LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

21
1 PROPOSAL ONE RECREATIONAL AREA BY LETTITIA LOIS HIEW 0323908

Transcript of LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

Page 1: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

1

PROPOSAL ONERECREATIONAL AREA

BY LETTITIA LOIS HIEW0323908

Page 2: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

2

TABLE OF CONTENTS

CONTENT PAGEINTRODUCTION 3-4PROPOSAL

1. RATIONALE 5-62. BENEFITS 73. IMPACTS 8

SKETCHES1. IDEAS 92. CONCEPT 103. PLAN 11

FACULITIES 12-13PROFESSIONS 14-21

Page 3: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

3

INTRODUCTION

After going through all the benefits and impacts of this

particular site, I have brainstormed for several days and had finally

come up with an proposal regarding the development of the land to

be something spectacular. I focused on the purpose of the site to be

a commercial area based on the fact that the area is concluded as a

family based residential area.

Through a series of analysis, I explored a variety of possible of

ideas and concepts that might be suitable in developing in this

specific land. Thus, I propose to develop this land into a

recreational building and propose to build fitness centre named

“ Just Fit ” with trees surrounding the area due to the hot

environment of the area and the residents. I want to build a place

where the residents can exercise comfortably and enjoy their time

there.

The aim : To build fitness centre not only because of money or

cash benefits to build up the building, its main aim is to ensure the

convenience and the health of the residents.

Page 4: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

4

The concept : The building is two storey tall that consist a gym,

sauna, office, balcony garden, and parking spaces. It also has trees

and bushes surrounding the building to balance out the humidity of

the surroundings as there are no shadings of any kind present there

and this makes the area dry and hot. Parking spaces will be

spacious to avoid any unwanted accidents to occur in the

community.

Additional information : The fitness centre is built mainly for

the residents in the area. Maintenance fees and operating fees will

be charged upon the members of the centre monthly to ensure the

safety and the cleanliness of the facilities in the centre so that

members can use the facilities comfortably.

Page 5: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

5

Rationale

The diagram shows the developments that have been built in the

area of the chosen site. It clearly portrays that there are many

residential areas and a educational area located near the site.

According to my observation, this area lacks unique-designed

buildings. Therefore, a two storey fitness centre is capable of

altering the landscape of this area, thus bringing up more

conveniences to the people.

EducationalArea Residential

Area

The Site

Page 6: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

6

The reasons of constructing Just Fit in this specific piece of

land are :

1. To provide a comfortable environment for the residentsDue to the amount of residents living in this area, they would surely find

a place to exercise as people nowadays wants a fit and healthy body.

Furthermore, they would want to exercise in a comfortable and cool

environment. By constructing a fitness centre, the residents can enjoy their

time exercising with ease. This also helps attract more people into wanting to

exercise and having a healthy lifestyle.

2. Alternative accessible routesThe area has many roads that can access the site as it is surrounded in a

residential neighborhood. Residents can drive or jog to the fitness centre as it

is located near the residential area. There are also a few commercial shop

lots located just across the building for the convenience of the residents.

3. Open job opportunities to the communityThis recreational building is able to contribute job opportunities to the

community as it needs professional trained fitness trainers to guide and help

the members of the fitness centre. It can bring up the economics of the area,

as well as introducing the community in constructing more fitness centres.

Page 7: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

7

BenefitsThe proposal of constructing Just Fit can bring benefits to the

clients. From the facilities to the maintenance services, the

management of Just Fit ensures the satisfaction of the clients with

their exercising experiences.

I. Full and complete facilitiesThe members will be provided access to the facilities such as the

gym, sauna, multi-function studio and the rooftop garden. The members

have the first priority to utilize the facilities.

II. 24 hour security serviceThe management of Just Fit sets up a guard house at both the

entrance and the exit of the building. There are 24 Hour functioning

surveillance cameras installed around the building to prevent any

unwanted accidents to occur in the building. Moreover, there are security

guards that patrols the building to prevent any non-members from

entering the building.

