Leveraging Lean Construction to Gain Trust, Speed, and Profitability in the Semiconductor Construction Industry
October 18, 2017
Alexander Finale AIA, GLOBALFOUNDRIES, Nathan Speanburg P.E., M+W Group, and Jose Garcia-Aranda, Total Facility Solutions, Inc.
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
© LEAN CONSTRUCTION INSTITUTE
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Agenda
2
• Background, Motivation, the “Big Idea”• Inspiring a Region to adopt Lean Construction
• Central Utility Building was the start• Advanced Lithography is setting the bar• Tool Install is the next horizon
• Lean Applications to Semiconductor Tool Install
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Industry Background
© LEAN CONSTRUCTION INSTITUTE
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Semiconductor Industry Background
4
• Forecasted to grow from $335 Billion to $347 Billion in 2017• Dominated by 4 major players:
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Semiconductor Fab Construction Context
5
• In the U.S. between 2011 and 2013 there were six Fabs (fabrication plants/foundries) under construction totaling $9.8B cost of work
• Between 2010 and 2015 the major four players constructed, rebuilt, and installed billions of dollars of construction in an effort to be the first to deliver the next technology to market
• A typical Fab costs over $2 billion and more than 24 months to build
• Fab retrofits/upgrades costs hundreds of millions and multiple months depending on the complexity
GLOBALFOUNDRIES FAB 8 Malta, New York
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Time is Money!
6
• Being first to a technology node (newest products) is critical
• A 45 day reduction in schedule can yield an additional $1.5 billion dollars of revenue over a product life cycle
• In 2016, Globalfoundries determined to retrofit Fab 8 in New York and employ advanced lithography to achieve 7nm technology and be one of the first players in the market
• The lean journey began out of necessity in 2015 and continues today…
Globalfoundries On A Roll With 7nm And 5nm AnnouncementsForbes, June 13, 2017
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Quest for Continuous Improvement
7
• Status Quo- “The Past”• BIM-Contractor Led minimal LOD• Cost Plus/Lump Sum Contracting• Lack of Communication
• Design, CM, contractors• Breakthrough #1-Informal Partnering
• Breakthrough #2- IFOA
• Breakthrough #3- The FUTURE
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
LCI CONGRESS PRESENTATION STYLE GUIDE
The Advent of Collaboration (Breakthrough #1)
© LEAN CONSTRUCTION INSTITUTE
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
3-D Design with Contractor Input
9
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Validation of Schedule with Technology
10
• Use of Synchro in 2015
Building Animation File
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Collaboration Result between Design and Construction
11
Structural Design
Mechanical Design
Design Coordination
Fabrication - supports aligned
Installation
On time, On target
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
LCI CONGRESS PRESENTATION STYLE GUIDE
Practical Application of Technology (Breakthrough #2)-IFOA
© LEAN CONSTRUCTION INSTITUTE
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
13
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
14
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
15
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
16
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
17
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Results and Path Forward (Breakthrough #3)
© LEAN CONSTRUCTION INSTITUTE
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Summary
19
-60
-40
-20
0
20
40
60
80
100
StatusQuo Breakthough#1 Breakthough#2 Breakthough#3
ContinualImprovementOngoing
CostSavingstoOwner(Actual%)
PercentOffsiteFabrication(%)
ContractStyle(%Favored)
VDCApproach(%Modeled)
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Path Forward
20
• Site Collaborative Design Program• Technology Goal: Implement BIM through all facets of project Delivery
• Utilize BIM on all Projects (BB, PLS, TI)• Last Planner on all Projects
• Eventually 4D, 5D
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Appreciation To All Partners
21
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Plus/Delta
22
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Contact Us
23
Jose Garcia-Aranda
Total Facility Solutions- A Company of the M+W Group
Alex Finale, AIAGLOBALFOUNDRIES
Colin Milberg
ASKM and Associates
Nathan W. Speanburg, P.E., PMP, CM-Lean
M+W U.S. Inc.-A Company of the M+W Group
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
In the spirit of continuous improvement, we would like to remind you to complete this session’s survey in the Congress app! We look forward to receiving your feedback. Highest rated presenters will be recognized.
© LEAN CONSTRUCTION INSTITUTE
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Glossary
25
• FAB-Fabrication Facility• CUB-Central Utility Building
• EUV-Extreme Ultraviolet• IFOA-Integrated Form of Agreement
• IPD-Integrated Project Delivery• CM- Construction Manager• BB-Base Build Facility Construction
• PLS- Process Laterals• TI- Tool Install
• VDC- Virtual Design and Construction
• AL- Advanced Lithography• More here
• More here.
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Presentation Style Guide
26
• Make sure guides are turned on. Click “View” on top ribbon then select guides• Use the Provided Template Layouts and Arial font• The Font color for text is Grey. Minimum font size = 28.• Plan to spell out acronyms the first time they are used in your presentation• Insert an image to each slide• Keep each bullet at no more than 15 words• Provide a glossary of acronyms from your presentation in the back• Make sure to delete any unused slide layouts
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Icon Library
27
• These icons can be used throughout your presentation
Training
Act | SafetyCheckDo Continuous Improvement
Plan | Value Generation
Removal of Waste
Tools
Optimize the Whole
BuiltEnvironment
Respect for people | Team
Resources
Process and Flow
Research Collaboration