City of Lebanon, NH CSO Contract 11 Community Conversation March 16, 2015 Sacred Heart Church

Transcript of Lebanon CSO 11 Public Meeting Presentation

City of Lebanon, NHCSO Contract 11

Community ConversationMarch 16, 2015

Sacred Heart Church

Agenda

• Introductions• Conversation Goals• CSO Overview• General Project Overview• Small Group Sessions• Q&A

Conversation Goals

• Collect information from residentsSewer backupsLocalized flooding (street, yard, basements)Sidewalk locations (current vs. desired)Pavement widthsParking needs (existing vs. desired)Curbing (vertical vs. sloped)Tree/planting/landscaping concernsCurb cuts (existing vs. desired)

CSO Terminology

• CB = Catch Basin

• CD = Consent Decree

• CSO = Combined Sewer Overflow

• IDDE = Illicit Discharge Detection & Elimination

• LF = Linear Feet

• PL = Property Line

CSO Program Overview• September 1998 – Draft CSO Master Plan

focus on combined areas

• 2000 – 2nd Administrative Order• December 2005 – CSO Engineering Study

flow metering, hydraulic analysis, field observations, and mappingprioritized sewer separation projects

• April 2009 – CD Issued Nov 2018 – Complete Contract 11 Sewer SeparationDec 2020 – Eliminate All CSOs

CSO Contract 11 Area (feet)• Mechanic Street (2,000)• Mascoma Street (840)• High Street (600)• Worthen Street (500)• Cameron Avenue (500)• Mason Street (520)• West Street (1,070)• Child Street (590)• Granite Street (1,015)• Young Street (1,300)• Guyer Street (1,160)• Bliss Street (370)• Light Street (600)

• Bank Street Extension (1,000)• Cooper Street (250)• Bank Street Near Bank Street Extension (200)

• Bank Street Near East Park Street (250)

March 16, 2015 Meeting Area• Mechanic Street (2,000)• Mascoma Street (840)• High Street (600)• Worthen Street (500)• Cameron Avenue (500)

• Bank Street Extension (1,000)• Cooper Street (250)• Bank Street Near Bank Street Extension (200)

• Bank Street Near East Park Street (250)

Mechanic StreetMascoma to Lumber Liquidator

• Upgrading sewer• Disconnecting catch

basins from sewer• New storm drain• New water main• DOT project will

address surface features

Mascoma StreetCameron to High

Approx. ProposedComponent Existing For Discussion

Width 28’ 28’

Esplanade yes (both) no change

Sidewalk yes (both) no change (both)

Drainage Vert. Curb/CBs Vert. Curb/CBs

High StreetLight to Mascoma

• Upgrading sewer• New storm drain• New water main• DOT project will

address surface features

Worthen Cross CountryWorthen to Mascoma

Approx. ProposedComponent Existing For DiscussionWidth 17’-20’ 18’

Esplanade None None

Sidewalk None None

Drainage None Vert. Curb/CBs

Cameron AvenueGuyer to Mascoma

Approx. ProposedComponent Existing For DiscussionWidth 18’-22’ 20’

Esplanade None None

Sidewalk Partial (west) 5’ (west)

Drainage None Vert. Curb/CBs

Bank Street ExtensionCooper to Jefferson

Approx. ProposedComponent Existing For Discussion

Width 21’-25’ 22’

Esplanade none none

Sidewalk yes (north) yes (north)

Drainage Curb/CBs (north) Curb/CBs (both)

Cooper StreetApprox. Proposed

Component Existing For Discussion

Width 20’-22’ 20’

Esplanade none none

Sidewalk none none

Drainage CBs Curb/CBs

Bank StreetNear Bank Street Extension

Approx. ProposedComponent Existing For DiscussionWidth 44’ 44’

Esplanade None None

Sidewalk Yes (north) Yes (north)

Drainage Curb/CBs Curb/CBs

Bank StreetNear East Park Street

Approx. ProposedComponent Existing For DiscussionWidth N/A N/A

Esplanade N/A N/A

Sidewalk N/A N/A

Drainage N/A Connect CBs

Protection of Trees

• Walkabout with arborist will be conducted.

• Invites via mailing will be forthcoming.

• Contact City staff if you have a concern about a particular tree or planting.

Schedule• House-To-House Inspections – January 2015

• Virtual Walkabouts – March 2015*

• Project Area Survey – April 2015

• CCVT/Smoke Testing – May 2015

• Preliminary Design – July 2015*

• 75% Design – September 2015*

• Final Construction Documents – March 2016*

• Bid Period – April 2016

• Start Construction – June 2016• End Construction – December 2017

* Public Meeting

Project Contacts• Christina Hall, City Engineer

[email protected]

603.448.3112

• Mike Lavalla, Director of Public [email protected]

603.448.3112

• LebAlertalert.lebnh.net

• Ryan Wingard, Wright-Pierce Project [email protected]

603.430.3728

Small Group Sessions