LEED Credits Guide USA
Transcript of LEED Credits Guide USA
-
7/29/2019 LEED Credits Guide USA
1/16
LEED Credits Guide to Eaton Productsand Services
Solutions Focus
A
bigger impacton the marketplace,
a smaller footprinton the world.
New Construction andMajor RenovationsLEED-NC v2.2
-
7/29/2019 LEED Credits Guide USA
2/16
PowerChain Management helps enterprises achieve a competitive and sustainable
advantage through proactive management of the power system as a strategic, integrat-
ed asset throughout its life cycle. With Eatons distribution, generation and power quality
equipment; full-scale engineering services; and information management systems, the
power system is positioned to deliver powerful results: greater reliability, operating cost
efficiencies, effective use of capital, enhanced safety, and risk mitigation. Thats the valueof PowerChain Management.
Introduction 1
Inside the green building 2
Eaton impact on LEED-NC 5
Sustainable Sites (SS) 5
SS Credit 5.2: Site Development:Maximize Open Space 5
SS Credit 8: Light Pollution Reduction 5
Energy and Atmosphere (EA) 6
EA Prerequisite 1:FundamentalCommissioning of the Building Energy Systems 6
EA Prerequisite 2: Minimum Energy Performance 6
EA Credit 1:Optimize Energy Performance 7
EA Credit 2: On-Site Renewable Energy 7
EA Credit 3: Enhanced Commissioning 8
EA Credit 5:Measurement & Verification 8
Materials & Resources (MR) 9
MR Credit 2.1:Construction Waste Management:Divert 50% from Disposal 9
Indoor Environmental Quality 9
EQ Prerequisite 1: Minimum IAQ Performance 9
EQ Credit 5: Indoor Chemical & PollutantSource Control 9
EQ Credit 6.1:Controllability of Systems: Lighting 10
EQ Credit 7.1:Thermal Comfort: Design 10
EQ Credit 8.1: Daylight & Views:Daylight 75% of Spaces 10
Innovation & Design Process (ID) 11
ID Credit 11.4: Innovation in Design 11
ID Credit 2:LEED Accredited Professional 11
Sustainability 12
Regional Manufacturing Facilities 13
-
7/29/2019 LEED Credits Guide USA
3/16
The Powerto make a
Difference
Environmental stewardship, innovation andleadership are becoming increasingly importantas we take steps to create a sustainable environmentfor future generations by going green. This isparticularly important when it comes to constructionof new buildings or major renovations of older ones.To this end, Eaton Corporation offers a broad rangeof energy-efficient and environmentally-friendlyelectrical solutions that can help a building gogreen and qualify for Leadership in Energy andEnvironmental Design (LEED) credits through theU.S. Green Buildings Council (USGBC).
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
The LEED Green Building Rating
System is the nationallyaccepted benchmark for thedesign, construction, and opera-tion of high performance greenbuildings. LEED gives buildingowners and operators the toolsthey need to have an immedi-ate and measurable impact ontheir buildings performance.LEED promotes a whole-buildingapproach to sustainability byrecognizing performance in fivekey areas of human and envi-ronmental health: sustainablesite development, water sav-ings, energy efficiency, materials
selection, and indoor environ-mental quality.*
This document provides archi-
tects, specifying engineers,designers, building owners anothers an overview of Eatonproducts that collectively havethe potential to contribute up 27 of the 69 total credit pointstowards LEED certification.The information contained inthis document aligns with theGreen Building Rating Systemfor New Construction and MaRenovations (LEED-NC) Versio2.2 project checklist.**
*USGBC web site.
**The water savings category is not applicable to Eaton solutions and is therefore not addressed within
this document.
