Leeds SHLAA 2018 Update 2018 - Site...Leeds SHLAA 2018 Update SHLAA Ref: 12 Adjacent To Ivy House...
Transcript of Leeds SHLAA 2018 Update 2018 - Site...Leeds SHLAA 2018 Update SHLAA Ref: 12 Adjacent To Ivy House...
Leeds SHLAA 2018 Update
SHLAA Ref: 3
Monk Bridge Road (3) LS6 North Leeds
SAP Ref: HG1-106
Large woodland garden of Victorian villa in attractive residential area of Headingley.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 11/01460/EXT and is an Identified site in SAP. Permission for previous scheme expired on 11/07/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr R Spencer on 08/08/2008. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward. Agent contacted owner to discuss relocation from existing dwelling to accommodate re-development of site. Landowner confirmed in November 2016 that application subject to adoption in SAP. Part of the Council's Private Sector Housing Acceleration Scheme.
HG1-106Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 9 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 8
Spenfield House Otley Road Headingley Leeds LS16 5 North Leeds
SAP Ref: HG1-88
Listed Victorian building in landscaped setting forming part of The Village hotel complex. Attractive residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 19/04/2017 and has current approval under 16/04153/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04153/FU by Round Strategies Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-88Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
13Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 13 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 13
Total short
Total medium
13
0
Leeds SHLAA 2018 Update
SHLAA Ref: 12
Adjacent To Ivy House Off Larkfield Drive Rawdon Leeds Aireborough
SAP Ref: HG2-11
The site appears to be a large meadow/grass land forming an "L-shape" and is sandwiched between existing residential properties. As back land the site cannot be readily accessed. The site has a number of mature trees particularly in the south east corner and along the boundaries.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-11 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The owner is actively seeking development opportunities. Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. Delivery would require removal of existing property to enable access to the site. Landowner in talks with Housing Growth Team.
HG2-11Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 6 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 6
Total short
Total medium
6
0
Leeds SHLAA 2018 Update
SHLAA Ref: 15
Scarcroft Lodge Wetherby Road Scarcroft Leeds Outer North East
SAP Ref: HG2-26
Former YEB offices and grounds located to the east of Wetherby Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Medium (6-10yrs)
Site proposed as housing allocation in SAP under HG2-26 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (England & Lyle on behalf of Stirling Investments).
Achievability: Medium (6-10yrs)High housing market area. Higly desireable area. Demand and attractiveness of site likely to increase if site is allocated.
HG2-26Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
100Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
0 50 50 30 0
0
Dwellings - current figures
Remaining capacity 130
Total short
Total medium
0
130
Leeds SHLAA 2018 Update
SHLAA Ref: 26
Land North Of Morrisons Swinnow Road Swinnow Leeds Outer West
SAP Ref: HG1-156
Area of scrubby/naturally regenerated or planted land alongside railway behind Morrison's. Mixed use area, low to mid market housing to east and west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 23/01/2018 and has current approval under 16/05828/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/05828/RM by Duffield Printers and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-156Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
25
0
Leeds SHLAA 2018 Update
SHLAA Ref: 33
Daytona Works Carlisle Road Pudsey Leeds LS28 8PL Outer West
SAP Ref: HG1-198
Mill buildings occupied in part by Computer Services Consultants, Omco UK & Loxton Lighting - these last temporary acc NDR - moving to Thornbury summer 2008. Another works building immediately adjoining to S, and also beyond & on other side of Carlisle Rd - otherwise residential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/01860/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-198Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
23Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
18 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 34
Riverside Mill Low Hall Road Horsforth Leeds LS19 Aireborough, North Leeds
SAP Ref: HG1-96
See 1257
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/01592/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-96Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
131Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
58 27 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 85
Total short
Total medium
85
0
Leeds SHLAA 2018 Update
SHLAA Ref: 37
Land At Vesper Road Kirkstall Leeds LS5 3NU North Leeds
SAP Ref: HG2-47
Site with small sheds and scrap on Vesper Rd/Spen Lane corner, beneath Harrogate railway line (embanked here), private housing on Vesper Rd, edge of Lea Farm LCC estate to other side.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-47 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
On basis of pre-application enquiry, site likely to be available in short period. Existing uses on site can easily be relocated. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)Whilst low to medium housing market zone, likely to be achievable in this existing residential area.
HG2-47Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
17Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
17 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
0
17
Leeds SHLAA 2018 Update
SHLAA Ref: 41
Moorfield Road / Tower Works Outer West
SAP Ref: HG1-183
Works site vacated 4/08 but acquired by developer in 2004. Site adjacent to sports field and in area of Victorian terraces, small semis.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 24/438/05/FU and is an Identified site in SAP. Permission for previous scheme expired on 03/12/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Commercial Estates Projects on 03/12/2009. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site previously obtained planning approval by Commercial Estates Projects on 03/12/2009. Site remains undeveloped and available. Site is to be allocated as part of Site Allocations Plan under HG1-183.
HG1-183Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
62Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 31 31 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 62
Total short
Total medium
62
0
Leeds SHLAA 2018 Update
SHLAA Ref: 64
South Park Mills, 15, 15a, 16 And 17, Acrivan Ltd, Fulneck Outer West
SAP Ref: HG1-206
This an isolated mill site at end of Hare Lane in open country & green belt, except for small terrace of workers' cottages adjacent. Acrivarn are the main occupants - producers of food manufacturing units who wish to relocate to modern premises. Other occupants of site Tytel Sheet Metal Engineering & joiner. Rcent permission given for 14 Units with expiry in 2017.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 20/01/2017 and has current approval under 15/00169/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/00169/OT by Acrivarn Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term.
HG1-206Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 21 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 21
Total short
Total medium
21
0
Leeds SHLAA 2018 Update
SHLAA Ref: 65
Woodside Mill Low Lane Horsforth Leeds North Leeds
SAP Ref: HG1-69
Aerial photo shows largely vacant mill buildings, but non-domestic rating has one or two operations still active - however most of site vacant. Behind housing fronting Low Lane, with woodland behind up to railway line. Many structures demolished early 2007 after vandalism.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 11/02795/EXT and is an Identified site in SAP. Permission for previous scheme expired on 16/03/2015. Site is suitable for a new scheme to be brought forward. New application (18/04952/FU) for 149 dwellings was submitted in August 2018.
Site previously obtained planning approval by John Ogden Properties Ltd on 28/07/2009. Site remains undeveloped and available. New application (18/04952/FU) for 149 dwellings was submitted in August 2018.
Achievability: Short (=<5yrs)Recent pre-application discussions under PREAPP/17/00561 for Apartments with associated landscaping and car parking. Further pre-application activity under PREAPP/17/00561 for 147 apartments with associated landscaping and car parking. Site previously obtained planning approval under 11/02795/EXT and is an Identified site in the emerging Site Allocations Plan. Permission for previous scheme expired on 16/03/2015. Site is to be allocated as part of Site Allocations Plan under HG1-69. Correspondence from DPP planning states that a new application (18/04952/FU) for 149 dwellings was submitted in August 2018.
HG1-69Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
59Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 29 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 59
Total short
Total medium
59
0
Leeds SHLAA 2018 Update
SHLAA Ref: 70
Office Building, Linton Spring, Sicklinghall Road, Wetherby
SAP Ref:
Vacant office/leisure building (no NDR record) in curtilage of former Linton Springs Hotel. Now under conversion to flats.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 25/01/2018 and has current approval under 17/03777/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/03777/FU by Quarters Developments Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
70Site Allocations Plan ref:
Not allocated for housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 7 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 81
Land Rear High Moor Court, High Moor Avenue, Moor Allerton North Leeds
SAP Ref: HG2-40
Substantial area of green space - largely grass - within residential area, with 2 formal rugby pitches to east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/02223/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG2-40Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
20Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 9 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 90
St Vincents School, 27 Church Street, Boston Spa Outer North East
SAP Ref: HG1-39
New application for 13 dwelling 08/02322/FU, RC Diocese of Leeds. Site of RC school in attractive village environment, with fields to rear. Previous consent for 15 units 07/02654/FU
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 14/03309/FU and is an Identified site in SAP. Permission for previous scheme expired on 14/10/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr K Anderson - Trustees Of The Diocese Of Leeds on 03/09/2008. Site remains undeveloped and available
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-39Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
13Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 6 7 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 13
Total short
Total medium
13
0
Leeds SHLAA 2018 Update
SHLAA Ref: 97
Meanwood Road Working Mens Club Meanwood Road Leeds North Leeds
SAP Ref: HG1-518
Meanwood shops to south and opposite - otherwise private housing on Stonegate Road and to rear.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 09/03/2017 and has current approval under 15/04521/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/04521/FU by Hillcrest And Louis Homes Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-518Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
54Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 25 29 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 54
Total short
Total medium
54
0
Leeds SHLAA 2018 Update
SHLAA Ref: 106
Former Civil Service Sports Association Ground Newton Green North Leeds
SAP Ref: HG1-111
A flat enclosed former playing field site enclosed by residential hospital and retailing uses
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 13/01426/EXT and is an Identified site in SAP. Permission for previous scheme expired on 07/07/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Rahon Property Developments Ltd on 09/04/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-111Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
74Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 74 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 74
Total short
Total medium
74
0
Leeds SHLAA 2018 Update
SHLAA Ref: 125_210
Hill Top Works & Buslingthorpe Tannery, Buslingthorpe Lane Inner Area
SAP Ref: HG2-99
The site comprises the original Buslingthorpe Tannery which consists of a red brick, part 4 and part 5 storey building located towards the centre of the site. Other industrial buildings of different eras are located around the site, the majority of which are single storey. The majprity of the site is cleared. To the north of the site is Hilltop Works which is on a separate level and of similar character. A planning application is due to be submitted for this site for 269 units.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-99 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Planning activity confirms site available now.
Achievability: Medium (6-10yrs)Market for flats in this edge of city centre location. Recent activity around student flats but given links to city centre strong prospects for PRS or owner occupied. Confirmation by adjacent landowner that development will progress quickly on neighbouring Hill Top Works sites.
HG2-99Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
189Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 89 0 0 0
0
Dwellings - current figures
Remaining capacity 189
Total short
Total medium
0
189
Leeds SHLAA 2018 Update
SHLAA Ref: 129A
Main Street and Pitfield Road, Carlton, Wakefield Outer South
SAP Ref: HG2-182
Flat brownfield site in Carlton with road frontage. A number of containers on site which appear to be being used for storage. The site is within residential area, with housing immediately to the north and east. Large greenfield site directly to the south (129B).
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-182 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Representation received during SAP consultation confirming willing landowner (Turley on behalf of Miller Homes).
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-182Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
36Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 36 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 36
Total short
Total medium
36
0
Leeds SHLAA 2018 Update
SHLAA Ref: 130
77 - 79 Aberford Road Oulton Leeds LS26 8HS Outer South
SAP Ref: MX2-14
Coopers of Oulton - active car showroom in largely residential area
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-14 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
There has already been a pre-application enquiry regarding residential development on the site. The current improving economic climate will assist in the remediation costs.The landowner has confirmed that the site remains available for residential development.
Achievability: Medium (6-10yrs)Improving market and developer interest signals confidence that residential will be delivered. Response reveived from landowner Coopers of Oulton during SHLAA consultation to confirm site availablity and timeframe for delivery.
MX2-14Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
0
50
Leeds SHLAA 2018 Update
SHLAA Ref: 133
Royds Green Farm Royds Green Oulton Leeds LS26 8EZ Outer South
SAP Ref: HG1-411
Redundant farm buildings on Green Belt site surrounded by fields. Buildings listed stone built and attractive, so would want to be retained.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/04913/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-411Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
2 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 2
Total short
Total medium
2
0
Leeds SHLAA 2018 Update
SHLAA Ref: 136
Site At Alma Villas, Woodlesford, Leeds, LS26 8PW Outer South
SAP Ref: HG2-177
Cleared terrace of 4 small houses in about half a hectare of land at head of Alma street cul-de-sac. Pleasant residential area - canal to north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-177 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)High to medium market area. Very dependent on resolution of Alma St/Pottery Lane junction issue. This junction is well detached from the site and surrounded by residential properties.
HG2-177Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 12 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 137A
Britannia Road, Morley Outer South West
SAP Ref: HG2-157
Greenfield site grassed over and unused. Bordered by Britannia Road to the north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-157 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Landowner has confirmed that the site remains availble for an employment or housing allocation. However, they do not believe that a less dense scheme than that for which they have sought LCC's views is likley to proceed in the foreseeable future.
Achievability: Short (=<5yrs)Landowner has also been approached post-November 2016 to confirm availability. Landowner has put forward an indicative density greater than the capacity in the plan in line with the timescales as assessed. Landowner has confirmed that the site remains available. Site is to be allocated as part of Site Allocations Plan under HG2-157.
HG2-157Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
63Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 63 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 63
Total short
Total medium
63
0
Leeds SHLAA 2018 Update
SHLAA Ref: 141
Tingley Mills Tingley Common Morley Leeds Outer South West
SAP Ref: HG2-158
Tingley Mills complex at junction of B6127/A650. Some good quality stone buildings plus sheds, with what seem to be numerous commercial occupants, large modern sheds with containers storage to rear, residential opposite .
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-158 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability The landowner has confirmed that the site remains available for residential development.
Achievability: Medium (6-10yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-158Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
100Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 0 0 0
0
Dwellings - current figures
Remaining capacity 100
Total short
Total medium
0
100
Leeds SHLAA 2018 Update
SHLAA Ref: 143
Site Of Glenoit And Minerva Mills Aberford Road Oulton Outer South
SAP Ref: HG2-178
Certainly vacant and cleared according to DC former industrial site alongside Leeds -Liverpool Canal. New housing to the south, vacant residential allocations opposite.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-178 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is vacant & has no known ownership problems. Planning application is pending determination subject to the response of the Environment Agency. Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Application considers that flood risk is not an impediment to delivery of housing.
HG2-178Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
70Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 70 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 70
Total short
Total medium
70
0
Leeds SHLAA 2018 Update
SHLAA Ref: 163
Salvation Army, 139 Broad Lane, Bramley, Leeds Outer West
SAP Ref: HG1-142
This a phase 1 housing allocation, at least one third of which taken up by Copper Beech day Nursery & car parking. Low density LCC housing adjacent.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/04994/FU and scheme has commenced and live at 1 April 2017.
Site is under construction as at 30th June 2016.
Achievability: Short (=<5yrs)Site is under construction as at 30th June 2016.
HG1-142Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
83Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 20 8 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 174
University Of Leeds Tetley Hall 40-42 Moor Road North Leeds
SAP Ref: HG1-103
Vacated site of University's Tetley Hall residences, located in attractive residential area of Headingley.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/03234/FU and is under construction as at 1 April 2017.
Site is under construction as at 31st March 2017.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2017.
HG1-103Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
68Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
27 28 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 55
Total short
Total medium
55
0
Leeds SHLAA 2018 Update
SHLAA Ref: 180
Brookfield Nursing Home, Swaine Hill Terrace, Yeadon Aireborough
SAP Ref: HG2-7
Nursing Home in large villa on northern edge of Yeadon adjacent to Nunroyd Park. Allotments to south. Trees around site perimeter
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-7 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-7Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
7 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
0
7
Leeds SHLAA 2018 Update
SHLAA Ref: 182
19 Springfield Mount Woodhouse Leeds LS2 9ng City Centre
SAP Ref: HG1-423
Large det house on Springfield Mt, adjacent to large res conversion now in progress & other good quality mainly University related accommodation.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02212/EXT and is an Identified site in SAP. Permission for previous scheme expired on 08/07/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Leeds Partnership Nhs Foundation Trust on 22/04/2008. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-423Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 7 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 187
Westgate - Brotherton House LS1 2RS City Centre
SAP Ref: MX2-20
West Yorkshire Police HQ, in 1950s office building that is deteriorating rapidly at Grace St, just to the north of the International Pool site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-20 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The landowner has confirmed that the site remains available for residential development.
Achievability: Medium (6-10yrs)Increasingly buoyant city centre market points to increased confidence in this coming forward. Owners have applied for funding being brokered through LCC economic development unit. Landowner confirmed through SHLAA consultation that site remains avaialble and await movement on adjacent former International Swimming Pool site for delivery.
MX2-20Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
63Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
63 0 0 0 0
0
Dwellings - current figures
Remaining capacity 63
Total short
Total medium
0
63
Leeds SHLAA 2018 Update
SHLAA Ref: 188
St Marks Flats St Marks Walk Woodhouse Leeds Inner Area
SAP Ref: HG1-230
St Mark's student flats, proposed to be redeveloped for student housing.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 10/00407/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-230Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
108Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
28 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 197
Land At Bridge Street, Gower Street, Regent Street Inner Area
SAP Ref: HG1-247
This is the site running down from Bridge Street to Regent Street, immediately west of elevated IRR. Former British Gas offices. Now 08/01948/FU for mixed use development (retail/hotel/leisure) with 636 residential units and some serviced apartments. There has been significant activity in 2015. It is understood the site has been bought by a South Eastern Company. Many of the conditions are being discharged.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 27/05/2011 and has current approval under 08/01948/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 08/01948/FU by Lunar Properties Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site has planning permission under 08/01948/FU by Lunar Properties Ltd and available for scheme to be brought forward. Approval 3 November 2015 for Erection of four buildings varying in height from 23 to 40 storeys over two podiums incorporating 636 residential units (Class C3) under 15/9/00264/MOD. Demolition approved in 2015 under 15/04980/DEMRG to implement scheme and conditions on 08/01948/FU application discharged in May 2016 under 16/02570/COND. Building control notice to commence Phase 1a (hotel) received in March 2016 with residential element to follow. The site is identified for housing in the Site Allocations Plan. There are no identified impediments to the site being delivered. Identified site in the SAP under HG1-247.
HG1-247Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
636Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 200 200 236 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 636
Total short
Total medium
636
0
Leeds SHLAA 2018 Update
SHLAA Ref: 198
Land at Kirkstall Road and land off Wellington Road Inner Area
SAP Ref: MX1-28
Cleared factory site on Kirkstall Road just outside the City Centre boundary. Borders the River Aire to the South west. Referred to as former Yorkshire Chemicals site and/or "City Reach" under current proposals.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 14/07/2016 and has current approval under 15/06844/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/06844/OT by Residential Securities Ltd Acting For Clyde Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site has planning permission under 15/06844/OT by Residential Securities Ltd Acting For Clyde Ltd for ‘mixed use development comprising residential (C3/C4), student accommodation (C3/C4), A1-A5, B1, D1 and D2 units, public open space, landscaping, pedestrian river bridge, alterations to site access and highway improvements ‘ and is available for scheme to be brought forward. Pre-app submitted under PREAPP/17/00602 for Residential development including PRS and affordable housing, student accommodation, supporting commercial uses, surface level car park, and landscaped public realm. Reserved Matters application now submitted under 18/00604/RM for Reserved Matters for appearance, layout, landscaping and scale of the mixed use development comprising residential (C3/C4), student accommodation (C3/C4), A1-A5, B1, D1 and D2 units, public open space, landscaping, pedestrian river bridge, alterations to site access and highway improvements as approved under outline planning permission 15/06844/OT. Landowner confirmed availability through contact with LCC’s Housing Growth Team post-June 2015 as part of Private Sector Housing Acceleration Scheme. The site is identified for housing in the Site Allocations Plan. There are no identified impediments to the site being delivered. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Identified site in the SAP under MX1-28.
MX1-28Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
1010Site Allocations Plan capacity
Leeds SHLAA 2018 Update
SHLAA Ref: 198
Land at Kirkstall Road and land off Wellington Road Inner Area
SAP Ref: MX1-28
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 200 300 300
210 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1010
Total short
Total medium
800
210
Leeds SHLAA 2018 Update
SHLAA Ref: 200_411
Quarry Hill Leeds LS2 / York Street, LS1 City Centre
SAP Ref: MX2-23
Remaining parts of the Quarry Hill development site to the west of Quarry House and north of the Yorkshire Playhouse. Mainly used as a surface car park.The site was a former social housing development and has been vacant since the 1970s. It is an important gateway to the city and the redevelopment will add to the regeneration of this area of the city. The design is set to improve public space, strengthen the Eastgate – Headrow east/west axis and complement the existing cultural uses at Quarry Hill including the West Yorkshire Playhouse. Caddick was chosen as preferred developer in 2002, the scheme was approved in principle in 2005 but delayed due to the recession. Revised scheme with new mix submitted in 2015.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-23 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Owners have recently submitted an application.
Achievability: Short (=<5yrs)Proximity of Victoria Gate, recent planning application and location of site mean this development is very likely to be built in the short term. LCC marketed the site and Caddick was selected as preferred purchaser by LCC in 2003. Recent pre-application activity under PREAPP/17/00261 for Reserved matters proposals for blocks E and F (circa 500 dwellings) and ancillary uses. A five year redevelopment programme of £300m announced by Caddick Developments in September 2017. Reserved Matters application approved under 17/07206/RM on 11 May 2018 for Phase 1 development of Blocks E and F for 515 Private Rented Sector units. Moda to start on site immediately and have updated the case officer with construction programme as part of the approval to build out the entire Phase on this part of the site in a two year period. Caddick proposed a mixed use development with a high content of residential properties on the wider site. Caddick’s offer was subject to contract, site surveys and planning approval. LCC sold site to Caddick Developments Ltd on revised terms to reflect a change in the market brought about by the recession. Outline application approved on 2 November 2017 for ‘mixed use redevelopment including A1, A3, A4 and A5 uses, offices (B1), hotel (C1), residential (815 to 985 units) (C3), medical centre (D1), college (D1), student residential accommodation, multi storey car park, basement car parking, access and open space’ under 14/06534/OT by Iain Bath Planning and Caddick Developments Ltd. Caddick have made the following statement: “Caddick Developments now control the site, having completed the purchase in March 2014, therefore, the site is now in the control of a single landowner with the ability to deliver development. Various funding streams are ready and available to assist the commencement of development. Caddick have a superb track record of delivering significant development schemes. The market is now moving again at pace, funding is improving and the enquiries are increasing. The timing is right to secure outline planning permission as the foundation and catalyst to attract occupiers and ensure early Reserved Matters application submissions”. Caddick are currently actively engaged in market discussions for build to rent (PRS) residential units. Allocated site in SAP under MX2-23.
MX2-23Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
600Site Allocations Plan capacity
Leeds SHLAA 2018 Update
SHLAA Ref: 200_411
Quarry Hill Leeds LS2 / York Street, LS1 City Centre
SAP Ref: MX2-23
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 115 200 200
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 515
Total short
Total medium
515
0
Leeds SHLAA 2018 Update
SHLAA Ref: 202
Midland Mills, Silver Street, Leeds, LS11 9yw City Centre
SAP Ref: MX1-16
Mill building in Holbeck Urban Village between Water Lane, and old viaduct. Midland Mills is split into numerous units about 10 of which the applicant pays non-domestic rates on. Car related activities are the main business. Car park and car hire adjacent.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 06/02209/FU and is an Identified site in SAP. Permission for previous scheme expired on 06/05/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr K Durkin on 06/05/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG.
MX1-16Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 205
Granary Wharf Car Park, Off Water Lane, Leeds, LS11 5ps City Centre
SAP Ref: MX1-15
Formal car park sandwiched between Tower Works and modern B1 units, running between Water Lane and the canal - very irregularly shaped.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/11/2017 and has current approval under 16/01115/FU. Under construction as at 31st March 2018.
Site has planning permission under 16/01115/FU by Ctp/St James and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Under construction. Legal & General Investment Management is approval under 16/01115/FU for ‘Mixed use development across three buildings, comprising residential apartments (use class C3), flexible office (use class B1) or food and drink (use class A3), D1 (Clinics and health centres), under croft parking and associated landscaping’. Planning application pending prior to approval subject to S106 Agreement. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG.
MX1-15Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
250Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
100 150 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 250
Total short
Total medium
250
0
Leeds SHLAA 2018 Update
SHLAA Ref: 206
Adjacent To Rose Wharf, 78 East Street, Leeds, LS10 Inner Area
SAP Ref: AV32
This cleared site with some formal parking for Rose Wharf laid out - adjacent to the office and before the adjacent Lowfold site, adjoining canal.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV32 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is in use as a temporary car park. No known ownership or legal constraints. Previous planning application was submitted by developer who undertakes residential schemes.
Achievability: Short (=<5yrs)Cleared site which is achievable given increased activity in city centre. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG.
AV32Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
72Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 50 22
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 72
Total short
Total medium
72
0
Leeds SHLAA 2018 Update
SHLAA Ref: 207
Lowfold, East Street, Leeds, LS9 8 Inner Area
SAP Ref: AV33
Area of cleared land alongside river, downstream from Rose Wharf towards South Accom Road. As a waterside site it would be attractive, although major highways to rear.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 04/08/2015 and has current approval under 15/00415/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/00415/FU by Citu ( Low Fold ) LLP and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
AV33Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
312Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
200 100 12 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 312
Total short
Total medium
312
0
Leeds SHLAA 2018 Update
SHLAA Ref: 208
Land Between Mabgate, Macaulay Street, Argyll Road Inner Area
SAP Ref: MX1-6
Large block of warehouses/factories in block between Mabgate and Macaulay Street and Argyle Road and Lincoln Green Road. Similar units opposite on Mabgate, (some recent housing also), LCC multi-storey etc to Lincoln Green Road and behind on Macaulay Street, where also another industrial property. Main user is Bridge Estates, where premises in use, but not fully occupied and small units on Macaulay Street - gym, offices.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 05/10/2017 and has current approval under 17/01993/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/01993/RM by Bridge Estates and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward. In August 2018 KMRE Group announced plans to deliver 92 homes as part of an £14.5m scheme at Mabgate Gateway on the land immediately south of the site. Reserved Matters applications now submitted for Phase 1 and 2 for multi-level mixed use development.
MX1-6Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
428Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
200 228 0 0 0
0
Dwellings - current figures
Remaining capacity 428
Total short
Total medium
0
428
Leeds SHLAA 2018 Update
SHLAA Ref: 215
79 Clarence Road, Hunslet, Leeds, LS10 1lw City Centre
SAP Ref: AV13
Car related workshop at junction of Carlisle Road/Clarence Road. Student housing over the road, vacant site to south, industrial units in most other directions.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV13 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Sites is active use with multiple landowners but a planning permission has previously been sought for redevelopment for residential use by the owner. Landowner has also been approached post-November 2016 to confirm availability Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)Deliverable prospect is for the site to be brought forward as part of a more comprehensive scheme alongside neighbouring sites. Landowner confirmed as part of SHLAA consultation that in advanced discussions with developers to bring forward the site as part of a wider scheme in partnership with the Council's regeneration service.
AV13Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
15 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
0
15
Leeds SHLAA 2018 Update
SHLAA Ref: 225
Westbank, Water Lane, Leeds City Centre
SAP Ref: MX2-32
This is large block in Holbeck Urban Village bounded by Water Lane, David Street, Back Row and Bridgewater Place. Business units on David Street, HBOS premises on Back Row - remaining half of site car parking.
General Attributes
Site Description:
Suitability: Suitable
Availability: Medium (6-10yrs)
Site proposed as mixed use allocation in SAP under MX2-32 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Modern business premises and associated car parking cover the entire site. Existing uses by Halifax plc would need to be relocated.
Achievability: Short (=<5yrs)Site progressing from medium term in 2017 SHLAA to short term in the five year supply period commencing 1 April 2018. Discounted as not available now as currently occupied for alternative use. Promoted as mixed use allocation under MX2.32 in SAP for delivery in plan period. Landowner contacted to confirm post-November 2016. Site to be allocated in SAP under MX2-32.
MX2-32Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
288Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
150 138 0 0 0
0
Dwellings - current figures
Remaining capacity 288
Total short
Total medium
0
288
Leeds SHLAA 2018 Update
SHLAA Ref: 226
46 Burley Street Burley Leeds LS3 1dh Inner Area
SAP Ref: HG2-109
Occupied premises of Leeds and Moortown Furniture store, a charitable concern. Modern shed in the mixed student/commercial area beyond Westgate.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 10/03/2017 and has current approval under 16/01322/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/01322/FU by Burley Place Limited and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is allocated for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-109Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
48Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 87 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 87
Total short
Total medium
87
0
Leeds SHLAA 2018 Update
SHLAA Ref: 228
Evans Halshaw, Hunslet Road, Hunslet, Leeds, LS10 1ld City Centre
SAP Ref: AV9
Vacant buildings and land formerly used as a car showroom and workshops, occupying two blocks between Black Bull Street and Sayner Road. Commercial area has been undergoing change over recent years with introduction of residential/office/leisure and education uses.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV9 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Vacant buildings and land. Site owner has indicated potential availability of site for future redevelopment.
Achievability: Short (=<5yrs)Vacant buildings and land. Site owner has indicated availability of site for future redevelopment. Vacant site which is available to come forward for development in the short term. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Recent pre-application activity under PREAPP/16/00474 for Mixed use residential development. Further pre-application under PREAPP/17/00649 in November 2017 for ‘Demolition of existing buildings and construction of approximately 950 to 1,000 flats with ground floor commercial units, car parking and the provision of public realm’. Developer X1 submitted a full application on 11 May 2018 for 978 flats at former Evans Halshaw site - they hope to get planning permission by September, 2018 start on site December 2018, with rolling delivery immediately. (PREAPP/17/00649 City Plans Panel 10 May 2018 report). Site is allocated as part of the AVLAAP adopted November 2017 under AV9.
AV9Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
191Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 150 150 300
378 0 0 0 0
0
Dwellings - current figures
Remaining capacity 978
Total short
Total medium
600
378
Leeds SHLAA 2018 Update
SHLAA Ref: 228
Evans Halshaw, Hunslet Road, Hunslet, Leeds, LS10 1ld City Centre
SAP Ref: AV9
Leeds SHLAA 2018 Update
SHLAA Ref: 230
Leeds International Swimming Pool Westgate Leeds City Centre
SAP Ref: MX2-19
Swimming pool at the western end of St Pauls St abutting the A58 inner ring road. It is situated at the margin of the city centre office quarter.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-19 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Marketed for office and residential.
Achievability: Short (=<5yrs)Marketed for office and residential. Given location, suitability and availability of site coupled with the recent upturn in the economy a short term delivery is likely. Part of a number of sites likely to be more attractive to developers given renaissance of city centre in the economic upturn. Recent pre-application activity under PREAPP/16/00073 for Mixed use development including offices, car parking and public realm. Temporary car-park uses on vacant site with no structures or buildings. Landowner capable of obtaining immediate vacant possession in order to facilitate delivery. Allocated site in SAP under MX2-19.
MX2-19Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
209Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 109 0 0 0
0
Dwellings - current figures
Remaining capacity 209
Total short
Total medium
0
209
Leeds SHLAA 2018 Update
SHLAA Ref: 235
Land At Clarence Road Horsforth Leeds LS18 4lb North Leeds
SAP Ref: HG2-44
Heavily wooded site occupied by Barnardos offices (four gables, 26 Clarence Road, and Low Wood at no. 28), these two substantial stone villas in Newlay CA.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 10/11/2017 and has current approval under 17/03692/FU for 8 units. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/03692/FU by Barnardo's and available for scheme to be brought forward. SHLAA consultation August 2018 response states that the landowner has confirmed that the site remains available for residential development and is currently for sale. There is interested party who is currently in liaisons with the landowner regarding the finer details of the sale (August 2018).
Achievability: Short (=<5yrs)High to medium market area. SHLAA 2018 consultation response from Rebecca Housam (Savills) confrims that it is likely that development will come forward in 2019.
HG2-44Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
8 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 254
Oldfield Lane (leeds City Boy's Pitch) LS12 Outer West
SAP Ref: HG2-84
Adjacent to new housing to west, mixed uses off Amberley Road to east, open school playing field etc land to north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-84 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is jointly owned by Leeds City Council and Leeds Schools Sports Association (LSSA). LCC land leased to LSSA. LCC intends to dispose of the site.Representation received during SAP consultation confirming willing landowner (Leeds School Sports Association). Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Recent pre-application discussions under PREAPP/16/00515 for Residential development for affordable homes (64 dwellings) with Strategic Team Group And Affinity Sutton. Representation received during SAP consultation confirming willing landowner (Leeds School Sports Association). Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme. Site is to be allocated as part of Site Allocations Plan under HG2-84.
HG2-84Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
61Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 20 20 21
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 61
Total short
Total medium
61
0
Leeds SHLAA 2018 Update
SHLAA Ref: 262
Miles Hill Primary School, Beckhill Approach Inner Area
SAP Ref: HG2-85
Primary school on western edge of Beckhill estate, comprising predominantly social housing. Site consists of a third cleared school buildings, and two thirds playing fields and multiple use games area and greenspace/landscaping. To the south is another area identified for LCC disposal (383 Beckhill Garth/Approach). Surrounded by residential properties.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-85 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is available as LCC owned.
Achievability: Short (=<5yrs)Low market or social housing scheme should be viable to a willing developer. Part of LCC HILS Scheme. Site to be procured through the Homes and Communities Agency's Development Partner Panel July 2015. Beckhill Neighbourhood Framework in place for delivery of 50 dwellings alongside site 383.
HG2-85Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
79Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 25 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
50
0
Leeds SHLAA 2018 Update
SHLAA Ref: 263
Hill Top Public House, Beckhill Grove Inner Area
SAP Ref: HG2-86
Cleared site of public house in middle of Beckhill/Potternewton LCC estate, adjacent to a recreation ground/grassed amenity space to the west and north (UDP N1). Site is level, with pedestrian access through houses to the south to Potternewton Lane.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 12/03/2018 and has current approval under 17/06932/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/06932/FU by Unity Housing Development Services Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)In conjunction with wider estate remodelling would become more attractive. Potential as affordable housing site. Beckhill Neighbourhood Framework in place. Could offer more dwellings subject to larger site and reproviding greenspace elsewhere. Recent pre-application activity under PREAPP/16/00691 for Residential development (32 affordable houses).
HG2-86Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 265
Ash Tree Primary School, Leeds Road, Kippax Outer South East
SAP Ref: HG2-129
Vacant primary school within residential area of Kippax just to north of town centre boundary. Site rises steeply from Leeds Road frontage, some tree cover in northern part of site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-129 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Disposed at auction by the Council. Live pre-app under PREAPP/17/00294 for Affordable housing development of 15 flats for residents over the age of 55, and 11 houses.
Achievability: Short (=<5yrs)Application submitted under 17/08268/FU on 15 December 2017 by Waller & Partners Ltd for Residential development of 23 dwellings comprising of 8 semi-detached houses, one block of 3 terrace houses and one three storey block of 12 flats. Site is to be allocated as part of Site Allocations Plan under HG2-129.
HG2-129Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
22Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 22 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 267
Wykebridge Depot, Killingbeck Bridge, LS14 East Leeds
SAP Ref: HG2-121
Cleared highways depot off York Road, with two tower blocks to York Road frontage, housing to east, main York/Selby railway line to the south, access to commercial premises on Selby Road roundabout to west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-121 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Cleared site. Subject to Capital Receipt sale ready to be developed. Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Market sector is low. However, developer interest expressed in conjunction with neighbouring site. Application submitted for residential development in 2014. The application has been revised, with a new application form submitted in October 2016 for 25 dwellings. This is pending consideration.
