Legal Notice NOTICE OF SOLICITATION OF BIDS FOR Building Demolition at 139 Main Street and the Common Wall to 147 Main Street The City of Claremont is soliciting firm fixed price bids for the complete demolition of 139 Main Street and the common wall to 147 Main Street. Demolition will include but not be limited to (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal of the brick exterior walls, wood framing, debris, roof, interior walls, floors, contents, site debris and garbage, and (3) site restoration. As part of a separate contract, the owner of 147 Main Street will install structural shoring and/or bracing for its building prior to the commencement of demolition. Interested bidders may request from the City: (a) drawings showing the temporary shoring conditions in the 147 Main Street building, and (b) a common wall agreement with the 147 Main Street property owner. Coordination and notifications of adjacent property owners will be required in addition to maintaining safe pedestrian and vehicular traffic in the vicinity of the work site. SCOPE OF WORK: Verify electrical service disconnect. Notify Dig Safe. Provide site equipment and dump containers. Provide adequate on-site dust control and erosion measures. Saw-cut front and rear brick walls at or near the common wall as indicated in engineer’s report. Demolish all above ground buildings and appurtenances of 139 Main Street, starting at the east end and working towards the west. o Note: All demolition work must be conducted from the exterior of 139 Main Street (no interior work). It must be assumed that the building and the 8” brick common wall will collapse during demolition. Remove all demolished building contents, garbage and debris from site. Any and all building contents, if any, become the property of the contractor, with salvage value to be a consideration in the bid price. Remove existing foundation to minimum two feet below grade. Fill, grade, loam and seed all disturbed areas. (Fill must be non-hazardous materials.) o Note: Fill of foundation to western property line cannot be completed until after reconstruction of a new eastern foundation wall for the 147 Main Street building (to be done under separate contract with the owner of 147 Main Street). Maintain protection of adjacent structures, utilities and properties. Maintain protection of vehicular traffic and pedestrians. Contractor must ensure adequate access to adjacent properties. Contractors will be responsible for all permits. Bids must be received no later than 11:30 A.M on Friday, July 10 th 2020 at the City Manager’s Office, 58 Opera House Square, Claremont, NH 03743, where they will be opened and read aloud. Bids must be clearly marked “139 Main Street & Common Wall Demolition”. The City Manager reserves the right to waive defects in form and minor irregularities and to reject any or all bids as determined to be in the best interest of the City. The lowest responsive and responsible bidder will be required to sign a Standard Form of Agreement (form available upon request), provide proof of insurance in amounts acceptable to the City and list the City and the owner of 147 Main Street as additional insureds on insurance certificates. A bid guarantee equal to five percent of the bid price is required with each bid. Payment and Performance Bonds for 100% of the contract price are also required. All demolition

Transcript of Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition...

Page 1: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

Legal Notice NOTICE OF SOLICITATION OF BIDS FOR

Building Demolition at

139 Main Street and the Common Wall to 147 Main Street

The City of Claremont is soliciting firm fixed price bids for the complete demolition of 139 Main

Street and the common wall to 147 Main Street. Demolition will include but not be limited to

(1) the complete demolition of the 139 Main Street building and the common wall, (2) the

removal and disposal of the brick exterior walls, wood framing, debris, roof, interior walls, floors,

contents, site debris and garbage, and (3) site restoration. As part of a separate contract, the

owner of 147 Main Street will install structural shoring and/or bracing for its building prior to the

commencement of demolition. Interested bidders may request from the City: (a) drawings

showing the temporary shoring conditions in the 147 Main Street building, and (b) a common

wall agreement with the 147 Main Street property owner. Coordination and notifications of

adjacent property owners will be required in addition to maintaining safe pedestrian and vehicular

traffic in the vicinity of the work site.

SCOPE OF WORK:

• Verify electrical service disconnect.

• Notify Dig Safe.

• Provide site equipment and dump containers.

• Provide adequate on-site dust control and erosion measures.

• Saw-cut front and rear brick walls at or near the common wall as indicated in engineer’s

report.

• Demolish all above ground buildings and appurtenances of 139 Main Street, starting at

the east end and working towards the west.

o Note: All demolition work must be conducted from the exterior of 139 Main

Street (no interior work). It must be assumed that the building and the 8” brick

common wall will collapse during demolition.

• Remove all demolished building contents, garbage and debris from site.

• Any and all building contents, if any, become the property of the contractor, with salvage

value to be a consideration in the bid price.

• Remove existing foundation to minimum two feet below grade.

• Fill, grade, loam and seed all disturbed areas. (Fill must be non-hazardous materials.)

o Note: Fill of foundation to western property line cannot be completed until after

reconstruction of a new eastern foundation wall for the 147 Main Street building

(to be done under separate contract with the owner of 147 Main Street).

• Maintain protection of adjacent structures, utilities and properties.

• Maintain protection of vehicular traffic and pedestrians.

• Contractor must ensure adequate access to adjacent properties.

Contractors will be responsible for all permits. Bids must be received no later than 11:30 A.M on

Friday, July 10th 2020 at the City Manager’s Office, 58 Opera House Square, Claremont, NH

03743, where they will be opened and read aloud. Bids must be clearly marked “139 Main Street

& Common Wall Demolition”. The City Manager reserves the right to waive defects in form and

minor irregularities and to reject any or all bids as determined to be in the best interest of the City.

The lowest responsive and responsible bidder will be required to sign a Standard Form of

Agreement (form available upon request), provide proof of insurance in amounts acceptable to

the City and list the City and the owner of 147 Main Street as additional insureds on insurance

certificates. A bid guarantee equal to five percent of the bid price is required with each bid.

Payment and Performance Bonds for 100% of the contract price are also required. All demolition

Page 2: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

activities shall comply with City, State and Federal laws, rules, regulations and ordinances. An

on-site meeting will be held on Friday, June 26th, 2020 at 10:30AM. For questions or to

request additional information contact Tom Krebs at 603-504-0349 or [email protected].

This project is, in part, funded through a Community Development Block Grant from the

Community Development Finance Authority under the provisions, and subject to the

requirements of Title I of the Housing and Community Development Act of 1974, as amended.

Federal compliance requirements include Civil Rights, Affirmative Action, Etc. This is an equal

opportunity/affirmative action agency. All qualified bidders will receive consideration without

regard to race, color, religion, creed, age, sex, national origin, sexual orientation or familial

status. Women and minority-owned businesses are encouraged to submit bids. Davis-Bacon

Wage Rates DO NOT apply.

Page 3: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 4: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 5: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 6: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 7: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 8: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 9: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 10: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 11: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 12: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 13: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 14: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 15: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 16: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 17: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 18: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 19: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 20: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 21: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 22: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 23: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 24: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 25: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 26: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 27: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 28: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 29: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 30: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 31: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 32: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 33: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 34: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 35: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 36: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 37: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 38: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 39: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

SE

DRAWN BY:

CHECKED BY:DATE:

SCALE:

BTH

T.L.S.SEE PLANS

DRAWING NUMBER

OF R

TEM

POR

AR

Y S

HO

RIN

GEX

ISTI

NG

CO

ND

ITIO

NS

IA ND R GW

NE

W E

NG

LA

ND

FA

MIL

Y H

OU

SIN

G36

8 N

H R

OU

TE

104

NE

W H

AM

PTO

N, N

H 0

3256

SHEET 1 OF 7

6/24/19

REV

ISIO

ND

ATE

NO

.

139

and

143-

147

MA

IN S

TR

EE

TC

LA

RE

MO

NT

, NH

N

PROJECTNORTH

AutoCAD SHX Text
SE
AutoCAD SHX Text
A
AutoCAD SHX Text
SE
AutoCAD SHX Text
B
AutoCAD SHX Text
EX. 5" DIA LOG JOISTS AT 24" O.C
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 11"x11" BEAM
AutoCAD SHX Text
STEEL POSTS ON CONCRETE PIERS
AutoCAD SHX Text
EX. 12" BRICK WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
EX. 6" CMU WALL WITH SPRAY FOAM INSUL.
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
EX. 6"x6" JOISTS AT 26"-28" O.C.
AutoCAD SHX Text
EX. 11"x11" BEAM
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
EX. 2"x4" STUD WALL
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 12" BRICK WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
EX. 6"x6" JOISTS AT 30" O.C.
AutoCAD SHX Text
EX. 11"x11" BEAM
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
EX. WOOD STRAPPED WALL WITH LATH & PLASTER
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 12" BRICK WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
EX. 6"x8" ATTIC FLOOR JOISTS AT +/-36" O.C.
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
EX. 8" BRICK WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 2"x4" STUD WALL w/ LATH & PLASTER
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's @ 28"-30" O.C., WITH (2)2x6x30" ORIENTED EAST-WEST
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 6"x6" RAFTERS AT +/-36" O.C.
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
8"x8"RIDGE
AutoCAD SHX Text
2x6 STUDS AT 16" O.C., INSTALLED IN 2019 AS TEMP. SUPPORTS UNDER GABLE END RAFTER
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
EX. 6" CMU WALL WITH SPRAY FOAM INSUL.
AutoCAD SHX Text
EX. 2"-3" CONC. SLAB ON GROUND
AutoCAD SHX Text
DEPTH & GEOMETRY OF EX. FOUNDATIONS ARE UNKNOWN
AutoCAD SHX Text
EX. 11"x11" BEAM
AutoCAD SHX Text
STEEL POSTS ON CONCRETE PIERS
AutoCAD SHX Text
EX. 5" DIA LOG JOISTS AT 24" O.C
AutoCAD SHX Text
STEEL OR WOOD POSTS; SPACING VARIES
AutoCAD SHX Text
EX. 11"x11" BEAM
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
HUNG A.C.T. CEILING
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
STEEL OR WOOD POSTS; SPACING VARIES
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
EX. 2"x4" STUD WALL
AutoCAD SHX Text
EX. WOOD STRAPPED WALL WITH LATH & PLASTER
AutoCAD SHX Text
EX. INTER. WALL
AutoCAD SHX Text
2x4, STRAPPING & PRESS-BD. CEILING
AutoCAD SHX Text
EX. 6"x8" ATTIC FLOOR JOISTS AT +/-36" O.C., STRAPPED AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
EX. 2"x4" STUD WALL w/ LATH & PLASTER
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's @ 28"-30" O.C., WITH (2)2x6x30" ORIENTED EAST-WEST
AutoCAD SHX Text
EX. 6"x6" RAFTERS AT +/-36" O.C.
AutoCAD SHX Text
8"x8"RIDGE
AutoCAD SHX Text
2 LAYERS OF 1" BOARDS BELOW FOAM AND CELLULOSE INSUL.
AutoCAD SHX Text
2x6 STUDS AT 16" O.C., INSTALLED IN 2019 AS TEMP. SUPPORTS UNDER GABLE END RAFTER
AutoCAD SHX Text
EX. 8" BRICK WALL PARTY (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
8"x8"RIDGE
AutoCAD SHX Text
EX. CHIMNEY, INTEGRAL WITH EX. 8" BRICK WALL PARTY (FAILING), TO BE REMOVED; TYP. 2 LOC.'s.
AutoCAD SHX Text
2x6 STUDS AT 16" O.C., INSTALLED IN 2019 AS TEMP. SUPPORTS UNDER GABLE END RAFTER
AutoCAD SHX Text
EX. 8" WALL, PART OF 139 MAIN STREET, TO BE REMOVED
AutoCAD SHX Text
EX. 6"x8" ATTIC FLOOR JOISTS AT +/-36" O.C., STRAPPED AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's @ 28"-30" O.C., WITH (2)2x6x30" ORIENTED EAST-WEST
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C.,
AutoCAD SHX Text
EX. 8" WALL, FROM 3rd FLOOR UP
AutoCAD SHX Text
DEPTH & GEOMETRY OF EX. FOUNDATIONS ARE UNKNOWN
AutoCAD SHX Text
EX. 2"-3" CONC. SLAB ON GROUND
AutoCAD SHX Text
EX. 6" CMU WALL WITH SPRAY FOAM INSUL.
AutoCAD SHX Text
EX. 12" BRICK WALL, UP TO THE 3rd FLOOR
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
HUNG A.C.T. CEILING
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
EX. 5" DIA LOG JOISTS AT 24" O.C.; 5" DIA LOG JOISTS AT 24" O.C.; NOTE: THE 6" CMU WALL STOPS THE 6" CMU WALL STOPS APPROX. 1" BELOW THE UNDERSIDE OF THE EXISTING LOG JOISTS..
AutoCAD SHX Text
EX. 2x4 & 2x6 BRACES FOR TEMP. WALLS. LOC.'S AND ANGLES VARY
AutoCAD SHX Text
**- EX. (2)2x6's, TURNED 90 DEGREES RELATIVE TO ALL OTHERS
AutoCAD SHX Text
**
AutoCAD SHX Text
**
AutoCAD SHX Text
**
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
BASEMENT LAYOUT & 1st FLOOR FRAMING PLAN
AutoCAD SHX Text
SCHAAL ENGINEERING, P.C. P.O. Box 152 | 61 Depot Street Wilder, VT 05088-0152 (802) 295-2002 [email protected]
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
ROOF FRAMING PLAN
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
1st FLOOR LAYOUT & 2nd FLOOR FRAMING PLAN
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
2nd FLOOR LAYOUT & 3rd FLOOR FRAMING PLAN
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
3rd FLOOR LAYOUT & ATTIC FLOOR FRAMING PLAN
AutoCAD SHX Text
3/16" = 1'-0"
AutoCAD SHX Text
SECTION B/SE
AutoCAD SHX Text
3/16" = 1'-0"
AutoCAD SHX Text
SECTION A/SE
AutoCAD SHX Text
EXISTING CONDITIONS
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
W
AutoCAD SHX Text
N
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
H
AutoCAD SHX Text
9880
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
No.
AutoCAD SHX Text
L
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
T
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
Page 40: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

S1

DRAWN BY:

CHECKED BY:DATE:

SCALE:

BTH

T.L.S.SEE PLANS

DRAWING NUMBER

OF R

TEM

POR

AR

Y S

HO

RIN

GPL

AN

AN

D D

ETA

ILS

IA ND R GW

NE

W E

NG

LA

ND

FA

MIL

Y H

OU

SIN

G36

8 N

H R

OU

TE

104

NE

W H

AM

PTO

N, N

H 0

3256

SHEET 2 OF 7

6/24/19

REV

ISIO

ND

ATE

NO

.