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/29/2019 LEED Credits Guide USA
4/16
15
5
6
2
14
13
12
11
7
34
8
10
1
9
Inside the green building
EATON CORPORATION LEED Credits Guide to Eaton Products and Services2
Eaton can help your building go green and qualify
for LEED credits through the USGBC
Tour this green building at www.eaton.com/greenbuildings
-
7/29/2019 LEED Credits Guide USA
5/16
1 Pow-R-CommandLighting Controls
Automatically turn offthe lights when a spaceis empty; reduce artificiallighting requirements;energy savings of 10 to 30%
2 Uninterruptible PowerSystems (UPS)
50% less power loss com-pared to traditional UPS
3 Variable Frequency Drives
Lower the demands on amotor, extending life;energy savings of 10 to 50%
4 ENERGY STAR andHarmonic MitigatingTransformers
Fewer harmonics meansmore efficient energyconsumption overall
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
10 Integrated FacilitiesSystems (IFS)
Switchboard structurereduces material for powersystems; reduces requiredfloor space by 40%
11 Medium Voltage Switchgear
Environmentally friendlyinsulation, avoids SF6gasan extremely harmfulgreenhouse gas
12 Refurbishing Services
Extend useful life of existingequipment, preserve naturalresources
13 Circuit Breakers
Less watts loss than fuses;can be reset, while fusesare typically discarded afterthey fail
Eaton solutions Sustainable Energy and Materials & Indoor Innovation Sites (SS) Atmosphere Resources Environment Design
(EA) (MR) Quality (EQ) Process (ID
Save Energy
Pow-R-Command Lighting Controls
Uninterruptible Power Systems (UPS)
Variable Frequency Drives
ENERGY STAR and Harmonic Mitigating Transformers
Power Xpert Software and Meters
Energy Audits
Power Factor Correction Capacitors and Filters
Paralleling Switchgear
Automatic Transfer Switches
Protect the Environment
Integrated Facilities Systems (IFS)
Medium Voltage Switchgear
Refurbishing Services
Circuit Breakers
Integrated Power Assemblies
Busway
Maximum Credits 2 15 + prerequisites 1 4 + prerequisites 5
5 Power Xpert Softwareand Meters
Monitor energy consump-tion; identify energy savingsopportunities and powerquality issues
6 Energy Audits
Eaton engineers identifysolutions to increaseenergy efficiencies
7 Power Factor CorrectionCapacitors and Filters
Decrease energyconsumption and improvepower quality
8 Paralleling Switchgear
Manage critical transitionfrom utility power toon-site power sources;make practical use of alter-native energy systems
9 Automatic Transfer Switches
Transfer essential loadsand electrical distributionsystems from utility powerto green alternative energy
sources
14 Integrated PowerAssemblies
Prefabricated, modulardesigns reduce packagingwaste, save space
15 Busway
Use less copper and steelcompare to cable andconduit; waste lessmaterial because buswayis built to exact length
Protect the environmentSave energy
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/29/2019 LEED Credits Guide USA
6/16
Protect the environment
Integrated Facilities Systems (IFS)
Medium Voltage Switchgear
Refurbishing Services
Circuit Breakers
Integrated Power Assemblies (IPA)
Busway
Save energy
Pow-R-Command Lighting Controls
Uninterruptible Power Systems (UPS)
Variable Frequency Drives
ENERGY STAR and Harmonic
Mitigating Transformers
Power Xpert Software and Meters
Energy Audits
Power Factor Correction Capacitors
and Filters
Paralleling Switchgear
Automatic Transfer Switch
EATON CORPORATION LEED Credits Guide to Eaton Products and Services4
1 2 3
654
7 98
121110
151413
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
-
7/29/2019 LEED Credits Guide USA
7/16
SS Credit 5.2:
Site Development: MaximizeOpen Space
1 Point
Intent:Provide a high ratio ofopen space to developmentfootprint to promote biodi-versity.
Requirements:*
Reduce the developmentfootprint (defined as the totalarea of the building footprint,hardscape, access roads andparking) and/or provide
vegetated open space withinthe project boundary toexceed the local zoningsopen space requirement forthe site by 25%.
Eaton impact on LEED-NC
*Note: Requirements under LEED-NC in the following pages have been abridged for brevity.
Sustainable Sites (SS)
SS Credit 8:
Light Pollution Reduction
1 Point
Intent:Minimize light tres-pass from the building andsite, reduce sky-glow toincrease night sky access,improve nighttime visibilitythrough glare reduction, andreduce development impacton nocturnal environments.
Requirements:*
FOR INTERIOR LIGHTING
All non-emergency interior
lighting shall be automaticallycontrolled to turn off duringnon-business hours. Providemanual override capability forafter hours use.
Related Eaton Solutions:
Integrated FacilitiesSystems (IFS)
The compact design of the IFSreduces the space required forelectrical distribution equip-ment by as much as 40%. Asmaller electrical room layoutcan help lead to a smallerbuilding footprint.
Uninterruptible PowerSystems (UPS)
Eatons new Powerware 9395UPS has a small footprint,requiring 50% less floor spacethan traditional UPS systemdesigns.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
FOR EXTERIOR LIGHTING
Only light areas as requiredfor safety and comfort. Do notexceed 80% of the lightingpower densities for exteriorareas and 50% for buildingfacades and landscape fea-tures as defined in ASHRAE/IESNA Standard 90.1-2004,Exterior Lighting Section,without amendments.