III. Good maintenance serviceThe management of Just Fit has a good maintenance service, ranging

from leaky pipes, plugged toilet to circuit shortage. The building will

have monthly maintenance so that the members can exercise in a

comfortable environment.

Page 8: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

8

ImpactsWhen there are benefits, there are also impacts wherever you go

or whatever you do. In this case, there are a few impacts regarding

the construction of Just Fit.

I. Increase in trafficThe amount of vehicles passing through the area will slowly increase,

hence worsens the traffic. The residents living in the area may feel frustrated

as they are needed to waste their time waiting in line during the traffic.

II. High business competitionAs what was stated above, there are commercial shop lots located across

the fitness building. Because of the new opening of another commercial

building, business competition will surely happen among the commercial

shops and the current proposed building.

Page 9: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

9

SKETCHES OF IDEAS

BUBBLE DIAGRAM

Page 10: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

10

SKETCHES OF CONCEPTS

CONCEPTUAL DESIGN

Page 11: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

11

SKETCH PLAN OF “JUST FIT”

MASTER PLAN

Page 12: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

12

JUST FIT FACULITIES

GYM ROOM

The gym is a spacious and fully air-conditioned room that is equipped

with different types of gym equipment. Such as treadmills, dumbbells,

upright exercise bikes, standard elliptical trainers and so on. The

members can workout to improve cardiovascular health and build

muscle.

COFFEE SHOP

The coffee shop is located on the ground floor. It is a place where the

members can have a quick bite before or after their exercise. They also

can relax and have a cup of coffee after a tiring exercise.

Page 13: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

13

EXERCISE STUDIO

This multi- purpose exercise studio is built on the ground floor. The exercise

studio caters for fitness classes, dance, yoga, zumba, martial arts and so on.

Beside that, the exercise studio is accessible only to the members of the

centre.

LOCKERS ROOM

The room has numerous lockers where the members can change and bath

after their exercise. Lockers are provided for the members to ensure the

safety of their belongings.

Page 14: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

14

LIST OF PROFESSION INVOLVEDAND THEIR TASKS

There are many kinds of professions in the world that are

needed and involved in every construction. Every one of those

involved plays a crucial role in every stages of construction. For

example:

1. Land Surveyor

Land surveyors are licensed specialists authorized by the government

to determine boundaries, they not only collect and analyze data to map

the shape of land, but also determine the relative positions of places on

or beneath the surface of the earth by measuring distances, directions and

elevations. They are involved in constructing the building, and their tasks

includes :

(A) Doing the pre-construction responsibilities that is to determine the

location (latitude and longitude), property boundaries (shape), and the area

of the property (size).

(B) Establishing a level for the proposed construction building and a

benchmark that would be used as the reference point throughout the whole

construction phase.

Page 15: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

15

2. Geotechnic Engineer

Geotechnical engineering is a discipline within civil engineering

related to the performance of soil and rock mechanics, including their

subsurface conditions, determination of the physical, mechanical, and

chemical properties that will influence the project under consideration.

Their tasks include:

(A) Carry out site investigation.

(B) Design the earthwork.

(C) Do supervision of the site and carry out foundation and construction.

(D) Develop ground improvement as to support foundations for a wide

variety of structures.

(E) Determines and designs the type of foundations, earthworks and

pavement subgrades required for the intended man-made structures to be

built.

Page 16: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

16

3. Structure Engineer

Structural engineering is a branch of Civil engineering which carries

out strength calculations, loads, forces and their interactions and effects

on proposed construction and prepare drawings of structures to ensure

they are strong enough to avoid collapse when loaded. Their tasks

include:

(A) Work on the design.

(B) Designs the structural members (slabs, beams, columns and

foundations).

(C) Designs foundations working with the Geotechnic Engineer.

(D) Determines the sizes (thickness span and depth) of structural

members and the quality, size, type and quantity of reinforcements.

(E) Decides on the quality and type of materials used for structural

members and the required concrete strength.

(F) Designs the roof trusses to sustain all expected loads and forces.