HG2-121Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
23Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
25
0
Leeds SHLAA 2018 Update
SHLAA Ref: 278
Compton Arms, Compton Road, Burmantofts, Leeds, LS9 7b Inner Area
SAP Ref: MX2-8
Cleared site of former Compton Arms public house. Row of shops and Labour club to west, small workshops to north, library and new pre-school nursery to east (with recent permission for library extension), and terraced housing to south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-8 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is available and planning applications indicate interest.
Achievability: Short (=<5yrs)Independent viability assessment carried out by the DVS in 2014 indicated that site was unviable at the time. Location now viable and the site is deliverable.
MX2-8Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 25 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
50
0
Leeds SHLAA 2018 Update
SHLAA Ref: 279
St Marys Church And Presbytery Church Road Richmond Hill Inner Area
SAP Ref: AV24
St Mary's Church and Presbytery, both LB's, adjacent to 1970's LCC estate, Saxton Gardens redevelopment, and other new build on East Street. Playing fields to SE and St Mary's RC High School to SE. Demolition of church nave and aisles plus presbytery. Site not itself in city centre.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 11/01021/EXT and is an Identified site in the emerging Site Allocations Plan. Permission for previous scheme expired on 26/09/2014. Site is suitable for a new scheme to be brought forward.
Site previously obtained planning approval by Msm (Leeds) Ltd (Part Of Rushbond Plc Group) on 03/06/2008. Site remains undeveloped and available. The landowner has confirmed that the site remains available for residential development during the SHLAA consultation August 2018 and confirms the they are in iaison with the Council as to options for development, which would be residential-led.
Achievability: Short (=<5yrs) Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG. Response reveived from Mark Finch (Rushbond) during the SHLAA 2018 consultation confirms that the Council's assumption of a 21/22 start of delivery is fair at this stage.
AV24Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
171Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 57 57
57 0 0 0 0
0
Dwellings - current figures
Remaining capacity 171
Total short
Total medium
114
57
Leeds SHLAA 2018 Update
SHLAA Ref: 281
Radial Park, Phase One Manston Lane Cross Gates East Leeds
SAP Ref: HG1-297
This is the western end of the former Vickers tank factor currently under construction.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/02315/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-297Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
148Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
22 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 282
Manston Lane East Leeds
SAP Ref: HG1-298
Optare bus fitting site, plus vacant cable manufacturer to east. Adjoins LCC housing estate to west, and playing fields to north. To east is more industrial/commercial development.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/00288/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-298Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
192Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
40 0 0 3 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 43
Total short
Total medium
43
0
Leeds SHLAA 2018 Update
SHLAA Ref: 289
Hunts Farm, Main Street, Methley Outer South
SAP Ref: HG2-186
The site comprises a range of disused farm buildings, with flood plain and open land to the rear dropping down to the River Aire. To the south and east are residential and commercial properties, to the north is a reclaimed former slag heap and fields, and to the west is open fields and a couple of houses.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-186 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is free from legal or ownership problems, and is being promoted for development through the recent planning application and appeal. Landowner has confirmed that the site remains available for residential development and is willing for it to be brought forward into the short term.
Achievability: Short (=<5yrs)There is anticipated to be a market for dwellings in this rural village location.
HG2-186Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
25
0
Leeds SHLAA 2018 Update
SHLAA Ref: 301
Upper Accomodation Road, LS9 City Centre, Inner Area
SAP Ref: AV22
Cleared wasteland (former Richmond PH), with social facilities to east, otherwise newish LCC housing; railway cutting to north, beyond which industrial.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV22 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Vacant and cleared site.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
AV22Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
26Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 26 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 26
Total short
Total medium
26
0
Leeds SHLAA 2018 Update
SHLAA Ref: 310
Barnsdale Road, Allerton Bywater Outer South East
SAP Ref: HG2-135
Nordan Builder's Merchants - shed with large open storage area, to north of Millennium Village housing, and south of existing semi-terrace village housing.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-135 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)Planning approval for Erection 55 affordable houses with associated parking and landscaping under 17/02935/FU.
HG2-135Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
49Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
10 15 15 15 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 55
Total short
Total medium
55
0
Leeds SHLAA 2018 Update
SHLAA Ref: 313
Westgate, Otley Outer North West
SAP Ref: MX2-2
Backland between Westgate and parish church, occupied by car park, car repair operation ( Milligan's Yard) and redundant storage area with a crane shown by the aerial photo. Some mature trees on site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-2 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availabilitySite for sale and pre-application enquiries received (PREAPP/16.00476). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)High to medium market area. Active developer interest. Mixed use scheme could come forward. Will link to the neighbouring Ashfield Works site which is progressing. LCC helping to broker agreement between landowners.
MX2-2Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
15 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
0
15
Leeds SHLAA 2018 Update
SHLAA Ref: 320
Ashfield Works, Westgate, Otley Outer North West
SAP Ref: MX2-1
Ashfield Works, industrial property owned by LCC, together with car park. Housing to west, retail on Westgate frontage mainly to east, primary school to NE, river Wharfe with open country beyond to north. Ashfield split into units, partly vacant, two garage businesses. Part of site located within Otley town centre.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-1 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site for sale and pre-application enquiries received (PREAPP/1600476).
Achievability: Medium (6-10yrs)High to medium market area and a very attractive riverside location.
MX2-1Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
0
50
Leeds SHLAA 2018 Update
SHLAA Ref: 331
South Accommodation Road And Atkinson Street Leeds Inner Area
SAP Ref: AV98
A pair of modern industrial sheds at junction of South Accommodation Road/Atkinson Street in the Aire Valley regeneration area. Adjacent to Aire and Calder Navigation and final stage of the Inner Ring Road. The Hunslet Mills complex (SHLAA Ref 467) is located immediately to the south of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV98 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site in active use but site owner has indicated potential availability of site or part of site for future redevelopment.
Achievability: Medium (6-10yrs)Would require high density scheme to generate sufficient value to displace existing commercial uses. This type of housing scheme will only come forward in favourable market condition and it unlikely that this would be before the adjacent Hunslet Mills site is developed (SHLAA Ref: 467).
AV98Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
35Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
35 0 0 0 0
0
Dwellings - current figures
Remaining capacity 35
Total short
Total medium
0
35
Leeds SHLAA 2018 Update
SHLAA Ref: 333
Off Whitehall Road Drighlington BD11 1bx Outer South West
SAP Ref: HG2-142
Forms part of the Drakes Extrusions site, which has already been partly redeveloped for housing. Except for the remainder of Drakes premises, site in a mixed residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-142 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Medium (6-10yrs)Brownfield site located in a low to medium market sector. Some residential development has already begun.
HG2-142Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
49Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
49 0 0 0 0
0
Dwellings - current figures
Remaining capacity 49
Total short
Total medium
0
49
Leeds SHLAA 2018 Update
SHLAA Ref: 340
Former Motor Dealers Premises Church Street Hunslet Inner Area
SAP Ref: AV48
Tate Accident Repair Centre - largely open site with a couple of sheds and lots of parked cars on a small industrial area, formed by boundaries of Beza Street/Balm Road and railway. Generally mixed use area, some housing opposite, but mainly non residential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV48 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is currently occupied. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Medium (6-10yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered.
AV48Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
23Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
23 0 0 0 0
0
Dwellings - current figures
Remaining capacity 23
Total short
Total medium
0
23
Leeds SHLAA 2018 Update
SHLAA Ref: 341
Jubilee Works, Old Lane, Beeston Outer South West
SAP Ref: HG2-139
Former modern shed, on a small industrial estate in Beeston - believed demolished late 2007, no record identified on non-domestic rate. Adjacent are small workshop type units, largely occupied. Mixed LCC/private housing, open aspect to north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-139 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Notification of and demolition has been carried out clearing the site for development. Pre-application discussion is ongoing regarding residential development on the site. From this it is considered that the site is available for housing.
Achievability: Short (=<5yrs)Low market area. Commercial surroundings but there is current developer interest.
HG2-139Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
44Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 44 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 44
Total short
Total medium
44
0
Leeds SHLAA 2018 Update
SHLAA Ref: 364
Bramwood, 11 Creskeld Crescent, Bramhope, Leeds LS16 Outer North West
SAP Ref: HG1-25
Large house in substantial grounds, with extensive tree cover to the north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 12/05354/RM and is an Identified site in SAP. Permission for previous scheme expired on 12/02/2016. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr And Mrs Brown on 14/01/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-25Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 8 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 375
The Old Hall Yard Main Street East Ardsley WF3 2ap Outer South West
SAP Ref: HG1-392
Rhubarb sheds, barns etc in East Ardsley village, with housing around, open fields to rear.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/05603/EXT and is an Identified site in SAP. Permission for previous scheme expired on 18/02/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr Auty on 17/04/2008. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-392Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 6 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 6
Total short
Total medium
6
0
Leeds SHLAA 2018 Update
SHLAA Ref: 376
Ring Road West Park, Silk Mill Way And Iveson Drive North Leeds
SAP Ref: MX1-2
Former quarry, bounded by woodland on all sides, with Clayton Wood industrial estate beyond to south, housing to east and north, and railway and more open land to west. This site was acquired by Burfords in around 2004 and was bought as part of portfolio. An Outline application was submitted in 2006 following pre-application discussions with Officers and a public consultation event with the local communities bordering the site. The 2006 scheme also included a significant amount of commercial floorspace, including a gym, hotel, retail, offices, creshe and pub restaurant which conflicted with the high ecological value. A new application with approximately 335 houses has been submiited.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 22/09/2016 and has current approval under 14/06918/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/06918/OT by Burford Delta Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site has planning permission under 14/06918/OT by Burford Delta Ltd and ID Planning for ‘for circa 335 residential units’ approved in September 2016 and available for scheme to be brought forward. The site is identified for housing in the Site Allocations Plan. A pre-app to determine the delivery of the scheme was submitted in February 2017 by Barratt And David Wilson Homes under PREAPP/17/00117 (associated with 14/06918/OT). The provision of the receptor ponds on land ownership to the west of the railway will be suitable to receive any Great Crested Newts moved from the quarry and having considered the submitted information as part of 14/06918/OT the proposal is acceptable. As part of the planning application the applicants identified an approach for delivering the required development levels through enabling works at the site which included proposed procedures for environmental compliance. Identified site in the SAP under MX1-2.
MX1-2Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
485Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 100 100
50 35 0 0 0
0
Dwellings - current figures
Remaining capacity 335
Total short
Total medium
250
85
Leeds SHLAA 2018 Update
SHLAA Ref: 376
Ring Road West Park, Silk Mill Way And Iveson Drive North Leeds
SAP Ref: MX1-2
Leeds SHLAA 2018 Update
SHLAA Ref: 383
Beckhill Garth/Approach Inner Area
SAP Ref: HG1-207
1960s LCC housing mainly in long interlinked terrace, part recently cleared. Further social housing to east and south (beyond Potternewton Lane), open space and private housing to west, and former Miles Hill School site to north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02222/LA and is an Identified site in SAP. Permission for previous scheme expired on 13/08/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Leeds City Council on 13/08/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-207Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
34Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 34 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 34
Total short
Total medium
34
0
Leeds SHLAA 2018 Update
SHLAA Ref: 395
36 The Calls LS1 City Centre
SAP Ref: HG1-459
The application site relates to the open car park area only.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 02/04/2013 and has current approval under 10/01059/EXT. Construction yet to commence as at 31st March 2018.
Site had planning permission under 10/01059/EXT by Calls Landing Limited and available for scheme to be brought forward. Approval expired on 2 April 2018.
Achievability: Medium (6-10yrs)The site is identified for housing in the Site Allocations Plan.
HG1-459Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
14 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
0
14
Leeds SHLAA 2018 Update
SHLAA Ref: 402
Cropper Gate LS1 City Centre
SAP Ref: MX1-7
Effectively an island site surrounded by main roads
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 22/07/2011 and has current approval under 10/03459/EXT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 10/03459/EXT by A D Rodger & R N Phillips and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site has planning permission under 10/03459/EXT by Iain Bath Planning. Demolition for redevelopment application under 16/01596/DEMRG in April 2016. Discharge of conditions for implementation submitted pending in November 2017 by Park Lane Properties under 16/04130/COND. Identified site in the SAP under MX1-7.
MX1-7Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
272Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 150 122 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 272
Total short
Total medium
272
0
Leeds SHLAA 2018 Update
SHLAA Ref: 405
Tower Works, Globe Road LS10 City Centre
SAP Ref: MX1-14
Waterfront site close to the main railway station and benefitting from the new southern entrance. Site contains substantially vacant industrial buildings and three listed Italian style towers built in the late 19th and early 20th centuries.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 12/07/2016 and has current approval under 15/06578/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/06578/FU by Carillion (Maple Oak) Ltd. - Mr Gareth Jackson and available for scheme to be brought forward. SHLAA 2018 correspondence from Jeremy Good confirms site is still available for residential and agrees with the prospect of delivery starting in 19/20.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. SHLAA 2018 correspondence from Jeremy Good agrees with the delivery schedule starting in 19/20.
MX1-14Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
158Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 50 100 10 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 160
Total short
Total medium
160
0
Leeds SHLAA 2018 Update
SHLAA Ref: 406
16-18 Manor Road LS11 City Centre
SAP Ref: HG1-463
Cleared former industrial site in the heart of Holbeck Urban Village
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-1A.44 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Site has been cleared and is available for development. No known legal or ownership constraints. Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term. Pre-application discusssion for scheme advanced. Pre-application discussion for scheme advanced. Recent pre-application activity under PREAPP/16/00567 for Residential development.
HG1-463Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
57Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 29 28 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 57
Total short
Total medium
57
0
Leeds SHLAA 2018 Update
SHLAA Ref: 407
Dandarra, Sweet Street/Manor Road City Centre
SAP Ref: HG1-464
Cleared former industrial site being temporarily used as a car park. Located within Holbeck Urban Village between recent office developments at City Walk and The Mint.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/04641/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-464Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
744Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
186 372 186 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 744
Total short
Total medium
744
0
Leeds SHLAA 2018 Update
SHLAA Ref: 409
Bath Road LS11 City Centre
SAP Ref: MX1-17
Northern end of site contains warehouse and workshop buildings with some vacancies. Southern part of site has been cleared.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02672/EXT and is an Identified site in SAP. Permission for previous scheme expired on 05/03/2015. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Igloo Regeneration (Gp) Ltd on 30/06/2005. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site previously obtained planning approval by Igloo Regeneration (Gp) Ltd on 30/06/2005. Site remains undeveloped and available and Lichfields confirmed programme for delivery as part of SHLAA consultation. This site forms part of a wider landholding comprising seven parcels of land, known as ‘CEG: South Bank’, which is being promoted for the development of office, commercial and housing, alongside improved connectivity and public realm by CEG. The site will be developed as part of a comprehensive site masterplan which has been subject to detailed pre-application discussions with officers since January 2016. Details of the emerging masterplan have been presented to members of City Plans Panel at pre-application presentations in August 2016 and January 2017. The planning application is due to be submitted shortly for the delivery of housing, commercial and office uses. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Recent pre-application activity under PREAPP/17/00272 for Remediate site to facilitate future development. Approval on 25 October 2017 for the Council to undertake ‘engineering operations to remediate and level brownfield land’. Identified site in the SAP under MX1-17.
MX1-17Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
90Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 60 60 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 120
Total short
Total medium
120
0
Leeds SHLAA 2018 Update
SHLAA Ref: 409
Bath Road LS11 City Centre
SAP Ref: MX1-17
Leeds SHLAA 2018 Update
SHLAA Ref: 410
Regent St / Skinner Ln LS2 City Centre
SAP Ref: MX2-18
Cleared site fronting Skinner Lane.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-18 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Landowner has also been approached and has confirmed site the site is availabile.The landowner has confirmed that the site remains available for residential development.
Achievability: Short (=<5yrs)The site is allocated for housing in the emerging Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
MX2-18Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
72Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 72 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 72
Total short
Total medium
72
0
Leeds SHLAA 2018 Update
SHLAA Ref: 414
Skinner Lane LS9 Inner Area
SAP Ref: HG1-246
Development in two blocks, one fronting Skinner Lane and one at the junction of Skinner Lane and Mabgate.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/06106/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-246Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
286Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 415
High Court LS1 City Centre
SAP Ref: MX1-21
Existing buildings, unoccupied, plus development site opportunity. Adjacent to Leeds Parish Church.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 14/05054/FU and is an Identified site in SAP. Permission for previous scheme expired on 23/01/2018. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr M Rothwell on 19/09/2003. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation upon occupaction as no notification through private building control certification. Delivery will be part of 2018/19 performance.
MX1-21Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
9 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 419
The Gateway, Marsh Lane LS9 City Centre
SAP Ref: AV26
Remaining last phase site is undeveloped at extreme south eastern corner of the traffic island.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 27/07/2004 and has current approval under 08/06681/FU. Construction yet to commence as at 1 April 2017.
Site has planning permission under 08/06681/FU by The Gateway (Leeds) Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG.
AV26Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
110Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
96 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 96
Total short
Total medium
96
0
Leeds SHLAA 2018 Update
SHLAA Ref: 421
Leylands Road LS2 City Centre
SAP Ref: HG1-511
Site appears as last infill site on Concord Street.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on25/05/2018 and has current approval under 17/02853/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/02853/FU by Private and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Landowner in discussions with Housing Growth Team investigating funding with HCA.
HG1-511Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 35 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 35
Total short
Total medium
35
0
Leeds SHLAA 2018 Update
SHLAA Ref: 431
38 The Calls LS2 City Centre
SAP Ref: MX2-29
The site comprises of the existing building with a basement bar and ground floor restaurant and vacant upper floors. Adjacent car park benefits from residential new build consent but not implemented.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-29 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
MX2-29Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 14 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 433
Globe Road (Doncasters) LS11 Inner Area
SAP Ref: MX1-12
The city centre site is located adjacent to the railway. Cleared volume house builder owned site (Taylor Wimpey). Permission for 609 flats granted in late 2013 with viability assessment and reduced S106 package to help progress site. 3 planning consents granted by the Council but none implemented because land was bought at height of market at too high a cost and Taylor Wimpey now marketing for specialist PRS provider to develop further bespoke scheme and have indicated this will be on basis of substantial write down of land costs.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 12/03459/FU and is an Identified site in SAP. Permission for previous scheme expired on 15/11/2016. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Globe Road Ltd on 22/09/2005. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site previously obtained planning approval by Globe Road Ltd and Barton Willmore on 22/09/2005. Site remains undeveloped and available. Landowner confirmed availability through representation(s) made to Site Allocations Plan consultation in November 2015. Pre-application discussions and advice provided in August 2016 for a residential scheme with a view to an application being submitted in the short-term under PREAPP/16/00374. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Recent pre-application activity under PREAPP/16/00374 for Residential development. Further pre-application under PREAPP/17/00675 for Residential development by ID Planning. Identified site in the SAP under MX1-12.
MX1-12Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
609Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 200 200 209
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 609
Total short
Total medium
609
0
Leeds SHLAA 2018 Update
SHLAA Ref: 433
Globe Road (Doncasters) LS11 Inner Area
SAP Ref: MX1-12
Leeds SHLAA 2018 Update
SHLAA Ref: 437
South Accommodation Road LS9 (adjacent to Low Fold) Inner Area
SAP Ref: AV34
Cleared brownfield site to the north of South Accommodation adjacent to the River Aire corridor. The site adjoins another development site to the north (SHLAA Ref: 207).
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV34 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Vacant and cleared site. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
AV34Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
27Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 27 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 27
Total short
Total medium
27
0
Leeds SHLAA 2018 Update
SHLAA Ref: 438
Richmond Street LS9 City Centre
SAP Ref: AV25
Site being marketed For Sale as a development site opportunity. Saxton Gardens nearing completion at the immediate rear of the site. Gateway scheme is opposite the site. East Street Mills approaching completion December 2008 adjacent to the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 11/11/2005 and has current approval under 20/408/04/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 20/408/04/FU by Private and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG. Recent pre-application activity under PREAPP/17/00138 for 8-14 storeys of 300 flats with landscaping, parking and associated works.
AV25Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
195Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 50
45 0 0 0 0
0
Dwellings - current figures
Remaining capacity 195
Total short
Total medium
150
45
Leeds SHLAA 2018 Update
SHLAA Ref: 443
Jayco Ho Skinner Lane LS7 City Centre
SAP Ref: MX1-22
Site fronts Skinner Lane and is last remaining infill between existing flats development schemes.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/01008/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
MX1-22Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
106Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
12 35 35 24 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 106
Total short
Total medium
106
0
Leeds SHLAA 2018 Update
SHLAA Ref: 445
City One (Caddick), Manor Road City Centre
SAP Ref: MX1-20
Former car dealership, spares, garage, car parks on Meadow Rd. No active uses on the site and most of the buildings are now cleared.. Temporary car park on remainder of site. City One lies to the south of the city adjacent to Meadow Lane, the principle entrance to the city from the motorway. This area has undergone significant regeneration and development in recent years including City Walk a mixed use residential, offices and hotel destination, The Mint home to Asda and Jet 2 and the award winning Holbeck Urban Village with a diverse offering of pubs, restaurants and cafes along with the Round Foundry Media Centre. The southern station entrance and proposed HS2 station also serve to further add to the areas renaissance.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/00923/OT and is an Identified site in SAP. Permission for previous scheme expired on 12/04/2016. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Montpellier Estates Ltd on 19/09/2006. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site previously obtained planning approval by Montpellier Estates Ltd on 19/09/2006. Site remains undeveloped and available. Outline planning application for redevelopment of land (up to 296 residential units) Montpellier Estates Ltd was approved under 10/00923/OT on 12 April 2013. Site has since been purchased by Caddick. Caddick Vision in November 2017 was for site to be gateway to Leeds South Bank, one of Europe’s largest regeneration programmes as ‘City One, Leeds’. Reserved Matters application submitted on 21 December 2017 for enabling works for redevelopment of land at Meadow Road for uses within the following classes B1, D2, C1, C3 (up to 296 residential units) under 17/08408/RM by Caddick (City One) Limited. Application includes detailed phasing programme for development. The currently proposed RM application is submitted in accordance with the approved parameters of the extant planning permission. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Identified site in the SAP under MX1-20.
MX1-20Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
296Site Allocations Plan capacity
Leeds SHLAA 2018 Update
SHLAA Ref: 445
City One (Caddick), Manor Road City Centre
SAP Ref: MX1-20
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 150 146 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 296
Total short
Total medium
296
0
Leeds SHLAA 2018 Update
SHLAA Ref: 446
57 Great George Street LS1 City Centre
SAP Ref: HG2-188
Former bookshop on south side of Great George St opposite the LGI. Ground floor currently used as a mail storage facility. Upper floors vacant.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-188 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-188Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 7 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 447
Doncasters Whitehall Road LS12 Inner Area
SAP Ref: MX1-11
Cleared site in the west-end area of the city centre. Bounded by Whitehall road to the south, the canal to the east, railway embankment to the west and the rear car park of the Roundhouse to the north. Site bisected by disused railway viaduct. 3 consents and extension of time given.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 06/12/2011 and has current approval under 11/03759/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 11/03759/RM by Lend Lease and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site previously obtained planning approval by Lend Lease on 14/11/2006. Site remains undeveloped and available. Landowner confirmed availability through representation(s) made to Site Allocations Plan consultation in November 2015. Pre-app on Northern part under PREAPP/16/00421 for 303 PRS and 280 private sale apartments (583 units). Reserved Matters application for full site under 17/05182/RM for mixed-use. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. A formal full application for ‘erection three blocks of 307 apartments’ was submitted by ID Planning working in partnership with the Council to assist in delivering this important city centre brownfield site, which was approved on 21 September 2017 under 16/07714/FU. Identified site in the SAP under MX1-11.
MX1-11Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
463Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 200 263 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 463
Total short
Total medium
463
0
Leeds SHLAA 2018 Update
SHLAA Ref: 447
Doncasters Whitehall Road LS12 Inner Area
SAP Ref: MX1-11
Leeds SHLAA 2018 Update
SHLAA Ref: 449
7 Duncan Street LS1 City Centre
SAP Ref: MX2-25
Upper floors above 3 shops in a handsome listed building on the north side of Duncan St.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-25 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Upper floor housing has been successfully achieved in a similar neighbouring building. Recent pre-application activity under PREAPP/17/00316 for Installation of various linkUK BT telecommunication units.
MX2-25Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 450
Globe Road/water Lane LS11 City Centre
SAP Ref: MX1-13
Site encompasses land to the north and south of Globe Road. Land to north used as temporary car park. Vacant commercial buildings and car park to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 11/03925/EXT and is an Identified site in SAP. Permission for previous scheme expired on 16/12/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr Kevin Durkin on 28/10/2005. Site remains undeveloped and available
Achievability: Medium (6-10yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward. This site forms part of a wider landholding comprising seven parcels of land, known as ‘CEG: South Bank’, which is being promoted for the development of office, commercial and housing, alongside improved connectivity and public realm by CEG. The site will be developed as part of a comprehensive site masterplan which has been subject to detailed pre-application discussions with officers since January 2016. Details of the emerging masterplan have been presented to members of City Plans Panel at pre-application presentations in August 2016 and January 2017. The planning application is due to be submitted shortly for the delivery of housing, commercial and office uses.
MX1-13Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
263Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 163 0 0 0
0
Dwellings - current figures
Remaining capacity 263
Total short
Total medium
0
263
Leeds SHLAA 2018 Update
SHLAA Ref: 454
Portland Crescent LS1 City Centre
SAP Ref: MX1-5
The site is situated to the north of Leeds city centre to the north of Millennium Square and is bordered to the west by Leeds Metropolitan University. Phase I has recently been completed and contains no residential accommodation. Phase II is yet to commence but was approved in outline to include 50 dwellings
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 06/00949/FU and is an Identified site in SAP. Permission for previous scheme expired on 08/03/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Private on 28/02/2007. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site progressing from medium term in 2017 SHLAA to short term in the five year supply period commencing 1 April 2018. Promoted as mixed use allocation under MX1-5 in SAP for delivery in plan period. Landowner contacted to confirm post-November 2016. Site previously obtained planning approval under 06/00949/FU and is an Identified site in the emerging SAP. Site remains undeveloped and available. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme. There are no identified impediments to the site being delivered subject to a suitable scheme being brought forward in a strengthened City Centre market.
MX1-5Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
0
50
Leeds SHLAA 2018 Update
SHLAA Ref: 456
Rear 2-28 The Calls LS2 City Centre
SAP Ref: MX1-23
Existing frontage buildings onto The Calls and large area of open land adjacent to the River Aire. One of the few riverside frontage sites with potential for substantial new build.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 24/02/2015 and has current approval under 13/02034/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 13/02034/FU by Commercial Development Projects Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
MX1-23Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
77Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 77 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 77
Total short
Total medium
77
0
Leeds SHLAA 2018 Update
SHLAA Ref: 465
Waterloo Sidings LS9 Inner Area
SAP Ref: HG1-256
Former railway siding
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-1A.23 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Allocated in the UDP Review (2006) as a Phase 1 site but with access issues to resolve. Network Rail proposal is to dispose of site to HCA for housing. Barbar Ahmed MRICS, Senior Deveopment Surveyor to confirm. The landowner has confirmed that the site remains available for residential development.
Achievability: Short (=<5yrs)Network Rail are in discussions with Asset Management and Regeneration Land & Property Team to resolve access issue by using Council owned land which would provide access into the site via Halton Moor Avenue. Disposal of the site is expected to commence once the necessary regulatory approvals required for the disposal have been secured. The site has an existing allocation for housing in the Local Plan. HCA have done due dillgence on the site and concluded the site is unviable for their requirements. Site recently marketed as a greenspace site and has four interested parties. Intrusive ground investigation are taking place to further progress the sale of the site.
HG1-256Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
140Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 20 50
50 20 0 0 0
0
Dwellings - current figures
Remaining capacity 140
Total short
Total medium
70
70
Leeds SHLAA 2018 Update
SHLAA Ref: 467
Hunslet Mill, Goodman Street LS10 Inner Area
SAP Ref: AV41
Grade II* listed buildings located within the Aire Valley Area Action Plan area. The River Aire forms the eastern boundary; the Yarn Street development site lies immediately to the south (with planning permission for residential uses)
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 13/11/2003 and has current approval under 21/100/00/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 21/100/00/FU by Airebank Developments Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Developers are working with the Council to develop a viable scheme which will bring the listed buildings back into use. Site has approval under 17/03203/FU for Variation of condition 27 (approved plans) of previous approval 21/100/00/FU for 758 units. Planning permission approved on 17 May 2017 under 17/9/00142/MOD for 758 units. Developers are working with LCC to develop a viable scheme which will bring the listed buildings back into use. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG.
AV41Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
699Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
86 100 100 41 100
200 131 0 0 0
0
Dwellings - current figures
Remaining capacity 758
Total short
Total medium
427
331
Leeds SHLAA 2018 Update
SHLAA Ref: 473
West Grange Road(ph 2) LS 10 Inner Area
SAP Ref: HG1-280
Greenfield site located south of West Grange Road and west of Winrose Avenue. Surrounded by residential to the north, east and west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.16 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Expect landowner would promote development if the site were released through new planning policy.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term.
HG1-280Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
35Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 20 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 35
Total short
Total medium
35
0
Leeds SHLAA 2018 Update
SHLAA Ref: 474
Urn Farm Middleton Road LS10 Inner Area
SAP Ref: HG1-281
Predominantly greenfield allocated phase III site located Ring Road (Middleton) and Middleton Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.17 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Site owned by Leeds City Council and available for residential development.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term
HG1-281Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
100Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 25 25
25 0 0 0 0
0
Dwellings - current figures
Remaining capacity 100
Total short
Total medium
75
25
Leeds SHLAA 2018 Update
SHLAA Ref: 476
Shaftesbury House Beeston Road LS11 Inner Area
SAP Ref: HG1-267
Former homeless hostel situated in a mainly residential part of Beeston comprised of 2 and 3-storey red brick housing of fairly recent construction. On the opposite side of Beeston Road is Hillside primary school which is a Grade II listed Victorian building which will itself become redundant as a school when the new West Hunslet Primary School on Dewsbury Road is opened.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 10/02956/EXT and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-267Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 481
Barkly Road LS11 Outer South West
SAP Ref: HG1-327
Brownfield site located in Beeston. Site is located on Barkly Road with access coming from the south east of the site on Firth Road. Small garage located adjacent to the site on the west, with residential development to the north of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/03010/OT and is an Identified site in SAP. Permission for previous scheme expired on 16/03/2014. Site is suitable for a new scheme to be brought forward
�Site previously obtained planning approval by Ice Pak Seafood Specialists Retirement Death Benefit Schem on 07/08/2006. Site remains undeveloped and available
Achievability: Medium (6-10yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward. Appeal allowed in June 2017 for Mixed use development comprising sports hall, teaching, prayer and community facilities and associated offices and ancillary facilities and creation of basement car park; change of use of office building for temporary community use during building works.
HG1-327Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
25 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
0
25
Leeds SHLAA 2018 Update
SHLAA Ref: 495
Fall Lane (west) East Ardsley Outer South West
SAP Ref: HG1-379
The site is on the edge of East Ardsley and is in the process of being developed.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 08/06250/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-379Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
64Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
64 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 64
Total short
Total medium
64
0
Leeds SHLAA 2018 Update
SHLAA Ref: 499
Aberford Rd, Woodlesford Outer South
SAP Ref: HG1-400
The A642 - Aberford Road forms the western boundary with Woodlesford Station located along the southern boundary. Pottery Lane encompasses the northern and eastern boundaries. This is a greenfield site which includes a coverage of mature trees to the north/east and southern edges. Neighbouring use to the west is residential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/04894/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-400Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
32Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
30 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 502
Sharp Lane C Inner Area, Outer South West
SAP Ref: HG1-357
Part of Sharp Lane allocation H3-1A.43 in Middleton, Site C is one of the smaller parcels of land on the site and is situated slightly south west of the central area of openspace.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 22/113/05/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-357Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
183Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
49 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 49
Total short
Total medium
49
0
Leeds SHLAA 2018 Update
SHLAA Ref: 507
Main Street Carlton Outer South
SAP Ref: HG1-410
Unkempt area used for miscellaneous storage possibly in association with the adjacent warehouse. Adjacent to larger protected area of search site (Policy N34 of UDP).
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-1A.12 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
The site may well be in the same ownership as the PAS site situated to the rear and as such developers could be waiting to develop the sites in tandem. Representation received during SAP consultation confirming willing landowner (Turley on behalf of Miller Homes). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term
HG1-410Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 509
Lingwell Road, Middleton, LS10 Outer South West
SAP Ref: HG1-353
Site is situated in the centre of Middleton and is primarily used as residential use. Housing surrounds the site on 3 sides with open grassland to the south. 60% of the site has already been developed with housing association dwellings.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/02500/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-353Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
128Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
17 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
17
0
Leeds SHLAA 2018 Update
SHLAA Ref: 515
Former Bay Horse, Main St, Methley Outer South
SAP Ref: HG1-415
Former public house within residential area to east and south, a few properties in landscaped setting to west and open fields beyond, and GB fields and River Aire / canal corridor to north. Site cleared and construction nearly complete.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 22/345/05/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-415Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
2Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 523
Pinfold Lane, Wmc, Methley Outer South
SAP Ref: HG1-416
The site contains a large villa converted into a working men's club, and extended several times. It also contains a small vacant outbuilding. There is a 35 space car park, and a number of mature TPO protected trees. Beyond the clubhouse to the rear of the site is a grassed field. The surrounding area is predominantly residential, and to the east are open fields (in GB).
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/03222/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-416Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
2 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 2
Total short
Total medium
2
0
Leeds SHLAA 2018 Update
SHLAA Ref: 527
Bradford Road, Ardsley Common Outer South West
SAP Ref: HG1-390
Site is located in East Ardsley, off Bradford Road. Site is almost completed, only a small section of the site remains un-finished in the north western corner. Construction in this corner is currently on going.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/00922/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th June 2016.
Achievability: Short (=<5yrs)Site is under construction as at 30th June 2016.
HG1-390Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
10Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
8 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 536
Woolin Crescent West Ardsley Outer South West
SAP Ref: HG1-394
Agricultural site located on Nook Farm in West Ardsley. Residential developments are located adjacent to the site on the east, south and west. The site is located off Haigh Moor Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-1A.7 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term. Landowner and developer Richard Binks at Binks Executive Homes Ltd confirmed during SHLAA consultation that site remains available with application submitted to devleop site with the expectation to commence as soon as practicable. Confirmed timeframe for delivery.
