Lee's Portfolio

51
Design Projects Property Projects Photography Illustration Blacksmithing

description

A sample of Lee's Product Design, Blacksmithing, Property Development Projects and Photography

Transcript of Lee's Portfolio

Page 1: Lee's Portfolio

Design Projects

Property Projects

Photography

Illustration

Blacksmithing

Page 2: Lee's Portfolio
Page 3: Lee's Portfolio

Design Work

Lee Wynyard 0400 471133

Page 4: Lee's Portfolio

1

2

3

4

5

6 7 8 9 10 11 12 13 14

1:1 A2

28 May 2009 L Wynyard 1082589915 16 17 18

A A

SECTION A-A

175 OA

B

B

Blade Housing Pressed Mild Steel

Zinc Plated Mild Steel

Pressed Mild Steel

Pivot Pin

Mild Steel

Mild Steel

Blade

High Tensile Steel

High Tensile Steel

High Tensile Steel

Trigger

Trigger Pivot pin

Reel Sub-Assy

Roller

Chalk Wiper gate

String Line Path

Seal Washer

Lock Out Switch

End Cap

Torsion Return Spring

Right Side Casing

Blade Cover Screw

Blade Cover

Reservoir Cover

Plasterboard Clip

Plastic

Plastic

Plastic

Plastic

Plastic

Plastic

Rubber

Nylon

Synthetic Felt47 OA

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Drawn:

At Sheet Size Scale:

Item

Date:

Part Name: Material: Qty:

1 1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

2

4

5

6

8

9

10

11

12

13

7

3

14

15

16

17

18

Plasterer’s DualTool

General Assembly

All measurements in millimetres. Do not scale from drawings

SECTION B-B

29 OA

Project Brief Process

Plasterer’s Dual Function Utility Knife

Design and undertake user research to establish market feasibility of a dual purpose knife targeted at handymen and professional plasterers.

While the final design resembles a regular utility knife it incorporates a number of additional features. Ergonomic issues including balance, surface texture and maximising grip strength have received particular attention. The knife body also conceals a chalkline and chalk reservoir. The retracting chalkline is capable of marking 3.6 metre lengths (the maximum length of a plasterboard sheet) while the clip en-ables single handed operation. A self retracting blade mechanism means the knife can be put straight back in the pocket or tool belt.

Illustration for conceptual use

Foam model for user research

Page 5: Lee's Portfolio

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Drawn:

At Sheet Size Scale:

Date:

RIGHT SIDE CASING

1:1

28 May 2009

A2

Lee Wynyard 10825899

Plasterer’s DualTool

Material

Tolerances

Linear: 0.15 Angular: 0.5

Finish

All measurements in millimetresDo not scale from drawings

Thermo Plastic Polyester Elastomer

Smooth cast

Drafting Standard: AS1100

O 11

O 810305070

20406080

90

100

110

120

130

140

150

0

213.520.222.319.514.599 8.5

18231919

20 40 60 100 120 140 160 0

8.79.6111213.9 14.5120 8.9

22252213

34 5

166.2 OA

19

47 OA

DETAIL B

TOP VIEW

BOTTOM VIEW

BACK VIEWRIGHT SIDE VIEWFRONT VIEWSECTION A-A

O 10 Boss

DETAIL BScale 3:1

M5

27.2 OA

A

A

Page 6: Lee's Portfolio

Project Brief Process

Paper Desk Lamp Design and create a task light made only from paper and make it as lightweight as pos-sible. The base must be capa-ble of clamping to a tabletop - it too will be made of paper.

Other constaints were that the arm needed to pivot from a point at its base and that the lamp housing was required to extend 450mm from the edge of the table. The challenge of making the arm of the light as light as possible resulted in my achieving a weight of just 9.6 grams. However, it was the clamp mecha-nism that really impressed. Made entirely of paper (laminated) and combining several principles of me-chanical advantage, I came to a tightly resolved design that clamped so firmly that it was almost immov-able.