Circuit Breakers
In a power distribution panel,circuit breakers ranging from100 to 1200 Amps consume40 50% of the space ofcomparable fusible devices.
Variable Frequency Drives
The HVX9000 IntelliPass/IntelliDisconnect family has a
footprint that is one-third thesize of other typical bypassdrive offerings reducingbuilding space and packag-ing requirements. The designalso significantly reduces theweight of the bypass driveby 70%, decreasing shippingloads.
Integrated PowerAssemblies (IPA)
The IPA is a prefabricatedmetal enclosure containingEaton power distribution anindustrial control products.In addition to electricalswitchgear, motor controlcenters and communicationsystems, IPAs contain otherauxiliary equipment neces-
sary to complete the projectin the minimum footprintrequired. By reducing thespace required for the electrcal distribution equipment,owners can reduce the overdevelopment footprint.
Related Eaton Solutions:
Pow-R-CommandLighting Controls
Apply lighting control toreduce interior and exteriorlighting levels that adjust withavailable daylighting.
Fluorescent dimming fordaylight harvesting. Providesability to automatically main-tain preset fluorescent levels.Utilizes a light sensor inputto monitor and control thelighting levels. Also provides:
Event scheduling
Time scheduling andload override
Calculates run-time forlamps and ballasts, tracksON or OFF cycles
Impact on LEED credit qualification
Greenest Greener Gr
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/29/2019 LEED Credits Guide USA
8/16EATON CORPORATION LEED Credits Guide to Eaton Products and Services6
Energy and Atmosphere (EA)
EA Prerequisite 1:
Fundamental Commissioningof the Building EnergySystems
Required
Intent:Verify that the build-
ings energy related systemsare installed, calibrated andperform according to theowners project requirements,basis of design, and construc-tion documents.
Requirements:*
The following commission-ing process activities shallbe completed by the com-missioning team, in accor-dance with the LEED for NewConstruction 2.2 ReferenceGuide.
Verify the installation and
performance of the systemsto be commissioned.
Complete a summarycommissioning report.
Commissioning processactivities shall be com-pleted for the followingenergy-related systems, at aminimum:
Heating, ventilating, airconditioning, and refrig-eration (HVAC&R) systems(mechanical and passive)and associated controls
Lighting and daylightingcontrols
Domestic hot watersystems
Renewable energy systems(wind, solar etc.)
EA Prerequisite 2:
Minimum Energy Performance
Required
Intent:Establish the minimumlevel of energy efficiency forthe proposed building andsystems.
Requirements:*
Design the building project tocomply with both
the mandatory provisions(Sections 5.4, 6.4, 7.4, 8.4,9.4 and 10.4) of ASHRAE/IESNA Standard 90.1-2004(without amendments); and
the prescriptive require-ments (Sections 5.5, 6.5,7.5 and 9.5) or performancerequirements (Section 11) of
ASHRAE/IESNA Standard90.1-2004 (without amend-ments).
Related Eaton Solutions:
Pow-R-CommandLighting Controls
Incorporating use of creativecontrols such as occupancysensors, timers and daylightharvesting systems will assistin reducing building energyconsumption.
Uninterruptible PowerSystems (UPS)
High efficiency of 95 percentreduces total energy lossesby more than 50% when com-pared to traditional UPSs.
Variable Frequency Drives
Incorporating use of variablefrequency drives on HVAC sys-tem components such as fansand pump motors provides forsignificantly improved
efficiency, energy savings
and optimization. The energysavings can be dramatic.For example, the speed of acentrifugal fan reduced byonly 1/3 will save over 70%in energy consumption.
Power Factor CorrectionCapacitors and Filters
Power factor correction savesenergy and can also reducethe required sizes of electri-cal equipment due to lowerkVA. Power factor correctionenables your organization tobecome more environmentally
responsible without reducingthe amount of working poweravailable. This correspondsto additional savings inmaterial costs that wouldhave been used to producelarger electrical equipmentand distribution systems.
As part of a power factorcorrection system, harmonicfilters resolve the poweranomalies caused by harmon-ics that shorten equipmentlife and trigger unexpectedshutdowns. By controlling har-monics, current levels in thesystem are reduced, and heatis removed from the system.This, in turn, minimizes trou-blesome issues such as blownfuses, damaged motors, andfailed transformers extendingequipment life.
