avago should arrive in the second half of December.
85 optical transmitter boards have been fabricated and assembled in October
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 4
Implemented few minor layout changes in the mezzanine design.
Two pre-production boards have been assembled by Pactron in the middle of November and are being tested at Rice.
Muon Port Card Status (2)
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 5
Complete testing of the two pre-production mezzanines by the end of December
Assemble 80 production boards in the 1st half of January
Test 80 new mezzanines at Rice in January-March
Set up a uTCA test stand at Rice in January-March
Installation of 36 optical trunk cables at p.5: spring 2014
Installation of the upgraded Muon Port Cards at p.5: late spring- early summer 2014
Muon Port Card Mezzanine Plans
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 6
L5-Start EMUTF Test, Install, and Commission 401.04.03.04.03 2013-11-04 A control PC of the type recommended by CERN was ordered for tests in Florida
L5 -Start EMUTF Infrastructure 401.04.03.05 2013-11-01 A control PC of the type recommended by CERN was ordered for tests in Florida First Optical Patch Panel Prototype delivered (next slide)
L5 -Start EMUTF Infrastructure Production 401.04.03.05.01 2013-11-01 Started, covered above
L5-Start EMUTF Software and Firmware 401.04.03.04.01 2013-11-04 A first version of the software emulator (for the initial endcap TF algorithm) has
started. It is nearly ready to be used in CMSSW, but likely will occur in early 2014. Initial firmware for all MTF cards (FPGA control board, optics board, and PT LUT
mezzanine board) has been written and already used for testing of the prototypes.
L5-Start EMUTF Production 401.04.03.04.02 2013-11-04 The preproduction of the MTF7 board with Virtex-7 has started with the submission
for PCB manufacture this December, and components procured.
18 Dec. 2013, Wesley Smith
L5 Active Mu. Trig. Milest. - Florida
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 7
Endcap Muon TF block diagram
18 Dec. 2013, Wesley Smith
Optical plant(fanouts and splitters)
From MPCs60 12-core fibers, 8 cores used in each.90 trig. primitives per 60° sector3.2 Gbps
From RPCUp to 216 fibers at 1.6 Gbps (may be concentrated to higher bandwidth and fewer fibers)
Sector Processors12 units60° sector each
To Overlap Track Finder
Best 3 Muons in each sector (36 total)To GMT
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 8
EMUTF Optical Patch Panel
18 Dec. 2013, Wesley Smith
Prototype patch panel to split, fan-out and bundle fibers to appropriate processor inputs.
Units are only 1 U wide.
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 9
Sector Processor (SP) o Each occupies 2 uTCA slotso 12 units in system
All chassis use AMC13 (designed by Boston University) o Clocking, TTC, and DAQo 3 units
Plan to control boards via PCI express for development (faster)
But will be compatible with IPbus as well for operations per CMS standard
o IP-based protocol for controlling hardware devices adopted by CMS.
