LEAN Product Development (LPD)
description
Transcript of LEAN Product Development (LPD)
1Itzhak Ben-Levy LEAN Expert ©
LEAN Product Development(LPD)
October 2012
Itzhak Ben-Levy - LEAN Expert972-523579166
2Itzhak Ben-Levy LEAN Expert ©
"A systematic approach to identifying and eliminating Waste through continuous improvement "
Lean Definition
Lean is about our people – Train them, Empower them, Trust them,
Motivate them, Engage them
3Itzhak Ben-Levy LEAN Expert ©
The Development Problems• Long development cycle times
• Many redevelopment cycles
• High development costs
• Long production cycle times
• High production costs
4Itzhak Ben-Levy LEAN Expert ©
In The BoxOut Of The Box
What is the best way to understand what is going on?
Each one Separately see
Part of the picture
Everyone see together all
the picture
5Itzhak Ben-Levy LEAN Expert ©
LEANLEAN Manufacturing
LEAN Product Development
6Itzhak Ben-Levy LEAN Expert ©
The main Principles Of Lean Product Development
• Establish customer-defined value • Front-load the product development
process • Create a level product development
information flow • Organize to balance functional expertise
and cross-functional integration • Align your project through simple visual
communication
7Itzhak Ben-Levy LEAN Expert ©
IPT PRINCIPLES
• Focus on a product
• Multidisciplinary team
• Co - location
• Team working
8Itzhak Ben-Levy LEAN Expert ©
IPT Integrated Product Team
Engineering
StressManufacturi
ngQuality &System Safety
Production
IPT Leader
SUPLIER
Analysis
CUSTOMER
Ron
Bill
RonnyDanSamGil
Neb
Roth Bob
9Itzhak Ben-Levy LEAN Expert ©
LPD principle
TOOLS LEAN
FACILITATOR
IPT
PROJECT MANAGERLPD workshop
LPD TOOL
TO DO LIST
Just Do It!
10Itzhak Ben-Levy LEAN Expert ©
Workshop TO DO LISTN° PROBLEM / ISSUE / OPPORTUNITY COUNTERMEASURE / EXPECTED RESULTS START COMPLETERESPONSIBLE STATUS
Project : Team Leader: DATE :
11Itzhak Ben-Levy LEAN Expert ©
Development plan workshop
12Itzhak Ben-Levy LEAN Expert ©
LPD Gates
1. SRR – SYSTEM REQUIREMENT REVIEW
2. DRR – DESIGN READINESS REVIEW
3. PDR – PELIMINARY DESIGN REVIEW .
4. CDR – CRITICAL DESIGN REVIEW.
5. TRR –TESTS READINESS REVIEW
6. TRDR– TEST RESULT DESIGN REVIEW
7. PRR– PRODUCTION READINESS REVIEW
8. FAI – FIRST ARTICLE INSPECTION
13Itzhak Ben-Levy LEAN Expert ©
The process
Time – days / weeks / month
ACTIVITIES
LEGENTFUNCTIONAL
DEPARTMENTS
Main milestones
14Itzhak Ben-Levy LEAN Expert ©
• Templates for capturing new data and information• A focus on value creating activities• New insights into the development process • Real time reallocation and synchronization activities• Discover Unknown - unknown• Team identity and emotional commitment• Common language among team members• To do list identifying new corrective actions
Outcome of LPD workshop Reducing development lead time and cost by:
15Itzhak Ben-Levy LEAN Expert ©
16Itzhak Ben-Levy LEAN Expert ©16
Value to the customer
• Solving customer Problems
• Exploiting Opportunities
• The product should Look good
• The Customer should Feel good
17Itzhak Ben-Levy LEAN Expert ©17
QFD shorten cycle time by:1. Understanding value to the customer2. Exploiting customer needs3. Deriving and consolidation of the
requirements from customer needs4. Prioritizing requirements 5. Allocating requirements to the project
team
18Itzhak Ben-Levy LEAN Expert ©
ONCE
PRICE = PROFIT + COST
What the customer
pays
"by product" of the design
Determined by the
corporate
19Itzhak Ben-Levy LEAN Expert ©
NOW
COST = PROFIT - PRICE
Determined by the
corporate
Determined by the
competitorsDetermined
to the project manager
DTC - Design To Cost
20Itzhak Ben-Levy LEAN Expert ©
How the engineer now how to design?
casting welding
machiningforging
Sub contracting riveting
The cost target determined it
21Itzhak Ben-Levy LEAN Expert ©
Not important
Important
Low High
Requirements(QFD)
Accept all
Consider to delete
delete
challenge
ImplementationCost)DTC(
Reduce requirementsAnd cost
22Itzhak Ben-Levy LEAN Expert ©
Cost Reduction workshop
Projectmanager
DFMA ToolsFacilitator
Challenge the design
Multidisciplinary Team
• Requirements• Architecture• Technology• Assembly
• Reuse• COTS• Standards• Symmetry
• Tolerances• No. of Parts• Tests• Commonality
23Itzhak Ben-Levy LEAN Expert ©
Description$hr1sliding tube material 1002sliding tube assy, 143INER BODY 1304GLEND1205NUT80126ORIFICE CAP807DOWEL 48048SPACER20079RING80
10tests30011
total117037
How to integrate the production and procurement into development process
The project manager should requirea real cost status in each gate
Multidisciplinary Team
24Itzhak Ben-Levy LEAN Expert ©
Engineering
Requirements ReductionCost Reduction
Supplier
Suppliers costs reduction
Costs drivers
Requirements Priorities
25Itzhak Ben-Levy LEAN Expert ©
"What's it in for me?" Project Manager
• Shorten Time to Market • Reducing manufacturing costs• Reduction of problem solving meetings of the
project. • The project team itself solves the most problems
and takes its responsibilities without management involvement.
• Information provided to management is more reliable and realistic with maximum transparency
• Introduction of a culture that allows to deal with complex issues and find solutions agreed upon in a very short time.