Page 7: Lee's Portfolio

1

2

3

4

5

67

8

9

10

11

12

1:2 A2

28 May 2009 L Wynyard 10825899

B BA A

SECTION B-B

SECTION A-A

565 mm OA

60 mm OA

565 mm OA

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Drawn:

At Sheet Size Scale:

Item

Date:

Part Name: Material: Qty:

1 1

1

1

1

1

1

1

1

1

1

1

2

1

4

5

6

8

9

10

11

12

7

3

Paper Desk Lamp

General Assembly

All measurements in millimetres. Do not scale from drawings

OEM 240v AV - 12VDC 1.5A Transformer (1.8 meter cable)

Lamp Unit

Washer

Tension Member

Paper

Paper

Paper

Nylon - 0.25mm

Switch

Clamp Lock Lever

Transformer OEM

Input Socket

Clamp Sub-Assy

Inverter

Connecting Bolt Nylon/steel

Twin Insulated Cable Req 0.76 metres

Main Lamp Stem

Page 8: Lee's Portfolio

Project Brief Process

Public Bin Enclosure Public street furniture is prone to abuse including graffiti, vandalism and fires. In this in-stance the brief calls for the inclusion of changable adver-tising panels.

Not only does the design satisfy all criteria for all stakeholders, it is ergonomically designed for users as well as taking into account OHS concerns for council staff. The design also looks at issues of possible en-trapment, the need not to touch the bin when depositing rubbish, prevention of water egress, discourag-ing wildlife access and ease of cleaning the enclosure. Advertising displays can be assembled off-site and changed without the need to move the bin. There are no external exposed fastenings improving the look and further reducing the likelihood of vandalism.

Top View(Lid down)

Side View(Ad panels removed)

Advertising maintenance

Advertising can be 4 x half side, 2 x full side or a combination

Assemble panel o� site.Unlock lid and lift old panel,Slide in new panel and close.No tools required.

Unimpeded Access

Door opens to 490mm wide Top lifts to 1300mm high

Rubbish Removal Cycle

Unlock waist-level cam lock. Lid and tray raise automatically To clear top of binBin can be tilted on wheels from engaged position (no dragging)

Advertising panel

a Mounting board - folded 3.2mm sheet aluminium water cut

b Backing board (core�ute or similar to prevent mold)

c Poster (suggest UV cured/ solvent based print)d Acrylic 6mm with 2mm rebate for �ush �t to framee Aluminium frame with button/keyway attachment

a b c d e

Accessibility and public safety

Suitable for use by all including children and the mobility impairedThe waste tray has a steep angle and the bottom of the tray sits below the lip of the bin to ensure positive deliveryof rubbish. This eliminates the risk of spilt litter in the enclosure

Apertures (all four sides) are less than 120mm to protect against entrapment.

Frame mild steel square tube galvanised and powder coated

Cross member mild steel rectan-gular tube welded joints galvan-

ised and powder coated

Tray - 2mm Stainless steel (316) folded and tig welded over mild

steel galvanised frame

Stainless steel full length hinge

Gas struts (2) 12mm shaft/210mm body/160mm

stroke (resistance to engineers speci�cation) OEM

No fastenings visible from exterior

Heavy galvanised mild steel 'cup' M10 x 65mm dynabolt or similar.

Secure frame with 5/32" rivet

Door locks in three places all released by turning key one keyDoor and rear panel brake press

folded and spot welded (projection) mild steel powder

coated

Top cap stainless steel (3 16) folded attached via tig

welded stainless steel threaded sleeve

M10 socket head hex bolt from underside

Spring return for door lock

30 MPa concrete and F62 reinforcing

mesh smooth trowel �nidsh. Concrete ramp not to exceed

1 in 10 gradient

Bin Enclosure

920

1090

clo

sed

1410

ope

n

620 OA

570

OA

35 º

130 º

Page 9: Lee's Portfolio

Top View(Lid down)

Side View(Ad panels removed)

Advertising maintenance

Advertising can be 4 x half side, 2 x full side or a combination

Assemble panel o� site.Unlock lid and lift old panel,Slide in new panel and close.No tools required.