18 Dec. 2013, Wesley Smith
uTCA chassis
SPSP SP SP SP
SPSP SP SP SP
SP SP
Chassis #1
Chassis #2
Chassis #3
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
Modular Muon Track Finder (MTF)
18 Dec. 2013, Wesley Smith 10
Modularity makes future partial upgrades easier (e.g. FPGA) Card layout is simpler Power density is less
Optical module
Custom backplane connector
Core logic module
Optical module
Core logic module
Pt LUT module
Custom backplane
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
Optical module
18 Dec. 2013, Wesley Smith 11
uTCA connector
Custom backplane connector
Backplane redrivers
Optical receivers(2 out of 7 installed)
MMC
Optical transmitters (2 out of 3 installed)
Tested, Done! Works with either V6 or V7 MTF versions
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
MTF6 Core logic module (Virtex6)
18 Dec. 2013, Wesley Smith 12
Custom backplane connector
Core logic FPGA
Control FPGA
uTCA connector
Control FPGA JTAG
PT LUT module connector
FMM connector
SD card connector
MMC USB console
MMC JTAG
MMC CPU
Estimated power consumption: ~50 W (assuming FPGAs nearly full)PT LUT mezzanine not included
1Gb FLASHMain FPGA firmware storage
MMC = Module Management Controller
Tested
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
MTF7 design (Virtex-7 version)
18 Dec. 2013, Wesley Smith 13
Core logic module FPGAs:
Core logic: XC7VX690T-FFG1927 or XC7VX550T-FFG1927 Control: XC7K70-FB676
Inputs: 80 Virtex-7 GTH links (10 Gbps) directly to Core FPGA
o Minimal latencyo All available receivers are designated for trigger data
– Maximum flexibility 4 additional Kintex GTX links (10 Gbps) to Control FPGA
o Delivered to Core FPGA via parallel channelo Longer latency
Outputs: 28 Virtex-7 GTH links (10 Gbps)
Control: PCI express Gen 2, 2 lanes IPbus
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
MTF7 Base board
18 Dec. 2013, Wesley Smith 14
Main FPGA
Control FPGA
DC-DC converters(switchers)
Low-DropoutLinear regulators
MMC
PT LUT connector
Custom backplaneconnector
uTCA connector
Layout finishedRFQ for board production submittedAssembled boards should arrive by end of December
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
Glue logic FPGA(Spartan-6)
Base boardconnector
RLDRAM3 memory16 chips, 8 on each side(clamshell topology)Total size: 512M x 18 bits ≈ 1GBUpgrade possible to2 GB with bigger RLDRAM3 chips(no board redesign)
DC-DC converters
Clock synthesisand distribution
PT LUT module
18 Dec. 2013, Wesley Smith 15
Tested! Works with either V6 or V7 MTF core logic modulesInvestigating further latency reduction
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
Optical communication test
18 Dec. 2013, Wesley Smith 16
@3.2 Gbps 47 input channels Transmission from:
o Loopbacko Muon Port Cardo Earlier VME prototype (2010)
For MPC and VME prototype clock was synchronized with VME crateo Twisted pair LVDS connection to uTCA backplane
@10 Gbps 6 input channels Asynchronous clock Transmission from:
o Loopbacko Earlier 10Gbps
prototype (2006)
Results Zero errors for hours
Eye pattern @10 Gbps.GTH receiver input.
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 17
Integration tests
18 Dec. 2013, Wesley Smith
Mimicking real system setup: Sending data from 2 MPCs to
MTF6 Each MPC clocked by separate
CCB MTF6 receives clock from
AMC13 CCBs and AMC13 receive clock
from common source (TTCvi)
Types of tests:o PRBSo Random data via test FIFOso Latest MPC data format used
Result:o No errors.
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
Optical components tests
18 Dec. 2013, Wesley Smith 18
Trunk cable identical to what will be used for Endcap TF Total length (126 m) exceeds actual max fiber length in Endcap TF system (113 m) Results:
o @3.2 Gbps: no errors with 2-way and 4-way splitting [CSC signals]o @1.6 Gbps: 2-way splitting OK, errors with 4-way [RPC signals]o Newer optical receivers lose efficiency at low bitrates
MPCor
MTF6MTF6
63-meter trunk cable(2 lengths)
Couplers
Fanout
Splitters Fanout
Endcap TF needs:2-way splitters: 3484-way splitters: 60Rate: 3.2 Gbps
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status
PT LUT tests
18 Dec. 2013, Wesley Smith 19
Parameters: RLDRAM clock : 200 MHz Address & control: 200 Mbps each bit Data: 400 Mbps each bit RLDRAM can tolerate up to ~1GHz clock. However:
o Hard to implement in FPGAo Needed for burst-oriented applications mostlyo Does not change latency for random address accesso Lower clk F lower power consumption
Tests performed (random data, full 1GB space): Writing into consecutive addresses Reading from consecutive addresses Reading from random addresses
No errors detected Except soldering defects in one RLDRAM chip
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 20
L5-Start Calorimeter Trigger Processor 401.04.04.02 2013-11-01 Two Prototype Boards delivered this week
L5-Start CTP7 Software and Firmware 401.04.04.02.01 2013-11-01 Initial SW and FW for Prototype Operation is being prepared
L5 -Start CTP7 Production 401.04.04.02.02 2013-11-01 First two prototype PCB delivered, parts received and assembly underway (see next slides) Ordered and received 8 Virtex-7 FPGAs.