HG1-394Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
28Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 28 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 547
Park Mills South St Morley Outer South West
SAP Ref: HG1-350
Site is brownfield and was previously used for light industry which has now been cleared.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02584/EXT and is an Identified site in SAP. Permission for previous scheme expired on 18/04/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Ahf Projects on 04/06/2004. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-350Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
33Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 18 15 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 33
Total short
Total medium
33
0
Leeds SHLAA 2018 Update
SHLAA Ref: 551
Manor House Farm, Baghill Green Wa Outer South West
SAP Ref: HG1-393
Pig farm, half derelict, with 2 sheds
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 06/04729/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-393Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
4 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 4
Total short
Total medium
4
0
Leeds SHLAA 2018 Update
SHLAA Ref: 563
Albert Road Morley (Mone Bros Plant Hire Yard) Outer South West
SAP Ref: HG1-344
Site still in use as transport haulage depot but not an intensive use but scrap yard next door may affect deliverability. However Outline approval for residential development granted on appeal so concerns about potential bad neighbour use will have been addressed.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/03141/OT and is an Identified site in SAP. Permission for previous scheme expired on 28/12/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mone Bros Properties on 11/09/2006. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site previously obtained planning approval by Mone Bros Properties on 11/09/2006. Landowner has also been approached post-November 2016 to confirm availability. Site remains undeveloped and available. Site is to be allocated as part of Site Allocations Plan under HG1-344.
HG1-344Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
40Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 20 20 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 40
Total short
Total medium
40
0
Leeds SHLAA 2018 Update
SHLAA Ref: 595
Cliff House Fawcett Lane LS12 Outer West
SAP Ref: HG1-205
The site is a large open site on the edge of green space.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 28/06/2017 and has current approval under 16/08004/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/08004/FU by Together Money - Mr A Grant and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-205Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 7 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 602
Pollard Lane LS13 Outer West
SAP Ref: HG1-131
Former mill site now cleared and decontaminated with construction well underway, some units probably occupied by now
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/03580/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-131Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
179Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
80 40 16 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 136
Total short
Total medium
136
0
Leeds SHLAA 2018 Update
SHLAA Ref: 613
Elder Road/Swinnow Road LS13 Outer West
SAP Ref: HG1-155
The site has been cleared and is located in a predominantly commercial/industrial area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 06/06936/OT and is an Identified site in SAP. Permission for previous scheme expired on 03/01/2016. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by K Moorhead on 07/09/2006. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-155Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
25
0
Leeds SHLAA 2018 Update
SHLAA Ref: 620
214-244 Cardigan Road LS4 Inner Area
SAP Ref: HG1-238
Former glassworks factory on west side of Cardigan Road. Adjoined by Burley library and commercial uses. Railway line forms western site boundary
Most recent PA (student flats) subject to appeal against refusal. Reasons for refusal: design, housing mix; and greenspace. Outcome of appeal awaited.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 09/00856/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-238Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
65Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
22 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 625
Canal Wharf Wyther Lane LS5 Outer West
SAP Ref: HG1-145
Modern industrial units to the west of Wyther Lane in Kirkstall. Housing area to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 23/09/2016 and has current approval under 14/06872/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/06872/FU by Merchant County Developments - Mr M Murray and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-145Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
84Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 64 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 64
Total short
Total medium
64
0
Leeds SHLAA 2018 Update
SHLAA Ref: 626
Kirkstall ForgeAbbey Road
North Leeds, Outer West
SAP Ref: MX1-3
Former forge works with significant area of landscaping. Part of the site is crossed by the River Aire.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 17/11/2017 and has current approval under 17/04846/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/04846/RM by Commercial Estates Group and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site has planning permission under 11/01400/EXT for ‘mixed use development comprising residential, offices, leisure, hotel, retail & bar/restaurants’ by Commercial Estates Group and available for scheme to be brought forward. Landowner confirmed availability through representation(s) made to Site Allocations Plan consultation in November 2015. The site is identified for housing in the Site Allocations Plan Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Recent pre-application activity under PREAPP/16/00513 for Plots E and F - 109 houses and apartments, 1900 sq. m. retail, new public square. Reserved matters approval comprising 112 houses and apartments (Use Class C3), circa 2,925 square metres of commercial space, (Use Classes A1, and/or A2, and/or A3, and/or A4, and/or A5, and/or B1, and/or D1 and/or D2) on 17 November 2017 under 17/04846/RM. Identified site in the SAP under MX1-3.
MX1-3Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
1385Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 150 150 185 200
200 185 165 150 0
0
Dwellings - current figures
Remaining capacity 1385
Total short
Total medium
685
700
Leeds SHLAA 2018 Update
SHLAA Ref: 626
Kirkstall ForgeAbbey Road
North Leeds, Outer West
SAP Ref: MX1-3
Leeds SHLAA 2018 Update
SHLAA Ref: 636
Westfield Mill Broad Lane LS13 Outer West
SAP Ref: HG1-152
Existing industrial premises in generally residential area
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/05155/EXT and is an Identified site in SAP. Permission for previous scheme expired on 18/04/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by T And Td Properties on 10/12/2007. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site has planning permission under 10/05155/EXT by T And Td Properties and available for scheme to be brought forward. Site is to be allocated as part of Site Allocations Plan under HG1-152.
HG1-152Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
133Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 33 50 50
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 133
Total short
Total medium
133
0
Leeds SHLAA 2018 Update
SHLAA Ref: 637
Royds Lane, Wortley, LS12 Outer South West
SAP Ref: HG1-325
Part regenerated wood area and derelict industrial area to rear of commercial premises
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/00521/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-325Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
154Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
52 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 52
Total short
Total medium
52
0
Leeds SHLAA 2018 Update
SHLAA Ref: 644
Berry Mount Wood Lane LS12 Outer West
SAP Ref: HG1-190
The site is used as a base for a haulage firm and is located within a predominantly residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/01348/EXT and is an Identified site in SAP. Permission for previous scheme expired on 17/06/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by J Wadsworth on 20/03/2008. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward. Landowner has confirmed that they intend to sell the site for the purposes of residential development.
HG1-190Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 12 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 645
Bagley Lane Farsley Outer West
SAP Ref: HG1-134
The site is part of an agricultural holding on the edge of Farsley. The site is predominantly open field but also includes a hardsurfaced car park.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/10/2016 and has current approval under 16/01423/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/01423/FU by Chartford Developments Ltd - P Wade and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-134Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
45Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
13 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 13
Total short
Total medium
13
0
Leeds SHLAA 2018 Update
SHLAA Ref: 646
Delph End Pudsey Outer West
SAP Ref: HG1-168
The site is an area of grass/scrub land located between existing housing on the south side of Waterloo Road, Pudsey.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-2A.9 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward.
No planning consent has been sought or granted and therefore it is not immediately apparent as to the sites availability. However, the lack of physical constraints is such that if the site was to become available it could be developed in the short term. The landowner has confirmed that the site remains available for housing or mixed use allocation.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term.
HG1-168Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
38Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
32 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 32
Total short
Total medium
32
0
Leeds SHLAA 2018 Update
SHLAA Ref: 649
Charity Farm, Swinnow Outer West
SAP Ref: HG1-161
The site is a greenfield site located on the junction with Stanningley Bypass and Bradford Road and is predominately open grassland with some landscaping.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.12 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
LCC brokering the sale of the site on behalf of the Trustees of Charity Farm, for housing.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term
HG1-161Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 25 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
50
0
Leeds SHLAA 2018 Update
SHLAA Ref: 650
Lane End, Pudsey Outer West
SAP Ref: HG1-177
Former railway cutting now filled and naturalised (effectively greenfield), the site is located within Pudsey Conservation Area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-1A.11 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Western site cleared and available for development. Some buildings to the east of the site remain to be cleared.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term
HG1-177Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
20Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 10 10 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 20
Total short
Total medium
20
0
Leeds SHLAA 2018 Update
SHLAA Ref: 653
Robin Lane/Longfield Road (Varley's Yard), Pudsey Outer West
SAP Ref: HG1-189
The site is a greenfield allocated site located within the main urban area. The site abuts allotments and protected greenspace.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 02/04/2015 and has current approval under 10/03908/EXT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 10/03908/EXT by N And B Properties - N Varley and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Landowner considering alternative access in discussion with Houing Growth Team.
HG1-189Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
28Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 28 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 656
Pudsey Road, Bramley, LS 13 Outer West
SAP Ref: HG1-181
The greenfield phase II allocated site on the edge of the main urban area. The large number of trees on the site are covered by a group Tree Preservation Order (1998/50).
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 11/07/2016 and has current approval under 13/01975/EXT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 13/01975/EXT by K Jones And P Rider and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-181Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
10Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 10 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 659
Station Street, Pudsey Outer West
SAP Ref: HG2-74
The site is a disused railway located within a mixed residential and commercial area. The site benefits from mature trees and landscaping.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-74 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site has no current use and has outline planning permission, therefore is deemed to be available for development. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme. The landowner has confirmed that the site remains available for residential development during the SHLAA consultation August 2018 and are looking to submit an application in Spetember 2018.
Achievability: Short (=<5yrs)The site is in an area of low to medium market value and requires ground works to enable development. This may impact on its achievability, but as a vacant site with outline planning permission it is considered development is eminently achievable. E P Homes are planning to submit a planning application in September 2018 according to correspondence received during 2018 SHLAA consultation.
HG2-74Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
20Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 20 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 20
Total short
Total medium
20
0
Leeds SHLAA 2018 Update
SHLAA Ref: 678
83-105 Bradford Road Stanningley Outer West
SAP Ref: HG1-162
The site is predominantly office buildings located in an area of mixed commercial and residential properties.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02881/EXT and is an Identified site in SAP. Permission for previous scheme expired on 13/05/2014. Site is suitable for a new scheme to be brought forward.
Site previously obtained planning approval by Jack Lunn (Properties) Ltd on 05/09/2007. Site remains undeveloped and available.
Achievability: Medium (6-10yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward. The properties on the site which are in the ownership of Jack Lunn Ltd (Protection House and Progress House) are fully let on medium to long term leases to various tenants. Accordingly, units moved to long term to reflect requirement to gain vacant possession prior to delivery.
HG1-162Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
78Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
0 0 20 30 28
0
Dwellings - current figures
Remaining capacity 78
Total short
Total medium
0
78
Leeds SHLAA 2018 Update
SHLAA Ref: 685
Eastmoor Tile Lane, Adel, LS16 North Leeds
SAP Ref: HG1-60
Site vacant for several years with buildings becoming derelict and site overgrown
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-1A.35 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Leeds City Council have agreed to dispose of the site.
Achievability: Short (=<5yrs)Council owned sites which has been agreed to dispose by Asset Management and Regeneration. Site is to be allocated as part of Site Allocations Plan under HG1-60.
HG1-60Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
40Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 37 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 67
Total short
Total medium
67
0
Leeds SHLAA 2018 Update
SHLAA Ref: 687
Dunstarn Lane, Adel, LS 16 North Leeds
SAP Ref: HG1-74
This is the Heath. The Heath itself and other properties in the north west corner of the site are in residential use, there is also a house to the south west corner. Rest of the site is a large garden, part lightly cultivated. Trees to Dunston Lane frontage, which would be the access to the site. Upmarket housing to the north and west, fields to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 06/10/2017 and has current approval under 16/06463/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/06463/FU by Mr R Wainwright and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-74Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
28Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 28 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 688
Silk Mill Drive LS 16 North Leeds
SAP Ref: HG1-68
The site is located in between the housing on Silk Mill Drive and the railway and has a number of trees on the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.6 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Site available as UPD allocation. Written to landowner to confirm availability and timescales for delivery.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term.
HG1-68Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
20Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 20 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 20
Total short
Total medium
20
0
Leeds SHLAA 2018 Update
SHLAA Ref: 720
Westbrook Lane Horsforth North Leeds
SAP Ref: HG1-66
Site already completed and occupied as cluster flats for Trinity and All Saints College students (on campus).
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 27/183/04/RM and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-66Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
15 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 721
Westbrook Lane Horsforth North Leeds
SAP Ref: HG1-65
Active playing fields forming part of the Trinity and All Saints College (TASC) campus.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.19 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Site first included as part of SHLAA assessment in 2009.
Achievability: Short (=<5yrs)Pre-application discussions under PREAPP/14/00784. Site is suitable, available and achievable and to be allocated as part of Site Allocations Plan under HG1-65.
HG1-65Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
75Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 35 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 75
Total short
Total medium
75
0
Leeds SHLAA 2018 Update
SHLAA Ref: 731
Victoria Avenue Horsforth North Leeds
SAP Ref: HG1-98
Greenfield housing allocation located at the end of Victoria Avenue, to the east of Horsforth cemetery.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 06/01/2017 and has current approval under 16/05384/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/05384/RM by S.W. Fraser Trustees and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. David Whittaker at Amberstone Developments confirms through SHLAA consultation that 5 units under construction are to be completed in June 2019.
HG1-98Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 5 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 738
Cromptons, Netherfield Rd, Guiseley Aireborough
SAP Ref: HG1-2
Former employment site located within popular area for new residential development. Bordered by housing allocation H3-3A.09 (SHLAA ref 742 & 1111). Open land to east of site (Green Belt), existing residential area to north and employment uses to west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/01843/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-2Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
116Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 742
Netherfield Road Guiseley Aireborough
SAP Ref: HG1-3
Grassed field (agricultural use although no evidence of active use) with rundown buildings and car parking on frontage to Netherfield Road (used by Abraham Moon & Sons). SHLAA site 738 located to north west. Abraham Moon textile mill to west. Established residential area to east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/02690/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-3Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
98Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
20 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 20
Total short
Total medium
20
0
Leeds SHLAA 2018 Update
SHLAA Ref: 744
Rumplecroft Outer North West
SAP Ref: HG1-15
Greenfield site on northern edge of Otley.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.21 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Confirmation received from landowner that site is available and a scheme with Yorkshire Housing Association is being prepared with a formal planning application due to be submitted. The Landowner has confirmed post-November 2016 that the site remains available for residential development. Correspondence from Charles Lupton confirms that site is now being developed.
Achievability: Short (=<5yrs)Erection of 75 dwellings (C3), public open space, landscaping and access details approved on 25 October 2017. Previous pre-application for Residential development 44 Affordable and 56 Market Dwellings. Site to be allocated as part of Site Allocations Plan under HG1-15. Correspondence from Charles Lupton during SHLAA 2018 consultation confirms that site is now being develop for 75 homes.
HG1-15Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
135Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
50 25 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 75
Total short
Total medium
75
0
Leeds SHLAA 2018 Update
SHLAA Ref: 745
East Of Otley Outer North West
SAP Ref: MX1-26
Predominantly open land with some market gardening uses, adjacent to well established residential areas on the edge of Otley.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.30 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Landowner interest and housebuilders have negotiated options. Subject to detailed work. Representation received during SAP consultation confirming willing landowner (Johnson Brook Ltd on behalf of BBS).
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term. The Council is currently working with Persimmon Homes to progress a deliverable scheme for the site which addresses the requirements identified in the UDP Policy (namely housing, employment, greenspace and the provision of a relief road) together with school provision identified in the SAP. A report was presented to the Council’s Executive Board on the 20th September 2017 in relation to facilitating the delivery of the proposed relief road during Phase 1 of the site delivery. Other technical considerations are ongoing including land assembly, geotechnical surveys and site investigation work. In March 2018 approval of more than £7million from the government’s Housing Infrastructure Fund has been confirmed to support the development of new housing at land to the east of Otley. Persimmon Homes stated in March 2018 “we’re delighted to hear the news that we’ve been successful in our joint bid to secure HIF…we look forward to continuing our ongoing work with Leeds City Council to bring forward the construction of the relief road as well delivering much-needed housing”. Site is to be allocated as part of Site Allocations Plan under MX1-26.
MX1-26Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
550Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 30 60 60 60
60 70 70 70 70
0
Dwellings - current figures
Remaining capacity 550
Total short
Total medium
210
340
Leeds SHLAA 2018 Update
SHLAA Ref: 745
East Of Otley Outer North West
SAP Ref: MX1-26
Leeds SHLAA 2018 Update
SHLAA Ref: 764
The Mansion, Woodlea Drive, LS6 North Leeds
SAP Ref: HG1-89
Brownfield site used for offices.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 30/618/04/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-89Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
17 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
17
0
Leeds SHLAA 2018 Update
SHLAA Ref: 778
Bramham House, Bowcliffe Road, Bramham Outer North East
SAP Ref: HG1-51
Large sloping site covered with mature trees and difficult access - hence limited potential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-1A.33 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Currently being marketed and planning brief exists. A number of schemes under consideration.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term Recent pre-application activity under PREAPP/17/00449 for Residential development.
HG1-51Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
30Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 787
Linton Springs Sicklinghall Rd, Linton Outer North East
SAP Ref: HG1-27
Vacant hotel currently under conversion to flats.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/04965/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-27Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 795
Red Hall Lane LS17 East Leeds
SAP Ref: HG1-284
Allocated housing site located on the edge of Red Hall and the main urban area of Leeds. Residential to the East and South of the site, playing pitches to the North and Industrial premises to the West.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-2A.3 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Site is owned by Leeds City Council who are interested in development.
Achievability: Short (=<5yrs)Site is owned by LCC who are progressing development with details set out in Development Brief document. Forming part of the wider ELE, a Planning Brief has been prepared for the Red Hall site, in consultation with the local community and stakeholders. Capable of accommodating approximately 350 new homes. Scheme assessed as achievable and able to commence in the short term. Identified site in the SAP under HG1-284.
HG1-284Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
300Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 100 100 100
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 300
Total short
Total medium
300
0
Leeds SHLAA 2018 Update
SHLAA Ref: 796
Grime's Dyke York Road LS14 East Leeds
SAP Ref: HG1-287
Green field site located on the edge of Seacroft and adjacent to York Road. The site previously contained a couple of farms plus a kennels. The buildings have been removed some time in the recent past. The site is partially tree'd but mostly open grassland.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/03402/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th June 2016.
Achievability: Short (=<5yrs)Site is under construction as at 30th June 2016.
HG1-287Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
369Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
12 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 797
East Leeds Extension East Leeds, Outer North East
SAP Ref: HG1-288
Existing UDP allocation delivered in three quadrants during the plan period - northern (with permission), mid and southern. The ELE wraps around the Thorpe Park business park which is one of the largest in the region and attracts significant blue chip companies. The business park has plans to grow and provide retail which will increase the attractiveness of the ELE. The extension is also supported by a West Yorkshire Plus Transport Fund scheme to build the East Leeds Orbital Road which will help to improve connectivity between motorways and in particular between the M1 and the A61 as well as freeing up space at Thorpe Park.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
UDP Allocated site. Part of site obtained planning permission on 16/10/2017 and has current approval under 17/01858/FU. Construction yet to commence as at 31st March 2018.
Wider site available in multiple ownership. Part of the site has planning permission under 17/01858/FU by Hft Ltd for Strata Homes and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Part of site has planning permission under 17/01858/FU for Demolition of existing buildings; erection of 51 dwellings and garages; with associated highway infrastructure, landscape and drainage works on 16 October 2017. The site is part of the wider East Leeds Extension housing allocation, forming part of the area known as the ‘Northern Quadrant’. The area to the north and east of the site is subject to a current planning application (12/02571/OT) for a residential led development (circa 2000 dwellings), retail, health centre, community centre and primary school development, with associated drainage and landscaping. The outline application on the wider site has been recommended for approval and awaits the signing of a s106 agreement by the volume housebuilders. The site with full permission is deliverable in Years 1 and 2 in accordance with agreed lead-in times and build out rates for sites with detailed permission. The wider site subject to the outline planning approval is deliverable in the short term. Following the legal agreement and the obtaining of Reserved Matters this is likely to be following the delivery of the Strata Homes site. This planning activity dictates today that a realistic prospect of delivery would be for the site with full permission followed by the Northern Quadrant rather than both in Year 1. Accordingly, a delivery of 51 Year 1, followed by the 2017 SHLAA build out rates would provide a revised five year supply picture of 1,501 – a discount of 249 units based on planning status today (1,750 – 1,501 = -249 dwellings). The Unitary Development Plan (UDP) allocated land for housing at the East Leeds Extension (ELE) through Policy H3.3A.33 as a Phase 3 UDP site released by Executive Board 22 June 2011. A variety of landownerships. The ELE is a large area of allocated housing land stretching around the eastern edge of the Leeds main urban area adjacent to the Green Belt. The area covers 233 hectares (with capacity for around 5,000 houses). The ELE comprises Northern Quadrant, Middle Quadrant, Southern Quadrant and Red Hall (Site #795). A consortium of landowners, including Persimmon Homes (Yorkshire) Ltd (Persimmon) submitted a planning application (12/02571/OT) in 2012 for an area known as the Northern Quadrant between the A58 and A64. This includes proposals for 2,000 houses, land for a primary school, local centre and community/health buildings, together with details of the East Leeds Orbital Road (ELOR) route through the site. The application states that the Northern Quadrant “will create a residential led, mixed use sustainable urban extension to Leeds of the highest design quality. It will deliver the first phase of the wider East Leeds Extension allocated in the adopted Unitary Development Plan Review 2006 to meet current and predicted future housing need and provide the first phase of the ELOR to improve the quality of life for surrounding communities”. The Council has determined that the application should be approved and a planning permission will be issued subject to completion of a s106 legal agreement to confirm the package of related planning obligations. The scheme establishes a number of key principles for this part of the ELE. Land ownership within the Middle Quadrant is more fragmented than elsewhere in the ELE. In addition the topography is more challenging and the depth of the allocation (distance between the existing urban area and outer edge of the allocation) is narrower adding a further level of complexity in bringing forward a scheme which takes into account the requirement for a buffer to ELOR, internal spine road through the ELE and the laying out of effective housing development platforms. Persimmon and Taylor Wimpey are currently the principal landowners ELE SPD Consultation within this area and have taken a lead role in negotiating with others to assemble the site for planning and development purposes. The main landowners in the Southern Quadrant are currently Leeds City Council and Taylor Wimpey, with Redrow also having an interest in part of the area. In view of the multiple land ownerships across the ELE, the scale of ELOR and the complex commercial, land and planning relationships involved, Leeds City Council is taking a leading role in co-ordinating all interests to engage in and support a strategy for the design and delivery of the road. A Supplementary Planning Document (SPD) is in preparation to establish development and delivery principles in
Leeds SHLAA 2018 Update
SHLAA Ref: 797
East Leeds Extension East Leeds, Outer North East
SAP Ref: HG1-288
order to aid and positively prepare for the delivery of the site. This document sets out a clear vision for the development of new homes, community facilities and infrastructure including greenspace across the area. The East Leeds Orbital Road (ELOR) is the largest element of infrastructure that will support development of the area and the Council was approved at Plans Panel 23 November 2017. Representation received during SAP consultation confirming willing landowner (Johnson Brook Ltd on behalf of Taylor Wimpey UK Ltd). Scheme assessed as achievable and able to commence in the short term. Identified site in the SAP under HG1-288.
HG1-288Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
4446Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
51 200 350 450 450
600 600 600 600 545
0
Dwellings - current figures
Remaining capacity 4446
Total short
Total medium
1501
2945
Leeds SHLAA 2018 Update
SHLAA Ref: 799
Whinmoor Way (pfi C) LS14 East Leeds
SAP Ref: HG1-291
Infill site within a larger social housing estate.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 09/02971/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-291Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
116Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 802
Swarcliffe Avenue (pfi E) LS14 East Leeds
SAP Ref: HG1-290
Infill site within a larger social housing estate.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/02817/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-290Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 814
Oak Tree Mount, Gipton, LS9 Inner Area
SAP Ref: HG1-508
Cleared site formerly occupied by post war social housing. Site is surrounded by similar postwar housing which characterises the majority of Gipton.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/02721/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-508Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
79Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
4 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 4
Total short
Total medium
4
0
Leeds SHLAA 2018 Update
SHLAA Ref: 815
South Parkway (easel) LS 14 Inner Area
SAP Ref: HG1-227
The site is located within a predominantly residential area of Seacroft, within the EASEL Regeneration area. The northern boundary is formed by South Parkway and existing residential two storey houses. The southern and eastern boundaries are formed by Parkway Vale and adjacent Parklands High school and associated playing fields. The site is reasonably flat with a slight slope in a westerly direction. The site has been cleared.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/01904/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th June 2016.
Achievability: Short (=<5yrs)Site is under construction as at 30th June 2016.
HG1-227Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
106Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
9 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 817
Amberton Terrace, Gipton, LS8 Inner Area, North Leeds
SAP Ref: HG2-87
Cleared site formerly occupied by post war social housing. Site is surrounded by similar postwar housing which characterises the majority of Gipton.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-87 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is cleared and available. It is identified as a phase 1 housing site in the emerging EASEL AAP and has a planning consent granted in March 2008.
Achievability: Short (=<5yrs)The developer has recently formed a Joint Venture partnership with the Local Authority to develop housing sites within the area covered by the EASEL AAP.
HG2-87Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
57Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
30 27 0 0 0
0
Dwellings - current figures
Remaining capacity 57
Total short
Total medium
0
57
Leeds SHLAA 2018 Update
SHLAA Ref: 818
Station Road, Allerton Bywater Outer South East
SAP Ref: MX1-27
Part of the Millennium Village
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 17/02935/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
MX1-27Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
262Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
57 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 57
Total short
Total medium
57
0
Leeds SHLAA 2018 Update
SHLAA Ref: 820
South Of Old Micklefield Outer South East
SAP Ref: HG1-305
The land is agricultural and lies adjacent to the existing residential area of Old Micklefield. The site is allocated in the UDP for housing under Policy H3. Part of the site is used as a playing pitch for Micklefield Primary School and is protected greenspace. The site slopes in a southerly direction. The land is split between Grade 2 and Grade 3 agricultural land (best and most versatile)
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.31 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
No known legal or ownership constraints. Representation received during SAP consultation confirming willing landowner (ID Planning on behalf of Great North Developments).
Achievability: Short (=<5yrs)Approved scheme under 15/05484/OT for Outline application for residential development. Site is to be allocated as part of Site Allocations Plan under HG1-305.
HG1-305Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
150Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 50
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 150
Total short
Total medium
150
0
Leeds SHLAA 2018 Update
SHLAA Ref: 827
Carlton View, Allerton Bywater Outer South East
SAP Ref: HG2-134
Several large gardens with dense hedgerow and trees as a boundaries.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-134 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-134Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
25
0
Leeds SHLAA 2018 Update
SHLAA Ref: 836
Barleyhill Road Garforth Outer South East
SAP Ref: HG1-308
Site is the former Barleyhill Infant and Junior School which was declared “surplus” and included as part of Educations “schools disposal programme” in 2003/04 and sold through LCC's Capital Receipts. Located within a residential area, it is a flat site, within easy walking distance of Garforth Town Centre and is well served by public transport. Barley Hill recreation ground lies opposite.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/05386/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-308Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
30Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
13 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 13
Total short
Total medium
13
0
Leeds SHLAA 2018 Update
SHLAA Ref: 841
Oak Tree Drive, Gipton Inner Area
SAP Ref: HG1-224
Cleared site formerly occupied by post war social housing. Site is surrounded by similar postwar housing which characterises the majority of Gipton.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 07/01012/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-224Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
77Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
18 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 845
Mansion House Mansion Gate Drive LS7 North Leeds
SAP Ref: HG1-108
Site includes Mansion house north of redundant hospital. Site south and east of Gledhow Park Drive.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/04975/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-108Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 18 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 846
Killingbeck Hospital C LS14 Inner Area
SAP Ref: HG1-234
Site of the Former Killingbeck Hospital, accessed off York Road (A64). It is allocated in the UDP Review as a housing allocation (phase 1). Construction has started and some properties are occupied. The site sits on a plateaux within the wider green corridor of Wykebeck valley, as such there are several areas of tree coverage and TPOs on site and pedestrian linkages to the north and west to the adjoining areas of natural and recreational greenspace. To the east of the site is Killingbeck RC cemetery. Abutting the site, to the south, separated by a considerable level drop is ASDA and BBQ (and associated parking).
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 06/02904/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-234Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
156Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1002
Land To Rear Of 45 Creskeld Lane, Bramhope Outer North West
SAP Ref: BL1-3
The site is half in the Green Belt and half comprised of domestic curtilage. There are a number of trees on it to the north and east which form part of an area of woodland to the north.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site has been submitted providing evidence of developer interest. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme. Correspondence from the 2018 SHLAA consultation states that the site is available and achievable for housing with a willing developer keen to bring it forward.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need. Correspondence from the landownerfrom the 2018 SHLAA consultation states that the site is available and achievable for housing with a willing developer keen to bring it forward.
BL1-3Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
23Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
23 0 0 0 0
0
Dwellings - current figures
Remaining capacity 23
Total short
Total medium
0
23
Leeds SHLAA 2018 Update
SHLAA Ref: 1008
Grove Road, Boston Spa
SAP Ref:
Flat field site on the southern edge of Boston Spa. Designated as PAS in the UDP.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/03196/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG3-10Site Allocations Plan ref:
Safeguarded land (PAS)Site Allocations Plan status
Site Allocations Plan
103Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
49 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 49
Total short
Total medium
49
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1010
Baker House, Bridge Street, Leeds, LS2 7qz City Centre
SAP Ref: MX2-16
Effectively two sites in single ownership separated by Trafalgar St. The site fronting New York Road is occupied by a building in use for self-storage. The other site is a fenced in surface car park in use for contract parking.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-16 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The storage and car parking uses are active. The fact the landowner has submitted to the SHLAA shows willingness for development, although no dates for dwelling completions were suggested. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme. 2018 SHLAA consultation response states that a current outline application for employment is being considered by LCC, however Safestore consider that there remains potential in the future for a mixed use scheme on the site, subject to market conditions.
Achievability: Medium (6-10yrs)Active use. End of short term expectation for housing given context of wider area and interest on neighbouring sites. Owner (Safestore Properties Ltd) has clarified that could come forward. Interested in housing but held off during recession. 2018 SHLAA consultation response states that a current outline application for employment is being considered by LCC, however Safestore consider that there remains potential in the future for a mixed use scheme on the site, subject to market conditions.
MX2-16Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
63Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
33 30 0 0 0
0
Dwellings - current figures
Remaining capacity 63
Total short
Total medium
0
63
Leeds SHLAA 2018 Update
SHLAA Ref: 1016
Land At Broadway And Calverley Lane, Horsforth North Leeds
SAP Ref: HG2-42
The site is a small piece of agricultural/small holding land on the junction of the ring road and the A65.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-42 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is available.
Achievability: Short (=<5yrs)The site's location adjacent to existing dwellings and location in a high to medium market area make this attractive to the market.
HG2-42Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 18 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1023
West Of Wesley Road, North Of Tong Road, Armley Inner Area
SAP Ref: HG2-110
Disused allotments with vicarage, scout hut and community hall also on site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 08/02/2017 and has current approval under 10/05520/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 10/05520/FU by Ripon And Leeds Diocesan Board Of Finance Ltd and available for scheme to be brought forward. Correspondence from the SHLAA 2018 consultation states that Leeds Diocesan Board of Finance confirms that the site is still available to b ebrought forward.
Achievability: Short (=<5yrs)The site is allocated for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Correspondence from the SHLAA 2018 consultation states that Leeds Diocesan Board of Finance are the owners of the site and would be looking to bring this site to the market shortly and there is no reason why it could not be delivered from 2019/20.
HG2-110Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
38Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 33 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 33
Total short
Total medium
33
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1029
Land Of Long Thorpe Lane, Thorpe, Wakefield, WF3 3bz Outer South West
SAP Ref: HG2-166
Greenfield site located on the southern edge of Thorpe-on-the-Hill and designated as Green Belt.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-166 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (WYG).
Achievability: Short (=<5yrs)Located in viable market with no impediments to delivery in short term.
HG2-166Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
17Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 17 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
17
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1032
Land Off Bradford Road , East Ardsley WF3
SAP Ref:
Large greenfield site located North of the M1 motorway. Bradford road runs adjacent to the site on the West. Housing estates back onto the site in the South and East.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 14/12/2017 and has current approval under 17/04308/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/04308/RM by Johnson Brook and available for scheme to be brought forward. SHLAA 2018 correspondence from Barratt Homes confirms site is still available.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme. SHLAA 2018 correspondence from Barratt Homes confirms site is still available, however there are delays to starting on site, so therefore a start date of 20/21 is expected, at a delivery rate of 40 units per annum.
HG3-24Site Allocations Plan ref:
Safeguarded land (PAS)Site Allocations Plan status
Site Allocations Plan
218Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 80 80
80 35 0 0 0
0
Dwellings - current figures
Remaining capacity 315
Total short
Total medium
200
115
Leeds SHLAA 2018 Update
SHLAA Ref: 1033
Government Buildings , Otley Road, LS16 5pu North Leeds
SAP Ref: HG1-72
Brownfield site located North of Leeds City Centre. Residential developments to the North and East of the site, and a University of Leeds campus directly to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/04008/OT and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-72Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
130Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
84 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 84
Total short
Total medium
84
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1035
Land At Fleet Lane / Eshald Lane, Oulton, LS26 8ht Outer South
SAP Ref: HG2-179
This is a greenfield site located on the eastern edge of Woodlesford and it is designated as Green Belt.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-179 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Gerald Eve LLP on behalf of Marshalls Mono Limited). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Low to medium Achievability could be effected by the gas pipeline constraint identified.
HG2-179Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
40Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 40
Total short
Total medium
40
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1038
7a Waterword Close, Tingley, WF3 1ql Outer South West
SAP Ref: HG1-385
Greenfield site located off Waterwood Close. Ardsley Reservoir located to the south of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/02974/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-385Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
2 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 2
Total short
Total medium
2
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1046
Spofforth Hill, Wetherby, LS22 Outer North East
SAP Ref: HG1-28
Large agricultural PAS site on the north west side of Wetherby.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07291/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-28Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
325Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
158 100 25 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 283
Total short
Total medium
283
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1049_1058
Haighside, Rothwell Outer South
SAP Ref: BL1-31
Large L-shaped greenfield site located on the urban edge of Rothwell and designated as Green Belt. Large modern housing estate located within the grounds of a former hospital forms the North Eastern boundary of the site. The long side of the 'L' wraps around to Haigh Side Farm.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Nathaniel Lichfield & Partners on behalf of Persimmon Homes and Persimmon Homes West Yorkshire).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-31Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
578Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 150 150 100 78
0
Dwellings - current figures
Remaining capacity 578
Total short
Total medium
0
578
Leeds SHLAA 2018 Update
SHLAA Ref: 1060A_3377A
Houghside Pudsey, LS28 Outer West
SAP Ref: BL1-19
Green field site in agricultural use. There is a nursery on the site in the north east corner, the northern boundary also has a road frontage to Hough Side Road.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Johson Brook for Rubyover Ltd).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-19Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
200Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 75 75 0 0
0
Dwellings - current figures
Remaining capacity 200
Total short
Total medium
0
200
Leeds SHLAA 2018 Update
SHLAA Ref: 1062
The Former Waste Water Treatment Work, Horsforth North Leeds
SAP Ref: HG2-46
Regenerated Green Belt and Urban Green Corridor Site with extensive tree cover. The vegetation has regenerated and forms critical link in Green Belt.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-46 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Barton Willmore on behalf of Stonebridge Homes). The landowner has confirmed that the site remains available for residential development during the SHLAA consultation August 2018
Achievability: Short (=<5yrs)High to medium market area. The landowner has confirmed that the site remains available for residential development during the SHLAA consultation August 2018 and confirms that the site can be delivered very quickly as the site is currently optioned by Stonebridge Homes.
