LHC 14 & 15 April 2015• 9:22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench• 10:30: Access during cryo recovery• 16:00: Pre-cycle• 17:05: RB.A78 short towards end of pre-cycle: access EPC• 20:45: Cycling• 22:00: Injection of beam. Beam dump system MKD waveform and
abort gap keeper (AGK) set-up– 23:45: QPS not OK for RB.A34, RQD/RQF.A34. Very likely communication
problem with gateway• 06:00: Pilots at 6.5 TeV• 07:19: Dump again on BLM 15.R8• 08:00: QPS – gateway problem is back, to be sorted out
15/04/2015 LHC Morning meeting – MG & JU 1
Third Multiple UFO @ B15R8, B2
15/04/2015 LHC Morning meeting – MG & JU 2
IP8
Q14 Q15
Highest lossQuench
After about 15 minutes at flat top, with 1 pilot per beam < 1e10 p+.
UFO Buster working again
15/04/2015 LHC Morning meeting – MG & JU 3
Also some B1 at 5R4…..
Actions taken
• Reduce BLM dump thresholds of 4 adjacent BLMs by factor of 2.2– Dump the beam before the magnet quenches
• Installed two mobile BLMs on magnet C• UFO buster is now working• Post Mortem on orbit up again• Contact with vacuum group; possibility of
X-Ray of the interconnect
15/04/2015 LHC Morning meeting – MG & JU 4
Access done• Vacuum • BPM (fixed 9, another 9 to go, access needed, plus FESA restart)
– Important for reference orbit we want to establish soon
• BLM (additional installation) • BSRT • Beam Presence flag: OK now• Cryo • IP7 door check • Wire scanner • AC dipole • •
15/04/2015 LHC Morning meeting – MG & JU 5
RB.A78 short
• Performed similar intervention also on RQD.A78 circuit• Thanks to Mirko Pojer (OP), Consuelo Goncalves and Ivan Moya
(EN/EL, they executed the work), Olivier Fournier and Charles Genton (TE/EPC, condemnation)
• To be followed up during TS1
15/04/2015 LHC Morning meeting – MG & JU 6
Before After
Beam Dump and timing
• MKD waveform measurement– BTV Sign change
since last time…
• Abort Gap Keeper measurements– Need access to
dial in the new delays on the beam dump
15/04/2015 LHC Morning meeting – MG & JU 7
ABT team
O-night
• One Ramp, MUFO on same BLM @ 6.5 TeV– Only one Mega
UFO
• Laurette keeps smiling (dump 19 pilots at injection)
15/04/2015 LHC Morning meeting – MG & JU 8
Next• With beam
– MUFO research– Injection kicker MKI waveform IP8– ADT and K-modulation other beam– RF blow-up in ramp (tbc)– Later: reference orbit at injection
• Without beam– ATLAS urgent access Thursday, 4 hours
15/04/2015 LHC Morning meeting – MG & JU 9