L5 -Start CIOx Card 401.04.04.03 2013-11-01 Prototype CIOx card made and is adequate for use.
L5 -Start CIOx Software 401.04.04.03.01 2013-11-01 Included in CTP6 software package
L5 -Start CIOx Production 401.04.04.03.02 2013-11-01 Production needed in 2016. Will reschedule.
L5 -Start CTP Infrastructure 401.04.04.04 2013-11-01 Have 3 Vadatech Crates and optical fibers for interconnects in hand.
L5 -Start oRM 401.04.04.05 2013-11-01 oRM Production underway (not US cost – this item is personnel for installation)
L5 -Start oSLB-oRM Optical Fibers 401.04.04.06 2013-11-01 Fibers have been purchased (not US cost – this item is personnel for installation)18 Dec. 2013, Wesley Smith
L5 Active Cal. Trig. Milest. – Wisc.
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 21
Current & Stage 1 Cal. Trigger
Stage 1 Calorimeter Trigger Upgrade Improved processing of current RCT with new oRSC Converts current system to optical New HF (fwd calo) data is available to upgrade path Prepare for the Stage 2 Upgrade Layer 1 cards will also read out RCT in Stage 1
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 22
Two oRSCs are at 904 since mid-October Integration Row & Lab Test Crate
Continuing to validate FPGA builds at UW
Finishing up VME access now New oRSC code to test VME VME-Spartan BE-Kintex FE working
Integrating oRSC into Trigger Supervisor Using new oRSC code
oRSC
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 23
Stage 2 Calo Trigger – Layer 1
Layer 1 cards will receive the calorimeter trigger primitives via optical fiber from
ECAL TCCs with oSLB 4.8 Gbps optical to oRM on legacy RCTo To be installed this wintero Send duplicate to layer-1
HF and HCAL mHTRso Passive optical splitting before HTRs for deployment of mHTR in parallel
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 24
CTP7 Concept
Main Layer-1 processor card
• Virtex-7 690T for processing
• ZYNQ for TCP/IP + Linux
• 60 10Gbps optical Input links
• 36 10Gbps opticalOutput links
• Function: Find ET clusters & transmit to Layer-2
• Card Count = 46• 36 total +
8 spares + 2 test setups
Virtex-7 VX690T FPGA
ZYNQXC7Z03
0EPP
1.5V
S
up
ply
2.5V
S
up
ply
3.3V
S
up
ply
1V
30A
S
up
ply CXP Module
12Tx + 12 Rx
CXP Module12Tx + 12Rx
CXP Module12Tx + 12 Rx
12XRx
12XRx
(CTP-6 BG View)
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 25
Calorimeter Trigger Processor Prototype for Layer-1
4 Rev. A and 8 Rev. B CTP6s have been built 48 input links in 4 Avago AFBR-820B Rx Modules 12 output links in 1 Avago AFBR-810B Tx Modules Back-end & Front-end FPGA XC6VXH 250T/380T Dual SDRAM for DAQ and TCPIP buffering Custom power modules working at 1.0V, 1.5V, & 2.5V Embedded Microblaze processor with Linux on back-end FPGA Custom MMC for control
o Phased power-supply enableso Add’l analog voltage, power good and FPGA Load Done sensors
Parallel FPGA Flash - ~6 seconds to load both FPGAs SI5338 Prog. Clock Synthesizer, multiple options for Reference clocks
o 4.8 Gbps: 120, 240, 300 MHz optionso 6.4 Gbps: 160, 320, 400 MHz options
Nelco 4000-13 SI laminateo Lower losses & better εr for 50Ω trace geometry
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 26
CTP6 Layer-1 Prototype
MMC Power Supplies
BEFPGA
FEFPGA
AvagoRx (4)
Avago TxDual SDRAMFor DAQ & TCP/IP
JTAGUSBInterface
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 27
CTP6 Back Side
Inter-FPGA Links
Link Clock Fanout & Distribution
12X Frontpanel Tx Link Source-Select Muxes (Front or Back-End FPGA)
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 28
UW Test Crate
BU
AM
C13
Vad
atec
h
MC
H UW
CT
P-6
UW
CT
P-6
TTC Downlink
UW
Au
x
(Final system: 3 crates w/ 12 CTP7 ea. + 2 test setups + spare = 6)
U. Wisconsin designed backplane with dense card interconnectsmanufactured & installed in commercial Vadatech VT892 Crate available in Vadatech Catalog
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 29
CTP6 Status
CTP6 inter-board link tests show wide margins