Busway
Busway sized to carry thesame current as cable willhave lower losses, improveenergy performance and it canalso be reconfigured easily asneeds change.
Related Eaton Solutions:
Pow-R-CommandLighting Controls
Programming of the lightingcontrols and any daylight-ing control aspects of thelighting system must becommissioned for optimalperformance. Eaton provides awide variety of services frominitial design consultation tostart-up, commissioning andon-going monitoring.
Variable Frequency Drives
Used as a commissioning
tool, software associated withEatons Variable FrequencyDrives can verify installationand performance character-istics of the buildings HVACsystems especially when usedin conjunction with PowerXpert metering and software.
Integrated PowerAssemblies (IPA)
An IPA from Eaton is a prefab-ricated building containing allmajor electrical equipment.It is fully wired for ease of
inspection, startup andcommissioning. The completefactory installation & wiringof these systems result in lesstroubleshooting at the jobsite.Factory wiring goes througha standard quality controlprocedure improving commis-sioning results at the jobsite.
*Note: Requirements under LEED-NC in the following pages have been abridged for brevity.
Impact on LEED credit qualification:
Greenest Greener Green
-
7/29/2019 LEED Credits Guide USA
9/16
Intent:Achieve increasinglevels of energy performanceabove the baseline in the pre-requisite standard to reduce
environmental and economicimpacts associated withexcessive energy use.
Requirements:*
Select one of the threecompliance path options.Project teams documentingachievement using any of thethree options are assumedto be in compliance with EAPrerequisite 2.
NOTE: LEED for NewConstruction projects regis-tered after June 26th, 2007 arerequired to achieve at least
two (2) points under EAc1.
OPTION 1 WHOLEBUILDING ENERGYSIMULATION (110 Points)
Demonstrate a percentageimprovement in the proposedbuilding performance ratingcompared to the baselinebuilding performance ratingper ASHRAE/IESNA Standard90.1-2004 (without amend-ments) by a whole buildingproject simulation using theBuilding Performance RatingMethod in Appendix G of the
Standard.
Intent:Encourage and rec-ognize increasing levels ofon-site renewable energyself-supply in order to reduce
environmental and economicimpacts associated with fossilfuel energy use.
Requirements:*
Use on-site renewable energysystems to offset buildingenergy cost. Calculate projectperformance by expressingthe energy produced by therenewable systems as a per-centage of the building annualenergy cost to determine thenumber of points achieved.
Use the building annualenergy cost calculated
in EA Credit 1 or use theDepartment of Energy (DOE)Commercial Buildings EnergyConsumption Survey (CBECS)database to determine theestimated electricity use.
Related Eaton Solutions:
Power XpertSoftwareand Meters
Recognizing that the use ofon-site renewable energy willrequire a means to measure
the percentage of buildingenergy requirements, PowerXpert meters and software canmeter and provide the back-bone of load control, mea-surement and monitoring foron-site power sources. Whenapplying renewable energy,every effort should be made totake advantage of net meter-ing with the local utility.
Related Eaton Solutions:
Pow-R-CommandLighting Controls
Using task and ambient light-ing control strategies willenable building occupants toadjust lighting levels to meettheir task needs as well aspersonal preferences andreduce lighting energy con-sumption by 10 to 30 percent.
Uninterruptible PowerSystems (UPS)
Eaton BladeUPS go evenfurther with a rating upwardsof 97% efficiency, further mini-mizing energy usage.
ENERGY STARandHarmonic MitigatingTransformers
Use of harmonic mitigatingtransformers (HMTs) smoothout the energy-use curve.The increasing amount ofelectronic equipment in facili-ties increases the amount ofnonlinear loads, reducing theefficiency of electronic equip-ment and creating overloadconditions. HMTs correct thissituation.
The results are 30% less
power loss when compared tostandard delta-wye designedtransformers.
Circuit Breakers
Circuit breakers waste 10 to30% less energy for equivalentloading levels when comparedto fuses. Less wasted energymeans less generated powerand therefore less greenhousegas production. (http://pps2.com/b1/watts_calc.php) forenergy and greenhouse gasreduction.)
Paralleling Switchgear
When applying renewableon-site generation, Eatonparalleling switchgear can
provide a smooth transitionEatons solutions combine thproven power circuit breakeswitchgear and circuit breakers with advanced, industryleading, microprocessor basengine generator set controfor any distributed generatioapplication.
