Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on...
Transcript of Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on...
Legislative Council Panel on Economic Development
Update on the Development of the
Three-Runway System at the
Hong Kong International Airport
Airport Authority Hong Kong
23 April 2018
Three-Runway System
2
3
Construction works of 3RS commenced on 1 August 2016
4
Overall 3RS project is progressing on track to meet timeline
2016 2017 2018 2019 2020 2021 2022 2023 2024
Commencement of
works in Aug 2016
Commissioning of
the new North
Runway in 2022Completion of 3RS
5
Aviation Fuel Pipeline Diversion Works Substantially Completed
6
Permanent Aviation
Fuel Facility (PAFF)
Airport
West QuayOn-Airport
Tank Farm
Sha Chau
Aviation Fuel
Receiving
Facility (AFRF)
Legend :
Existing Aviation Fuel
Pipelines
Diverted Aviation Fuel
Pipelines by Horizontal
Directional Drilling (HDD)
Existing Aviation Fuel
Pipelines to be
decommissioned
Sha Chau
and Lung
Kwu Chau
Marine
Park
Plan
Rock
Alluvium / Decomposed Rock
3RS Reclamation Area
Marine Deposit
FillSeawall
HDD Launching SiteDaylighting Location
at Sheung Sha ChauTai Sha Chau
Existing
HKIA
-20mPD
-40mPD
-60mPD
-80mPD
-100mPD
-120mPD
-140mPD
+0mPD
+10mPD+6mPD
Remark: N.T.S.
0m 1000m 2000m 3000m 4000m 5000m 5190m
Length
Section
DCM for Seawall Area is Substantially Completed Seawall Rock Core Placing Commenced
7
Reclamation Works in Progress
8
Reclamation Works in Progress
9
Terminal 2 Expansion Foundations and Substructure Site Works Commenced
10
Detailed Designs of Airfield Infrastructure and Third Runway Passenger Building are Progressing According to Plan
11
Automated People Mover System and High-speed Baggage Handling System Design and Build Contracts Commenced on Programme
12
Robust Environmental Monitoring & Audit Arrangement in Place
13
EPD
Independent
Environmental
Checker (IEC)
Environmental
Team (ET)Contractors
AAHK
(EP Holder)
Notes :
Communication Pathway
Employment + Communication Pathway
Dedicated
Complaint
Hotline and
Email Channel
Professional Liaison
Group (PLG)
Community Liaison
Group (CLG)
3RS Dedicated Website Easily Accessible by Public
14
http://env.threerunwaysystem.com/en/index.html
Octocoral Guaiagorgia reproductive
biology study by The Chinese University
of Hong Kong
Environmental DNA project by
The Education University of
Hong Kong
Lingding Bay CWD population
dynamics study by South China Sea
Fisheries Research Institute, Chinese
Academy of Fishery Sciences
Year 2017-18 MEEF – Project Progress
15
Pearl farming pilot project
by Aberdeen Fisherwomen
Association
Study on strategy towards sustainable
fisheries development by Hong Kong
Fishery Alliance
Radar reflector installation
project for fishing vessels
by Aberdeen
Fisherwomen Association
Year 2017-18 FEF – Project Progress
16
Proposed Marine Ecology and Fisheries Enhancement Measures Directly Funded by AAHK
17
Eco-enhancement Seawall Design Fish fry release
Artificial reef deployment
Continuous Engagement of Key Stakeholders
18
CLG (Jan 2017) LegCo 3RS Sub-Com(May 2017)
ACE (Apr 2017) PLG (May 2017)
Media (May 2017)
Notes :
CLG = Community Liaison Group; ACE = Advisory Council on the Environment; PLG = Professional Liaison Group
19
THANK YOU