INTRODUCTION37 day construction blitz condensed down from 18 months worth of work, requiring around 1,000 project personnel working 24 hours a day, seven days a week, to make sure that major construction will be completed by 1 August. 250,000 cubic metres of soil from the rail corridor between Ormond and Bentleigh. The haulage program to transport the excavated soil (which has 150 trucks leaving site every hour at peak).34 hydraulic struts (MP150) spanning from 16 to 23 meters, 500 lineal meters of modular walers (Mega Brace) supporting the walls

Page 3: Level Crossing Removal Project - Coates Hire Capabilities

3

At Coates Hire, we aim to supply cost effective custom designed solutions for all our specialist productareas and in particular projects where temporary works play a key part in the construction process.To achieve this we have set up a team of fully qualified structural, civil, mechanical and environmentalengineers with many years of industry experience to work with our clients at all stages in the projectprocess from design right through to commissioning and handover.This enables us to support our clients, along with their consultants and contractors, delivering the best and most cost effective engineering solution for their project.We can now support you at the very early planning stage, manage the installation process via a range ofturnkey solutions and also provide engineering sign off for designs and installed schemes when needed.We provide full project support, which includes a team of qualified experts offering support and advice ranging from simple enquiries to highly complex project challenges.