HG2-46Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
53Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 28 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 53
Total short
Total medium
53
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1064A
Bruntcliffe Road and Scott lane, Morley Leeds LS27 Outer South West
SAP Ref: HG1-513
Greenfield site in agricultural use located to the south of Bruntcliffe Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/06/2017 and has current approval under 16/06109/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/06109/FU by Barratt Homes and available for scheme to be brought forward. SHLAA 2018 correspondence from Barratt Homes confirms site is still available and a re-plan has recently been submitted to due to some technical challenges.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. SHLAA 2018 correspondence from Barratt Homes confirms site is still available and a re-plan has recently been submitted to due to some technical challenges. Confirmation that delivery schedule of 19/20 is acievable, at a rate of 40 units per annum.
HG1-513Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
115Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 40 40 35 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 115
Total short
Total medium
115
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1065
Tetleys Motor Services Ltd, 76 Goodman Street Hunslet LS10 Inner Area
SAP Ref: AV46
Coach depot located in the Aire Valley regeneration area. Site is bounded by the Yarn Street development site to the east (with planning permission for residential scheme); the disused Hunslet Mills listed buildings to the north (with planning permission for residential scheme); and industrial and commercial uses to the west and south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV46 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
No known legal or ownership constraints. Owner is looking to sell on the site.
Achievability: Medium (6-10yrs)This site would become more attractive when the neighbouring residential proposals are advanced. Proximity to neighbouring industrial and commercial uses may depress development values to some extent.
AV46Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
36Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
36 0 0 0 0
0
Dwellings - current figures
Remaining capacity 36
Total short
Total medium
0
36
Leeds SHLAA 2018 Update
SHLAA Ref: 1073A_3440
Owlcotes Farm/Owlcotes Gardens Pudsey Outer West
SAP Ref: HG2-67
Covered reservior and green field land in agricultural use. The site is in UDP N8 Green Corridor and N11 Open Land.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 24/10/2017 and has current approval under 17/02105/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/02105/OT by Keyland Developments Limited and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-67Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
100Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 12 40 40
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 92
Total short
Total medium
92
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1077
Nethertown Pig Farm, Old Lane, Drighlington, Leeds, BD11 1LU Outer South West
SAP Ref: HG1-333
Mixed uses including livery yard, equestrian uses, depot, caravan, vehicle and equipment storage and repair. Site located between A58 (Whitehall Road) and Old Lane, Drighlington.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 14/06917/OT and is an Identified site in SAP. Permission for previous scheme expired on 21/12/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Chartford Developments Ltd on 02/04/2015. Site remains undeveloped and available
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-333Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
23Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 23 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 23
Total short
Total medium
23
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1078
Saxton Lane / Marsh Lane LS9 City Centre
SAP Ref: AV19
"L" shaped low rise building with business units on the eastern fringe of the city centre. The adjoining land to the south was developed as high rise purpose built student accommodation.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 03/08/2011 and has current approval under 11/01442/EXT. Construction yet to commence as at 30th June 2016.
Site has planning permission under 11/01442/EXT by Direct Investments (Yorkshire) Ltd and available for scheme to be brought forward. Landowner has confirmed that the site remains available for residential development.
Achievability: Short (=<5yrs)Residential use has become well established in this area of the city centre with recently completed schemes at Mill St, The Gateway and Quarry Hill. However, achievability will depend upon the strength of the city centre flats market.
AV19Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
80Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 40 40
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 80
Total short
Total medium
80
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1080_3367A
Breary Lane East, Bramhope LS16 Outer North West
SAP Ref: HG2-17
The south east part of the site falls within the Green Belt. The western and larger area of the site is an existing UDP Protected Area of Search (PAS) site. The Green Belt boundary lies to the east and is relatively contained by the road to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/11/2017 and has current approval under 17/02312/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/02312/RM by ID Planning and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site has detailed planning permission under 17/02312/RM for Reserved Matters Application for residential development of 319 dwellings, a convenience store and public open space. Previous outline permission under 13/05134/OT for 380 dwellings. High market area for development of mix 3, 4 and 5 bedroom homes with capacity for 2 outlets of up to 50 pa in accordance with agreed SHLAA methodology on outlets. Lead-in time conservative now Reserved Matters approval in place. Site to be allocated in SAP under HG2-17.
HG2-17Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
376Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
35 100 100 84 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 319
Total short
Total medium
319
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1083
Bridgewater Road North East Leeds
SAP Ref: AV40
Site is former oil depot (now mainly cleared) with limited rail freight. Located to the north bank of the river Aire in the Aire Valley regeneration area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV40 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Willing landowner means site available for development subject to relocation of existing leasehold operations.
Achievability: Short (=<5yrs)Development of site will require relocation of existing minerals operation which is unlikely to be achievable until 2021. Given housing development is proceeding on other site in the area there is considered to be a viable market for housing.
AV40Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
546Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 150 150 146 0
0
Dwellings - current figures
Remaining capacity 546
Total short
Total medium
0
546
Leeds SHLAA 2018 Update
SHLAA Ref: 1095B
Old Pool Bank (land at), Pool in Wharfedale, Otley LS21 Outer North West
SAP Ref: BL1-1
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site submitted to SHLAA process as available.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-1Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
280Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 60 60 60 50
0
Dwellings - current figures
Remaining capacity 280
Total short
Total medium
0
280
Leeds SHLAA 2018 Update
SHLAA Ref: 1113
Land At Silverdale Avenue, Guiseley Aireborough
SAP Ref: HG2-6
Underused allotments within residential area of Guiseley bordering the edge of the urban area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-6 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
There is developer interest. But there is also an unsubstantiated allegation raised in April 2012 that 3 acres of the allotments are owned by people unwilling to make their land available for development. Application by Stonebridge Properties for 46 units (17/01262/FU) - under provision of allotments. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)High market area. Lead in time for the commencement and delivery of the site reflects multiple land ownership and the requirement for collective agreement prior to the submission of a suitable planning application.
HG2-6Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
32Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
32 0 0 0 0
0
Dwellings - current figures
Remaining capacity 32
Total short
Total medium
0
32
Leeds SHLAA 2018 Update
SHLAA Ref: 1118
Church Lane And Manor Farm, Micklefield Outer South East
SAP Ref: HG1-307
Site submitted as two plots: one to the south of the settlement with open land beyond (UDP H3-3A.31); one to the east between the existing dwellings and the motorway (UDP H3A.32). The former is dealt with under SHLAA ref 820.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/05140/RM and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015. Representation received during SAP consultation confirming willing landowner (Barton Willmore on behalf of Barrat and David Wilson Homes, ID Planning on behalf of Great North Developments).
Achievability: Short (=<5yrs)Representation received during SAP consultation confirming willing landowner (Barton Willmore on behalf of Barratt and David Wilson Homes, ID Planning on behalf of Great North Developments). Site is to be allocated as part of Site Allocations Plan under HG1-307.
HG1-307Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
400Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 100 100
100 40 0 0 0
0
Dwellings - current figures
Remaining capacity 390
Total short
Total medium
250
140
Leeds SHLAA 2018 Update
SHLAA Ref: 1122
Garnetts Paper Mill, Mill Lane , Otley Outer North West
SAP Ref: MX1-1
Industrial site located to the north of the River Wharf with agricultural land to the east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/03714/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
MX1-1Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
245Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
31 37 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 68
Total short
Total medium
68
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1124
Land Off Upper Carr Lane, Calverley Outer West
SAP Ref: BL1-16
The site is locate on the southern edge of Calverley within the Green Belt, Special Landscape Area and Urban Fringe Priority Zone. The site is Greenfield.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (ID Planning for Thornhill Estates). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-16Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
18 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
0
18
Leeds SHLAA 2018 Update
SHLAA Ref: 1125
Braims Pressings Ltd, Hunslet Road, LS10 City Centre
SAP Ref: AV17
Industrial premises occupied by Braimes Pressings. Site is located in the Aire Valley regeneration area just outside the boundary of the city centre. The site fronts onto Hunslet Road Some of the buildings are Grade II listed.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV17 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The occupiers have expressed intention to move to more modern industrial premises but not known if they are still pursuing this option in the short term. There are no known legal or ownership constraints. Part of site has been developed for a technical college and is no longer available.
Achievability: Medium (6-10yrs)Market conditions will influence type and form of residential development on the site but it will most likely form part of a wider mixed use proposal.
AV17Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
121Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 21 0 0
0
Dwellings - current figures
Remaining capacity 121
Total short
Total medium
0
121
Leeds SHLAA 2018 Update
SHLAA Ref: 1143B
Old Thorpe Lane (land at), Tingley WF3 Outer South West
SAP Ref: HG2-167
Greenfield.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-167 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site submitted to SHLAA process as available now. Vacant greenfield site.
Achievability: Short (=<5yrs)Site located in medium market with no impediments to delivery in the short-term. Strong links to the existing settlement and is well contained by existing roads to the north and east.
HG2-167Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
207Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 100
7 0 0 0 0
0
Dwellings - current figures
Remaining capacity 207
Total short
Total medium
200
7
Leeds SHLAA 2018 Update
SHLAA Ref: 1143D
Old Thorpe Lane (land at), Tingley WF3 Outer South West
SAP Ref: BL1-28
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site submitted to SHLAA process as available.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-28Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
412Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 100 100 100 12
0
Dwellings - current figures
Remaining capacity 412
Total short
Total medium
0
412
Leeds SHLAA 2018 Update
SHLAA Ref: 1144
St Michaels College St Johns Road LS3 Inner Area
SAP Ref: HG1-242
Former school and grounds, now vacant.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 06/03/2015 and has current approval under 14/06495/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/06495/FU by Watkin Jones And Son Limited and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation upon occupation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-242Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
459Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
459 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 459
Total short
Total medium
459
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1145A
Hudson Road, Hudson Mill (Arcadia), Burmantofts Inner Area
SAP Ref: MX2-37
Large site occupied by various industrial buildings, an area of playing pitch, car parking, and internal access roads. Adjacent to LCC owned area of scrub and residential (including schools) to east, terraces to northeast, Harehills Cemetery to northwest, and residential to west and south. Further to the west is St James' Hospital.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-37 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has been submitted and the lanowner is known and indicates that they are intending to redevelop the site.
Achievability: Medium (6-10yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered.
MX2-37Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
470Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 100 60 0 0
0
Dwellings - current figures
Remaining capacity 260
Total short
Total medium
0
260
Leeds SHLAA 2018 Update
SHLAA Ref: 1153
Land To The North Of Keswick Lane, Bardsey Site Of The Blessed Sacrament Church LS22
Outer North East
SAP Ref: BL1-4
The site is located in the greenbelt on the edge of Bardsey; dense tree/shrubs on much of the site, with buildings in use, on western edge. The site shares two boundaries with the settlement boundary of Bardsey.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Bradley Stankler Planning on behalf of Diocese Leeds).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-4Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
10Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
10 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
0
10
Leeds SHLAA 2018 Update
SHLAA Ref: 1154_3132
Church Street, Boston Spa Outer North East
SAP Ref: HG2-22
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-22 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2016
Achievability: Short (=<5yrs)High market area with no impediment to delivery in the short-term.
HG2-22Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
36Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 36 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 36
Total short
Total medium
36
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1171B
Whitehall Road (south of) - Harpers Farm Outer South West
SAP Ref: HG2-136
The site is agricultural land located on the southern side of Whitehall Road and within the Green Belt. To the north of the site is a large area in employment use.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-136 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Johnson Brook Ltd on behalf of Taylor Wimpey Uk Ltd).
Achievability: Short (=<5yrs)High to medium market area. Likely to be developed as on the edge of the Green Belt.
HG2-136Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
279Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 75 100 100
4 0 0 0 0
0
Dwellings - current figures
Remaining capacity 279
Total short
Total medium
275
4
Leeds SHLAA 2018 Update
SHLAA Ref: 1174
Land To North Of Micklefield Railway Station Car Park, Micklefield, LS25 Outer South East
SAP Ref: HG2-126
The site is triangular in shape and is currently used for agriculture/grazing. It has clearly defined boundaries formed by the Leeds York/Selby railway and station carpark to the South, the former carriageway and new road alignment of the A1 to the East and the existing Garden village council housing estate to the North.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-126 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
No known legal or ownership issues. Submission shows landowner interest. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Despite the low to medium housing market, Micklefield is an attractive location to developers and Micklefield has seen housing investment over recent years.
HG2-126Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 18 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1175A
Brigshaw Lane (land to east of), Kippax Outer South East
SAP Ref: BL1-38
Currently an agricultural use the site consists of a square shaped field bordered by trees. It has a road frontage along the western boundary and abuts a Site of Ecological and Geological Importance (SEGI) to the east (the SHLAA site has been separated so this section is no longer included within this site).
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Landowner confirmed availability through representation(s) made to Site Allocations Plan consultation
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-38Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
76Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 26 0 0 0
0
Dwellings - current figures
Remaining capacity 76
Total short
Total medium
0
76
Leeds SHLAA 2018 Update
SHLAA Ref: 1176
Land To The South Of Pit Lane, Micklefield, LS25 Outer South East
SAP Ref: HG2-125
The site is a triangular piece of land stretching south from Pit Lane and has clearly defined boundaries following the built up area to the east and an embankment (with established trees) which forms the SW boundary.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-125 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Johnson Brook Ltd on behalf of Taylor Wimpey UK Ltd). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Given desireable location on edge of Green Belt site likely to be delivered at appropriate phasing period.
HG2-125Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
79Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 39 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 79
Total short
Total medium
79
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1178A
Dunstarn Lane (land south), Adel LS16 North Leeds
SAP Ref: HG2-38
Greenfield site to the south of Dunstarn Lane, Adel. Residential to north and west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-38 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The landowner has confirmed that the site remains available for residential development.
Achievability: Short (=<5yrs)Site is in a desirable area however essential access is needed through adjacent identified site (HG1-74) or property needs to be acquired. Medium term achievability.
HG2-38Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
68Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 18 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 68
Total short
Total medium
68
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1184_3050
Land At Acres Hall Avenue, Pudsey, LS28 Outer West
SAP Ref: BL1-20
The majority of the site is in agricultural use consisting of several fields. The north west part of the site is currently a livery stable consisting of a stable building and paddocks. The site slopes downwards north to south. Roads run along the southern and western boundary. The narrow access road to the north is outside of the site boundary.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Barton Willmore on behald of Barratt and David Wilson Homes.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-20Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
62Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
62 0 0 0 0
0
Dwellings - current figures
Remaining capacity 62
Total short
Total medium
0
62
Leeds SHLAA 2018 Update
SHLAA Ref: 1193A
Rodley Lane (land at) - Calverley Lane, Calverley LS19 Outer West
SAP Ref: BL1-17
Greenfield land set between Calverley and Rodley.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2015.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-17Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
53Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
53 0 0 0 0
0
Dwellings - current figures
Remaining capacity 53
Total short
Total medium
0
53
Leeds SHLAA 2018 Update
SHLAA Ref: 1195
Land At Waterloo Road, Pudsey LS28 Outer West
SAP Ref: HG2-68
The site is a small piece of agricultural land on the southern edge of Pudsey within the Green Belt.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-68 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Directions Planning Consultancy for Mr G Lythe).
Achievability: Short (=<5yrs)Low to medium market area.
HG2-68Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
28Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 35 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 35
Total short
Total medium
35
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1199A
Moseley Wood Gardens (land off), Cookridge LS16 North Leeds
SAP Ref: HG1-58
The site is a open area on the edge of Cookridge currently used for agriculture. The majority of the site is Protected Area of Search.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/04884/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-58Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
135Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 35
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 135
Total short
Total medium
135
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1199B
Moseley Wood Gardens (land off), Cookridge LS16 North Leeds
SAP Ref: HG2-29
The site is a open area on the edge of Cookridge currently used for agriculture. The majority of the site is Protected Area of Search.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-29 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is available for development. Respresentation received during SAP consultation confirming willing landowner (Johnson Brook Ltd on behalf of Taylor Wimpey Uk Ltd).
Achievability: Short (=<5yrs)The site is in a very desireable area. The allocation of this site would mean its achievability in the Medium term is very likely.
HG2-29Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
63Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 13 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 63
Total short
Total medium
63
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1200A
Highfield Drive/Harthill Lane (land off), Gildersome LS27 Outer South West
SAP Ref: BL1-26
Greenfield site in agricultural use located to the west of existing properties.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
SAP rep from WYG/Avant Homes promoting the site. Correspondence from WYG/Avant Homes during SHLAA consultation 2018 confrims commitment to delivery of the site if it was to be released from the Green Belt through the SAP process.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need. Correspondence from WYG/Avant Homes during SHLAA consultation confrims commitment to delivery of the site if it was to be released from the Green Belt through the SAP process.
BL1-26Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
76Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 26 0 0 0
0
Dwellings - current figures
Remaining capacity 76
Total short
Total medium
0
76
Leeds SHLAA 2018 Update
SHLAA Ref: 1201
Land Adjoining Woodhall Road - Gain Lane, Thornbury Bd3 Outer West
SAP Ref: HG2-63
The site is located on the northern edge of Pudsey and is located within the Green Belt, Special Landscape Area and Urban Fringe Priority Zone.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-63 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (FM Lister & Son for Trustees of AW Vint). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Low market area but greenbelt location would be attractive to market.
HG2-63Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
196Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 50
46 0 0 0 0
0
Dwellings - current figures
Remaining capacity 196
Total short
Total medium
150
46
Leeds SHLAA 2018 Update
SHLAA Ref: 1220A
Churwell (land to the east of) LS27 Outer South West
SAP Ref: HG2-150
Site made up of a number of agricultural fields to the south west of the White Rose Shopping Centre, north of Morley.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-150 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Persimmon Homes West Yorkshire, Spawforths and DHA Planning).
Achievability: Short (=<5yrs)The site is in a high to medium housing market zone. Past interest and possible allocation make the achievability high.
HG2-150Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
205Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 75 100 30
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 205
Total short
Total medium
205
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1221
Gill Lane, Yeadon LS19 Aireborough
SAP Ref: BL1-9
Greenfield site located in the greenbelt. New Road borders the site to the east. Residential developments surround the site on the east, north and west.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Barton Willmore on behalf of Barratt and David Wilson Homes).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need. Graham Lister at FM Lister (Otley) confirms in SHLAA consultation landowners have option with Barrett Homes and the site remains available and deliverable.
BL1-9Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
155Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 55 0 0
0
Dwellings - current figures
Remaining capacity 155
Total short
Total medium
0
155
Leeds SHLAA 2018 Update
SHLAA Ref: 1224
Land South Of Church Lane, Mickletown Outer South
SAP Ref: BL1-35
Agricultural field with housing to the north, open fields to the east and south, and housing beyond a railway line to the west.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
A developer is promoting the site as available.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-35Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
55Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
55 0 0 0 0
0
Dwellings - current figures
Remaining capacity 55
Total short
Total medium
0
55
Leeds SHLAA 2018 Update
SHLAA Ref: 1225C
Pinfold Lane (land west of), Mickletown Outer South
SAP Ref: BL1-36
Greenfield site adjacent to 1224. Allotments and housing to east, housing to north and fields to south and west.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2015.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-36Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
0
50
Leeds SHLAA 2018 Update
SHLAA Ref: 1232C
Stourton Grange Farm, South Accommodation Road Outer South East
SAP Ref: HG2-124
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-124 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Barratts, David Wilson and Taylor Wimpey have confirmed availability through the SAP process. Correspondence from WYG/Barratts, David Wilson and Taylor Wimpey during the SHLAA 2018 consultation confirms the site is still available.
Achievability: Short (=<5yrs)Barratts, David Wilson and Taylor Wimpey (the prospective developers) have submitted a delivery statement which includes lead-in time and build-out rates as part of a detailed construction programme. Correspondence from WYG/Barratts, David Wilson and Taylor Wimpey during the SHLAA consultation confirms commitment to delivery of the site in line with the Council's current delivery schedule, subject to the SAP being adopted in a timely manner.
HG2-124Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
1090Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 80 160 160
160 160 160 150 60
0
Dwellings - current figures
Remaining capacity 1090
Total short
Total medium
400
690
Leeds SHLAA 2018 Update
SHLAA Ref: 1232D
Stourton Grange Farm South B Outer South East
SAP Ref: BL1-40
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site submitted to SHLAA process as available.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-40Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
1224Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
250 250 250 250 224
0
Dwellings - current figures
Remaining capacity 1224
Total short
Total medium
0
1224
Leeds SHLAA 2018 Update
SHLAA Ref: 1233_2158_3125
Land to the east of Wetherby Outer North East
SAP Ref: HG2-226
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-226 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2016. Confirmation in August 2017 from Carter Jonas on behalf of landowners that site available now with first parcel subject of a submitted planning application and second part of the parcel being pursued for further planning application in due course.
Achievability: Short (=<5yrs)Site first included as part of SHLAA assessment in 2016 as part of submission from Site Allocations Plan. Application pending on part of the site under 17/02594/OT by Taylor Wimpey for access, for the creation of a new community comprising up to 800 dwellings, a food store (A1) (up to 372 sq.m), primary school and public open spaces. Confirmation in August 2017 from Carter Jonas on behalf of landowners that second part of the parcel is being pursued. Further recent pre-application under PREAPP/16/00560 for outline application for 1,000 dwellings. Allocated site in SAP under HG2-226.
HG2-226Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
1100Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 10 90 90
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 190
Total short
Total medium
190
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1255B
Shaw Lane (land at), Guiseley and Banksfield Mount, Yeadon Aireborough
SAP Ref: BL1-7
Large agricultural site located within the greenbelt. Site is bordered by a large residential development to the south. In the south west corner of the site is Shaw Farm.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Johnson Brook Ltd on behalf of Taylor Wimpey Uk Ltd).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-7Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
234Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 100 34 0 0
0
Dwellings - current figures
Remaining capacity 234
Total short
Total medium
0
234
Leeds SHLAA 2018 Update
SHLAA Ref: 1258_2105_3365_5144
Westerton Road, Tingley, WF3 Outer South West
SAP Ref: BL1-29
The majority of the site is in agricultural use with the exception of the north eastern corner which is in use as a residential institution.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
SAP rep received from Barton Wilmore/Barratt Homes and David Wilson Homes promoting site.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-29Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
160Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 50 45 0
0
Dwellings - current figures
Remaining capacity 195
Total short
Total medium
0
195
Leeds SHLAA 2018 Update
SHLAA Ref: 1259B
Bullough Lane - Haigh Farm (land adjacent to), Rothwell Haigh LS26 0JY Outer South
SAP Ref: HG2-175
Greenfield site to the north of Rothwell. The site is contained by Rothwell Country Park to the north and housing to the south. There is no tree cover and the boundary is well defined.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-175 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2015.
Achievability: Short (=<5yrs)Site located in medium market with no impediments to delivery in the short-term.
HG2-175Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
222Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 54
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 154
Total short
Total medium
154
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1261_4220
Church Farm And Surrounding Land North Of M62, Lofthouse, Wakefield, WF3 3SA
Outer South
SAP Ref: BL1-34
Agricultural land sandwiched between Lofthouse and the M62 merged with Industrial site off Ouzlewell Green containing a group of large warehouse buildings. The site lies adjacent to the M62. The surrounding area is largely rural in nature. However the site is connected to housing to the north.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (ID Planning on behalf of The Ogden Group).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-34Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
188Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 50 38 0
0
Dwellings - current figures
Remaining capacity 188
Total short
Total medium
0
188
Leeds SHLAA 2018 Update
SHLAA Ref: 1265
Former Gas Works, Armley Gyratory Inner Area
SAP Ref: MX2-11
The former Gas Works is located on the edge of the city centre.
General Attributes
Site Description:
Suitability: Suitable
Availability: Medium (6-10yrs)
Site proposed as mixed use allocation in SAP under MX2-11 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
National grid submitted.
Achievability: Medium (6-10yrs)Low market area
MX2-11Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
122Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
0 0 122 0 0
0
Dwellings - current figures
Remaining capacity 122
Total short
Total medium
0
122
Leeds SHLAA 2018 Update
SHLAA Ref: 1281A
Bruntcliffe Road, Morley Outer South West
SAP Ref: HG1-370
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/00863/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-370Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
173Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
22 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1281B
Bruntcliffe Road, Morley Outer South West
SAP Ref: HG1-371
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-213 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2015.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term.
HG1-371Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
61Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 31 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 61
Total short
Total medium
61
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1282
Lane Side Farm Pas Morley Outer South West
SAP Ref: HG2-149
Greenfield site in agricultural use allocated for PAS under UDP Policy N34, with Victoria Rd. running along the Western Boundary, King George Ave. to the South and Harwill Ct. to the North. Now allocated for Housing in the Publication Draft Site Allocations Plan.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-149 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Outline application (16/02988/OT) submitted for 550 units.
Achievability: Short (=<5yrs)High to medium market area on a greenfield site likely to indicate sufficient demand.
HG2-149Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
542Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 100 150 150
100 50 0 0 0
0
Dwellings - current figures
Remaining capacity 550
Total short
Total medium
400
150
Leeds SHLAA 2018 Update
SHLAA Ref: 1284A_4211
Albert Drive, Morley Outer South West
SAP Ref: HG2-153
Partially geenfield site in agriculturual use, and mainly site is split between a storage depot and workshop uses with a small amount of office space.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-153 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
SAP rep received from Archbold Holdings Ltd/Barton Wilmore promoting site.
Achievability: Short (=<5yrs)Site located in medium market with no impediments to delivery in the short-term.
HG2-153Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
121Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 21
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 121
Total short
Total medium
121
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1285
Owlers Farm Pas , Wide Lane, Morley Outer South West
SAP Ref: HG1-351
Agricultural land off Wide Lane on the eastern edge of Morley. Residential areas lie to west and north of the site with agricultural land to the south and east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/01886/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-351Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
114Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
54 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 54
Total short
Total medium
54
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1297
Former Vickers Tank Factory Site, Manston Lane, Cross Gates East Leeds
SAP Ref: HG2-120
Former Tank Factory with very large industrial building and extensive grounds located on the urban edge of Crossgates. The southern boundary of the site is marked by the railway line (Leeds-York). To the north is a collection of other industrial/commercial activities. Surrounding this to the north and west is residential housing, to the east is open land identified as the East Leeds Extension and to the south beyond the railway line is a proposed park. The western tip of the factory site is covered by SHLAA record 281, where some early development is possible.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-120 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Current application submitted. Advanced negotiations on bringing site forward residential use.
Achievability: Short (=<5yrs)Advanced negotiations on bringing site forward residential use. Bellway Homes Ltd approved application for site remediation works in 2014. In July 2017 a minerals application proposed to remove the coal in advance of the MLLR being in place strategically bringing forward this site early is desirable in terms of housing delivery. S106 agreement being developed to progress constraints on site. High probability of site being developed in stated timescales. Recent pre-application activity under PREAPP/17/00420 for Potential to vary permission 14/02521/FU to allow for an alternative haulage route to the north of the site this will involve the removal and/or variation of a number of conditions the application, subject to the agreed methodology. Recent pre-application for Proposed residential development of approx 460 dwellings under PREAPP/17/00721 on 30 November 2017. Allocated site in SAP under HG2-120.
HG2-120Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
450Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 100 100 100
100 50 0 0 0
0
Dwellings - current figures
Remaining capacity 450
Total short
Total medium
300
150
Leeds SHLAA 2018 Update
SHLAA Ref: 1297
Former Vickers Tank Factory Site, Manston Lane, Cross Gates East Leeds
SAP Ref: HG2-120
Leeds SHLAA 2018 Update
SHLAA Ref: 1299A
Otley Road - Bodington Hall, Lawnswood LS16 North Leeds
SAP Ref: HG1-73
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/04269/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-73Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
126Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1308
Land To The Rear Of Naylor Jennings Mill Of Green Lane , Yeadon Aireborough
SAP Ref: HG1-12
Brownfield site formally used as an industrial reservoir for adjacent mill. Industry is located to the west of the site with residential developments north and east. Henshaw Avenue runs along much of the northern border of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/06295/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-12Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
171Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
31 40 40 11 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 122
Total short
Total medium
122
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1311
Land To The South Of Coach Road, Guiseley Aireborough
SAP Ref: BL1-8
Vacant greenfield site located in the Green Belt. A railway runs along the site to the east. Coach Road runs along the northern border of the site. Spring Road borders the west of the site.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
The site has been suggested by the landowner and is available for development. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-8Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
83Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
42 41 0 0 0
0
Dwellings - current figures
Remaining capacity 83
Total short
Total medium
0
83
Leeds SHLAA 2018 Update
SHLAA Ref: 1319
Land North Of Albert Road , Morley Outer South West
SAP Ref: HG1-517
The site is bordered by housing to the east and south, industrial estate to the west and woodland to the north. An industrial depot is situated just beyond the woodland. The site has been used previously for mining, but has now been levelled for work.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/00865/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-517Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
63Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
4 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 4
Total short
Total medium
4
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1320
Lower Moor Farm Pas , Albert Drive, Morley Outer South West
SAP Ref: HG1-514
Agricultural land and groups of farm buildings on the eastern edge of the urban area of Morley.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/12/2016 and has current approval under 16/04733/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04733/RM by Persimmon Homes (West Yorkshire) And Priestgate Morley Ltd and available for scheme to be brought forward. According to correspondence from Perismmon Homes during the SHLAA 2018 consultation, construction started on site Summer 2018.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. SHLAA 2018 consultation response from Persimmon Homes confirms construction has started on site and the Council's delivery schedule is correct.
HG1-514Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
185Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 50 50 50 50
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 200
Total short
Total medium
200
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1322
Airedale Mills, Rodley Outer West
SAP Ref: HG2-58
The site contains two large industrial units that are no longer in use along with a section of car parking. Woodland and a cricket field are located to the north, with the river Aire running to the east and the Leeds Liverpool canal running to the west and south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-58 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site was submitted by the land owner suggesting land will be available for housing development, and representation received during SAP consultation confirming willing landowner (ID Planning for Dynamic Capital). Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme. The site is currently vacant, but not cleared.
Achievability: Short (=<5yrs)The site is located within a low to medium housing market area but has an attractive waterfront setting. DVS confirm site viability. Landowner in discussions with Housing Growth Team.
HG2-58Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 5 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1330A
Haigh Moor Road - Jude's Point, West Ardsley, WF3 1EF Plan App 12/01850/RM
Outer South West
SAP Ref: HG1-383
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/01850/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-383Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
32Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
3 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 3
Total short
Total medium
3
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1337
Stylo House, Harrogate Road, Apperley Bridge Bradford Bd10 Outer West
SAP Ref: HG1-130
Site contains large industrial unit and small section of car parking. Open grassland borders the site to the east and south, housing to the west and the river Aire runs to the north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/07149/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-130Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
17Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1338
Mistress Lane Armley Inner Area
SAP Ref: HG1-251
Cleared site to the east of Armley town centre. Contains a small children's playground in the middle of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 13/03679/EXT and is an Identified site in SAP. Permission for previous scheme expired on 13/08/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Leeds City Council on 10/08/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-251Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
41Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 41 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 41
Total short
Total medium
41
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1339
Clarient Production Uk Limited, Calverley Lane, Horsforth, LS18 4RP North Leeds
SAP Ref: HG1-97
The site contains a number of large industrial units that are still in active use. The site also contains office space and a number of residential properties. The Aire river and a train line border the site to the south, woodland to the east and industrial units to the north and west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 17/02067/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-97Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
331Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
53 19 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 72
Total short
Total medium
72
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1340A
Oak Road, New Wortley - Former Club Inner Area
SAP Ref: HG1-253
Site is small area of larger green area and was formerly a working mens club. Site is now grassed over and is adjacent to a major distributor road. Site also has an electricity sub station in one corner.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 26/10/2017 and has current approval under 17/00924/FU.
Site has planning permission under 17/00924/FU by Leeds City Council and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Confrimation received from landowner as of August 2018 SHLAA consultation that they are preparing to build on site.
HG1-253Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 6 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 6
Total short
Total medium
6
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1340B
Oak Road, New Wortley - Gassey Fields Inner Area
SAP Ref: HG2-112
Site is Green area between British Gas training / research facility and residential area. Has some paths through it and appears to be used Green amenity space.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-112 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)Site has progressed through four SHLAA reviews and two SAP statutory consultations where the site is promoted for allocation for residential development. Landowner has also been approached post-November 2016 to confirm availability and timescales for delivery. The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term. Allocated site in SAP under HG2-112.
HG2-112Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
113Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 13 50 50
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 113
Total short
Total medium
113
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1343A
Harper Gate Farm, Tyersal Lane, Bradford BD4 0RD Outer West
SAP Ref: HG2-73
The site is just under 20 hectares and is made up of agricultural fields. The site is bordered by more agricultural field to the north and east, with housing to the south and west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/04151/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG2-73Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
283Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
55 50 50 50 45
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 250
Total short
Total medium
250
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1344
Westfield Farm Drighlington, Bd11 Outer South West
SAP Ref: BL1-24
Green belt land in use for grazing, with access onto Old Lane the site is located to the west of Westfield Farm.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Submitted site by owner.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-24Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
17Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
17 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
0
17
Leeds SHLAA 2018 Update
SHLAA Ref: 1357
Ninevah Lane, Allerton Bywater Outer South East
SAP Ref: HG2-133
Kennels and rescue centre with scrub land in the west of the site. Farm Building in the south west corner of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-133 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Short term submitted by land owners. The landowner has confirmed that the site remains available for residential development.
Achievability: Short (=<5yrs)Landowner would like the site to be brought forward in the short-term but it is a Phase 3 allocation in SAP as a greenfield site in a Smaller Settlement.
HG2-133Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
65Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 27 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 57
Total short
Total medium
57
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1359
Rothwell Garden Centre, Wood Lane, Rothwell, LS26 East Leeds, Outer South
SAP Ref: HG2-174
Garden centre and agricultural land washed over by the Green Belt on the north side of Wood Lane opposite the recent St Georges residential development.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-174 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Walker Morris LLP on behalf of Denman House Holdings Limited). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)High to medium market area
HG2-174Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
83Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 33 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 83
Total short
Total medium
83
0
Leeds SHLAA 2018 Update
SHLAA Ref: 1365A
Swithens Lane, Rothwell, Leeds LS26 0BS Outer South
SAP Ref: HG2-183
Greenfield site to the south of Rothwell. The site is connected to residential area to the north and east. Good access.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-183 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Landowner confirmed availability through representation(s) made to Site Allocations Plan consultation
Achievability: Short (=<5yrs)Site located in medium market with no impediments to delivery in the short-term.