139

and

143-

147

MA

IN S

TR

EE

TC

LA

RE

MO

NT

, NH

N

PROJECTNORTH

AutoCAD SHX Text
S4
AutoCAD SHX Text
A
AutoCAD SHX Text
S3
AutoCAD SHX Text
B
AutoCAD SHX Text
EX. 5" DIA LOG JOISTS AT 24" O.C
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 11"x11" BEAM
AutoCAD SHX Text
STEEL POSTS ON CONCRETE PIERS
AutoCAD SHX Text
EX. 12" BRICK WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
EX. 6" CMU WALL WITH SPRAY FOAM INSUL.
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
NEW 2x10 @24" WALL
AutoCAD SHX Text
3.
AutoCAD SHX Text
1.
AutoCAD SHX Text
NEW 12"x12" CONC. FOOTING
AutoCAD SHX Text
2.
AutoCAD SHX Text
4.
AutoCAD SHX Text
NEW 2x6 @16" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
STRUCT. STEEL SHORING & BRACING; SEE PLAN DETAIL "1" AND SECTION "A" ON SHEET S4
AutoCAD SHX Text
(3)2'x4'x18" CONC. BLOCKS, STACKED SOUTH SIDE, (6) ON NORTH SIDE
AutoCAD SHX Text
KEYED NOTE; TYP.
AutoCAD SHX Text
EX. 6"x6" JOISTS AT 26"-28" O.C.
AutoCAD SHX Text
EX. 11"x11" BEAM
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
EX. 2"x4" STUD WALL
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 12" BRICK WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST. REMOVE DIAGONAL BRACES AND THEN REMOVE DIAGONAL BRACES AND THEN FULLY SHEATH ON THE WEST SIDE WITH " CD-X 58" CD-X PLYWOOD OR ADVANTECH. SEE SECTIONS "A" AND "B" FOR ADDITIONAL INFORMATION
AutoCAD SHX Text
NEW 2x6 @16" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
2.
AutoCAD SHX Text
1.
AutoCAD SHX Text
S3
AutoCAD SHX Text
B
AutoCAD SHX Text
STRUCT. STEEL SHORING & BRACING; SEE PLAN DETAIL "1" AND SECTION "A" ON SHEET S4
AutoCAD SHX Text
KEYED NOTE; TYP.
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
S4
AutoCAD SHX Text
A
AutoCAD SHX Text
SCHAAL ENGINEERING, P.C. P.O. Box 152 | 61 Depot Street Wilder, VT 05088-0152 (802) 295-2002 [email protected]
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
BASEMENT LAYOUT & 1st FLOOR FRAMING PLAN
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
1st FLOOR LAYOUT & 2nd FLOOR FRAMING PLAN
AutoCAD SHX Text
KEYED NOTES: 1. REMOVE COMPLETELY THE EXISTING SPRAY FOAM INSULATION REMOVE COMPLETELY THE EXISTING SPRAY FOAM INSULATION WHERE THE NEW FOOTING IS TO COME INTO CONTACT WITH THE CMU WALL. TRIM THE SPRAY FOAM INSULATION TO A UNIFORM SURFACE PRIOR TO INSTALLING STUDS FOR THE 2x10 WALL. SEE SECTION "F" ON SHEET S5 FOR ADDITIONAL DETAILS. 2. INSTALL A NEW 12" WIDE x 11 " HIGH CONCRETE FOOTING, 14" HIGH CONCRETE FOOTING, WITH (2) #5's CONTINUOUS, AND #6x3'-0" DOWELS AT 24" O.C., DRIVEN THROUGH " DIA. HOLES IN THE CONCRETE SLAB. INSTALL 34" DIA. HOLES IN THE CONCRETE SLAB. INSTALL #4x12" DOWELS AT 16" O.C INTO THE BOTTOM COURSE OF CMU. SEE SECTION "F" ON SHEET S5 FOR ADDITIONAL DETAILS. 2. INSTALL THE 2x10@24" WALL WITH " DIA. x12" ANCHOR INSTALL THE 2x10@24" WALL WITH " DIA. x12" ANCHOR 12" DIA. x12" ANCHOR BOLTS AT 24" O.C., CAST INTO THE NEW FOOTING. THE WALL'S TOP PLATE SHALL BE IN CONTACT WITH THE UNDERSIDE OF THE LOG JOISTS AND HAVE (3) "x4 " SIMPSON SDS SCREWS AT EACH 14"x4 " SIMPSON SDS SCREWS AT EACH 12" SIMPSON SDS SCREWS AT EACH JOIST. WALL SHALL HAVE 2x10 BLOCKING AT 48" O.C. VERTICALLY AND BE SHEATHED WITH " STRUCT I GRADE SHEATHING, NAILED 58" STRUCT I GRADE SHEATHING, NAILED WITH 10d (GUN) NAILS AT 4" O.C. EDGE, 12" O.C. FIELD. 4. NEW SHEARWALLS SHALL BE 2x6@24" O.C, WITH (2)2X6'S AT THE EAST END AND (2)2x6'S AT THE WEST END. SHEATH WITH " 12" STRUCT I GRADE SHEATHING, NAILED WITH 10d (GUN) NAILS AT 4" O.C. EDGE, 12" O.C. FIELD.
AutoCAD SHX Text
GENERAL NOTES: 1. THESE PLANS ARE INTENDED TO ALLOW FOR THE REMOVAL THESE PLANS ARE INTENDED TO ALLOW FOR THE REMOVAL OF THE 139 MAIN STREET PORTION OF THE CO-JOINED BUILDINGS COMPRISING 143 & 147 MAIN STREET (143/147) AND 139 MAIN STREET (139). THE DESIGN INTENT IS FOR TEMPORARY SHORING AND BRACING WORK TO BE DONE FROM OUTSIDE OR WITHIN 143 & 147 MAIN STREET, AS 139 SHOULD BE CONSIDERED UNSAFE 139 SHOULD BE CONSIDERED UNSAFE AND IS AT RISK OF COLLAPSE. AS SUCH MAIN AND NO AS SUCH MAIN AND NO CONSTRUCTION ACTIVITY EXCEPT SHOULD TAKE PLACE WITHIN 139. IT IS ASSUMED THAT ONCE SIGNIFICANT DEMOLITION ACTIVITY OF 139 IS INITIATED, THAT PORTION OF THE BUILDING, INCLUDING THE 8" BRICK PARTY WALL BETWEEN THE TWO PORTIONS OF THE BUILDING, WILL COLLAPSE. 2. SEE SHEET S2 FOR THE SUGGESTED CONSTRUCTION & SEE SHEET S2 FOR THE SUGGESTED CONSTRUCTION & DEMOLITION SEQUENCING. 3. THIS DESIGN IS BASED UPON LIMITED FIELD OBSERVATIONS. THIS DESIGN IS BASED UPON LIMITED FIELD OBSERVATIONS. ALL EXISTING CONDITIONS SHALL BE FIELD VERIFIED. ANY DISCREPANCIES WHICH MATERIALLY AFFECT THE DESIGN OR CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF SCHAAL ENGINEERING, P.C. FOR CLARIFICATION. 4. THE WORK DEPICTED HEREIN IS FOR THE STRUCTURAL WORK ONLY. OTHER INCIDENTAL MECHANICAL, PLUMBING AND/OR ELECTRICAL WORK MAY BE REQUIRED TO COMPLETE THE STRUCTURAL WORK. THE OWNER OR CONTRACTOR SHALL EMPLOY THE SERVICES OF LICENSED TRADESMEN AS NECESSARY TO TEMPORARILY MOVE AND/OR PROTECT ALL MECHANICAL, ELECTRICAL, TELECOM, HVAC, FIRE PROTECTION (AND OTHER EXISTING UTILITIES). 5. SEE SHEET S4 FOR BASIS OF DESIGN AND LOADING CRITERIASEE SHEET S4 FOR BASIS OF DESIGN AND LOADING CRITERIA
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
W
AutoCAD SHX Text
N
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
H
AutoCAD SHX Text
9880
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
No.
AutoCAD SHX Text
L
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
T
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
Page 41: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

S2

DRAWN BY:

CHECKED BY:DATE:

SCALE:

BTH

T.L.S.SEE PLANS

DRAWING NUMBER

OF R

TEM

POR

AR

Y S

HO

RIN

GPL

AN

AN

D D

ETA

ILS

IA ND R GW

NE

W E

NG

LA

ND

FA

MIL

Y H

OU

SIN

G36

8 N

H R

OU

TE

104

NE

W H

AM

PTO

N, N

H 0

3256

SHEET 3 OF 7

6/24/19

REV

ISIO

ND

ATE

NO

.

