leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as...

8
leyton super hub www.cyclepods.co.uk - t:01959 546 046 - [email protected]

Transcript of leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as...

Page 1: leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council.

leyton super hubw w w . c y c l e p o d s . c o . u k - t : 0 1 9 5 9 5 4 6 0 4 6 - i n f o @ c y c l e p o d s . c o . u k

Page 2: leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council.

The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council. Waltham Forest were given £27million of funding by Transport for London to invest in making their streets more accessible and safe for all users.

The funding was used to create designated spaces for cycling, including cycle routes, segregated cycle paths and cycle hubs for secure storage across the borough, redesigned public areas and pedestrianised high streets, and removing unnecessary motor traffic on residential streets

“We want to make cycling an enjoyable, safe and easy way of getting around, not just for people who already cycle but for people who might be thinking about cycling but have reservations.

We want to use the scheme to increase cycling among residents. Getting more residents to jump on a bike will improve health and fitness levels, and reduce vehicle emissions to create a more pleasant environment for everyone. We recognise that people need to feel confident whilst cycling so in addition to making routes safer, we offer a range of activities to encourage people to jump on a bike and feel more confident about cycling.”

- LB of Waltham Forest, Mini-Holland Scheme

Several Cycle Hubs were planned across the Borough, with the Cycle Hub at Leyton earmarked from the start of the project as being the flagship Hub. Situated in one of the busiest commuting areas and central to Leyton town, the Hub needed to be a beacon of the Mini-Holland project, encapsulating the passion and commitment of Waltham Forest towards cycling.

Cyclepods submitted our two-storey design to Waltham Forest Council, ours was the only double level design and it opened the eyes of the Project Managers to the possibilities that could be achieved. Waltham Forest then decided that they would go bigger and better with the Leyton Hub, and decided to make it a project in it’s own right so it would make a bigger impact. Our proposed solution that provided more cycle parking spaces and maximised the use of the limited available space in an innovative and striking design.

Page 3: leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council.

1234568101112

1211108654321ABCDE

Eastern Elevation As Proposed - 1:50 @ A1

scale bar - 1:50 @ A1

DRAWN BY

CHECKED

AMENDMENT

REVISION

DATE

JOB NO. DRAWING NO.

SCALE

DRAWING TITLE

JOB TITLE

CLIENT

REV DATE BY

NOTES

THE DESIGN STUDIO94 HIGH STREET, STEYNING

WEST SUSSEX BN44 3RD

TEL: (01903) 868645FAX: (01903) 816496

[email protected]

Cyclepods LtdUnit 2 Betsoms Farm, Pligrims Way,

Westerham, Kent, TN16 2DS

Tel - 0845 094 0490 | Mob- 07979 806 779Web - www.cyclepods.co.uk

Email - [email protected]

Southern Elevation As Proposed - 1:50 @ A1

Western Elevation As Proposed - 1:50 @ A1Northern Elevation As Proposed - 1:50 @ A1

A 14.12.15 ec South & east elevations added

The design of the Leyton Super Hub was based on our ‘Lewes’ style Cycle Hub. We used the modern architecture in the surrounding area as an inspiration so that the Cycle Hub would complement the local urban environment.

Originally the space contained an octagonal style shelter which held 20 cycle parking spaces. The space available was extremely tight and limited so carefully planning was necessary to ensure maximum cycle parking. 165 cycle parking spaces were planned in using a two-tier system - a 725% growth!

The structure of the hub is made from recyclable steel and the walls are toughened, laminated glass. Using transparent materials as cladding on the hub creates an illusion so that the Hub spears smaller than it’s physical dimensions suggest. As the contents of the Hub are well lit and visible from the outside, it also makes the Hub an open and inviting space in which users can feel safe and secure.

The high-street location meant a larger Hub was necessary to accommodate the potential footfall from Leyton Tube Station, the neighbouring shopping complex as well as local cyclist traffic. The natural street levels worked in favour of a double level hub as access to the upper level can be achieved from the bridge across the A12 via. a specially designed cantilever ramp, and to the lower level from the street. Stairs with a cycle ramp were built from the lower level to the upper level.

Due to the modular nature of our design, the lower level could be easily extended to provide more spaces or facilities if usage needs demand it. The whole building is low consuming in energy and the materials themselves are recyclable where possible to ensure the whole Hub is sustainable.

Design and inception

Page 4: leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council.

80T

Public bike pump and Repair Stand available

on both floors

53 panes of toughened &

laminated glass used for the

walls, making it bright & secure

Unique heavyweight structural design with

robust architectural features

1st Secured by Design Cycle Hub! Certified with SBD’s National Building Approval

The whole Hub is a sustainable building,

low consuming in energy and built with

recyclable steel

Easy maintenance, floor and structure can be jet washed and the Hub is modular so if parts need to be replaced or built on this is a straightforward process.