HG2-183Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
85Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 36
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 136
Total short
Total medium
136
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2000
Marsh Lane Goods Yard City Centre
SAP Ref: AV18
Large city centre site to the east of Marsh Lane, south of York Road, west of Upper Accommodation Road and north of the Leeds-York railway line. The majority of the site comprises of the former Marsh La Goods Yard, which has been cleared. A number of occupied business and storage premises face onto York Road and Upper Accommodation Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV18 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Front part of the site is vacant and has been marketed. The rear of the site is occupied by temporary rail uses but the landowner has indcated an interest in bringing the site forward for development. Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Front part of the site is vacant and has been marketed. The rear of the site is occupied by temporary rail uses but the landowner has indicated an interest in bringing the site forward for development. Landowner confirmed availability through contact with LCC’s Housing Growth Team post-June 2015 as part of Private Sector Housing Acceleration Scheme. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term. Landowner and developer Rushbond confirmed as part of the 2017 SHLAA consultation that the capacity of the site is to increase to 750 units maximise the potential of the site and would total 1,000 with the adjacent site owned by Network Rail. Rushbond also confirmed that they will pursue the site through the PiP mechanism alongside an informed outline application early in the new year with delivery in the short-term. The site capacity will be set at 750 units in the 2018 SHLAA as agreed with the landowner following discussions with the Council’s Asset Management and Regeneration Service to bring the site forward in partnership with Rushbond, LCC, HCA, MHCLG and Network Rail. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Site is allocated as part of the AVLAAP adopted November 2017 under AV18.
AV18Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
289Site Allocations Plan capacity
Leeds SHLAA 2018 Update
SHLAA Ref: 2000
Marsh Lane Goods Yard City Centre
SAP Ref: AV18
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 200 350 200
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 750
Total short
Total medium
750
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2001
St Peters Square City Centre
SAP Ref: MX2-22
Cleared site within St Peters Sq block facing onto York Street. This is the remaining part of the block which remains to be refurbished or redeveloped.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-22 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)Dependent on revival of the city centre housing market. Proximity of the St Anne's resource centre for the homeless on the opposite side of York Street project may be a disincentive. Discussions with landowner who wishes to ressurect expired permission (via Private Sector Acceleration programme). Recent pre-application activity under PREAPP/17/00132 for 8 storey residential building with first floor offices and ground floor cafe/bar.
MX2-22Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
49Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 49 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 49
Total short
Total medium
49
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2004
Leeds College Of Building City Centre
SAP Ref: MX2-17
Purpose built educational building from circa 1970 in the northern quarter of the city centre. Most of the site is covered by building with a small amount of car parking and landscaping. Fronts North Street with Byron St to the side and Leylands Road to the rear. Adjoins the flats recently built on Concord St.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-17 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The college has recently been seeking relocation through pre-application enquiries. Funding from the Learning & Skills Council currently being sought. A number of sites to the east and south east of the city centre have been identified for the re-location. Site identified in Hunslet and will relocate this year. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)Release of the building expected within the next 5 years. The speed and nature of development depends on the future market. The location would be attractive for residential development forming part of the "Northern Quarter" where residential uses are firmly established.
MX2-17Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
180Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 50 30 0
0
Dwellings - current figures
Remaining capacity 180
Total short
Total medium
0
180
Leeds SHLAA 2018 Update
SHLAA Ref: 2006A
Caspar, North Street Leeds City Centre
SAP Ref: HG1-512
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07289/FU and is under construction as at 1 April 2017.
Site is under construction as at 31st March 2017.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2017.
HG1-512Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
51Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
45 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 45
Total short
Total medium
45
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2006B
Centenary House, North Street Leeds City Centre
SAP Ref: HG2-189
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 22/11/2017 and has current approval under 17/01230/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/01230/FU by Avenue A Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is allocated for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-189Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
85Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
85 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 85
Total short
Total medium
85
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2009
Carlsberg Uk Ltd Brewery, Black Bull Street
SAP Ref:
Brownfield city centre site formerley used for industrial processes for Carlsberg UK LTD . Site within area of the Aire Valley Action Plan. Note that 825 capacity includes sites: 2009, 2010 and 2011.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 within the Regeneration Priority Programme Area of Aire Valley in Spatial Policies 4 & 5 and contributes to the planned distribution of housing land in Spatial Policy 7. Part of the site is located in Flood Zones 2 & 3 and therefore a flood risk sequential and exception test has been undertaken.
Most of site is vacant with some temporary uses. Site has recently been acquired by Vastint site owners who are progressing proposals for a major mixed use development on the site including residential uses. Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Site has recently been acquired by Vastint site owners who are progressing proposals for a major mixed use development on the site including residential uses. Landowner confirmed availability through contact with LCC’s Housing Growth Team post-June 2015 as part of Private Sector Housing Acceleration Scheme. The site is part of the wider South Bank Regeneration Framework supported by an emerging masterplan in Supplementary Planning Document. Active developer interest in bringing the site forward for development in the short term. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Recent pre-application activity under PREAPP/16/00453 for Mixed use development consisting of residential, office, hotel, retail, institutional, ancillary uses and park. Pending application under 17/02501/OT in May 2018 for ‘Outline application (all matters reserved except for access) for a phased mixed use development comprising demolition of existing buildings, up to 850 residential units (C3), business uses (B1), flexible commercial uses (A1, A2, A3, A4, A5, B1, D1, D2), hotel use (C1), public realm including a City Park and vehicular access’. The scheme has been approved in principle by City Plans Panel subject to the removal of the Highways England holding direction. Detailed highways modelling is underway, anticipated this will be complete by June and the permission can then be granted. Vastint state that phase 1 RM will be submitted later this year with start on site early 2019, with a rolling delivery of phases after that. Site is allocated as part of the AVLAAP adopted November 2017 under AV94.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
Leeds SHLAA 2018 Update
SHLAA Ref: 2009
Carlsberg Uk Ltd Brewery, Black Bull Street
SAP Ref:
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 150 200 200
200 200 200 200 190
0
Dwellings - current figures
Remaining capacity 1540
Total short
Total medium
550
990
Leeds SHLAA 2018 Update
SHLAA Ref: 2010
Hindle Valve / New Lane
SAP Ref:
Large site in the south of the city centre surrounded by major highways. New Lane bisects the site dividing it into two parcels of land. The site north of New Lane is in industrial use with Hindle Valve operating there. The southern part of the site is in use as offices.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed-use allocation in AVLAAP as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 within the Regeneration Priority Programme Area of Aire Valley in Spatial Policies 4 & 5 and contributes to the planned distribution of housing land in Spatial Policy 7. The site is in Flood Zone 3 and therefore a flood risk sequential and exception test has been undertaken.
Both parts of the site in active use. Most of site was included within the HS2 station area shown in the Government's consultation document (January 2013). There is uncertainty over the availability of the land until the HS2 proposals are finalised.
Achievability: Medium (6-10yrs)The site is part of the wider South Bank regeneration programme supported by an emerging masterplan. The prospect of housing development on this site will depend on the finalisation of the HS2 proposals.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
95 0 0 0 0
0
Dwellings - current figures
Remaining capacity 95
Total short
Total medium
0
95
Leeds SHLAA 2018 Update
SHLAA Ref: 2018
Silver Street/ Midland Mills North City Centre
SAP Ref: HG2-194
Triangular site demarcated by the disused railway viaduct to the east, Water Lane to the west and Midland Mills to the south. Occupied by van hire business with a small office building and surface level parking for the hire vehicles.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-194 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Land currently in use as car hire business, but development interest being pursued by landowner in association with Midland Mills itself. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)Pre-application planning interest being expressed by landowners for residential development involving a new build tower, in association with conversion of Midland Mills (MX1-16)
HG2-194Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
86Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 80 0 0 0
0
Dwellings - current figures
Remaining capacity 180
Total short
Total medium
0
180
Leeds SHLAA 2018 Update
SHLAA Ref: 2019
Silver Street/ Midland Mills South City Centre
SAP Ref: HG2-195
Triangular elliptical site demarcated by the disused railway viaduct to the east, the Leeds to Castleford railway line to the west and Midland Mills to the north. Cleared site currently used for commuter car parking. Electrical sub-station to the southern tip of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-195 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is cleared & temporarily used for car parking. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Medium (6-10yrs)Part of a number of sites likely to be more attractive to developers given renaissance of city centre in the economic upturn. Development interest in Midland Mills itself and the land to the north could stimulate interest in this site.
HG2-195Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
179Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 179 0 0 0
0
Dwellings - current figures
Remaining capacity 279
Total short
Total medium
0
279
Leeds SHLAA 2018 Update
SHLAA Ref: 2021
Water Inn Car Park City Centre
SAP Ref: MX2-36
Thin triangular site at the apex of the junction of Globe Road and Water Lane currently used as a surface level car park.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-36 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner is pursuing pre-application enquiries relating to wider land holdings north of Water Lane, including this site.
Achievability: Short (=<5yrs)Interest is focussed on the Holbeck South Bank area has been boosted by commitment to build the HS2 station as a stimulus to economic growth of the area. The landowner is in active dialogue with LCC about development on this and other sites in its ownership. Landowner is pursuing pre-application enquiries relating to wider land holdings north of Water Lane, including this site. Interest is focussed on the Holbeck South Bank area has been boosted by commitment to build the HS2 station as a stimulus to economic growth of the area. The landowner is in active dialogue with LCC about development on this and other sites in its ownership. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG.
MX2-36Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
30Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2022
Clarence Road and Carlisle Road City Centre
SAP Ref: AV12
Storage building with car park to the south of Clarence Dock. Site bounded by Armouries Way to the north, Clarence Road to the east and Carlisle Road to the south. The site wraps around car workshop SHLAA site 215.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV12 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is partly vacant and partly in active use with multiple landowners. The Council owns part of the site and that land is available. Other Landowner has also been approached post-November 2016 to confirm availability The landowners Andrew Plumb and Darn it Limited have confirmed that the site remains available for residential development.
Achievability: Medium (6-10yrs)Deliverable prospect is for the site to be brought forward as part of a more comprehensive scheme alongside neighbouring sites.
AV12Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
114Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 14 0 0
0
Dwellings - current figures
Remaining capacity 114
Total short
Total medium
0
114
Leeds SHLAA 2018 Update
SHLAA Ref: 2023
Yorkshire Evening Post City Centre
SAP Ref: MX1-24
Yorkshire Evening Post site on Wellington Road, bordering river to south. Flat site in active use.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 01/04/2015 and has current approval under 14/05976/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/05976/OT by Yp Real Estate Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Reserved Matters agreed in principle for Phase 1. HBF consultation states longer term potential for more dwellings (500 approx) to be recorded in future update.
MX1-24Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
204Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 100 104 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 204
Total short
Total medium
204
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2026
Rspca, Cavendish St Inner Area
SAP Ref: HG1-244
Former RSPCA site, now cleared and vacant. Flat site surrounded by roads on 3 sides. Mixed use area on edge of city centre adjacent student housing, restaurant and commercial uses.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 06/02/2015 and has current approval under 14/03023/EXT.
Site has planning permission under 14/03023/EXT by Magro Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and largely complete. The site will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation upon occupation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-244Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
70Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
70 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 70
Total short
Total medium
70
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2027
Rear Of Round House Inner Area
SAP Ref: HG2-113
Large elongated site part used as a car park but recently cleared half of it. Part is used for contract parking & part for the storage of vehicles used in connection with the van hire business which occupies the Roundhouse. To the north lies the Half Roundhouse and associated car park and pocket park, the canal and City Island flats. To the south lies the disused railway viaduct and tree covered area that forms part of SHLAA site 447.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-113 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The Council has written to the landowner to confirm land available for housing/mixed use development when the city centre residential market strengthens and as the westward redevelopment of the city centre progresses.
Achievability: Short (=<5yrs)Land available for housing/mixed use development when the city centre residential market strengthens and as the westward redevelopment of the city centre progresses. This site has attractions of the canal, the pocket park and trees alongside the railway line to the south. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Allocated site in SAP under HG2-113.
HG2-113Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
310Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
0 75 85 0 0
0
Dwellings - current figures
Remaining capacity 160
Total short
Total medium
0
160
Leeds SHLAA 2018 Update
SHLAA Ref: 2027
Rear Of Round House Inner Area
SAP Ref: HG2-113
Leeds SHLAA 2018 Update
SHLAA Ref: 2028A
Great George Street - LGI City Centre
SAP Ref: MX2-15
Older historic wings of the Leeds General Infirmary facing Great George Street, Portland Street and Calverley Street
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-15 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Representation received during SAP consultation confirming willing landowner (Peacock and Smith on behalf of Leeds Teaching Hospitals).
Achievability: Medium (6-10yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term. Need for further detailed masterplanning.
MX2-15Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
372Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 100 100 79 0
0
Dwellings - current figures
Remaining capacity 329
Total short
Total medium
0
329
Leeds SHLAA 2018 Update
SHLAA Ref: 2029
Leeds Metropolitan University City Centre
SAP Ref: HG1-436
The site formed the main teaching campus for Leeds Metropolitan University. It is diamond shaped bounded by Calverley St and Portland Way to the south and Woodhouse La and the Inner Ring Road to the north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/04584/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-436Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
145Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2031
Water Lane Railway Triangle City Centre
SAP Ref: MX2-30
Triangle of land formed by railway lines to the south west of Leeds train station with road access from Water Lane. Forms part of the Holbeck Urban Village strategic housing site (ref H3.1A.44)
General Attributes
Site Description:
Suitability: Suitable
Availability: Medium (6-10yrs)
Site proposed as mixed use allocation in SAP under MX2-30 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site owned by Network Rail cleared and unused. Development interest will be stimulated by the spread of development westwards through the Holbeck Urban Village area.
Achievability: Short (=<5yrs)Site progressing from medium term in 2017 SHLAA to short term in the five year supply period commencing 1 April 2018. Promoted as mixed use allocation under MX2.30 in SAP for delivery in plan period. Landowner contacted to confirm post-November 2016. Site owned by Network Rail cleared and unused. Development interest will be stimulated by the spread of development westwards through the Holbeck Urban Village area. The site is part of the wider South Bank Regeneration Framework supported by an emerging masterplan in Supplementary Planning Document. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes.
MX2-30Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
171Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 71 0 0
0
Dwellings - current figures
Remaining capacity 171
Total short
Total medium
0
171
Leeds SHLAA 2018 Update
SHLAA Ref: 2031
Water Lane Railway Triangle City Centre
SAP Ref: MX2-30
Leeds SHLAA 2018 Update
SHLAA Ref: 2036
Rod Mills Lane, High Street, Morley Outer South West
SAP Ref: HG2-156
Brownfield site located to the south of Fountain Street, east of Rod Mills Lane and west of High Street, within the boundary of Morley Town Centre.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-156 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Some of the site is currently in use. SHLAA 2018 consultation correspondence from landowner confirms site is available for housing/mixed use development.
Achievability: Short (=<5yrs)Located within a low to medium housing market sector. Previous housing development on site. SHLAA 2018 consultation correspondence from landowner confirms site is available for housing/mixed use development.
HG2-156Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2039
Thorpe Park, Undeveloped Non-submitted Land East Leeds
SAP Ref: MX1-25
This is the remaining part of the Employment Allocation (E4:6) which has not yet been developed with employment uses and excludes the land submitted by the landowner which is considered separately in SHLAA site 1234. Located north of Junction 46 of the M1.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 26/01/2018 and has current approval under 17/03974/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/03974/RM by Thorpe Park Developments Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
MX1-25Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
300Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 50 75
75 75 0 0 0
0
Dwellings - current figures
Remaining capacity 300
Total short
Total medium
150
150
Leeds SHLAA 2018 Update
SHLAA Ref: 2049
West Park Centre, LS16 North Leeds
SAP Ref: HG2-236
Former West Park Centre off Spen Lane, West Park. Brownfield site within residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 13/02/2018 and has current approval under 17/06427/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/06427/FU by Space Homes and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Medium to high market area.
HG2-236Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
69Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 69 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 69
Total short
Total medium
69
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2053B
Alwoodley Lane, Alwoodley LS17 North Leeds
SAP Ref: HG2-36
Greenfield agricultural site in the Greenbelt North of Alwoodley/Alwoodley Lane, Sand Moor Golf Club to the West and Eccup Reservoir North.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-36 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site owned and submitted by LCC. No known issues.
Achievability: Short (=<5yrs)High market area
HG2-36Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
285Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 75 100 100
10 0 0 0 0
0
Dwellings - current figures
Remaining capacity 285
Total short
Total medium
275
10
Leeds SHLAA 2018 Update
SHLAA Ref: 2055
Carr Manor, Meanwood, LS6 North Leeds
SAP Ref: HG2-51
Large residence in substantial grounds between Stonegate Road and Carr Manor Crescent. N1A allotments at North of the site, and residence is a listed building.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-51 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
No ownership issues, site submitted by Leeds City Council. Dependent on accommodating existing function within any proposal following consultation with current user.
Achievability: Medium (6-10yrs)High to medium market area would be likely to prove very popular as a sensitively designed scheme
HG2-51Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
15 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
0
15
Leeds SHLAA 2018 Update
SHLAA Ref: 2062
Red Hall Offices & Playing Field, LS17 East Leeds
SAP Ref: HG2-119
Large site to the west of Wetherby Road on the fringe of urban Leeds. Includes a hall currently in use as offices and extensive playing fields. These parts are currently allocated as an employment site E4 11 in the UDP. The northern part of the site includes a Council depot. Industrial premises are located to the east of the site. To the west is the Red Hall Nurseries which form part of the East Leeds Extension Housing allocation and separate SHLAA site reference 797. To the south is a rectangle of agricultural land allocated as a Phase II housing site in the UDP (reg 795).
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-119 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site predominantly owned by Leeds City Council who are interested in development.
Achievability: Short (=<5yrs)Located within a High market sector and would be an attractive prospect for developers.
HG2-119Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
50
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2078
Land To The South Of Gelderd Road, Wortley, LS12 Outer South West
SAP Ref: BL1-23
The site comprises of an area of grazing land within the Green Belt to the west of Lower Wortley to the north west of the A62.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
The site is available for development.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-23Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
315Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 100 100 15 0
0
Dwellings - current figures
Remaining capacity 315
Total short
Total medium
0
315
Leeds SHLAA 2018 Update
SHLAA Ref: 2080
Copperfields College, Cross Green, LS9 East Leeds
SAP Ref: AV38
The site consists of the former Copperfields college buildings and playing fields with a small area of allotments along the north east edge of the site. It is located in the Aire Valley regeneration area immediately to the east of Cross Green housing area and to the west of the Cross Green industrial estate. The newly opened East Leeds Link Road forms the southern and eastern boundary of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV38 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Part of site available immediately but some of the playing pitches are in use by East Leeds RLFC and replacement provision would need to be made in the local area.
Achievability: Short (=<5yrs)The former Copperfields College site. Following closure of the school the site was used as an education facility and has now been cleared and vacant. The former school site is flanked by two areas of green space, including an area of disused allotments. East Leeds ARFLC has a pitch on this part of the site which is to be retained as green space. An alternative site has been identified off Halton Moor Road to provide replacement pitches with changing facilities that are not available at Copperfields. Lower market area but it is now a high profile site following construction of the East Leeds Link Road and is located in the Aire Valley regeneration area. A range of family homes will be built alongside new green space, outdoor sports facilities, allotments and a food store. The new development will feel part of a revitalised Cross Green area with improvements to homes, streets and spaces. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Site is allocated as part of the AVLAAP adopted November 2017 under AV38.
AV38Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
273Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
73 100 100 0 0
0
Dwellings - current figures
Remaining capacity 273
Total short
Total medium
0
273
Leeds SHLAA 2018 Update
SHLAA Ref: 2080
Copperfields College, Cross Green, LS9 East Leeds
SAP Ref: AV38
Leeds SHLAA 2018 Update
SHLAA Ref: 2086
Barrowby Lane, Manston, LS15 East Leeds
SAP Ref: MX2-38
Triangular site of agricultural fields bounded by railway to the northeast and M1 to the southeast, Thorpe Park site to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-38 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is Council owned and is willing to dispose.
Achievability: Short (=<5yrs)Greenfield site with slight gradients. Connection to MLLR required. Land required to be released from Green Belt through SAP process.
MX2-38Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
150Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 50
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 150
Total short
Total medium
150
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2090A
Colton Road East, Colton LS15 East Leeds
SAP Ref: HG2-123
Fields with some scrub cover and lines of trees along some of the field boundaries. No distinct boundary to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-123 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations.Site owned by the Council.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term, other than SAP phasing.
HG2-123Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 14 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2098A_C
Sissons Farm, Middleton, LS10 Outer South West
SAP Ref: HG2-159
Agricultural land between the railway line and Middleton containing some forest within the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-159 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-159Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
222Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 75 75
22 0 0 0 0
0
Dwellings - current figures
Remaining capacity 222
Total short
Total medium
200
22
Leeds SHLAA 2018 Update
SHLAA Ref: 2100A
Throstle Lane Playing Fields, Middleton LS10 Outer South West
SAP Ref: HG1-368
The site is a large open space of grassed land crossed by paths. Housing surrounds the site on all sides. 2 pitches on site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.18 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Yes. LCC owned. Members agreed housing in principle subject to playing pitches.
Achievability: Short (=<5yrs)LCC owned available for development. Part of Council’s Housing Investment Land Strategy. LCC Executive Manager for Regeneration confirmed to Housing Growth Board that the site is being prepared for sale with the intention of being marketed for sale in early 2018. Scheme assessed as achievable and able to commence in the short term. Agreement has been reached regarding reconfiguration of greenspace at this site. Opportunity to incorporate an Extra Care alongside a Market/Affordable Housing development and green space provision. Identified site in the SAP under HG1-368.
HG1-368Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
140Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 40 0 0
0
Dwellings - current figures
Remaining capacity 140
Total short
Total medium
0
140
Leeds SHLAA 2018 Update
SHLAA Ref: 2120
Hill Foot Farm, Pudsey Outer West
SAP Ref: HG2-66
Greenfield PAS site located to the west of Galloway Lane
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 18/01/2018 and has current approval under 16/06514/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/06514/FU by Berkeley Deveer and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Greenfield site in a low-medium market area within existing urban area and good access to existing amenities and public transport.
HG2-66Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
60Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 26 26 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 52
Total short
Total medium
52
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2121
Calverley Lane, Farsley Outer West
SAP Ref: HG1-133
Triangular area of grazing/scrub land on the western edge of the Leeds main urban area in Farsley. The ring road bounds the site to the north west and residential properties and open space lie to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/01649/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-133Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
47Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2123
Low Moor Side, New Farnley
SAP Ref:
Agricultural land and farm buildings on the western edge of New Farnley. The site is bounded by Low Moor Side Lane to the west and residential priorities to the north, east and south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/02/2018 and has current approval under 16/05912/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/05912/OT by and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Low to medium market area.
HG3-17Site Allocations Plan ref:
Safeguarded land (PAS)Site Allocations Plan status
Site Allocations Plan
130Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 40 40
20 0 0 0 0
0
Dwellings - current figures
Remaining capacity 130
Total short
Total medium
110
20
Leeds SHLAA 2018 Update
SHLAA Ref: 2124_3003
Spring Gardens Drighlington Outer South West
SAP Ref: HG2-143
Protected Area of Search site that lies to the east of Whitehall Road, north of the main settlement of Drighlington.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/03/2018 and has current approval under 16/07987/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07987/OT by Johnson Mowat and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Greenfield site located in a low-medium housing market. Site likely to be developed through appropriate phasing.
HG2-143Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
250Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 100 100 8
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 208
Total short
Total medium
208
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2129A
Mickletown Road Methley Outer South
SAP Ref: HG1-412
Buildings on edge of larger PAS site. 2129B.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 13/01473/FU and is an Identified site in SAP. Permission for previous scheme expired on 17/01/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr Andrew Pritchard on 17/01/2014. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-412Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 6 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 6
Total short
Total medium
6
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2129B
Mickletown Road Methley Outer South
SAP Ref: HG1-413
Agricultural field. Canal and lakes to north, listed dwelling (s) directly adjacent to northwest, railway to west with housing beyond, housing to south, and scrubland and scattered dwellings to east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/04604/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-413Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
220Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
50 31 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 81
Total short
Total medium
81
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2130
Church Lane Adel Outer North West
SAP Ref: HG2-18
The site is located between Otley Road (A660) to the west and Church Lane to the east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 20/11/2017 and has current approval under 16/06222/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/06222/OT by Hallam Land Management Ltd and Barrett David Wilson Homes and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Predominantly greenfield site in a high-medium market area. Good access to public transport and existing amenities. Planning permission (16/06222/OT) granted for up to 100 units and land reserved for primary school.
HG2-18Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
87Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 35 35 30
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 100
Total short
Total medium
100
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2131
Moorgate Kippax
SAP Ref:
PAS site located to the north-eastern boundary of existing settlement of Kippax.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/03846/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG3-19Site Allocations Plan ref:
Safeguarded land (PAS)Site Allocations Plan status
Site Allocations Plan
166Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
47 50 50 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 147
Total short
Total medium
147
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2135
Leeds Road Collingham
SAP Ref:
PAS site located to the North of Leeds Road, Collingham. Existing residential areas lie to the immediate north and east of the site. Green Belt land to the immediate west and to the south of Leeds Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 22/12/2016 and has current approval under 14/00315/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/00315/OT by ID Planning and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
HG3-8Site Allocations Plan ref:
Safeguarded land (PAS)Site Allocations Plan status
Site Allocations Plan
100Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 50
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 150
Total short
Total medium
150
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2138
Abbey Street, Kirkstall Road Inner Area
SAP Ref: HG1-245
In retail use - single storey wooden floor sales and door sales. Flat site bounded by roads on 3 sides, frontage to main A65. In mixed use area on edge of city centre - commercial and industrial, including casino, and student housing surrounding.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 04/11/2016 and has current approval under 15/05030/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/05030/RM by ATC Properties Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-245Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 107 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 107
Total short
Total medium
107
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2141A
Wykebeck Avenue, Osmondthorpe Inner Area
SAP Ref: HG1-257
Cleared former school site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 27/07/2017 and has current approval under 16/07348/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07348/FU by Keepmoat Homes Limited and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-257Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
55Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 25 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 55
Total short
Total medium
55
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2141B
Wykebeck Avenue, Osmondthorpe Inner Area
SAP Ref: HG2-105
Larger green area (with some amenity value) adjacent to train tracks. To south of the site is some brownfield land that is currently fenced off. An area across the road is an identified housing site that is also brownfield line.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-105 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
LCC owned.
Achievability: Short (=<5yrs)Part of HILS Brownfield Land programme. Recent pre-application activity under PREAPP/16/00326 for Residential development of 108 units. No impediment to delivery in the short-term.
HG2-105Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
52Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 27 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 52
Total short
Total medium
52
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2142
Kendall Drive, Halton Moor Inner Area
SAP Ref: HG2-106
This cleared housing site is located in Halton Moor housing estate situated to the northwest of Greystone Mount and to the west of Kendall Drive.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-106 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Cleared site ready for development
Achievability: Short (=<5yrs)Low to medium market area. Part of LCC HILS brownfield land programme. Recent pre-application activity under PREAPP/16/00324 for Residential development of 112 units.
HG2-106Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2143
Neville Road, Halton Moor Inner Area
SAP Ref: HG2-107
This site is located in Halton Moor, and is an area that was previously residential and has been cleared. The site was formerly bisected by Neville Road and Ingleton Drive.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 27/07/2017 and has current approval under 16/07340/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07340/FU by Keepmoat Homes Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Low to medium market area. Part of LCC HILS brownfield land programme. Currently LCC preparing development framework for a number of sites in Halton Moor and Osmondthorpe including this site.
HG2-107Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
83Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 43 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 83
Total short
Total medium
83
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2144A
Cartmell Drive, Halton Moor East Leeds, Inner Area
SAP Ref: HG1-303
The site is located in Halton Moor to the west of Cartmell Drive. The siteis a cleared area of flats.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 09/06/2017 and has current approval under 16/07359/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07359/FU by Keepmoat Homes Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-303Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
62Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 20 20 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 40
Total short
Total medium
40
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2144B
Cartmell Drive, Halton Moor East Leeds
SAP Ref: HG2-122
Grassed open space with some tree cover as part of Wykebeck Valley, flat site sloping down to the beck on the western boundary. Bounded by tree belts apart from to the north, with residential also to the east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-122 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Council owned site that is not programmed for short-term disposal, given the number of other Council owned sites recently sold for residential uses in the area, for fear of saturation. Site will be sold for residential development but most likely in the medium term.
Achievability: Short (=<5yrs)Potential for contamination (previously a glass tip) on site may affect deliverability. General market interest likely to be stimulated by neighbouring site coming forward in the ST and other regeneration activity across East Leeds.
HG2-122Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
170Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 50 50
50 20 0 0 0
0
Dwellings - current figures
Remaining capacity 170
Total short
Total medium
100
70
Leeds SHLAA 2018 Update
SHLAA Ref: 2146
Barncroft Close, Seacroft Inner Area
SAP Ref: HG2-90
The site is located in Seacroft situated north west of Grange Farm Primary School and is to the east of the A58.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-90 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is cleared and vacant.
Achievability: Short (=<5yrs)Low-medium housing market area which is strengthening. LCC HILS Brownfield land programme.
HG2-90Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
27Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 27 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 27
Total short
Total medium
27
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2147A
Askets and Boggarts (A), Seacroft Inner Area
SAP Ref: HG1-210
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/01254/LA and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-210Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
22Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
19 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 19
Total short
Total medium
19
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2147B
Askets and Boggarts (B), Seacroft Inner Area
SAP Ref: HG2-91
Site is green area in middle of large resiedential area. Surrounded on all sides by resiential uses.It is part of the HILS (Housing Investment Land Strategy) which is a partnership project between the Council and Housebuilders.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-91 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
LCC owned.
Achievability: Short (=<5yrs)Site is part of the HILS (Housing Investment Land Strategy) which is a partnership project between the Council and Housebuilders. Permission granted. Start on Site predicted for September 2017 with delivery of first houses in 2018.
HG2-91Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
150Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 100
Total short
Total medium
100
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2147C
Askets and Boggarts (C), Seacroft Inner Area
SAP Ref: HG1-211
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/00903/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-211Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
106Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 36 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 43
Total short
Total medium
43
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2147D
Askets and Boggarts (D), Seacroft Inner Area
SAP Ref: HG2-92
A large green area in surrounded predominantly by residential. The site is sloping. Currently a path bisects the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-92 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
LCC owned.
Achievability: Short (=<5yrs)Site is part of the HILS (Housing Investment Land Strategy) which is a partnership project between the Council and Housebuilders. Permission granted. Start on Site predicted for April 2020 with delivery of first houses in January 2021.
HG2-92Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
88Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 100
Total short
Total medium
100
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2150A
South Parkway and Brooklands, Seacroft Inner Area
SAP Ref: HG2-95
Cleared brownfield land surrounded by residential and other cleared areas. Land appears to have no current amenity value.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-95 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
LCC owned
Achievability: Short (=<5yrs)Part of LCC HILS briownfield land programme. This site part of a larger permission given - 16/07381. First houses indicatively scheduled for April 2022.
HG2-95Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
68Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 25 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
50
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2150B
South Parkway / Brooklands Avenue Inner Area
SAP Ref: HG1-226
Cleared brownfield land surrounded by residential and other cleared areas. Land appears to have no current amenity value.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/07442/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-226Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
160Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 50 50 50 10
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 160
Total short
Total medium
160
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2150C
South Parkway and Brooklands, Seacroft Inner Area
SAP Ref: HG2-96
Cleared brownfield land surrounded by residential and other cleared areas. Land appears to have no current amenity value.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-96 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)Part of LCC Brownfield land programme. Site currently out to tender with indicative capacity worked up.
HG2-96Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
65Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2150D
South Parkway and Brooklands, Seacroft Inner Area
SAP Ref: HG1-225
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/04368/LA and is an Identified site in SAP. Permission for previous scheme expired on 14/12/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Leeds City Council on 14/12/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-225Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
45Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 30 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 2154
Rear Of Seacroft Hospital East Leeds
SAP Ref: HG1-296
This phase 2 housing site is located to the rear of Seacroft Hospital. It is currently an area of vacant land. The western end of the site has access to the A64. The site has current planning permission.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07300/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-296Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
720Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 53 150 150 150
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 503
Total short
Total medium
503
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3000_3064
Street Lane, Gildersome Outer South West
SAP Ref: BL1-25
Green Belt site. The site is relatively small and adjoining residential development to the east and south, with a cricket ground to the north, so is relatively well contained and would have relatively limited impact on the Green Belt. A comprehensive development along with site 3064 could be considered.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Spawforths on behalf of JW Crowther & Son Ltd).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-25Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
393Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 100 100 93 0
0
Dwellings - current figures
Remaining capacity 393
Total short
Total medium
0
393
Leeds SHLAA 2018 Update
SHLAA Ref: 3010A
Land south east of Holt Park Leisure Centre, Holt Park, Leeds North Leeds
SAP Ref: HG1-59
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02227/LA and is an Identified site in SAP. Permission for previous scheme expired on 10/08/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Leeds City Council on 10/08/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-59Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
52Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 26 26 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 52
Total short
Total medium
52
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3010B
Land south east of Holt Park Leisure Centre, Holt Park, Leeds North Leeds
SAP Ref: HG2-33
Greenfield site off Farrar Lane, Holt Park. The site is bounded by Ralph Thoresby School and Holt Park Active. The area is predominantly residential, with housing directly to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-33 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-33Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
28Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 24 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 24
Total short
Total medium
24
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3011_4044
Dick Lane, Thornbury, Bradford, BD3 Outer West
SAP Ref: HG2-69
Site of Dick Lane Garages and adjoining grass/scrub land sits between Dick Lane to the west and the railway line to the east has been joined with grassland to the north of this area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-69 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Large part of site not submitted by owner. Likely to be released with the prospect of housing development.
Achievability: Short (=<5yrs)Site is located within low market area.
HG2-69Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
206Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 75 106 25
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 206
Total short
Total medium
206
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3014
Area Within Kirkstall Hill, Beecroft Street, Commercial Road North Leeds
SAP Ref: MX2-4
Site overlooking busy junction between Kirkstall Lane, Kirkstall Hill, Beecroft Road and Commercial Road. Partly located within Kirkstall Town Centre. Site currently split over varied levels, though much of site has been vacated.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-4 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is substantially vacant and planning process would suggest site is available in short term.
Achievability: Short (=<5yrs)Low to medium market zone Recent pre-application activity under PREAPP/17/00430 for Mixed-use development incorporating residential use (434 units) and office, retail and leisure uses (2,750m²).
MX2-4Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
55Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 55 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 55
Total short
Total medium
55
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3015
Benyon House, Ring Road, Middleton, LS10 4AA Inner Area
SAP Ref: MX2-13
Large warehouse building situated adjacent to ring road at Middleton. Industrial units to south, residential sites on remaining sides
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-13 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Of the two supermarket planning proposals for Middleton centre, the application 09/01727/FU on this site was rejected in favour of the other better placed site. An earlier pre-application enquiry for residential development can now be reopened.