Unimpeded Access

Door opens to 490mm wide Top lifts to 1300mm high

Rubbish Removal Cycle

Unlock waist-level cam lock. Lid and tray raise automatically To clear top of binBin can be tilted on wheels from engaged position (no dragging)

Advertising panel

a Mounting board - folded 3.2mm sheet aluminium water cut

b Backing board (core�ute or similar to prevent mold)

c Poster (suggest UV cured/ solvent based print)d Acrylic 6mm with 2mm rebate for �ush �t to framee Aluminium frame with button/keyway attachment

a b c d e

Accessibility and public safety

Suitable for use by all including children and the mobility impairedThe waste tray has a steep angle and the bottom of the tray sits below the lip of the bin to ensure positive deliveryof rubbish. This eliminates the risk of spilt litter in the enclosure

Apertures (all four sides) are less than 120mm to protect against entrapment.

Frame mild steel square tube galvanised and powder coated

Cross member mild steel rectan-gular tube welded joints galvan-

ised and powder coated

Tray - 2mm Stainless steel (316) folded and tig welded over mild

steel galvanised frame

Stainless steel full length hinge

Gas struts (2) 12mm shaft/210mm body/160mm

stroke (resistance to engineers speci�cation) OEM

No fastenings visible from exterior

Heavy galvanised mild steel 'cup' M10 x 65mm dynabolt or similar.

Secure frame with 5/32" rivet

Door locks in three places all released by turning key one keyDoor and rear panel brake press

folded and spot welded (projection) mild steel powder

coated

Top cap stainless steel (3 16) folded attached via tig

welded stainless steel threaded sleeve

M10 socket head hex bolt from underside

Spring return for door lock

30 MPa concrete and F62 reinforcing

mesh smooth trowel �nidsh. Concrete ramp not to exceed

1 in 10 gradient

Bin Enclosure

920

1090

clo

sed

1410

ope

n

620 OA

570

OA

35 º

130 º

Page 10: Lee's Portfolio

A

A

35.6

8

ID 85.00

3.00

B

00.65

13.00

55.0054.40

027.0

028

.00

29.0

0

SECTION A-A

R48.00

R500.00

R3.00TYP x 4

3.30 6.50TYP x 4

R2.10R3.00

R3.00TYP x 6

R3.00 TYP x 6

165.00°

DETAIL B SCALE 2 : 1

CL

Conic Desktop Speaker

Lee Wynyard 10825899

FRONT

BOTTOM

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Body BaseWEIGHT:

A3

SHEET 1 OF 1SCALE:1:1

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWINGUNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERS

MATERIAL:SURFACE FINISH:

2.00 WALL THICKNESS NOMINAL0.30 RADIUS0.30 RADIUS TO ALL SHARP EDGES5.50 DEPTH HOLES TO M4 1.5 DRAFT UNLESS SPECIFIED

TOLERANCES:0.05 LINEAR0.5 ANGULAR:

Project Brief Process

Desktop Computer Speak-ers

Design and detail a pair of self powered speakers to be used on a desktop.

The preciousness of desktop space can’t be underestimated here. In this design the sleek tower conceals a woofer at the base and a tweeter style speaker at the top to enhance audio quality. Power, Bass, Treble and Volume controls are actuated via touch sensors in the metalic bands that break the form. A cone defector is designed to direct the sound to the listener at ear-level. The top of the cone and the touch controls are lit when the speakers are powered up.

Page 11: Lee's Portfolio

313.

90

1

2

5

6

7

8

9

8

10

1112

14

13

15

16

3

4

88.7

8

ITEM PART NUMBER QTY.1 Hex M4 x 12 42 Foot Body 13 66mm Speaker 14 Bolt Threaded M4 15 Body Base 16 Main Control

Assembly 17 Body Centre 18 Control Ring Sub

Assembly 29 Separator Ring 110 Body Top 111 Nut M4 112 Default 113 Reflector Bracket 114 Hex M3 x 9 415 Reflector 116 Relector Cap 1

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

CONICSPEAKER ASSEMBLY

A3

SHEET 1 OF 1SCALE:2:3

DWG NO.