When applying renewableenergy, every effort should bmade to take advantage of nmetering with the local utilit(See Power Xpert).
Automatic TransferSwitches
A transfer switch is a criti-cal component of any on-sitpower system. When the nomal source of power is lost,a transfer switch quickly andsafely shifts the load circuitfrom the normal source ofpower to the alternate sourcof power. This permits criti-cal loads to continue runninwith minimal or no outage.After the normal source ofpower has been restored, thre-transfer process returns
the load circuit to the normapower source. Such a procewhen combined with paral-leling switchgear allows for seamless connection of on-srenewable energy sourcesthat may operate somewhatintermittently and require sucontrol and transfer capabili
EA Credit 2:
On-Site Renewable Energy
13 Points
EA Credit 1:
Optimize Energy Performance
110 Points
EATON CORPORATION LEED Credits Guide to Eaton Products and Services*Note: Requirements under LEED-NC in the following pages have been abridged for brevity.
Impact on LEED credit qualification
Greenest Greener Gr
-
7/29/2019 LEED Credits Guide USA
10/16EATON CORPORATION LEED Credits Guide to Eaton Products and Services8
Intent:Begin the commission-ing process early during thedesign process and execute
additional activities after sys-tems performance verificationis completed.
Requirements:*
Implement, or have a con-tract in place to implementadditional commissioningprocess activities in additionto the requirements of EAPrerequisite 1 and in accor-dance with the LEED for NewConstruction 2.2 ReferenceGuide.
Related Eaton Solutions:Pow-R-Command LightingControls
Power XpertSoftwareand Meters
Energy Audits
Eatons team of profession-als can work with the com-missioning agent during thedesign phase to incorporatestrategies for optimizing build-ing performance, includingfactory-direct product manu-als, training coursework andusing third party systems aswell as toolsets on the manyEaton products such as thePowerXpert meter and Pow-R-Command lighting controls.
Eaton offers training course-work throughout the year inEnergy Management projectimplementation for custom-ers to implement their ownenergy management program.Coursework is offered throughthe Eaton University system.
Intent:Provide for the ongo-ing accountability of buildingenergy consumption over
time.Requirements:*
Develop and implement aMeasurement & Verification(M&V) Plan consistentwith Option D: CalibratedSimulation (SavingsEstimation Method 2), orOption B: Energy ConservationMeasure Isolation, as speci-fied in the InternationalPerformance Measurement &Verification Protocol (IPMVP)Volume III: Concepts andOptions for Determining
Energy Savings in NewConstruction, April, 2003.
The M&V period shall covera period of no less than oneyear of post-constructionoccupancy.
Related Eaton Solutions:
Pow-R-CommandLighting Controls
Pow-R-Command lightingcontrol panels provide ofseamless integration of light-ing and power metering func-tions and provide for ongoingaccountability for buildingenergy performance.
Power XpertSoftwareand Meters
Track building energy per-formance with Power Xpertmeters and software bycomparing predicted perfor-mance to actual performance,
broken down by componentor system. Supports theInternational PerformanceMeasurement & VerificationProtocol (IPMVP) Volume III:Concepts and Options forDetermining Energy Savingsin New Construction, April,2003. Measurement and verifi-cation strategies using PowerXpert architecture can be usedin conjunction with monitoringand trend logging of signifi-cant energy systems for ongo-ing accountability of buildingenergy performance.
Variable Frequency Drives
With Eatons VFDs, track per-formance of HVAC systems(kwh), comparing predictedperformance to actual perfor-mance, in conjunction withtrend logging for ongoingaccountability of buildingenergy performance.
EA Credit 5:
Measurement & Verification
1 Point
EA Credit 3:
Enhanced Commissioning
1 Point
*Note: Requirements under LEED-NC in the following pages have been abridged for brevity.
Impact on LEED credit qualification:
Greenest Greener Green
-
7/29/2019 LEED Credits Guide USA
11/16
MR Credit 2.1:
Construction WasteManagement: Divert 50%from Disposal
1 Point
Materials & Resources (MR)
Intent:Divert construction,
demolition and land-clearingdebris from disposal in land-fills and incinerators. Redirectrecyclable recovered resourcesback to the manufacturingprocess. Redirect reusablematerials to appropriate sites.
Requirements:
Recycle and/or salvage atleast 50% of non-hazardousconstruction and demolitiondebris. Develop and imple-ment a construction wastemanagement plan that, at a
minimum, identifies the mate-rials to be diverted from dis-posal and whether the materi-als will be sorted on-site orco-mingled. Excavated soiland land-clearing debris donot contribute to this credit.Calculations can be done byweight or volume, but mustbe consistent throughout.
