Lewis County Solar Photovoltaic Energy Project Development - Critical Elements

Transcript of Lewis County Solar Photovoltaic Energy Project …...Experienced Legal Consultant to assist with...

Lewis CountySolar Photovoltaic Energy Project

Development - Critical Elements

Electric Usage Calculation Per Year

➢ Accurate Assessment of Power Utilization (Energy Audit)

Prepare Detailed RFQ

➢ Solar Developer Knowledgeable with NY Criteria➢ Experienced Legal Consultant to assist with Power Purchase Agreement (PPA)

➢ Points of Contact – Municipality – Developer - Nationalgrid➢ Scheduling and Execution of Completion Time-lines

➢ Local Employment

This Photo by Unknown Author is licensed under CC BY-SA

➢ Zoning➢ Minimum 10 Acres (2-Meg System)

➢ Material Staging Area, Panels, Inverters, Transformers etc. (Average Number of Panels 7932, 400 Pallets of Equipment, 22 Rows of Panels, 6 Inverter Banks)

➢ Driveway/Road Access

➢ Minimum Site Disturbance

➢ Nationalgrid Interconnect Fee

➢ Infrastructure and Array Banks

➢ Inverters

➢ Transformers

➢ Weather

➢ Internet – Access for Remote Monitoring

Critical Elements of the Project➢ Accurate Assessment of Power Utilization (Energy Audit)

➢ Prepare Detailed RFQ

➢ Solar Developer Knowledgeable with NY Criteria

➢ Experienced Legal Consultant to assist with Power Purchase Agreement (PPA)

➢ Zoning

➢ Minimum 10 Acres (2-Meg System)

➢ Material Staging Area, Panels, Inverters, Transformers etc. (Average Panel Amount 7932, 400 Pallets)

➢ Minimum Site Disturbance

➢ Driveway/Road Access

➢ Local Employment

➢ Nationalgrid Interconnect Fee

➢ Internet – Access for Remote Monitoring

➢ Points of Contact – Municipality – Developer - Nationalgrid

➢ Scheduling and Execution of Completion Time-lines

➢ Daily Site Visits – Photo Document

➢ Infrastructure and Array Banks

➢ Inverters

➢ Transformers

➢ Weather