SMART COMMISSIONINGLeveraging Analytics Tools to Deliver Persistent Performance
Jim Meacham, PEThanks to: Matt Berbee and Glenn Friedman
AIA Quality Assurance
The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of the Completion for both AIA members and non-AIA members are available upon request.
This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.
Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
2
Learning Objectives
3
1. Attendees will be able to define what analytics and fault detection and diagnostics platforms are and why they are valuable
2. Attendees will be able to describe how to integrate analytics platforms into the traditional NC Cx process
3. Attendees will be able to identify how to leverage automated testing to support the traditional functional testing processes
4. Attendees will be able to define key challenges and solutions to analytics platform integration for NC Cx projects, spanning specification development, to start-ups, to functional testing, and issue resolution.
Complexity of Smart Buildings
Image Source: USGBC
TRADITIONAL COMMISSIONING
SMART COMMISSIONING
DESIGN & CONSTRUCTION
Warranty PeriodC
x
OPERATIONS RC
x
Project Handoff
VS.
Warranty Period
Project Transition
CxDESIGN & CONSTRUCTION
Warranty Period
Cx OPERATIONS
RC
x
Goals: Prove the potential for future Cx cost savings
Reduce the issue correction time
Run functional tests simultaneously
Improve data flow and improve Cx quality
Establish baselines and reduce future O/M Costs
Warranty period supported by Smart Cx
Everything gets tested
Traditional vs. Smart Commissioning
Traditional functional testing
Traditional CommissioningOPR Review
BOD Review
Peer Review
Submittal Review
Pre-Functional Tests
Functional Performance Test Scripts
Functional Performance Test
Demonstration Tests
Punch list Back Check and Verification
Systems Manual
Warranty Review
Continuous Alarming
Ongoing Commissioning
Future Retro-Commissioning
Develop Tests
Now repeat over
Meanwhile…• Owner wants to move in• MEP punch items being resolved• Cx & Controls teams is trying to “Make it Work”
RESULT: likely Cx result is sub-optimized
and over and over...
An automated whole building diagnosticstool is a software program that takes a top-down approach to diagnostics to detect excess energy consumption of the whole building and its major systems…-ASHRAE
Key to Smart Commissioning
Automated Diagnostics at Caltech
2006 2010
• Research Project RP 1455: develop best of class control sequences• Guideline Project Committee: GPC 36 working on providing uniform detailed sequences and associated functional tests to verify proper implementation.
In line with ASHRAE’s current efforts
Standardization of Control
Sequences
Standardization of Controls Sequences
SkySpark 2014
Automated Diagnostics at Caltech
Case Study: Caltech Beckman
InstituteRetrofitting 27 labs
from analog to digital controls
data points
111 Data Points in each lab
Occupancy
Pressure Offset Supply Temperature
Fume Hood Flow
General Exhaust Flow
Reheat Control
Exhaust Momentum
Bypass AirSash Position
…and multiply with each branch
Data Points start in building controls
j
2485 Data Points in SkySpark
What’s different about smart commissioningSmart Commissioning
OPR Review
BOD Review
Peer Review
Submittal Review
Pre-Functional Tests
Functional Performance Test Scripts
Functional Performance Test
Demonstration Tests
Punch List Back Check and Verification
Systems Manual
Warranty Review
Continuous Alarming
Ongoing Commissioning
Future Retro-Commissioning?
Traditional CommissioningOPR Review
BOD Review
Peer Review
Submittal Review
Pre-Functional Tests
Functional Performance Test Scripts
Functional Performance Test
Demonstration Tests
Punch list Back Check and Verification
Systems Manual
Warranty Review
Continuous Alarming
Ongoing Commissioning
Future Retro-Commissioning
Smart CommissioningTranslating traditional functional performance tests1Running automated process; no longer self performed by installing contractors2Automated diagnostics sent to controls contractor for correction3Enhancing the traditional model4Making Data Work5
Smart CommissioningOPR Review
BOD Review
Peer Review
Submittal Review
Pre-Functional Tests
Functional Performance Test Scripts
Functional Performance Test
Demonstration Tests
Punch List Back Check and Verification
Systems Manual
Warranty Review
Continuous Alarming
Ongoing Commissioning
Future Retro-Commissioning?
Integrated Workspace Management
TRADITIONAL SCRIPTS WITH STEP BY STEP TESTS
SET OF CONDITIONS
SET OF RULES
1 Translating traditional functional performance tests
FIELD VERIFICATION?
Automated Cx requires all the points to be named consistently or taggedwith a searchable convention
Building-NN-AHU-X-FLOOR-##VAV-Y-DAT(F) Building-NN-AHU-X-FLOOR-##VAV-Z-Supply Air Temp(F)
#ERROR- CANNOT FIND DATA
OR
Translating traditional functional performance tests1
The Rules need to be commissioned
Running automated process2
3 Automated diagnostics sent to controls contractor for correction
In the hand-off to warranty, No complaints does not mean the system is optimized.
This approach will find system inefficiency where others will find the job working…
Through continuous testing during the warranty period.
4 Enhancing the traditional model
Making Data Work5Smart Cx
If it’s “too hot” it is too late!
Traditional Cx
• Define the use of automated Cx in project specifications
• Deep coordination needed with controls vendors
• Automated Cx exposes the “copy/paste” nature of controls programming - just “making it work” is not possible with this model
• The process needs to be commissioned…
What we learned
Project Transition
CxDESIGN & CONSTRUCTION R
Cx
Warranty Period
Cx OPERATIONS
SMART COMMISSIONING
• Demonstrated potential for future cost reduction through automated testing
• Faster identification of issues – issues log available at Cx Kickoff
• Able to test all labs with the “hit of a button” – retesting was made much simpler
• Significantly reduced field hours for all players
How we did on goals…
Project Transition
CxDESIGN & CONSTRUCTION R
Cx
Warranty Period
Cx OPERATIONS
SMART COMMISSIONING
Energy ForumOctober 30, 2014 m
what’s to come…
Apply Smart Commissioning in “New” Construction
Caltech:Thomas Laboratory
Major Renovation
Jim Meacham, PEPrincipal
Altura Associates, [email protected]