Refurbishing services
By taking steps to reduce,recycle, and reuse build-ing materials, businesses
can reduce their impact onthe environment, as well asdecrease the costs of buildingnew structures and refittingexisting structures.
During major renovation work,
Eaton Electrical Services &Systems can refurbish existingequipment or recycle equip-ment for replacement parts onother vintage electrical equip-ment. Over the past seven (7)years, Eaton has preservedmore than 200,000 lbs. of cop-per and steel by refurbishingelectrical equipment for reusein the marketplace.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
Impact on LEED credit qualification
Greenest Greener Gr
www.eaton.com/greenbuildings 877-ETN-CARE
EQ Prerequisite 1:
Minimum IAQ Performance
Required
Intent:Establish minimum
indoor air quality (IAQ) perfor-mance to enhance indoor airquality in buildings, thus con-tributing to the comfort andwell-being of the occupants.
Requirements:
Meet the minimum require-ments of Sections 4 through7 of ASHRAE 62.1-2004,Ventilation for AcceptableIndoor Air Quality. Mechanicalventilation systems shall bedesigned using the VentilationRate Procedure or the appli-cable local code, whichever is
more stringent.Naturally ventilated buildingsshall comply with ASHRAE62.1-2004, paragraph 5.1.
Related Eaton Solutions:
Variable Frequency Drives
Improved occupant health andproductivity are a result ofoptimal IAQ. Eatons variablefrequency drives provide themotor control to balance theimpacts of ventilation rates onenergy use and IAQ to opti-
mize for energy efficiency andoccupant health.
Indoor Environmental Quality (EQ)
EQ Credit 5:
Indoor Chemical & PollutantSource Control
1 Point
Intent:Minimize exposure o
building occupants to potentially hazardous particulatesand chemical pollutants.
Requirements:
Where hazardous gases orchemicals may be presentor used (including garages,housekeeping/laundry areasand copying/printing roomsexhaust each space suffi-ciently to create negative prsure with respect to adjacenspaces with the doors to theroom closed.
Related Eaton Solutions:
Switchgear
Eaton does not utilize SF6 inany of its switchgear producbecause it is one of the greehouse gases listed under theKyoto Protocol with the highest global warming potentia(GWP 23,000).
-
7/29/2019 LEED Credits Guide USA
12/16EATON CORPORATION LEED Credits Guide to Eaton Products and Services10
Impact on LEED credit qualification:
Greenest Greener Green
EQ Credit 6.1:
Controllability of Systems:Lighting
1 Point
Intent:Provide a high level of
lighting system control by indi-vidual occupants or by specificgroups in multi-occupant spaces(i.e. classrooms or conferenceareas) to promote the productiv-ity, comfort and well-being ofbuilding occupants.
Requirements:
Provide individual lighting con-trols for 90% (minimum) of thebuilding occupants to enableadjustments to suit individualtask needs and preferences.
AND
Provide lighting system
controllability for all shared multi-occupant spaces to enable light-ing adjustment that meets groupneeds and preferences.
Related Eaton Solutions:
Pow-R-CommandLighting Controls
Using task and ambient light-ing control strategies will enablebuilding occupants to adjust light-ing levels to meet their task needsas well as personal preferences.
Fluorescent dimming fordaylight harvesting. Providesability to automatically maintainpresent fluorescent levels. Utilizesa light sensor input to monitorand control the lighting levels.Also provides:
Event scheduling orOne-Shot
Time scheduling andload override
Calculates run-time for lampsand ballasts, tracks ON orOFF cycles
EQ Credit 7.1:
Thermal Comfort: Design
1 Point
Intent:Provide a comfortablethermal environment thatsupports the productivityand well-being of buildingoccupants.
Requirements:
Design HVAC systems andthe building envelope to meetthe requirements of ASHRAEStandard 55-2004, ThermalComfort Conditions for HumanOccupancy. Demonstratedesign compliance in accor-dance with the Section 6.1.1Documentation.
Related Eaton Solutions:
Variable Frequency Drives
As part of a well-designedHVAC system, Eatons variablefrequency drives provide thecapability to control air speedand thus temperature controlto meet varying occupantneeds.
EQ Credit 8.1:
Daylight & Views:Daylight 75% of Spaces
1 Point
Intent: Provide for the build-ing occupants a connectionbetween indoor spaces andthe outdoors through theintroduction of daylight andviews into the regularly occu-pied areas of the building.