139

and

143-

147

MA

IN S

TR

EE

TC

LA

RE

MO

NT

, NH

N

PROJECTNORTH

AutoCAD SHX Text
EX. 6"x6" JOISTS AT 30" O.C.
AutoCAD SHX Text
EX. 11"x11" BEAM
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
EX. WOOD STRAPPED WALL WITH LATH & PLASTER
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 12" BRICK WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
S3
AutoCAD SHX Text
B
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST. REMOVE DIAGONAL BRACES AND THEN REMOVE DIAGONAL BRACES AND THEN FULLY SHEATH ON THE WEST SIDE WITH " CD-X 58" CD-X PLYWOOD OR ADVANTECH. SEE SECTIONS "A" AND "B" FOR ADDITIONAL INFORMATION
AutoCAD SHX Text
NEW 2x6 @16" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
2.
AutoCAD SHX Text
1.
AutoCAD SHX Text
STRUCT. STEEL SHORING & BRACING; SEE PLAN DETAIL "1" AND SECTION "A" ON SHEET S4
AutoCAD SHX Text
KEYED NOTE; TYP.
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
S4
AutoCAD SHX Text
A
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
EX. 6"x8" ATTIC FLOOR JOISTS AT +/-36" O.C.
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
EX. 8" BRICK WALLS
AutoCAD SHX Text
EX. STUD WALLS
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 2"x4" STUD WALL w/ LATH & PLASTER
AutoCAD SHX Text
NEW 2x6 @16" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
2.
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST. REMOVE DIAGONAL BRACES AND THEN REMOVE DIAGONAL BRACES AND THEN FULLY SHEATH ON THE WEST SIDE WITH " CD-X 58" CD-X PLYWOOD OR ADVANTECH. SEE SECTIONS "A" AND "B" FOR ADDITIONAL INFORMATION
AutoCAD SHX Text
1.
AutoCAD SHX Text
S3
AutoCAD SHX Text
B
AutoCAD SHX Text
STRUCT. STEEL SHORING & BRACING; SEE PLAN DETAIL "1" AND SECTION "A" ON SHEET S4
AutoCAD SHX Text
KEYED NOTE; TYP.
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
S4
AutoCAD SHX Text
A
AutoCAD SHX Text
SCHAAL ENGINEERING, P.C. P.O. Box 152 | 61 Depot Street Wilder, VT 05088-0152 (802) 295-2002 [email protected]
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
2nd FLOOR LAYOUT & 3rd FLOOR FRAMING PLAN
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
3rd FLOOR LAYOUT & ATTIC FLOOR FRAMING PLAN
AutoCAD SHX Text
KEYED NOTES: 1. EXISTING TEMPORARY WALLS SHALL HAVE (2)2x6'S ADDED AT EXISTING TEMPORARY WALLS SHALL HAVE (2)2x6'S ADDED AT ALL NEW SHEARWALLS, 2x6 HORIZ. BLOCKING INSTALLED AT 48" O.C. VERTICALLY BETWEEN STUDS, AND THEN BE SHEATHED ON THE WEST SIDE WITH " STRUCT I GRADE SHEATHING, NAILED WITH 58" STRUCT I GRADE SHEATHING, NAILED WITH 10d (GUN) NAILS AT 4" O.C. EDGE, 12" O.C. FIELD. 2. NEW SHEARWALLS SHALL BE 2x6@24" O.C, WITH (2)2x6's AT THE EAST END AND (2)2x6'S AT THE WEST END. SHEATH WITH " 12" STRUCT I GRADE SHEATHING, NAILED WITH 10d (GUN) NAILS AT 4" O.C. EDGE, 12" O.C. FIELD. ADDITIONAL DETAILS T.B.D.
AutoCAD SHX Text
CONSTRUCTION SEQUENCING THE FOLLOWING CONSTRUCTION SEQUENCING IS SUGGESTED: 1. INSTALL A NEW 2x10 WALL ON A NEW CONCRETE FOOTING IN THE BASEMENT INSTALL A NEW 2x10 WALL ON A NEW CONCRETE FOOTING IN THE BASEMENT OF 143/147. 2. REINFORCE THE CONNECTION OF THE EXISTING TEMPORARY SHORING WALLS REINFORCE THE CONNECTION OF THE EXISTING TEMPORARY SHORING WALLS TO THE EXISTING MAIN FRAMING ELEMENTS OF 143/147. 3. FIELD LOCATE NEW SHEARWALL LOCATIONS AT 6'-0" O.C. MAXIMUM SPACING FIELD LOCATE NEW SHEARWALL LOCATIONS AT 6'-0" O.C. MAXIMUM SPACING TO ALLOW FOR VERTICAL ALIGNMENT OF THE SHEARWALLS FROM THE BASEMENT TO THE ATTIC. THIS MAY REQUIRE SELECTIVE DEMOLITION OF INTERIOR PARTITIONS. 4. INSTALL NEW STRUCTURAL STEEL SHORING/BRACING ON THE EXTERIOR, NEW INSTALL NEW STRUCTURAL STEEL SHORING/BRACING ON THE EXTERIOR, NEW TIE RODS THROUGH THE BUILDING, AND PRE-CAST CONCRETE THRUST BLOCKS. 5. INSTALL (2) 2x6 STUD WITHIN EXISTING TEMPORARY WALLS TO BE CENTERED ON NEW SHEARWALLS AND THEN INSTALL NEW HORIZONTAL BLOCKING BETWEEN ALL VERTICAL STUDS AND INSTALL SHEATHING OVER THE TEMPORARY WALLS. 6. INSTALL NEW SHEARWALLS, INCLUDING TENSION STRAP & HOLDOWNS AT THE INSTALL NEW SHEARWALLS, INCLUDING TENSION STRAP & HOLDOWNS AT THE ENDS OF THE SHEARWALLS. 7. SAW-CUT THE EXISTING EXTERIOR BRICK WALLS OF 139 AT THE LOCATIONS SAW-CUT THE EXISTING EXTERIOR BRICK WALLS OF 139 AT THE LOCATIONS SHOWN ON PLAN DETAIL "1" ON SHEET S4. 8. CAREFULLY DEMOLISH & REMOVE DEBRIS OF 139 STARTING AT THE EAST END OF 139 AND WORKING TOWARDS THE WEST (143 /147). IT IS RECOMMENDED IT IS RECOMMENDED THAT ALL DEMOLITION BE CONDUCTED FROM OUTSIDE OF 139. 9. IF DEMOLITION OF 139 PROGRESSES TO THE SAW-CUTS (ITEM 7., ABOVE) WITHOUT COMPLETE COLLAPSE OF THE BRICK PARTY WALL, THEN THIS REMAINING WALL SHALL BE CAREFULLY DISASSEMBLED FROM THE TOP DOWN AND WORKING FROM THE NORTH AND SOUTH ENDS. IT SHOULD BE ASSUMED THAT THIS IT SHOULD BE ASSUMED THAT THIS REMAINING BRICK WALL COULD COLLAPSE AT ANY TIME. IT IS THE DEMOLITION IT IS THE DEMOLITION CONTRACTOR'S OPTION TO DESIGN AND INSTALL ADDITIONAL TEMPORARY SHORING OF THIS WALL TO FACILITATE IT'S SAFE DEMOLITION. 10. UPON COMPLETE DEMOLITION OF 139, THE SITE SHALL BE CLEARED OF ALL DEMOLITION DEBRIS AND 139's BASEMENT HOLE FILLED TO WITHIN 8 FEET OF 143/147's EAST WALL. 11. CONSTRUCT THE NEW EAST WALL FOR 143/147. SEE DETAIL ON SHEET S6. 12. COMPLETE THE BACKFILLING OF THE NEW 143/147 FOUNDATION WALL. 13. REMOVE THE TEMPORARY SHORING & BRACING FROM 143 /147.
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
W
AutoCAD SHX Text
N
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
H
AutoCAD SHX Text
9880
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
No.
AutoCAD SHX Text
L
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
T
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
Page 42: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

S3

DRAWN BY:

CHECKED BY:DATE:

SCALE:

BTH

T.L.S.SEE PLANS

DRAWING NUMBER

OF R

TEM

POR

AR

Y S

HO

RIN

GPL

AN

AN

D D

ETA

ILS

IA ND R GW

NE

W E

NG

LA

ND

FA

MIL

Y H

OU

SIN

G36

8 N

H R

OU

TE

104

NE

W H

AM

PTO

N, N

H 0

3256

SHEET 4 OF 7

6/24/19

REV

ISIO

ND

ATE

NO

.

139

and

143-

147

MA

IN S

TR

EE

TC

LA

RE

MO

NT

, NH

N

PROJECTNORTH

AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 6"x6" RAFTERS AT +/-36" O.C.
AutoCAD SHX Text
EX. EXTERIOR STAIR TOWER
AutoCAD SHX Text
2x6 STUDS AT 16" O.C., INSTALLED IN 2019 AS TEMP. SUPPORTS UNDER GABLE END RAFTER. REMOVE HORIZONTAL BRACES AND REMOVE HORIZONTAL BRACES AND THEN FULLY SHEATH ON THE WEST SIDE WITH 58" CD-X PLYWOOD OR ADVANTECH. SEE SECTIONS "A" AND "B" FOR ADDITIONAL INFORMATION
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
EX. 8" BRICK WALLS
AutoCAD SHX Text
8"x8"RIDGE
AutoCAD SHX Text
NEW 2x6 @24" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
2.
AutoCAD SHX Text
STRUCT. STEEL SHORING & BRACING; SEE PLAN DETAIL "1" AND SECTION "A" ON SHEET S4
AutoCAD SHX Text
S3
AutoCAD SHX Text
B
AutoCAD SHX Text
1.
AutoCAD SHX Text
S4
AutoCAD SHX Text
A
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
EX. 8" BRICK PARTY WALL (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
EX. 6" CMU WALL WITH SPRAY FOAM INSUL.
AutoCAD SHX Text
EX. 2"-3" CONC. SLAB ON GROUND
AutoCAD SHX Text
DEPTH & GEOMETRY OF EX. FOUNDATIONS ARE UNKNOWN
AutoCAD SHX Text
EX. 11"x11" BEAM; TYP.
AutoCAD SHX Text
(3)2x6's AT END OF SHEARWALL; TYP.
AutoCAD SHX Text
EX. 5" DIA LOG JOISTS AT 24" O.C
AutoCAD SHX Text
STEEL OR WOOD POSTS; SPACING VARIES
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
HUNG A.C.T. CEILING
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
STEEL OR WOOD POSTS; SPACING VARIES
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
EX. 2"x4" STUD WALL
AutoCAD SHX Text
EX. WOOD STRAPPED WALL WITH LATH & PLASTER
AutoCAD SHX Text
EX. INTER. WALLS, TO BE REMOVED TO BE REMOVED & REPLACED AS NECESSARY TO INSTALL NEW SHEAR WALLS
AutoCAD SHX Text
2x4, STRAPPING & PRESS-BD. CEILING
AutoCAD SHX Text
EX. 6"x8" ATTIC FLOOR JOISTS AT +/-36" O.C., STRAPPED AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
EX. 2"x4" STUD WALL w/ LATH & PLASTER
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's @ 28"-30" O.C., WITH (2)2x6x30" ORIENTED EAST-WEST
AutoCAD SHX Text
EX. 6"x6" RAFTERS AT +/-36" O.C.
AutoCAD SHX Text
8"x8" RIDGE
AutoCAD SHX Text
REMOVE FOAM AND CELLULOSE INSUL. AS REQ'D. TO EXTEND NEW SHEARWALLS TO EX. 1" BOARDS.
AutoCAD SHX Text
NEW 2x10 @24" WALL WITH 34" SHEATHING SHEATHING
AutoCAD SHX Text
NEW 12"x11 " CONC. FOOTING 14" CONC. FOOTING
AutoCAD SHX Text
4.
AutoCAD SHX Text
3.
AutoCAD SHX Text
2x6 STUDS AT 16" O.C., INSTALLED IN 2019 AS TEMP. SUPPORTS UNDER GABLE END RAFTER
AutoCAD SHX Text
REMOVE EX. BRACES, ADD BLOCKING AT 48" O.C, AND THEN SHEATH WITH 58" STRUCT I SHEATHING
AutoCAD SHX Text
2.
AutoCAD SHX Text
NEW 2x6 @24" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
REMOVE EX. BRACES, ADD BLOCKING AT 48" O.C, AND THEN SHEATH WITH 58" STRUCT I SHEATHING
AutoCAD SHX Text
REMOVE EX. BRACES, ADD BLOCKING AT 48" O.C, AND THEN SHEATH WITH 58" STRUCT I SHEATHING
AutoCAD SHX Text
REMOVE EX. BRACES, ADD BLOCKING AT 48" O.C, AND THEN SHEATH WITH 58" STRUCT I SHEATHING
AutoCAD SHX Text
(2)2x6's & TENSION STRAP OR HOLD-DOWNS FROM ATTIC SHEARWALLS TO BASEMENT SHEARWALLS, ANCHORED TO NEW CONCRETE FOUNDATIONS. SEE DETAILS ON SHEET S5
AutoCAD SHX Text
STEEL POSTS ON CONCRETE PIERS
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
KEYED NOTE; TYP.
AutoCAD SHX Text
(2) 1" DIA. RODS EAST, 34" DIA. WEST
AutoCAD SHX Text
(2) " DIA. RODS, EAST & WEST 34" DIA. RODS, EAST & WEST
AutoCAD SHX Text
AT ALL SHEARWALLS INSTALL 2x6 OUTRIGGERS, WITH (3)12d(GUN) NAILS TO NEW/EX. DOUBLE STUDS OF TEMP. WALL INSTALLED IN 2019. SEE KEYED NOTE
AutoCAD SHX Text
6.
AutoCAD SHX Text
INSTALL (2)2x6'S IN EX. TEMP. WALLS AT ALL SHEAR WALL INTERSECTIONS
AutoCAD SHX Text
TYP. SHEARWALL STRAP TIES OR HOLDOWNS; SEE DETAILS ON SHEET S5
AutoCAD SHX Text
FIELD VERIFY ALL CONNECTIONS AT UNDERSIDE OF EX. JOISTS AND TEMP. WALL TOP PLATE
AutoCAD SHX Text
5.
AutoCAD SHX Text
2.
AutoCAD SHX Text
NEW 2x6 @24" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
1.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
NEW 2x6 @24" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
NEW 2x6 @24" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
NEW 2x6 @24" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
PRIOR TO INSTALLING SHEARWALLS' DOUBLE STUDS, INSTALL (2) " DIA. THREADED 58" DIA. THREADED ROD ANCHORS AT 4" O.C. INTO NEW CONC. FOOTING. TOP ANCHOR TO BE 3" FROM TOP OF CONCRETE. USE SIMPSON SET-XP EPOXY WITH " DIA. x 6" HOLES 34" DIA. x 6" HOLES AND 12" LONG RODS. INSTALL STUDS OVER THE RODS WITH " MAX. DIA. HOLES 1116" MAX. DIA. HOLES IN STUDS AND USE 3"x3" PLATE WASHERS & NUTS.
AutoCAD SHX Text
(2) " DIA. RODS, EAST & WEST 34" DIA. RODS, EAST & WEST
AutoCAD SHX Text
(2) " DIA. RODS, EAST & WEST 34" DIA. RODS, EAST & WEST
AutoCAD SHX Text
(2) " DIA. RODS, EAST & WEST 34" DIA. RODS, EAST & WEST
AutoCAD SHX Text
(2) " DIA. RODS, EAST & WEST 34" DIA. RODS, EAST & WEST
AutoCAD SHX Text
SCHAAL ENGINEERING, P.C. P.O. Box 152 | 61 Depot Street Wilder, VT 05088-0152 (802) 295-2002 [email protected]
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
ROOF FRAMING PLAN
AutoCAD SHX Text
3/8" = 1'-0"
AutoCAD SHX Text
SECTION B/SE
AutoCAD SHX Text
KEYED NOTES: 1. EXISTING TEMPORARY WALLS SHALL HAVE (2)2x6'S ADDED AT EXISTING TEMPORARY WALLS SHALL HAVE (2)2x6'S ADDED AT ALL NEW SHEARWALLS, 2x6 HORIZ. BLOCKING INSTALLED AT 48" O.C. VERTICALLY BETWEEN STUDS, AND THEN BE SHEATHED ON THE WEST SIDE WITH " STRUCT I GRADE SHEATHING, NAILED WITH 58" STRUCT I GRADE SHEATHING, NAILED WITH 10d (GUN) NAILS AT 4" O.C. EDGE, 12" O.C. FIELD. 2. NEW SHEARWALLS SHALL BE 2x6@24" O.C, WITH (2)2x6's AT THE EAST END AND (2)2x6'S AT THE WEST END. SHEATH WITH " 12" STRUCT I GRADE SHEATHING, NAILED WITH 10d (GUN) NAILS AT 4" O.C. EDGE, 12" O.C. FIELD. *** SEE SHEARWALL DETAILS ON SHEET S5 FOR ADDITIONAL INFORMATION. *** 3. INSTALL THE 2x10@24" WALL WITH " DIA.x12" ANCHOR BOLTS 12" DIA.x12" ANCHOR BOLTS AT 24" O.C., CAST INTO THE NEW FOOTING. THE WALL'S TOP PLATE SHALL BE IN CONTACT WITH THE UNDERSIDE OF THE LOG JOISTS AND HAVE (3) "x4 " SIMPSON SDS SCREWS AT EACH JOIST. 14"x4 " SIMPSON SDS SCREWS AT EACH JOIST. 12" SIMPSON SDS SCREWS AT EACH JOIST. WALL SHALL HAVE 2x10 BLOCKING AT 48" O.C. VERTICALLY AND BE SHEATHED WITH " STRUCT I GRADE SHEATHING, NAILED WITH 10d 58" STRUCT I GRADE SHEATHING, NAILED WITH 10d (GUN) NAILS AT 4" O.C. EDGE, 12" O.C. FIELD. *** TRIM OR REMOVE THE EXISTING SPRAY FOAM INSULATION ON TRIM OR REMOVE THE EXISTING SPRAY FOAM INSULATION ON THE CMU WALL TO A UNIFORM SURFACE PRIOR TO INSTALLING STUDS FOR THE 2x10 WALL. 4. REMOVE COMPLETELY THE EXISTING SPRAY FOAM INSULATION REMOVE COMPLETELY THE EXISTING SPRAY FOAM INSULATION WHERE THE NEW FOOTING IS TO COME INTO CONTACT WITH THE CMU WALL. INSTALL A NEW 12" WIDE x 11 " HIGH CONCRETE 14" HIGH CONCRETE FOOTING, WITH (2) #5's CONTINUOUS, AND #6x3'-0" DOWELS AT 24" O.C., DRIVEN THROUGH " DIA. HOLES IN THE CONCRETE SLAB. 34" DIA. HOLES IN THE CONCRETE SLAB. INSTALL #4x12" DOWELS AT 16" O.C INTO THE BOTTOM COURSE OF CMU USING SIMPSON SET-XP EPOXY ADHESIVE (OR APPROVED EQUAL) WITH " DIA. HOLES AND 1 " EMBEDMENT. 34" DIA. HOLES AND 1 " EMBEDMENT. 12" EMBEDMENT. MANUFACTURER'S INSTRUCTIONS FOR HOLE CLEANING AND INSTALLATION SHALL BE FOLLOWED. 5. THE CONNECTION OF THE EXISTING TEMP. WALLS TO THE UNDERSIDE OF THE EXISTING JOISTS SHALL BE FIELD VERIFIED AT EACH CROSSING TO ENSURE NO GAPS EXIST BETWEEN THE UNDERSIDE OF JOIST AND THE TEMP. WALLS' TOP PLATE. AT ANY AND ALL LOCATIONS WHERE GAPS EXIST, THE GAP SHALL BE FILLED WITH HARDWOOD SHIMS AND (2) "x8" SIMPSON SDS SCREWS 14"x8" SIMPSON SDS SCREWS INSTALLED FROM BELOW, THROUGH THE TOP PLATES AND SHIMS, INTO THE HEAVY TIMBER FLOOR JOIST. 6. AT EACH SHEARWALL, INSTALL A 2x6 OUTRIGGER FROM THE DOUBLE STUD WHICH EITHER EXISTS, OR IS TO BE ADDED TO THE EX TEMPORARY WALLS. THE OUTRIGGERS SHALL EXTEND THROUGH ALL EXISTING WALL FINISHES AND FRAMING TO BE IN DIRECT CONTACT WITH THE BRICK PARTY WALL. INSTALL TWO OUTRIGGERS, AT APPROXIMATELY POINT OF THE WALL HEIGHT, AT EACH 13 POINT OF THE WALL HEIGHT, AT EACH SHEARWALL LOCATION.
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
W
AutoCAD SHX Text
N
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
H
AutoCAD SHX Text
9880
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
No.
AutoCAD SHX Text
L
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
T
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
Page 43: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

