You use SAP PLM Guided Structure Synchronization (GSS) to transfer source structures from one application area, such as engineering, to target structures of another application area, such as manufacturing. The aim is to keep the target structure up-to-date. The system takes changes to structures into account in each synchronization and updates the target structure. Any differences between the source and target structure are displayed as conflicts with varying degrees of severity. For example, you can transfer an engineering BOM to manufacturing and create a manufacturing BOM from it. You can transfer any subsequent changes to the engineering BOM to manufacturing by performing another synchronization.

Transcript of LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Page 1: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Copyrighted 2012 by LeverX, Inc. 1 11/09/2012

Page 2: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Tutorial Goal

Display Engineering Bill Of Material (or eBOM) and run

synchronization process.

Create synchronization units and start synchronization.

Map Engineering BOM to Manufacturing BOM with a Change

Number.

Create Manufacturing Bill Of Material (or mBOM).

Create new structure in mBOM. Resolve Conflicts and update mBOM

2 Copyrighted 2012 by LeverX, Inc. 11/09/2012

Page 3: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Open Change Master

3 Copyrighted 2012 by LeverX, Inc.

Change Masters are used to document changes to the master data

objects such as eBOMs and mBOMs.

11/09/2012

Page 4: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Display eBOM

4 Copyrighted 2012 by LeverX, Inc.

Select eBOM from the Change Master to display components

11/09/2012

Page 5: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

The user can start Synchronization by selecting Synchronize BOM to

BOM from the “You can also” link.

Start Synchronization for BOM to BOM

11/09/2012 5 Copyrighted 2012 by LeverX, Inc.

Page 6: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

The SAP NWBC shall lead the user to another screen called “Plan Synchronization for BOM to BOM”

On the Plan Synchronization screen the user can create Synchronization Units and Map Change Numbers for eBOM and mBOM.

Plan Synchronization for BOM to BOM

11/09/2012 6 Copyrighted 2012 by LeverX, Inc.

Page 7: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

The Synchronization Unit establishes a connection between the

eBOM and mBOM.

Create Synchronization Unit

7 Copyrighted 2012 by LeverX, Inc. 11/09/2012

Page 8: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

New: New Synchronization

Unit. mBOM does not exist.

Aligned: mBOM created.

eBOM and mBOM in sync.

Not Aligned: mBOM exists.

eBOM and mBOM not in

sync.

Failed: Synchronization unit

created but unable to

perform the synchronization

process.

Obsolete: Synchronization

unit is not longer taken into

account.

Synchronization Unit Statuses

11/09/2012 8 Copyrighted 2012 by LeverX, Inc.

Page 9: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Map eBOM and mBOM

9

mBOM can be mapped to the eBOM by entering a valid change

number in the Target Change Number field.

The user can also set a Validity Date to activate mBOM on a specific

date.

Click Ok to create mBOM.

Copyrighted 2012 by LeverX, Inc. 11/09/2012

Page 10: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

3 options to map mBOM to eBOM,

• Enter the same Change Number as the eBOM.

• Enter an existing Change Number but not as in the the eBOM.

• Leave the Target Change Number field empty and proceed allowing

the system to create a new Change Number for the mBOM.

Mapping For Change Numbers

10 Copyrighted 2012 by LeverX, Inc. 11/09/2012

Page 11: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Create mBOM

11 Copyrighted 2012 by LeverX, Inc.

The system displays the eBOM under Source Structure and mBOM

under Target Structure on the Reconciliation Workbench for BOM to

BOM screen.

Click Save to create mBOM.

11/09/2012

Page 12: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Create New Structure in mBOM

12 Copyrighted 2012 by LeverX, Inc.

The structure of eBOM and mBOM need not be the same.

To create a new structure, select a component in the mBOM and

click New Structure.

Clipboard can be used to temporarily store components.

11/09/2012

Page 13: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Create New Structure in mBOM: Contd

Select a

component in

mBOM and click

New Structure.

Enter BOM Usage,

Alternative and

click Ok to create a

New Structure.

11/09/2012 13 Copyrighted 2012 by LeverX, Inc.

Page 14: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Create New Structure in mBOM: Contd

Select the component to be moved to the New Structure from the

Clipboard and click Copy to Target Structure.

The system will add the component to the new structure in the

mBOM.

11/09/2012 14 Copyrighted 2012 by LeverX, Inc.

Page 15: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Create New Structure in mBOM: Contd

The components in the Clipboard can be removed once new

structures are created.

Click Save to apply and save new structures to the mBOM.

11/09/2012 15 Copyrighted 2012 by LeverX, Inc.

Page 16: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Resolve Conflicts And Update mBOM:

Changes made to the eBOM such as adding a new component,

deleting an existing component or changing quantity can be easily

updated in the mBOM using GSS.

Note that the Synchronization process has been performed earlier.

The current status of the Synchronization Unit is Not Aligned.

Open eBOM and select Synchronize BOM to BOM from the “You

can also” link.

Select Synchronization Units and click Start Synchronization to view

and update changes.

11/09/2012 16 Copyrighted 2012 by LeverX, Inc.

Page 17: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Resolve Conflicts And Update mBOM: Contd

11/09/2012 17 Copyrighted 2012 by LeverX, Inc.

Page 18: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Severities:

: No further steps necessary.

: Can be ignored. More information can be found the in

Conflicts section.

: Displayed only in the eBOM when a component does not

have a corresponding component in mBOM.

: Synchronization not complete. View proposals and resolve

errors.

11/09/2012 18 Copyrighted 2012 by LeverX, Inc.

Page 19: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Resolve Conflicts And Update mBOM: Contd

Select appropriate Proposals and click Apply Solutions to update

mBOM.

11/09/2012 19 Copyrighted 2012 by LeverX, Inc.

Page 20: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Resolve Conflicts And Update mBOM: Contd

Once the solutions are applied the conflicts are resolved.

Click Save to update and save changes to the mBOM.

11/09/2012 20 Copyrighted 2012 by LeverX, Inc.

Page 21: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

Conclusion:

GSS plays a vital role in bridging the gap between the Engineering

and Manufacturing processes.

It is simple to understand and easy to use.

Its highly customizable platform provides the users with a wide

range of options to streamline processes.

11/09/2012 21 Copyrighted 2012 by LeverX, Inc.

Page 22: LeverX Tutorial - SAP PLM Guided Structure Synchronization - Overview and Functionality

22 Copyrighted 2012 by LeverX, Inc. 11/09/2012