LG 001 Checklists

35
Effective 1 st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd Checklist 1 - Weekly Inspection (SOLAS III Reg 20.7) Checklist for Life Boat (Please indicate if Item is not applicable to vessel) Checklist 1 pg 1/ 2 Date of Weekly Inspection Item Method Inspection Procedure No 1 No2 No 1 No 2 No 1 No 2 No 1 No2 Outside Hull Visual Inspect for deformation or other defects. Inspect peeling or any damage to retro reflective material Outside Canopy Visual Inspect for deformation or other defects Inside Hull GRP Visual Inspect for deformation or any defects on internal structures. Inspect condition of Buoyancy Chambers. wood Metal Buoyant Lifeline Visual Inspect for deterioration, damage and securing points Drain Valve Visual Check for damage Markings ( each side) Visual No of persons, Name and Port of Registry, Markings (top) Visual Call Sign of Ship and No of Lifeboat All Hatches Visual Operation Inspect condition of hatch and gasket, check movement. Release Gear Visual Check resetting condition. Remove any dirt on moving parts Painter Release Gear Visual Check resetting condition, remove dirt from moving parts Steering Gear Visual Check condition of rudder Operation Check for proper operation and connection of Emergency Tiller as applicable. Propeller and Guard Visual Inspect for damage blades & guard. Stern Tube Visual Inspect condition, leakage of SW ( when waterborne ) Starter Switch operational Check operating properly

description

LSA checklist

Transcript of LG 001 Checklists

Page 1: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 1 - Weekly Inspection (SOLAS III Reg 20.7) Checklist for Life Boat (Please indicate if Item is not applicable to vessel)

Checklist 1 pg 1/ 2 Date of Weekly Inspection

Item Method Inspection Procedure No 1 No2 No 1 No 2 No 1 No 2 No 1 No2

Outside Hull Visual

Inspect for deformation or other defects. Inspect peeling or any damage to retro reflective material

Outside Canopy Visual Inspect for deformation or other defects

Inside Hull

GRP

Visual

Inspect for deformation or any defects on internal structures. Inspect condition of Buoyancy Chambers.

wood

Metal

Buoyant Lifeline Visual Inspect for deterioration, damage and securing points

Drain Valve Visual Check for damage Markings ( each side)

Visual No of persons, Name and Port of Registry,

Markings (top) Visual Call Sign of Ship and No of Lifeboat

All Hatches Visual Operation

Inspect condition of hatch and gasket, check movement.

Release Gear Visual Check resetting condition. Remove any dirt on moving parts

Painter Release Gear

Visual Check resetting condition, remove dirt from moving parts

Steering Gear

Visual Check condition of rudder

Operation Check for proper operation and connection of Emergency Tiller as applicable.

Propeller and Guard

Visual Inspect for damage blades & guard.

Stern Tube Visual Inspect condition, leakage of SW ( when waterborne )

Starter Switch operational Check operating properly

Page 2: LG 001 Checklists

Effective 1st May 2011 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 1 pg 2/2 Date of Weekly Inspection

Item Method Inspection Procedure No 1 No2 No 1 No 2 No 1 No 2 No 1 No2

Glow Lamp operational Check light on when pre

heating.

Bilge Pump and

piping

Visual

Operational

Inspect condition, check

operation. NOTE the suction

pipes must be made of

re-enforced non-collapsible

material.

Safety Belts Visual Check belt, buckles and

securing. Renew if required

Engine Operational

Start and operate engine,

Check operation of throttle

Check operation of clutch

Confirm Gear box and gear

train engaging satisfactorily.

Check ahead and astern

movement of propeller and

smooth rotation of propeller

shaft.

Tachometer operational Check proper indication of

revolution.

Oil pressure

warning Lamp,

Charge Lamp

operational

Check proper light on or off as

per condition

Stop Wire operational Check condition and working

when stopping engine.

