Legend ( ): N Temporary Works Area
1
Project Title: Drainage Improvement in Northern Hong Kong Island – Hong Kong West Drainage Tunnel : – Environmental Permit No. : EP-272/2007/B : EP-272/2007/B Figure 2: Location of Eastern Portal 2 : (This figure was prepared based on Drawing No. 24133/B/E/D133 of EP Application (AEP-272/2007) ( (AEP-272/2007) 24133/B/E/D133 ) Main Drainage Tunnel Legend ( ): Temporary Works Area ( ) Alignment of main drainage Tunnel ( ) N Slope Stabilisation Works Stepped Chute
Transcript of Legend ( ): N Temporary Works Area
Project Title: Drainage Improvement in Northern Hong Kong Island –
Hong Kong West Drainage Tunnel 工程項目名稱工程項目名稱工程項目名稱工程項目名稱 : 港島北部雨水排放糸統改善計劃港島北部雨水排放糸統改善計劃港島北部雨水排放糸統改善計劃港島北部雨水排放糸統改善計劃 – 港島西雨水排放隧道港島西雨水排放隧道港島西雨水排放隧道港島西雨水排放隧道
Environmental Permit No. : EP-272/2007/B 環境許可證編號環境許可證編號環境許可證編號環境許可證編號 : EP-272/2007/B
Figure 2: Location of Eastern Portal 圖圖圖圖 2 : 東東東東面入水面入水面入水面入水口位置口位置口位置口位置
(This figure was prepared based on Drawing No. 24133/B/E/D133 of EP Application (AEP-272/2007)
(本圖是根據申請環境許可証 (AEP-272/2007) 繒圖編號 24133/B/E/D133編制)
Main Drainage Tunnel 主排水隧道
Legend (圖例):
Temporary Works Area (臨時工地)
Alignment of main drainage Tunnel
(主排水隧道)
N
Slope Stabilisation Works
Stepped Chute