Workshop on Hydro Power Development 17 th September, 2018, Delhi K V S Baba CMD, POSOCO Image Credit: NASA Leverage Hydro Power for Balancing the Renewable and Ensuring Grid Stability

Transcript of Leverage Hydro Power for Balancing the Renewable and ...

Page 1: Leverage Hydro Power for Balancing the Renewable and ...

Workshop on Hydro Power Development17th September, 2018, Delhi

K V S BabaCMD, POSOCO

Image Credit: NASA

Leverage Hydro Power for Balancing the Renewable and Ensuring Grid Stability

Page 2: Leverage Hydro Power for Balancing the Renewable and ...

Indian Grid…Large Footprint

Page 3: Leverage Hydro Power for Balancing the Renewable and ...

3

Indian Electricity Act, 2003

• Development of Grid Interactive Renewable Power

• Tariff Determination , Renewable Purchase Obligation

• Grid Connectivity, Market Development

National Electricity Policy, 2005

• Competition and Development of RE technologies

• Policy for Repowering of the Wind Power Projects – Aug’16

• Competitive Bidding

• Guidelines for Grid Connected Solar PV Power Projects – Aug’17

• Guidelines for Development of Wind Power Projects – Oct’16

Tariff Policy, 2016

• Competitive bidding for RE procurement (maximum 35% of installed capacity can be sourced from determined/preferential tariff)

• Renewable Generation Obligations (RGO), Long term RPO

• Guidelines in July 2016 for long term growth of RPOs for non-solar & solar

• Inter-state transmission charges waived off for RE power

• Solar RPO to be 8% by 2022 (excluding hydro power)

• Provisions regarding micro-grids

• Smart meters mandated - consumers 500 units (2017) & 200 units (2019)

• Procurement of power from waste-to-energy plants compulsory

Policy Initiatives (1)

Page 4: Leverage Hydro Power for Balancing the Renewable and ...

4

Technical Committee on Large Scale Integration of RE, 2016

• Intra-State Settlement System and Imbalance Handling

• Forecasting (Load/ RE generation/Net Load)

• Spinning Reserves

• Frequency Control (Primary/Secondary/ Tertiary)

• Technical Standards for RE Generation

• Ancillary Services

• Balanced Portfolio

• Flexibility - Harnessing and Incentivizing

• Market Design Enhancements

• Communication in Power Sector

• Capacity Building of all stakeholders

Guidelines on Cross Border Trade of Electricity, 2016

• Facilitating cross border trade of electricity between India & neighbouring countries.

• Aims to promote transparency, consistency and predictability in regulatory approaches across jurisdictions and minimize perceptions of regulatory risks.

• Ensures establishment of a larger footprint suitable for RE integration

• Draft CERC Regulations on Cross Border Trade of Electricity in Feb’17

Policy Initiatives (2)

Web-Link: http://powermin.nic.in/sites/default/files/uploads/Final_Consolidated_Report_RE_Technical_Committee.pdf

Page 5: Leverage Hydro Power for Balancing the Renewable and ...

5

• Deviation charges of RE generators delinked from frequency

• More opportunities to revise the schedule – 16 times in a day

• Commercial liability known upfront with no additional charges & surcharges

• Centralized (LDCs) & De-centralized (Generators, Aggregators) Forecasting

• Renewable Energy Certificates (RECs) to ensure physical energy balance

Framework for Forecasting, Scheduling & Imbalance Handling for Renewable Energy Generators at Inter-State Level

• Grid Code – Flexibility in Conventional Generation; 55% minimum for thermal

• Deviation Settlement Mechanism – Provisions for Renewable Rich states

• Renewable Energy Certificate (REC) Mechanism

• 15 Minute Bidding in Power Exchanges, 24x7 Round-the-clock session

• Ancillary Services Operations, Roadmap to Operationalize Reserves

• Communication System for inter-State transmission of Electricity

• Transmission Planning

• Pilot Project on 05-Minute Metering and Fast Response Ancillary Services (FRAS)

Other Regulatory Measures at Inter-State Level

• Harmonization at intra-state levels

• Report on SCHEDULING, ACCOUNTING, METERING AND SETTLEMENT OF TRANSACTIONS IN ELECTRICITY (“SAMAST”)

Forum of Regulators - Model Regulations on Imbalance Handling Mechanisms

Regulatory Interventions

Page 6: Leverage Hydro Power for Balancing the Renewable and ...