CCTV and help points available around the Hub

LED lighting on motion sensors are ultra-low energy for a low carbon footprint

The original Leyton shelter had 20 bike spaces. The new Super Hub has 165 spaces using the

Easylift two-tier system - a 725% growth in cycle parking spaces!

Located next to Leyton Tube Station for easy transport links

Structure (above ground) is more than

80 Tonnes of steel 1st Multi-Level Cycle Hub in London

1st

165 bike spaces make it over twice the size of the other Waltham Forest hubs

x165725%

This Super-Hub is the largest of the Waltham Forest hubs, and the only two storey Cycle Hub1

2

Page 5: leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council.

80T

Public bike pump and Repair Stand available

on both floors

53 panes of toughened &

laminated glass used for the

walls, making it bright & secure

Unique heavyweight structural design with

robust architectural features

1st Secured by Design Cycle Hub! Certified with SBD’s National Building Approval

The whole Hub is a sustainable building,

low consuming in energy and built with

recyclable steel

Easy maintenance, floor and structure can be jet washed and the Hub is modular so if parts need to be replaced or built on this is a straightforward process.

CCTV and help points available around the Hub

LED lighting on motion sensors are ultra-low energy for a low carbon footprint

The original Leyton shelter had 20 bike spaces. The new Super Hub has 165 spaces using the

Easylift two-tier system - a 725% growth in cycle parking spaces!

Located next to Leyton Tube Station for easy transport links

Structure (above ground) is more than

80 Tonnes of steel 1st Multi-Level Cycle Hub in London

1st

165 bike spaces make it over twice the size of the other Waltham Forest hubs

x165725%

This Super-Hub is the largest of the Waltham Forest hubs, and the only two storey Cycle Hub1

2

Page 6: leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council.

This project was a full, turn-key solution from Cyclepods. We conceived the design for the Hub, architected the drawings and planning permission necessary, designed the bespoke cantilever ramp and structure, carried out groundworks and foundation, provided the facilities, storage and technology for the hub and contracted all peripheral aspects such as the electrics, security and site management.

Cyclepods worked closely with Waltham Forest Council throughout the entirety of the project, all aspects of the design and build process required involvement from both parties to ensure that all available opportunities were taken advantage of. This close working relationship was particularly beneficial when unforeseen circumstances and delays led to minor setbacks in the construction process. No project is exempt from troubles but having clear communication meant obstacles and problems were easily overcome and served to provide more opportunities for consideration and improvements in delivering the Hub.

Over 80 tonnes of recyclable steel and 50 panes of toughened and laminated glass were used in the construction of Leyton Super Hub.

Building such a large structure was a challenger in such a tight space. The Location is nestled between the A12 cutting, High Road Leyton (a main road with heavy traffic and pedestrians) and a residential street. This meant access to site was restricted and site logistics had to be timed meticulously to ensure minimal disruption to the surrounding streets and the public.

LP

LP

existing manholes to be retained andprotected during the works

dashed line denotes extent of slopedfeature to be excavated and removedfrom site

dashed line denotesextent of sloped featureto be excavated andremoved from site

dashed line denotes extent of existingcycle store to be demolished, with allexisting foundations etc grubbed out andelectrical feeds isolated

existing fencing and gates to be retainedand protected during works

line of portal frame over

line of portal frame over

line of portal frame over

1

A

2

3

4

5

68

10

11

12

B

C

DE

F

9

7

rwp

rwp

SW drainage run

SW dr

ainag

e run

SW d

rain

age

run

RWP - 90mm dia. downpipe to bepolyester powder coated aluminium - colourRAL 7012. RWP to discharge to new belowground drainage run

position of emergencybreak glass door release

dashed line denotes extent ofPFC drainage channel over

dashed line denotes extent ofPFC drainage channel over

position of powder coated metalpanel to house electrical rising main,distribution board and overrideswitches for PIR switching to lightingand door power isolation

dashed line denotes galvanisedcable tray fixed to u/s first floorstructure, trunking to perimeter oflower ground floor, with all cableruns housed in galvanised trunking

hatched areas denote extent of crankedsteelwork to support ramp - to St. Eng.details - PLEASE NOTE T.O.S. LEVELSVARIES AS RAMP DROPS

gulley

gulley

gulley over manhole

new IC

rwp

rwp

service riser

LP

LP

+14.230 ex. FFL

end panel and post of existingrailing to be removed andexisting pavement made goodas necessary

landing

landing

line o

f stru

cture

below

line of structure below

+14.565 FFL

1

A

2

3

4

5

68

10

11

12

B

C

DE

9

7

rwp

rwp

drainage outlet

F

automatic sliding door - to specialistsub-contractors design

stainless steel 'posts' to side ofentrance - 01no. (left hand side)to house swipe card entranceequipment

position of emergencybreak glass door release

Post detail to comprise of 100 x 100mm SHS, fixed tobaseplate - to be polyester powder coated finished, toRAL 7012 (dark grey) with 100 x 75mm unequal anglesfixed to posts - to be polyester powder coated finished, toRAL 7012 (dark grey). Angles to be pre-drilled to acceptglazing panels. Angles to have chamfered detail at headand base - refer to elevational details