Lifeboat equipment

Survival

Manual

Confirm in Life boat

Life Saving

Tables

Confirm in Life boat

Bilge Pump operational Check proper operation

Checked by Senior Officer In charge

Confirmation by Master

* Space for additional items

Page 3: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 2 - Weekly Inspection procedure and Maintenance Checklist for Life Boat Davit (Please indicate if Item is not applicable to vessel)

Date of Inspection

Item Method Procedure No 1 No 2 No 1 No 2 No 1 No 2 No 1 No 2

Davit Arms Visual

Check for corrosion, deformation and depression.

operational Moving out from stowed position

Frame Visual Check for corrosion, deformation and depression.

Sheave, Suspension Block

operational Check moving condition

Davit Arm Stopper and Trigger Hook

Visual Check wear and corrosion.

operational Check moving condition Lashing wire rope

Visual Check for wear, corrosion, looseness.

Remote Control Wire

Visual Check wear and corrosion

Boat Chock Visual Check wear and corrosion

Checked by Senior Person In charge

Confirmation by Master

Page 4: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 3 - Weekly Inspection procedure and Maintenance Checklist for Life Boat Davit Winch (Please indicate if Item is not applicable to vessel)

Date of Inspection

Item Method Procedure No 1 No 2 No 1 No 2 No 1 No 2 No 1 No 2 Hand Brake, Governor brake

visual Check corrosion or any defects

Brake lever Visual Check for corrosion / defects

operational Check operating condition Speed change lever

Lubricate Lubricate / Grease

Checked by Senior Person In charge

Confirmation by Master

Page 5: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 4 - Weekly Inspection procedure and Maintenance Checklist for Life Boat Davit & Winch Electric parts (Please indicate if Item is not applicable to vessel)

Date of Inspection

Item Method Procedure No 1 No 2 No 1 No 2 No 1 No 2 No 1 No 2 Electric Motor

Visual Check wiring

Limit Switch

Visual Check wiring

Operational Check movement

Lubricate Grease Push button switch box and cable

Visual Check wiring and connector

Starter Panel Visual Check wiring and contacts

Checked by Senior Person In charge

Confirmation by Master

Page 6: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Guide to Monthly Maintenance Check List 1. The items should be checked for the following points as applicable: a). Rusting b). Corrosion c). Wear & Tear d). Cracking e). Bend or deflection. f). Damage g). Loose – clip, linkage etc h). Painting i). Lever position incorrect. j). Oil deteriorated / unsuitable for further use. k). Safety device malfunction l). Cooling water contamination. m). Cable damage n). Bulb fused o). Electrical connection faulty p). Leakage q). Others Please indicate N.A. for items which are not applicable to vessel. Please include additional items to the checklist as applicable to vessel to make it ship specific. Refer to Greasing / Lubricating Charts for points to be greased for stated items. Lube Oil, Fuel Oil, Water and Air Bottles to be maintained in topped up condition at all times. Davit Winch Oil to be replaces at least once a year. Every week the Lifeboats should be moved from their stowed position, without any persons on board, to the extent necessary to demonstrate satisfactory operation of launching appliances, if weather and sea conditions so allow. An entry to this effect should be made in the Ship’s Log Book. The above paragraph is not applicable to Free Fall Life Boats.

Page 7: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 5 - Monthly Inspection ( SOLAS III Reg 20.7 ) and Maintenance Checklist for Life Boat – 3 pages (Please indicate if Item is not applicable to vessel)

Checklist 5 pg1/3 Date of Monthly Inspection

Item Method Inspection Procedure No 1 No2 Remark No 1 No 2 Remark

Outside Hull Visual

Inspect for deformation or other defects. Inspect peeling or any damage to retro reflective material

Outside Canopy Visual Inspect for deformation or other defects

Inside Hull Visual

Inspect for deformation or any defects on internal structures. Inspect condition of Buoyancy Chambers.

Buoyant Lifeline Visual Inspect for deterioration, damage and securing points

Hand Rail Visual Check for damage Markings ( each side)

Visual No of persons, Name and Port of Registry,

Markings (top) Visual Call Sign of Ship and No of Lifeboat

Bottom Plugs Visual Check condition

All Hatches Visual Operation

Inspect condition of hatch and gasket, check movement.