S4

DRAWN BY:

CHECKED BY:DATE:

SCALE:

BTH

T.L.S.SEE PLANS

DRAWING NUMBER

OF R

TEM

POR

AR

Y S

HO

RIN

GPL

AN

AN

D D

ETA

ILS

IA ND R GW

NE

W E

NG

LA

ND

FA

MIL

Y H

OU

SIN

G36

8 N

H R

OU

TE

104

NE

W H

AM

PTO

N, N

H 0

3256

SHEET 5 OF 7

6/24/19

REV

ISIO

ND

ATE

NO

.

139

and

143-

147

MA

IN S

TR

EE

TC

LA

RE

MO

NT

, NH

AutoCAD SHX Text
EX. 8" BRICK WALL PARTY (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
8"x8"RIDGE
AutoCAD SHX Text
EX. CHIMNEY, INTEGRAL WITH EX. 8" BRICK WALL PARTY (FAILING), TO BE REMOVED; TYP. 2 LOC.'s.
AutoCAD SHX Text
2x6 STUDS AT 16" O.C., INSTALLED IN 2019 AS TEMP. SUPPORTS UNDER GABLE END RAFTER
AutoCAD SHX Text
EX. 8" WALL, PART OF 139 MAIN STREET, TO BE REMOVED
AutoCAD SHX Text
EX. 6"x8" ATTIC FLOOR JOISTS AT +/-36" O.C., STRAPPED AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's @ 28"-30" O.C., WITH (2)2x6x30" ORIENTED EAST-WEST
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C.,
AutoCAD SHX Text
EX. 8" WALL FROM 3rd FLOOR UP
AutoCAD SHX Text
DEPTH & GEOMETRY OF EX. FOUNDATIONS ARE UNKNOWN
AutoCAD SHX Text
EX. 2"-3" CONC. SLAB ON GROUND
AutoCAD SHX Text
EX. 6" CMU WALL WITH SPRAY FOAM INSUL.
AutoCAD SHX Text
EX. 12" BRICK WALL UP TO THE 3rd FLOOR
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
EX. 5" DIA LOG JOISTS AT 24" O.C.; 5" DIA LOG JOISTS AT 24" O.C.; NOTE: THE 6" CMU WALL STOPS THE 6" CMU WALL STOPS APPROX. 1" BELOW THE UNDERSIDE OF THE EXISTING LOG JOISTS..
AutoCAD SHX Text
EX. 2x4 & 2x6 BRACES FOR TEMP. WALLS, TO BE REMOVED TO BE REMOVED PRIOR TO ADDING NEW SHEATHING TO THE EXISTING TEMP. WALLS
AutoCAD SHX Text
**- EX. (2)2x6's, TURNED 90 DEGREES RELATIVE TO ALL OTHERS
AutoCAD SHX Text
**
AutoCAD SHX Text
**
AutoCAD SHX Text
**
AutoCAD SHX Text
ADD 2x6 HORIZONTAL BLOCKING AT 48" O.C. VERTICAL TO ALL EX. TEMPORARY WALLS AND INSTALL " 58" STRUCT. I GRADE SHEATHING ON THE WEST (139 MAIN STR.) SIDE. NAIL SHEATHING WITH 10d (gun) NAILS AT 4" O.C. EDGE, 12" O.C. FIELD
AutoCAD SHX Text
NEW 2x6 @16" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
NEW 2x6 @16" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
NEW 2x6 @16" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
NEW 2x6 @24" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
NEW 2x6 @16" SHEAR WALLS, 8' LONG AND 6'-0" O.C.
AutoCAD SHX Text
NEW 2x10 @24" WALL ON TOP OF NEW FOOTING WITH 34" SHEATHING
AutoCAD SHX Text
NEW 11 "x12" CONC. FOOTING; 14"x12" CONC. FOOTING; SEE SECTION B ON SHEET S3 FOR ADDITIONAL DETAILS
AutoCAD SHX Text
(6)2'x4'x18" CONC. BLOCKS STACKED ON NORTH SIDE
AutoCAD SHX Text
W6x16 VERTICAL WALERS ON EAST SIDE, W6x9 ON WEST SIDE
AutoCAD SHX Text
W6x16 HORIZ. WALERS WITH (2) 1" DIA. (2) 1" DIA. RODS, THIS LEVEL ONLY
AutoCAD SHX Text
W6x9 HORIZ. WALERS WITH (2) " DIA. RODS 34" DIA. RODS
AutoCAD SHX Text
W6x9 HORIZ. WALERS WITH (2) " DIA. RODS 34" DIA. RODS
AutoCAD SHX Text
W6x9 HORIZ. WALERS WITH (2) " DIA. RODS 34" DIA. RODS
AutoCAD SHX Text
W6x9 HORIZ. WALERS WITH (2) " DIA. RODS 34" DIA. RODS
AutoCAD SHX Text
W6x9 HORIZ. WALERS WITH (2) " DIA. RODS 34" DIA. RODS
AutoCAD SHX Text
(3)2'x4'x18" CONC. BLOCKS STACKED ON SOUTH SIDE
AutoCAD SHX Text
2.
AutoCAD SHX Text
HORIZ. WALERS TO BE FIELD LOCATED. DIM.'S SHOWN ARE APPROXIMATE AND CAN VARY +/-6".
AutoCAD SHX Text
1.
AutoCAD SHX Text
INSTALL (2)2x6'S IN EX. TEMP. WALLS AT ALL SHEARWALL INTERSECTIONS
AutoCAD SHX Text
1.
AutoCAD SHX Text
PC OR C.I.P. CONCRETE LEVELING PAD BELOW VERT. WALERS
AutoCAD SHX Text
W6x9(or 16) HORIZ. WALERS, +/-6' LONG ON NORTH SIDE
AutoCAD SHX Text
W6x9(or 16) HORIZ. WALERS, +/-5' LONG, WITH (2) " DIA. 34" DIA. RODS AT THE WEST END. ROD SIZE AT EAST END VARIES; SEE SECTION "A"
AutoCAD SHX Text
W6x9 (WEST) & W6x16(EAST) VERT. WALERS, +/-30' LONG
AutoCAD SHX Text
FULL HEIGHT & DEPTH SAW-CUT OF EXISTING BRICK MASONRY WALL. CUT NO CLOSER THAN 24" FROM BRICK EXISTING PARTY WALL
AutoCAD SHX Text
1"x8"x11" STEEL PLATES
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST. REMOVE DIAGONAL REMOVE DIAGONAL BRACES AND THEN FULLY SHEATH ON THE WEST SIDE WITH " CD-X PLYWOOD OR 58" CD-X PLYWOOD OR ADVANTECH. SEE SECTIONS "A" AND "B" FOR ADDITIONAL INFORMATION
AutoCAD SHX Text
CONTINUOUS (3)2x8 COMPRESSION MEMBER AT WEST END OF HORIZ. WALERS.
AutoCAD SHX Text
NOTE: DESIGN INTENT IS FOR THE RODS & COMPR. MEMBERS AT THE WEST END TO PASS THROUGH EXISTING MASONRY OPENINGS FOR WINDOWS & DOORS
AutoCAD SHX Text
139 MAIN STREET (TO BE DEMOLISHED)
AutoCAD SHX Text
34" PLYWOOD, LAYED WITH 8' DIM. VERTICAL
AutoCAD SHX Text
NEW 2x6 @24" SHEAR WALLS, 8' LONG AND 6'-0" O.C..
AutoCAD SHX Text
FULL HEIGHT & DEPTH SAW-CUT OF EXISTING BRICK MASONRY WALL. CUT NO CLOSER THAN 24" FROM BRICK EXISTING PARTY WALL
AutoCAD SHX Text
EX. 8" BRICK WALL PARTY (FAILING); TO BE REMOVED & REPLACED AS NEW EXTERIOR WALL FOR 143-147 MAIN STREET
AutoCAD SHX Text
CONTRACTOR'S OPTION TO USE TURN-BUCKLES TO FACILITATE ROD INSTALLATION
AutoCAD SHX Text
34" PLYWOOD, LAYED WITH 8' DIM. HORIZ.
AutoCAD SHX Text
SEE "DETAIL ST1" BELOW
AutoCAD SHX Text
S5
AutoCAD SHX Text
D
AutoCAD SHX Text
(3) 2x6 CONT., WITH "x6"x6" PLYWOOD SHIM 12"x6"x6" PLYWOOD SHIM AT HORIZ. WALER, LOCATED AT EDGE OF OPENINGS
AutoCAD SHX Text
W6x9 (WEST) & W6x16(EAST) VERT. WALERS, +/-30' LONG
AutoCAD SHX Text
SEE "DETAIL ST2" ON SHEET S5
AutoCAD SHX Text
PROVIDE VERTICAL SUPPORT OF THREADED RODS AT 6'-0" O.C. MAX. SPACING
AutoCAD SHX Text
W6x9 OR W6x16 HORIZ. WALERS, +/-5' LONG WITH SEE SECTION "A" FOR LOCATION SPECIFIC WALER SIZE
AutoCAD SHX Text
W6x16 VERT. WALERS ON EAST SIDE, W6x9 ON WEST SIDE, +/-30' LONG
AutoCAD SHX Text
34" PLYWOOD, LAYED WITH 8' DIM. VERTICAL
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL ST1
AutoCAD SHX Text
(2) " or 1" DIA. ROD WITH "x2"x2" 34" or 1" DIA. ROD WITH "x2"x2" 14"x2"x2" PLATE WASHERS. SEE SECTION "A" FOR LOCATION SPECIFIC ROD SIZE
AutoCAD SHX Text
EX. 12" BRICK WALL UP TO THE 3rd FLOOR, THEN 8" ABOVE 3RD FLOOR
AutoCAD SHX Text
14" WEB STIFFENER, EACH SIDE OF WEB, WELDED TO WEB AND FLANGES WITH 2" OF " FILLET WELD EACH 316" FILLET WELD EACH SIDE TO WEB AND 1 " TO FLANGES 12" TO FLANGES
AutoCAD SHX Text
1"x8"x11" STEEL PLATES WITH HOLES 18" DIA. LARGER THAN RODS, LOCATED 7" O.C.
AutoCAD SHX Text
(3) 2x6 CONT., WITH "x6"x6" PLYWOOD 12"x6"x6" PLYWOOD SHIM AT HORIZ. WALER, LOCATED MID-SPACING BETWEEN VERT. WALERS
AutoCAD SHX Text
316" 2"
AutoCAD SHX Text
EACH EDGE OF HORIZ. WALER
AutoCAD SHX Text
NOTE: THIS DETAIL IS TYPICAL FOR ALL WALER-WALER CONNECTIONS.
AutoCAD SHX Text
316" 1"
AutoCAD SHX Text
316" 1"
AutoCAD SHX Text
AFTER RODS INSTALLED
AutoCAD SHX Text
CORE HOLES IN BRICK WALL " DIA. LARGER 18" DIA. LARGER THAN ROD SIZE. FILL FILL ALL HOLES COMPLETELY THROUGH WITH MORTAR AFTER REMOVING THE RODS.
AutoCAD SHX Text
SCHAAL ENGINEERING, P.C. P.O. Box 152 | 61 Depot Street Wilder, VT 05088-0152 (802) 295-2002 [email protected]
AutoCAD SHX Text
3/8" = 1'-0"
AutoCAD SHX Text
SECTION A/SE
AutoCAD SHX Text
3/8" = 1'-0"
AutoCAD SHX Text
PLAN DETAIL "1"
AutoCAD SHX Text
BASIS OF DESIGN & LOADING CRITERIA THE BASIS OF DESIGN IS PREDICATED UPON THE ASSUMPTION THAT THE EXISTING BRICK PARTY WALL BETWEEN 139 MAIN STREET AND 143/147 MAIN STREET IS UNSTABLE AND CAN/WILL COLLAPSE AT ANYTIME AFTER DEMOLITION OF 139 IS INITIATED. SUCH A COLLAPSE WILL RESULT IN DYNAMIC LOADING TO THE REMAINING 143/147 BUILDING FROM THE FALLING BRICK. THIS LOADING INCLUDES: A. HORIZONTAL LOADS FROM THE COLLAPSING BRICK HORIZONTAL LOADS FROM THE COLLAPSING BRICK PUSHING WEST INTO THE EAST WALLS OF 143/147. . THE REINFORCING & SHEATHING OF THE EXISTING TEMPORARY WALLS AND ADDITION OF THE SHEAR WALLS ARE DESIGNED FOR THIS LOADING. B. HORIZONTAL THRUST AT THE NORTHEAST AND HORIZONTAL THRUST AT THE NORTHEAST AND SOUTHEAST CORNERS OF THE REMAINING 143/174 BUILDING. THIS IS A RESULT OF THE COLLAPSE OF . THIS IS A RESULT OF THE COLLAPSE OF BRICK AT THE LOWER LEVELS (ASSUMED TO OCCUR FIRST) CREATING "ARCHING ACTION" IN THE REMAINING BRICK WALL ABOVE AND THAT CREATES A HORIZONTAL FORCE TO THE OUTSIDE EDGES OF THE WALL. THE STRUCTURAL STEEL AND TIE-ROD BRACING ARE DESIGNED TO RESIST THESE LOADS AND PREVENT THE BRICK WALL COLLAPSE FROM PROPAGATING TO THE WEST. C. GRAVITY DEAD LOADS FROM 143/147 WEIGHT OF GRAVITY DEAD LOADS FROM 143/147 WEIGHT OF EXISTING BUILDING MATERIAL AND NEW CONSTRUCTION MATERIALS. THE REINFORCEMENT OF THE CONNECTIONS THE REINFORCEMENT OF THE CONNECTIONS OF EXISTING TEMPORARY WALLS TO EXISTING FRAMING AND THE ADDITION OF THE NEW FOOTING & 2x10 WALL IN THE BASEMENT ARE DESIGNED FOR THESE LOADS. THE FOLLOWING LOADING CRITERIA WAS USED: WEIGHT OF 8" BRICK WALL = 80 psf WEIGHT OF 12" BRICK WALL = 120 psf UNIT WEIGHT OF BRICK RUBBLE = 80 pcf "AT-REST" PRESSURE COEFFICIENT = 0.50 IMPACT FACTOR (FOR DYNAMIC LOADING) = 1.3 CONSTRUCTION LIVE LOAD = 20 psf ROOF DEAD LOAD = 11 psf ATTIC FLOOR/CEILING DEAD LOAD = 18 psf 2ND & 3RD FLOOR DEAD LOADS = 17 psf 1ST FLOOR DEAD LOAD = 8 psf 6" CMU WALL = 37 psf DEAD LOAD FACTOR = 0.60 (WHEN DEAD LEADS USED TO RESIST TENSION LOADS IN THE SHEAR WALLS)
AutoCAD SHX Text
STRUCTURAL STEEL NOTES 1. ALL STRUCTURAL STEEL WORK SHALL CONFORM TO THE SPECIFICATION FOR DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS OF THE A.I.S.C. AND TO THE REQUIREMENTS OF THE LOCAL BUILDING CODES. 2. ALL WELDING SHALL CONFORM TO THE CODE FOR WELDING IN BUILDING CONSTRUCTION OF THE AMERICAN WELDING SOCIETY. 3. STEEL MATERIALS SHALL CONFORM TO THE FOLLOWING: W SHAPES: A992, GRADE 50 OTHER SHAPES, BARS & PLATES: ASTM A36 WELDING ELECTRODE: E70XX 4. CONTRACTOR SHALL PROVIDE ALL NECESSARY GUYING AND BRACING REQUIRED TO ERECT AND HOLD THE STEEL FRAME PLUMB AND SQUARE. 5. THE HORIZ. AND VERTICAL WALERS SHALL BE THE HORIZ. AND VERTICAL WALERS SHALL BE CONNECTED ON THE GROUND, THEN LIFTED INTO PLACE AS ONE ASSEMBLY FOR EACH SIDE OF THE BUILDING.
AutoCAD SHX Text
KEYED NOTES: 1. SAW-CUT & REMOVE EX. SIDEWALK AND CAREFULLY EXCAVATE TO SAW-CUT & REMOVE EX. SIDEWALK AND CAREFULLY EXCAVATE TO BOTTOM OF BRICK WALL. HAND EXCAVATE AS NECESSARY TO MINIMIZE DISTURBANCE TO THE EXISTING BUILDING. PLACE THE CONCRETE BLOCKS ON A LIGHTLY (HAND) COMPACTED 4" LEVELING COURSE OF CRUSHED GRAVEL WITH BOTTOM BLOCK POSITIONED TO BE IN FULL CONTACT WITH THE HORIZONTAL WALER. BACKFILL WITH LIGHTLY (HAND) COMPACTED CRUSHED GRAVEL TO ORIGINAL SIDEWALK ELEVATION. TO ORIGINAL SIDEWALK ELEVATION. 2. SAW-CUT & REMOVE EX. PAVEMENT AND CAREFULLY EXCAVATE TO SAW-CUT & REMOVE EX. PAVEMENT AND CAREFULLY EXCAVATE TO PLACE TOP OF THE LOWER BLOCK AT THE CENTERLINE OF THE HORIZONTAL WALER AND IN FULL CONTACT WITH THE WALER. HAND EXCAVATE AS NECESSARY TO MINIMIZE DISTURBANCE TO THE EXISTING BUILDING. PLACE THE CONCRETE BLOCKS ON A LIGHTLY (HAND) COMPACTED 4" LEVELING COURSE OF CRUSHED GRAVEL. BACKFILL WITH LIGHTLY (HAND) COMPACTED CRUSHED GRAVEL TO ORIGINAL PAVEMENT ELEVATION.
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
W
AutoCAD SHX Text
N
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
H
AutoCAD SHX Text
9880
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
No.
AutoCAD SHX Text
L
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
T
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
Page 44: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

S5

DRAWN BY:

CHECKED BY:DATE:

SCALE:

BTH

T.L.S.SEE PLANS

DRAWING NUMBER

OF R

TEM

POR

AR

Y S

HO

RIN

GPL

AN

AN

D D

ETA

ILS

IA ND R GW

NE

W E

NG

LA

ND

FA

MIL

Y H

OU

SIN

G36

8 N

H R

OU

TE

104

NE

W H

AM

PTO

N, N

H 0

3256

SHEET 6 OF 7

6/24/19

REV

ISIO

ND

ATE

NO

.