Achievability: Medium (6-10yrs)Low market area but well related to the local shops and services of Middleton
MX2-13Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
37Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
37 0 0 0 0
0
Dwellings - current figures
Remaining capacity 37
Total short
Total medium
0
37
Leeds SHLAA 2018 Update
SHLAA Ref: 3017
St Peters Church And House, Chantrell House, Leeds Parish Church, Kirkgate City Centre
SAP Ref: MX1-10
Site located in popular Calls area. Located to rear of the Palace pub next door to renovated Chantell House. Incorporates some former church buildings with distinctive character
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/00819/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th June 2016.
Achievability: Short (=<5yrs)Site is under construction as at 30th June 2016.
MX1-10Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
35Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
27 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 27
Total short
Total medium
27
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3018
4 St Peters Place, Leeds, LS9 8AQ City Centre
SAP Ref: HG1-458
Derelict former warehouse on corner of St Peters Square and York St, opposite railway viaduct running along York St. Old industrial area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/01371/EXT and is an Identified site in SAP. Permission for previous scheme expired on 17/02/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Opaltex Pension Fund - Mr A Srao on 14/12/2000. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-458Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 18 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3026
Land Between Mire Beck And Ings Lane Aireborough
SAP Ref: HG2-1
Large site predominantly located between Mire Beck (Moorland Crescent) and Lings Lane, and stretching north along and across railway line to Buckle Lane. Bounded by flood zone in North west. Green Belt site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-1 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Turley on behalf of Gallagher Estates Ltd).
Achievability: Short (=<5yrs)Given desirability of location and that the site will be on the edge of the Green Belt likely to be developed in stated time period. Localised flooding from beck so western part of site to have no built development. Has resulted in reduced site capacity.
HG2-1Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
160Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 50
10 0 0 0 0
0
Dwellings - current figures
Remaining capacity 160
Total short
Total medium
150
10
Leeds SHLAA 2018 Update
SHLAA Ref: 3029
Land South Of Wills Gill, Guiseley, LS20 9NG Aireborough
SAP Ref: HG2-2
Site to rear(north) of properties on Shaw Land Gardens. Within the site are several large residential properties off Wills Gill. Remainder of site is agricultural, with extensive agricultural land to north and east. Guiseley district centre is approx 1km from the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-2 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (WYG on behalf of Avant Homes). Correspondence from WYG during SHLAA consultation 2018 confirms that landowners are commited to delivery of the site.
Achievability: Short (=<5yrs)High to medium market area. Attractive edge of settlement site. Correspondence from WYG during SHLAA consultation 2018 states that delivery can start in 19-20 subject to the SAP being adopted.
HG2-2Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
133Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 38 40
40 0 0 0 0
0
Dwellings - current figures
Remaining capacity 133
Total short
Total medium
93
40
Leeds SHLAA 2018 Update
SHLAA Ref: 3060A
Gelderd Road/M621, Gildersome Outer South West
SAP Ref: BL1-27
Green Belt site. Current agricultural open use, the site is separated by Woodlands Hall that is located in between the two separate fields. Roads border the site along the west and north sides. To the south and west is a dense line of trees
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
SAP rep submitted by Taylor Wimpey Uk Ltd/Johnson Brook Ltd promoting site.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-27Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
203Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
100 103 0 0 0
0
Dwellings - current figures
Remaining capacity 203
Total short
Total medium
0
203
Leeds SHLAA 2018 Update
SHLAA Ref: 3088
Land East Of Shop Lane, Lofthouse, Wakefield, WF3 3pd Outer South
SAP Ref: BL1-33
Site overlapping Westgate Lane, with M62 at northern edge. To the east are residences on Westgate Lane and Westgate Close and west Shop Lane. To the south site covers land on either side of Westgate Lane, included some established residential areas and land to rear of these properties. Site largely farm land, with some tree cover in northern segment
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (ID Planning on behalf of John Duffy). Landowner correspondence received during the SHLAA consultation 2018 confirms site is still available for housing or a mixed use scheme.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-33Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
31 0 0 0 0
0
Dwellings - current figures
Remaining capacity 31
Total short
Total medium
0
31
Leeds SHLAA 2018 Update
SHLAA Ref: 3100B
Whitehouse Lane, Great Preston Outer South East
SAP Ref: BL1-37
Greenfield site in Great Preston. Connected to residential area to the south. Fields and countryside to the north.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of submission to SHLAA assessment in 2015.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-37Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
40Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
40 0 0 0 0
0
Dwellings - current figures
Remaining capacity 40
Total short
Total medium
0
40
Leeds SHLAA 2018 Update
SHLAA Ref: 3109C
Selby Road/Leeds Road, Kippax Outer South East
SAP Ref: BL1-39
Large site that has been split into three parts. This section is set to the north east of Kippax with one boundary linking to the settlement. Site has an agricultural use, fields surround a farm in the centre. Limited amount of trees on site, most line the boundary and the edges of fields but there is a small collection to the east of the farm up until the boundary of the site.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2015.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-39Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
40Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
40 0 0 0 0
0
Dwellings - current figures
Remaining capacity 40
Total short
Total medium
0
40
Leeds SHLAA 2018 Update
SHLAA Ref: 3121
Land At Rear Of 41 Tyersal Avenue, Tyersal, Bradford, Bd4 8hj Outer West
SAP Ref: HG2-70
Land lies to rear of 41 Tyersal Avenue and also abuts Tyersal Close/Mews. To the west and south of the site is long established residential housing. To the north of the site is a small amount of open land and beyond this the Leeds-Bradford railway line. To the east is an area of open land
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-70 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site brought forward by owner, therefore deemed to be available in short term. Landowner has confirmed post-November 2016 that the site remains available for a housing or mixed use allocation.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term. Recent pre-application activity under PREAPP/16/00051 for Erection of a three storey 30No. bed care home; 17No. affordable dwellings.
HG2-70Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
27Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 27 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 27
Total short
Total medium
27
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3137
Leeds Girls High School, Headingley, LS6 1bn Inner Area
SAP Ref: HG1-216
Site of Leeds Girls High School, within triangular site bounded by Headingley Lane to the north and Victoria Road to the south. Site lies within an established residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/00923/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-216Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
105Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
28 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3142
Malvern Rise, LS11 Inner Area
SAP Ref: HG1-271
Site of LCC social housing site on Malvern Grove and Malvern Rise, with some access from Malvern Road. Site is made up of a number of blocks, dominated two storey red brick terracing.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02952/EXT and is an Identified site in SAP. Permission for previous scheme expired on 07/09/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Leeds City Council on 15/12/2008. Site remains undeveloped and available
Achievability: Medium (6-10yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-271Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
60Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
0 0 0 30 30
0
Dwellings - current figures
Remaining capacity 60
Total short
Total medium
0
60
Leeds SHLAA 2018 Update
SHLAA Ref: 3143
Cambrian Street, LS11 Inner Area
SAP Ref: HG2-114
Grassed area of land to the rear of properties on Normanton Place, St Luke's Crescent and Cambrian Street. Site has some gentle undulations
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-114 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
LCC owned and available in the short term
Achievability: Short (=<5yrs)Site progressing from medium term in 2017 SHLAA to short term in the five year supply period commencing 1 April 2018. LCC owned site. Part of Private Sector Housing Acceleration Scheme. Available site in viable market area progressing as allocation in SAP under HG2-114.
HG2-114Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
37Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 21 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 21
Total short
Total medium
21
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3145
Bismarck Street, LS11 Inner Area
SAP Ref: HG1-275
Site of existing social housing either side of Bismarck Drive, on junction with Bismarck Street. Site is predominantly made up of two storey buildings, though the buildings fronting Bismarck Street are 3 storey. The southern part of the site is grassland. Bewerley Primary School is to the north of the site, with residential areas generally dominating surroundings
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 10/05220/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-275Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
70Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 10 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3147
Waverley Garth, LS11 Inner Area
SAP Ref: HG1-274
LCC housing units on Waverley Garth. Site is an L-shape of connected 3 storey blocks of 5 flats with some parking to the rear. To the north of the site is an existing housing estate with similar architecture to the site. The south has a green buffer to Coupland Street, with some tree coverage.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02955/EXT and is an Identified site in SAP. Permission for previous scheme expired on 08/09/2015. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Leeds City Council on 17/12/2008. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-274Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
55Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 20 10 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3152
Spen Common Lane, Bramham Outer North East
SAP Ref: HG1-53
Site of Headley Hall and associated farm buildings, including Leeds University research units. Site is made up of a number of varied units, and is surrounded by agricultural land on all sides, with a small number of residential dwellings to the west. Site largely isolated from development
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 14/00132/FU and is an Identified site in SAP. Permission for previous scheme expired on 06/03/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by The University Of Leeds on 24/02/2009. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-53Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 9 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3157
Woodhouse Square, Brandon Road, Woodhouse City Centre
SAP Ref: HG2-187
Cleared area adjacent to gardened Woodhouse Square. Site surrounded on all sides by residential properties. Slope runs from south to north
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 09/06/2017 and has current approval under 16/04778/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04778/FU by Private and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Existing planning permission in high to medium market area
HG2-187Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
72Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 72 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 72
Total short
Total medium
72
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3182
Rocheford Court, Pepper Lane, Hunslet, Leeds East Leeds
SAP Ref: AV112
Site of 1960s housing development, predominantly 2 storey units on the junction of Midland Road/Pepper Road and Pepper Lane. Some tree coverage to the front, but site is generally flat
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 17/06/2015 and has current approval under 14/05957/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/05957/FU by Unity Housing Association - Mr W Noteman and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
AV112Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
11Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
11 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 11
Total short
Total medium
11
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3184
The Former Dutton Arms, Queenswood Drive, Headingley, Leeds North Leeds
SAP Ref: HG1-113
Site has permission for 9 dwellings. Eight have been built. One outstanding.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/02701/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-113Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3187
Station Garage Henshaw Lane Yeadon Aireborough
SAP Ref: HG1-11
Site of The Station public house, with car park to the rear off Henshaw Lane. Site is within residential area. Site has a slight gradient rising from south to north. Land to the east rises sharply away from the site, to adjoining development.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/05349/FU and is an Identified site in SAP. Permission for previous scheme expired on 24/01/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by K M Norris Ltd on 24/01/2011. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-11Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 5 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3195
St Luke's Green LS11 Inner Area
SAP Ref: HG1-266
Site consists of 2 separate polygons located north and south of St Luke's Green, both fronting onto St Luke's Road. Sites currently have blocks of 3 storey residential dwellings on them, in keeping with the housing of the area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 10/05219/RM and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term.
HG1-266Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
19Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 17 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
17
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3196
Elder Road LS13 Outer West
SAP Ref: HG1-157
Site to the rear of Bramley Working Mens club including access to Elder Road. Part of the site is used as car park, while remainder of the site falls away to the south, and has some tree cover. Further south runs the railway line with Bramley Train station a short distance to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 08/05924/FU and is an Identified site in SAP. Permission for previous scheme expired on 06/03/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Urban Places Ltd on 07/11/2007. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-157Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
22Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 22 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3203
Lumby Lane, Pudsey Outer West
SAP Ref: HG1-200
Grassed site south of Lumby Lane, adjacent to now cleared properties on Walmer Grove.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 18/06/2015 and has current approval under 14/05829/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/05829/OT by The Estate Of Ms Elsie Smith and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-200Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 12 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3206
Din Buildings, Roundhay Road, LS8 3qd Inner Area
SAP Ref: HG1-222
Site formed of the Din Building (former Fforde Green public house), currently housing a ground floor supermarket on the busy intersection Harehills Lane and Roundhay Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 12/02962/FU and is an Identified site in SAP. Permission for previous scheme expired on 01/04/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Private on 01/04/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-222Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 8 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3207
Rear 268-274 Shadwell Lane LS17 North Leeds
SAP Ref: HG1-63
Site to rear of properties on Beechwood Hill and Shadwell Lane. South of the site is a protected area of greenspace (N1)
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 10/01560/EXT and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-63Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
3 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 3
Total short
Total medium
3
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3214
Batley Road West Ardsley Outer South West
SAP Ref: HG1-395
Area of scrubland between properties on Batley Road and Hill Top Green. A surfaced access road runs along the north western boundary of the site
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 10/05628/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-395Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
2 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 2
Total short
Total medium
2
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3216
Wakefield Road Drighlington Outer South West
SAP Ref: HG1-336
Site to the south of Wakefield Road, backing onto new properties on Moorside Vale. Site is currently surfaced and seems to be used as a temporary car park for local stores.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 23/346/99/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-336Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
5 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3301
128 Wetherby Road, Roundhay, Leeds, LS8 2jz North Leeds
SAP Ref: HG1-93
Existing residence with large garden south of Wetherby Road. Site is within existing residential area
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/00813/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-93Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3302
Old Road, Farsley, Pudsey, LS28 5dj Outer West
SAP Ref: HG1-149
Site of builders yard to rear of residential properties on Arthur Street and St Johns Avenue with access also available from these streets and New Street
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 03/03/2017 and has current approval under 16/04296/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04296/FU by Mr R Johnson & Mrs V Clow and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-149Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
10Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
10 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
0
10
Leeds SHLAA 2018 Update
SHLAA Ref: 3304
The Old Vic, 17 Whitecote Hill, Bramley, Leeds Outer West
SAP Ref: HG1-140
Former pub site set to rear of properties on Whitecote Hill. Includes former car park and grounds. Area is predominantly residential
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 15/06/2015 and has current approval under 14/04499/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/04499/OT by Mr Richard Jones and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-140Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 9 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3329_5145
Layton Lane, Rawdon, Leeds Aireborough
SAP Ref: BL1-10
Agricultural fields to the rear of properties on Layton Lane. The site is bounded to the east by a tree line, though there is limited tree coverage on the remainder of the site. Site slopes from north to south. Green belt site between existing properties on Layton Road to the west and Gill Beck which forms the eastern site boundary.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Landowner confirmed availability through representation(s) made to Site Allocations Plan consultation
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-10Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
130Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
130 0 0 0 0
0
Dwellings - current figures
Remaining capacity 130
Total short
Total medium
0
130
Leeds SHLAA 2018 Update
SHLAA Ref: 3331
Land At Knott Lane/layton Lane, Rawdon, Leeds, LS19 6jw Aireborough
SAP Ref: BL1-13
Land south of junction between Knott Lane and Layton Lane. North of Rawdon cemetery. Small cluster of residential properties adjacent to Knott Lane/Southlands Avenue. The remaining area open. Access from Knott Lane.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site submission indicates landowner interest in development
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-13Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
35Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
35 0 0 0 0
0
Dwellings - current figures
Remaining capacity 35
Total short
Total medium
0
35
Leeds SHLAA 2018 Update
SHLAA Ref: 3339
University Of Leeds 20 - 28 Hyde Terrace, Woodhouse, Leeds, LS2 9ln City Centre
SAP Ref: HG1-434
Site of former university administration buildings, in larger residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/04825/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-434Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
27Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3341
Rear Of The Hollies, Park Avenue, Roundhay, Leeds, LS8 2jj North Leeds
SAP Ref: HG1-91
Site in residential area within Roundhay. Accessed off Park Crescent
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/02881/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-91Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
5 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3345
Servia Road, Leeds, LS7 1nj Inner Area
SAP Ref: HG1-232
Former depot and associated buildings with access road to the west of Servia Road. Site borders student flats to the rear, while residential properties dominate eastern border
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 14/04315/FU and is an Identified site in SAP. Permission for previous scheme expired on 09/02/2018. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Phd1 Ltd & Betra Ltd on 16/03/2012. Site remains undeveloped and available
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and largely complete. The site will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation upon occupation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-232Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
72Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
72 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 72
Total short
Total medium
72
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3350
309 Leeds Road, Lofthouse, WF3 3qd Outer South West
SAP Ref: HG1-375
Established housing area off Leeds Road, between Lofthouse and Robin Hood. M1 to the west and M62 to the south, countryside to the east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/02655/FU and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-375Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3352
51 Westfield Lane, Kippax, Leeds, LS25 7ja Outer South East
SAP Ref: HG1-315
Site to the west of Kippax in an established housing area. Housing to the north and east, countryside to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning approval under 14/07316/FU and is an Identified site in SAP. Site is suitable for a new scheme to be brought forward.
Site previously planning approval by Shadwell Developments Ltd on 17/11/2011.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of future performance (post-2017/18).
HG1-315Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 6 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 6
Total short
Total medium
6
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3354
New Wortley Labour Club, Oak Road, New Wortley, Leeds, LS12 2hj Inner Area
SAP Ref: HG1-252
Housing estate in New Wortley, to the south east of Armley prison. Surrounding use is predominantly residential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 11/01362/OT and is an Identified site in SAP. Permission for previous scheme expired on 17/06/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr Reiller on 17/06/2011. Site remains undeveloped and available
Achievability: Medium (6-10yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-252Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
9 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
0
9
Leeds SHLAA 2018 Update
SHLAA Ref: 3366
White House Lane, Yeadon Aireborough
SAP Ref: HG2-9
Flat greenfield land adjoining residential to the southern part; greenspace area on the north side; Leeds Bradford Airport is located to the south east side and the runway lies adjacent to northern site boundary; Yeadon Tarn (Local Nature Area) is on the north west side.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-9 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (WYG on behalf of Leeds Bradford International Airport).
Achievability: Short (=<5yrs)Although the site is very close to the airport, because the area falls within a high to medium market area, housing development is still likely to be popular.
HG2-9Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
102Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 35 35 32
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 102
Total short
Total medium
102
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3373A
Haigh Wood, Ardsley Outer South West
SAP Ref: HG2-168
Poorly defined site with no road access incorporating some agricultural use and wooded area with existing residential development to the nort and west of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-168 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Landowner confirmed availability through representation(s) made to Site Allocations Plan consultation
Achievability: Short (=<5yrs)Site located in medium market with no impediments to delivery in the short-term.
HG2-168Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
108Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 8
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 108
Total short
Total medium
108
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3373C
Haigh Wood, Ardsley Outer South West
SAP Ref: HG2-169
The Site is relatively flat greenfield. Strip of protected Haigh Wood runs through to the west of the site. The site is surrounded by residential to the south and east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-169 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is available and the landowner wishes to develop the land. Representation received during SAP consultation confirming willing landowner (Walker Morris LLP on behalf of West Ardsley Consortium).
Achievability: Short (=<5yrs)The site lies within a low to medium housing market area.
HG2-169Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
262Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 100 100 62
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 262
Total short
Total medium
262
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3376
Weetwood Avenue, Leeds, LS16 5NQ North Leeds
SAP Ref: BL1-15
The site is flat with a significant number of treecover. Residential areas on the east, south and west.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Leeds Cricket Football And Athletic Company Ltd submitted application for Outline application for residential development up to 45 dwellings including access under 16/02583/OT. Planning application withdrawn 20.12.2016
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-15Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
30Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
30 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
0
30
Leeds SHLAA 2018 Update
SHLAA Ref: 3378
Finning (uk) Ltd, Gelderd Road, Gildersome, LS27 7JS Outer South West
SAP Ref: HG2-146
Brownfield site to the south of Gildersome, along Gelderd Road. The site falls within an industrial area with housing to the north. There is greenfield site immediately to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-146 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The submitter originally suggested permission will be obtained in 2012, clearance in 2013 and commencement in 2013. Interest is maintained as current buildings in empoyment use are in need of refurbishment and owners are keen to relocate. The landowner (Finning UK) has confirmed that the site remains available for residential development.
Achievability: Medium (6-10yrs)Site lies within a high to medium market sector. Finning UK (Caterpillar) are currently carrying out a valuation exercise and LCC are assisting in identifying potential alternative sites for the current uses to relocate. Strong desire to free land up for housing.
HG2-146Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
85Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 35 0 0 0
0
Dwellings - current figures
Remaining capacity 85
Total short
Total medium
0
85
Leeds SHLAA 2018 Update
SHLAA Ref: 3384
Land At Brownberrie Lane, Horsforth, LS18 5 North Leeds
SAP Ref: HG2-37
The site lies to the north of Horsforth along Brownberrie Lane, opposite Leeds Trinity University sports fields. The site is bordered by housing to the north and east, and farmland/greenfield to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-37 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is vacant and would be available immediately. Landowner has confirmed that the site remains available for residential development.
Achievability: Short (=<5yrs)Falls within a high market area, making housing achievable.
HG2-37Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 12 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3386
Site of Makro Supermarket on Royds Lane, Lower Wortley, Leeds Outer South West
SAP Ref: HG2-137
Site is located to the south east of Lower Wortley, along Royds Lane. Brownfield site in mixed use area. Resi to the west and north, industrial/commercial to the east and greenfield to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-137 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site owner has confirmed demolition/clearance could take place in the short term. Owner expectation for clearance and delivery upon vacant possession of the site.
Achievability: Medium (6-10yrs)Delay in clearance programme reflected in delivery commencing 20/21 rather than 18/19. Since the site is located within a high to medium market sector it is expected that housing would be achievable.
HG2-137Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
111Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 11 0 0
0
Dwellings - current figures
Remaining capacity 111
Total short
Total medium
0
111
Leeds SHLAA 2018 Update
SHLAA Ref: 3390_3393
Kirkstall Road, Leeds Inner Area
SAP Ref: MX2-9
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-9 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2016. Agent suggests potential to accommodate a greater amount of housing (approx. total 1,000 units) to be determined following outcome of SAP proposals.
Achievability: Short (=<5yrs)Site progressing from medium term in 2017 SHLAA to short term in the five year supply period commencing 1 April 2018. Correspondence with Quod as part of 2017 SHLAA on behalf Clyde Ltd to confirm delivery in short term period alongside adjacent site with planning permission. Landowner confirmed availability through contact with LCC’s Housing Growth Team post-June 2015 as part of Private Sector Housing Acceleration Scheme. Agent suggests potential to accommodate a greater amount of housing (approx. total 1,000 units) to be determined following outcome of SAP proposals. The city centre market is strengthened by the Private Rented Sector (PRS) in the home building industry with market conditions demonstrating potential for delivery of this site from 2022/23. Site to be allocated in SAP under MX2-9.
MX2-9Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
553Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 185
185 183 0 0 0
0
Dwellings - current figures
Remaining capacity 553
Total short
Total medium
185
368
Leeds SHLAA 2018 Update
SHLAA Ref: 3394
Sugar Mill, Oakhurst Avenue (just Off Dewsbury Road), Leeds, LS11 7DF Outer South West
SAP Ref: HG2-140
Industrial sites located in the heart of substantial residential area. Comprises a number of buildings.
General Attributes
Site Description:
Suitability: Suitable
Availability: Medium (6-10yrs)
Site proposed as housing allocation in SAP under HG2-140 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Existing tenants on overall site but vacant possession achievable within 2-3 years. Interest for housing in past.
Achievability: Medium (6-10yrs)Low market area. Assessed as unviable given current use. Fuly occupied. Maintain contact with owner to establish when might change to housing.
HG2-140Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
60Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
60 0 0 0 0
0
Dwellings - current figures
Remaining capacity 60
Total short
Total medium
0
60
Leeds SHLAA 2018 Update
SHLAA Ref: 3400
Land At Green Acres, Moor Road, Bramhope, LS16 9HJ Outer North West
SAP Ref: BL1-2
Mixed brownfield/greenfield site along Moor Road, to the West of Bramhope. Countryside to the south and west, and housing to the north and east.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site availablility confirmed by landowner.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-2Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
42Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
42 0 0 0 0
0
Dwellings - current figures
Remaining capacity 42
Total short
Total medium
0
42
Leeds SHLAA 2018 Update
SHLAA Ref: 3408
New Wortley, Wellington Road Industrial Estate, Wellington Road, LS12 2ue, Leeds
Inner Area
SAP Ref: MX2-10
Attractive island site located between the River Aire and Leeds/Liverpool canal, within close proximity to city centre.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-10 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The landowner has confirmed that the site remains available for housing or mixed use allocation. Occupancy arrangements for existing tenants mean delivery is likely to be medium or long term of the plan period following the landowner gaining vacant possession.
Achievability: Medium (6-10yrs)Otter Island development on adjacent site started and completed within a year and demonstrates high demand for housing in this part of Leeds.
MX2-10Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
325Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
0 110 110 105 0
0
Dwellings - current figures
Remaining capacity 325
Total short
Total medium
0
325
Leeds SHLAA 2018 Update
SHLAA Ref: 3412
Site At Waterloo Lane And Waterloo Way, LS13 2, Leeds Outer West
SAP Ref: MX2-5
Retail units within larger residential area, known uses include supermarket and pet store. Roads running around perimeter.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-5 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Submitted by owners who anticipate completion of a mixed use scheme by 2017. Hence, the submitters capacity of 24 is used in preference to the standard multiplier capacity of 45. Representation received during SAP consultation confirming willing landowner (Bidwells for Trinity College Cambridge).
Achievability: Medium (6-10yrs)Low market area. Although the submitter expects completion by 2017, because of the complexity of town centre development, completion in the medium term is considered more realistic.
MX2-5Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
20Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
20 0 0 0 0
0
Dwellings - current figures
Remaining capacity 20
Total short
Total medium
0
20
Leeds SHLAA 2018 Update
SHLAA Ref: 3445A
Land at Leadwell Lane, Robin Hood Outer South
SAP Ref: BL1-32
Greenfield site to the east of Robin Hood. The site wraps around the back of a group of houses to the south. Site is connected to residential area to west, and countryside to east. Most of the boundary is clearly defined, eastern boundary cuts across centre of field.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Landowner confirmed availability through representation(s) made to Site Allocations Plan consultation
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-32Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
60Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
30 30 0 0 0
0
Dwellings - current figures
Remaining capacity 60
Total short
Total medium
0
60
Leeds SHLAA 2018 Update
SHLAA Ref: 3454
Holdforth Place, New Wortley, LS12 1 Inner Area
SAP Ref: HG2-111
Site at end of Holdforth Place, New Wortley. Made up largely of grassed area surrounded by residential properties (part of Wellington Estate), some of which fall within the site boundary.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-111 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Dependant on vacant possession of properties within the site boundary, anticipated within next 5 years.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-111Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
48Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 48 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 48
Total short
Total medium
48
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3455A
Land off Gamble Lane Outer West
SAP Ref: BL1-21
Single field in agricultural use. No buildings / constraints on site.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Put forwards for housing by landowner, with their objection to PAS status showing willingness to bring forwards in short term.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-21Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
120Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
120 0 0 0 0
0
Dwellings - current figures
Remaining capacity 120
Total short
Total medium
0
120
Leeds SHLAA 2018 Update
SHLAA Ref: 3455B
Land off Gamble Lane Outer West
SAP Ref: BL1-22
Fields with dwellings in the centre surrounded by two roads, residential development to the east.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Put forward for housing by landowner, with their objection to PAS status showing willingness to bring forwards in short term.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-22Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
200Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
200 0 0 0 0
0
Dwellings - current figures
Remaining capacity 200
Total short
Total medium
0
200
Leeds SHLAA 2018 Update
SHLAA Ref: 3456A
Land off Haigh Moor Road Outer South West
SAP Ref: BL1-30
Site topography is flat and sloping
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Landowner has confirmed that the site remains available for a housing allocation and would be happy for the development to proceed as soon as possible.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-30Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
41Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
41 0 0 0 0
0
Dwellings - current figures
Remaining capacity 41
Total short
Total medium
0
41
Leeds SHLAA 2018 Update
SHLAA Ref: 3457
Land off Weetwood Court (adjacent to water treatment works) North Leeds
SAP Ref: HG2-48
The site is approximately 0.9ha in size and is adjacent to the Headingley Water Treatment Works, Otley Road. Access to the site is currently from Otley Road. Residential properties are located to the north and east of the site, with sports pitches to the south east. The current operational water treatment works is to the west of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-48 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Submitter expects development could be complete by 2014. Representation received during SAP consultation confirming willing landowner (ID Planning on behalf of Keyland Developments Limited).
Achievability: Short (=<5yrs)High market area
HG2-48Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
32Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 32 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 32
Total short
Total medium
32
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3459
Land Adjacent, St Hildas Church, Knowsthorpe Crescent/cross Green Lane Inner Area
SAP Ref: AV36
The site lies next to an established housing area in Cross Green, Leeds. There are rows of terraced housing to the north, and the M63 and retail warehousing to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/04168/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
AV36Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
86Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 43 43 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 86
Total short
Total medium
86
0
Leeds SHLAA 2018 Update
SHLAA Ref: 3464
Land Off Tyersal Court, Tyersal Bd4 8 Outer West
SAP Ref: HG2-72
Greenfield site off Tyersal Drive, Tyersal, Bradford. Tyersal primary school borders the site to the east. Housing to the north and west, countryside to the south and east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-72 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Barton Willmore on behalf of Scemthorpe Ltd). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Low market area.
HG2-72Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
40Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 40
Total short
Total medium
40
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4002
Park Lees, St Anthony's Road, Beeston Outer South West
SAP Ref: HG2-138
Brownfield cleared site within the existing built up area, with access from St Anthony's Road to the south west and Beeston Park Place to the north. Site is adjacent to residential on the north and west side, primary education to the east and industrial to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-138 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is cleared and has been actively marketed. Looking at other options (including a possible extension to the primary school adjacent to the site) as well as housing.
Achievability: Short (=<5yrs)LCC site currently cleared.
HG2-138Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 18 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4004
Thorpe Hill Farm, Lingwell Gate Lane, Thorpe Outer South West
SAP Ref: HG2-165
Active brownfield site in the greenbelt. Site is to the West of Lingwell Gate Lane between Middleton and Robin Hood. Residential and primary school to the south of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-165 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Currently in use as light industrial but owners suggest that the site could be made available fairly soon. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)No ownership issues. Submitter information suggests they would want dwellings to be completed by 2018.
HG2-165Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
57Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 37 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 62
Total short
Total medium
62
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4007
Wortley High School And Leeds West City Learning Centre, Swallow Crescent, LS12 4rb
Outer West
SAP Ref: HG2-82
Cleared school site with pitches and tennis counts. In the north corner of the a site there is the Leeds West City Learning centre in active use and the pitches are leased by Wortley Football Club . Blue Hill Lane runs to the east of site, Cliffe Park Drive to the south and the Silver Royd's to the north.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-82 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Part of site is being actively marketed now.
Achievability: Medium (6-10yrs)Part of LCC HILS
HG2-82Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
40Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
40 0 0 0 0
0
Dwellings - current figures
Remaining capacity 40
Total short
Total medium
0
40
Leeds SHLAA 2018 Update
SHLAA Ref: 4019
Kirkland House, Queensway, Yeadon, LS19 7rd Aireborough
SAP Ref: HG2-8
Brownfield site within Yeadon. Queensway is to the north and New Lands Ave to the east. To the west and south the site is surrounded by Kirk Lane Park - Allotments to the west and a bowling green to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-8 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Application for demolition of existing buildings approved.
Achievability: Short (=<5yrs)Site in High to medium market area. Site about to be marketed for "extra care" dwellings. Planning statement approved.
HG2-8Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
17Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 17 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
17
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4020
Hollins Lane/hawstone Ave, Guiseley, LS20 Aireborough
SAP Ref: HG2-4
Site is between Hollins Lane and Hawstone Ave. Existing residential is to the North and East of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-4 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site not submitted by owner.
Achievability: Short (=<5yrs)High market area.
HG2-4Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
80Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 30 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 80
Total short
Total medium
80
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4021
Horsforth Mill, Low Lane. Horsforth, LS18 4er North Leeds
SAP Ref: HG1-87
Site currently in use as offices in the main urban area and part vacant to the rear.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/01523/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-87Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
89Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
89 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 89
Total short
Total medium
89
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4027
Winrose Drive/newhall Gate, LS10 3rz Inner Area
SAP Ref: HG1-510
Greenfield site facing Middleton Park across Newhall Road. The other three sides of the site are surrounded by housing, including Newhall Drive, Aberfield Drive and Exeter Drive.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/05637/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-510Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
27Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
21 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 21
Total short
Total medium
21
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4032
Thorpe Square, Middleton, LS10 Outer South West
SAP Ref: HG2-164
Cleared site in the main urban area. Thorpe Road runs to the north of the site, Thorpe Square runs into the site from the north and Thorpe View to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-164 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has planning permission under 16/03861/FU by Keepmoat Homes Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is allocated for housing in the emerging Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-164Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
26Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 20 17 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 37
Total short
Total medium
37
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4034
Sissons Drive/sissons Road, Middleton Outer South West
SAP Ref: HG2-160
Cleared site in the main urban area. Sisson Road runs to the West, Sissions Lane to the East and Acre Way to the South.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-160 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site cleared following permission to demolish in 2004.
Achievability: Short (=<5yrs)Low market area. However other sites in the area are being developed/ have planning decisions pending. Recent pre-application activity under PREAPP/17/00333 for Affordable housing development of 18 dwellings.
HG2-160Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 14 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4035
Throstle Mount, Middleton Outer South West
SAP Ref: HG2-161
Site within the existing urban area. Throstle Mount accesses the road from the south, To the east is Middleton Park Avenue and to the north is the Laurel Bank Centre.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-161 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site cleared and available now
Achievability: Short (=<5yrs)Low market area. However other sites in the area are being developed/ have planning decisions pending.
HG2-161Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4036
Thornhill Road, Upper Wortley, LS12 4lg Outer West
SAP Ref: HG2-83
Site within the main urban area at the junction of Thornhill Road and Upper Wortley Road. Surrounding area is predominantly residential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 22/12/2016 and has current approval under 16/04640/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04640/FU by Chartford Developments Ltd - Mr Paul Wade and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is allocated for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-83Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 14 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4039
Regina House, Ring Road, Bramley, LS13 4et Outer West
SAP Ref: HG2-77
Site is between the A6110 Bramley Ring Road and the A647 Stanningly By-pass. Gamble Hill drive runs to the East of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Medium (6-10yrs)
Site proposed as housing allocation in SAP under HG2-77 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site sold by BNP Paribas in August 2015. Site considered and marketed as residential use but went to the highest bidder for industrial use. Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Site progressing from medium term in 2017 SHLAA to short term in the five year supply period commencing 1 April 2018. Discounted as not available now as currently occupied for alternative use. Promoted as housing allocation under HG2-77 in SAP for delivery in plan period. Landowner contacted to confirm post-November 2016.