12mm thick toughened and laminatedsingle glazed glazing panels to be securedback to steel angles via Stainless SteelGlass Connector GR304/ Satin finish, withcountersunk bolt - manet-style fitting, byGlass UK

1400mm high glass infill panel to be 12mmthick toughened and laminated singleglazed glazing panel to be secured back tosteel angles via Stainless Steel GlassConnector GR304/ Satin finish, withcountersunk bolt - manet-style fitting, byGlass UK

external barrier to be IDS17 System byI-D-Systems, glass thickness to be confirmed byStructural Engineer to resist loadings as set out inBS EN1991-1-1 and to be installed in accordancewith manufacturers recommendations and details

ALL STRUCTURAL STEELWORKTO RECEIVE 12 HOUR FIREPROTECTION (HALF-HOUR FIRERATED BUILDING). FOR THEEXACT SIZING AND POSITIONINGOF BEAMS, REFER TOSTRUCTURAL ENGINEERSDRAWINGS

GROUND FLOOR STRUCTUREto comprise of flexible anti-slip resin system, by Specialist ResinFlooring, or similar approved, on insitu cast concrete floor slab -to Structural Engineers details and specification

INTERMEDIATE FLOOR STRUCTUREto comprise of flexible anti-slip resin system, by Specialist ResinFlooring, or similar approved on galvanised steel cheque plate,rivet fixed to purlins/ secondary steel work to st. eng. details,fixed to polyester powdered coated galvanised primary steelwork,to St. Eng. details - all to specialist sub-contractors/ structuralengineers details/ specification

EXTERNAL WALLSPost detail to comprise of 100 x 100mm SHS, fixed to baseplate- to be polyester powder coated finished, to RAL 2001 (dark grey)with 100 x 75mm unequal angles fixed to posts - to be polyesterpowder coated finished, to RAL 7012 (dark grey). Angles to bepre-drilled to accept glazing panels. Angles to have chamfereddetail at head and base - refer to elevational details

Glazing to be 12mm thick toughened and laminated single glazedglazing panels to be secured back to steel angles via StainlessSteel Glass Connector GR304/ Satin finish, with countersunk bolt- manet-style fitting, by Glass UK

ROOF STRUCTUREroofing to be aluminium KingZip SF standing seam roof byKingspan. Roof fascia profile/ soffits/ all trims to be polyesterpowder coated to RAL 7012 (dark grey). Standing seam roofsheets and 'hidden' gutter to be self finished aluminium sheeting.Underside of roof structure to receive liner tray, finished inpolyester powder coat, colour - white. Roof void to be insulatedusing quilt insulation over vapour barrier of thickness to suithalter depth.All roofing elements to specialist sub-contractors design. Allroofing components to be installed in accordance withmanufacturers recommendations and details.

drainage outlet

column

column

position of powder coated metalpanel to house electrical rising main,distribution board and overrideswitches for PIR switching to lightingand door power isolation

dashed line denotes galvanisedcable tray fixed to u/s first floorstructure, trunking to perimeter oflower ground floor, with all cableruns housed in galvanised trunking

access ramp to comprise of 6 mm thick steelchequer plate with non-slip paint finish. Plate to besupported/ fixed to purlins spanning betweenPFC's which are in turn supported on steppedprimary steelwork - all steelwork to St. Eng.details. Ramp to be set with a gradient of 1 in 15

Upper Ground Floor Plan - 1:50 @ A1

scale bar - 1:50 @ A1

DRAWN BY

CHECKED

AMENDMENT

REVISION

DATE

JOB NO. DRAWING NO.

