Lean Supply Chain Professional Series - Atlanta, GA · ©LeanCor 2011 . Lean Review & PDCA Projects...

10
Lean Supply Chain Professional Series with Robert Martichenko

Transcript of Lean Supply Chain Professional Series - Atlanta, GA · ©LeanCor 2011 . Lean Review & PDCA Projects...

Lean Supply Chain Professional Series

with Robert Martichenko

©LeanCor 2011

The Lean Supply Chain Professional

Problem Solver

Lean SCM Expert

Lean Leader

©LeanCor 2011

The Lean Enterprise System

PDCA

Long Term Thinking

Creating Customer Value

The Purpose

Th

e

Peo

ple

Learning Organization

Change Agent

“Go See”

Problem Solver

Systems Thinker

Responsibility & Results

Students & Teacher

Standardization

Stability

Flow - JIT

Quality at the Source

Waste Elimination

Customer Focus

Th

e P

roce

ss

Respect For Humanity

©LeanCor 2011

Lean Review & PDCA Projects

Lean Supply Chain Guiding

Principles

Introduction to the Fulfillment

Stream Map

Lean Logistics Simulation –

Total Cost

The Strategic Profit Model

Systems Thinking / Total

Cost

Customer Collaboration

Outbound Logistics

Shipping / Receiving /

Yard Control

Parts Ordering / Material Planning

Collaboration Game

Supplier Collaboration

Inbound Logistics

A33 Concept

ABE Future State Mapping

Airplane Simulation

Vision, Strategy, &

Tactics – A3X

Course Roadmap

©LeanCor 2011

Lean Supply Chain - Guiding Principles

Make customer consumption visible

Increase velocity an reduce variation

1. Make consumption visible throughout the fulfillment stream

2. Reduce lead time to enable pull and reduce inventory

3. Create level flow to reduce variation and enable stability

4. Use pull systems to reduce complexity and over production

6. Increase velocity to drive flexibility for meet customer demand

5. Collaborate , solve problems and focus on process discipline

7. Lead and make decisions based on Total Cost of Fulfillment

Why : To eliminate all waste so that only value remains

©LeanCor 2011

Process: Systems Thinking

Ownership and Control

Taking Responsibility for System Wide Results

©LeanCor 2011

Takt Time for Shipping and Receiving

©LeanCor 2011

The Lean Fulfillment Stream

Customer Bases

RDC’s

Reverse Logistics

Order Mgt

Logistics Design

Customer Mgt Supplier Mgt

Traffic Mgt

Shipping Mgt Receiving Mgt

Yard Mgt

Supplier Bases

Pooled Volumes

Planned System Event Mgt Pull Replenishment Visibility & Stability Trailer Activity.

Pick Up Frequency Pick Up Verification Supplier Compliance Feedback Mechanism

Delivery Frequency Delivery Verification Window Times Customer Compliance Feedback Mechanism

Network Ownership Network Optimization Shipping Schedule Carrier Performance Reduced Lead Time

Cross Docking Yard Control Receiving Schedule Leveled Flow Delivery Frequency

Right Part ● Right Quantity ● Right Time ● Right Place ● Right Price ● Right Quality ● Right Source ● Right Service

©LeanCor 2011

Lean Supply Chain Professional Series

Building the Lean Supply Chain Problem Solver

March 13-15, 2012

September 18-20, 2012

Building the Lean Supply Chain Professional

April 10-12, 2012

October 16-18, 2012

Building the Lean Supply Chain Leader

May 15-17, 2012

November 13-15, 2012

www.scl.gatech.edu/LEAN

©LeanCor 2011

Thank You

[email protected]