• Balancing with Conventional Generation

0

10

20

30

40

50

60

70

1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep

In M

illi

on

Un

its

Flexing the Hydro for Balancing the wind generation in Karnataka

Hydro

Wind

0

10

20

30

40

50

60

1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep

Mil

lio

n U

nit

se

Flexing of Thermal for Balancing Wind Generation in Karnataka

THERMAL

Wind

Flexing Hydro Flexing Thermal

• Balancing with Pumped Storage Hydro Plant

6

Balancing of Renewables

• 96,524 MW Pumped Storage potential

• 4785 MW developed• 1080 MW under construction.

• Only four (4) plants of 2450 MW operational as pumped storage.

• Tehri Pumped Storage Plant -First PSP in India to have Variable speed vertical Francis type reversible Turbine. Anticipated to be operational in 2019.

Page 7: Leverage Hydro Power for Balancing the Renewable and ...

Ancillary Services - Essential Reliability Service

• Layer of Centralized Ancillary Despatch over Decentralized Layer of Scheduling Process

• Ramp Management, Congestion Management

• Grid Resilience, Reliability Support

• Benefits – Generators & State Utilities

• Freedom and Choice available to states retained

• Improvement in Frequency Profile

Enabler – 24x7 Power for All

• Service Providers: 55 Nos.

• Capacity under RRAS: 56 GW

• Instructions/day (Avg.): 7-8 Nos.

• Highest Regulation ‘Up’ in a day: 3816 MW

• Highest Regulation ‘Down’ in a day: 2518 MW

• Weekly Accounting

Weblink: https://posoco.in/download/half-year-

feedback-to-cerc/?wpdmdl=8916

Launched in Apr’16

7

Page 8: Leverage Hydro Power for Balancing the Renewable and ...

8

Improved Frequency Profile

Page 9: Leverage Hydro Power for Balancing the Renewable and ...

9

Flexibility Resources for Grid Operation to manage variability of demand & RE generation:

- Flexible Hydro / Gas generation

- Grid level Energy Storage (like PSP)

Hourly Variation in Demand (2008-17)

The envelope is likely to widen further due to changes in load pattern

Variation in Demand

Page 10: Leverage Hydro Power for Balancing the Renewable and ...

6/12/2017 10

Typical Winter Day (2016)Typical Summer Day (2017)

Need for Flexibility Resources

Page 11: Leverage Hydro Power for Balancing the Renewable and ...

Variation in Hydro Generation

Page 12: Leverage Hydro Power for Balancing the Renewable and ...

• Sub optimal operation of some hydro generators

– Scope for optimization & flexible operation along with economic gains

– Requirement of flexibility in view of large scale Renewable Integration

• Hydro Power - a source of flexibility & reliability• Overload capability• Fast ramping• Peaking support• Voltage Regulation• Black Start Capability

• Constitution of FOLD Working Group

Need for Optimization of Hydro Resources

• Hydropower potential - 150 GW out of which 44.6 GW (30%) tapped.

• Central – 15 GW, State - 27 GW, Private - 3 GW

• Capacity harnessed for peaking is of the order of 30-32 GW.

Page 13: Leverage Hydro Power for Balancing the Renewable and ...

Survey of hydro power stations

• 35 GW (79%) out of 44.5 GW

• 149 hydro stations

• 486 generating units

Consultation with hydrogenerators / State LoadDespatch Centres• Appreciation of constraints• Philosophy of dispatch

Big Data Analysis• 9 Years Data Analysis• 38 Million Data Points• Data Visualization

Brain Storming in FOLDMeetings• 6 months work• Around 50 Contributors• More than 1000 man hours

Survey and Analysis Process

Page 14: Leverage Hydro Power for Balancing the Renewable and ...

14

Distribution of Hydro Stations

Page 15: Leverage Hydro Power for Balancing the Renewable and ...

15

Out of the 486number of hydro units responded, there are 146 number of grid friendly peltonturbine hydro units (~8534 MW) which can smoothly operate at part load & regulate generation from no load to full load to provide flexibility in grid operation;

Distribution of Turbine Types

Page 16: Leverage Hydro Power for Balancing the Renewable and ...