SCALE

DRAWING TITLE

JOB TITLE

CLIENT

REV DATE BY

NOTES

THE DESIGN STUDIO94 HIGH STREET, STEYNING

WEST SUSSEX BN44 3RD

TEL: (01903) 868645FAX: (01903) 816496

[email protected]

Cyclepods LtdUnit 2 Betsoms Farm, Pligrims Way,

Westerham, Kent, TN16 2DS

Tel - 0845 094 0490 | Mob- 07979 806 779Web - www.cyclepods.co.uk

Email - [email protected]

Lower Ground Floor Plan - 1:50 @ A1 Typical Post Plan Detail - 1:10 @ A1

A 05.10.15 ec general updatesB 12.10.15 ec upper floor structure notationamended at clients requestC 14.12.15 ec general updatesD 17.12.15 ec ramp details addedE 19.01.16 ec ramp amendedF 29.01.16 ec dimensions added for SAWOG 25.05.16 ec rwp position amended following development of SAVVO dwgsH 07.06.16 ec rwp positions dimensioned

line of portal frame over

line of portal frame over

rwp

rwp

SW d

rain

age

run

gulley

gulley

gulley over manhole

rwp

rwp

Drawing number

Client Drawing number

CheckedDate Drawn Site Visit

Cyclepods Ltd.Betsoms Farm, Pilgrims Way,Westerham, Kent, TN16 2DSTel: 0845 094 0490Fax: 0845 094 0151Email: [email protected]: www.cyclepods.co.uk

----

1

NTS

--PR13/02/17

DRAFT - NOT FOR CONSTRUCTION

All dimensions in millimeters . Where dimensions are not given,drawings must not be scaled and the matter referred back to CyclepodsLtd.

All dimensions and conditions are to be checked on site by thecontractor prior to preparing drawings or commencing any work. Thecontractor is responsible for checking that there is no conflict betweensite dimensions and drawn dimensions.

In the event of any detail or dimensional conflict between Cyclepodsdrawings, the matter must be referred back to Cyclepods for clarification.

Revisions By Authorised

BUILDING PROCESS

Page 7: leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council.

The Super Hub is fully-equipped with the most up-to-date, eco-friendly and user-friendly Cycle Hub facilities available and features state-of-the-art access control technology for maximum security.

Cyclepods used LED lighting systems to ensure all areas of the Hub are well lit and inviting. These lights are run off low-voltage electricity and are triggered with PIR motion sensors which stay lit as long as movement within the hub is detected. This makes them energy-saving, long lasting and very low maintenance and the extruded aluminium casing makes them extremely tough and vandal-resistant.

The storage provided is the Cyclepod’s Easylift two-tier system – one of the most user-friendly, gas-assisted two-tier systems available. Due to the low loading height of the Easylift, it takes minimal effort from users to wheel their bike into place without having to lift the whole weight of the bike. Once loaded, the gas-assist does the rest of the work - the upper arm lifts on its own and just needs to be pushed gently back into place. Each parking space has several secure locking hoops so bike wheels and frame can be locked for extra security.

A Cyclepod XL Bike Pump & Fix-It Repair Stand are available on both floors to provide basic tools for bike maintenance and repair. The XL Pump is designed for heavy use and fits both Schrader & Presta valves. There is also a Help Point on both floors in case users ever need assistance.

Secured by Design & National Building Approval

The most unique feature of the Leyton Super Hub is that it is the only Secured by Design Cycle Hub to date, meaning the Hub meets the Police Preferred Specifications for security.

‘Secured by Design is a crime prevention initiative operated by the Police Services of the United Kingdom. It combines proven environmental design principles with the use of physical security products to reduce the risk of crime. Independent academic research consistently demonstrates dramatic crime reduction benefits of up to 75%.’

The Hub was awarded Secured by Design’s National Building Approval and has been equipped with the first Secured by Design automated door system, which combined with Cyclepod’s access control technology the Leyton Hub is one of the safest places in the UK to store your bike! A CCTV system has also been included in the Hub, due to the very public location and the elevated levels of traffic expected through the Hub.

cycle hub facilities

Page 8: leyton super hub - Cyclepods Ltd › wp-content › uploads › ...The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council.

This pioneering Cycle Hub design is the product of Cyclepods innovation and creativity meeting Waltham Forest Council’s forward-thinking ambition. Leyton Super Hub is now a beacon for Waltham Forest and a benchmark for further multi-level hubs in London. The hub will hopefully increase cycle use and rail use, due to its proximity to Leyton Tube Station, and will provide easier sustainable transport and commuting links. This Cycle Hub will become a communal tool in the day to day lives of Leyton residents and is an eminent example of Waltham Forest’s commitment to sustainable travel and healthy lifestyles.

If you want to use the Leyton Super Hub, you can sign up for a membership and access fob online. Membership costs £25 per person per year and is subject to an annual renewal fee 12 months from the start date.

To sign up you will need to provide proof of address, a photo of yourself and the details of your bike, so have those ready before you begin!Visit http://www.enjoywalthamforest.co.uk/cycle-sheds/ now to register.

Benefits of the Leyton Super Hub

• Peace of mind knowing your bike is dry and safe • Located near public transport and amenities for your convenience• Most secure Cycle Hub in the UK • Equipped with CCTV and help points• Bike repair & maintenance facilities available• Helps you easily include cycling as part of your longer journey or commute

leyton super hub - in partnership with waltham forest