TITLE:

DATE: 06 NOVEMBER 2009DO NOT SCALE DRAWING

ALL MEASUREMENTS IN MM

LEE WYNYARD 0400 471133

Page 12: Lee's Portfolio

Project Brief Process

Reducing Public Urination in Kings Cross

Design a solution to help aleviate the issues associated with the influx of 30,000+revelers each Friday and Saturday night.

Through consultation with Police, Ambulance, Hospitals, Resident groups and Council combined with observation it became clear that the needs exceeded the willingness of the authorities to fix the problem. We suggested an interim solution involving the construction of trailer-based urinals and wayfinding solutions.The thrust of the proposal was that we could take care of the weekend revelers’ needs yet return Kings Cross to the residents during the week.

THE THIN YELLOW LINEHOW DO YOU HANDLE THE TOILETING NEEDS OF 30,000 WITH JUST THREE PUBLIC TOILETS?

OUR PROPOSAL SUGGESTS A STRATEGY TO BRING TOILETS TO THE AREA AND LET THE PUBLIC KNOW WHERE TO FIND THEM.

To enhance the experience of visitors to Kings Cross, easy access to public toilets is essential.

The solutions we propose can be divided into two main areas. The provision of more toilets and its support partner, the provision of information services. The ratio of visitors to public toilets in the area makes this an immediate concern. The proposal includes ensuring the use of existing public toilets, potential to use other facilities and commissioning new permanent and mobile toilets.

Half the battle with using public toilets is in fi nding them. We propose a number of initiatives for dealing with this issue. We suggest improvements to the City of Sydney Council’s website. We also discussed the possibility of off ering a ‘Text-a-Toilet’ Service, improved street signage and patrols by ‘Cross Guides’ on the street. SituationSince the 1940s , ‘The Cross’ has attracted the fringe dwellers of our society. The anti-social. Prostitutes, drug addicts, the homeless and ‘colourful Sydney identities’ all flock to the part of Sydney that doesn’t sleep. Recently the flavour has changed. Sleaze is making way for reckless fun.

Along with other antisocial behaviours, public urination has become a serious social and health issue.

With only one sign directing intoxicated men to three toilets located at the police station there is an understandable lack of commitment to using them. Many resort to finding a corner or wall against which they can relieve themselves.

Walk though any lane and you’ll see and smell urine tracks on the walls and footpaths. Police acknowledge that there is little alternative and tend to be tolerant of the behaviour. To fine someone would take up to three hours of an officer’s time while there are many more pressing duties. ConsiderationsThe major societal issue is that there is a tendency to increase population densities and attract more and more visitors while reducing essential services. There is little doubt that Kings Cross requires more public toilets but the construction of new toilet facilities is a process that could take two to three years and requires lengthy negotiations with resident groups and business owners. In any LGA

there would be significant concerns, in the high density Kings Cross area the issues are magnified. Project OutcomeOur proposed solution consists of the provision additional toilets and better information services. The first one includes improved utilisation of the toilets located at Fitzroy Gardens and suggests the possibility of recommissioning of the existing private facilities in King Cross Shopping Centre for public use through arrangement between owners and Council. There may be some physical security barriers required and the toilets would require security personnel on hand to oversee their use. In addition we offer two design concepts of trailer mounted temporary urinal facilities which require no plumbing (stored on board), no electrical connection (battery powered with solar support) and take up roughly the footprint of a car. They will be convenient, clean, safe, and private, and will incorporate technologies to enhance the experience and make it fun.