HF from mHTR to CTP6 integration successful 12 links tested at 6.4 Gbps – no errors RAM based data between
One CTP6 at 904 to continue SW work, HW Integration18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 30
oRSC to CTP6 Integration Test
Data patterns successfully transferred from the oRSC, captured on the CTP6 and readout via embedded Linux
• Fiber capture RAM readout
• SW controlled capture• Capture RAM clears
on each capture• All six links capture
expected pattern from oRSC• Automatically
checked by host
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 31
CTP6 and 7 Status
CTP6 at 904 at CERN since Mid-october Checked out Necessary tools work Most effort with oRSC at the moment
CTP7 prototype board in UW lab, post-production final assembly Installation of CXP modules – new innovation – see next slides
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 32
Conforms to 100GbE and 12x10Gbps Infiniband standards
12 optical lanes in each direction
MPO-24 optical connector
Multi-rate capable from 1 Gbps to 10.5 Gbps
850 nm wavelength
Single 3.3V supply
Uses same Avago MicroPOD engine that is used in the Avago MiniPODs Optically compatible with Wisconsin oRSC Card and
Imperial College MP7 Card
Pluggable frontpanel interface means module can be replaced without a card/crate PCB extraction cycle
18 Dec. 2013, Wesley Smith
Avago AFBR-83 CXP Module
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 33
CXP Module, cont’d
Optical Tx Board
Optical Rx Board
MicroPod Optical Rx Interface
12-fiber Ribbon to Optical Tx
Engine
AC coupling caps(external caps not
req’d)
MicroPod Tx Optical
Engine (bottom
side)18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 34
CXP Cage Press-Fit Insertion Operation
Post-reflow operation
84 electrical pins, 4 screws and 2 alignment pins per housing
Electrical pins are press-fit
Requires a tool for properly force application, and a fixture for bottom side board support
Designed and made a fixture for the CTP7
Molex I-Pass Plus EFConnectorP/N 170465-0001
Tool centers insertion force over
electrical pins
CTP7 PCB
Molex Insertion Tool
Fixture
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 35
CTP7 CXP Board Hole Pattern
84 Electrical holes are spec’d for 14.6 mils, ±2 mils
Finished hole diameter spec should be given to the PCB vendor, letting them work backwards from there
PCB Decal has ringed border to chassis ground
Alignment & Screw Retaining Holes
Electrical Connection Press-Fit Holes
CTP7 PCB
Ground Vias (Smaller Holes)
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 36
CTP7 CXP Press-In Fixture
Milled from ¾” aluminum stock
For use after components are soldered on to the board
Clearances for bottom side components
Provides critical board support immediately under the 84 electrical pins
Custom-designed to match CTP7 board design
Relieved for Bottom Side Component Clearance
Direct board support immediately under the CXP Connector electrical Holes (3 places)
Kapton tape for anti-gouge protection
Alignment Pin
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 37
CXP Modules on CTP7
Each CXP module provides 12x lanes of optical Tx and Rx, at speeds between 1Gbps and 10.5Gbps
CTP7 uses 3 CXP modules for front side optical connection
Front panel mounting simplifies PCB design
Avago CXP Modules use same optical engine as Avago MiniPODs for complete compatibility with other CMS boards
Press-fit receptacles required design of special CTP7 holding fixture during the press-in process
Front-panel pluggable design means board extraction not required to replace module
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 38
Embedded processing
Xilinx provides two embedded solutions Soft – Microblaze, on CTP6 Hard – ZYNQ, on CTP7
PetaLinux is an embedded Linux product from Xilinx Runs on Microblaze and ZYNQ platforms Standard, debugged drivers for SPI, I2C, Ethernet,
USART, Flash, etc.