Requirements:*
Demonstrate, through recordsof indoor light measurements,that a minimum daylight illu-mination level of 25 footcan-dles has been achieved in atleast 75% of all regularly occu-pied areas. Measurementsmust be taken on a 10-footgrid for all occupied spaces
and must be recorded onbuilding floor plans.
Related Eaton Solutions:
Pow-R-CommandLighting Controls
Allow the lighting control sys-tem to make the connectionbetween indoor spaces andthe outdoors by controllinglighting levels with daylightharvesting and occupancycontrols.
-
7/29/2019 LEED Credits Guide USA
13/16
Power XpertSoftwareand Meters
Power Xpert Architecturehelps building operationsbeyond traditional powermanagement systems.Power Xpert Architecturecan open the door to com-municating with the rest ofyour organization, becauseit is based on the Ethernetprotocol that is the de factostandard for modern localarea communications net-works.
Once your power systemis linked to an Ethernetnetwork via the Power
Xpert Architecture, you canconnect to applications likethe building managementsystem, monitoring yourHVAC equipment, orsharing informationwith your enterpriseaccounting system.
Paralleling Switchgear
Paralleling switchgear mayallow for innovative useof waste heat for powerproduction or integrationof other renewable powersources that still requiresome grid-connectedpower. The parallelingswitchgear is a criticalcomponent to a morecomprehensive renewableenergy strategy.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
*Note: Requirements under LEED-NC in the following pages have been abridged for brevity.
Impact on LEED credit qualification
Greenest Greener Gr
www.eaton.com/greenbuildings 877-ETN-CARE
ID Credit 11.4:
Innovation in Design
14 Points
ID Credit 2:
LEED Accredited Professional
1 Point
Innovation & Design Process (ID)
Intent: To provide designteams and projects the oppor-
tunity to be awarded pointsfor exceptional performanceabove the requirements set bythe LEED-NC Green BuildingRating System and/orinnovative performance inGreen Building categoriesnot specifically addressed bythe LEED-NC Green buildingRating System.
Requirements
Credit 1.1 (1 point) Inwriting, identify the intentof the proposed innova-tion credit, the proposedrequirement for compliance,the proposed submittals todemonstrate compliance,and the design approach(strategies) that mightbe used to meet therequirements.
Credit 1.2 (1 point) Sameas Credit 1.1
Credit 1.3 (1 point) Sameas Credit 1.1
Credit 1.4 (1 point) Sameas Credit 1.1
Related Eaton Solutions:
Pow-R-Command Lighting
Controls
Wireless lighting controlintegration reduces controlwiring installation and furthercontrollability of general andtask lighting.
Capabilities are available toprovide control of windowtreatments, further enhanc-ing the daylight harvestingpotential for further energy.
Fluorescent lamps last lon-ger when dimmed and/orturned off, by as much as50%, reducing the frequency
of lamp and ballast replace-ment and therefore reducingthe raw materials needed forlighting.
Uninterruptible PowerSystems (UPS)
Advanced BatteryManagement (ABM) extendsbattery life and optimizesbattery recharge time viapatented technology, featuresthat extend battery life byup to 100% and minimizeenergy usage.
Optional temperature-compensated chargingmonitors battery temperatureand extends battery lifeeven further.
Intent: To support and encour-age the design integration
required by a LEED for NewConstruction green buildingproject and to streamline theapplication and certificationprocess.
Requirements:
At least one principal par-ticipant of the project teamshall be a LEED AccreditedProfessional (AP)
Related Eaton Solutions:
Energy Audits
Eaton employs LEEDAccredited Professionals whocan help you navigate theLEED certification system toapply the proper solutions formaximum credits.
-
7/29/2019 LEED Credits Guide USA
14/16
Many of Eatons productsdescribed in this guide pro-vide sustainable benefits notcovered by the LEED GreenBuilding Rating System suchas extending equipment life,consuming less materials orusing more environmentallyfriendly insulting gases.
Related Eaton Solutions:
Integrated FacilitiesSystems (IFS)
Integrated PowerAssemblies (IPA)
Many projects will havevarious pieces of distribu-tion equipment all headed tothe same general area of theelectrical room. Traditionalpanelboard construction con-
sists of three pieces: a backbox, interior chassis, and trim.Multiplied by the number ofpanels in the electrical room,and added to the distributionswitchboards and transform-ers, the materials add up. TheIFS and IPA come pre-config-ured, reducing the number ofpieces, in many cases, to justone or two, nearly eliminat-ing construction waste andlandfill disposal compared totraditional construction. Eventhe packaging waste is signifi-cantly reduced.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services12 *Note: Requirements under LEED-NC in the following pages have been abridged for brevity.
