Transcript of Leveraging Cisco UCS for Public & Private Cloud Infrastructure to run SAP
End-‐to-‐End Op*miza*on Cisco Unified Compu*ng Technology
Secure-‐24 Overview
Secure-‐24 & SAP
Secure-‐24 & Cisco
Prac*cal Case Study – Moving Physical to UCS
Ques*ons
Agenda
Founded 2001
Headquarters Southfield, Michigan
Services Applica7on hos7ng, enterprise cloud compu7ng, complete IT outsourcing
Data Centers Michigan (3), plus global partnerships
IT Innova*on. Business Value.
Cloud & Hos*ng
Leadership
SAP-‐Cer7fied Hos7ng Partner SAP-‐Cer7fied Cloud Provider SAP-‐Cer7fied Mobile Provider
SAP 2010 Pinnacle Award Finalist for IT Outsourcing 1 of 3 selected from 150+ Global Cer7fied Hos7ng Partners
Only US Partner
SAP Flagship ERP Offering
Secure-‐24 and SAP
Strategic Partners -‐ Helping customers transi7on to the private/hybrid cloud
Three specific areas UCS-‐Based Data Center – most cost-‐effec7ve, scalable virtualiza7on plaWorm
Cisco Tidal SAP Automa7on soXware
Cisco equipment runs core network infrastructure
Secure-‐24 and Cisco
Improved deployment 7melines
-‐ Faster provisioning -‐ Faster implementa7on
-‐ Faster 7me to value
Expandable plaWorm characteris7cs
Flexibility to do physical reloca7ons Massive resources available for SAP – ability to provision quickly
UCS-‐Based Data Center
UCS-‐Based Data Center
Ini7ally did an evalua7on that included POC
Deployed UCS systems internally for approximately 6 months
Have been using UCS systems now for approximately 18 months
Currently have around 270 UCS blades varying from 4cpu 12GB to 40cpu 256GB RAM deployed between 3 datacenters
UCS-‐Based Data Center
UCS-‐Based Data Center
Service Profile Templates – Ensure all node’s in a vSphere Cluster are 100% consistent and based off a central template.
Palo ( M81KR ) – Ability to dynamically create network interfaces / HBA’s as required based on design
vNIC templates and upda7ng vNIC templates -‐ An upda7ng template allows a change to be made in one place and automa7cally pushed to service profiles linked to said template ( e.g. adding a vlan in a vmware cluster)
High performance / low latency – As virtualiza7on density increases, providing 10 gig connec7vity to an ESXi host.
Provide complete redundancy of VMware infrastructure
U7lize the cugng edge Intel CPU’s with extended memory that can s7ll run at 1333Mhz
What made Secure-‐24 decide on UCS
UCS-‐Based Data Center ROI Hard Cost
Number of 10 gig ports Number of FC ports
Human Resources Time to deploy Central Management
Availability Focus on redundancy Less chance of human failure
Case Study Company Headquarters Bal7more, MD
SAP End-‐users 2,500 +
Key Products /Markets Chemical
Number of Servers 50
Overview: Chemical Division of Fortune 500
Company sold to Offshore Company.
Largest sale of U.S. Company to Saudi interests.
Results a reference account with tremendously lower TCO
Issues: No SAP technical staff Hardware refreshment Disaster recovery Budget constraints Upgrade project in 6 months Three months to get self sufficient SAP, Hyperion, Exchange, SharePoint
Current Situa7on Equipment between 3-‐5 years old
Total number of Physical servers – 46
Total CPU/Memory requirements Datacenter A -‐ 114cpu’s/520GB Datacenter B -‐ 110cpu’s/480GB
Proposed configura7on Datacenter A – UCS cluster with 7 20cpu x 96GB Ram blades
Datacenter B – UCS cluster with 7 20cpu x 96GB Ram blades
Total of 14 New Blades vs. 46 Physical Servers
Case Study
6 Week Project!
Migra7on of 9 physical and 10 VM produc7on systems
Migra7on of 13 physical and 14 VM non-‐produc7on systems
Windows Domain Changed
PI 7.00 SP13 migrated along with Cer7ficates changed to new domain
Parallel export / import using FTP method to reduce down7me
Case Study
System Type Source Database DB Version OS Version Current Size Source Method Export Time DB Version OS Version Import TimeR3 ABAP MSSQL 2005 2003 1650GB DB Parallel Export 8:30 Hrs 2008 R2 2008 R2 5:00 HrsHR ABAP MSSQL 2005 2003 210GB DB Parallel Export 3:00 Hrs 2008 R2 2008 R2 3:00 HrsBI ABAP Oracle 10.2.0.2 2003 665GB DB Parallel Export 5:00 Hrs 11.2.0.3 2008 R2 4:00 HrsXI ABAP+Java MSSQL 2005 2003 50GB DB Parallel Export 4:00 Hrs 2008 R2 2008 R2 3:00 HrsEP Java Oracle 10.2.0.2 2003 50GB DB Parallel Export 2:00 Hrs 11.2.0.3 2008 R2 2:00 HrsBJ Java Oracle 10.2.0.2 2003 50GB DB Parallel Export 2:00 Hrs 11.2.0.3 2008 R2 2:00 HrsSM ABAP+Java MaxDB 7.6.02 2003 100GB Fresh Install 7.8.02 2008 R2WD Web Dispatcher 2003 Fresh Install 2008 R2WD Web Dispatcher 2003 Fresh Install 2008 R2
Cost to replace 46 physical servers with like equipment -‐ $330,000
Cost for 14 UCS Blades -‐ $290,000 Hos7ng cost savings per month because of reduced rackspace requirement -‐ $6,000 p/m x 36 month -‐ $216,000
Total Savings over 36 months $256,000
Case Study
Ques*ons
Thank You!