139

and

143-

147

MA

IN S

TR

EE

TC

LA

RE

MO

NT

, NH

AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL SW3
AutoCAD SHX Text
EX. 6"x8" ATTIC FLOOR JOISTS AT +/-36" O.C., STRAPPED AND WITH LATH & PLASTER CEILING, AND TWO LAYERS OF 1" BOARD FLOOR IN THE ATTIC SPACE, WITH RIGID & CELLULOSE INSULATION ABOVE (NOT SHOWN).
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's @ 28"-30" O.C., WITH (2)2x6x30" TOP PLATES ORIENTED EAST-WEST
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH LATH & PLASTER CEILING AND 1" BOARD SUB-FLOOR
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
REMOVE EX. DIAGONAL BRACES, ADD BLOCKING AT 48" O.C, AND SHEATH WITH " STRUCT I SHEATHING, NAILED WITH 10d(GUN) 58" STRUCT I SHEATHING, NAILED WITH 10d(GUN) NAILS AT 6" O.C EDGE, 12" O.C. FIELD
AutoCAD SHX Text
EX. LATH & PLASTER CEILING, TO BE REMOVED AS NECESSARY TO INSTALL NEW SHEARWALLS
AutoCAD SHX Text
EX. LOWER CEILING IS SOME AREAS, TO BE REMOVED AS NECESSARY TO INSTALL NEW SHEARWALLS
AutoCAD SHX Text
NOTES: 1. SHEAR WALLS SHALL ALIGN VERTICALLY. SHEAR WALLS SHALL ALIGN VERTICALLY. 2. SHEARWALL ABOVE SHALL BEAR ON SHEARWALL ABOVE SHALL BEAR ON THE BOARD SUB-FLOOR AND SHEAR BOARD SUB-FLOOR AND SHEAR WALL FROM BELOW SHALL EXTEND TO THE UNDERSIDE OF THE BOARD FLOOR UNDERSIDE OF THE BOARD FLOOR ABOVE IT. 3. SHEAR WALLS SHALL BE 8' LONG AND SHEAR WALLS SHALL BE 8' LONG AND 6'-0" O.C., GENERALLY AS SHOWN IN THE PLANS ON SHEETS S1 & S2 4. INSTALL 2x6 HORIZ. BLOCKING AT INSTALL 2x6 HORIZ. BLOCKING AT 48" O.C. VERTICALLY 5. FULLY SHEATH ON ONE SIDE WITH " FULLY SHEATH ON ONE SIDE WITH " 12" STRUCT I SHEATHING AND NAIL WITH 10d's AT 4" O.C EDGE, 12" O.C. FIELD. 5. INSTALL SIMPSON "x6" SDS SCREWS INSTALL SIMPSON "x6" SDS SCREWS 14"x6" SDS SCREWS AT 8" O.C. FROM ABOVE, THROUGH THE UPPER SHEARWALL'S BTM. PLATE THROUGH AND INTO THE DOUBLE TOP PLATE OF SHEARWALL BELOW. ** IF TWO LAYERS OF 1" BOARD SUB-FLOOR LAYERS OF 1" BOARD SUB-FLOOR EXIST, USE 8" LONG SDS SCREWS **
AutoCAD SHX Text
THIS DETAIL APPLIES AT THE 1st, 2nd, AND 3rd FLOORS WHERE THE SHEARWALLS FALL BETWEEN EXISTING FLOOR JOISTS.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL SW2
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
THIS DETAIL APPLIES AT THE 1st, 2nd, AND 3rd FLOORS WHERE THE SHEARWALLS ALIGN 3" OR LESS OVER THE EXISTING 3" OR LESS OVER THE EXISTING OVER THE EXISTING HEAVY TIMBER FLOOR JOISTS.
AutoCAD SHX Text
EX. LOWER CEILING IS SOME AREAS, TO BE REMOVED AS NECESSARY TO INSTALL NEW SHEARWALLS
AutoCAD SHX Text
EX. LATH & PLASTER CEILING, TO BE REMOVED AS NECESSARY TO INSTALL NEW SHEARWALLS
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH CEILING AT UNDERSIDE OF JOISTS AND 1" BOARD SUB-FLOOR
AutoCAD SHX Text
NOTES: 1. SHEAR WALLS SHALL ALIGN VERTICALLY. SHEAR WALLS SHALL ALIGN VERTICALLY. 2. SHEARWALL ABOVE SHALL BEAR ON SHEARWALL ABOVE SHALL BEAR ON THE BOARD SUB-FLOOR AND SHEAR BOARD SUB-FLOOR AND SHEAR WALL FROM BELOW SHALL EXTEND TO THE UNDERSIDE OF THE BOARD FLOOR UNDERSIDE OF THE BOARD FLOOR ABOVE IT. 3. SHEAR WALLS SHALL BE 8' LONG AND SHEAR WALLS SHALL BE 8' LONG AND 6'-0" O.C., GENERALLY AS SHOWN IN THE PLANS ON SHEETS S1 & S2 4. INSTALL 2x6 HORIZ. BLOCKING AT INSTALL 2x6 HORIZ. BLOCKING AT 48" O.C. VERTICALLY 5. FULLY SHEATH ON ONE SIDE WITH " FULLY SHEATH ON ONE SIDE WITH " 12" STRUCT I SHEATHING AND NAIL WITH 10d's AT 4" O.C EDGE, 12" O.C. FIELD. 5. INSTALL SIMPSON "x6" SDS SCREWS INSTALL SIMPSON "x6" SDS SCREWS 14"x6" SDS SCREWS AT 8" O.C. FROM ABOVE & BELOW INTO CENTER OF THE ADDED 2"x6". IF TWO LAYERS OF 1" BOARDS WERE USED FOR THE SUB-FLOOR, USE 8" LONG SDS SCREWS FROM ABOVE.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL SW1
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
THIS DETAIL APPLIES AT THE 1st, 2nd, AND 3rd FLOORS WHERE THE SHEARWALLS ALIGN WITH EXISTING HEAVY TIMBER FLOOR JOISTS.
AutoCAD SHX Text
EX. LOWER CEILING IS SOME AREAS, TO BE REMOVED AS NECESSARY TO INSTALL NEW SHEARWALLS
AutoCAD SHX Text
EX. LATH & PLASTER CEILING, TO BE REMOVED AS NECESSARY TO INSTALL NEW SHEARWALLS
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH CEILING AT UNDERSIDE OF JOISTS AND 1" BOARD SUB-FLOOR
AutoCAD SHX Text
NOTES: 1. SHEAR WALLS SHALL ALIGN VERTICALLY. SHEAR WALLS SHALL ALIGN VERTICALLY. 2. SHEARWALL ABOVE SHALL BEAR ON SHEARWALL ABOVE SHALL BEAR ON THE BOARD SUB-FLOOR AND SHEAR BOARD SUB-FLOOR AND SHEAR WALL FROM BELOW SHALL EXTEND TO THE UNDERSIDE OF THE BOARD FLOOR UNDERSIDE OF THE BOARD FLOOR ABOVE IT. 3. SHEAR WALLS SHALL BE 8' LONG AND SHEAR WALLS SHALL BE 8' LONG AND 6'-0" O.C., GENERALLY AS SHOWN IN THE PLANS ON SHEETS S1 & S2 4. INSTALL 2x6 HORIZ. BLOCKING AT INSTALL 2x6 HORIZ. BLOCKING AT 48" O.C. VERTICALLY 5. FULLY SHEATH ON ONE SIDE WITH " FULLY SHEATH ON ONE SIDE WITH " 12" STRUCT I SHEATHING AND NAIL WITH 10d's AT 4" O.C EDGE, 12" O.C. FIELD. 5. INSTALL SIMPSON "x6" SDS SCREWS INSTALL SIMPSON "x6" SDS SCREWS 14"x6" SDS SCREWS AT 8" O.C. FROM ABOVE & BELOW. IF TWO LAYERS OF 1" BOARDS WERE USED FOR THE SUB-FLOOR, USE 8" LONG SDS SCREWS FROM ABOVE.
AutoCAD SHX Text
ADD 2"x6" (MATCH EX. JST. DEPTH)x8'-0" TO SIDE OF EX. JOIST. NAIL WITH 16d(GUN) NAILS AT 4" O.C. , STAGGERING ADJACENT NAILS 1 " FROM TOP & BTM EDGES.12" FROM TOP & BTM EDGES.
AutoCAD SHX Text
THIS DETAIL APPLIES AT THE 3rd FLOOR'S CEILING / ATTIC FLOOR
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL SW4
AutoCAD SHX Text
NEW 2x6@24" SHEAR WALLS ABOVE & BELOW
AutoCAD SHX Text
NOTES: 1. SHEAR WALLS SHALL ALIGN VERTICALLY. SHEAR WALLS SHALL ALIGN VERTICALLY. 2. SHEARWALL ABOVE SHALL BEAR ON SHEARWALL ABOVE SHALL BEAR ON THE BOARD SUB-FLOOR AND SHEAR BOARD SUB-FLOOR AND SHEAR WALL FROM BELOW SHALL EXTEND TO THE UNDERSIDE OF THE BOARD FLOOR UNDERSIDE OF THE BOARD FLOOR ABOVE IT. 3. SHEAR WALLS SHALL BE 8' LONG AND SHEAR WALLS SHALL BE 8' LONG AND 6'-0" O.C., GENERALLY AS SHOWN IN THE PLANS ON SHEETS S1 & S2 4. INSTALL 2x6 HORIZ. BLOCKING AT INSTALL 2x6 HORIZ. BLOCKING AT 48" O.C. VERTICALLY 5. FULLY SHEATH ON ONE SIDE WITH " FULLY SHEATH ON ONE SIDE WITH " 12" STRUCT I SHEATHING AND NAIL WITH 10d's AT 4" O.C EDGE, 12" O.C. FIELD. 6. INSTALL (2)SIMPSON "x8" SDS SCREWS INSTALL (2)SIMPSON "x8" SDS SCREWS 14"x8" SDS SCREWS AT 3" O.C. FROM ABOVE, THROUGH THE UPPER SHEARWALL'S BTM AND BOARD FLOOR INTO THE 6x8 JOISTS. INSTALL (2)SIMPSON "x6" SDS SCREWS 14"x6" SDS SCREWS AT 3" O.C. FROM BELOW, THROUGH THE LOWER SHEARWALL'S TOP PLATES INTO THE 6x8 JOISTS.
AutoCAD SHX Text
REMOVE EX. DIAGONAL BRACES, ADD BLOCKING AT 48" O.C, AND SHEATH WITH " STRUCT I SHEATHING, NAILED WITH 10d(GUN) 58" STRUCT I SHEATHING, NAILED WITH 10d(GUN) NAILS AT 6" O.C EDGE, 12" O.C. FIELD
AutoCAD SHX Text
REMOVE EX. DIAGONAL BRACES, ADD BLOCKING AT 48" O.C, AND SHEATH WITH " STRUCT I SHEATHING, NAILED WITH 10d(GUN) 58" STRUCT I SHEATHING, NAILED WITH 10d(GUN) NAILS AT 6" O.C EDGE, 12" O.C. FIELD
