Highly Productive Maintenance Execution
Trends in Mining & Defence
How automotive manufacturing best practices have been
successfully applied in non-manufacturing industries
Learning From Others
2
AGENDA
Introduction
Standard Work
The Oil & Gas Industry Challenge
Case Studies – Mining and Defence
Enabling Technology
The Way Forward / Next Steps
3
INTRODUCTION
General Manager, Partner
John Grout
Former VP Operations Tier 1 Suppliers -
>16years in the European Automotive Industry
Specialist in Developing and Implementing
Lean Production Systems in Mining, Defence,
O&G
Leading Lean Implementation, Supply Chain
Optimisation and Technology Management for
over 10 years’ in Australia & the APAC
Region
Director, Partner
Mark Haverty
Mobile technology specialist
Over 10 years’ delivering technology solutions
to the Oil & Gas industry
Leading Codealign’s technology partnership
with SECORA
Delivery of disruptive technology solutions to
Nissan, E.ON, Tesco, G4S and Walmart
4
Strategic direction of
the majority of major
mining companies
Basic Competencies
for the Mining Sector
EVOLUTION OF EXECUTION OPTIMISATION
2010 – 2016 2013 – 2015 2012 – 2016
Pro
du
ctivity an
d S
ustain
ab
ility
Felt Leadership
Frontlline
Supervision
Tool Time Focus
Quick Change Over
(QCO)
BREAKTHROUGH
Standard Work
Technology Apps
2016 Onwards
5
Our deployment approach starts with personal engagement to educate and nurture the waste elimination philosophy.
During implementation we coach and support the right behaviours displayed by work crews when dealing with variance to standards and abnormalities.
We use state of the art technology to provide tailored solutions for sustainable improvements. Our approach covers systems, processes, technology, hearts and minds
KEYS TO SUSTAINABLE IMPROVEMENT
Our deployment approach starts with
personal engagement to educate and
nurture the waste elimination philosophy
We use state of the
art technology to
provide tailored
solutions for
sustainable
improvements.
Our approach
covers systems,
processes,
technology as well
as people (hearts
and minds)
During implementation we coach and
support the right behaviours displayed by
work crews when dealing with variance to
standards and abnormalties
6
WHAT IS STANDARD WORK?
Step
#
Work Steps NVA Auto
Time Elements
1
VA ENVA Walk
ASSEMBLE CLUTCH PIPE 4 2
2 TEMP FIT CLUTCH PIPE ASSY TO BODY
2 6
3 PICK UP AIR TOOL
2 1
4 SECURE CLUTCH PIPE ASSY TO BODY
2 2
5 RETURN AIR TOOL AND PICK UP WASHER PIPE 3 1
6 TEMP FIT WASHER PIPE TO BODY 9 1
7 PICK UP ROOF RAIL 2 5
8 TEMP FIT ROOF RAIL TO BODY
2 4
9 PICK UP AIR TOOL & 3 NUTS
2 2
10 SECURE ROOF RAIL
2 7
21 !! Total Walk Time
FL
OW
RA
CK
Too
l
7
4
2
1
3
6
8
9
5
10
AUTOMOTIVE EXAMPLE OPTIMISING THE WORK CELL
7
STANDARD WORK, WES, YAMAZUMI
3. YAMAZUMI
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
2. Work Element Sheets 1. Standard Work
Note: The Supervisor plays a critical role in this system as the custodian of
Standard Work and driver of CI. Leadership Development will be a key
component of successful implementation
8
STANDARD WORK
Standard Work
Standard Work: Configured like
a playlist in iTunes with songs
from the iTunes library
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Library
Work Element Sheet Library: Populated with ‘best practice’
standard work elements. to be configured as required for the
Standard Work Sheets/Programs
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
9
Mining – Haul Truck Servicing (500hr)
> 60% Reduction
Case Study
10
SCOPING & PLANNING 500HR SERVICE
d
An Industrial Engineering
approach was then taken
to logistically analyse the
location of activities
around the truck and the
logical numbers of
Standard Work, Work
Element Sheets and
Elements
11
RESULTING STD. WORK FOR TRUCK SERVICE
Task Order Map
Inspect condition of side walls3
Date:
Supervisor Sign Off:
Initial Reading
Revision No: 1.1 Revision Date: Oct 2016
Standardised Work Sheet
Inspect condition of side walls2
Inspect condition of tyre bead3
Inspect condition of side walls3
1.5Inspect condition of tyres.2
6 Inspect RH Rear Suspension Joint
Inspect condition of tyre bead2
1.5Inspect condition of tyres.3
Inspect valve hardware1
Measure tyre tread depths
Inspect Rear Magnetic Plug & Hub Oil Level4
Inspect valve hardware1
Measure tyre tread depths3
5 Inspect RH Front Suspension Joint
Inspect wheel studs, flanges for loose or missing nuts or bolts.1
35
25
27
26
37
36
40
38 2 Measure tyre tread depths
33
28 3
32 1 Inspect the condition of wheel rims.
