Lexington IIat Market Square North, Washington D.C.
Alexis Pacella – Structural Option
![Page 2: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/2.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 3: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/3.jpg)
Building Summary
12 Story Residential Tower
Market Square North Complex
3 below grade levels
72,000 sq ft
49 Apartment Units
Completed in 2002
![Page 4: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/4.jpg)
Building Summary
![Page 5: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/5.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 6: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/6.jpg)
Existing Structure
Gravity System:
2 Way Flat Plate Slab8 inches
Irregular Column LayoutSmall Bays
Lateral System:
Shear Walls
Foundation:
MAT
![Page 7: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/7.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 8: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/8.jpg)
Proposal
Current design restricted by height limit: 130 feet(current height = 125 ft w/ penthouse)
Only structures with a thin floor sandwich, such as flat plate and pre-stressed were considered
When height restriction is not a factor,
Can A More Economic System be Found???
![Page 9: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/9.jpg)
Proposal
How will a steel structural system effect…
Other building systems
Time
COST
![Page 10: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/10.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 11: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/11.jpg)
Gravity System
Composite:Steel composite deck on steel beams and
columns
Relatively shallow floor sandwichNo large change in stiffness and vibrationSteel is usually most cost effective
Additional cost and labor for fireproofing and connections
![Page 12: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/12.jpg)
Gravity System
New column layout required for steel system to be economical
Does not interfere w/architecture
Windows moved
One closet obstructed
![Page 13: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/13.jpg)
Gravity System
Composite Decking:
Span is too long, bisect each bay with a beam
Unshored saves on labor and material
Unshored will use extra concrete
Residential Levels: 2” LOK floor deck with 4.5” slab
Public Levels: 3” LOK deck with 5.5”slab
Decking chosen from USD catalog.
![Page 14: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/14.jpg)
Beams, columns, and shear studs were designed for gravity loads using RAM software.
Gravity System
RAM criteria set to LRDF 3rd Edition
![Page 15: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/15.jpg)
Gravity System
Final Design:
4.5” deck + slab
12” beam
= 16.5” Total floor sandwich depth
Increase of 8.5” per floor 8.5’ total
New Height = 133.5’ > Allowable 130’
![Page 16: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/16.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 17: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/17.jpg)
3 possible Lateral Systems:Shear WallsMoment FramesBraced Frames
Located around elevator shaft
Architectural Feature of the building
Will not obstruct bays
Costly connections
High strength and stiffness
Easy to erect
Lateral System
![Page 18: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/18.jpg)
Lateral System
Shear Walls:
Check Existing Walls
ETABS
Results:
Surround Elevator Shaft
Steel Lighter Weight Less Seismic Load
8.5’ height increase Slightly Greater Wind Load
![Page 19: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/19.jpg)
Braced Frames:Find location in building Distribute Loads by RigidityCheck ASCE 7 wind casesDesign, check on STAAD
Design was controlled by
allowable stress
Lateral System
![Page 20: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/20.jpg)
Lateral System
STAAD Design:
Chevron Braces
Member Stresses Controlled
Size Range: W12x65 – W12X170
Total Deflection < 3.6” allowable
![Page 21: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/21.jpg)
Final Design:
Some columns controlled by biaxial bending increased size
Sizes: W12x65 – W14x342
Final Deflection = 2.7”< 3.6” allowable
12
Mny
Muy
Mnx
Mux
Pn
Pu
Lateral System
![Page 22: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/22.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 23: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/23.jpg)
Are there other issues with the structure to be considered?
Connections
Substructure
Foundation
Other Structural Factors
![Page 24: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/24.jpg)
Beam to Column Connections:
Stiffeners Required
Typical 7th floor connection
Other Structural Factors
![Page 25: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/25.jpg)
Heavy Bracing Connection:
Uniform Force MethodSame beam to column connection
27”x27”x1/2” gusset plate
3”x3”x1/2” angles
Other Structural Factors
Typical 7th floor connection
![Page 26: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/26.jpg)
Other Structural Factors
The Substructure:
Concrete is better in subterranean conditions
Additional building weight
Concrete is a more durable parking structure
![Page 27: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/27.jpg)
Other Structural Factors
Substructure:
One way joist floor ~easy to construct
~works with new bay sizes
20” pans; 5” ribs; 25” o.c.
![Page 28: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/28.jpg)
Other Structural Factors
Substructure:
Girders: 24”x15”
top steel = 7 #9’s
bottom steel = 4 #8’s
Stirrup PlacementReinforcement Cutoffs
Girder Section
![Page 29: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/29.jpg)
Other Structural Factors
Substructure:
Columns:Below the Braced Frames:
Shear walls were used, shear controlled
![Page 30: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/30.jpg)
Other Structural Factors
Substructure:
Connections ~ a base plate sunk into floor slab at each column
![Page 31: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/31.jpg)
Other Structural Factors
Foundation:
Existing MAT foundation
Punching shear
Overturning
Forces affecting
overturning
No Problems
![Page 32: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/32.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 33: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/33.jpg)
Construction Management
Construction Management Issues:
Site Layout
Cost
Scheduling
![Page 34: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/34.jpg)
Construction Management
Site Layout:
Needed spaces: offices, circulation paths, storage, etc…
Steel Design ~ Crane
~ Lay Down Area
![Page 35: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/35.jpg)
Construction Management
![Page 36: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/36.jpg)
Construction Management
Cost :
Concrete ......................................$1,526,000
Steel ………………………………...$1,455,600
Saves $70,000
This does not however account for cost due to extra façade material or fireproofing
Building Scale is not large enough to develop full economy associated with a steel structure
![Page 37: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/37.jpg)
Construction Management
Each level is built in the sequence:
1 day for columns and beams 2 days for deck
Next level is started Slabs poured when beam, column, and deck
construction is 3 stories ahead.