HG2-77Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
64Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 14 0 0 0
0
Dwellings - current figures
Remaining capacity 64
Total short
Total medium
0
64
Leeds SHLAA 2018 Update
SHLAA Ref: 4042A
Outer West
SAP Ref: HG2-61
A piece of land which is part greenspace in a residential area. The site has been split in two so that the western half can be upgraded with the adjacent greenspace and the eastern part can be redeveloped with the section of greenspace to the east
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/00509/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG2-61Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4043
Ings Lane, Guiseley Aireborough
SAP Ref: BL1-6
Site to the north of Ings Lane, to the rear of the Netherfield Road. To the west are railway lines.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Owner submitted and confirmed as available.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-6Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
114Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 14 0 0
0
Dwellings - current figures
Remaining capacity 114
Total short
Total medium
0
114
Leeds SHLAA 2018 Update
SHLAA Ref: 4046
Daleside Road, Pudsey Outer West
SAP Ref: HG2-65
Open grassland site situated between the rear of the Gallagher cinema/leisure complex and the rear of housing along Daleside Road. Access possible at the southern end of the site from Daleside Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-65 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability Landowner has confirmed that the site remains available for residential development, deliverable from as soon as practicable.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-65Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
89Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 49 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 89
Total short
Total medium
89
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4047
Sunnybank Lane, Pudsey Outer West
SAP Ref: HG2-64
Vacant employment site at the corner of Sunnybank Lane and Bradford Road (A647). To the north and east are playing fields in the Green Belt. Across Bradford Road to the south and Sunnybank Lane to the west are residential areas. The boundary with Bradford District slightly further to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-64 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availabilityThe landowner has confirmed that the site remains available for residential development.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-64Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
22Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 22 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4049
Calverley Lane, Calverley Outer West
SAP Ref: BL1-43
Open greenfield site fronts onto Calverley Lane on the eastern edge of Calverley. Countryside to the east in the gap between Calverley and Leeds.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-43Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
18 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
0
18
Leeds SHLAA 2018 Update
SHLAA Ref: 4053
Joseph Priestley College, Peel Street, Morley Outer South West
SAP Ref: HG2-155
Victorian school with a mix of 1 and 2 storey buildings and ancillary spaces and car parking. Bounded by Peel St to the north, South Parade to the east and School St to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 25/04/2017 and has current approval under 16/06900/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/06900/FU by Crosshall Developments (Leeds) Ltd - P Baldwin and available for scheme to be brought forward. The landowner has confirmed that the site remains available for residential development during the SHLAA consultation August 2018
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term. Response received from landownerPeter Baldwin during SHLAA consultation 2018 to confirm site availability and timeframe for delivery and site will be completed by the end of September 2018.
HG2-155Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
28 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4057
Former St Josephs Convalescent Home, Outwood Lane, Horsforth North Leeds
SAP Ref: HG2-45
Cleared site of former convalescent home situated between Outwood Lane and New Road Side (A65). Site within a predominantly residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 14/12/2017 and has current approval under 16/07784/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07784/FU by Yorkshire Housing and available for scheme to be brought forward.
Achievability: Short (=<5yrs)High to medium market area. Pending planning application for41 units application reference 16/07784/FU
HG2-45Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
30Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
30 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4058A
Land at 116 Cardigan Road, Headingley North Leeds
SAP Ref: HG1-127
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 10/02052/EXT and is an Identified site in SAP. Permission for previous scheme expired on 31/01/2014. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Private on 16/06/2005 and extended in 2010. Site remains undeveloped and available and landowner has confirmed intention to develop housing on the land. Landowner confirmed site is available and in contact with the Council's Housing Growth Team as part of the Private Sector Acceleration Programme.
Achievability: Short (=<5yrs)Landowner contacted as part of Private Sector Housing Acceleration Programme. High market area. Requires new planning application and landowner has contacted an agent/architect to gain planning permission. On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-127Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 14 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4060
Former Shaftsbury Public House, York Road, Harehills Inner Area
SAP Ref: HG2-103
Cleared site of former Shaftsbury Public House on corner of Harehills Lane and York Road. The rear of the site adjoins housing.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-103 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Outline permission for 84 bed care home given in 2011. No development interest expressed since either to follow up the care home outline permission with reserved matters approval nor for housing development.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-103Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
23Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 23 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 23
Total short
Total medium
23
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4063
Butterfield Manor & Richmond Court, Walter Crescent, Richmond Hill, LS9 8jl Inner Area
SAP Ref: AV23
Site to the North and East of Upper Accommodation Road. The South West of the site is Butterfield Manor, a vacant old people's home and to the North is Richmond Court, a residential estate.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV23 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is vacant and available for development.
Achievability: Short (=<5yrs)Low to medium market area. Housing Association interest
AV23Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
48Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 48 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 48
Total short
Total medium
48
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4068
Land Adjacent To Belle Vue Road, Scholes Outer North East
SAP Ref: HG2-28
Oblong of farm land to the rear of 39-49 Belle Vue Road and 2-22 Belle Vue Avenue. A further narrow strip of farmland separates the site from the "East of Scholes" PAS site to the east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 27/04/2017 and has current approval under 16/04310/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04310/FU by Chartford Homes - N Clark and available for scheme to be brought forward.
Achievability: Short (=<5yrs)High housing market area
HG2-28Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 9 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4072
White House Farm, Bunkers Hill, Aberford, LS25 Outer North East
SAP Ref: HG1-57
Site at the Southern end of Aberford. Bunkers Kill runs to the West of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 07/12/2011 and has current approval under 11/03955/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 11/03955/FU by Atkinsons Of Aberford - Mr T Atkinson and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-57Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 5 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4075
Mercure Hotel, Leeds Road, Wetherby Outer North East
SAP Ref: HG2-20
Hotel and associated car park on the north side of Leeds Road on the south side of Wetherby. Housing to the north. Countryside to the south and west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/07096/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Reserved Matters Application approved for seven houses on 24 May 2017 under 16/07096/RM. Site to be allocated as part of Site Allocations Plan under HG2-20.
HG2-20Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
86Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 7 0 0 0
40 39 0 0 0
0
Dwellings - current figures
Remaining capacity 86
Total short
Total medium
7
79
Leeds SHLAA 2018 Update
SHLAA Ref: 4081
Former Leeds College of Technology, East Street City Centre
SAP Ref: AV27
Former Leeds College of Technology Building with planning permission for change of use to residential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 02/12/2014 and has current approval under 14/05170/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/05170/FU by Beaumont Morgan Developments Ltd - Mr Gareth Morgan and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
AV27Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
39Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
39 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 39
Total short
Total medium
39
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4082
Windlesford Green Hostel, Woodlesford Outer South
SAP Ref: HG2-176
Former Hostel, located to the north side of Holmsley Lane. Surrounded by residential development on the north, south and east, with Rothwell Training Centre located to the west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-176 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is owned by the Council and it has been agreed that the site will be released for the development of Extra Care housing.
Achievability: Short (=<5yrs)High to medium market area
HG2-176Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
26Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 26 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 26
Total short
Total medium
26
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4087
Land North Of St Hildas Crescent, Cross Green, Leeds. LS9 0DB Inner Area
SAP Ref: AV117
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07671/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
AV117Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4095
Land West Of Knott Lane, Rawdon Aireborough
SAP Ref: BL1-11
Grassed area in the Green Belt located to the south west of the A65 at its junction with Knott Lane. The site is also bounded to the west by the Park Mills business complex. There are residential dwellings on the north side of the A65 and on Knott Lane.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to potentially contribute to the future development needs as Safeguarded Land subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Available now.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to development needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-11Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
81Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
40 41 0 0 0
0
Dwellings - current figures
Remaining capacity 81
Total short
Total medium
0
81
Leeds SHLAA 2018 Update
SHLAA Ref: 4097
Calverley Cutting, Leeds Liverpool Canal, Apperley Bridge Outer West
SAP Ref: HG2-53
Grass land to the east of Eleanor Drive and Calverley Cutting. Adjoins Stylo House (business building - SHLAA site 1337) to the west. The northern end of the site abuts the Leeds Liverpool Canal.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-53 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (ID Planning for Thornhill Estates).
Achievability: Short (=<5yrs)High to medium housing market area.
HG2-53Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
32Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 32 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 32
Total short
Total medium
32
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4110
Seacroft Green Social Club, Seacroft Inner Area
SAP Ref: HG2-93
Site is located on the south side of Brooklands Avenue. It has a social club with car park on the eastern half of the site, adjacent to Seacroft Library. The western half of the site comprises grass and trees.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-93 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Medium (6-10yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-93Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
26Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
26 0 0 0 0
0
Dwellings - current figures
Remaining capacity 26
Total short
Total medium
0
26
Leeds SHLAA 2018 Update
SHLAA Ref: 4117
Moresdale Avenue, Foundry Mill Street, Seacroft Inner Area
SAP Ref: HG1-509
Land situated between Moresdale Avenue, Foundry Mill Street and Foundry Mill Mount in Seacroft
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 10/07/2015 and has current approval under 15/01949/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/01949/FU by Leeds Mental Health Teaching Nhs Trust - M Cundle and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-509Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
16Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
16 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 16
Total short
Total medium
16
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4120
Land At Hawkshead Crescent, Seacroft Inner Area
SAP Ref: HG2-98
Area of cleared council housing grassland between Hawkshead Crescent and Tarnside Drive in Seacroft.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-98 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-98Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
25
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4123
Land At A64 And A63 Junction, Killingbeck Bridge, Halton East Leeds, Inner Area
SAP Ref: HG2-104
Site is located at the junction of the A64 and the A63. Land is located to the south of the A64 and to the east of the junction. It comprises a former children's diner/play centre, car park and cleared land.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-104 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability. The landowner has confirmed that the site remains available for residential development.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-104Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
32Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 32 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 32
Total short
Total medium
32
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4125
Winrose Drive Greenspace, Middleton Inner Area
SAP Ref: HG2-116
The site comprises part of the parkland amenity space on the east side of Winrose Drive. It adjoins the residential houses of Darney Avenue to the south and Windmill Primary School to the east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-116 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-116Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
13Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 13 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 13
Total short
Total medium
13
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4150
Land At Farfield House, Great North Road, Bramham, LS23 6lh Outer North East
SAP Ref: BL1-5
Site is an existing residential building with other out buildings (one of which has planning permission to be converted to residential). To the east and the south of the site is residential (Lyndon Road)
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Carter Jonas LLP on behalf of AC Plant & Development Ltd).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-5Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
14 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
0
14
Leeds SHLAA 2018 Update
SHLAA Ref: 4169
Land Off Tyersal Road, Pudsey, Bd4 8ez Outer West
SAP Ref: HG2-71
Greenfield site with residential (The Tyersal estate) to the north, across Tyersal Road. Agriculture is to the east and south of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-71 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Owner submitted site in vacant use.
Achievability: Short (=<5yrs)Low market area. Site adjacent to community centre and on the edge of the existing built up area.
HG2-71Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
33Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 33 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 33
Total short
Total medium
33
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4185
Boggart Hill Gardens, Seacroft, Leeds, LS14 Inner Area
SAP Ref: HG1-212
Greenfield site with N6 to the south west and Boggart Hill Gardens to the north east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/07453/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-212Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
8 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4190
Forsyth House, 5 South Parade, Leeds, LS1 5qx City Centre
SAP Ref: HG1-450
Site within Leeds City Centre. To the south of the site is South Parade and to the North is the Headrow.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/01319/DPD and is under construction as at 1 April 2017.
Site is under construction as at 31st March 2017.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2017.
HG1-450Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
13Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
21 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 21
Total short
Total medium
21
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4191
Land At Brooksbank Drive, Halton, Leeds, LS15 East Leeds
SAP Ref: HG1-300
Former old people's home in the main urban area, adjacent to Halton Town Centre. The site is to the South of Brooksbank Drive.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/02101/RM and is complete at 13th July 2018.
Development is complete at 13th July 2018
Achievability: Short (=<5yrs)Development is complete at 13th July 2018
HG1-300Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
2 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 2
Total short
Total medium
2
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4196
Royal Oak, Cross Hills, Kippax, Leeds, LS25 Outer South East
SAP Ref: HG1-316
Site within Kippax Town Centre. To the North East of the site is Cross Hills.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/01879/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-316Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
11Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
4 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 4
Total short
Total medium
4
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4197
St Lawrence House, Crawshaw Road, Pudsey, LS28 7ub Outer West
SAP Ref: HG1-188
Site within an existing built up area, adjacent to Pudsey Park. Crawshaw Road is to the East of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 11/05295/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-188Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
11Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4198
St Marys Congregational Church, Commercial Street, Morley, Leeds, LS27 8hy Outer South West
SAP Ref: HG1-346
Site advance to Morley Town Centre. Troy road to the North and West.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 11/03697/FU and is an Identified site in SAP. Permission for previous scheme expired on 13/06/2015. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Sandmile (Gibraltar) Ltd on 13/06/2012. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-346Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 18 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4199
Town End Works, Back Lane, Bramley, Leeds, LS13 4es Outer West
SAP Ref: HG1-158
Site adjacent to existing residential to the east. Back Lane is to the north of the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 08/01847/FU and is an Identified site in SAP. Permission for previous scheme expired on 18/01/2016. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by M Beaumont on 18/01/2013. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-158Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
28Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
14 14 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
0
28
Leeds SHLAA 2018 Update
SHLAA Ref: 4200B
Newtown Farm, Micklefield Outer South East
SAP Ref: BL1-41
Contains farm buildings and field, bounded by hedgerows (except no boundary to the north i.e. where former site 4200 was split into A and B), and road frontage to the west. A1M directly adjacent to the east.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2015.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-41Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
42Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
42 0 0 0 0
0
Dwellings - current figures
Remaining capacity 42
Total short
Total medium
0
42
Leeds SHLAA 2018 Update
SHLAA Ref: 4213
Land On North East Side Of Rodley Lane, Rodley Outer West
SAP Ref: BL1-18
Green belt site adjacent to main urban area. Road frontage runs along the southern boundary. Surrounded by residential development to east and south, good access to services.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Respresentation received during SAP consultation confirming willing landowner (David Kendrew). Landowner confirmed availability through contact with the Council’s Housing Growth Team as part of Private Sector Housing Acceleration Scheme.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-18Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
17Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
17 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
0
17
Leeds SHLAA 2018 Update
SHLAA Ref: 4217
Cookridge Fire Station, Otley Old Road, LS16 7bf North Leeds
SAP Ref: HG2-32
Site currently in use as a fire station on the junction of Old Otley Road to the west and Farrar Land on the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 30/10/2017 and has current approval under 16/06712/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/06712/OT by WYFRS and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Brownfield site within the urban area. High to medium market area.
HG2-32Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 10 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4222A_B_C
Fleet Lane And Methley Lane, Oulton, LS26 8 Outer South
SAP Ref: HG2-180
Large greenfield site to the south east of Oulton. The northern part of the site borders SHLAA 334 (outline permission now granted). The area is predominantly agricultural, however, the site is connected to housing to the west. The site has two road frontages, Fleet Lane and Methley Lane.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-180 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Johnson Brook Ltd on behalf of Hallam Land Management).
Achievability: Short (=<5yrs)Given the diesreability of the location and the fact that this is a submitted site likely to be developed in appropriate time period.
HG2-180Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
322Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 75 100 100
47 0 0 0 0
0
Dwellings - current figures
Remaining capacity 322
Total short
Total medium
275
47
Leeds SHLAA 2018 Update
SHLAA Ref: 4233
Land Off Farrar Lane, Holt Park, LS16 7 North Leeds
SAP Ref: HG2-34
Surface car park within centre of Holt Park. There is a park and tennis courts to the east, the main Holt Park shopping centre to the north, Holt Park Active Centre to the west and housing to the south. The surrounding area is predominantly residential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-34 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
City Council owned site. Has been identified as a development site in the Holt Park framework with some car parking retained.
Achievability: Short (=<5yrs)High to medium market area.
HG2-34Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
16Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 16 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 16
Total short
Total medium
16
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4240
South Of The A65 From Horsforth Rab To Rawdon Crematorium, LS18 4 North Leeds
SAP Ref: BL1-14
Large parcel of land to the south of Rawdon Road (A65) and bounded by Calverley Road to the south. The site backs on to Clairant Works. The area is predominantly agriculture. However, there is a fair amount of housing to the north of the site.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site was submitted. Given the desireability of the location availability is unlikely to be a barrier to development. Representation received during SAP consultation confirming willing landowner (Barton Willmore on behalf of Barratt and David Wilson Homes, Walker Morris LLP on behalf of Byre Developments Ltd, WYG on behalf of Harrow Estates Plc).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-14Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
777Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
150 200 200 200 27
0
Dwellings - current figures
Remaining capacity 777
Total short
Total medium
0
777
Leeds SHLAA 2018 Update
SHLAA Ref: 4249_5010
Stanningly Road, LS12 3qs Outer West
SAP Ref: HG2-200
Brownfield site
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-200 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-200Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
22Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 22 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 4254
Woodlands Drive, Rawdon Aireborough
SAP Ref: BL1-12
0.96 hectare piece of agricultural land to the south east of Rawdon and west of Horsforth. The site is in agricultural use at present and is bounded to the north by New York Lane, to the south by Woodlands Drive, to the west by a hedge (beyond which lies open countryside) and to the east in part by residential development.
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Representation received during SAP consultation confirming willing landowner (Johnson Brook Ltd on behalf of Taylor Wimpey UK Ltd).
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-12Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
25 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
0
25
Leeds SHLAA 2018 Update
SHLAA Ref: 4259
Former Inglewood Children's Home, Otley, LS21 3 Outer North West
SAP Ref: HG2-13
Former Inglewood Children's home to the south of Otley. The site is a mix of brown and greenfield containing the former children's home and adjoining garden. Access is off Whitely Croft Garth. The area is predominantly residential with the A660 and open countryside to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07166/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG2-13Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
16Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5009A
Site of Leeds City College, Calverley Lane, Horsforth, Leeds North Leeds
SAP Ref: HG1-515
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 24/03/2016 and has current approval under 15/02901/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/02901/OT by Leeds City College and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site with planning permission expected to deliver in short-term.
HG1-515Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
72Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 72 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 72
Total short
Total medium
72
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5009B
Site of Leeds City College, Calverley Lane, Horsforth, Leeds North Leeds
SAP Ref: HG2-43
The site forms the greendfield elements of the Horsforth Campus. The brownfield element has recently obtained planning permission for residential use and lies outside this site boundary. The site is located to the southern edge of Horsforth and the A6120 lies to the west of the site boundary.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-43 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site forms part of the curtilage of Horsforth Campus, the brownfield element of the campus has planning permission.
Achievability: Short (=<5yrs)High to medium market area
HG2-43Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
134Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 34
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 134
Total short
Total medium
134
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5011
St Alban's Place, Leeds City Centre
SAP Ref:
A site including one of the few Green areas in the City Centre. Adjacent to bars with late licences. Adjacent to the Inner Ring Road. Sloping in a south-easterley direction.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/04/2017 and has current approval under 16/07741/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07741/FU by Vita Leeds 1 Limited And Wade Lane Developments Limited and available for scheme to be brought forward. The landowner has confirmed that the site remains available for residential development during the SHLAA consultation August 2018 and are currently on site.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme. Response received from Deloitte during SHLAA consultation 2018 to confirm site availability and states that the site should complete in September 2019.
5011Site Allocations Plan ref:
Not allocated for housingSite Allocations Plan status
Site Allocations Plan
202Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 376 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 376
Total short
Total medium
376
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5013
Land At 25 - 29 High Street, Kippax Outer South East
SAP Ref: HG2-130
Brownfield site off Kippax High Street. One side of the site borders onto housing, Kippax parish church.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-130 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
A derelict and nuisance property that might have to be CPO'd.
Achievability: Short (=<5yrs)Part of the Council's Private Sector Housing Acceleration Scheme. Site is to be allocated as part of Site Allocations Plan under HG2-130.
HG2-130Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
16Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 16 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 16
Total short
Total medium
16
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5014
Gledhow Road/gledhow Terrace Inner Area
SAP Ref: HG2-100
Land currently in use as a Car Park. Educational uses to the north and residential to the west. To the west is a small busniess park. Site is close to the City Centre.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-100 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. LCC own the site.
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-100Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
25
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5015
Kendall Carr, Hanover Mount, Woodhouse City Centre
SAP Ref: HG1-441
Three storey block of elderly persons housing expected to become surplus to requirements. Located at the north west corner of Hanover Square.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/06675/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-441Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
23Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5017
Amberton Hop, Thorn Mount, Gipton Inner Area
SAP Ref: HG2-88
Home for Older Persons that has been recently closed. Vacant building. Residential and greenspaces around the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-88 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-88Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
20Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 20 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 20
Total short
Total medium
20
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5020
Burley Willows Care Home, Willow Garth, Burley Inner Area
SAP Ref: HG2-108
Recently closed Home for Older People. Green areas and resdential surround the site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-108 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term.
HG2-108Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
28Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 28 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5100
Leeds Valve Co Ltd, 23 - 25 Town End, Gildersome, Morley, Leeds, LS27 7HF Outer South West
SAP Ref: HG1-335
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 12/05095/FU and is an Identified site in SAP. Permission for previous scheme expired on 03/04/2016. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Prospect Estates Limited - Mr Rob Cooke on 03/04/2013. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-335Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 9 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5104
18 Queen Square, Leeds, LS2 City Centre
SAP Ref: HG1-438
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 13/01681/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-438Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
4 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 4
Total short
Total medium
4
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5109
Browning House, 126 Chapeltown Road, Chapeltown Inner Area
SAP Ref: HG1-220
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 13/02/2017 and has current approval under 16/00971/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/00971/FU by Mr Mohammed Rashid and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-220Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
21 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 21
Total short
Total medium
21
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5114
Land And Premises Opposite 60 To 68, Half Mile Lane, Stanningley, Pudsey Outer West
SAP Ref: HG1-151
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 16/06/2014 and has current approval under 13/03007/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 13/03007/FU by C/O Agent and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-151Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 12 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5117
Timber Tops Forsythia Avenue East Ardsley Outer South West
SAP Ref: HG1-388
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 09/06/2017 and has current approval under 17/02395/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/02395/RM by Brooke Property Developments and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-388Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 8 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5120
Whitecote Hill LS13 Outer West
SAP Ref: HG1-139
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 24/56/99/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-139Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
5 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5121
Parkside Works Otley Road Guiseley Aireborough
SAP Ref: HG1-5
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 08/02206/FU and is an Identified site in SAP. Permission for previous scheme expired on 05/01/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Private on 05/01/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-5Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 7 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5122
17 Regent Street Sheepscar City Centre
SAP Ref: HG1-440
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 08/01247/FU and is an Identified site in SAP. Permission for previous scheme expired on 12/03/2013. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by The Riverside Group on 03/03/2010. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-440Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
73Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 36 37 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 73
Total short
Total medium
73
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5124
Pepper Road LS10 East Leeds, Inner Area
SAP Ref: HG1-278
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 17/06/2016 and has current approval under 15/05699/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/05699/FU by Maple Properties (Headingley) Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-278Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
12 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5129
Sharp Lane Robin Hood Outer South
SAP Ref: HG1-408
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 06/03301/RM and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-408Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
9 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5130
Fall Lane East Ardsley Outer South West
SAP Ref: HG1-389
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 12/02720/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-389Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
35Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5131
Reedsdale Gardens Gildersome Outer South West
SAP Ref: HG1-334
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site is allocated in UDP review 2006 under H3-3A.3 and is an identified site in the emerging Site Allocations Plan. Site is suitable for a new scheme to be brought forward immediately.
Landowner confirmed availability through contact with the Council’s Housing Growth Team post-July 2015 as part of Private Sector Housing Acceleration Scheme.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term
HG1-334Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5135
Musgrave Court Crawshaw Road Pudsey Outer West
SAP Ref: HG2-75
Former residential care home within well established residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-75 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)Part of HILS. Site being prepared for open market sale.
HG2-75Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 14 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5144
Healey Croft Westerton Road West Ardsley Outer South West
SAP Ref: HG2-171
Former residential institution within established residential area. Bordered by open agricultural land to the south and south west.
General Attributes
Site Description:
Suitability: Suitable
Availability:
Site proposed as housing allocation in SAP under HG2-171 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
x
Achievability:
HG2-171Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
35Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
38 0 0 0 0
0
Dwellings - current figures
Remaining capacity 38
Total short
Total medium
0
38
Leeds SHLAA 2018 Update
SHLAA Ref: 5150
Dog and Gun, 601 York Road Leeds Inner Area
SAP Ref: HG1-249
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 14/02846/FU and is an Identified site in SAP. Permission for previous scheme expired on 04/08/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mr Jazz Singh on 04/08/2014. Site remains undeveloped and available
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-249Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 7 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5157
6 - 12 Lands Lane, LS1 6LD City Centre
SAP Ref: HG1-453
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 13/05222/FU and is an Identified site in SAP. Permission for previous scheme expired on 03/07/2017. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Aviva Life And Pensions Uk Ltd on 03/07/2014. Site remains undeveloped and available
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-453Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
18Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 18 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 18
Total short
Total medium
18
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5161
Grove Park Care Home Grove Lane Meanwood Inner Area
SAP Ref: HG1-208
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 13/01683/FU and is an Identified site in SAP. Permission for previous scheme expired on 15/07/2016. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Roseville Properties Limited - Mr Stephen Foster on 04/09/2007. Site remains undeveloped and available
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered subject to a suitable scheme being brought forward.
HG1-208Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
77Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 38 39 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 77
Total short
Total medium
77
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5165
Land at Moor Knoll Lane East Ardsley Outer South West
SAP Ref: HG2-233
Vacant land on the edge of East Ardsley bordered by agricultural land and residential uses.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-233 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site was promoted through the SAP by the land owner as available.
Achievability: Short (=<5yrs)Site in medium market area with no impediment to delivery in the short term.
HG2-233Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
11Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 11 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 11
Total short
Total medium
11
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5166
Land at Sandbeck Lane Wetherby Outer North East
SAP Ref: HG2-19
A triangular shaped site which lies to the north-east edge of urban Wetherby. The site is bounded by the A1(M) to the east, Harrogate BC land to the north and industrial premises to the west. Sandbeck Lane runs east-west across the site and splits it into two distinct sections.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/03206/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG2-19Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
165Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
70 11 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 81
Total short
Total medium
81
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5175
53 The Calls, Leeds, LS2 7EY City Centre
SAP Ref: HG1-462
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 03/02/2017 and has current approval under 14/07404/DPD.
Site has planning permission under 14/07404/DPD by F Revol.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-462Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
16Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
19 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 19
Total short
Total medium
19
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5176
29 - 31 Moor Road, Headingley, Leeds, LS6 4BG North Leeds
SAP Ref: HG1-102
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 14/00905/FU and is an Identified site in SAP. Permission for previous scheme expired on 30/03/2018. Site is suitable for a new scheme to be brought forward
Site previously obtained planning approval by Mrs Carol Hill - Catholic Care (Diocese Of Leeds) on 30/03/2015. Site remains undeveloped and available
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Landowner Catholic Care confirmed through SHLAA consultation that they are working with Westward Care Ltd to develop an extra-care scheme for older people on the site.
HG1-102Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
32Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 32 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 32
Total short
Total medium
32
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5177
Land At Lakestream House, 142 Wetherby Road, Leeds, LS8 2LF North Leeds
SAP Ref: HG1-94
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 31/03/2015 and has current approval under 15/00722/FU. Construction yet to commence as at 31st March 2018.
Site had planning permission under 15/00722/FU by Mr Mike Lupton, Mr Dan Lupton & Ms Harriet Lupton and available for scheme to be brought forward. Approval expired 31 March 2018.
Achievability: Medium (6-10yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-94Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
7 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
0
7
Leeds SHLAA 2018 Update
SHLAA Ref: 5178
Leeds Trinity University College, Brownberrie Lane, Horsforth, Leeds, LS18 5HD North Leeds
SAP Ref: HG1-64
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 01/04/2015 and has current approval under 14/07276/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/07276/FU by Leeds Trinity University and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Correspondence received from Emma Gomersal (WYG) stating that site is fully built out.
HG1-64Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
29Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
29 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 29
Total short
Total medium
29
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5181
Development Engineering Services, Ilkley Road, Otley Outer North West
SAP Ref: HG1-21
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 27/11/2014 and has current approval under 14/04077/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/04077/FU by William Ackroyd (Holdings) Ltd and available for scheme to be brought forward. Response received from Graham Connel (WYG) August 2018 that states that in the process of being moved on to a local housebuilder.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Response received from Graham Connel (WYG) August 2018 that states that in the process of being moved on to a local housebuilder.
HG1-21Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 12 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5182
22 to 24 New Briggate City Centre
SAP Ref: HG1-451
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 23/12/2014 and has current approval under 14/06296/FU.
Site has planning permission under 14/06296/FU by Mr Jaleel Ghani.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-451Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
12 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5183
Elton Lodge, Newton Road North Leeds
SAP Ref: HG1-112
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 23/06/2015 and has current approval under 14/04479/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/04479/FU by C W Langton Developments and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-112Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 9 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5184
42 Park Place, LS1 2RY City Centre
SAP Ref: HG1-454
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site previously obtained planning approval under 14/03850/FU and is an Identified site in SAP. Permission for previous scheme expired on 14/10/2017. Site is suitable for a new scheme to be brought forward.
Site previously obtained planning approval by Khalsmith Ltd on 14/10/2014.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site recently completed and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-454Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
8 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5185
Former Garage Site, Harley Green Outer West
SAP Ref: HG1-180
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/06124/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-180Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
8 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5188
13 - 17 Shaw Lane, Meanwood, Leeds, LS6 4DH North Leeds
SAP Ref: HG1-104
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/03956/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-104Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
31Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
27 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 27
Total short
Total medium
27
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5191
Summerfield Court Residential Home, Britannia RoadMorley, Leeds, LS27 0DN
Outer South West
SAP Ref: HG1-373
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 19/02/2015 and has current approval under 14/06481/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/06481/FU by Suvia Care Ltd. - Mr Vindan Kumar and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-373Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5194
Sunny Bank Mills, Town Street, Farsley, LS28 5UJ Outer West
SAP Ref: MX1-4
Site of an old mill, several buildings still remain with a mix of uses. Brownfield site, large man made pond in north west section. Well defined trees along western boundary shield residential dwellings to west but site adjoins houses along northern boundary. To the south and east is Farsley town centre.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 02/04/2015 and has current approval under 14/02476/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/02476/FU by Edwin Woodhouse And Co Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
MX1-4Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 12 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5195
8 Blenheim Terrace, Woodhouse Lane, Woodhouse, Leeds, LS2 9HZ City Centre
SAP Ref: HG1-420
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 23/01/2015 and has current approval under 14/06573/FU. Construction yet to commence as at 1 April 2017.
Site has planning permission under 14/06573/FU by High Gates Investments Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term.
HG1-420Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
6Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
2 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 2
Total short
Total medium
2
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5196
Criterion Place North City Centre
SAP Ref: MX2-34
Site bordered by office development, a multi-storey car park and railway lines with access taken to the south.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-34 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Yes. Owners are aware of aims to develop last available plot.
Achievability: Short (=<5yrs)Owners are aware of aims to develop last available plot. Part of larger developed area. Expectation that residential will be developed on last available plot. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Allocated site in SAP under MX2-34.
MX2-34Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
210Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 210
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 210
Total short
Total medium
210
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5199
Burley House, 12 Clarendon Road, Woodhouse, Leeds, LS2 9NF City Centre
SAP Ref: HG1-465
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 12/06/2015 and has current approval under 14/07273/FU.
Site has planning permission under 14/07273/FU by Maan Investments Limited.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-465Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
25 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 25
Total short
Total medium
25
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5202
Former Railway Public House, Moor Knoll Lane, East Ardsley, WF3 2ED Outer South West
SAP Ref: HG1-467
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 05/06/2015 and has current approval under 14/05882/FU. Construction yet to commence as at 1 April 2017.
Site has planning permission under 14/05882/FU by Burkhard Homes and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-467Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
9 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5203
The Swinnow, Swinnow Lane, Swinnow, Leeds, LS13 4QX Outer West
SAP Ref: HG1-468
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 30/06/2015 and has current approval under 15/01388/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/01388/OT by Mr Eddie Mcghee and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-468Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 14 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5204
3 Crowther Avenue, Calverley, Pudsey, LS28 5SA Outer West
SAP Ref: HG1-469
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 29/04/2015 and has current approval under 14/04306/OT. Construction yet to commence as at 31st March 2018.
Site had planning permission under 14/04306/OT by Frankil Ltd and available for scheme to be brought forward. Approval expired 29 April 2018.
Achievability: Medium (6-10yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-469Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
5 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
0
5
Leeds SHLAA 2018 Update
SHLAA Ref: 5205
Victoria Road, Headingley, Leeds, LS6 Inner Area
SAP Ref: HG1-470
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 27/04/2015 and has current approval under 14/05794/RM. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/05794/RM by Chartford Homes And Holbeck Land - Mr Paul Wade and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-470Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
24Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
24 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 24
Total short
Total medium
24
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5207
22 Shire Oak Road, Headingley, Leeds, LS6 2DE North Leeds
SAP Ref: HG1-471
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 29/04/2015 and has current approval under 15/00089/FU. Construction yet to commence as at 31st March 2018.
Site had planning permission under 15/00089/FU by Landmark Properties and available for scheme to be brought forward. Approval expired 29 April 2018.
Achievability: Medium (6-10yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Correspondence from SHLAA 2018 states that development is complete.
HG1-471Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
9 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
0
9
Leeds SHLAA 2018 Update
SHLAA Ref: 5208
Ledston Hall, Hall Lane, Ledston, Leeds, WF10 2BB Outer South East
SAP Ref: HG1-472
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 29/05/2015 and has current approval under 15/00771/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/00771/FU by Carter Jonas - Mrs Helen Parker and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-472Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
10Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
10 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5209
Broadlea Street, Leeds, LS13 2SD Outer West
SAP Ref: HG1-473
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/00877/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-473Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
24Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
22 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5212
Hydro Works, Clarence Road City Centre
SAP Ref: AV14
Former works have been demolished. Flat site with frontage onto Clarence Road. Trans Pennine Trail runs to the rear between the site and the waterfront. Student accommodation lies to the north, industrial works to the south and the Allied Glass plant to the south west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV14 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Vacant and cleared site. A planning application has been submitted for a residential scheme.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered. Likely to follow development of the Low Fold site.
AV14Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
105Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 65 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 105
Total short
Total medium
105
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5213
Sayner Lane / Clarence Road City Centre
SAP Ref: AV15
Vacant land within wider parcel of land between Carlisle Road, Clarence Road and Sayner Lane which includes further vacant land (Site AV16) and the Leeds Museum Discovery Centre. Site has frontages to both Clarence Road and Sayner Lane. The Allied Glass plant lies immediately to the South of Sayner Lane.
General Attributes
Site Description:
Suitability: Suitable
Availability: Medium (6-10yrs)
Site adopted as mixed use allocation in AVLAAP under AV15 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Planning approval has been granted (August 2016) for an extension to the existing warehouse building for office use on part of the site. The scheme involves bringing the vacant warehouse back into active use. A further application has been submitted for office use on another part of the site. With these scheme implemented there is limited prospect of land becoming available for residential use in the short to medium term on the site although some land remain to the north of the site
Achievability: Medium (6-10yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered, potentially on a phased basis.
AV15Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
94Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
0 0 0 50 44
0
Dwellings - current figures
Remaining capacity 94
Total short
Total medium
0
94
Leeds SHLAA 2018 Update
SHLAA Ref: 5214
Sayner Lane / Carlisle Road City Centre
SAP Ref: AV16
Vacant land within wider parcel of land between Carlisle Road, Clarence Road and Sayner Lane which includes further vacant land (Site AV15) and the Leeds Museum Discovery Centre. Site has frontages to both Carlisle Road, Clarence Road and Sayner Lane.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as mixed use allocation in AVLAAP under AV16 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site is vacant. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG.