(G) Produces the structural drawings which is required for building

construction approval.

(H) During construction he inspects materials and supervise the

construction of structural members, he gives approvals, conduct test on

materials and structural integrity test on the structure as a whole and declares

the structure safe or not.

Page 17: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

17

4. ArchitectArchitects are licensed professionals trained in the art and science of

building design, develop the concepts for structures and turn those

concepts into images and plans. Their tasks include:

(A) Before constructing a building, an architect needs to draw a plan of

the building.

(B) Design building so that people can escape from the building in an

emergency.

(C) Specify the building materials and the interior furnishings.

(D) Provide various designs, then prepares drawings and a report

presenting ideas to the client based on his needs.

(E) Develop final construction plans that show the building's appearance

and details for its construction.

(F) Do continual revision of plans on the basis of client needs, budget

and other constraints not envisaged during design stage.

(G) Visit building sites to make sure that contractors follow the design,

adhere to the schedule, use the specified materials, and meet work quality

standards.

Page 18: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

18

5. Quantity Surveyor

A Quantity Surveyor is a construction industry professional who

specializes in estimating the value of construction works. Their tasks

include:

(A) Estimates the project budget, analysis the effect of design changes on

the budget.

(B) Prepares Bill of Quantities that assist in the tender process.

(C) Produce tender document and manage the tender process.

(D) Clarify and evaluate tenders.

(E) Do variations control, contract administration and assessment of

claims.

(F) Negotiate and settlement of accounts.

(G) Valuing completed work and arranging for payments.

6. Builder

ABuilder is an academically trained specialist and statutorily

registered professional responsible for Building Production Management,

Construction and Maintenance of Buildings for the use and protection of

mankind and his assets. Their tasks include:

(A)Study the production information that is the drawings, schedules and

specifications.

Page 19: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

19

(B) Analyze the build ability and maintainability of buildings.

(C) Writes on the construction method and program.

(D) Assess the workmanship skill of artisan.

(E) Suggest solution to technical problems.

7. Building Contractor

A building contractor is an organization that engages in the Planning,

Developing and Coordinating activities in the building of structures.

Their tasks includes :

(A) Draws up a plan to carry out the construction project.

(B) Hiring, supervising, firing and payment of workers alongside

obtaining materials for the project to precise specifications, mostly using the

services of suppliers.

(C) Do research regarding relevant regulations and laws guiding the

construction process.

(D) Controls budget issues, follow that budget as closely as possible

though there might be slight variation at the end of the project.

(E) Ensures that the project is completed within the specified time frame.

(F) Reviewing the progress and implementing any changes along the

course of completion.

(G) Deals with all emergencies and surprises which relate to the project

that occurs on-site and sometimes off-site as well that affects the project.

Page 20: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

20

8. Building Service Engineer

Building services engineers bring buildings to life by designing the

mechanical and electrical systems that allow people to function within an

enclosed structure. Their tasks includes :

(A) Involves the production and maintenance of a stable internal

environment that has the correct temperature, air quality and lighting

levels.

(B) Install the life protection systems such as fire alarms, and sprinkler

systems.

(C) Design layouts and requirements for building services for residential

or commercial developments which is one of the requirements for building

approval.

(D) Design and development of electrical systems required based on

envisaged power consumption for safety and energy sustaining operation

of buildings, construction and operation of Heating, ventilation and air

conditioning (HVAC) systems.

Page 21: LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )

21

9. Consultant

The building consultancy teams bring together project managers,

building surveyors, quantity surveyors, architects, engineers, interior

designers and other construction professionals, but his loyalties is with

the building owner. Their tasks includes :

(A) Represent the owner and to lend practical expertise to the job.

(B) Identify and address potential construction problems in the design

stages and, as an independent party, may be in the best position to suggest

cost saving or time saving alternatives and to evaluate suggestions made by

the other parties.

(C) Deal with the contractors and professionals on the owner's behalf,

whether the issue is design, construction method, cost of change orders or

scheduling.