Stepping on the pressure pad located in front of the urinal bowl will illuminate the ‘engaged’ sign outside, extinguish the stair lighting and emit a dose

of water to the hand basin which also will reminds users to wash their hands afterwards and rinses the urinal bowl ready for use. Stepping off the pressure pad illuminates the stairs and changes the ‘engaged’ light to ‘vacant’.As a longer term solution we propose to construct an additional small (3-4 cubicle) automated toilet block with greater accessibility to the active hub at the north end of the Springfield pedestrian area as the preferred location.The information system can be improved in the following ways;- Providing links at Council website to updated toilet maps,- “Text-a-toilet” service based on immediate text back of the nearest public toilet based on the location from which message was sent,- Improved signage with extended information (open hours, distance) and, finally, - By establishing “The Cross Guides” – a mixed group of people who “dare to care” by patrolling the streets as a visible helpers who also will custodians of the toilets ensuring that anti-social behaviour is reduced therefore making them safer and cleaner for users and that the toilets presence in the community reinforces the Cross Guides awareness.

CLIENTCity of Sydney Council King Cross Police Department

BRIEFTo reduce the incidence of public urination in the Kings Cross area during Friday and Saturday nights.

SOLUTION PROPOSEDEssentially, there is no other option – the Cross needs more toilets. Our solution concentrates on making toilets available without the lead times required to construct permanent facilities and without the ugliness of the ‘portaloo’ stand-by solutions.

We also address the issues of finding a toilet in an unfamiliar location.

DESIGNERSLee WynyardCaroline CarolineAh Won Tatiana Sheverda Harold Poon

“With only one sign directing intoxicated men to three toilets located at the police station there is an understandable lack of commitment to using them.”

1. Street scene - Bayswater Road2. Map with proposed locations for mobile urinals

3. Mobile Urinal Unit - Concept 14. Mobile Urinal Unit - Concept 2

Page 13: Lee's Portfolio

THE THIN YELLOW LINEHOW DO YOU HANDLE THE TOILETING NEEDS OF 30,000 WITH JUST THREE PUBLIC TOILETS?

OUR PROPOSAL SUGGESTS A STRATEGY TO BRING TOILETS TO THE AREA AND LET THE PUBLIC KNOW WHERE TO FIND THEM.

To enhance the experience of visitors to Kings Cross, easy access to public toilets is essential.

The solutions we propose can be divided into two main areas. The provision of more toilets and its support partner, the provision of information services. The ratio of visitors to public toilets in the area makes this an immediate concern. The proposal includes ensuring the use of existing public toilets, potential to use other facilities and commissioning new permanent and mobile toilets.

Half the battle with using public toilets is in fi nding them. We propose a number of initiatives for dealing with this issue. We suggest improvements to the City of Sydney Council’s website. We also discussed the possibility of off ering a ‘Text-a-Toilet’ Service, improved street signage and patrols by ‘Cross Guides’ on the street. SituationSince the 1940s , ‘The Cross’ has attracted the fringe dwellers of our society. The anti-social. Prostitutes, drug addicts, the homeless and ‘colourful Sydney identities’ all flock to the part of Sydney that doesn’t sleep. Recently the flavour has changed. Sleaze is making way for reckless fun.

Along with other antisocial behaviours, public urination has become a serious social and health issue.

With only one sign directing intoxicated men to three toilets located at the police station there is an understandable lack of commitment to using them. Many resort to finding a corner or wall against which they can relieve themselves.

Walk though any lane and you’ll see and smell urine tracks on the walls and footpaths. Police acknowledge that there is little alternative and tend to be tolerant of the behaviour. To fine someone would take up to three hours of an officer’s time while there are many more pressing duties. ConsiderationsThe major societal issue is that there is a tendency to increase population densities and attract more and more visitors while reducing essential services. There is little doubt that Kings Cross requires more public toilets but the construction of new toilet facilities is a process that could take two to three years and requires lengthy negotiations with resident groups and business owners. In any LGA

there would be significant concerns, in the high density Kings Cross area the issues are magnified. Project OutcomeOur proposed solution consists of the provision additional toilets and better information services. The first one includes improved utilisation of the toilets located at Fitzroy Gardens and suggests the possibility of recommissioning of the existing private facilities in King Cross Shopping Centre for public use through arrangement between owners and Council. There may be some physical security barriers required and the toilets would require security personnel on hand to oversee their use. In addition we offer two design concepts of trailer mounted temporary urinal facilities which require no plumbing (stored on board), no electrical connection (battery powered with solar support) and take up roughly the footprint of a car. They will be convenient, clean, safe, and private, and will incorporate technologies to enhance the experience and make it fun.