Window Visual Inspect Glass for any cracks Clean both sides of Glass

Remote control wire and sheaves

Visual Check condition of wire Check / Lubricate guide sheaves

operational Confirm when boat is lowered to water.

Lifting Gear Visual Check condition of lifting gear

Release Gear Visual Check condition of unit Remove any dirt from moving parts, apply Lubrication.

Painter Release Gear

Visual Check resetting condition, remove dirt from moving parts Grease

Page 8: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 5 pg 2/3 Date of Monthly Inspection Item Method Inspection Procedure No 1 No2 Remark No 1 No 2 Remark

Steering Gear

Visual Check condition of rudder

Operation Check for proper operation and connection of Emergency Tiller as applicable. Grease

Propeller and Guard

Visual Inspect for damage blades & guard, Grease.

Stern Tube Visual Inspect condition, leakage of SW ( when waterborne )

Fire Extinguisher Visual Check for condition, charge and securing arrangement

Air support System

HP Pipe Visual Inspect for any Damage Regulator

Visual / operational Inspect for damage, function

Nozzles Visual Inspect for corrosion, damage Pressure Visual Check pressure, re-charge Control lever

operational Check for operation

Breather Valve Visual Inspect condition & operation Bilge Pump and piping

Visual Operational

Inspect condition, check operation

Water Spray System

Clutch, V-belt

Visual Inspect for proper tension operational Inspect any damage to belt

Spray Pipe Visual Inspect for damage or corrosion

Spray Nozzle Visual

Inspect for corrosion, damage, choking

Pump operational Engage clutch, check turning, grease shaft & lever. Water delivery check.

Safety Belts Visual Check belt, buckles and securing. Renew if required

*

Page 9: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 5 pg 3/3 Date of Monthly Inspection

Item Method Inspection Procedure No 1 No2 Remark No 1 No 2 Remark

Checked by Senior Officer In charge

Confirmation by Master

* Space for additional items

Page 10: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 6 - Monthly Inspection procedure and Maintenance Checklist for Life Boat Engine – 2 pages (Please indicate if Item is not applicable to vessel) Checklist 6 pg 1/ 2 Date of Monthly Inspection

Item Method Procedure No 1 No2 Remark No1 No 2 Remark Lubricating Oil

Visual Check amount of oil operation Check viscosity with finger

Fuel Oil Tank Visual Check Amount of Oil in tank Check securing condition of tank. Drain check for water.

Fuel Oil pipe Visual Check for damage, leakage on connections

Water cooler Visual Check Amount of Fresh water Cooling Water Pipe

Visual Check any leakage on pipe

Glow Lamp Visual Check Light on when pre heating

Oil Pressure Warning Lamp,

Visual Check for Light on or off condition

Charge Lamp Visual Check for Light on or off condition

Stop Wire Visual Inspect condition operational Check operation

Starter Switch Visual Check condition operation Check operating properly

Engine

Visual Check in good condition

operational

Start and run engine for 3 mins ( consult manual if ok ) Check operation of control lever Check operation of clutch Check propeller ahead and astern

Accumulator Visual Check condition, leakage

operational Confirm operation by engine starting.

Page 11: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Additional Items as applicable: Checklist 6 pg 2/2 Date of Monthly Inspection

Item Method Inspection Procedure No 1 No2 Remark No 1 No 2 Remark

Checked by Senior Person In charge

Confirmation by Master

Page 12: LG 001 Checklists

Effective 1st Dec 2011 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 7 - Monthly Inspection procedure and Maintenance Checklist for Life Boat Electrical parts – 1 page An Engineer or Electrician to assist for these checks. (Please indicate if Item is not applicable to vessel)

Date of Inspection

Item Method Procedure No 1 No 2 Remark No 1 No 2 Remark

Battery

Visual Check Lead Wires, electrolyte

Measure operational

Measure Voltage of Battery Operational check by starting Charge if voltage is low

Inside Lamp operational Check light on Canopy Lamp

operational Check light on

Search Light operational Check light on Electric wiring

Visual Check condition of wire for defects.

Battery Charger

operational Check working of current meter and regulating switches.

Selector switch

operational Check operation of battery charge selector switch

Battery Charge selector

operational Check operation of switch for 1, 2 or both battery charging.

Cable & Plug Visual Check condition of Plug and Cable for charger.

Start Key switch

Contact Check if the contact is being made when key is turned.

Battery wiring

Engine Starter Check the battery wiring to starter motor is good and voltage present.

Start Signal wiring and connection

Contact Check that wiring is intact and contacts of connection to starter motor are clean.

Checked by (Senior Person In charge)

Confirmation by Master

Page 13: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 8 - Monthly Inspection procedure and Maintenance Checklist for Life Boat Davit – 1 page (Please indicate if Item is not applicable to vessel)

Date of Inspection

Item Method Procedure No 1 No 2 Remark No 1 No 2 Remark

Davit Arms Visual

Check for corrosion, deformation and depression.

operational Turning out from stowed position

Frame visual Check for corrosion, deformation and depression.

Hinge and Sheave Pins

Visual Check for wear, Grease

Davit Arm Stopper and Trigger Hook

Visual Check condition

operational Check movement, Grease Sheaves & Suspension block

visual Check for wear

operational Check for movement, Grease

Boat Fall and turnbuckle

visual Check wear, wire breakage, corrosion.

Lubricate As required

Turn ends Turn ends every 2.5 years

replace Replace falls every 5 years

Gripes visual Check for wear, corrosion, looseness.

Deck operation device

operation Check movement

Lubricate Grease

Boat Chock Visual Check for wear & corrosion

Davit Lubricate Grease Monthly as per Manufacturers Lubrication chart.

Hanging-off pennant

Visual Check Condition, wear Lubricate Lubricate if required

Checked by Senior Person In charge

Confirmation by Master

Page 14: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 9 - Monthly Inspection procedure and Maintenance Checklist for Life Boat Davit Winch – 1 page (Please indicate if Item is not applicable to vessel)

Date of Inspection

Item Method Procedure No 1 No 2 Remark No 1 No 2 Remark

Gear Box, Gear Bearing, Oil Seal

Visual Check level and deterioration of Lubricating Oil.

operational Check unusual noises

Replace Oil At least once a year

Hand Brake, Governor brake

visual Check corrosion or any defects

operational Check for proper operation

Brake lever Visual Check for corrosion / defects

operational Check movement / operation Speed change lever

Lubricate Grease

Checked by Senior Person In charge

Confirmation by Master

Page 15: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 10 - Monthly Inspection procedure and Maintenance Checklist for Life Boat Davit & Winch Electric parts - 1 page (Please indicate if Item is not applicable to vessel)

Date of Inspection

Item Method Procedure No 1 No 2 Remark No 1 Item Method

Electric Motor

Visual Check wiring

operational Check for normal operation

Limit Switch

Visual Check wiring

Operational Check movement

Lubricate Grease Push button switch box and cable

Visual Check wiring and connector

operational Confirm normal operations

Starter Panel Visual Check wiring and contacts

operational Check for normal operation

Checked by Senior Person In charge

Confirmation by Master

Page 16: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 11 - Monthly Inspection (SOLAS III Reg. 20.7) /// Liferaft

Date of Monthly Inspection

Item Description No 1 No 2 No 3 No 4 No 5 No 1 No 2 No 3 No 4 No 5 No 1 No 2 No 3 No 4 No 5

Container

Check Condition of Container

Check condition of watertight packing

Check markings & instructions on container

Identification Card Check water tightness and vessel information provided

Cradle Check the condition of the Cradle for corrosion, paint if required

Checked the condition of Automatic Painter system

Ladder ( Fwd Raft) Checked the condition of Embarkation ladder

Manual Release Unit

Check the condition of the release unit, lubricate

Check condition of connecting bolts, nuts & safety pin.