Scheduling:
Total: 18 weeks
![Page 38: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/38.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 39: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/39.jpg)
Mechanical
Mechanical Considerations:
HVAC
Acoustics
![Page 40: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/40.jpg)
Mechanical
HVAC:
Fresh air requirements are met by windows
![Page 41: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/41.jpg)
Mechanical
HVAC:
MEP Systems can be moved from soffits into ceiling sandwich.
Beams should not be intersected.
![Page 42: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/42.jpg)
Mechanical
SupplyExhaust
![Page 43: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/43.jpg)
Mechanical
Acoustics:
Original System: Concrete ceilings with sprayed acoustical sealant
NRF = .75
Steel System: Suspended ceiling with acoustical tiles
NRF = .5 to .95
![Page 44: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/44.jpg)
Mechanical
Acoustics:
Acoustic Tiles on suspended ceiling
Assembly Issues
![Page 45: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/45.jpg)
Presentation Outline
Building SummaryExisting StructureProposalGravity SystemLateral SystemOther Structural FactorsConstruction ManagementMechanicalConclusion
![Page 46: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/46.jpg)
Conclusions
Structural design was controlled by height restriction
Composite:
Larger Bays
Works well with other integrated systems
Full Economy of Steel Savings was not
achieved
![Page 47: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/47.jpg)
Questions?
![Page 48: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/48.jpg)
Building Summary
Key PlayersArchitectureFaçadeSite/ZoningOther Systems
OwnerSquare 407 LP
ArchitectStudios Architects
Structural EngineerThornton Tomasetti
MEPEngineering Design Group
General ContractorClark Construction
Transportation
2 elevators and stairwells in building core
MechanicalWater source heat pump;
Boiler, pumps, cooling tower
Electric/Lighting
1 phase, 3 wire; 120/208 VFluorescent Lights
12 Story Residential Tower
Market Square North Complex
3 below grade levels
72,000 sq ft
Completed in 2002
![Page 49: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/49.jpg)
Existing Structure
Materials
Concrete: Columns and MAT ~ 5000psi Slab and Shear Walls ~ 4000psi
Reinforcement: Slab ~ bottom #4 every 12”
Shear Walls ~ #4 every 12” MAT ~ #8 bars every 9” Columns ~ varies by size
Top and extra reinforcement is placed as needed
![Page 50: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/50.jpg)
Gravity System
Loads:
Dead Load: Self Weight of System
Superimposed = 30psf
Live Load: Residential = 60psf
Public = 100psf
Partitions = 20psf
Loads taken from ASCE 7 02
![Page 51: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/51.jpg)
Construction Management
Cost:
Steel vs. Concrete
Steel Concrete
Costly Connections
Formwork
Fireproofing Reinforcement
Extra Façade Waste
Accessories
![Page 52: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/52.jpg)
Excavation: $23,600Foundation:
$159,000
Concrete Design Cost:Sub Grade Floors:
$671,000Super Structure Floors:
$154,000Columns:
$395,000Shear Walls:
$123,900______________________________________Total $1,526,000
Construction Management
Prices taken from R.S. Means
![Page 53: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/53.jpg)
Construction Management
Excavation: $23,600Foundation: $159,000
Steel Design Cost:Sub Grade Levels: $741,200Steel Levels: $467,200Braced Frames: $156,400Connections: $51,300
___________________________________Total: $1,455,600
Prices taken from R.S. Means
![Page 54: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/54.jpg)
Construction Management
Scheduling:
Excavation
Backhoe .5 daySheathing .5 daysHauling 1 days
Sheathing 3 daysTotal per story 4 days
x 3 stories 2.4 weeks
![Page 55: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/55.jpg)
Construction Management
Scheduling:
Foundation
Cast in Place MAT 1dayCuring 4 days
Total 5 days
3 weeks
![Page 56: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/56.jpg)
Scheduling:
Substructure
Columns 1.1 dayGrade walls 2 daysShear walls .5 days
1-way Joist 5 daysCuring 4 days
Total per story 11 days x 3 stories 9.2
weeks
Construction Management
![Page 57: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/57.jpg)
Construction Management
Scheduling:
Super Structure
Columns .5 dayBeams .5 dayDeck 2 days
Slab 1 dayCuring 1 day
Total per story 5 days
x 12 stories 18 weeks
![Page 58: Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649f155503460f94c2b52b/html5/thumbnails/58.jpg)
Mechanical
Fire Suppression: