Lean Games
-
Upload
iiba-uk-chapter -
Category
Business
-
view
326 -
download
1
Transcript of Lean Games
A few games for Lean/Analysis tools
Roughly in order of when they’re needed in a project
Max 5 minutes per game
Take the fear from LEAN
What’s about to happen..?
List documents
Put in a category
Assign a best before
Review at that date
Grocery Shopping Documents
Use the floor
Walk – literally – through the process
Film your feet and upload to shared space
If you have metrics, allocate time to each step during filming
Hold the data in your hands
Be the process
Keep Britain Tidy
Collate your group
Give them the process/data
Ask them to identify the 8 wastes
Write them on stickers
Put them in the pretend bin
When process improved, put in the real bin
How the Pro(totypers) Play
Acquire or make your play dough
Start making
Discuss the prototype as you make
Use it, play with it, don’t just talk
Collect your feedback data
Spend very little money
Be smart with the written word
Write for your user
Read as them on a great day
Read as them on a crappy day
Read as them on their last day
Play devil’s advocate
Devil’s advocate game
Take the product
Empower each person to argue
Invite all challenges
React and respond to each
Discover the real risks in the room