Manual Painter Check condition of Manual release Painter

Hydrostatic Release Unit

Check condition & expiry date of HRU

Check condition of connecting shackles & lubricate. Check Weak link condition and proper connection, check for any obstructions for launching

Lashing apparatus Check condition of wire, turnbuckle & shackles

Check condition & tightness of lashing, lubricate

ILLUMINATION Tested Illumination for Embarkation/ Disembarkation

INSTRUCTION Checked the condition of Operating Instruction

Checked by Senior Officer in charge ( )

Confirmed by the Master

Page 17: LG 001 Checklists

Effective 31st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 12 - Monthly Inspection (SOLAS III Reg. 20.7) /// Other Life-Saving Appliances Date of Monthly Inspection

EQUIPMENT Description SOLAS Requirement

Check No. Condition Remark Check

No. Condition Remark Check No. Condition Remark

LIFE BUOYS

Total Number of Life Buoys (III Reg.. 32.1) pcs Lifebuoys with Light and Smoke Signals capable of quick release from the Bridge (2 pcs) (Smoke Signals)

Expiry ............... (Smoke Signals) Expiry ............... (Smoke Signals)

Expiry ...............

Lifebuoys with Self Igniting Light (only) ( pcs)

Lifebuoys with Buoyant Lifeline 2 pcs

Lifebuoys without any attachment ( pcs)

LIFE JACKET

Total Numbers of Lifejackets (III Reg.. 7.2.1) pcs

Number of Child Life Jackets pcs

Life Jackets for person on watch

(Bridge) ( pcs)

(FWD Station) ( pcs)

(AFT Station) ( pcs)

(ECR) ( pcs)

Lifejackets Lights for Lifejackets (III Reg... 32.2) pcs Expiry ............... Expiry ............... Expiry ...............

IMMERSION SUITS

Total Numbers of Immersion suits (III Reg.. 32.3) psc

Immersion suits for person on watch

(Bridge) ( pcs)

(FWD Station) ( pcs)

(AFT Station) ( pcs)

(ECR) ( pcs)

(other) ( pcs)

LINE THROWING APPLIANCES

Line-throwing Appliances (III Reg.. 18) 1 pcs

Projectiles of Line-throwing Appliances with lines 4 pcs Expiry ............... Expiry ............... Expiry ...............

Brief Instruction for Line-throwing Appliances 1 Vol.

COMMUNICATION

Rocket Parachute Flares (III Reg.. 6.3) 12 pcs Expiry ............... Expiry ............... Expiry ...............

Tow-way VHF Radiotelephone (III Reg.. 6.2.1) 3 pcs

Non-Rechargeable Batteries (Res. A.809) 3 pcs Expiry ............... Expiry ............... Expiry ...............

Radar Transponders (III Reg.. 6.2.2) 2 pcs Expiry ............... Expiry ............... Expiry ...............

On-Board Communication (III Reg.. 6.4) 1 set

Hand Flares

EPIRB

Satellite EPIRB (IV Reg.. 7.6.1)

1 set

Battery of EPIRB Expiry ............... Expiry ............... Expiry ...............

Battery of Release Sensor of EPIRB Expiry ............... Expiry ............... Expiry ...............

Date of last Annual Test (IV Reg.. 15.9.1)

Date of last shore based maintenance (IV Reg.. 15.9.2)

Page 18: LG 001 Checklists

Effective 31st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Other Life Saving Appliances

Date of Monthly Inspection

EQUIPMENT Description SOLAS Requirement

Check No. Condition Remark Check

No. Condition Remark Check No. Condition Remark

ELSA ( if Applicable)

Visually check Cylinder is fully charged and seal intact.

Check condition of Hose for stiffness. (Smoke Signals) Expiry ...............

Randomly perform te functional test and recharge

Cylinder.

Checked by Senior Officer in charge

Confirmed by the Master Expiry ...............