Communications and control functions are most easily handled by processors and software
Advantages General communications & control functions
originally requiring HDL design now can be done by SW engineers writing Linux Apps
More SW engineers than FW engineers
Deployed on CTP6 & oRSC using Microblaze
On the CTP7 using ZYNC processor
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 39
CTP7 Zynq SoC Linux Control Chip
•ZYNQ has hard ARM core
•embedded Linux on transforms housekeeping tasks into Linux application
•Xilinx AXI chip-to-chip exposes Target FPGA into ZYNQ memory space
•Can store FPGA bitfiles on μSD FAT filesystem for easy upgrades via SCP/pop in a new μSD
SD
RA
M
Low Speed Peripherals (EEPROM, Clock Synths,
Optical Modules, Crosspoint Switches,
Console, etc.)
TargetFPGA
AXI Chip-to-Chip
Interface
SPI Config Interface
GbE Connection
ZYNQSoC
(Linux)
microSDFlash
Memory
Target AMC Board
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 40
CTP Software
CTP6 has two FPGAso Front-end connected to optical linkso Back-end connect to Etherneto Inter FPGA Communication via serial bus: UART
CTP7 follows the same model, replace BE by ZYNQ chip Development going on now should be portable
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 41
CTP6 Software
All of the FPGAs have a Microblaze core
On the CTP6 BE, PetaLinux is installed So we use IPBus protocol, in our “softipbus” implementation available in the
CACTUS SVN repository softipbus includes:
o A TCP server that runs on Linux and interprets the byte stream as IPBuso A TCP server that runs on Linux and forwards the byte stream along a file
descriptoro Functions to de-serialize a byte stream into IPBus transactionso Functions to handle IPBus transactions (READ/WRITE/RWM)o Functions to serialize the responses into a bytes stream
Code is written so it can run on Linux as a server or be used as library on the standalone deviceso All the standalone programs are in github
– Problem Tracking and Wiki too
18 Dec. 2013, Wesley Smith
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 42
MMC Project: IPMI System Manager
•μTCA features Gigabit Ethernet to address individual slots and IPMI to manage the power and sensors of individual cards
•Commercial IPMI management tools available, but
•Vendor specific
•Not extensible (GUIs)
18 Dec. 2013, Wesley Smith
IPMI: Intelligent Platform Management InterfaceMMC: Memory Management Controller
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 43
IPMI System Manger
18 Dec. 2013, Wesley Smith
•API wrapping a socket interface
•Act as a gateway for other applications into the IPMI system
•Provide a robust IPMI-over-LAN connection to crates
•Provide a service for automatic low-level initialization of AMC cards at startup
Crate MCH Crate MCH Crate MCH
LHC CMSDetectorUpgrade
Project
PMG: Trigger Upgrade Status 44
Complete oRSC testing and manufacture cards
Test prototype CTP7 in Madison Lab and then bring to CERN for integration tests with MP7 card
Work on implementation and optimzation of Stage-1 algorithms Design and Performance documented in Level-1 TDR Collaboration with FNAL and UIC
Continue Firmware development for oRSC and CTP7
Integrate Software for oRSC and CTP7 with online Trigger Supervisor system
18 Dec. 2013, Wesley Smith
Calorimeter Trigger Plans