AV16Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
90Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 50 40
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 90
Total short
Total medium
90
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5215
Bow Street and East Street Inner Area
SAP Ref: AV28
Two cleared sites adjacent to each other.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV28 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Vacant site with active developer interest (S Harrison) in bringing the site forward for residential development.
Achievability: Short (=<5yrs)Owners are seeking to progress a residential led development. On the strength of an improving housing market there are no identified impediments to the site being delivered in the short term. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG. Recent pre-application activity under PREAPP/16/00150 for Residential development.
AV28Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
23Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 23 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 23
Total short
Total medium
23
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5216
Ellerby Road and Bow Street Inner Area
SAP Ref: AV29
Site based on boundaries of former planning permission for residential and commercial units this includes privately owned land that is designated as green space in the UDP and other land between Bow Street and Ellerby Road. The site slopes signficantly down towards Bow Street. There are a number of important listed buildings in the vicinity of the site including the Grade I listed St Saviours Church immediately to the east, the Grade II listed former school building to the south and Rose Wharf on the waterfront to the west of East Street. Bow Street recreation lies to the north of the site. The site includes a number of mature trees and has access from both Bow Street and Ellerby Road.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV29 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Vacant site with active developer interest (S Harrision) in bringing the site forward for residential development.
Achievability: Short (=<5yrs)On the strength of an improving housing market and subject to a suitable design that addresses heritage issues there are no identified impediments to the site being delivered in the short term. Part of programme of sites in 'Leeds Living' Deal with HCA and DCLG. Recent pre-application activity under PREAPP/16/00150 for Residential development.
AV29Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
79Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 40 39 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 79
Total short
Total medium
79
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5217
Skelton Gate East Leeds
SAP Ref: AV111
The site is partially included within the AVL AAP boundary to the east of the M1 motorway. The site is currently part vacant and part agricultural. The River Aire forms the southern boundary.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site adopted as housing allocation in AVLAAP under AV111 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Landowners are actively seeking residential development through submission of a planning application.
Achievability: Short (=<5yrs)The scale of the development provides opportunity to create a new market in an attractive setting.
AV111Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
1801Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 100 100
200 300 350 350 351
0
Dwellings - current figures
Remaining capacity 1801
Total short
Total medium
250
1551
Leeds SHLAA 2018 Update
SHLAA Ref: 5221
Thomas Danby College, Roundhay Road Inner Area
SAP Ref: MX2-7
Ex educational site. College now not used. Bounded to the south by light industrial and office and to the north by educational buildings and office. At the conluence of major distrbutor roads.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-7 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has progressed through four SHLAA reviews and two SAP statutory consultations. Landowner has also been approached post-November 2016 to confirm availability
Achievability: Medium (6-10yrs)The site is allocated for housing in the SAP. On the strength of an improving housing market there are no identified impediments to the site being delivered.
MX2-7Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
118Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
50 50 18 0 0
0
Dwellings - current figures
Remaining capacity 118
Total short
Total medium
0
118
Leeds SHLAA 2018 Update
SHLAA Ref: 5225
25 Wellington Street, Leeds, LS1 4DL City Centre
SAP Ref: HG1-475
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 11/08/2015 and has current approval under 15/03821/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/03821/DPD by Mr S Bhullar and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-475Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
20Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
20 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 20
Total short
Total medium
20
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5226
Land South Of By Pass, Hough End Lane, Bramley, Leeds, LS13 4ET Outer West
SAP Ref: HG1-476
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 10/08/2015 and has current approval under 14/04062/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/04062/OT by AGM Building Renovations and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Landowner in discussions with Housing Growth Team.
HG1-476Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
36Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 36 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 36
Total short
Total medium
36
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5229
88 North Street, Sheepscar, Leeds, LS2 7PN City Centre
SAP Ref: HG1-479
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 03/08/2015 and has current approval under 15/01343/FU.
Site has planning permission under 15/01343/FU by 88 North St. (Leeds) Limited - Mr N Hemming.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-479Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
11Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
11 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 11
Total short
Total medium
11
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5230
143-5 THE HEADROW LS1 City Centre
SAP Ref: HG1-480
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 25/02/2016 and has current approval under 13/05031/DPD.
Site has planning permission under 13/05031/DPD by Mr Firas Al Fadhili.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of 2018/19 performance.
HG1-480Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
15 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5231
109 - 113 The Headrow City Centre
SAP Ref: HG1-481
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 05/09/2013 and has current approval under 13/03401/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 13/03401/DPD by Mr D Bowers and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-481Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
22Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 22 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5232
Rivers House, 21 Park Square South City Centre
SAP Ref: HG1-482
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/02351/DPD and is under construction as at 1 April 2017.
Site is under construction as at 30th September 2015
Achievability: Short (=<5yrs)Site is under construction as at 30th September 2015
HG1-482Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
63Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5235
117 The Headrow City Centre
SAP Ref: HG1-485
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/02167/DPD and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-485Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
27Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
13 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 13
Total short
Total medium
13
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5238
Block 1, Whingate House, Whingate, Armley Outer West
SAP Ref: HG1-488
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/06029/DPD and is under construction as at 1 April 2017.
Site is under construction as at 31st March 2017.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2017.
HG1-488Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
54Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
15 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5239
Victoria House, Longfield House, Buckingham House, Headingley Office Park, 8 Victoria Road, Leeds, LS6 1PF
Inner Area
SAP Ref: HG1-489
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 14/06815/DPD and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-489Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
124Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
43 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 43
Total short
Total medium
43
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5241
Mary Morris House, 24 Shire Oak Road, Headingley, Leeds, LS6 2DE North Leeds
SAP Ref: HG1-490
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 17/12/2015 and has current approval under 15/01919/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/01919/FU by Campbell Property - Ms R Brown and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-490Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
10Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
10 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5243
135 Alwoodley Lane, Alwoodley, Leeds, LS17 7PG North Leeds
SAP Ref: HG1-491
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 07/12/2015 and has current approval under 15/04713/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/04713/FU by Mr & Mrs A Tarsuslugil and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-491Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
5 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5244
60 Upper Basinghall Street, Leeds, LS1 5HR City Centre
SAP Ref: HG1-492
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 07/12/2015 and has current approval under 15/06372/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/06372/DPD by Stapleton Ltd - Mr Stewart Slater and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site assessment in July 2018 reveals site under construction and will now be visited by Council Tax for completions to be recorded by Valuation Office Agency confirmation as no notification through private building control certification. Delivery will be part of 2018/19 performance. SHLAA 2018 correspondence from Stapleton Limited confirms site has been completed.
HG1-492Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
5 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5245
Oak Villa Hotel, 55 Cardigan Road, Headingley, LeedsLS6 1DW
North Leeds
SAP Ref: HG1-493
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 01/12/2015 and has current approval under 15/03649/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/03649/FU by Mr Bela Kemeny - Heathfield Properties and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-493Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
10Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
10 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5246
Oulton Hall, Rothwell Lane, Rothwell, Leeds, LS26 8ZF Outer South
SAP Ref: HG1-494
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 18/11/2015 and has current approval under 15/05461/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/05461/FU by MB Models - Mr M Ball and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-494Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
5Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
5 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5247
54 Albion Street, Leeds, LS1 6AD City Centre
SAP Ref: HG1-495
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 23/10/2015 and has current approval under 15/05019/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/05019/FU by Town Centre Securities Plc and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-495Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
8 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5248
35 Aire Street, Leeds, LS1 4HT City Centre
SAP Ref: HG1-496
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 22/10/2015 and has current approval under 14/07420/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 14/07420/FU by Mr D S Deu - Deu Estates and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Correspondence received from Jaskaran Deu during SHLAA 2018 consultation confirms site is complete and fully occupied.
HG1-496Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
8 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5249
Former Farnley Working Mens Club, Butt Lane, Farnley, Leeds, LS12 5BD Outer West
SAP Ref: HG1-497
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/00447/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-497Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
8Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
8 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5250
Garnet Grove, Beeston, Leeds, LS11 5JX Inner Area
SAP Ref: HG1-498
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/03808/LA and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-498Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
25Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
20 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 20
Total short
Total medium
20
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5268
Stocks Blocks site, Ninelands Lane, Garforth Outer South East
SAP Ref: HG2-235
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 04/01/2018 and has current approval under 17/00307/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/00307/FU by Stocks Bros Ltd And Redrow Homes (Yorkshire) Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs) Recent pre-application activity under PREAPP/16/00678 for Residential development.
HG2-235Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
240Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
50 50 50 50 40
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 240
Total short
Total medium
240
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5272
Globe Quay, Globe Road, Holbeck City Centre
SAP Ref: HG2-208
Land between larger SHLAA sites Tower Works and Globe Road temporary car park. The northern end of the site has a 4 storey listed building facing the canal. The southern part of the site is a yard with lean-to shed accessed off Globe Road. Previously used as an office, but vacant since c. 2010.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-208 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Available now. Site submitted by agent on behalf of owner
Achievability: Short (=<5yrs)Active development interest.
HG2-208Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
4Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 16 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 16
Total short
Total medium
16
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5281
The Faversham, Springfield Mount, LS2 9NG City Centre
SAP Ref: HG2-209
Large detached two storey Victorian pub with car park, out buildings and lawn landscaping within the curtilage. On the edge of Leeds University campus, with large Victorian residential terraced houses to the north and west.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-209 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Although building is in active use, the submission by owner suggests immediate development interest.
Achievability: Medium (6-10yrs)Attractive conservation location with ownerdevelopment interest would suggest development before 2020
HG2-209Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
30Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
15 15 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
0
30
Leeds SHLAA 2018 Update
SHLAA Ref: 5286
Wood Nook, North of the B6155, Pudsey Outer West
SAP Ref: HG2-204
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-204 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2016 as available.
Achievability: Short (=<5yrs)Scheme assessed as achievable and able to commence in the short term. No imediment to delivery. Medium market area.
HG2-204Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
60Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 60 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 60
Total short
Total medium
60
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5287
The Old Mill, Miry Lane, Guiseley Aireborough
SAP Ref: HG2-229
Former mill and adjacent vacant land. Miry Lane runs through centre of site, with a public right of way crossing the tip of the southern corner of site.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-229 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Preapplication submission (PREAPP/16/00772) for 30 units. Principle of residential accepted subject to listed building considerations.
Achievability: Short (=<5yrs)Brownfield site in high market value area.
HG2-229Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
15Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5300
Land bound by Grange Avenue, Rudgate Park, Street 5 and Wealstun Prison, Wealstun
Outer North East
SAP Ref: HG2-227
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-227 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2016
Achievability: Short (=<5yrs)Site located in high market with no impediments to delivery in the short-term.
HG2-227Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
142Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 50 42
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 142
Total short
Total medium
142
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5303
Stonebridge Mills, Farnley Outer West
SAP Ref: HG2-205
Brownfield site with a collection of listed mill buildings and mill pond to north and open land with some tree cover to south-east.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-205 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2016.
Achievability: Short (=<5yrs)Site requirements in SAP to be addressed prior to commencement.
HG2-205Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
75Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 25 25 25
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 75
Total short
Total medium
75
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5305
Hough Top Court Amenity Space, Hough Top, Pudsey Outer West
SAP Ref: HG2-207
Majority of site occupied by buildings of former Hough Top High School and associated car parking, in use as Leeds City Council offices and a gymnastics club. Some grassed areas, boundary trees, and access via a driveway from the north and road frontage along southern site boundary.
General Attributes
Site Description:
Suitability: Suitable
Availability:
Site proposed as housing allocation in SAP under HG2-207 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
In use for LCC offices with intention for relocation although no immediate plans.
Achievability:Site within LCC ownership, and subject to relocation there are no issues to prevent achieving development on the site.
HG2-207Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
76Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
25 25 26 0 0
0
Dwellings - current figures
Remaining capacity 76
Total short
Total medium
0
76
Leeds SHLAA 2018 Update
SHLAA Ref: 5307
Burley Liberal Club, Burley Road/Willow Road Inner Area
SAP Ref: HG2-211
Site is a disused Liberal club the south of Burley Road and to the west of Willow Road. The site contains a vacant property (the Liberal club) and associated land. The club also had a car park. Part of the site is taken up with greenspace - sports typology. However this is not protected and has not been used for some time. To the west is a railway line. Both west and east of the site are residential areas. South of the site (split by Kirkstall Road and buffered by an area of greenspace) is an industrial area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-211 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The landowner is willing to have the land used for housing.
Achievability: Short (=<5yrs)Leeds City Council is promoting a scheme on the site therefore the delivery prospects are very high. However, part of the site is taken up with the greenspace - sports typology. However this is not protected and has not been used for some time. This has been identified by the Council as an ideal site for social/affordable housing. At a strategic level it is accepted that the small loss of Greenspace is reasonable given the benefit to Leeds social/affordable housing would bring.
HG2-211Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
50
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5329
St Gregory's Primary School, Stanks Gardens, Swarcliffe East Leeds
SAP Ref: HG2-210
Partially brownfield, former school site within the Main Urban Area. Grassed over with flat topography.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-210 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Council to begin marketing exercise within the next quarter. Site to be sold for residential development.
Achievability: Short (=<5yrs)Cleared, grassed over site benefitting from flat topography and road frontage.
HG2-210Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
33Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 33 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 33
Total short
Total medium
33
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5331
Seacroft Crescent, Seacroft Inner Area
SAP Ref: HG2-212
This is site is a poor area of Greenspace to the West of the Seacroft local centre (behind Tescos). It includes a large area of designated Greenspace (G219) added to the site of the now closed and cleared Fairview Home for Older People. All other adjacent properties are residential.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-212 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
LCC own the site. Available.
Achievability: Short (=<5yrs)Very High. Council owned and directed scheme. Part of an overall regeneration plan for the area.
HG2-212Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
50Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 50
Total short
Total medium
50
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5332
Bishops Way, LS14 Inner Area
SAP Ref: HG2-213
The western edge of this is site is made up of the proposed designated greenspace area (G1849). The eastern edge of the site is covered in part by SHLAA site 4090 and is a brownfield site (formerley used for educational purposes). Overlapping the greenspace is an area of N6 that extends to the north into the now David Young Academy. To the west of the site is the Wykebeck Way which is an important greenpace and green corridor. The the South and East of the site are residential areas. To the north is a school.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-213 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The site is largely owned by LCC and is this available.
Achievability: Short (=<5yrs)Very High as site is to be developed as part of wider strategic regeneration proposals for the area and are promoted by the Council.
HG2-213Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
62Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 50 12 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 62
Total short
Total medium
62
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5333
York road/ South Parkway, Seacroft Inner Area
SAP Ref: HG2-214
Site is made up of two parts. To the east is an area of Brownfield Land. To the West is some Greenspace (amenity) which is a small part of G326. To the south of the site are playing fields (the rest of G326). West is a school and to the Northand east are residential area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 14/06/2017 and has current approval under 16/07380/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07380/FU by Keepmoat Homes Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)This site is part of an overall regeneration programme for the Seacroft area and is likely to start on site in 2 years.
HG2-214Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
30Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
30 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5334
The Halton Moor PH, Halton Moor Inner Area
SAP Ref: HG2-215
Site is currently a closed down pub surrounded by some hard standing and green space. To the east is a large area of Greenspace. Around the pub on all other side is housing. The proposed site is only part of the overall green area.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 30/11/2017 and has current approval under 16/07871/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07871/FU by Provident Land Ltd - Mr Jerome O'Malley and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The landowner very keen to develop and in discussions with LCC. An estimate of .72 Ha available to develop. Possible delivery in 3 to 4 years.
HG2-215Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
30Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
30 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 30
Total short
Total medium
30
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5336
Throstle Terrace Outer South West
SAP Ref: HG2-231
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-231 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has planning permission under 16/03861/FU by Keepmoat Homes Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is allocated for housing in the emerging Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-231Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
20Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 15 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 15
Total short
Total medium
15
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5337
Heights Lane, Armley Outer West
SAP Ref: HG2-206
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-206 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site first included as part of SHLAA assessment in 2016 as available.
Achievability: Short (=<5yrs)Medium market area is with impediment to delivery in the short-term.
HG2-206Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
28Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 28 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 28
Total short
Total medium
28
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5338
Ramshead Approach, Seacroft Inner Area
SAP Ref: HG2-216
Site is a large area of designated greenspace with limited tree cover. To the east of the site is the Leeds Ring Road. To the north on the opposite of the road is a large industrial area. To the south of the site is residential with more Greenspace to the west. The site also surrounds an emergecy services station that is not available for residential development.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-216 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
LCC owned and available now. Site remains available for residential.
Achievability: Short (=<5yrs)VCouncil owned and directed scheme. Part of an overall regeneration plan for the area. No impediment to delivery in the short-term.
HG2-216Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
48Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 48 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 48
Total short
Total medium
48
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5339
Towcester Avenue Outer South West
SAP Ref: HG2-232
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-232 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site has planning permission under 16/03861/FU by Keepmoat Homes Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is allocated for housing in the emerging Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG2-232Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
44Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 41 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 41
Total short
Total medium
41
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5342
The Fellmonger, North Parkway, Seacroft, Leeds, LS14 6QS Inner Area
SAP Ref: HG1-499
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 19/01/2017 and has current approval under 16/07572/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07572/FU by Mr Ross Trutch and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Landowner in discussions with Housing Growth Team
HG1-499Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
12Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
12 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5344
Site Of The Former Christ Church Vicarage, Armley Ridge Road, Leeds, LS12 Outer West
SAP Ref: HG1-501
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 26/01/2016 and has current approval under 15/03168/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/03168/FU by Real Housing Foundation - Mrs Amanda Aimes and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered.
HG1-501Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
9Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
9 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5345
101 Commercial Road, Kirkstall, Leeds, LS5 3AD North Leeds
SAP Ref: HG1-502
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 17/01549/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-502Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
36Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5346
Land Rear Of Shoulder Of Mutton Public House, Garmont Road, Leeds, LS7 3LW
North Leeds
SAP Ref: HG1-503
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07027/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-503Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
7Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5347
Site Of Former Spotted Cow, Top Moor Side, Holbeck, Leeds, LS11 9LH Inner Area
SAP Ref: HG1-504
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 09/12/2016 and has current approval under 16/04125/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04125/FU by One Leeds Plc - Mr A Sims and available for scheme to be brought forward. Correspondence received during SHLAA 2018 consultation from One Leeds PLC confirms that the site is still available for development.
Achievability: Short (=<5yrs)The site is identified for housing in the Site Allocations Plan. On the strength of an improving housing market there are no identified impediments to the site being delivered. Correspondence received during SHLAA 2018 consultation from One Leeds PLC confirms that the site is still available for development and aims to be complete in June 2019.
HG1-504Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
14Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
17 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 17
Total short
Total medium
17
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5348
Zicon House, Wade Lane, Leeds, LS2 8NL City Centre
SAP Ref: HG1-505
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/03396/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
HG1-505Site Allocations Plan ref:
Identified housingSite Allocations Plan status
Site Allocations Plan
65Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
79 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 79
Total short
Total medium
79
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5349
Temple Works Mixed Use Site City Centre
SAP Ref: MX2-35
Large site in Holbeck South Bank centred upon Temple Works. It is located to the south of Water Lane between the railway line and Siddall St comprising of a mix of plots of land. Plots to the north, west and south of Temple works are largely cleared. Plots to the east comprise occupied buildings.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-35 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
The land is either owned by Leeds City Council or Burberry PLC which is in the process of assembling land for mixed use development.
Achievability: Short (=<5yrs)This is the wider site surrounding the Temple Works building and includes a number of parcels of land available for residential development principally owned by LCC and Burberry PLC which is in the process of assembling land for mixed use development. These sites are in the SAP with a combined capacity of well over 1,200 units. Pre-application under PREAPP/11/00455 for residential development. In July 2017, the development to construct a state-of-the-art manufacturing and weaving facility on land south of Sweet St has was delayed whilst commercial decisions are made on developments across the company confirming in September 2017 the commitment to keeping manufacturing in Yorkshire. The residential, office and other supporting facilities are planned to follow as part of continuation of the delivery of Holbeck Urban Village benefiting from the new southern entrance to Leeds train station. The site is part of the wider South Bank Regeneration Framework supported by an emerging masterplan in Supplementary Planning Document. Part of the programme of sites in ‘Leeds Living’ Deal with HCA and MHCLG to accelerate housing delivery. HM Treasury confirmed in Autumn Budget negotiations with Leeds for housing deal as part of further £2.7 billion commitment to more than double the Housing Infrastructure Fund. On 21 March 2018 the Council received notification that it had been successfully shortlisted for a bid award. At May 2018 MHCLG have announced that the Leeds City Council bid to the Housing Infrastructure Fund is through to the next round of development with Homes England. The Co-development phase will allow for the Council to work up a business case for investment with Homes England for submission in December 2018. The business case will detail the strategic, financial, and commercial case for £113m of infrastructure funding across Leeds city centre to support the acceleration and delivery of new homes. Allocated site in SAP under MX2-35.
MX2-35Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
1000Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 250 250
250 250 0 0 0
0
Dwellings - current figures
Remaining capacity 1000
Total short
Total medium
500
500
Leeds SHLAA 2018 Update
SHLAA Ref: 5349
Temple Works Mixed Use Site City Centre
SAP Ref: MX2-35
Leeds SHLAA 2018 Update
SHLAA Ref: 5350
Adel Eastmoor North Leeds
SAP Ref: HG2-217
This site is a brownfield site which includes a group of vacant listed buildings in need of repair. The site is bounded to the east and south by green belt land.The site is bounded by dense and mature trees to the north west and Eastmoor Regional Secure Unit to the north which was granted pp in 2012. Adel Beck is located to the east of the site and runs in a north west to south east direction. The beck is densely covered by trees. The site is accessed from Eastmoor Lane which is relatively narrow and windy.
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as housing allocation in SAP under HG2-217 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site vacant and currently on the market
Achievability: Short (=<5yrs)High to medium market area would be likely to prove very popular as a sensitively designed scheme. This site is adjacent to identified site HG1-60 Tile Lane, therefore it is considered that both sites should be developed comprehensively.
HG2-217Site Allocations Plan ref:
Housing allocationSite Allocations Plan status
Site Allocations Plan
27Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 27 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 27
Total short
Total medium
27
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5353
Land At David Street, Holbeck
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 15/06/2016 and has current approval under 15/03167/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/03167/FU by Igloo Regeneration Partnership - Mrs H Massarella and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5353Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
72 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 72
Total short
Total medium
72
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5354
Land At Devonshire Lodge, Devonshire Avenue, Lidgett Park
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07209/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5354Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5355
Elmete Wood School, Elmete Lane, Roundhay
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07665/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5355Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
1 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 1
Total short
Total medium
1
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5356
Unit 111 Regent Street, Sheepscar
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 28/04/2016 and has current approval under 16/01540/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/01540/DPD by Citispace Properties Ltd - Mr R Kidd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5356Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
6 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 6
Total short
Total medium
6
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5357
Trafalgar House, 29 Park Place
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/06185/DPD and is under construction as at 1 April 2017.
Site is under construction as at 31st March 2017.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2017.
5357Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
5 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5359
Doncaster Monk Bridge, Whitehall Road, Leeds City Centre
SAP Ref: MX1-8
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/09/2017 and has current approval under 16/07714/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07714/FU by ART PRS Leeds GP Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)The site benefits from extant permissions for a major residential development on the site with four towers up to 33 storeys in height providing a total of 720 apartments along with the repair and refurbishment of the viaduct and provision of commercial uses within the viaduct arches. Planning approval on 21 September 2017 under 16/07714/FU for development is for up to 607 no. apartments in five buildings. The three western buildings (A,B and C) will provide 307 no. apartments intended to be made available to the Private Rented Sector (PRS) with the other two buildings (D and E) providing for open market sale. The 307 PRS units are applied for in full along with the commercial elements mainly contained within the railway arches with outline permission being sought for the open market dwellings. A further Reserved Matters application submitted on 23 April 2018 for additional 357 apartments in 14 storey and 21 storey blocks, restaurant and associated landscaping and public space submitted with site notices put up 18 May 2018 for another PRS financed scheme in the short term. Site to be allocated as MX1-8 in SAP.
MX1-8Site Allocations Plan ref:
Identified mixed useSite Allocations Plan status
Site Allocations Plan
600Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 307 300 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 607
Total short
Total medium
607
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5372A
Parlington Estate Aberford Outer North East
SAP Ref: MX2-39
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site proposed as mixed use allocation in SAP under MX2-39 as suitable for residential development. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and contributes to the planned distribution of housing land in Spatial Policy 7.
Site submitted through SHLAA and SAP process as available.
Achievability: Short (=<5yrs)Longer lead-in time (1st completion in 2022/23 - Year 5) to reflect the submitted delivery programme as part of SAP consultation and the requirement for installation of infrastructure prior to commencement and the delivery of units.
MX2-39Site Allocations Plan ref:
Mixed use allocationSite Allocations Plan status
Site Allocations Plan
792Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 100
200 200 200 92 0
0
Dwellings - current figures
Remaining capacity 792
Total short
Total medium
100
692
Leeds SHLAA 2018 Update
SHLAA Ref: 5372B
Parlington B Outer North East
SAP Ref: BL1-42
General Attributes
Site Description:
Suitability: LDF to determine
Availability: Longterm (+11yrs)
Site proposed as Broad Location for growth to contribute to the future residential development need of the district subject to a review of the housing requirements of the current development plan. Location is consistent with the Settlement Hierarchy approach set out in the Core Strategy as part of Spatial Policy 1 and potential to contribute to the planned distribution of housing land in Spatial Policy 7.
Site submitted to SHLAA process as available.
Achievability: Longterm (11+yrs)The requirement for the site to contribute to housing needs will be determined by review of the Core Strategy Selective Review (CSSR) and any future allocation of the site for housing as part of a review to the SAP according to the identified need.
BL1-42Site Allocations Plan ref:
Broad locationSite Allocations Plan status
Site Allocations Plan
1058Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 0 0 0
200 220 220 218 200
0
Dwellings - current figures
Remaining capacity 1058
Total short
Total medium
0
1058
Leeds SHLAA 2018 Update
SHLAA Ref: 5373
67 - 83 Cookridge Street, Leeds, LS2 3AW
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/02175/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5373Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
96 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 96
Total short
Total medium
96
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5374
49 St Pauls Street
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 13/10/2016 and has current approval under 16/05304/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/05304/DPD by Mr Robin Dhand and available for scheme to be brought forward. The landowner has confirmed that the site remains available for residential development during the SHLAA consultation August 2018
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme. Correspondence from landowner (Aug 2018) states that they are pressing ahead with development and aiming to complete the development by April/May 2019.
5374Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
10 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5375
2 The Embankment, Sovereign Street
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 08/12/2016 and has current approval under 16/06603/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/06603/DPD by Hampshire Pension Fund and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5375Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 41 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 41
Total short
Total medium
41
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5377
Former Site of Barfield House, Britannia Road, Morley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07145/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5377Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 8 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5378
Land Adjacent To 11 Hall Road, Armley, Leeds, LS12 1UZ
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 21/09/2016 and has current approval under 16/02732/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/02732/OT by Mr R Dhillion and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5378Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 8 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5379
Green Flag House And Park House, Cote Lane, Farsley, Pudsey, LS28 5GF
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 12/04/2017 and has current approval under 17/01039/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/01039/DPD by Sekhon Firth LLP and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5379Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
139 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 139
Total short
Total medium
139
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5380
Land Off Carlise Road, Pudsey
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 29/11/2016 and has current approval under 16/04825/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04825/FU by EP Homes Ltd - Mr J Cliff and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5380Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 8 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5381
1 Union Court, Westgate, Otley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 25/11/2016 and has current approval under 16/05790/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/05790/FU by Leeds City Council - Mr Paul Rounding and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site assessed as deliverable.
5381Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 32 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 32
Total short
Total medium
32
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5382
Bramley Liberal Club, 14 Hough Lane, Bramley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/00937/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5382Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5384
Protection House, 16 - 17 East Parade
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 10/02/2017 and has current approval under 16/04393/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/04393/FU by Mr Aimar Lombard-Natheer and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5384Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 7 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5385
Blenheim Court, Woodhouse
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/06312/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5385Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 52 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 52
Total short
Total medium
52
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5386
Baileys House Adult Residential Centre, Baileys Hill, Seacroft
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/07009/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5386Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 10 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5387
Quarry Court, High Street, Morley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 03/02/2017 and has current approval under 16/07726/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07726/DPD by Alfa Estates Ltd - Mr Firas Al Fadhili and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5387Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 9 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5388
Valley Mills, Whitehall Road, Drighlington
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 19/09/2016 and has current approval under 12/05438/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 12/05438/OT by Watts Planning Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
5388Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 22 22 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 44
Total short
Total medium
44
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5389
Former Site Of The Whinmoor Pub, Stanks Lane
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 16/06656/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5389Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 22 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 22
Total short
Total medium
22
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5390
Land Adjacent To 320 Pudsey Road, Bramley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 19/02/2007 and has current approval under 16/00790/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/00790/OT by Mr Ian Clarke and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site assessed as deliverable.
5390Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 9 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5391
Norton House, Deighton House, Wetherby
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/07255/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5391Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
7 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5393
Former Stanks Fire Station, Sherburn Road
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 12/05/2016 and has current approval under 16/01766/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/01766/OT by West Yorkshire Fire And Rescue Service and available for scheme to be brought forward.
Achievability: Short (=<5yrs)Site assessed as deliverable.
5393Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 5 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5394
Roberts Wharf, Neptune Street, Leeds, LS9 8DX
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 15/06753/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
5394Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
0Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
14 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5395
Junction Of Mabgate, Hope Road And Argyle Road, Sheepscar
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 15/06/2017 and has current approval under 15/06721/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 15/06721/FU by BETRA Ltd - Mr Kam Mogul and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 89 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 89
Total short
Total medium
89
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5397
2 - 8 Brunswick Court, Bridge Street, Sheepscar
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 02/08/2017 and has current approval under 17/03881/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/03881/DPD by Yorath and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 45 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 45
Total short
Total medium
45
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5398
51 - 53 Great George Street, Leeds
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 15/09/2017 and has current approval under 17/04903/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/04903/FU by City East Limited Rushbond PLC and available for scheme to be brought forward. The landowner has confirmed that the site remains available for residential development during the SHLAA consultation August 2018
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme. Response received from landownerRishbond during SHLAA consultation 2018 to confirm site availability andsite is due for completion this year.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
5 0 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5399
The Radius, Springwell Road, Holbeck
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 09/06/2017 and has current approval under 16/05198/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/05198/FU by Citylife (Holdings) 4 Ltd - Mr N Brown and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 224 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 224
Total short
Total medium
224
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5400
Global Court, Millshaw Court, Global Avenue
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 22/09/2017 and has current approval under 17/05216/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/05216/DPD by Megnum Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 142 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 142
Total short
Total medium
142
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5402
Former site of The Ancestor, Armley Ridge Road, Armley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 17/01127/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 14 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5403
Former Sunfield Printers, Sun Street, Stanningley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 17/00149/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 14 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5404
The Homestead Wheaters Fold, Stanningley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 03/07/2017 and has current approval under 17/02709/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/02709/FU by J M Sykes & Sons and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 9 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5405
Greencroft Works, Kirk Lane, Yeadon
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 12/09/2017 and has current approval under 16/03978/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/03978/FU by Messrs D and J Greenwood and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 8 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 8
Total short
Total medium
8
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5407
Former Yeoman Public House, Gay Lane
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 25/05/2017 and has current approval under 17/00529/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/00529/FU by Mr G Tate and available for scheme to be brought forward. SHLAA 2018 consultation correspondence from George Tate confirms availability for residential but there are current issues regarding car parking spaces.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme. SHLAA 2018 consultation correspondence from George Tate states that the delivery shcedule of 19/20 may not be achievable due to car parking concerns, therefore has been moved to 20/21.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 5 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5408
West Yorkshire Fire And Rescue Service Stonegate Road
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 20/06/2017 and has current approval under 16/06711/OT. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/06711/OT by WYFRS and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 0 12 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5409
Eden House, Alwoodley Lane, Alwoodley
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 17/07/2017 and has current approval under 16/07483/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 16/07483/FU by Loxley Homes Ltd. - Mr T Dodkins and available for scheme to be brought forward. SHLAA 2018 consultation corresponence received from Tim Dodkin confirms site is still available for residential development.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme. SHLAA 2018 consultation corresponence received from Tim Dodkin confirms site will be delivered by 19/20.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 7 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 7
Total short
Total medium
7
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5410
178 - 182 Chapeltown Road, Chapeltown
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 17/01265/FU and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 14 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5411
Salvation Army Church Hall, Opposite 123 Kirkstall Lane, Kirkstall
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 13/11/2017 and has current approval under 17/00789/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/00789/FU by Mr Ismail RMI Developments Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 12 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 12
Total short
Total medium
12
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5412
Hanover House, 22 - 24 Clarendon Road, Woodhouse
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 25/10/2017 and has current approval under 17/03250/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/03250/FU by IP Properties LTD and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 10 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 10
Total short
Total medium
10
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5413
18 East Parade, Leeds
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 06/11/2017 and has current approval under 17/05462/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/05462/FU by Space Investment Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 5 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 5
Total short
Total medium
5
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5414
Clock Buildings, Roundhay Road
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained detailed planning permission under 17/06890/DPD and is under construction as at 31st March 2018.
Site is under construction as at 31st March 2018.
Achievability: Short (=<5yrs)Site is under construction as at 31st March 2018.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 24 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 24
Total short
Total medium
24
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5415
Kimberley House, 11 Woodhouse Square, Woodhouse
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 19/12/2017 and has current approval under 17/07253/DPD. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/07253/DPD by QAR Property LTD and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 45 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 45
Total short
Total medium
45
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5416
Land Adj Agfa Graphics Ltd, Coal Road, Whinmoor
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 26/01/2018 and has current approval under 17/00548/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/00548/FU by Redrow Homes (Yorkshire) Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 30 30 11 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 71
Total short
Total medium
71
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5417
Lloyds Bank Chambers, Vicar Lane
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 17/01/2018 and has current approval under 17/03216/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/03216/FU by Archian Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 14 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 14
Total short
Total medium
14
0
Leeds SHLAA 2018 Update
SHLAA Ref: 5418
Springhead Park House, Park Lane, Rothwell
SAP Ref:
General Attributes
Site Description:
Suitability: Suitable
Availability: Short (=<5 yrs)
Site obtained planning permission on 27/02/2018 and has current approval under 17/06926/FU. Construction yet to commence as at 31st March 2018.
Site has planning permission under 17/06926/FU by RDF Building Ltd and available for scheme to be brought forward.
Achievability: Short (=<5yrs)On the strength of an improving housing market there are no identified impediments to the site being delivered in accordance with the approved scheme.
Site Allocations Plan ref:
Site Allocations Plan status
Site Allocations Plan
Site Allocations Plan capacity
23-24
Beyond plan period
18-19 19-20 20-21 21-22 22-23
24-25 25-26 26-27 27-28
Short
Medium
0 9 0 0 0
0 0 0 0 0
0
Dwellings - current figures
Remaining capacity 9
Total short
Total medium
9
0