Page 19: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 13 - Monthly Inspection (SOLAS III Reg. 20.7) /// Lifeboat Equipment

Checklist 13 pg 1/ 2 Date of Monthly Inspection

Lifeboat Equipment Reqn No. 1

No. 2

Remark No. 1

No. 2

Remark No. 1 No. 2

Remark

1 Buoyant oar and thole pins, or crutches with lanyard or chain 1 set

2 Boat Hook 2 pcs

3 Buoyant bailer 1 pc

Bucket 2 pcs

4 Survival Manual (Refer to Instructions adopted by IMO A.657 (16)) 1 vol.

5 Operational Compass (Fitted at Steering Position with illumination) 1 set

6 Sea anchor of adequate size fitted with a shock-resistant hawser 1 set

7

Efficient Painters

2 sets

(One painter to be attached to release device in FWD for immediate use)

(The other painter to be firmly secured at or near the bow ready for use)

8 Hatches (One at each end of the Lifeboat) 2 pcs

9 Water containing in the watertight receptacles (3l of fresh water for each person)

3l x person

10 Rustproof Dipper with lanyard 1 pc

11 Rustproof graduated Drinking vessel 1 pc

12 Food ration totaling not less than 10,000 kJ for each person 1 set Expiry............

Expiry............

Expiry............

13 Rocket Parachute Flares 4 pcs Expiry ..........

Expiry ..........

Expiry ..........

14 Hand Flares 6 pcs Expiry ..........

Expiry ..........

Expiry ..........

15 Buoyant Smoke Signals 2 pcs Expiry ..........

Expiry ..........

Expiry ..........

Page 20: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

16 Waterproof Electric Torch with Spare Batteries and Spare Bulb 1 set

17 Copy of the Life-saving Signals table on a waterproof card or container

1 copy

18 Daylight Signaling Mirror with Instruction 1 set

19 Whistle or equivalent sound signal 1 pc

20 First-aid outfit in a waterproof case capable of being closed after use

1 set Expiry ..........

Expiry ..........

Expiry ..........

21 Anti-seasickness medicine for 48 hours with Seasickness bag Each

person Expiry ..........

Expiry ..........

Expiry ..........

22 Jack-knife, to be kept attached to the boat by lanyard 1 pc

23 Tin-Openers 3 pcs

24 Buoyant Rescue Quoits, attached to more than 30m of buoyant in line

2 sets

25 Manual Pump suitable for effective bailing 1 set

26 Fishing Tackle 1 set

27 Tools for minor adjustment for Engine and its accessories 1 set

28 Portable Fire Extinguisher 1 pc Expiry ..........

Expiry ..........

Expiry ..........

29 Searchlight 1 pc

30 Radar Reflector, unless Radar Transponder is stowed in the Lifeboat

1 pc

31 Water Resistant Instructions for Starting and Operating Life Boat Engine

1 set

Checked by Senior Officer in charge ( )

Confirmed by the Master

Checklist 13 page 2 / 2

Page 21: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 14 – Monthly Inspection of Immersion Suits

Item Procedure

Storage Bag

Check condition of bag, ease of removal and donning instructions are legible. Confirm Suit is type and size indicated on bag.

Immersion Suit

Check suit is clean and dry

Check for any damage, wear & tear

Suit Zipper Check for operation and lubricate

Inflatable Head support and buoyancy ring

If fitted, check attachment and condition, check inflation hose for deterioration.

The head support / buoyancy ring should be tested for leaks at least quarterly.

Retro reflective tape

Check condition and for peeling

Whistle (if fitted)

Check condition and working

Light (if Fitted)

Check condition and expiry date

Storage Store suit with zipper fully open

Checked by senior officer in charge

Confirmed by Master

Page 22: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Checklist 15 – Monthly Inspection of 2 Way Radio, SART & EPIRB

Item Procedure

2 Way Radio Telephone

Visual Check for condition – clean any dirt or moisture.

Operational check – talking test to confirm operation and function.

Check expiry for Spare Battery

Clean contacts on battery and charger.

SART

Check condition of container Radome and bracket for any damage, cracks etc.

Check condition of securing rope

Operational test to confirm proper function

EPIRB

Check condition of case and bracket for any damage, looseness, cracks, corrosion etc. confirm no obstruction for release.

Check condition of unit, clean with freshwater.

Check replacement date of Hydrostatic release Sensor. If replacement is required, same to be done by Authorized Agent.

In case of Hydrostatic Release Units, the replacement can be done by Ship’s Staff

Checked by senior officer in charge

Confirmed by Master

Page 23: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship management (Asia) Pte Ltd

ELSA Record

No Cabin Location Maker Model Serial No Duration Capacity Pressure Manuf Date

1 Master C - Deck Interspiro HP 23 15 mins 3 Ltrs 200 bars March 06

2

3

4

5

6

7

8

9

Page 24: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship management (Asia) Pte Ltd

No Cabin Location Maker Model Serial No Size Type Manuf Date

Senior Officer In-Charge

Master

Last Hydrostatic Test:___________________________________________ Last Shore Inspection: _________________________________________

Page 25: LG 001 Checklists

Effective 1st Sept 2009 (Ver 1.2) LG-001 MOL Tankship Management (Asia) Pte Ltd

Immersion Suit Details

No Cabin Location Maker Model Serial No Date of Air Test

Size Condition Manufacture

Date

1 Master E - Deck Imperial Co

International Inc. 1409-ECA 167171 03 Aug 09 Adult Good 2005.May

2 C/O E - Deck Imperial Co

International Inc. 1409-ECA 167465 03 Aug 09 Adult Good 2005.May

3 2/O-1 E - Deck Imperial Co

International Inc. 1409-ECA 167176 03 Aug 09 Adult Good 2005.Apr

4 (OFF SPARE B) 2/O-2

E - Deck Imperial Co

International Inc. 1409-ECA 168512 03 Aug 09 Adult Good 2005.May

5 3/O E - Deck Imperial Co

International Inc. 1409-ECA 167635 03 Aug 09 Adult Good 2005.May

6 R/O E - Deck Imperial Co

International Inc. 1409-ECA 167175 03 Aug 09 Adult Good 2005.Apr

7 OFF SPARE A E - Deck Imperial Co

International Inc. 1409-ECA 168508 03 Aug 09 Adult Good 2005.May

8 C/E D - Deck Imperial Co

International Inc. 1409-ECA 167464 03 Aug 09 Adult Good 2005.Apr

9 1/E D - Deck Imperial Co

International Inc. 1409-ECA 167463 03 Aug 09 Adult Good 2005.May

10 Master E - Deck Imperial Co

International Inc. 1409-ECA 168507 03 Aug 09 Adult Good 2005.May

11

12

SAMPLE PAGE SAMPLE PAGE SAMPLE PAGE SAMPLE PAGE SAMPLE PAGE

Page 26: LG 001 Checklists

Effective 1st Sept 2009 (Ver 1.2) LG-001 MOL Tankship Management (Asia) Pte Ltd

Immersion Suit Details

No Cabin Location Maker Model Serial No Date of Air Test

Size Condition Manufacture

Date

Page 27: LG 001 Checklists

Effective 1st Sept 2009 (Ver 1.2) LG-001 MOL Tankship Management (Asia) Pte Ltd

No Cabin Location Maker Model Serial No Date of Air Test

Size Condition Manufacture

Date

Page 28: LG 001 Checklists

Effective 1st Sept 2009 (Ver 1.2) LG-001 MOL Tankship Management (Asia) Pte Ltd

No Cabin Location Maker Model Serial No Date of Air Test

Size Condition Manufacture

Date

Senior Officer In-Charge

Master

Notes: Updated on:

Page 29: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Life Jacket Record

No Cabin Location Maker Model No Size Type Manuf Date

1 Master C - Deck Cosalt Ltd Premier A 23 Adult Inherent Buoyant March 06

2

3

4

5

6

7

8

9

Page 30: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

No Cabin Location Maker Model Serial No Size Type Manuf Date

Senior Officer In-Charge

Master

Page 31: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Monitoring Record of Company’s Representative

Date Name of Company's

Representative (Signature)

Items Verified Remarks

Page 32: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship management (Asia) Pte Ltd

B) PARTICULARS FOR LIFERAFT

No.1 Life raft (Location : )

Maker's name or trade mark Model and serial number Date of manufacture (Month and Year) Name of approving authority Capacity (Number of Persons) Serviced Last Done: Next Due: No.2 Life raft (Location: )

Maker's name or trade mark Model and serial number Date of manufacture (Month and Year) Name of approving authority Capacity (Number of Persons) Serviced Last Done: Next Due: No.3 Life raft (Location: )

Maker's name or trade mark Model and serial number Date of manufacture (Month and Year) Name of approving authority Capacity (Number of Persons) Serviced Last Done: Next Due: No.4 Life raft (Location: )

Maker's name or trade mark Model and serial number Date of manufacture (Month and Year) Name of approving authority Capacity (Number of Persons) Serviced Last Done: Next Due: No.5 Liferaft (Location: )

Maker's name or trade mark Model and serial number Date of manufacture (Month and Year) Name of approving authority Capacity (Number of Persons) Serviced Last Done: Next Due:

Page 33: LG 001 Checklists

Effective 31st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Particulars for Life-Saving Appliances

Life-Saving Appliances No. Name of Manufacturer/ Type and Serial No. Remarks

1 Line Throwing appliances with 4 rockets and Line

2 12 of Parachute Distress Flares

3 Two-way Portable Radio Telephone Apparatus

No. 1

No. 2

No. 3

4 EPIRB: Emergency Position Indicating Radio Beacons

5 Radar Transponder No. 1

No. 2

6 Daylight Signaling Lamp and Source of Power

7 Lifeboat Davit

No. 1

Lifeboat Winch

8 Lifeboat Davit

No. 2

Lifeboat Winch

Page 34: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Particulars of Lifeboat ( -side: No )

Manufacturer’s Name

Lifeboat Model and Serial Number

Month and Year of Manufacture

Name of Approving Authority

Number of Persons the Lifeboat is approved to carry

Annual Thorough Examination ( Annual Periodic Servicing of Launching Appliances and On-Load Release Gear) (SOLAS Ch III Reg.20.11)

Examination Date of Examination Place of Examination Sign / Name of Manufacturer’s Representative or Certified person

1

2

3

4

5

*Annual Periodic Servicing of Launching Appliances and On-Load Release Gear is including Dynamic Winch Brake Test (Annual Operating Test) Five Yearly Thorough Examination (Annual Periodic Servicing of Launching Appliances and On-Load Release Gear) (SOLAS Ch III Reg.20.11)

Examination Date of Examination Place of Examination Sign / Name of Manufacturer’s Representative or Certified person

Dynamic Test

Over-hauling

* Five Yearly Periodic Servicing of Launching Appliances and On-Load Release Gear is including Dynamic Winch Brake Test with 1.1 times total mass Maintenance of Falls (SOLAS Chapter III Reg.20.4) Date Checked by senior Officer In-charge Confirmed by the Master

Boat Falls Turned end to end

Boat Falls renewed

Hydrostatic Test for Air-Bottles for Lifeboat with self-contained air support system (if fitted )

Date Place Name of Manufacturer Confirmed by Master

Page 35: LG 001 Checklists

Effective 1st Dec 2007 LG-001 MOL Tankship Management (Asia) Pte Ltd

Summary of Work done – Monthly

Remarks: Date Sign PIC Chief Officer Master Remarks: Date Sign PIC Chief Officer Master Remarks: Date Sign PIC Chief Officer Master Remarks: Date Sign PIC Chief Officer Master Remarks: Date Sign PIC Chief Officer Master