Stepping on the pressure pad located in front of the urinal bowl will illuminate the ‘engaged’ sign outside, extinguish the stair lighting and emit a dose

of water to the hand basin which also will reminds users to wash their hands afterwards and rinses the urinal bowl ready for use. Stepping off the pressure pad illuminates the stairs and changes the ‘engaged’ light to ‘vacant’.As a longer term solution we propose to construct an additional small (3-4 cubicle) automated toilet block with greater accessibility to the active hub at the north end of the Springfield pedestrian area as the preferred location.The information system can be improved in the following ways;- Providing links at Council website to updated toilet maps,- “Text-a-toilet” service based on immediate text back of the nearest public toilet based on the location from which message was sent,- Improved signage with extended information (open hours, distance) and, finally, - By establishing “The Cross Guides” – a mixed group of people who “dare to care” by patrolling the streets as a visible helpers who also will custodians of the toilets ensuring that anti-social behaviour is reduced therefore making them safer and cleaner for users and that the toilets presence in the community reinforces the Cross Guides awareness.

CLIENTCity of Sydney Council King Cross Police Department

BRIEFTo reduce the incidence of public urination in the Kings Cross area during Friday and Saturday nights.

SOLUTION PROPOSEDEssentially, there is no other option – the Cross needs more toilets. Our solution concentrates on making toilets available without the lead times required to construct permanent facilities and without the ugliness of the ‘portaloo’ stand-by solutions.

We also address the issues of finding a toilet in an unfamiliar location.

DESIGNERSLee WynyardCaroline CarolineAh Won Tatiana Sheverda Harold Poon

“With only one sign directing intoxicated men to three toilets located at the police station there is an understandable lack of commitment to using them.”

1. Street scene - Bayswater Road2. Map with proposed locations for mobile urinals

3. Mobile Urinal Unit - Concept 14. Mobile Urinal Unit - Concept 2

Page 14: Lee's Portfolio

Project Brief Process

Improvements to Solar Panel Efficiencies

Combine the principles of na-no-nipples in the production of high efficiency thin film photovoltaics.

The structure of a moths eye reveals a tightly packed array of small nipples in the order of 250 nanometres diameter. This array makes the eye non-reflective - a benefit to its survival. The same array is seen on the Greta Oto butterfly’s wings, only now this nano-textured surface is both non-relective and virtually 100% transmissive of light. My investigation led me to consider how this may be of use in the photovoltaics in-dustry. I then consisdered how we could integrate these improved, flexible panels into the buildiing fabric. Using ETFE sheet as the basis, I reason that we can imprint or emboss this nanotexture onto the outer sur-face of the material while printing the PV metaliasation to the inside skin. The result - a lightweight, self-cleaning, building fabric that generates power longer throughout the day. I estimate that the improve-ment in efficiency (over glass panel PVs) is in the order of 12-15% however, the real benefit is that we’ll be able to generate power from every face of the building not just the north, as is traditionally used.

Page 15: Lee's Portfolio
Page 16: Lee's Portfolio

Ornamental Ironwork

Lee Wynyard 0400 471133

Page 17: Lee's Portfolio

A selection of blacksmithing projects I’ve made. These pieces demonstrate nearly all blacksmithing techniques in use. All are made with traditional tools and methods and most pieces have not been treated or have minimal oiled coatings to preserve their handmade appearance.

Its hard and hot, but rewarding work and I feel priveleged to have been able to spend those years making things in a way that is now all but forgotten.

Page 18: Lee's Portfolio
Page 19: Lee's Portfolio

Project Brief Process

Paper Desk Lamp Design and create a task light made only from paper and make it as lightweight as pos-sible. The base must be capa-ble of clamping to a tabletop - it too will be made of paper.