Sustainability
Circuit breakers
Eatons circuit breakers canbe reset and reused overand over again, essentiallyrecycled when compared toa standard fuse that must bereplaced and discarded in
compliance with specialdisposal procedures.
Pow-R-CommandLighting Controls
Integrated FacilitiesSystems (IFS)
Integrated PowerAssemblies (IPA)
Eaton has sixteen (16) regionalmanufacturing sites forstandard or custom assembledpanelboards, switchboardsand enclosed circuit breakers
as well as Pow-R-Command,Integrated Facilities Systems,and Integrated PowerAssemblies within a500-mile radius of nearlyevery US project.
Circuit Breakers
Eaton produces 600A andlarger molded case circuitbreakers in Beaver, PA within500 miles of nearly 50% of theUS population.
Variable Frequency Drives
Eaton produces its encloseddrives models HVX9000 inWatertown, WI within 500miles of much of the MidwestUS population.
Eaton Products:
A powder coat paintingsystem is used to paintEaton electrical equipment,eliminating Volatile OrganicCompounds (VOCs) that wouldbe released from conventional
solvent based paints.
Power Factor CorrectionCapacitors and Filters
Power Factor Correction mayallow for innovative use ofnormally wasted energy bymaximizing usable energy thatis distributed within the build-ing. PFC also reduces wasteby extending the life of electri-cal products such as motors,elevators and HVAC by provid-ing improved power quality tothese devices.
Busway
Busway uses less copper andsteel than cable and conduitand wastes less materialbecause it is built to exactlength.
-
7/29/2019 LEED Credits Guide USA
15/16
Located at strategic locationsthroughout the United States,these regional manufactur-ing facilities manufacture anddeliver standard or customCutler-Hammer brandedassembled panelboards,switchboards, enclosedcircuit breakers, motor controlCenters, enclosed control, LV
and MV switchgear and MVcontrolwhen and whereneeded. And with that kindof proximity to the projectsite, transportation costs andassociated fuel are reducedsignificantly. Eaton is the onlyelectrical manufacturer thatuses smaller satellitemanufacturing facilities acrossthe country to cater to indi-vidual needs using as muchregional resources as possible.
Atlanta, GA
Baltimore, MD
Chicago, IL
Cincinnati, OH
Cleveland, OH
Dallas, TX
Denver, CO
Hartford, CT
Houston, TX
EATON CORPORATION LEED Credits Guide to Eaton Products and Serviceswww.eaton.com/greenbuildings 877-ETN-CARE
Regional Manufacturing Facilities
Los Angeles, CA
Orlando, FL
Phoenix, AZ
Portland, OR
Raleigh, NC
San Francisco, CA
Seattle, WA
St. Louis, MO
Westampton, NJ
Satellite
Service Center
Power Center
Visit www.eaton.com/regionalmfg for address and phone numbers.
-
7/29/2019 LEED Credits Guide USA
16/16
Eaton Corporation
Electrical Group
1000 Cherrington Parkway
Moon Township, PA 15108
United States
877-ETN CARE (877-386-2273)
Eaton.com
2007 Eaton Corporation.All Rights ReservedPrinted in USAForm No. SA08300002ENovember 2007
Power Xpert and PowerChainare trademarks of EatonCorporation. All other trade-marks are property of theirrespective owners.
Eaton Corporation is a diversified industrialmanufacturer ranked among the largest Fortune 500companies. The electrical group is Eatons largestdivision and is a global leader in electrical control,power distribution, power quality, automation, andmonitoring products and services. Eatons electricalproducts include brands such as Cutler-Hammer,Powerware, Holec , MEM and others. Eatonprovides PowerChainTM Management solutions toserve the needs of the industrial, institutional, IT,data center, mission critical, utility, residential andOEM markets worldwide.
PowerChain Management solutions help enterprisesachieve a competitive advantage through proactivemanagement of the power system as a strategic,integrated asset throughout its life cycle. WithEatons distribution, generation and power qualityequipment; full-scale engineering services; andinformation management systems, the power systemis positioned to deliver powerful results: greater
reliability, operating cost efficiencies, effective useof capital, enhanced safety, and risk mitigation.