31 1 Inspect wheel studs, flanges for loose or missing nuts or bolts.
29
39 6 Inpsect LH Rear Suspension Joints
0.3
0.8
Process Name: 793F 500hr service
Product Name: 500hr Fitter 1 Name:
0.75
No Wes No Work Element DescriptionVA NVA Time
Start at Tyre P1 - LH Front 0.25
3 1 Inspect valve hardware
1 1 Inspect wheel studs, flanges for loose or missing nuts or bolts.
2 1 Inspect the condition of wheel rims.
Inspect condition of tyre bead6 3
0.75
1.5
4 2 Inspect Front Magnetic Plug & Hub Oil Level
5 3 Inspect condition of tyres.
7 3 Inspect condition of side walls
8 3 Measure tyre tread depths
0.25
0.75
12 1 Inspect the condition of wheel rims.
9 5 Inspect LH Front Suspension Joint
10 Walk to Tyre P2 - RH Front
11 1 Inspect wheel studs, flanges for loose or missing nuts or bolts.
Inspect condition of tyres.15 3
0.75
1.5
13 1 Inspect valve hardware
14 2 Inspect Front Magnetic Plug & Hub Oil Level
16
17
0.8
Walk to Tyre P4 - RH Rear 0.321
18
20
19
Inspect condition of tyre bead3
23
24
30
Inspect Rear Magnetic Plug & Hub Oil Level34 4 0.8
22 1 Inspect the condition of wheel rims.
0.8
Walk to Tyre P3 - LH Rear
1
10
11
20
21
30
31
12
IMPLEMENTED SYSTEM
Work Sequence Board Standard Work Sheets Performance Board
13
RESULTS
Original Setup Time
Step 1: Detail Steps &
Separate (internal /
external)
Step 2: Change the
internal to external steps
Step3: Rationalise the
internal steps
Step 4 (TBD): Design for
maintenance
T4 T3 T0 T1 T2
Time
External Internal
297 min
196 min
165 min
120 min
60 min
(estimate)
14
Defence – Helicopter Maintenance Downtime
50% Reduction
Case Study – Royal Australian Navy
15
RAN – SEAHAWK HELICOPTER SERVICE
An Industrial Engineering
approach was then taken to
logistically analyse the location
of activities around the
helicopter and the logical
numbers of Standard Work,
Work Element Sheets and
Elements
16
24
25
21
22
23
Sign Off
TL SV QA
2
Standardised Work Sheet Product Name: Seahawk FLC LAMY 1&2 Key Point Symbols
No Wes No Work Element DescriptionVA NVA Time
Revision No: 1.1 Revision Date: Feb 2011 Process Name: Daily Flightline Check
3 3 Hydraulic Systems Y 2
Short Vibration Analysis
Y 4.8
Y 25
Flightline Check (Daily - Overnight)
1 1 Environmental Control System
2
1.5
3.8
5
5
5 5 Engine Drive Shaft and Air Inlet Assembly Y
Main Transmission and Cargo Hook Support Y6 6
4 4 Flight Controls Y
8 8 Service part return (Bag & tag) Y
9
7 7 Visual inspection - Sensors Y
Y 6.25
Engine Drive Shaft and Air Inlet Assembly
1
Y 8.7510 1
12 3 Tail Rotor Drive Shafts Y
11 2 Transmission Systems 1
13
2.5
2.5
5
13 4 Tail Rotor Drive Shafts Y
Transmission Systems 2 Y14 5
16 7 Flight controls - Tail Rotor Cables 1 Y
17 8 Flight controls - Tail Rotor Cables 2 Y
15 6 Main and Tail Shock Struts Y
Service part return (Bag & tag) Y
3.5
3.5
118 9
20
19
43
Sheet No 1 of 1
44
Total Time (hours) 48.1
D
( 1
3
3 4
4
7
2
1
6
78
2
9 5
81
( 2
5
6
STORE
RAN – SEAHAWK HELICOPTER SERVICE
17
RELEVANT EXPERIENCE - DEFENCE
Submarine Capability Improvement Program (Collins Class)
Design & implement Lean-based CI program
Cross-functional training, implementation, change management
~$0.5Bn saving over the remaining asset life
Minor War Vessels Logistics CI Program
Establish & implement framework across 1st & 2nd line logistics
Standardise processes & procedures across all the FLSE
ROI ~8.0x . Critical asset availability increase by 30%
HUMVEE – MRAP Joint Program (Afghanistan)
Fielding capacity increased from 30-90 vehicles per week using Standard Work
Design and implementation
200% increase in throughput for critical equipment manufacture
18
INOVATIVE APPLICATION - CONSTRUCTION
Lendlease CLT Factory, Toyota Production System
Lean Construction, Lean Manufacturing, Lean Life Cycle Cost Optimisation
Standard Work developed and implemented for entire delivery process (from factory to site)
APQP methodology manufacturing process (factory layout, logistics, training requirements and
internal capabilities) in parallel with the factory design
Automotive style manufacturing facility taken to the construction industry
Just in Sequence Supply Chain Setup
19
Enabling Technology
20
ENABLING MOBILE READY STD. WORKS
Work Element Sheets Standard Work Sheets
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
Work Element Sheet Care Points Knack Quality Safety Environment Critical
Secure ash tray to J-gate Trim & Final
WL4/02/077 SL402003A casting Assembly
Line Four
S-Type
Standard
Working Position
1. Safety Shoes 5. Hard Hat 9. Ear Plugs
2. Safety Glasses 6. Cap 10. Wrist Cover
3. Mask/Visor 7. Gloves 11. Arm Cover
8 Apron
1 # Obtain two ash tray fixing screws. # From toolbox. # To secure ash tray.
2 # Secure ash tray. # Position two screws through ash tray into J-gate casting. # To hold down ash tray in place.
3 # Obtain battery gun and secure. # Pick-up battery gun from toolbox. Place screw on bit of gun, # To secure ash tray.
and secure and torque off both fixings.
WES No. SWC No. NVA
6
GSPAS No. / EOS Numbers: FTC00670
0.31.5No2 Phillips Bit
ENVA
28/01/2004
Date
Attachment
Dept
Area
Key Point (HOW)
Model
Spec
Protection
4. High Vis Vest
NOM
ICON
Sup'r/PLOp's/Assoc'sGL/TLOriginator Engineer Sup'nt/PAM
Major Step (WHAT) Reason (WHY)
L3S1
1 3
C4
L4
R1 R2 R3
C1 C2 C3
L1 L2
1
VAElement Description
R4
VARRTGTool
Battery Gun
E C
21
STANDARD WORKS APP
Supports the process of implementing
Standard Work processes
Simple user interface to streamline the
user experience
Apply and monitor safety regulations
Capture data associated to Standard
Works through, barcode, QR code,
photo, video, text and user forms
Instant updates to Standard Works
Standard Works App – Login Page
22
Standard
Work module
Fault
Reporting
module
Works Order
module
Tools for
Diagnostics
module
GPS Tracking
& Maps
module
???
EXAPANDABLE INNOVATION
Lean
Manufacturin
g
Facility
Inspection
23
Thank you
Questions?
24 24
WHERE PRODUCTIVITY MEETS SUSTAINABILITY
Company Information SECORA Australasia Pty Ltd
ABN: 38 123 554 085
WWW.SECORA.COM.AU
COMMERCIAL IN CONFIDENCE
SECORA AUSTRALASIA PTY LTD
SECORA Perth
Level 24 Allendale Square,
77 St Georges Terrace,
Perth, WA 6000
+61 8 6141 3298
SECORA Sydney
Level 6,
60 Carrington Street
Sydney, NSW 2000
+61 2 9299 4582
SECORA Singapore
20 Maxwell Road
#02-01 Maxwell House
Singapore 069113
+65 9359 6305
SECORA Berlin
Steinweg 53, D-14532
Kleinmachnow,
Germany
+49 33 203 222712
SECORA Tampa
8478 Dunham Station Drive,
Tampa, FL 33647, United
States
+1 813 409 5663