AutoCAD SHX Text
REMOVE EX. DIAGONAL BRACES, ADD BLOCKING AT 48" O.C, AND SHEATH WITH " STRUCT I SHEATHING, NAILED WITH 10d(GUN) 58" STRUCT I SHEATHING, NAILED WITH 10d(GUN) NAILS AT 6" O.C EDGE, 12" O.C. FIELD
AutoCAD SHX Text
REMOVE EX. DIAGONAL BRACES, ADD BLOCKING AT 48" O.C, AND SHEATH WITH " STRUCT I SHEATHING, NAILED WITH 10d(GUN) 58" STRUCT I SHEATHING, NAILED WITH 10d(GUN) NAILS AT 6" O.C EDGE, 12" O.C. FIELD
AutoCAD SHX Text
REMOVE EX. DIAGONAL BRACES, ADD BLOCKING AT 48" O.C, AND SHEATH WITH " STRUCT I SHEATHING, NAILED WITH 10d(GUN) 58" STRUCT I SHEATHING, NAILED WITH 10d(GUN) NAILS AT 6" O.C EDGE, 12" O.C. FIELD
AutoCAD SHX Text
REMOVE EX. DIAGONAL BRACES, ADD BLOCKING AT 48" O.C, AND SHEATH WITH " STRUCT I SHEATHING, NAILED WITH 10d(GUN) 58" STRUCT I SHEATHING, NAILED WITH 10d(GUN) NAILS AT 6" O.C EDGE, 12" O.C. FIELD
AutoCAD SHX Text
2x6 STUDS AT 16" O.C., INSTALLED IN 2019 AS TEMP. SUPPORTS UNDER GABLE END RAFTER
AutoCAD SHX Text
REMOVE EX. HORIZONTAL BRACES, ADD BLOCKING AT 48" O.C, AND SHEATH WITH " STRUCT I SHEATHING, NAILED WITH 58" STRUCT I SHEATHING, NAILED WITH 10d(GUN) NAILS AT 6" O.C EDGE, 12" O.C. FIELD
AutoCAD SHX Text
REMOVE EX. INSULATION AS NECESSARY TO INSTALL & EXTEND NEW SHEARWALLS TO THE EXISTING BOARD FLOOR
AutoCAD SHX Text
NEW 2x6@24" SHEAR WALLS ABOVE & BELOW
AutoCAD SHX Text
NEW 2x6@24" SHEAR WALLS ABOVE & BELOW
AutoCAD SHX Text
NEW 2x6@24" SHEAR WALLS ABOVE & BELOW
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL SW-HD1
AutoCAD SHX Text
THIS DETAIL APPLIES AT THE 1st, 2nd, AND 3rd FLOORS WHERE THE SHEARWALLS FALL BETWEEN EXISTING FLOOR JOISTS.
AutoCAD SHX Text
(2)2x6 AT EAST END OF THE SHEAR WALLS
AutoCAD SHX Text
INSTALL SIMPSON CS14 STRAP ON EACH SIDE TO THE THE INNER 2x6. STRAPS TO EXTEND EXTENDING 16" ABOVE & BELOW THE FLOOR BOARDS AND HAVE (15) 10d NAILS EVENLY SPACED IN EACH END. NOTE: STRAPS CAN BE STRAPS CAN BE APPLIED OVER THE " 12" SHEATHING
AutoCAD SHX Text
EX. 6x6 JOISTS(BEYOND) AND FLOOR BOARDS. EX. CEILING MATERIALS NOT SHOWN FOR DRAWING CLARITY.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL SW-HD2
AutoCAD SHX Text
THIS DETAIL APPLIES AT THE 1st, 2nd, AND 3rd FLOORS WHERE THE SHEARWALLS LAND PARTIALLY AND 3" PARTIALLY AND 3" OR LESS, OVER EX. FLOOR JOISTS OVER EX. FLOOR JOISTS
AutoCAD SHX Text
(2)2x6 AT EAST END OF THE SHEAR WALLS
AutoCAD SHX Text
INSTALL SIMPSON HDU2-SDS2.5 HOLDOWNS WITH " THREADED 58" THREADED ROD AND (6) "x2 " SDS 14"x2 " SDS 12" SDS SCREWS INTO EACH (2)2x6 END POST. HOLDOWNS SHALL BE POSITIONED SO RODS MISS THE FLOOR JOISTS AND NO CLOSER THAN 1" TO EDGE OF THE (2)2x6 END POST, AND SHALL ALIGN VERTICALLY
AutoCAD SHX Text
EX. 6x6 JOISTS; EX. CEILING MATERIALS NOT SHOWN FOR DRAWING CLARITY
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL SW-HD3
AutoCAD SHX Text
THIS DETAIL APPLIES AT THE 1st, 2nd, AND 3rd FLOORS WHERE THE SHEARWALLS LAND PARTIALLY & 3" PARTIALLY & 3" OR MOVE, OVER EX. FLOOR JOISTS OVER EX. FLOOR JOISTS
AutoCAD SHX Text
(2)2x6 AT EAST END OF THE SHEAR WALLS
AutoCAD SHX Text
INSTALL SIMPSON HDU2-SDS2.5 HOLDOWNS WITH " THREADED 58" THREADED ROD AND (6) "x2 " SDS 14"x2 " SDS 12" SDS SCREWS INTO EACH (2)2x6 END POST. DRILL " MAX. DIA. 1116" MAX. DIA. HOLE THROUGH THE THE EX. JOIST FOR THREADED ROD TO PASS THROUGH
AutoCAD SHX Text
EX. 6x6 JOISTS; EX. CEILING MATERIALS NOT SHOWN FOR DRAWING CLARITY
AutoCAD SHX Text
EX. TEMP. WALL, INSTALLED IN 2019, AND TO BE SHEATHED ON THE WEST SIDE
AutoCAD SHX Text
EX. TEMP. WALL, INSTALLED IN 2019, AND TO BE SHEATHED ON THE WEST SIDE
AutoCAD SHX Text
EX. TEMP. WALL, INSTALLED IN 2019, AND TO BE SHEATHED ON THE WEST SIDE
AutoCAD SHX Text
AFTER DEMOLITION OF 139 MAIN STREET AND REMOVAL OF ALL TEMPORARY SHORING & BRACING, REINFORCE THE EXISTING FLOOR JOIST BY ADDING "x4'-0" LONG 58"x4'-0" LONG STRUCT. I SHEATHING TO EACH SIDE. GLUE WITH PL-400 AND NAIL WITH 12d(GUN) NAILS AT 4" O.C., 1" FROM TOP & BOTTOM EDGES OF THE JOIST. NEW REINFORCING HEIGHT TO MATCH THE JOIST HEIGHT
AutoCAD SHX Text
CUT "x2" SLOT IN FLOOR 18"x2" SLOT IN FLOOR BOARDS FOR NEW STRAP TO PASS THROUGH
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL SW-HD4
AutoCAD SHX Text
(2)2x6 AT EAST END OF THE SHEAR WALLS
AutoCAD SHX Text
INSTALL SIMPSON HDU2-SDS2.5 HOLDOWNS WITH " THREADED ROD 58" THREADED ROD AND (6) "x2 " SDS SCREWS INTO 14"x2 " SDS SCREWS INTO 12" SDS SCREWS INTO EACH (2)2x6 END POST. HOLDOWNS SHALL BE POSITIONED ALIGN VERTICALLY AND BE NO CLOSER THAN 1" TO THE EDGE OF THE (2)2x6 END POST
AutoCAD SHX Text
EX. 6x8 JOISTS AT GABLE END. EX. CEILING MATERIALS NOT SHOWN FOR DRAWING CLARITY
AutoCAD SHX Text
2x6 @ 24" SHEARWALL STUDS
AutoCAD SHX Text
EX. TEMP. WALL, INSTALLED IN 2019, AND TO BE SHEATHED ON THE WEST SIDE
AutoCAD SHX Text
THIS DETAIL APPLIES AT THE 3rd FLOOR'S CEILING / ATTIC FLOOR
AutoCAD SHX Text
EX. BRICK WALL, TO BE REMOVED
AutoCAD SHX Text
2x6 @ 24" SHEARWALL STUDS
AutoCAD SHX Text
2x6 @ 24" SHEARWALL STUDS
AutoCAD SHX Text
2x6 @ 24" SHEARWALL STUDS
AutoCAD SHX Text
EX. FLOOR BOARDS
AutoCAD SHX Text
W6x9(or 16) HORIZ. WALERS
AutoCAD SHX Text
W6x9 (WEST) VERT. WALERS
AutoCAD SHX Text
CONTINUOUS (3)2x8 COMPRESSION MEMBER, BETWEEN THE TWO 34" DIA. RODS AND PASSING THROUGH EX. WINDOW & DOOR OPENINGS
AutoCAD SHX Text
34" PLYWOOD, LAYED WITH 8' DIM. VERTICAL
AutoCAD SHX Text
NEW 2x6 SHEAR WALLS
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
DETAIL ST2
AutoCAD SHX Text
NOTE: SEE DETAIL "ST1" ON SEE DETAIL "ST1" ON SHEET S4 FOR TYPICAL WALER-WALER CONNECTIONS.
AutoCAD SHX Text
14" WEB STIFFENER, EACH SIDE OF WEB, WELDED TO WEB AND FLANGES WITH 2" OF " FILLET WELD EACH 316" FILLET WELD EACH SIDE TO WEB AND 1 " TO FLANGES 12" TO FLANGES
AutoCAD SHX Text
14" WEB STIFFENER, EACH SIDE
AutoCAD SHX Text
EX. 12" BRICK WALL UP TO THE 3rd FLOOR, THEN 8" ABOVE 3RD FLOOR
AutoCAD SHX Text
EXTEND COMPRESSION MEMBER TO BACK SIDE OF SHEARWALL
AutoCAD SHX Text
1" DIA. (MAX.) HOLE IN SHEARWALL SHEATHING
AutoCAD SHX Text
2x8 HORIZ. BLOCKING WITH (4) 16d(GUN) NAIL TO SHEARWALL STUDS
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
SECTION D/S4 & S5
AutoCAD SHX Text
34" DIA. ROD WITH TURNBUCKLE
AutoCAD SHX Text
(3)2x8 WITH "x7 " CONT. 12"x7 " CONT. 14" CONT. PLYWOOD, TOP & BTM.; SEE "'WOOD CONSTR. NOTES" ON SHEET S6 FOR NAILING
AutoCAD SHX Text
S5
AutoCAD SHX Text
D
AutoCAD SHX Text
SCHAAL ENGINEERING, P.C. P.O. Box 152 | 61 Depot Street Wilder, VT 05088-0152 (802) 295-2002 [email protected]
AutoCAD SHX Text
3/8" = 1'-0"
AutoCAD SHX Text
SECTION A/SE
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
W
AutoCAD SHX Text
N
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
H
AutoCAD SHX Text
9880
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
No.
AutoCAD SHX Text
L
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
T
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
Page 45: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal

S6

DRAWN BY:

CHECKED BY:DATE:

SCALE:

BTH

T.L.S.SEE PLANS

DRAWING NUMBER

OF R

PER

MA

NEN

T W

ALL

REP

LAC

EMEN

T D

ETA

ILIA ND R GW

NE

W E

NG

LA

ND

FA

MIL

Y H

OU

SIN

G36

8 N

H R

OU

TE

104

NE

W H

AM

PTO

N, N

H 0

3256

SHEET 7 OF 7

6/24/19

REV

ISIO

ND

ATE

NO

.

139

and

143-

147

MA

IN S

TR

EE

TC

LA

RE

MO

NT

, NH

AutoCAD SHX Text
NEW 2x6@16" EXTERIOR WALL WITH 12" STRUCT. I GRADE SHEATHING.
AutoCAD SHX Text
EX. 6" CMU WALL WITH SPRAY FOAM INSUL.
AutoCAD SHX Text
NEW 10"x4'-0" FOOTING TO BEAR ON 4" MIN. OF COMPACTED 34" CRUSHED STONE. BTM OF FOOTING TO BE 6" BELOW TOP OF EX. SLAB
AutoCAD SHX Text
EX. 11"x11" BEAM; TYP.
AutoCAD SHX Text
EX. 5" DIA LOG JOISTS AT 24" O.C
AutoCAD SHX Text
STEEL OR WOOD POSTS; SPACING VARIES
AutoCAD SHX Text
EX. 6x6 JOISTS AT +/- 27" O.C, AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
TEMP. WALL, INSTALLED IN 2019; (2)2x6's UNDER EACH JOIST
AutoCAD SHX Text
EX. 2"x4" STUD WALL
AutoCAD SHX Text
EX. 6"x8" ATTIC FLOOR JOISTS AT +/-36" O.C., STRAPPED AND WITH LATH & PLASTER CEILING
AutoCAD SHX Text
EX. 6"x6" RAFTERS AT +/-36" O.C.
AutoCAD SHX Text
8"x8"RIDGE
AutoCAD SHX Text
NEW 12"x11 " CONC. FOOTING 14" CONC. FOOTING
AutoCAD SHX Text
REMOVE EXISTING SHINGLES AND ROOF BOARDS AS REQUIRED AND INSTALL NEW " SHEATHING TO 34" SHEATHING TO CENTERLINE OF THE FIRST EXISTING 6x6 RAFTER AND NAIL WITH 12d(GUN) NAIL AT 4" O.C. TO EX. RAFTER AND WALL NAILERS
AutoCAD SHX Text
2x8 RIM JST. & (2)2x8 PLATE WITH "x1'-3" GALV. HOOKED 12"x1'-3" GALV. HOOKED ANCHOR BOLTS W/ PLATE WASHERS AT 48" O.C., CENTERED IN WALL AND WITHIN 12" OF ENDS OF THE WALL. BOTTOM PLATE MUST BE PRESSURE TREATED. USE "x3 " SLOTS TO INSIDE 58"x3 " SLOTS TO INSIDE 12" SLOTS TO INSIDE EDGE FOR ANCHOR BOLT HOLES
AutoCAD SHX Text
SEE SHEETS S1-S5 FOR TEMPORARY SHORING & BRACING. *** THE NEW PERMANENT WALL SHALL BE STRUCTURALLY COMPLETE PRIOR TO REMOVING THE TEMPORARY SHORING.
AutoCAD SHX Text
SAW-CUT & REMOVE EDGE OF EX. SLAB AND POUR NOW FOOTING TO EX. SLAB
AutoCAD SHX Text
4'-3"
AutoCAD SHX Text
#5 DOWELS @ 16" O.C., 2" CLEAR TO OUTSIDE FACE
AutoCAD SHX Text
9"
AutoCAD SHX Text
#5's @ 16" O.C., HORIZ. & VERT.; VERTICAL BARS TO BE 2" CLEAR TO OUTSIDE FACE
AutoCAD SHX Text
NEW 8" FOUNDATION/RETAINING WALL, WITH "STAY-IN-PLACE" FORMS INSIDE. DETAILS OF RETURNS TO THE WEST T.B.D. AFTER DEMOLITION OF 139 MAIN
AutoCAD SHX Text
COMPACTED GRANULAR BACKFILL
AutoCAD SHX Text
REMOVE EX. BOARD SHEATHING FOR 24" FROM OUTSIDE FACE OF NEW WALL. ADD 2x8's TO EACH SIDE OF EACH LOG JOISTS AND SCREW TO CENTER OF LOG JOIST WITH (4) "x4 " 14"x4 " 12" SDS SCREWS. INSTALL (2)2x8 BLOCKING AT EDGE OF SHEATHING AND THEN INSTALL NEW " SHEATHING, GLUED & 34" SHEATHING, GLUED & NAILED WITH 12d(GUN) NAILS AT 6" O.C. TO NEW JOISTS, RIM AND BLOCKING. NAIL EX. FLOOR BOARD TO BLOCKING WITH 12d'S AT 6"
AutoCAD SHX Text
NOTE: ALL SHEATHING AND FRAMING MUST BE FIRE RETARDANT AND WALL MUST HAVE TWO LAYERS OF " TYPE "X" GYPSUM 58" TYPE "X" GYPSUM SHEATHING. SEE DETAILS ON THIS SHEET.
AutoCAD SHX Text
REMOVE EX. BOARD SHEATHING FOR 24" FROM OUTSIDE FACE OF NEW WALL. ADD 2x8's TO EACH SIDE OF EACH END OF 6x6 JOISTS AND SCREW WITH (4) "x4 " SDS SCREWS. INSTALL 14"x4 " SDS SCREWS. INSTALL 12" SDS SCREWS. INSTALL (2)2x8 BLOCKING AT EDGE OF SHEATHING AND THEN INSTALL NEW " SHEATHING, 34" SHEATHING, GLUED & NAILED WITH 12d(GUN) NAILS AT 6" O.C. TO NEW JOISTS, RIM AND BLOCKING. NAIL EX. FLOOR BOARD TO BLOCKING WITH 12d'S AT 6"
AutoCAD SHX Text
NEW WALL TO EXTEND 9" ABOVE EXISTING ROOF AND FOLLOW ROOF SLOPE. ARCHITECTURAL DETAILS ARE "BY OTHERS."
AutoCAD SHX Text
2x8 NAILER, SLOPED, AND WITH (3) 16d(GUN) NAILS TO EACH NEW WALL STUD
AutoCAD SHX Text
REMOVE EX. BOARD SHEATHING FOR 24" FROM OUTSIDE FACE OF NEW WALL. ADD 2x8 TO EX. ATTIC JOIST AND NAIL WITH 16d(GUN) NAILS AT 8" O.C., 1 " FROM EACH EDGE. INSTALL 12" FROM EACH EDGE. INSTALL NEW " SHEATHING, GLUED & NAILED WITH 34" SHEATHING, GLUED & NAILED WITH 12d(GUN) NAILS AT 6" O.C. TO NEW 2x8, RIM JOIST AND BLOCKING.
AutoCAD SHX Text
FOUNDATION DAMP-PROOFING & INSULATION IS "BY OTHERS"
AutoCAD SHX Text
#5x3'-8"@16" O.C., 2" CLEAR TO TOP, AND (5) #5's TOP + (2) #5's BTM
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
CORNER PLAN VIEW DETAIL AT 8" BRICK WALL
AutoCAD SHX Text
EX. 8" BRICK WALL, WITH CORNER REBUILT WITH UNBROKEN, UN-CRACKED, & VISUALLY SUITABLE SALVAGED BRICK AND TYPE "N" MORTAR
AutoCAD SHX Text
TWO LAYERS OF " TYPE "X" 58" TYPE "X" GYPSUM SHEATHING EXTERIOR & INTERIOR , NAILED WITH 6d's AT 24" O.C.
AutoCAD SHX Text
HARDI BOARD HORIZ. SIDING. ADDITIONAL ARCH. DETAILS T.B.D.
AutoCAD SHX Text
NEW 2x6@16" EXTERIOR WALL WITH HORIZ. BLOCKING AT 48" O.C VERT. AND WITH " STRUCT. I GRADE SHEATHING ON 12" STRUCT. I GRADE SHEATHING ON THE EXTERIOR AGAINST THE STUDS, NAILED WITH 10d(GUN) NAILS AT 6" O.C. EDGE, 12" O.C. FIELD. ALL SHEATHING AND FRAMING MUST BE FIRE RETARDANT AND WALL MUST HAVE TWO LAYERS OF 58" TYPE "X" GYPSUM SHEATHING.
AutoCAD SHX Text
VERT. 4x PVC TRIM BOARD54 PVC TRIM BOARD
AutoCAD SHX Text
BRICK WALL TIES AT 24" O.C VERT.
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
- INDICATES "ARCHITECTURAL INFORMATION, BY BARRETT ARCHITECTURE"
AutoCAD SHX Text
2x4 STRAPPING AT 24" O.C., AT WALL STUDS
AutoCAD SHX Text
PATCH EXIST. INTERIOR FINISH
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
CORNER DETAIL AT 12" BRICK WALL
AutoCAD SHX Text
EX. 12" BRICK WALL, WITH CORNER REBUILT AT 8" WITH UNBROKEN, UN-CRACKED & VISUALLY SUITABLE SALVAGED BRICK AND TYPE "N" MORTAR
AutoCAD SHX Text
TWO LAYERS OF " TYPE "X" 58" TYPE "X" GYPSUM SHEATHING EXTERIOR & INTERIOR , NAILED WITH 6d's AT 24" O.C.
AutoCAD SHX Text
HARDI BOARD HORIZ. SIDING. ADDITIONAL ARCH. DETAILS T.B.D.
AutoCAD SHX Text
NEW 2x6@16" EXTERIOR WALL WITH HORIZ. BLOCKING AT 48" O.C VERT. AND WITH " STRUCT. I GRADE SHEATHING ON 12" STRUCT. I GRADE SHEATHING ON THE EXTERIOR AGAINST THE STUDS, NAILED WITH 10d(GUN) NAILS AT 6" O.C. EDGE, 12" O.C. FIELD. ALL SHEATHING AND FRAMING MUST BE FIRE RETARDANT AND WALL MUST HAVE TWO LAYERS OF 58" TYPE "X" GYPSUM SHEATHING.
AutoCAD SHX Text
VERT. 4x PVC TRIM BOARD54 PVC TRIM BOARD
AutoCAD SHX Text
BRICK WALL TIES AT 24" O.C VERT.
AutoCAD SHX Text
A
AutoCAD SHX Text
- INDICATES "ARCHITECTURAL INFORMATION, BY BARRETT ARCHITECTURE"
AutoCAD SHX Text
2x4 STRAPPING AT 24" O.C., AT WALL STUDS
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
SCHAAL ENGINEERING, P.C. P.O. Box 152 | 61 Depot Street Wilder, VT 05088-0152 (802) 295-2002 [email protected]
AutoCAD SHX Text
1/2" = 1'-0"
AutoCAD SHX Text
NEW PERMANENT WALL DETAIL
AutoCAD SHX Text