16

Region

Multi-Purpose HEPs Electricity-Only HEPs

Number of

Stations

Number

of Units

Capacity

(MW)

Number

of

Stations

Number of

Units

Capacity

(MW)

ER 7 34 2966 3 12 1782

NER 3 8 220 12 31 1042

NR 17 62 6540 31 92 5679

SR 48 148 9821 0 0 0

WR 22 82 6501 6 17 697

All India97 334 26048 52 152 9200

Out of the 149 stations responded, 97 are multipurpose (26048 MW) projects whereas 52 stations (9200 MW) are used purely for electricity generation;

Multi-Purpose/Electricity-Only HEPs

Page 17: Leverage Hydro Power for Balancing the Renewable and ...

1. Introduction 2. Existing Hydro & Pattern Analysis

& Survey3. Flexibility Metrics 4. Valuing Hydro: Flexibility

Assessment, Ranking & Optimization

5. Pump Storage Facilities6. Constraints in Hydro Generation

Despatch7. Tariff Structure for Hydro Power 8. Scheduling & Dispatch at

Regional level9. International Experience on

Hydro Despatch10. Recommendations11. Bibliography

(Appendices)

17

Report on Operational Analysis for Optimization of Hydro Resources & facilitating Renewable Integration in India

Page 18: Leverage Hydro Power for Balancing the Renewable and ...

1. Peaking Capability

2. Ramping Capability

3. Frequency Response

4. Part-load operation for maintaining reserves,

5. Load following – Correlation with Demand

6. Energy Storage capability (pumped storage hydro units)

7. Multiple start-stop operation

8. Dynamic VAR support - Synchronous condenser operation

9. Black-start capability

18

Flexibility Metrics

Page 19: Leverage Hydro Power for Balancing the Renewable and ...

• Defining Flexibility Indices– Peaking,Ramping,Capacity Utilization

– Flexibility Indices as a metric forimprovement

– Plants with multi part tariff performing better

• Operational Performance– Peak Hydro Support 30 GW in high

hydro season & 18-20 GW in lean hydroseason against IC of 45 GW

– Seasonal Hydro Flexibility

– 87 tested for black start

– 25 Stations out of 150 havesynchronous condenser facility - to beharnessed

Summary of Findings (1)

Page 20: Leverage Hydro Power for Balancing the Renewable and ...

• Valuing Hydro

– 128 BU of annual hydro generation

– 32 BU Reservoir energy content

– Economic gains with further optimization

• Optimization based on Production CostModelling

– 4 GW Extra Peaking Support duringpeak

– 5 GW Extra Backing down during offpeak

– Overall flexibility enhanced

All India Hydro Gen. Optimisation (with PLEXOS) for a year

Summary of Findings (2)

Page 21: Leverage Hydro Power for Balancing the Renewable and ...

Sample IllustrationPeaking Support from Hydro Power Stations

Page 22: Leverage Hydro Power for Balancing the Renewable and ...

• Pilot Project on 05-Minute Scheduling, Metering, Accounting and Settlement for Thermal/Hydro, and on Hydro as Fast Response Ancillary Services (FRAS)

– CERC Order in Petition No. 07/SM/2018 (Suo-Motu) dtd. 16 July 2018

• Covering all Central sector hydro generating stations

– All constraints declared by the hydro stations shall be honoured

– Total energy delivered over the day shall be maintained as declared

– Total energy dispatched under FRAS shall be squared off by end of day

– FRAS shall be triggered based on a stack prepared based on the balance energy available in the hydro station.

– Schedules of the beneficiaries shall not be disturbed in FRAS despatch

– RPCs shall issue weekly FRAS accounts along with the RRAS accounts

– Incentive shall be paid from the DSM Pool on mileage basis 22

Pilot Project – Fast Response Ancillary Services

Page 23: Leverage Hydro Power for Balancing the Renewable and ...

Optimization & Incentives for Flexibility

Ancillary Services from hydro power stations

Coordinated Scheduling & Despatch

Transmission planning -hydro flexibility

Multi Part TariffSilt Forecasting &

Coordinated Flushing

Inflow Forecasting Review of standards

Revisiting Hydrological Constraints

Renovation & Modernization

Key Recommendations

Page 24: Leverage Hydro Power for Balancing the Renewable and ...

24

Image Credit: NASA