Other constaints were that the arm needed to pivot from a point at its base and that the lamp housing was required to extend 450mm from the edge of the table. The challenge of making the arm of the light as light as possible resulted in my achieving a weight of just 9.6 grams. However, it was the clamp mecha-nism that really impressed. Made entirely of paper (laminated) and combining several principles of me-chanical advantage, I came to a tightly resolved design that clamped so firmly that it was almost immov-able.

Page 20: Lee's Portfolio
Page 21: Lee's Portfolio
Page 22: Lee's Portfolio

Property Work

Lee Wynyard 0400 471133

Page 23: Lee's Portfolio

Project Brief Process

House renovation – Northbridge

Replace a tired redbrick street face to givea contemporary look adding new entry foyer and staircase, double garage and storage with internal access to the house.

The house was built in 1959 but incorporated some modern features including sliding aluminium doors and windows and a gorgeous curved china display case floating underneath the airflow ceilings. I worked closely with an architect to design the treatment that integrated these elements and met the practical re-quirements as well as incorporating provision for an additional level. I also supervised construction during the build.

Page 24: Lee's Portfolio
Page 25: Lee's Portfolio

Project Brief Process

Renovation – Crows Nest Replace lean-to kitchen and bathroom with new kitchen, dining room, bathroom, addi-tional toilet, laundry, carpark-ing and terrace in footprint less than 60 sq metres.

This was always going to be tight, but I was determined that it could be done. I designed the new ele-ments and used a draftsman to produce the plans for council. By excavating the bathrooms and laundry and using every inch of building envelope we managed to achieve a successful resolution. All aspects of the work were completed under a owner builders licence by me and a couple of handy friends. The lesson here – never take on roof construction again.

Page 26: Lee's Portfolio
Page 27: Lee's Portfolio

Project Brief Process

Unit Block Development -Croydon Park

Select, secure and refurbish a small block of 6 x 2 bedroom units and strata subdivide for individual sale.

The selection process was made a little easier due to the restriction of finance. I found the process of ne-gotiating the strata through the SEPP10 provisions very interesting. A DA was approved for larger balco-nies, garaging for all vehicles and the conversion of some units to three bedrooms. The three bedroom units sold for $120k more that the two-bed units. All units sold for area record prices turning this into a very profitable venture.

Page 28: Lee's Portfolio
Page 29: Lee's Portfolio

Project Brief Process

Flooring – Cooranbong Find a durable flooring solu-tion to integrate the new din-ing, living and family areas after walls removed. The chal-lenge is that there are three different floor types and lev-els.

I wanted something that felt soft under foot and would work equally well during the very cold winters and stifling summers of this farmhouse. Cost was also a factor. I chose marine-grade hoop pine ply but elect-ed to cut the sheets into 600x600mm pieces. To secure the pieces to the sub floor I recessed each corner to accommodate the thickness of a 30mm diameter washer and used a countersunk screw. I put a small chamfer on each edge to disguise any small discrepancies in board height. Each board was given three coats of polyurethane before installation.

Page 30: Lee's Portfolio
Page 31: Lee's Portfolio
Page 32: Lee's Portfolio

Cockatoo Island 2012PhotographyLee Wynyard 0400 471133

Page 33: Lee's Portfolio
Page 34: Lee's Portfolio
Page 35: Lee's Portfolio
Page 36: Lee's Portfolio
Page 37: Lee's Portfolio
Page 38: Lee's Portfolio
Page 39: Lee's Portfolio
Page 40: Lee's Portfolio
Page 41: Lee's Portfolio
Page 42: Lee's Portfolio
Page 43: Lee's Portfolio
Page 44: Lee's Portfolio
Page 45: Lee's Portfolio
Page 46: Lee's Portfolio
Page 47: Lee's Portfolio
Page 48: Lee's Portfolio
Page 49: Lee's Portfolio
Page 50: Lee's Portfolio
Page 51: Lee's Portfolio