CONCRETE NOTES 1. ALL STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE SITE, ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND THE SPECIFICATIONS. 2. ALL CONCRETE WORK SHALL COMPLY WITH THE LATEST RECOMMENDATIONS AND SPECIFICATIONS OF THE AMERICAN CONCRETE INSTITUTE (ACI) AND THE LOCAL BUILDING CODES. 3. UNLESS NOTED OTHERWISE, CONCRETE SHALL BE NORMAL WEIGHT HAVING A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI AT 28 DAYS, EXCEPT ALL SLAB-ON-GRADE, SHALL BE 4,000 psi, BOTH WITH THE FOLLOWING MINIMUM REQUIREMENTS: PORTLAND CEMENT - ASTM C150, TYPE II. SUPPLEMENTAL CEMENTITIOUS MATERIALS (SLAG AND FLY ASH) ARE PERMITTED WITH APPROVED CONCRETE MIX DESIGN. AGGREGATE - ASTM C33, 1" MAXIMUM SIZE FOR SLABS AND WALLS AND 1½" MAXIMUM SIZE FOR FOOTINGS. WATER - POTABLE SLUMP - 2" TO 4" ADMIXTURES - USE AIR ENTRAINING AGENT CONFORMING TO ASTM C260 WITH 4-6% TOTAL AIR. USE WATER REDUCING AGENT CONFORMING TO ASTM C494 IN ALL CONCRETE. CALCIUM CHLORIDE MAY NOT BE USED TO ACCELERATE THE SETTING TIME. DESIGN MIX - SUBMIT A CURRENT DESIGN MIX, WITH 28 DAY COMPRESSIVE STRENGTH TEST, TO THE GENERAL CONTRACTOR FOR APPROVAL PRIOR TO STARTING CONSTRUCTION. 4. ALL REINFORCING STEEL SHALL COMPLY WITH ASTM A615, GRADE 60 EXCEPT STIRRUPS AND TIES TO BE GRADE 40. WELDED WIRE FABRIC TO CONFORM TO ASTM A185. 5. LAP ALL BARS 30 DIAMETERS MINIMUM AT SPLICES UNLESS INDICATED OTHERWISE ON THE DRAWINGS. WELDED WIRE FABRIC TO BE LAPPED ONE FULL MESH AT SIDES AND ENDS. 6. REINFORCEMENT SHALL BE SECURELY TIED IN ITS PROPER PLACE BEFORE AND DURING POURING OPERATIONS USING APPROVED CHAIRS AND SPACERS AS REQUIRED. NO BARS SHALL BE CUT OR OMITTED IN THE FIELD WITHOUT THE APPROVAL OF THE ENGINEER. 7. WHERE CONTINUOUS BARS ARE CALLED FOR, INDICATED OR REQUIRED THEY SHALL BE RUN CONTINUOUSLY AROUND CORNERS, DOWELED INTO INTERSECTING WALLS AND LAPPED AT NECESSARY SPLICES WITH SPLICES STAGGERED WHEREVER POSSIBLE. 8. THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCEMENT: CONCRETE CAST AGAINST EARTH 3" FORMED CONCRETE EXPOSED TO EARTH OR WEATHER #5 AND SMALLER 1½" #6 AND LARGER 2" CONCRETE NOT EXPOSED TO EARTH OR WEATHER SLABS, WALLS & JOISTS " 34" BEAMS & COLUMNS 1½" 9. THE CONCRETE CONTRACTOR SHALL INSTALL (OR GIVE OTHER TRADES AMPLE OPPORTUNITY TO INSTALL) ALL ANCHORS, BOLTS, PLATES, NAILERS, SLOTS, CHASES, PIPE SLEEVES, ETC., AS REQUIRED BY OTHER TRADES. 10. FOOTINGS SHALL BE CONSTRUCTED ON A PREPARED FOUNDATION BASE CONSISTING OF PLACING AND COMPACTING 4" MIN. OF " CRUSHED STONE OVER UNDISTURBED NATIVE SOIL. THE DESIGN 34" CRUSHED STONE OVER UNDISTURBED NATIVE SOIL. THE DESIGN BEARING PRESSURE IS 2,000 PSF. ELEVATIONS OF BOTTOM OF FOOTINGS ARE SHOWN ON PLANS, BUT ARE SUBJECT TO REVISION WHEN TRUE SOIL CONDITIONS ARE EXPOSED BY EXCAVATION. THE ENGINEER SHALL BE NOTIFIED PROMPTLY OF ANY WEAK STRATA, WATER CONDITIONS OR OTHER POOR BEARING CONDITIONS. 11. PROPER VIBRATION OF THE CONCRETE IS IMPORTANT IN THE PLACEMENT OF ALL CONCRETE; THE CONCRETE CONTRACTOR SHALL MAKE PROVISIONS FOR BACK-UP VIBRATION EQUIPMENT. 12. THE OWNER MAY EMPLOY A QUALIFIED ENGINEERING TESTING FIRM TO PERFORM STANDARD FIELD TESTING OF THE CONCRETE.
AutoCAD SHX Text
WOOD CONSTRUCTION NOTES 1. ALL WOOD CONSTRUCTION WORK SHALL COMPLY WITH THE FOLLOWING CODES AND REGULATIONS; A. TIMBER CONSTRUCTION MANUAL BY THE AMERICAN INSTITUTE OF TIMBER TIMBER CONSTRUCTION MANUAL BY THE AMERICAN INSTITUTE OF TIMBER BY THE AMERICAN INSTITUTE OF TIMBER CONSTRUCTION. B. 2005 NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION AND IT'S DESIGN SPECIFICATION FOR WOOD CONSTRUCTION AND IT'S SUPPLEMENT BY THE NATIONAL FOREST PRODUCTS ASSOCIATIONS. BY THE NATIONAL FOREST PRODUCTS ASSOCIATIONS. C. 1997 PLYWOOD DESIGN SPECIFICATION BY THE AMERICAN PLYWOOD PLYWOOD DESIGN SPECIFICATION BY THE AMERICAN PLYWOOD BY THE AMERICAN PLYWOOD ASSOCIATION. 2. LUMBER FOR WOOD BEAMS, COLUMNS, STUDS AND JOISTS SHALL BE SPRUCE-PINE-FIR NO. 2 OR BETTER GRADE WITH A MINIMUM BENDING STRESS OF 1000 PSI. 4. ALL LUMBER SHALL BE STRAIGHT AND NEW, IN SOUND CONDITION, KILN DRIED WITH A MAXIMUM MOISTURE CONTENT OF 19%. ALL DIMENSION LUMBER SHALL BEAR THE GRADE AND MARK OF THE ASSOCIATION UNDER WHOSE RULES IT IS PRODUCED AND A MARK OF MILL IDENTIFICATION. 5. TAKE PRECAUTIONS TO KEEP PLYWOOD, WOOD DECKING AND STRUCTURAL MEMBERS DRY DURING CONSTRUCTION. 7. PLYWOOD SHEATHING SHALL BE STANDARD C-D INT-EFPA WITH EXTERIOR GLUE OR ADVANTECH. SEE PLANS AND DETAILS FOR STANDARD SHEATHING AND SUB-FLOOR THICKNESS REQUIREMENTS. 8. ALL WOOD FRAMING CONSTRUCTION SHALL BE ERECTED TRUE TO LINE AND DIMENSIONS, WELL FASTED AND PROPERLY BRACED. 9. ALL TIMBER FASTENING SHALL COMPLY WITH TABLE 2304.9.1,FASTENING SCHEDULE IN THE 2009 INTERNATIONAL BUILDING CODE, UNLESS OTHERWISE NOTED ON THE DRAWINGS. 10. HOLES IN SOLID LUMBER MEMBERS SHALL NOT EXCEED OF THE MEMBER 13 OF THE MEMBER DEPTH AND SHALL NOT BE WITHIN 2" OF THE TOP OR BOTTOM OF THE MEMBER NOR WITHIN 2" OF ANY NOTCH. UNLESS OTHERWISE ON THE DRAWINGS, NOTCHES IN SOLID LUMBER SHALL NOT EXCEED OF THE MEMBER DEPTH, AND NO NOTCHES 16 OF THE MEMBER DEPTH, AND NO NOTCHES SHALL BE IN THE MIDDLE OF THE MEMBER SPAN. 13 OF THE MEMBER SPAN. 11. HOLES AND NOTCHES IN MANUFACTURED LUMBER PRODUCTS SHALL ONLY BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 12. ALL HANGER HARDWARE AND FASTENERS IN CONTACT WITH PRESSURE TREATED WOOD SHALL BE STAINLESS STEEL (S.S.) OR HOT DIPPED GALVANIZED (H.D.G.) OR SIMPSON "Z-MAX" COATING. 13. ALL MULTI-PLY BEAM SHALL HAVE EACH PLY GLUED WITH PL-400 (OR EQUAL) STRUCTURAL ADHESIVE AND NAILED FROM EACH SIDE WITH (3) HORIZONTAL ROWS OF 16d(GUN) NAILS AT 8" O.C.. LOCATE TOP & BOTTOM ROWS 1 " FROM TOP & BOTTOM EDGES OF THE BEAM. 12" FROM TOP & BOTTOM EDGES OF THE BEAM. 14. FIRE RATED LUMBER & SHEATHING SHALL BE UL CLASSIFIED WITH AN FR-S RATING, INDICATING A FLAME-SPREAD INDEX AND SMOKE RATING INDEX OF 25 OR LESS WHEN SUBJECTED TO ASTM E 84 TESTS OF 30 MINUTES DURATION WITHOUT EVIDENCE OF SIGNIFICANT COMBUSTION.
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
W
AutoCAD SHX Text
N
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
H
AutoCAD SHX Text
9880
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
No.
AutoCAD SHX Text
L
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
T
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
Page 46: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 47: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 48: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 49: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 50: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 51: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 52: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 53: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 54: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 55: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 56: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 57: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 58: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 59: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 60: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 61: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 62: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 63: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 64: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal
Page 65: Legal Notice › uploads › Bids and Public Requests › 139 Ma… · (1) the complete demolition of the 139 Main Street building and the common wall, (2) the removal and disposal